MAYO
Item Descripción Und. metrado total L M M J V
4 5 6 7 8
01.01 CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60x2.40 m UND 1.00 S/. 1,094.78 S/. 1,094.78
01.02 CERCO PROVISIONAL CON PUNTAL Y MALLA M 20.00 S/. 309.20 S/. 309.20
01.03 TRANSPORTE DE EQUIPO Y MATERIALES GLB 1.00 S/. 8,000.00 S/. 8,000.00
01.04 ENERGIA ELECTRICA PARA LA OBRA MES 2.50 S/. 1,562.50 S/. 1,562.50
01.05 AGUA PROVISIONAL PARA LA OBRA MES 2.50 S/. 375.00 S/. 375.00
01.06 CASETA DE GUARDIANIA, OFICINA Y ALMACEN PROVISIONAL M2 32.85 S/. 3,275.47 S/. 3,275.47
DE OBRA
01.07 COMEDORES - VESTUARIOS M2 20.00 S/. 1,725.80 S/. 1,725.80
01.08 SERVICIOS HIGIENICOS PORTATILES MES 2.50 S/. 2,375.00 S/. 2,375.00
02.01 ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL S/. 2,500.00 S/. 2,500.00
GLB 1.00
TRABAJO
02.02 EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 S/. 850.00 S/. 850.00
02.03 EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 S/. 7,832.00 S/. 7,832.00
02.04 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS GLB 1.00 S/. 240.00 S/. 240.00
02.05 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL S/. 8,318.80 S/. 8,318.80
COVID 19
02.05.01 PLAN PARA LA VIGILANCIA PREVENCION Y CONTROL GLB 1.00 S/. 2,500.00 S/. 2,500.00
COVID 19 EN EL TRABAJO
02.05.02 IMPLEMENTACION DE MATERIALES PARA PREVENCION UND 1.00 S/. 2,609.80 S/. 2,609.80
POR EMERGENCIA
02.05.03 EQUIPOS DE PROTECCION PERSONAL PARA LA SALUD GLB 1.00 S/. 1,477.00 S/. 1,477.00
02.05.04 EQUIPOS DE PROTECCION COLECTIVA PARA LA SALUD S/. 1,732.00 S/. 1,732.00
GLB 1.00
04.01.03 EXCAVACION DE ZANJAS PARA CIMIENTOS M3 74.32 S/. 3,400.14 S/. 3,400.14
04.01.04 RELLENO Y COMPACTACION CON MATERIAL PROPIO M3 34.30 S/. 1,152.82 S/. 1,152.82
04.01.05 ACARREO DE MATERIAL EXCAVADO A ZONA QUE M3 55.23 S/. 736.77 S/. 736.77
PERMITA ELIMINAR
04.01.06 ELIMINACION DE MATERIAL EXCEDENTE EN OBRA M3 55.23 S/. 2,430.67 S/. 2,430.67
04.02 OBRAS DE CONCRETO SIMPLE S/. 19,967.64 S/. 19,967.64
04.02.01.01 CONCRETO 1:12 PARA SOLADOS E=4" M3 4.00 S/. 1,115.16 S/. 1,115.16
04.02.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS S/. 12,870.55 S/. 12,870.55
m3 68.61
MAYO
Item Descripción Und. metrado total L M M J V
4 5 6 7 8
04.03.01 ZAPATAS S/. 2,113.21 S/. 2,113.21
04.03.01.01 ENCOFRADO Y DESENCOFRADO EN ZAPATA M2 9.60 S/. 838.56 S/. 838.56
04.03.01.02 ZAPATAS : ACERO FY=4200 KG/CM2 kg 38.00 S/. 270.18 S/. 270.18
04.03.01.03 ZAPATAS : CONCRETO F'C=210 KG/CM2 m3 2.40 S/. 1,004.47 S/. 1,004.47
04.03.02.02 COLUMNAS : ACERO FY=4200 KG/CM2 kg 1,657.00 S/. 11,781.27 S/. 11,781.27
04.03.02.03 COLUMNAS : CONCRETO F'C=210 KG/CM2 m3 9.74 S/. 4,216.54 S/. 4,216.54
04.03.03 VIGAS S/. 14,720.40 S/. 14,720.40
04.03.03.02 VIGAS, ACERO FY=4200 KG/CM2 kg 1,135.00 S/. 8,069.85 S/. 8,069.85
04.03.03.03 VIGAS, CONCRETO F'C=210 KG/CM2 m3 6.36 S/. 2,661.85 S/. 2,661.85
04.03.04.03 VIGAS DE CONFINAMIENTO: CONCRETO F'C=210 KG/CM2 S/. 98.79 S/. 98.79
m3 0.25
04.03.05.02 LOSAS ALIGERADAS : ACERO FY=4200 KG/CM2 kg 596.00 S/. 4,237.56 S/. 4,237.56
04.03.05.03 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA und 1,159.83 S/. 7,875.25 S/. 7,875.25
TECHO ALIGERADO
04.03.05.04 LOSAS ALIGERADAS : CONCRETO F'C=210 KG/CM2 CON S/. 6,041.03 S/. 6,041.03
m3 12.89
ADITIVO
04.03.06 MESA DE CONCRETO - COCINA S/. 826.70 S/. 826.70
04.03.06.01 MESA DE CONCRETO, ENCOFRADO Y DESENCOFRADO M2 1.74 S/. 134.75 S/. 134.75
04.03.06.02 MESA DE CONCRETO, ACERO FY=4200 KG/CM2 kg 86.94 S/. 618.14 S/. 618.14
04.03.06.03 MESA DE CONCRETO, CONCRETO F'C=210 KG/CM2 M3 0.17 S/. 73.81 S/. 73.81
05.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X m2 245.45 S/. 29,073.55 S/. 29,073.55
1.5CM.
05.02 REVOQUES, ENLUCIDOS Y MOLDURAS S/. 18,110.46 S/. 18,110.46
05.02.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 36.62 S/. 937.47 S/. 937.47
05.02.02 TARRAJEO INTERIORES MORTERO 1:5, e=1.50 cm. m2 258.93 S/. 7,332.90 S/. 7,332.90
05.02.03 TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.50 cm. M2 202.60 S/. 7,273.34 S/. 7,273.34
05.02.04 TARRAJEO DE VIGAS M2 4.24 S/. 270.60 S/. 270.60
05.04.01.01 CONFORMACION DE BASE GRANULAR PARA VEREDAS m2 5.00 S/. 67.60 S/. 67.60
MAYO
Item Descripción Und. metrado total L M M J V
4 5 6 7 8
05.04.01.03 VEREDA DE CONCRETO DE E=0.10 M F'c=175 KG/CM2 M2 0.75 S/. 54.47 S/. 54.47
INC. ACAB C.A. 1:2 E=1 CM
05.04.01.04 JUNTAS ASFALTICA EN VEREDAS E=1" ML 5.00 S/. 37.45 S/. 37.45
05.06.02 PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 M2 36.00 S/. 470.52 S/. 470.52
MANOS ANTIC)
05.06.03 CERRADURA DOS GOLPES EN PUERTA PZA 24.00 S/. 1,763.76 S/. 1,763.76
05.07 VENTANAS Y VIDRIOS S/. 2,995.70 S/. 2,995.70
05.07.01 VENTANA VIDRIO CRUDO INCOLORO 6mm P2 20.48 S/. 473.50 S/. 473.50
05.07.02 REJA PARA VENTANA DE FIERRO FUNDIDO m2 9.88 S/. 2,079.64 S/. 2,079.64
06.01.02 RED DE DIST TUBERIA 1/2' PVC SAP m 10.00 S/. 282.50 S/. 282.50
06.01.03 RED DE DIST TUBERIA 3/4' PVC SAP m 25.45 S/. 818.22 S/. 818.22
06.01.04 VALVULA COMPUERTA DE BRONCE DE 1/2" pza 3.00 S/. 258.30 S/. 258.30
06.01.05 REDUCCIONES PVC-SAP 3/4" A 1/2" UND 3.00 S/. 84.30 S/. 84.30
06.02.01 SALIDA DE DESAGUE EN PVC 2" PTO 7.00 S/. 707.56 S/. 707.56
06.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 4.00 S/. 426.20 S/. 426.20
06.02.03 SALIDA PARA VENTILACION PTO 2.00 S/. 181.02 S/. 181.02
06.02.04 TUBERIA DE PVC PARA DESAGUE DE 2" INC. ACCESORIOS M 23.47 S/. 1,397.17 S/. 1,397.17
06.03.02 CODO PVC SAL 2"x45° UND 3.00 S/. 85.20 S/. 85.20
06.03.03 SUMIDERO CROMADO DE 2" und 3.00 S/. 135.75 S/. 135.75
06.03.04 REGISTRO DE BRONCE CROMADO DE 4" UND 3.00 S/. 237.36 S/. 237.36
06.03.05 CAJAS DE REGISTRO DE DESAGUE INC. TAPA Y UND 1.00 S/. 96.20 S/. 96.20
ACCESORIOS
OBRA : "CONSTRUCCIÓN DE LOCAL COMUNAL DE USOS MULTIPLES EN EL ANEXO DE PATI, DEL DISTRITO DE SAN JUAN DE TARUCANI, PROVINCIA Y REGIÓN AREQUIPA"
MAYO
Item Descripción Und. metrado total L M M J V
4 5 6 7 8
06.04 APARATOS SANITARIOS S/. 1,644.17 S/. 1,644.17
06.04.01 INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO PZA 2.00 S/. 625.78 S/. 625.78
(NAC. BLANCO)
06.04.02 LAVATORIOS BLANCO CON PEDESTAL pza 2.00 S/. 620.00 S/. 620.00
06.04.03 LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO PZA 1.00 S/. 398.39 S/. 398.39
CUELLO
06.05 VARIOS S/. 4,664.66 S/. 4,664.66
06.05.01 EXCAVACION DE ZANJAS RED DE AGUA M 32.58 S/. 1,490.54 S/. 1,490.54
06.05.02 EXCAVACION DE ZANJAS PARA DESAGUE M3 10.52 S/. 449.20 S/. 449.20
06.05.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO M3 9.75 S/. 327.70 S/. 327.70
06.05.04 PRUEBA HIDRAULICA RED DE AGUA M 35.18 S/. 316.62 S/. 316.62
06.05.05 PRUEBA HIDRAULICA Y LIMPIEZA DE DESAGUE M 32.37 S/. 189.36 S/. 189.36
06.05.06 INSTALACION DE BAJADA PLUVIAL 3" M 12.97 S/. 868.21 S/. 868.21
06.05.07 EMPALME A RED DE DESAGUE UND 1.00 S/. 576.12 S/. 576.12
06.05.08 EMPALME A RED EXISTENTE, AGUA UND 1.00 S/. 446.91 S/. 446.91
07.01 SALIDA DE ALUMBRADO DE TECHO PTO 20.00 S/. 2,610.60 S/. 2,610.60
07.02 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PTO 37.00 S/. 4,358.23 S/. 4,358.23
07.03 SALIDA INTERRUPTOR DE CENTRO DE LUZ PTO 6.00 S/. 518.34 S/. 518.34
07.04 SALIDA INTERRUPTOR TRIPLE PTO 5.00 S/. 649.45 S/. 649.45
07.05 CABLE ELECTRICO TW AWG-MCM 2.5 mm2 M 237.71 S/. 1,309.78 S/. 1,309.78
07.06 CABLE ELECTRICO TW AWG-MCM 4 mm2 M 172.46 S/. 1,350.36 S/. 1,350.36
07.07 INSTALACION DE TABLERO DE DISTRIBUCIÓN pza 1.00 S/. 255.23 S/. 255.23
07.08 EQUIPO FLUORECENTE DE 2 X 40 WATTS CON REJILLA und 15.00 S/. 3,129.45 S/. 3,129.45
07.09 ARTEFACTO TIPO GLOBO 350 mm VM 80 W UND 5.00 S/. 784.15 S/. 784.15
07.10 POZO PUESTA A TIERRA (10 OHMS) UND 1.00 S/. 1,006.18 S/. 1,006.18
07.11 CONEXION DOMICILIARIA DE ELECTRICIDAD GLB 1.00 S/. 713.45 S/. 713.45
08.02 ESCRITORIO DE MADERA INC SILLA JGO 2.00 S/. 600.00 S/. 600.00
08.08 MUEBLES BAJOS PARA COCINA GLB 1.00 S/. 1,300.00 S/. 1,300.00
09.01.01.02 COLUMNAS : ACERO FY=4200 KG/CM2 KG 470.00 S/. 3,341.70 S/. 1,447.55
09.01.01.03 COLUMNAS : CONCRETO F'C=210 KG/CM2 M3 1.26 S/. 545.47 S/. 3,341.70
09.02.01.02 VIGAS, ACERO FY=4200 KG/CM2 KG 441.00 S/. 3,135.51 S/. 1,162.75
OBRA : "CONSTRUCCIÓN DE LOCAL COMUNAL DE USOS MULTIPLES EN EL ANEXO DE PATI, DEL DISTRITO DE SAN JUAN DE TARUCANI, PROVINCIA Y REGIÓN AREQUIPA"
MAYO
Item Descripción Und. metrado total L M M J V
4 5 6 7 8
09.02.01.03 VIGAS, CONCRETO F'C=210 KG/CM2 M3 2.50 S/. 1,046.33 S/. 3,135.51
09.03.01 MESA DE CONCRETO - COCINA S/. 1,844.45 S/. 1,046.33
S/. 980.39 S/. 1,844.45
09.03.01.01 MESA DE CONCRETO, ENCOFRADO Y DESENCOFRADO M2 12.66
09.03.01.02 MESA DE CONCRETO, CONCRETO F'C=210 KG/CM2 M3 1.99 S/. 864.06 S/. 980.39
S/. 864.06
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X S/. 6,645.05 S/. 6,645.05
10.01.01 M2 56.10
1.5CM.
10.02 PISOS S/. 17,215.45 S/. 6,645.05
10.02.01 PISOS Y COBERTURAS S/. 17,215.45
10.02.01.01 CONTRAPISO 2", ACABADO = 1CM FROTACHADO M2 140.00 S/. 5,923.40 S/. 17,215.45
10.02.01.02 PISOS CERAMICO DE 45 X 45CM M2 150.80 S/. 10,696.24 S/. 17,215.45
10.02.01.03 PISOS CERAMICO DE 45 X 45CM - ANTIDESLIZANTE M2 8.40 S/. 595.81 S/. 5,923.40
10.03 ZOCALOS Y CONTRAZOCALOS S/. 3,514.61 S/. 10,696.24
11.01.02 RED DE DIST TUBERIA 1/2' PVC SAP M 10.00 S/. 282.50 S/. 1,146.50
11.01.03 VALVULA COMPUERTA DE BRONCE DE 1/2" PZA 3.00 S/. 258.30 S/. 605.70
11.02 INSTALACION DESAGUE S/. 1,961.82 S/. 282.50
11.02.01 SALIDA DE DESAGUE EN PVC 2" PTO 7.00 S/. 707.56 S/. 258.30
11.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 4.00 S/. 426.20 S/. 1,961.82
S/. 676.26 S/. 707.56
11.02.03 TUBERIA DE PVC PARA DESAGUE DE 2" INC. ACCESORIOS M 11.36
11.03.02 CODO PVC SAL 2"x45° UND 3.00 S/. 85.20 S/. 455.67
11.03.03 SUMIDERO CROMADO DE 2" UND 3.00 S/. 135.75 S/. 76.48
11.03.04 REGISTRO DE BRONCE CROMADO DE 4" UND 2.00 S/. 158.24 S/. 85.20
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO S/. 625.78 S/. 158.24
11.04.01 PZA 2.00
(NAC. BLANCO)
11.04.02 LAVATORIOS BLANCO CON PEDESTAL pza 2.00 S/. 620.00 S/. 1,644.17
OBRA : "CONSTRUCCIÓN DE LOCAL COMUNAL DE USOS MULTIPLES EN EL ANEXO DE PATI, DEL DISTRITO DE SAN JUAN DE TARUCANI, PROVINCIA Y REGIÓN AREQUIPA"
MAYO
Item Descripción Und. metrado total L M M J V
4 5 6 7 8
LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO S/. 398.39 S/. 625.78
11.04.03 PZA 1.00
CUELLO
S/. 620.00
12 INSTALACIONES ELECTRICAS S/. 7,267.90 S/. 398.39
12.05 CABLE ELECTRICO TW AWG-MCM 4 mm2 M 172.46 S/. 1,350.36 S/. 649.45
12.06 INSTALACION DE TABLERO DE DISTRIBUCIÓN PZA 1.00 S/. 255.23 S/. 207.78
12.07 EQUIPO FLUORECENTE DE 2 X 40 WATTS CON REJILLA UND 10.00 S/. 2,086.30 S/. 1,350.36
S/. 255.23
13.03 BARANDA METALICA DE TUBO DE 2" E=1.8MM M 10.80 S/. 1,566.00 S/. 1,000.00
ESTRUCTURA METALICA PARA COBERTURA(TECHO) S/. 34,300.00 S/. 1,300.00
13.04 GLB 1.00
SEGUN PLANOS
COBERTURA DE CALAMINON TR4 ALUZINC, SEGUN S/. 24,380.00 S/. 1,566.00
13.05 GLB 1.00
PLANOS
FALSO CIELO RASO CON BALDOSAS PREFABRICADAS S/. 14,625.00 S/. 34,300.00
13.06 M2 150.00
60X60
S/. 24,380.00
S/. 14,625.00
INFORME FINAL DEL RESIDENTE
I.-DATOS GENERALES
Nombre del Proyecto "CONSTRUCCIÓN DE LOCAL COMUNAL DE USOS MULTIPLES EN EL ANEXO DE PATI, DEL DISTRITO DE SAN JUAN DE TARUCANI, PROVINCIA
Y REGIÓN AREQUIPA"
II.- ANTECEDENTES:
1.1.- Ubicación
Region: AREQUIPA Provincia : AREQUIPA
06 DE SETIEMBRE DEL 2021 06 DE SETIEMBRE DEL 2021 02 DE FEBRERO DEL 2022 08 DE MAYO DEL 2022
Ing. Jheferson Claudio Avila Rodriguez 06 de Setiembre del 2021 08 de Mayo del 2022 168 D.C.
Ing. Hitler Juan Yucra Yucra 06 de Setiembre del 2021 08 de Mayo del 2022 168 D.C.
4.0.- RESPONSABILIDADES
RESP. DIRECCION TEC. RESIDENTE DE OBRA : ING. JHEFERSON CLAUDIO AVILA RODRIGUEZ
RESP. DIRECCION TEC. SUPERVISOR DE OBRA : ING. HITLER JUAN YUCRA YUCRA
5.0.- DESCRIPCION DE LA OBRA
EL presente proyecto "CONSTRUCCIÓN DE LOCAL COMUNAL DE USOS MULTIPLES EN EL ANEXO DE PATI, DEL DISTRITO DE SAN JUAN DE TARUCANI,
PROVINCIA Y REGIÓN AREQUIPA", consta en la ejecución de obras:
EQUIPAMIENTO
Se ha considerado mobiliario para las áreas de intervención, como sillas, escritorios, estantes, cocina, atrio, mesa de reuniones, monumento de
fibra de vidrio y muebles altos y bajos para cocina de acuerdo a sus necesidades los cuales se encuentran especificados en planos, metrados y
especificaciones técnicas.
PRIMER NIVEL
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60x2.40 m 100.00%
CERCO PROVISIONAL CON PUNTAL Y MALLA 100.00%
TRANSPORTE DE EQUIPO Y MATERIALES 100.00%
ENERGIA ELECTRICA PARA LA OBRA 100.00%
AGUA PROVISIONAL PARA LA OBRA 100.00%
CASETA DE GUARDIANIA, OFICINA Y ALMACEN PROVISIONAL DE OBRA 100.00%
COMEDORES - VESTUARIOS 100.00%
SERVICIOS HIGIENICOS PORTATILES 100.00%
SEGURIDAD Y SALUD
ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO 100.00%
EQUIPOS DE PROTECCION COLECTIVA 100.00%
EQUIPOS DE PROTECCION INDIVIDUAL 100.00%
RECURSOS PARA RESPUESTA ANTE EMERGENCIAS 100.00%
PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL COVID 19
PLAN PARA LA VIGILANCIA PREVENCION Y CONTROL COVID 19 EN EL TRABAJO 100.00%
IMPLEMENTACION DE MATERIALES PARA PREVENCION POR EMERGENCIA 100.00%
EQUIPOS DE PROTECCION PERSONAL PARA LA SALUD 100.00%
EQUIPOS DE PROTECCION COLECTIVA PARA LA SALUD 100.00%
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL 100.00%
TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION 100.00%
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
CORTE, PERFILADO Y NIVELACION 100.00%
EXCAVACION PARA ZAPATAS 100.00%
EXCAVACION DE ZANJAS PARA CIMIENTOS 100.00%
RELLENO Y COMPACTACION CON MATERIAL PROPIO 100.00%
ACARREO DE MATERIAL EXCAVADO A ZONA QUE PERMITA ELIMINAR 100.00%
ELIMINACION DE MATERIAL EXCEDENTE EN OBRA 100.00%
OBRAS DE CONCRETO SIMPLE
SOLADOS
CONCRETO 1:12 PARA SOLADOS E=4" 100.00%
CIMIENTOS CORRIDOS
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS 100.00%
SOBRECIMIENTOS
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. ADIT. IMPERMEABILIZANTE 100.00%
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS 100.00%
OBRAS DE CONCRETO ARMADO
ZAPATAS
ENCOFRADO Y DESENCOFRADO EN ZAPATA 100.00%
ZAPATAS : ACERO FY=4200 KG/CM2 100.00%
ZAPATAS : CONCRETO F'C=210 KG/CM2 100.00%
COLUMNAS
COLUMNAS : ENCOFRADO Y DESENCOFRADO 100.00%
COLUMNAS : ACERO FY=4200 KG/CM2 100.00%
COLUMNAS : CONCRETO F'C=210 KG/CM2 100.00%
VIGAS
VIGAS, ENCOFRADO Y DESENCOFRADO 100.00%
VIGAS, ACERO FY=4200 KG/CM2 100.00%
VIGAS, CONCRETO F'C=210 KG/CM2 100.00%
VIGAS DE CONFINAMIENTO
VIGAS DE CONFINAMIENTO: ENCOFRADO Y DESENCOFRADO 100.00%
VIGAS DE CONFINAMIENTO: ACERO FY=4200 KG/CM2 100.00%
VIGAS DE CONFINAMIENTO: CONCRETO F'C=210 KG/CM2 100.00%
LOSA ALIGERADA
LOSAS ALIGERADAS : ENCOFRADO Y DESENCOFRADO 100.00%
LOSAS ALIGERADAS : ACERO FY=4200 KG/CM2 100.00%
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO 100.00%
LOSAS ALIGERADAS : CONCRETO F'C=210 KG/CM2 CON ADITIVO 100.00%
MESA DE CONCRETO - COCINA
MESA DE CONCRETO, ENCOFRADO Y DESENCOFRADO 100.00%
MESA DE CONCRETO, ACERO FY=4200 KG/CM2 100.00%
MESA DE CONCRETO, CONCRETO F'C=210 KG/CM2 100.00%
ESCALERAS
ESCALERA, ENCOFRADO Y DESENCOFRADO 100.00%
ESCALERA : ACERO FY=4200 KG/CM2 100.00%
ESCALERA : CONCRETO F'C=210 KG/CM2 100.00%
ARQUITECTURA
MUROS Y TABIQUES DE ALBALIÑERIA
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. 100.00%
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO, MORTERO C:A 1:5 100.00%
TARRAJEO INTERIORES MORTERO 1:5, e=1.50 cm. 100.00%
TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.50 cm. 100.00%
TARRAJEO DE VIGAS 100.00%
VESTIDURA DE DERRAMES PULIDO 100.00%
BRUÑAS DE 1x1 cm 100.00%
CIELO RASOS
TARRAJEO EN CIELO RASO 100.00%
PISOS
VEREDAS
CONFORMACION DE BASE GRANULAR PARA VEREDAS 100.00%
ENCOFRADO Y DESENCOFRADO DE VEREDAS 100.00%
VEREDA DE CONCRETO DE E=0.10 M F'c=175 KG/CM2 INC. ACAB C.A. 1:2 E=1 CM 100.00%
JUNTAS ASFALTICA EN VEREDAS E=1" 100.00%
FALSO PISO
CONFORMACION DE BASE GRANULAR PARA FALSO PISO 100.00%
FALSO PISO DE 4" DE CONCRETO 1:10 100.00%
PISOS Y COBERTURAS
CONTRAPISO 2", ACABADO = 1CM FROTACHADO 100.00%
PISOS CERAMICO DE 45 X 45CM 100.00%
PISOS CERAMICO DE 45 X 45CM - ANTIDESLIZANTE 100.00%
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO h=0.10 m 100.00%
ZOCALO CERAMICO 30 x 20 100.00%
PUERTAS
PUERTAS DE PLANCHA METALICA 100.00%
PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 MANOS ANTIC) 100.00%
CERRADURA DOS GOLPES EN PUERTA 100.00%
VENTANAS Y VIDRIOS
VENTANA VIDRIO CRUDO INCOLORO 6mm 100.00%
REJA PARA VENTANA DE FIERRO FUNDIDO 100.00%
ESPEJOS 100.00%
PINTURA
PINTURA LATEX MURO INTERIOR BASE IMPRIMANTE 100.00%
PINTURA EN MUROS EXTERIORES, IMPRIMACION Y 2 MANOS AL LATEX 100.00%
PINTURA LATEX CIELO RASO BASE IMPRIMANTE 100.00%
PINTADO DE MURAL 100.00%
VARIOS
JUNTA DE DILATACION CON ESPUMA PLASTICA Y JEBE MICROPOROSO 1" 100.00%
INSTALACION SANITARIA
INSTALACION AGUA
SALIDA DE AGUA FRIA. - PVC 1/2" 100.00%
RED DE DIST TUBERIA 1/2' PVC SAP 100.00%
RED DE DIST TUBERIA 3/4' PVC SAP 100.00%
VALVULA COMPUERTA DE BRONCE DE 1/2" 100.00%
REDUCCIONES PVC-SAP 3/4" A 1/2" 100.00%
INSTALACION DESAGUE
SALIDA DE DESAGUE EN PVC 2" 100.00%
SALIDAS DE PVC SAL PARA DESAGUE DE 4" 100.00%
SALIDA PARA VENTILACION 100.00%
TUBERIA DE PVC PARA DESAGUE DE 2" INC. ACCESORIOS 100.00%
TUBERIA DE DESAGUE 4" 100.00%
ACCESORIOS DE REDES DE DESAGUE
YEE DE PVC 4" C/REDUCCION A 2" 100.00%
CODO PVC SAL 2"x45° 100.00%
SUMIDERO CROMADO DE 2" 100.00%
REGISTRO DE BRONCE CROMADO DE 4" 100.00%
CAJAS DE REGISTRO DE DESAGUE INC. TAPA Y ACCESORIOS 100.00%
APARATOS SANITARIOS
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) 100.00%
LAVATORIOS BLANCO CON PEDESTAL 100.00%
LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO CUELLO 100.00%
VARIOS
EXCAVACION DE ZANJAS RED DE AGUA 100.00%
EXCAVACION DE ZANJAS PARA DESAGUE 100.00%
RELLENO Y COMPACTACION CON MATERIAL PROPIO 100.00%
PRUEBA HIDRAULICA RED DE AGUA 100.00%
PRUEBA HIDRAULICA Y LIMPIEZA DE DESAGUE 100.00%
INSTALACION DE BAJADA PLUVIAL 3" 100.00%
EMPALME A RED DE DESAGUE 100.00%
EMPALME A RED EXISTENTE, AGUA 100.00%
INSTALACIONES ELECTRICAS
SALIDA DE ALUMBRADO DE TECHO 100.00%
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA 100.00%
SALIDA INTERRUPTOR DE CENTRO DE LUZ 100.00%
SALIDA INTERRUPTOR TRIPLE 100.00%
CABLE ELECTRICO TW AWG-MCM 2.5 mm2 100.00%
CABLE ELECTRICO TW AWG-MCM 4 mm2 100.00%
INSTALACION DE TABLERO DE DISTRIBUCIÓN 100.00%
EQUIPO FLUORECENTE DE 2 X 40 WATTS CON REJILLA 100.00%
ARTEFACTO TIPO GLOBO 350 mm VM 80 W 100.00%
POZO PUESTA A TIERRA (10 OHMS) 100.00%
CONEXION DOMICILIARIA DE ELECTRICIDAD 100.00%
EQUIPAMIENTO
SILLAS DE PLASTICO 100.00%
ESCRITORIO DE MADERA INC SILLA 100.00%
ESTANTES 100.00%
COCINA 100.00%
ATRIO 100.00%
MESA DE REUNIONES INCLUYE SILLA 100.00%
MONUMENTO DE FIBRA DE VIDRIO 100.00%
MUEBLES BAJOS PARA COCINA 100.00%
SEGUNDO NIVEL
ESTRUCTURAS
OBRAS DE CONCRETO ARMADO
COLUMNAS
COLUMNAS : ENCOFRADO Y DESENCOFRADO 100.00%
COLUMNAS : ACERO FY=4200 KG/CM2 100.00%
COLUMNAS : CONCRETO F'C=210 KG/CM2 100.00%
VIGAS
VIGAS, ENCOFRADO Y DESENCOFRADO 100.00%
VIGAS, ACERO FY=4200 KG/CM2 100.00%
VIGAS, CONCRETO F'C=210 KG/CM2 100.00%
MESA DE CONCRETO - COCINA
MESA DE CONCRETO, ENCOFRADO Y DESENCOFRADO 100.00%
MESA DE CONCRETO, CONCRETO F'C=210 KG/CM2 100.00%
ARQUITECTURA
MUROS Y TABIQUES DE ALBALIÑERIA
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. 100.00%
PISOS
PISOS Y COBERTURAS
CONTRAPISO 2", ACABADO = 1CM FROTACHADO 100.00%
PISOS CERAMICO DE 45 X 45CM 100.00%
PISOS CERAMICO DE 45 X 45CM - ANTIDESLIZANTE 100.00%
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO h=0.10 m 100.00%
ZOCALO CERAMICO 30 x 20 100.00%
PUERTAS
PUERTAS DE PLANCHA METALICA Y CONTRAPLACADAS 100.00%
PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 MANOS ANTIC) 100.00%
VENTANAS Y VIDRIOS
VENTANA VIDRIO CRUDO INCOLORO 6mm 100.00%
ESPEJOS 100.00%
PINTURA
PINTURA LATEX MURO INTERIOR BASE IMPRIMANTE 100.00%
PINTURA EN MUROS EXTERIORES, IMPRIMACION Y 2 MANOS AL LATEX 100.00%
INSTALACION SANITARIA
INSTALACION AGUA
SALIDA DE AGUA FRIA. - PVC 1/2" 100.00%
RED DE DIST TUBERIA 1/2' PVC SAP 100.00%
VALVULA COMPUERTA DE BRONCE DE 1/2" 100.00%
INSTALACION DESAGUE
SALIDA DE DESAGUE EN PVC 2" 100.00%
SALIDAS DE PVC SAL PARA DESAGUE DE 4" 100.00%
TUBERIA DE PVC PARA DESAGUE DE 2" INC. ACCESORIOS 100.00%
TUBERIA DE DESAGUE 4" 100.00%
ACCESORIOS DE REDES DE DESAGUE
YEE DE PVC 4" C/REDUCCION A 2" 100.00%
CODO PVC SAL 2"x45° 100.00%
SUMIDERO CROMADO DE 2" 100.00%
REGISTRO DE BRONCE CROMADO DE 4" 100.00%
APARATOS SANITARIOS
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) 100.00%
LAVATORIOS BLANCO CON PEDESTAL 100.00%
LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO CUELLO 100.00%
INSTALACIONES ELECTRICAS
SALIDA DE ALUMBRADO DE TECHO 100.00%
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA 100.00%
SALIDA INTERRUPTOR TRIPLE 100.00%
CABLE ELECTRICO TW AWG-MCM 2.5 mm2 100.00%
CABLE ELECTRICO TW AWG-MCM 4 mm2 100.00%
INSTALACION DE TABLERO DE DISTRIBUCIÓN 100.00%
EQUIPO FLUORECENTE DE 2 X 40 WATTS CON REJILLA 100.00%
EQUIPAMIENTO
PLACA RECORDATORIA 100.00%
MUEBLES BAJOS PARA COCINA 100.00%
BARANDA METALICA DE TUBO DE 2" E=1.8MM 100.00%
ESTRUCTURA METALICA PARA COBERTURA(TECHO) SEGUN PLANOS 100.00%
COBERTURA DE CALAMINON TR4 ALUZINC, SEGUN PLANOS 100.00%
FALSO CIELO RASO CON BALDOSAS PREFABRICADAS 60X60 100.00%
III.- GRADO DE CUMPLIMIENTOS DE METAS:
"CONSTRUCCIÓN DE LOCAL COMUNAL DE USOS MULTIPLES EN EL ANEXO DE PATI, DEL DISTRITO DE SAN JUAN DE
TARUCANI, PROVINCIA Y REGIÓN AREQUIPA"
PRIMER NIVEL
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60x2.40 m UND 1.00 1.00 100.00% 0.00% 0.00%
CERCO PROVISIONAL CON PUNTAL Y MALLA M 20.00 20.00 100.00% 0.00% 0.00%
TRANSPORTE DE EQUIPO Y MATERIALES GLB 1.00 1.00 100.00% 0.00% 0.00%
ENERGIA ELECTRICA PARA LA OBRA MES 2.50 2.50 100.00% 0.00% 0.00%
AGUA PROVISIONAL PARA LA OBRA MES 2.50 2.50 100.00% 0.00% 0.00%
CASETA DE GUARDIANIA, OFICINA Y ALMACEN PROVISIONAL DE OBRA M2 32.85 32.85 100.00% 0.00% 0.00%
COMEDORES - VESTUARIOS M2 20.00 20.00 100.00% 0.00% 0.00%
SERVICIOS HIGIENICOS PORTATILES MES 2.50 2.50 100.00% 0.00% 0.00%
SEGURIDAD Y SALUD
ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00 1.00 100.00% 0.00% 0.00%
EQUIPOS DE PROTECCION COLECTIVA GLB 1.00 1.00 100.00% 0.00% 0.00%
EQUIPOS DE PROTECCION INDIVIDUAL GLB 1.00 1.00 100.00% 0.00% 0.00%
RECURSOS PARA RESPUESTA ANTE EMERGENCIAS GLB 1.00 1.00 100.00% 0.00% 0.00%
PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DEL COVID 19
PLAN PARA LA VIGILANCIA PREVENCION Y CONTROL COVID 19 EN EL TRABAJO GLB 1.00 1.00 100.00% 0.00% 0.00%
IMPLEMENTACION DE MATERIALES PARA PREVENCION POR EMERGENCIA UND 1.00 1.00 100.00% 0.00% 0.00%
EQUIPOS DE PROTECCION PERSONAL PARA LA SALUD GLB 1.00 1.00 100.00% 0.00% 0.00%
EQUIPOS DE PROTECCION COLECTIVA PARA LA SALUD GLB 1.00 1.00 100.00% 0.00% 0.00%
OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL M2 150.00 150.00 100.00% 0.00% 0.00%
TRAZO NIVELACION Y REPLANTEO DURANTE LA EJECUCION MES 2.50 2.50 100.00% 0.00% 0.00%
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
CORTE, PERFILADO Y NIVELACION M3 30.00 30.00 100.00% 0.00% 0.00%
EXCAVACION PARA ZAPATAS M3 6.00 6.00 100.00% 0.00% 0.00%
EXCAVACION DE ZANJAS PARA CIMIENTOS M3 74.32 74.32 100.00% 0.00% 0.00%
RELLENO Y COMPACTACION CON MATERIAL PROPIO M3 34.30 34.30 100.00% 0.00% 0.00%
ACARREO DE MATERIAL EXCAVADO A ZONA QUE PERMITA ELIMINAR M3 55.23 55.23 100.00% 0.00% 0.00%
ELIMINACION DE MATERIAL EXCEDENTE EN OBRA M3 55.23 55.23 100.00% 0.00% 0.00%
OBRAS DE CONCRETO SIMPLE
SOLADOS
CONCRETO 1:12 PARA SOLADOS E=4" M3 4.00 4.00 100.00% 0.00% 0.00%
CIMIENTOS CORRIDOS
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 68.61 68.61 100.00% 0.00% 0.00%
SOBRECIMIENTOS
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. ADIT. IMPERMEABILIZANTE M3 4.87 4.87 100.00% 0.00% 0.00%
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 64.93 64.93 100.00% 0.00% 0.00%
OBRAS DE CONCRETO ARMADO
ZAPATAS
ENCOFRADO Y DESENCOFRADO EN ZAPATA M2 9.60 9.60 100.00% 0.00% 0.00%
ZAPATAS : ACERO FY=4200 KG/CM2 kg 38.00 38.00 100.00% 0.00% 0.00%
ZAPATAS : CONCRETO F'C=210 KG/CM2 m3 2.40 2.40 100.00% 0.00% 0.00%
COLUMNAS
COLUMNAS : ENCOFRADO Y DESENCOFRADO m2 113.02 113.02 100.00% 0.00% 0.00%
COLUMNAS : ACERO FY=4200 KG/CM2 kg 1657.00 1,657.00 100.00% 0.00% 0.00%
COLUMNAS : CONCRETO F'C=210 KG/CM2 m3 9.74 9.74 100.00% 0.00% 0.00%
VIGAS
VIGAS, ENCOFRADO Y DESENCOFRADO M2 42.88 42.88 100.00% 0.00% 0.00%
VIGAS, ACERO FY=4200 KG/CM2 kg 1135.00 1,135.00 100.00% 0.00% 0.00%
VIGAS, CONCRETO F'C=210 KG/CM2 m3 6.36 6.36 100.00% 0.00% 0.00%
VIGAS DE CONFINAMIENTO
VIGAS DE CONFINAMIENTO: ENCOFRADO Y DESENCOFRADO m2 3.28 3.28 100.00% 0.00% 0.00%
VIGAS DE CONFINAMIENTO: ACERO FY=4200 KG/CM2 kg 30.00 30.00 100.00% 0.00% 0.00%
VIGAS DE CONFINAMIENTO: CONCRETO F'C=210 KG/CM2 m3 0.25 0.25 100.00% 0.00% 0.00%
LOSA ALIGERADA
LOSAS ALIGERADAS : ENCOFRADO Y DESENCOFRADO m2 128.87 128.87 100.00% 0.00% 0.00%
LOSAS ALIGERADAS : ACERO FY=4200 KG/CM2 kg 596.00 596.00 100.00% 0.00% 0.00%
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 1159.83 1,159.83 100.00% 0.00% 0.00%
LOSAS ALIGERADAS : CONCRETO F'C=210 KG/CM2 CON ADITIVO m3 12.89 12.89 100.00% 0.00% 0.00%
MESA DE CONCRETO - COCINA
MESA DE CONCRETO, ENCOFRADO Y DESENCOFRADO M2 1.74 1.74 100.00% 0.00% 0.00%
MESA DE CONCRETO, ACERO FY=4200 KG/CM2 kg 86.94 86.94 100.00% 0.00% 0.00%
MESA DE CONCRETO, CONCRETO F'C=210 KG/CM2 M3 0.17 0.17 100.00% 0.00% 0.00%
ESCALERAS
ESCALERA, ENCOFRADO Y DESENCOFRADO M2 13.86 13.86 100.00% 0.00% 0.00%
ESCALERA : ACERO FY=4200 KG/CM2 kg 149.00 149.00 100.00% 0.00% 0.00%
ESCALERA : CONCRETO F'C=210 KG/CM2 m3 2.54 2.54 100.00% 0.00% 0.00%
0
ARQUITECTURA
MUROS Y TABIQUES DE ALBALIÑERIA
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. m2 245.45 245.45 100.00% 0.00% 0.00%
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO, MORTERO C:A 1:5 M2 36.62 36.62 100.00% 0.00% 0.00%
TARRAJEO INTERIORES MORTERO 1:5, e=1.50 cm. m2 258.93 258.93 100.00% 0.00% 0.00%
TARRAJEO EN EXTERIORES MORTERO 1:5, e=1.50 cm. M2 202.60 202.60 100.00% 0.00% 0.00%
TARRAJEO DE VIGAS M2 4.24 4.24 100.00% 0.00% 0.00%
VESTIDURA DE DERRAMES PULIDO M 133.80 133.80 100.00% 0.00% 0.00%
BRUÑAS DE 1x1 cm M 20.10 20.10 100.00% 0.00% 0.00%
CIELO RASOS
TARRAJEO EN CIELO RASO M2 144.78 144.78 100.00% 0.00% 0.00%
PISOS
VEREDAS
CONFORMACION DE BASE GRANULAR PARA VEREDAS m2 5.00 5.00 100.00% 0.00% 0.00%
ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 1.65 1.65 100.00% 0.00% 0.00%
VEREDA DE CONCRETO DE E=0.10 M F'c=175 KG/CM2 INC. ACAB C.A. 1:2 E=1 CM M2 0.75 0.75 100.00% 0.00% 0.00%
JUNTAS ASFALTICA EN VEREDAS E=1" ML 5.00 5.00 100.00% 0.00% 0.00%
FALSO PISO
CONFORMACION DE BASE GRANULAR PARA FALSO PISO m2 140.00 140.00 100.00% 0.00% 0.00%
FALSO PISO DE 4" DE CONCRETO 1:10 m2 140.00 140.00 100.00% 0.00% 0.00%
PISOS Y COBERTURAS
CONTRAPISO 2", ACABADO = 1CM FROTACHADO m2 140.00 140.00 100.00% 0.00% 0.00%
PISOS CERAMICO DE 45 X 45CM M2 136.67 136.67 100.00% 0.00% 0.00%
PISOS CERAMICO DE 45 X 45CM - ANTIDESLIZANTE M2 8.40 8.40 100.00% 0.00% 0.00%
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO h=0.10 m M 118.18 118.18 100.00% 0.00% 0.00%
ZOCALO CERAMICO 30 x 20 M2 27.00 27.00 100.00% 0.00% 0.00%
PUERTAS
PUERTAS DE PLANCHA METALICA M2 18.00 18.00 100.00% 0.00% 0.00%
PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 MANOS ANTIC) M2 36.00 36.00 100.00% 0.00% 0.00%
CERRADURA DOS GOLPES EN PUERTA PZA 24.00 24.00 100.00% 0.00% 0.00%
VENTANAS Y VIDRIOS
VENTANA VIDRIO CRUDO INCOLORO 6mm P2 20.48 20.48 100.00% 0.00% 0.00%
REJA PARA VENTANA DE FIERRO FUNDIDO m2 9.88 9.88 100.00% 0.00% 0.00%
ESPEJOS P2 10.58 10.58 100.00% 0.00% 0.00%
PINTURA
PINTURA LATEX MURO INTERIOR BASE IMPRIMANTE M2 258.93 258.93 100.00% 0.00% 0.00%
PINTURA EN MUROS EXTERIORES, IMPRIMACION Y 2 MANOS AL LATEX M2 44.46 44.46 100.00% 0.00% 0.00%
PINTURA LATEX CIELO RASO BASE IMPRIMANTE M2 140.00 140.00 100.00% 0.00% 0.00%
PINTADO DE MURAL GLB 1.00 1.00 100.00% 0.00% 0.00%
VARIOS
JUNTA DE DILATACION CON ESPUMA PLASTICA Y JEBE MICROPOROSO 1" ML 44.00 44.00 100.00% 0.00% 0.00%
INSTALACION SANITARIA
INSTALACION AGUA
SALIDA DE AGUA FRIA. - PVC 1/2" PTO 5.00 5.00 100.00% 0.00% 0.00%
RED DE DIST TUBERIA 1/2' PVC SAP m 10.00 10.00 100.00% 0.00% 0.00%
RED DE DIST TUBERIA 3/4' PVC SAP m 25.45 25.45 100.00% 0.00% 0.00%
VALVULA COMPUERTA DE BRONCE DE 1/2" pza 3.00 3.00 100.00% 0.00% 0.00%
REDUCCIONES PVC-SAP 3/4" A 1/2" UND 3.00 3.00 100.00% 0.00% 0.00%
INSTALACION DESAGUE
SALIDA DE DESAGUE EN PVC 2" PTO 7.00 7.00 100.00% 0.00% 0.00%
SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 4.00 4.00 100.00% 0.00% 0.00%
SALIDA PARA VENTILACION PTO 2.00 2.00 100.00% 0.00% 0.00%
TUBERIA DE PVC PARA DESAGUE DE 2" INC. ACCESORIOS M 23.47 23.47 100.00% 0.00% 0.00%
TUBERIA DE DESAGUE 4" M 16.64 16.64 100.00% 0.00% 0.00%
ACCESORIOS DE REDES DE DESAGUE
YEE DE PVC 4" C/REDUCCION A 2" UND 4.00 4.00 100.00% 0.00% 0.00%
CODO PVC SAL 2"x45° UND 3.00 3.00 100.00% 0.00% 0.00%
SUMIDERO CROMADO DE 2" und 3.00 3.00 100.00% 0.00% 0.00%
REGISTRO DE BRONCE CROMADO DE 4" UND 3.00 3.00 100.00% 0.00% 0.00%
CAJAS DE REGISTRO DE DESAGUE INC. TAPA Y ACCESORIOS UND 1.00 1.00 100.00% 0.00% 0.00%
APARATOS SANITARIOS
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) PZA 2.00 2.00 100.00% 0.00% 0.00%
LAVATORIOS BLANCO CON PEDESTAL pza 2.00 2.00 100.00% 0.00% 0.00%
LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO CUELLO PZA 1.00 1.00 100.00% 0.00% 0.00%
VARIOS
EXCAVACION DE ZANJAS RED DE AGUA M 32.58 32.58 100.00% 0.00% 0.00%
EXCAVACION DE ZANJAS PARA DESAGUE M3 10.52 10.52 100.00% 0.00% 0.00%
RELLENO Y COMPACTACION CON MATERIAL PROPIO M3 9.75 9.75 100.00% 0.00% 0.00%
PRUEBA HIDRAULICA RED DE AGUA M 35.18 35.18 100.00% 0.00% 0.00%
PRUEBA HIDRAULICA Y LIMPIEZA DE DESAGUE M 32.37 32.37 100.00% 0.00% 0.00%
INSTALACION DE BAJADA PLUVIAL 3" M 12.97 12.97 100.00% 0.00% 0.00%
EMPALME A RED DE DESAGUE UND 1.00 1.00 100.00% 0.00% 0.00%
EMPALME A RED EXISTENTE, AGUA UND 1.00 1.00 100.00% 0.00% 0.00%
INSTALACIONES ELECTRICAS
SALIDA DE ALUMBRADO DE TECHO PTO 20.00 20.00 100.00% 0.00% 0.00%
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PTO 37.00 37.00 100.00% 0.00% 0.00%
SALIDA INTERRUPTOR DE CENTRO DE LUZ PTO 6.00 6.00 100.00% 0.00% 0.00%
SALIDA INTERRUPTOR TRIPLE PTO 5.00 5.00 100.00% 0.00% 0.00%
CABLE ELECTRICO TW AWG-MCM 2.5 mm2 M 237.71 237.71 100.00% 0.00% 0.00%
CABLE ELECTRICO TW AWG-MCM 4 mm2 M 172.46 172.46 100.00% 0.00% 0.00%
INSTALACION DE TABLERO DE DISTRIBUCIÓN pza 1.00 1.00 100.00% 0.00% 0.00%
EQUIPO FLUORECENTE DE 2 X 40 WATTS CON REJILLA und 15.00 15.00 100.00% 0.00% 0.00%
ARTEFACTO TIPO GLOBO 350 mm VM 80 W UND 5.00 5.00 100.00% 0.00% 0.00%
POZO PUESTA A TIERRA (10 OHMS) UND 1.00 1.00 100.00% 0.00% 0.00%
CONEXION DOMICILIARIA DE ELECTRICIDAD GLB 1.00 1.00 100.00% 0.00% 0.00%
EQUIPAMIENTO
SILLAS DE PLASTICO UND 25.00 25.00 100.00% 0.00% 0.00%
ESCRITORIO DE MADERA INC SILLA JGO 2.00 2.00 100.00% 0.00% 0.00%
ESTANTES UND 2.00 2.00 100.00% 0.00% 0.00%
COCINA UND 1.00 1.00 100.00% 0.00% 0.00%
ATRIO UND 1.00 1.00 100.00% 0.00% 0.00%
MESA DE REUNIONES INCLUYE SILLA JGO 1.00 1.00 100.00% 0.00% 0.00%
MONUMENTO DE FIBRA DE VIDRIO UND 1.00 1.00 100.00% 0.00% 0.00%
MUEBLES BAJOS PARA COCINA GLB 1.00 1.00 100.00% 0.00% 0.00%
SEGUNDO NIVEL
ESTRUCTURAS
OBRAS DE CONCRETO ARMADO
COLUMNAS
COLUMNAS : ENCOFRADO Y DESENCOFRADO M2 19.58 19.58 100.00% 0.00% 0.00%
COLUMNAS : ACERO FY=4200 KG/CM2 KG 470.00 470.00 100.00% 0.00% 0.00%
COLUMNAS : CONCRETO F'C=210 KG/CM2 M3 1.26 1.26 100.00% 0.00% 0.00%
VIGAS
VIGAS, ENCOFRADO Y DESENCOFRADO M2 12.50 12.50 100.00% 0.00% 0.00%
VIGAS, ACERO FY=4200 KG/CM2 KG 441.00 441.00 100.00% 0.00% 0.00%
VIGAS, CONCRETO F'C=210 KG/CM2 M3 2.50 2.50 100.00% 0.00% 0.00%
MESA DE CONCRETO - COCINA
MESA DE CONCRETO, ENCOFRADO Y DESENCOFRADO M2 12.66 12.66 100.00% 0.00% 0.00%
MESA DE CONCRETO, CONCRETO F'C=210 KG/CM2 M3 1.99 1.99 100.00% 0.00% 0.00%
ARQUITECTURA
MUROS Y TABIQUES DE ALBALIÑERIA
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM. M2 56.10 56.10 100.00% 0.00% 0.00%
PISOS
PISOS Y COBERTURAS
CONTRAPISO 2", ACABADO = 1CM FROTACHADO M2 140.00 140.00 100.00% 0.00% 0.00%
PISOS CERAMICO DE 45 X 45CM M2 150.80 150.80 100.00% 0.00% 0.00%
PISOS CERAMICO DE 45 X 45CM - ANTIDESLIZANTE M2 8.40 8.40 100.00% 0.00% 0.00%
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO h=0.10 m M 118.18 118.18 100.00% 0.00% 0.00%
ZOCALO CERAMICO 30 x 20 M2 27.00 27.00 100.00% 0.00% 0.00%
PUERTAS
PUERTAS DE PLANCHA METALICA Y CONTRAPLACADAS M2 9.84 9.84 100.00% 0.00% 0.00%
PINTADO DE PUERTAS Y VENTANAS METALICAS LAC (2 MANOS ANTIC) M2 19.68 19.68 100.00% 0.00% 0.00%
VENTANAS Y VIDRIOS
VENTANA VIDRIO CRUDO INCOLORO 6mm P2 35.30 35.30 100.00% 0.00% 0.00%
ESPEJOS P2 10.58 10.58 100.00% 0.00% 0.00%
PINTURA
PINTURA LATEX MURO INTERIOR BASE IMPRIMANTE M2 129.47 129.47 100.00% 0.00% 0.00%
PINTURA EN MUROS EXTERIORES, IMPRIMACION Y 2 MANOS AL LATEX M2 44.46 44.46 100.00% 0.00% 0.00%
INSTALACION SANITARIA
INSTALACION AGUA
SALIDA DE AGUA FRIA. - PVC 1/2" PTO 5.00 5.00 100.00% 0.00% 0.00%
RED DE DIST TUBERIA 1/2' PVC SAP M 10.00 10.00 100.00% 0.00% 0.00%
VALVULA COMPUERTA DE BRONCE DE 1/2" PZA 3.00 3.00 100.00% 0.00% 0.00%
INSTALACION DESAGUE
SALIDA DE DESAGUE EN PVC 2" PTO 7.00 7.00 100.00% 0.00% 0.00%
SALIDAS DE PVC SAL PARA DESAGUE DE 4" PTO 4.00 4.00 100.00% 0.00% 0.00%
TUBERIA DE PVC PARA DESAGUE DE 2" INC. ACCESORIOS M 11.36 11.36 100.00% 0.00% 0.00%
TUBERIA DE DESAGUE 4" M 3.00 3.00 100.00% 0.00% 0.00%
ACCESORIOS DE REDES DE DESAGUE
YEE DE PVC 4" C/REDUCCION A 2" UND 2.00 2.00 100.00% 0.00% 0.00%
CODO PVC SAL 2"x45° UND 3.00 3.00 100.00% 0.00% 0.00%
SUMIDERO CROMADO DE 2" UND 3.00 3.00 100.00% 0.00% 0.00%
REGISTRO DE BRONCE CROMADO DE 4" UND 2.00 2.00 100.00% 0.00% 0.00%
APARATOS SANITARIOS
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO) PZA 2.00 2.00 100.00% 0.00% 0.00%
LAVATORIOS BLANCO CON PEDESTAL pza 2.00 2.00 100.00% 0.00% 0.00%
LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO CUELLO PZA 1.00 1.00 100.00% 0.00% 0.00%
INSTALACIONES ELECTRICAS
SALIDA DE ALUMBRADO DE TECHO PTO 10.00 10.00 100.00% 0.00% 0.00%
SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PTO 12.00 12.00 100.00% 0.00% 0.00%
SALIDA INTERRUPTOR TRIPLE PTO 5.00 5.00 100.00% 0.00% 0.00%
CABLE ELECTRICO TW AWG-MCM 2.5 mm2 M 37.71 37.71 100.00% 0.00% 0.00%
CABLE ELECTRICO TW AWG-MCM 4 mm2 M 172.46 172.46 100.00% 0.00% 0.00%
INSTALACION DE TABLERO DE DISTRIBUCIÓN PZA 1.00 1.00 100.00% 0.00% 0.00%
EQUIPO FLUORECENTE DE 2 X 40 WATTS CON REJILLA UND 10.00 10.00 100.00% 0.00% 0.00%
EQUIPAMIENTO
PLACA RECORDATORIA UND. 1.00 1.00 100.00% 0.00% 0.00%
MUEBLES BAJOS PARA COCINA GLB 1.00 1.00 100.00% 0.00% 0.00%
BARANDA METALICA DE TUBO DE 2" E=1.8MM M 10.80 10.80 100.00% 0.00% 0.00%
ESTRUCTURA METALICA PARA COBERTURA(TECHO) SEGUN PLANOS GLB 1.00 1.00 100.00% 0.00% 0.00%
COBERTURA DE CALAMINON TR4 ALUZINC, SEGUN PLANOS GLB 1.00 1.00 100.00% 0.00% 0.00%
FALSO CIELO RASO CON BALDOSAS PREFABRICADAS 60X60 GLB 150.00 150.00 100.00% 0.00% 0.00%
Tarucani.
• Implementación de infraestructura, ambientes y equipamiento para un adecuado servicio de la población del distrito.
• Beneficio al patrimonio público.
PRIMER NIVEL
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60x2.40 m
Comprende la instalación de un Cartel –según dimensiones y diseño- con información básica de la obra.
Cumpliendo con un metrado de 1 UND valorizandose la meta en S/. 1,094.78 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 20 M2 valorizandose la meta en S/. 1,725.80 nuevos soles de acuerdo a la valorización
Metrado Programado 20.00 100%
Metrado Ejecutado 20.00 100%
02 SEGURIDAD Y SALUD
02.01 ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
Esta partida comprende la elaboración de 01 plan de seguridad y salud en el trabajo (PSST), el mismo que debe de ser de conocimiento de los trabajadores e involucrarlos en dicho plan. El
plan será elaborado por un especialista y debe de realizar un respectivo análisis antes, durante y después de ocurrido 01 evento. Se deben de identificar los peligros de tal manera que se
minimice la vulnerabilidad del trabajador.
Cumpliendo con un metrado de 1 GLB valorizandose la meta en S/. 2,500.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 1 GLB valorizandose la meta en S/. 850.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 1 GLB valorizandose la meta en S/. 240.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
03 OBRAS PRELIMINARES
03.01 LIMPIEZA DE TERRENO MANUAL
Este trabajo consiste en el desbroce y limpieza del terreno natural en las áreas que ocuparán las obras del proyecto, que se encuentren cubiertas de rastrojo, maleza, bosque, pastos,
cultivos, etc., incluyendo la remoción de tocones, raíces, escombros y basuras, de modo que el terreno quede limpio y libre de toda vegetación y su superficie resulte apta para iniciar los
demás trabajos.
El trabajo incluye, también, la disposición final dentro o fuera de la zona del proyecto, de todos los materiales provenientes de las operaciones de desbroce y limpieza, previa autorización
del Supervisor, atendiendo las normas y disposiciones legales vigentes.
Comprende el desraíce y la limpieza en zonas cubiertas de pastos, rastrojo, maleza, escombros, cultivos y arbustos.
También comprende la remoción total de árboles aislados o grupos de árboles dentro de superficies que no presenten características de bosque continuo.
En esta actividad se deberá proteger las especies de flora y fauna que hacen uso de la zona a ser afectada, dañando lo menos posible y sin hacer desbroce innecesario, así como también
considerar al entorno socioeconómico protegiendo áreas con interés económico.
Cumpliendo con un metrado de 150 M2 valorizandose la meta en S/. 138.00 nuevos soles de acuerdo a la valorización
Metrado Programado 150.00 100%
Metrado Ejecutado 150.00 100%
04 ESTRUCTURAS
04.01 MOVIMIENTO DE TIERRAS
04.01.01 CORTE, PERFILADO Y NIVELACION
Esta partida comprende los trabajos de refinado, peinado y nivelación de las secciones de diseño, después de los trabajos de excavación, sobre la base de material de suelo, ya sea este
natural o conformado.
Se refinarán las superficies de suelo a los niveles definitivos marcados por la gradiente del canal, que defina su nivel de piso terminado y la sección de diseño para encofrado.
Estos trabajos son necesarios realizarse previamente a los trabajos de compactación de la superficie a nivel definitivo previo a la colocación de encofrados y revestimiento de concreto.
El proceso de refine y peinado de secciones será manual, haciendo uso de herramientas manuales básicas.
Cumpliendo con un metrado de 30 M3 valorizandose la meta en S/. 1,067.70 nuevos soles de acuerdo a la valorización
Metrado Programado 30.00 100%
Metrado Ejecutado 30.00 100%
Cumpliendo con un metrado de 34.3 M3 valorizandose la meta en S/. 1,152.82 nuevos soles de acuerdo a la valorización
Metrado Programado 34.30 100%
Metrado Ejecutado 34.30 100%
Cumpliendo con un metrado de 4 M3 valorizandose la meta en S/. 1,115.16 nuevos soles de acuerdo a la valorización
Metrado Programado 4.00 100%
Metrado Ejecutado 4.00 100%
Cumpliendo con un metrado de 68.61 m3 valorizandose la meta en S/. 12,870.55 nuevos soles de acuerdo a la valorización
Metrado Programado 68.61 100%
Metrado Ejecutado 68.61 100%
04.02.03 SOBRECIMIENTOS
04.02.03.01 SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. ADIT. IMPERMEABILIZANTE
Algunos muros llevarán sobre cimientos de concreto 1:8 + 25% PM con aditivo impermeabilizante, siendo el dimensionamiento el especificado en los planos respectivos, debiendo
respetarse los estipulados en éstos en cuanto a proporciones, materiales y otras indicaciones.
Se agregará piedra mediana de río limpia en un volumen que no exceda del 25% y con un tamaño de 3” de diámetro.
El concreto deberá vaciarse luego de tener un encofrado que reciba al mismo debidamente alienado.
Luego del fraguado inicial, se curará éste por medio de constantes baños de agua durante 3 días como mínimo. La cara superior del sobre cimiento deberá ser lo más nivelada posible, lo
cual garantizará el regular acomodo de los ladrillos del muro.
Cumpliendo con un metrado de 4.87 M3 valorizandose la meta en S/. 1,759.53 nuevos soles de acuerdo a la valorización
Metrado Programado 4.87 100%
Metrado Ejecutado 4.87 100%
Cumpliendo con un metrado de 9.6 M2 valorizandose la meta en S/. 838.56 nuevos soles de acuerdo a la valorización
Metrado Programado 9.60 100%
Metrado Ejecutado 9.60 100%
Cumpliendo con un metrado de 38 kg valorizandose la meta en S/. 270.18 nuevos soles de acuerdo a la valorización
Metrado Programado 38.00 100%
Metrado Ejecutado 38.00 100%
Cumpliendo con un metrado de 2.4 m3 valorizandose la meta en S/. 1,004.47 nuevos soles de acuerdo a la valorización
Metrado Programado 2.40 100%
Metrado Ejecutado 2.40 100%
04.03.02 COLUMNAS
04.03.02.01 COLUMNAS : ENCOFRADO Y DESENCOFRADO
Especificado en el item 04.03.01.01
Cumpliendo con un metrado de 113.02 m2 valorizandose la meta en S/. 8,355.57 nuevos soles de acuerdo a la valorización
Metrado Programado 113.02 100%
Metrado Ejecutado 113.02 100%
04.03.03 VIGAS
04.03.03.01 VIGAS, ENCOFRADO Y DESENCOFRADO
Especificado en el item 04.03.01.01
Cumpliendo con un metrado de 42.88 M2 valorizandose la meta en S/. 3,988.70 nuevos soles de acuerdo a la valorización
Metrado Programado 42.88 100%
Metrado Ejecutado 42.88 100%
04.03.07 ESCALERAS
04.03.07.01 ESCALERA, ENCOFRADO Y DESENCOFRADO
Especificado en el item 04.03.01.01
Cumpliendo con un metrado de 13.86 M2 valorizandose la meta en S/. 1,289.26 nuevos soles de acuerdo a la valorización
Metrado Programado 13.86 100%
Metrado Ejecutado 13.86 100%
05 ARQUITECTURA
05.01 MUROS Y TABIQUES DE ALBALIÑERIA
05.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.
Esta partida comprende la construcción de muros i/o paredes de soga, canto y cabeza para tabiques que se distribuyen perpendiculares y paralelos a los ejes del replanteo.
Cumpliendo con un metrado de 245.45 m2 valorizandose la meta en S/. 29,073.55 nuevos soles de acuerdo a la valorización
Metrado Programado 245.45 100%
Metrado Ejecutado 245.45 100%
Cumpliendo con un metrado de 36.62 M2 valorizandose la meta en S/. 937.47 nuevos soles de acuerdo a la valorización
Metrado Programado 36.62 100%
Metrado Ejecutado 36.62 100%
05.04 PISOS
05.04.01 VEREDAS
05.04.01.01 CONFORMACION DE BASE GRANULAR PARA VEREDAS
Comprende la preparación, acarreo, la colocación y compactación de material seleccionado para base y de acuerdo al espesor señalado, según la disposición marcada en los planos y
especificaciones técnicas.
Cumpliendo con un metrado de 5 m2 valorizandose la meta en S/. 67.60 nuevos soles de acuerdo a la valorización
Metrado Programado 5.00 100%
Metrado Ejecutado 5.00 100%
05.04.01.03 VEREDA DE CONCRETO DE E=0.10 M F'c=175 KG/CM2 INC. ACAB C.A. 1:2 E=1 CM
Comprende el concreto para veredas de espesor e= establecen sobre los falsos pisos, f’c= 175 kgf/cm2 con con acabo frotachado en los lugares que se indican en los planos y con
agregados que le proporcionen una mayor dureza. Se colocará, además, algún tipo de líquido endurecedor sobre el piso terminado.
Cumpliendo con un metrado de 0.75 M2 valorizandose la meta en S/. 54.47 nuevos soles de acuerdo a la valorización
Metrado Programado 0.75 100%
Metrado Ejecutado 0.75 100%
Cumpliendo con un metrado de 136.67 M2 valorizandose la meta en S/. 9,694.00 nuevos soles de acuerdo a la valorización
Metrado Programado 136.67 100%
Metrado Ejecutado 136.67 100%
Cumpliendo con un metrado de 8.4 M2 valorizandose la meta en S/. 595.81 nuevos soles de acuerdo a la valorización
Metrado Programado 8.40 100%
Metrado Ejecutado 8.40 100%
05.06 PUERTAS
05.06.01 PUERTAS DE PLANCHA METALICA
Este rubro es la estructura metálica que van colocados en las áreas colocadas en las áreas especificadas en los planos.
Se emplearán perfiles, tubos, barras, etc.; con las dimensiones indicadas en los planos, estos serán de acero de calidad estructural ASTM A-36.
Los elementos a emplearse serán rectos, lisos, sin dobladuras, abolladuras ni oxidaciones, de formas geométricas bien definidas.
No se aceptarán piezas que tengan porosidades, cavidades, cangrejeras, abombados, ampollas, grietas ni huellas de laminación.
Se usará electrodos E-06012.
La soldadura será del tipo de profundidad y se aplicará siguiendo las indicaciones del fabricante de los electrodos.
Cumpliendo con un metrado de 18 M2 valorizandose la meta en S/. 4,436.82 nuevos soles de acuerdo a la valorización
Metrado Programado 18.00 100%
Metrado Ejecutado 18.00 100%
05.07.03 ESPEJOS
Esta partida considera todos los equipos, materiales y mano de obra necesarios para el suministro y colocación de espejo en el proyecto según indiquen los planos de obra.
Cumpliendo con un metrado de 10.58 P2 valorizandose la meta en S/. 442.56 nuevos soles de acuerdo a la valorización
Metrado Programado 10.58 100%
Metrado Ejecutado 10.58 100%
05.08 PINTURA
05.08.01 PINTURA LATEX MURO INTERIOR BASE IMPRIMANTE
Especificado en el ítem 05.06.02
Cumpliendo con un metrado de 258.93 M2 valorizandose la meta en S/. 3,026.89 nuevos soles de acuerdo a la valorización
Metrado Programado 258.93 100%
Metrado Ejecutado 258.93 100%
05.09 VARIOS
05.09.01 JUNTA DE DILATACION CON ESPUMA PLASTICA Y JEBE MICROPOROSO 1"
Esta partida considera todos los equipos, materiales y mano de obra necesarios para la construcción de juntas de dilatación con espuma plástica y jebe según lo descrito en los planos.
Cumpliendo con un metrado de 44 ML valorizandose la meta en S/. 662.64 nuevos soles de acuerdo a la valorización
Metrado Programado 44.00 100%
Metrado Ejecutado 44.00 100%
06 INSTALACION SANITARIA
06.01 INSTALACION AGUA
06.01.01 SALIDA DE AGUA FRIA. - PVC 1/2"
Se entiende por punto de salida de agua fría la instalación de cada salida de agua fría, destinada a abastecer un aparato sanitario, grifo o salida especial. Se considera desde la salida de la
pared hasta el límite establecido por los muros que contienen el ambiente del baño o ambiente dotado con agua.
Cumpliendo con un metrado de 5 PTO valorizandose la meta en S/. 605.70 nuevos soles de acuerdo a la valorización
Metrado Programado 5.00 100%
Metrado Ejecutado 5.00 100%
Cumpliendo con un metrado de 7 PTO valorizandose la meta en S/. 707.56 nuevos soles de acuerdo a la valorización
Metrado Programado 7.00 100%
Metrado Ejecutado 7.00 100%
06.02.02 SALIDAS DE PVC SAL PARA DESAGUE DE 4"
Especificado en el ítem 06.02.01
Cumpliendo con un metrado de 4 PTO valorizandose la meta en S/. 426.20 nuevos soles de acuerdo a la valorización
Metrado Programado 4.00 100%
Metrado Ejecutado 4.00 100%
Cumpliendo con un metrado de 23.47 M valorizandose la meta en S/. 1,397.17 nuevos soles de acuerdo a la valorización
Metrado Programado 23.47 100%
Metrado Ejecutado 23.47 100%
Cumpliendo con un metrado de 1 UND valorizandose la meta en S/. 96.20 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 2 pza valorizandose la meta en S/. 620.00 nuevos soles de acuerdo a la valorización
Metrado Programado 2.00 100%
Metrado Ejecutado 2.00 100%
06.04.03 LAVADERO ACERO INOXIDABLE P/COCINA C/GRIFO CUELLO
Se refiere a la adquisición del aparato sanitario del lavadero de acero inoxidable para cocina de dos pozas según plano, vitrificado el cual deberá estar libre de imperfecciones y con todos
sus accesorios necesarios para su instalación.
Cumpliendo con un metrado de 1 PZA valorizandose la meta en S/. 398.39 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
06.05 VARIOS
06.05.01 EXCAVACION DE ZANJAS RED DE AGUA
Especificado en el ítem 04.01.02
Cumpliendo con un metrado de 32.58 M valorizandose la meta en S/. 1,490.54 nuevos soles de acuerdo a la valorización
Metrado Programado 32.58 100%
Metrado Ejecutado 32.58 100%
Cumpliendo con un metrado de 9.75 M3 valorizandose la meta en S/. 327.70 nuevos soles de acuerdo a la valorización
Metrado Programado 9.75 100%
Metrado Ejecutado 9.75 100%
Cumpliendo con un metrado de 35.18 M valorizandose la meta en S/. 316.62 nuevos soles de acuerdo a la valorización
Metrado Programado 35.18 100%
Metrado Ejecutado 35.18 100%
07 INSTALACIONES ELECTRICAS
07.01 SALIDA DE ALUMBRADO DE TECHO
Salida al dispositivo que sirve para la toma de artefacto eléctrico, específicamente para la iluminación suspendido en el techo.
Cumpliendo con un metrado de 20 PTO valorizandose la meta en S/. 2,610.60 nuevos soles de acuerdo a la valorización
Metrado Programado 20.00 100%
Metrado Ejecutado 20.00 100%
Cumpliendo con un metrado de 1 GLB valorizandose la meta en S/. 713.45 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
08 EQUIPAMIENTO
08.01 SILLAS DE PLASTICO
Comprende el suministro y colocación de sillas de plástico para el equipamiento del proyecto.
Cumpliendo con un metrado de 25 UND valorizandose la meta en S/. 375.00 nuevos soles de acuerdo a la valorización
Metrado Programado 25.00 100%
Metrado Ejecutado 25.00 100%
08.03 ESTANTES
Ver planos
Estante de madera tornillo, con divisiones verticales y horizontales.
Cumpliendo con un metrado de 2 UND valorizandose la meta en S/. 360.00 nuevos soles de acuerdo a la valorización
Metrado Programado 2.00 100%
Metrado Ejecutado 2.00 100%
08.04 COCINA
Cuerpo y estructura fabricados en acero inoxidable, cocina de 4 hornillas + Horno con las siguientes características:
Medidas: 0.90 x 0.90 x 0.90 m.
Fabricado en acero inoxidable.
04 parrillas angulares de fierro pintado con esmalte al horno color negro.
04 quemadores #7" en fierro fundido.
Combustible: gas propano.
Sistema: Cocina en baja o alta presión.
Ideal para ollas grandes. Cocción rápida.
Cumpliendo con un metrado de 1 UND valorizandose la meta en S/. 1,000.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
08.05 ATRIO
Ver planos
Atrio de madera, con divisiones horizontales.
Estructura y cuerpo de melanina de 18mm, de medidas 0.35 de ancho por0.50 de largo y 1.05m de alto y diseño según imagen.
Cumpliendo con un metrado de 1 UND valorizandose la meta en S/. 200.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 1 GLB valorizandose la meta en S/. 1,300.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
SEGUNDO NIVEL
09 ESTRUCTURAS
09.01 OBRAS DE CONCRETO ARMADO
09.01.01 COLUMNAS
09.01.01.01 COLUMNAS : ENCOFRADO Y DESENCOFRADO
Especificado en el item 04.03.01.01
Cumpliendo con un metrado de 19.58 M2 valorizandose la meta en S/. 1,447.55 nuevos soles de acuerdo a la valorización
Metrado Programado 19.58 100%
Metrado Ejecutado 19.58 100%
09.02.01 VIGAS
09.02.01.01 VIGAS, ENCOFRADO Y DESENCOFRADO
Especificado en el item 04.03.01.01
Cumpliendo con un metrado de 12.5 M2 valorizandose la meta en S/. 1,162.75 nuevos soles de acuerdo a la valorización
Metrado Programado 12.50 100%
Metrado Ejecutado 12.50 100%
10 ARQUITECTURA
10.01 MUROS Y TABIQUES DE ALBALIÑERIA
10.01.01 MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.
Esta partida comprende la construcción de muros i/o paredes de soga, canto y cabeza para tabiques que se distribuyen perpendiculares y paralelos a los ejes del replanteo.
Cumpliendo con un metrado de 56.1 M2 valorizandose la meta en S/. 6,645.05 nuevos soles de acuerdo a la valorización
Metrado Programado 56.10 100%
Metrado Ejecutado 56.10 100%
10.02 PISOS
10.02.01 PISOS Y COBERTURAS
10.02.01.01 CONTRAPISO 2", ACABADO = 1CM FROTACHADO
Comprende los solados conformados por cemento y hormigón en una proporción variable así como también se refiere en cuanto a su espesor, este tipo de piso servirá como base para un
recubrimiento de de formatos de cerámico.
El hormigon será extraído de la cantera ubicada cerca al Anexo Pati.
Cumpliendo con un metrado de 140 M2 valorizandose la meta en S/. 5,923.40 nuevos soles de acuerdo a la valorización
Metrado Programado 140.00 100%
Metrado Ejecutado 140.00 100%
Cumpliendo con un metrado de 150.8 M2 valorizandose la meta en S/. 10,696.24 nuevos soles de acuerdo a la valorización
Metrado Programado 150.80 100%
Metrado Ejecutado 150.80 100%
Cumpliendo con un metrado de 8.4 M2 valorizandose la meta en S/. 595.81 nuevos soles de acuerdo a la valorización
Metrado Programado 8.40 100%
Metrado Ejecutado 8.40 100%
10.04 PUERTAS
10.04.01 PUERTAS DE PLANCHA METALICA Y CONTRAPLACADAS
Este rubro es la estructura metálica que van colocados en las áreas colocadas en las áreas especificadas en los planos.
Se emplearán perfiles, tubos, barras, etc.; con las dimensiones indicadas en los planos, estos serán de acero de calidad estructural ASTM A-36.
Los elementos a emplearse serán rectos, lisos, sin dobladuras, abolladuras ni oxidaciones, de formas geométricas bien definidas.
No se aceptarán piezas que tengan porosidades, cavidades, cangrejeras, abombados, ampollas, grietas ni huellas de laminación.
Se usará electrodos E-06012.
La soldadura será del tipo de profundidad y se aplicará siguiendo las indicaciones del fabricante de los electrodos.
Cumpliendo con un metrado de 9.84 M2 valorizandose la meta en S/. 2,425.46 nuevos soles de acuerdo a la valorización
Metrado Programado 9.84 100%
Metrado Ejecutado 9.84 100%
10.05.02 ESPEJOS
Esta partida considera todos los equipos, materiales y mano de obra necesarios para el suministro y colocación de espejo en el proyecto según indiquen los planos de obra.
Cumpliendo con un metrado de 10.58 P2 valorizandose la meta en S/. 442.56 nuevos soles de acuerdo a la valorización
Metrado Programado 10.58 100%
Metrado Ejecutado 10.58 100%
10.06 PINTURA
10.06.01 PINTURA LATEX MURO INTERIOR BASE IMPRIMANTE
Especificado en el ítem 05.06.02
Cumpliendo con un metrado de 129.47 M2 valorizandose la meta en S/. 1,513.50 nuevos soles de acuerdo a la valorización
Metrado Programado 129.47 100%
Metrado Ejecutado 129.47 100%
11 INSTALACION SANITARIA
11.01 INSTALACION AGUA
11.01.01 SALIDA DE AGUA FRIA. - PVC 1/2"
Se entiende por punto de salida de agua fría la instalación de cada salida de agua fría, destinada a abastecer un aparato sanitario, grifo o salida especial. Se considera desde la salida de la
pared hasta el límite establecido por los muros que contienen el ambiente del baño o ambiente dotado con agua.
Cumpliendo con un metrado de 5 PTO valorizandose la meta en S/. 605.70 nuevos soles de acuerdo a la valorización
Metrado Programado 5.00 100%
Metrado Ejecutado 5.00 100%
Cumpliendo con un metrado de 7 PTO valorizandose la meta en S/. 707.56 nuevos soles de acuerdo a la valorización
Metrado Programado 7.00 100%
Metrado Ejecutado 7.00 100%
Cumpliendo con un metrado de 2 pza valorizandose la meta en S/. 620.00 nuevos soles de acuerdo a la valorización
Metrado Programado 2.00 100%
Metrado Ejecutado 2.00 100%
12 INSTALACIONES ELECTRICAS
12.01 SALIDA DE ALUMBRADO DE TECHO
Salida al dispositivo que sirve para la toma de artefacto eléctrico, específicamente para la iluminación suspendido en el techo.
Cumpliendo con un metrado de 10 PTO valorizandose la meta en S/. 1,305.30 nuevos soles de acuerdo a la valorización
Metrado Programado 10.00 100%
Metrado Ejecutado 10.00 100%
13 EQUIPAMIENTO
13.01 PLACA RECORDATORIA
Comprende el suministro y colocación de placa recordatoria del proyecto.
Cumpliendo con un metrado de 1 UND. valorizandose la meta en S/. 1,000.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 1 GLB valorizandose la meta en S/. 1,300.00 nuevos soles de acuerdo a la valorización
Metrado Programado 1.00 100%
Metrado Ejecutado 1.00 100%
Cumpliendo con un metrado de 150 M2 valorizandose la meta en S/. 14,625.00 nuevos soles de acuerdo a la valorización
Metrado Programado 150.00 100%
Metrado Ejecutado 150.00 100%
5.4.1.- OBSERVACIONES
Los trabajos de la partida de veredas no se concluyeron en su totalidad debido a que los anchos de las calles que que se intervinieron no coincidian con los anchos
segun expediente tecnico, por lo cual el area de las veredas que se ejecuto fue inferior al que mandaba el expediente tecnico. Asi mismo la partida de bermas se
tuvo mayores metrados debido a que incremento una calle mas, se tuvo mayores metrados en sardineles, mayores metrados en sumidero de rieles.
Se realizo 01 ampliacion de
plazo descrita a continuacion:
Se presento la ampliacion de plazo N° 01 la cual fue aprobada con RESOLUCION GERENCIAL N° 089-2019-MDCC/GOPI con fecha 21 de agosto de 2019 por 14 dias
calendarios.
5.4.2.- CONCLUSIONES
La obra no presento mayores inconvenientes y se culmino el 08 de mayo del 2022, se puede concluir que el avance final de la obra es el siguiente:
- Se tiene un avance físico de S/. 529,383.22 y 100 %.
5.4.3.- RECOMENDACIONES
Se esta presentando el informe final a la unidad de infraestructura y desarrollo rural, por lo que se recomienda seguir el tramite correspondiente para realizar la
liquidacion de obra.
PARTIDAS EJECUTADAS
CONSTRUCCION DE CAMINOS VECINALES TRAMO
LAUCAMAYO-PATILLANI-C.C. CHAUPIMAYO,DISTRITO DE
SUYCKUTAMBO, PROVINCIA DE ESPINAR - CUSCO
TRAMO LAUCAMAYO-PATILLANI-C.C. CHAUPIMAYO
Item
01 VEREDAS Y MARTILLOS
01.01 OBRAS PRELIMINARES
01.01.01 SERVICIOS HIGIENICOS EN PERSONAL
01.01.02 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO (PSST)
01.01.03 EQUIPOS DE PROTECCION INDIVIDUAL
01.01.04 EQUIPOS DE PROTECCION COLECTIVA
01.01.05 TRAZO DE NIVELES Y REPLANTEO
01.01.06 TRAZO, REPLANTEO DURANTE LA OBRA Y PLANOS
01.01.07 LIMPIEZA
POST DURANTE LA EJECUCION DE LA OBRA
CONSTRUCCION
01.02 OBRAS PROVISIONALES
01.02.01 ALMACEN, OFICINA Y CASETA DE GUARDIANIA
01.02.02 CARTEL DE IDENTIFICACION DE LA OBRA DE
01.03 MOVIMIENTO DE TIERRAS
3.60x2.40M
01.03.01 CORTE DE TERRENO A MAQUINA
01.03.02 DEMOLICION DE VEREDAS DE 0.10 M.
01.03.03 NIVELACION Y COMPACTACION DE SUBRASANTE
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE
01.04 VEREDAS Y MARTILLOS
01.04.01 BASE GRANULAR e=0.20M
01.04.02 VEREDA DE CONCRETO 175 KG/CM2 e=4"(incluye
01.04.03 ENCOFRADO Y DESENCOFRADO
acabado)
01.04.04 JUNTAS ASFALTICAS 1"
01.04.05 PINTURA DE TRANSITO EN BORDES
02 BERMAS
02.01 OBRAS PRELIMINARES
02.01.01 TRAZO DE NIVELES Y REPLANTEO
02.02 MOVIMIENTO DE TIERRAS
02.02.01 CORTE DE TERRENO A MAQUINA
02.02.02 NIVELACION Y COMPACTACION DE SUBRASANTE
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE
02.03 BERMAS
02.03.01 BASE GRANULAR e=0.20M
02.03.02 BERMAS DE CONCRETO F´C=175KG/CM2 e=4"(incluye
02.03.03 ENCOFRADO Y DESENCOFRADO
acabados)
02.03.04 JUNTAS ASFALTICAS 1"
03 CONSTRUCCION DE SARDINELES DE CONFINAMIENTO
03.01 SARDINEL DE CONCRETO SUMERGIDO(TIPO BURBUJA)
03.01.01 TRAZOS, NIVELES Y REPLANTEO
03.01.02 EXCAVACION MANUAL DE ZANJA EN TERRENO
03.01.03 ELIMINACION DE MATERIAL EXCEDENTE
NORMAL
03.01.04 CONCRETO F´C=175KG/CM2(PARA SARDINEL)
03.01.05 ENCOFRADO Y DESENCOFRADO DE SARDINEL
03.01.06 JUNTAS ASFALTICAS1"
03.01.07 PINTURA DE TRANSITO DE BORDES
03.02 SARDINEL DE PROTECCION EN BERMAS
03.02.01 TRAZOS, NIVELES Y REPLANTEO
03.02.02 EXCAVACION MANUAL DE ZANJA EN TERRENO
NORMAL
03.02.03 ELIMINACION DE MATERIAL EXCEDENTE
03.02.04 CONCRETO F´C=175KG/CM2(PARA SARDINEL)
03.02.05 ENCOFRADO Y DESENCOFRADO DE SARDINEL
03.02.06 JUNTAS ASFALTICAS1"
03.02.07 TARRAJEO DE SARDINEL MEZCLA C:A, 1:4 E=1.5 CM
04 AREAS VERDES
04.01 SEMBRADO DE PLANTONES
05 SISTEMA DE DRENAJE PLUVIAL
05.01 OBRAS PRELIMINARES
05.01.01 TRAZO Y REPLANTEO
05.02 MOVIMIENTO DE TIERRAS
05.02.01 EXCAVACION MANUAL DE ZANJA ENTERRENO NORMAL
m2 100.00% 0.00%
und 100.00% 0.00%
m3 100.00% 0.00%
m2 43.46% 0.00%
m2 70.18% 0.00%
m3 74.03% 0.00%
m3 70.18% 0.00%
m2 70.18% 0.00%
m2 100.00% 27.78%
m2 100.00% 13.71%
m2 100.00% 2.70%
m2 100.00% 112.56%
m3 100.00% 112.56%
m2 100.00% 112.56%
m3 100.00% 112.56%
m3 100.00% 112.56%
m2 100.00% 112.56%
m2 100.00% 88.40%
m2 100.00% 119.75%
m 100.00% 45.07%
m3 100.00% 45.05%
m3 100.00% 45.09%
m3 100.00% 45.13%
m2 72.54% 0.00%
m 100.00% 45.12%
m2 100.00% 45.07%
m 100.00% 20.32%
m3 100.00% 20.31%
m3 100.00% 20.07%
m3 100.00% 24.86%
m2 100.00% 23.65%
m 100.00% 30.84%
m2 100.00% 29.13%
m3 100.00% 0.00%
m2 100.00% 0.00%
m2 100.00% 0.00%
m2 100.00% 14.27%
m3 100.00% 20.96%
m 100.00% 28.88%
m 100.00% 28.88%
m 100.00% 28.88%
m3 100.00% 28.88%
m3 100.00% 6.91%
m2 100.00% 0.00%
m2 100.00% 0.00%
m2 100.00% 0.00%
kg 100.00% 0.00%
m3 100.00% 0.00%
m 100.00% 55.22%
m 100.00% 28.88%
120.31%
120.07%
124.86%
123.65%
130.84%
129.13%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%
0.00%
114.27%
0.00%
120.96%
128.88%
128.88%
128.88%
128.88%
106.91%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
155.22%
128.88%
0.00%
100.00%
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.02
01.02.01
01.02.02
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.03.03
02.03.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.03
03.03.01
03.03.02
03.03.03
04
04.01
05
05.01
05.01.01
05.02
05.02.01
05.02.02
05.02.03
05.02.04
05.02.05
05.02.06
05.02.07
05.03
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
06
06.01
DESCRIPCION DE LA PARTIDA
VEREDAS Y MARTILLOS
OBRAS PRELIMINARES
SERVICIOS HIGIENICOS EN PERSONAL
PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO (PSST)
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
TRAZO DE NIVELES Y REPLANTEO
TRAZO, REPLANTEO DURANTE LA OBRA Y PLANOS POST CONSTRUCCION
LIMPIEZA DURANTE LA EJECUCION DE LA OBRA
OBRAS PROVISIONALES
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60x2.40M
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO A MAQUINA
DEMOLICION DE VEREDAS DE 0.10 M.
NIVELACION Y COMPACTACION DE SUBRASANTE
ELIMINACION DE MATERIAL EXCEDENTE
VEREDAS Y MARTILLOS
BASE GRANULAR e=0.20M
VEREDA DE CONCRETO 175 KG/CM2 e=4"(incluye acabado)
ENCOFRADO Y DESENCOFRADO
JUNTAS ASFALTICAS 1"
PINTURA DE TRANSITO EN BORDES
BERMAS
OBRAS PRELIMINARES
TRAZO DE NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO A MAQUINA
NIVELACION Y COMPACTACION DE SUBRASANTE
ELIMINACION DE MATERIAL EXCEDENTE
BERMAS
BASE GRANULAR e=0.20M
BERMAS DE CONCRETO F´C=175KG/CM2 e=4"(incluye acabados)
ENCOFRADO Y DESENCOFRADO
JUNTAS ASFALTICAS 1"
CONSTRUCCION DE SARDINELES DE CONFINAMIENTO
SARDINEL DE CONCRETO SUMERGIDO(TIPO BURBUJA)
TRAZOS, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJA EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO F´C=175KG/CM2(PARA SARDINEL)
ENCOFRADO Y DESENCOFRADO DE SARDINEL
JUNTAS ASFALTICAS1"
PINTURA DE TRANSITO DE BORDES
SARDINEL DE PROTECCION EN BERMAS
TRAZOS, NIVELES Y REPLANTEO
EXCAVACION MANUAL DE ZANJA EN TERRENO NORMAL
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO F´C=175KG/CM2(PARA SARDINEL)
ENCOFRADO Y DESENCOFRADO DE SARDINEL
JUNTAS ASFALTICAS1"
TARRAJEO DE SARDINEL MEZCLA C:A, 1:4 E=1.5 CM
JARDINERIAS PARA PLANTONES
CONCRETO F´C=175KG/CM2(PARA SARDINEL)
ENCOFRADO Y DESENCOFRADO DE SARDINEL
TARRAJEO DE SARDINEL MEZCLA C:A, 1:4 E=1.5 CM
AREAS VERDES
SEMBRADO DE PLANTONES
SISTEMA DE DRENAJE PLUVIAL
OBRAS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL DE ZANJA ENTERRENO NORMAL
REFINE Y NIVELACION DE ZANJA
CAMA DE APOYO TUBERIA e=0.10 m
RELLENO PROTECTOR DE TUBERIA DN=315 MM.TN
RELLENO COMPACTADO CON MATERIAL PROPIO
ELIMINACION DE MATERIAL EXCEDENTE
ROTURA Y REPOSICION DE PAVIMENTO ASFLTICO EN FRIO
SUMIDERO DE CAPTACION E INSTALACION DE TUBERIA
CONCRETO F´C=1000 KG/CM2 PARA SOLADO E=2"
ENCOFRADO Y DESENCOFRADO CARAVISTA MUROS REFORZADOS
ACERO FY=4200KG/CM2
CONCRETO F´C=210 KG/CM2
REJILLA EN SUMIDERO
SUMINISTRO E INSTALACION TUB. PVC 315 mm + PRUEBA HIDRAULICA
MITIGACION DE IMPACTO AMBIENTAL
MEDIDAS DE MITIGACION AMBIENTAL
METAS FISICAS ANTERIOR
Und.
PROGRAMADAS EJECUTADAS ALCANZADAS %EJECUTADAS % ALCANZADAS