Está en la página 1de 3

VALORIZACION FINAL DE LA OBRA

" MEJORAMIENTO DEL SALON DE USOS MULTIPLES DEL P.J. SOL DE SACSAYHUAMAN DEL DISTRITO DE CHIVAY, PROVINCIA DE CAYLLOMA-AREQUIPA"
OBRA :

INICIO : 09 DE DICIEMBRE 2017 INSPECTOR : ING. CRISTHIAN JOEL MAMANI GOMEZ


PLAZO MODIFICADO : 90 DIAS CALENDARIZADOS RESIDENTE DE OBRA : ING. ABDON ARTURO YANQUI MACHACA >
MONTO REFERENCIAL : 297,171.15 NUEVOS SOLES
AVANCE
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
Item Descripción
Und. Metrado Precio Presupuesto % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
Unitario $ $ $ $

" MEJORAMIENTO DEL SALON DE USOS MULTIPLES DEL P.J. SOL DE


SACSAYHUAMAN DEL DISTRITO DE CHIVAY, PROVINCIA DE 205,560.20 99,313.95 106,246.25 205,560.20 0.00
CAYLLOMA-AREQUIPA"

01 ESTRUCTURAS 114,459.25 100% 71,061.48 43,397.77 114,459.25 0.00


01.01 OBRAS PROVISIONALES
10,890.33 1.00 10,890.33 0.00 10,890.33 0.00
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und
1.00 294.17 294.17 100%
1.00 294.17 100.00% 0.00 0.00 0.00% 1.00 294.17 100.00% 0.00 0.00 0.0%
01.01.02 ALMACEN Y DEPOSITO DE HERRAMIENTAS GLB
1.00 1,000.00 1,000.00 100%
1.00 1000.00 100.00% 0.00 0.00 0.00% 1.00 1,000.00 100.00% 0.00 0.00 0.0%
01.01.03 CERCO PERIMETRICO CON ARPILLERA m 64.00 24.94 1,596.16 100% 64.00 1596.16 100.00% 0.00 0.00 0.00% 64.00 1,596.16 100.00% 0.00 0.00 0.0%
01.01.04 SEGURIDAD Y SALUD EN EL TRABAJO GLB
1.00 8,000.00 8,000.00 100%
1.00 8000.00 100.00% 0.00 0.00 0.00% 1.00 8,000.00 100.00% 0.00 0.00 0.0%
01.02 TRABAJOS PRELIMINARES
5,296.47 100% 5,296.47 0.00 5,296.47 0.00
01.02.01 TRAZO Y REPLANTEO PRELIMINAR m2
220.00 2.38 523.60 100%
220.00 523.60 100.00% 0.00 0.00 0.00% 220.00 523.60 100.00% 0.00 0.00 0.0%
01.02.02 DEMOLICION ESTRUCTURA EXISTENTE m3
51.72 39.55 2,045.53 100%
51.72 2045.53 100.00% 0.00 0.00 0.00% 51.72 2,045.53 100.00% 0.00 0.00 0.0%
01.02.03 CORTE DE TERRENO NORMAL C/MAQUINARIA m3 150.20 8.63 1,296.23 100% 150.20 1296.23 100.00% 0.00 0.00 0.00% 150.20 1,296.23 100.00% 0.00 0.00 0.0%
01.02.04 ELIMININACION MATERIAL DE DEMOLICION m3
252.40 5.67 1,431.11 100%
252.40 1431.11 100.00% 0.00 0.00 0.00% 252.40 1,431.11 100.00% 0.00 0.00 0.0%
01.03 MOVIMIENTO DE TIERRAS
6,056.15 1.00 6,056.15 0.00 6,056.15 0.00
01.03.01 EXCAVACION PARA ZAPATAS 1.50 MT DE PROFUNDIDAD m3
40.95 54.86 2,246.52 100%
40.95 2,246.52 100.00% 0.00 0.00 0.00% 40.95 2,246.52 100.00% 0.00 0.00 0.0%
01.03.02 EXCAVACION PARA CIMIENTOS HASTA 0.80 MT TERRENO m3
NORMAL 18.15 47.46 861.40 100%
18.15 861.40 100.00% 0.00 0.00 0.00% 18.15 861.40 100.00% 0.00 0.00 0.0%
01.03.03 RELLENO CON MATERIAL PROPIO m3 16.90 92.85 1,569.17 100% 16.90 1,569.17 100.00% 0.00 0.00 0.00% 16.90 1,569.17 100.00% 0.00 0.00 0.0%
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3
52.75 14.14 745.89 100%
52.75 745.89 100.00% 0.00 0.00 0.00% 52.75 745.89 100.00% 0.00 0.00 0.0%
01.03.05 NIVELADO Y COMPACTADO C/EQUIPO LIVIANO m2
158.69 3.99 633.17 100%
158.69 633.17 100.00% 0.00 0.00 0.00% 158.69 633.17 100.00% 0.00 0.00 0.0%
01.04 OBRAS DE CONCRETO SIMPLE
3,580.73 100%
3,580.73 0.00 3580.73 0.00
01.04.01 SOLADO PARA ZAPATAS DE 4" DE ESPESOR m2 27.30 66.18 1,806.71 100% 27.30 1,806.71 100.00% 0.00 0.00 0.00% 27.30 1,806.71 100.00% 0.00 0.00 0.0%
01.04.02 CIMIENTOS CORRIDOS: CONCRETO 1:10 + 30% P.G. m3 17.03 104.17 1,774.02 100% 17.03 1,774.02 100.00% 0.00 0.00 0.00% 17.03 1,774.02 100.00% 0.00 0.00 0.0%
01.05 OBRAS DE CONCRETO ARMADO 41,562.80 100% 41,562.80 0.00 41,562.80 0.00
01.05.01 ZAPATAS: CONCRETO F'C=175 KG/CM2 m3
16.38 417.26 6,834.72 100%
16.38 6,834.72 100.00% 0.00 0.00 0.00% 16.38 6,834.72 100.00% 0.00 0.00 0.0%
01.05.02 ZAPATAS: ACERO: ACERO DE REFUERZO FY=4200 KG/CM2 kg
286.82 6.55 1,878.67 100%
286.82 1,878.67 100.00% 0.00 0.00 0.00% 286.82 1,878.67 100.00% 0.00 0.00 0.0%
01.05.03 SOBRECIMIENTO ARMADO: CONCRETO F'C=175 KG/CM2 m3
2.72 453.42 1,233.30 100%
2.72 1,233.30 100.00% 0.00 0.00 0.00% 2.72 1,233.30 100.00% 0.00 0.00 0.0%
01.05.04 SOBRECIMIENTO ARMADO: ENCOFRADO Y m2
DESENCOFRADO 36.21 51.71 1,872.42 100%
36.21 1,872.42 100.00% 0.00 0.00 0.00% 36.21 1,872.42 100.00% 0.00 0.00 0.0%
01.05.05 SOBRECIMIENTO ARMADO: ACERO DE REFUERZO FY=4200 kg
KG/CM2 227.08 6.57 1,491.92 100%
227.08 1,491.92 100.00% 0.00 0.00 0.00% 227.08 1,491.92 100.00% 0.00 0.00 0.0%
01.05.06 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3
5.78 545.59 3,153.51 100%
5.78 3,153.51 100.00% 0.00 0.00 0.00% 5.78 3,153.510 100.00% 0.00 0.00 0.0%
01.05.07 COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 89.22 76.04 6,784.29 100% 89.22 6,784.29 100.00% 0.00 0.00 0.00% 89.22 6,784.29 100.00% 0.00 0.00 0.0%
01.05.08 COLUMNAS: ACERO DE REFUERZO F'Y=4200 KG/CM2 kg 1,136.04 6.33 7,191.13 100% 1136.04 7,191.13 100.00% 0.00 0.00 0.00% 1136.04 7,191.13 100.00% 0.00 0.00 0.0%
01.05.09 VIGAS: CONCRETO F'C=210 KG/CM2 m3 4.59 519.07 2,382.53 100% 4.59 2,382.53 100.00% 0.00 0.00 0.00% 4.59 2,382.53 100.00% 0.00 0.00 0.0%
01.05.10 VIGAS: ENCOFRADO Y DESENCOFRADO m2 29.07 78.19 2,272.98 100% 29.07 2,272.98 100.00% 0.00 0.00 0.00% 29.07 2,272.98 100.00% 0.00 0.00 0.0%
01.05.11 VIGAS: ACERO DE REFUERZO F'Y=42000 KG/CM2 kg 909.61 7.11 6,467.33 100% 909.61 6,467.33 100.00% 0.00 0.00 0.00% 909.61 6,467.33 100.00% 0.00 0.00 0.0%
01.06 PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD 3,675.00 100% 3,675.00 0.00 3675.00 0.00
01.06.01 ESTUDIOS GEOTECNICOS GLB 1.00 1,800.00 1,800.00 100% 1.00 1,800.00 100.00% 0.00 0.00 0.00% 1.00 1800.00 100.00% 0.00 0.00 0.0%
01.06.02 DISEÑO DE MEZCLAS GLB 3.00 500.00 1,500.00 100% 3.00 1,500.00 100.00% 0.00 0.00 0.00% 3.00 1500.00 100.00% 0.00 0.00 0.0%
01.06.03 ROTURA DE PROBETAS DE CONCRETO GLB 15.00 25.00 375.00 100% 15.00 375.00 100.00% 0.00 0.00 0.00% 15.00 375.00 100.00% 0.00 0.00 0.0%
VALORIZACION FINAL DE LA OBRA
" MEJORAMIENTO DEL SALON DE USOS MULTIPLES DEL P.J. SOL DE SACSAYHUAMAN DEL DISTRITO DE CHIVAY, PROVINCIA DE CAYLLOMA-AREQUIPA"
OBRA :

INICIO : 09 DE DICIEMBRE 2017 INSPECTOR : ING. CRISTHIAN JOEL MAMANI GOMEZ


PLAZO MODIFICADO : 90 DIAS CALENDARIZADOS RESIDENTE DE OBRA : ING. ABDON ARTURO YANQUI MACHACA >
MONTO REFERENCIAL : 297,171.15 NUEVOS SOLES
AVANCE
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
Item Descripción
Und. Metrado Precio Presupuesto % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
Unitario $ $ $ $
01.07 ESTRUCTURAS METALICAS Y COBERTURAS 43,397.77 100% 0.00 43397.77 43397.77 0.00
01.07.01 TIJERAL DE METAL DE ACUERDO AL DISEÑO und 16.00 1,500.00 24,000.00 100% 0.00 0.00 0.00% 16.00 24,000.00 100.00% 16.00 24000.00 100.00% 0.00 0.00 0.0%
01.07.02 CORREAS EN LA ESTRUCTURA METALICA DE 2x3x2.5MM m
228.00 31.50 7,182.00 100%
0.00 0.00 0.00% 228.00 7,182.00 100.00% 228.00 7182.00 100.00% 0.00 0.00 0.0%
01.07.03 COBERTURA ETERNIT TIPO TEJA ANDINA COLOR ARCILLA m2
187.06 59.91 11,206.76 100%
0.00 0.00 0.00% 187.06 11,206.76 100.00% 187.06 11206.76 100.00% 0.00 0.00 0.0%
01.07.04 CUMBRERA ETERNIT TIPO TEJA ANDINA m 19.60 51.48 1,009.01 100% 0.00 0.00 0.00% 19.60 1009.01 100.00% 19.60 1009.01 100.00% 0.00 0.00 0.0%
02 ARQUITECTURA 77,016.28 100% 24,534.50 52,481.78 77,016.28 0.00
02.01 MUROS Y TABIQUERIA DE ALBAÑILERIA 7,374.40 100% 7,374.40 0.00 0.00 7,374.40 0.00
02.01.01 MURO DE SOGA, LADRILLO KK MECANIZADO DE 9x14x24, m2
MORTERO 1:4 x 1.5CM 88.20 83.61 7,374.40 100%
88.20 7,374.40 100.00% 0.00 0.00 0.00% 88.20 7,374.40 100.00% 0.00 0.00 0.0%
02.02 REVOQUES ENLUCIDOS Y MOLDURAS 13,591.03 100% 11,063.31 2527.72 13,591.03 0.00
02.02.01 TARRAJEO EN INTERIORES CON CEMENTO-ARENA m2 142.43 21.38 3,045.15 100% 142.43 3,045.15 100.00% 0.00 0.00 0.00% 142.43 3,045.15 100.00% 0.00 0.00 0.0%
02.02.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 52.37 26.71 1,398.80 100% 52.37 1,398.80 100.00% 0.00 0.00 0.00% 52.37 1,398.80 100.00% 0.00 0.00 0.0%
02.02.03 TARRAJEO DE COLUMNAS - SUPERFICIES m2 32.40 44.10 1,428.84 100% 32.40 1,428.84 100.00% 0.00 0.00 0.00% 32.40 1,428.84 100.00% 0.00 0.00 0.0%
02.02.04 TARRAJEO DE VIGAS - SUPERFICIES m2 31.20 45.76 1,427.71 100% 31.20 1,427.71 100.00% 0.00 0.00 0.00% 31.20 1,427.71 100.00% 0.00 0.00 0.0%
02.02.05 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS m 109.10 27.96 3,050.44 100% 109.10 3,050.44 100.00% 0.00 0.00 0.00% 109.10 3,050.44 100.00% 0.00 0.00 0.0%
02.02.06 BRUÑAS DE 1.0 cm m 81.60 8.73 712.37 100% 81.60 712.37 100.00% 0.00 0.00 0.00% 81.60 712.37 100.00% 0.00 0.00 0.0%
02.02.07 ENCHAPE CON PIEDRA LAJA APAREJO IRREGULAR m2 34.75 72.74 2,527.72 100% 0.00 0.00 0.00% 34.75 2527.72 100.00% 34.75 2,527.72 100.00% 0.00 0.00 0.0%
02.03 CIELORRASOS 13,316.08 0.00 13316.08 13316.08 0.00
02.03.01 CIELO RASO CON BALDOSA 60 X 60 CM m2 125.29 85.76 10,744.87 100% 0.00 0.00 0.00% 125.29 10744.87 100.00% 125.29 10744.87 100.00% 0.00 0.00 0.0%
02.03.02 CIELO RASO CON SUPER BOARD m2 31.36 81.99 2,571.21 100% 0.00 0.00 0.00% 31.36 2571.21 100.00% 31.36 2571.21 100.00% 0.00 0.00 0.0%
02.04 PISOS Y PAVIMENTOS 17,466.97 3,471.79 13995.18 17466.97 0.00
02.04.01 PISOS DE CONCRETO F'C=140KG/CM2 E=4" m2 125.29 27.71 3,471.79 100% 125.29 3,471.79 100.00% 0.00 0.00% 125.29 3471.79 100.00% 0.00 0.00 0.0%
02.04.02 PISO DE CERAMICO ALTO TRANSITO DE 40x40 m2 125.29 62.40 7,818.10 100% 0.00 0.00 0.00% 125.29 7818.10 100.00% 125.29 7818.10 100.00% 0.00 0.00 0.0%
02.04.03 VEREDA: CONCRETO 140 Kg/cm2 4" ACAB. FROTACHADO m2
47.48 76.26 3,620.82 100%
0.00 0.00 0.00% 47.48 3620.82 100.00% 47.48 3620.82 100.00% 0.00 0.00 0.0%
02.04.04 VEREDA: ENCOFRADO Y DESENCOFRADO m2 8.22 26.16 215.04 100% 0.00 0.00 0.00% 8.22 215.04 100.00% 8.22 215.04 100.00% 0.00 0.00 0.0%
02.04.05 VEREDAS: JUNTA ASFALTICA m 12.20 6.31 76.98 100% 0.00 0.00 0.00% 12.20 76.98 100.00% 12.20 76.98 100.00% 0.00 0.00 0.0%
02.04.06 VEREDAS: BRUÑAS DE 1.0cm m 88.00 25.73 2,264.24 100% 0.00 0.00 0.00% 88.00 2264.24 100.00% 88.00 2264.24 100.00% 0.00 0.00 0.0%
02.05 ZOCALOS 1,827.63 0.00 1827.63 1827.63 0.00
02.05.01 ZOCALO DE MAYOLICA 20 X 30 CM m2 37.80 48.35 1,827.63 100% 0.00 0.00 0.00% 37.80 1827.63 100.00% 37.80 1827.63 100.00% 0.00 0.00 0.0%
02.06 CONTRAZOCALOS 873.05 0.00 873.05 873.05 0.00
02.06.01 CONTRAZOCALO DE CERAMICO DE 0.10 M m 49.86 17.51 873.05 100% 0.00 0.00 0.00% 49.86 873.05 100.00% 49.86 873.05 100.00% 0.00 0.00 0.0%
02.07 CARPINTERIA DE MADERA 5,710.50 0.00 5710.50 5710.50 0.00
02.07.01 PUERTA DE MADERA TABLERO REBAJADO m2 12.69 450.00 5,710.50 100% 0.00 0.00 0.00% 12.69 5710.50 100.00% 12.69 5710.50 100.00% 0.00 0.00 0.0%
02.08 CARPINTERIA METALICA Y HERRERIA 3,212.16 0.00 3212.16 3212.16 0.00
02.08.01 VENTANA REJA METALICA und 5.00 250.00 1,250.00 100% 0.00 0.00 0.00% 5.00 1250.00 100.00% 5.00 1250.00 100.00% 0.00 0.00 0.0%
02.08.02 DIVISION METALICA CON MELAMINE PARA BAÑOS GLB 1.00 1,000.00 1,000.00 100% 0.00 0.00 0.00% 1.00 1000.00 100.00% 1.00 1000.00 100.00% 0.00 0.00 0.0%
02.08.03 CANALETA PLUVIAL GALVANIZADA m 38.00 25.32 962.16 100% 0.00 0.00 0.00% 38.00 962.16 100.00% 38.00 962.16 100.00% 0.00 0.00 0.0%
02.09 CERRAJERIA 1,511.50 0.00 1511.50 1511.50 0.00
02.09.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" pza 20.00 25.26 505.20 100% 0.00 0.00 0.00% 20.00 505.20 100.00% 20.00 505.20 100.00% 0.00 0.00 0.0%
02.09.02 CERRADURA PARA PUERTA PESADA pza 5.00 168.96 844.80 100% 0.00 0.00 0.00% 5.00 844.80 100.00% 5.00 844.80 100.00% 0.00 0.00 0.0%
02.09.03 MANIJA DE BRONCE PARA PUERTAS pza 5.00 32.30 161.50 100% 0.00 0.00 0.00% 5.00 161.50 100.00% 5.00 161.50 100.00% 0.00 0.00 0.0%
02.10 VIDRIOS, CRISTALES Y SIMILARES 2,966.70 0.00 2966.70 2966.70 0.00
02.10.01 VIDRIOS SEMIDOBLE p2 359.60 8.25 2,966.70 100% 0.00 0.00 0.00% 359.60 2966.70 100.00% 359.60 2966.70 100.00% 0.00 0.00 0.0%
02.11 PINTURA 4,005.30 0.00 4005.30 4005.30 0.00
02.11.01 PINTURA LATEX EN INTERIORES m2 142.43 15.92 2,267.49 100% 0.00 0.00 0.00% 142.43 2267.49 100.00% 142.43 2267.49 100.00% 0.00 0.00 0.0%
02.11.02 PINTURA LATEX EN EXTERIORES m2 115.97 14.30 1,658.37 100% 0.00 0.00 0.00% 115.97 1658.37 100.00% 115.97 1658.37 100.00% 0.00 0.00 0.0%
VALORIZACION FINAL DE LA OBRA
" MEJORAMIENTO DEL SALON DE USOS MULTIPLES DEL P.J. SOL DE SACSAYHUAMAN DEL DISTRITO DE CHIVAY, PROVINCIA DE CAYLLOMA-AREQUIPA"
OBRA :

INICIO : 09 DE DICIEMBRE 2017 INSPECTOR : ING. CRISTHIAN JOEL MAMANI GOMEZ


PLAZO MODIFICADO : 90 DIAS CALENDARIZADOS RESIDENTE DE OBRA : ING. ABDON ARTURO YANQUI MACHACA >
MONTO REFERENCIAL : 297,171.15 NUEVOS SOLES
AVANCE
PRESUPUESTO SALDO
ANTERIOR ACTUAL ACUMULADO
Item Descripción
Und. Metrado Precio Presupuesto % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO % METRADO VALORIZADO %
Unitario $ $ $ $
02.11.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 12.69 6.26 79.44 100% 0.00 0.00 0.00% 12.69 79.44 100.00% 12.69 79.44 100.00% 0.00 0.00 0.0%
02.12 VARIOS 5,160.96 2,625.00 2535.96 5160.96 0.00
02.12.01 LIMPIEZA FINAL DE OBRA m2 220.00 3.96 871.20 100% 0.00 0.00 0.00% 220.00 871.20 100.00% 220.00 871.20 100.00% 0.00 0.00 0.0%
02.12.02 MITIGACIÓN AMBIENTAL GLB 1.00 3,500.00 3,500.00 100% 0.75 2,625.00 75.00% 0.25 875.00 25.00% 1.00 3500.00 100.00% 0.00 0.00 0.0%
02.12.03 PLACA RECORDATORIA DE ALUMINIO und 1.00 789.76 789.76 100% 0.00 0.00 0.00% 1.00 789.76 100.00% 1.00 789.76 100.00% 0.00 0.00 0.0%
03 INSTALACIONES ELECTRICAS 9,129.16 466.29 8662.87 9129.16 0.00
03.01 TABLERO PRINCIOPAL (T.G.) DE CAJA METALICA CON LLAVE pza
1.00 265.48 265.48 100%
0.00 0.00 0.00% 1.00 265.48 100.00% 1.00 265.48 100.00% 0.00 0.00 0.0%
03.02 SALIDA DE TECHO (CENTRO DE LUZ) pto 18.00 38.10 685.80 100% 0.00 0.00 0.00% 18.00 685.80 100.00% 18.00 685.80 100.00% 0.00 0.00 0.0%
03.03 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON pto
PVC 11.00 42.39 466.29 100%
11.00 466.29 100.00% 0.00 0.00 0.00% 11.00 466.29 100.00% 0.00 0.00 0.0%
03.04 TABLERO DE DISTRIBUCION pza 1.00 698.84 698.84 100% 0.00 0.00 0.00% 1.00 698.84 100.00% 1.00 698.84 100.00% 0.00 0.00 0.0%
03.05 ARTEFACTO DE IULUMINACION und 8.00 157.90 1,263.20 100% 0.00 0.00 0.00% 8.00 1263.20 100.00% 8.00 1263.20 100.00% 0.00 0.00 0.0%
03.06 SPOT LIGHTS und 10.00 64.71 647.10 100% 0.00 0.00 0.00% 10.00 647.10 100.00% 10.00 647.10 100.00% 0.00 0.00 0.0%
03.07 TUBERIA PVC-SEL DE 3/4" m 171.00 6.54 1,118.34 100% 0.00 0.00 0.00% 171.00 1118.34 100.00% 171.00 1118.34 100.00% 0.00 0.00 0.0%
03.08 CONDUCTOR TW 1X2.50 mm2 m 180.00 2.32 417.60 100% 0.00 0.00 0.00% 180.00 417.60 100.00% 180.00 417.60 100.00% 0.00 0.00 0.0%
03.09 CONDUCTOR TW 1X4.00 mm2 m 140.00 3.20 448.00 100% 0.00 0.00 0.00% 140.00 448.00 100.00% 140.00 448.00 100.00% 0.00 0.00 0.0%
03.10 CONDUCTOR TWC 1X10 mm2 m 40.00 36.44 1,457.60 100% 0.00 0.00 0.00% 40.00 1457.60 100.00% 40.00 1457.60 100.00% 0.00 0.00 0.0%
03.11 CONDUCTOR TWC 1X6mm2 m 30.00 4.02 120.60 100% 0.00 0.00 0.00% 30.00 120.60 100.00% 30.00 120.60 100.00% 0.00 0.00 0.0%
03.12 SISTEMA DE PUESTA A TIERRA und 1.00 1,540.31 1,540.31 100% 0.00 0.00 0.00% 1.00 1540.31 100.00% 1.00 1540.31 100.00% 0.00 0.00 0.0%
04 INSTALACIONES SANITARIAS 4,955.51 3,251.68 1703.83 4955.51 0.00
04.01 APARATOS Y ACCESORIOS SANITARIOS 1,568.26 0.00 1568.26 1568.26 0.00
04.01.01 INODORO TANQUE BAJO COLOR pza 3.00 292.42 877.26 100% 0.00 0.00 0.00% 3.00 877.26 100.00% 3.00 877.26 100.00% 0.00 0.00 0.0%
04.01.02 LAVATORIOS TIPO OVALIN DE COLOR pza 2.00 174.62 349.24 100% 0.00 0.00 0.00% 2.00 349.24 100.00% 2.00 349.24 100.00% 0.00 0.00 0.0%
04.01.03 URINARIOS DE PARED COLOR pza 2.00 170.88 341.76 100% 0.00 0.00 0.00% 2.00 341.76 100.00% 2.00 341.76 100.00% 0.00 0.00 0.0%
04.02 SISTEMA DE DESAGUE Y VENTILACION 2,168.94 2,168.94 0.00 2168.94 0.00
04.02.01 SALIDA DE DESAGUE pto 9.00 104.94 944.46 100% 9.00 944.46 100.00% 0.00 0.00 0.00% 9.00 944.46 100.00% 0.00 0.00 0.0%
04.02.02 SALIDA DE VENTILACION DE 2" pto 2.00 101.83 203.66 100% 2.00 203.66 100.00% 0.00 0.00 0.00% 2.00 203.66 100.00% 0.00 0.00 0.0%
04.02.03 SUMIDERO CROMADO DE 2" pza 2.00 74.78 149.56 100% 2.00 149.56 100.00% 0.00 0.00 0.00% 2.00 149.56 100.00% 0.00 0.00 0.0%
04.02.04 REGISTRO ROSCADO DE BRONCE DE 4" und 1.00 84.60 84.60 100% 1.00 84.60 100.00% 0.00 0.00 0.00% 1.00 84.60 100.00% 0.00 0.00 0.0%
04.02.05 TUBERIA DE DESAGUE PVC SAL 2" m 24.00 9.16 219.84 100% 24.00 219.84 100.00% 0.00 0.00 0.00% 24.00 219.84 100.00% 0.00 0.00 0.0%
04.02.06 TUBERIA DE DESAGUE PVC SAL 4" m 15.00 11.50 172.50 100% 15.00 172.50 100.00% 0.00 0.00 0.00% 15.00 172.50 100.00% 0.00 0.00 0.0%
04.02.07 CAJA DE INSPECCION DESAGUE und 2.00 197.16 394.32 100% 2.00 394.32 100.00% 0.00 0.00 0.00% 2.00 394.32 100.00% 0.00 0.00 0.0%
04.03 INSTALACION DE AGUA FRIA 1,082.74 1082.74 0.00 1082.74 0.00
04.03.01 SALIDA DE AGUA FRIA pto 8.00 73.45 587.60 100% 8.00 587.60 100.00% 0.00 0.00 0.00% 8.00 587.60 100.00% 0.00 0.00 0.0%
04.03.02 VALVULA DE PASO und 2.00 14.75 29.50 100% 2.00 29.50 100.00% 0.00 0.00 0.00% 2.00 29.50 100.00% 0.00 0.00 0.0%
04.03.03 TUBERIA DE AGUA PVC SAP 1/2" m 40.00 7.56 302.40 100% 40.00 302.40 100.00% 0.00 0.00 0.00% 40.00 302.40 100.00% 0.00 0.00 0.0%
04.03.04 CAJA DE INSPECCION und 1.00 163.24 163.24 100% 1.00 163.24 100.00% 0.00 0.00 0.00% 1.00 163.24 100.00% 0.00 0.00 0.0%
04.04 SISTEMA DE AGUA DE LLUVIA 135.57 0.00 135.57 135.57 0.00
04.04.01 TUBERIA DE PVC SAL 2" m 10.60 12.79 135.57 100% 0.00 0.00 0.00% 10.60 135.57 100.00% 10.60 135.57 100.00% 0.00 0.00 0.0%
COSTO DIRECTO 205,560.20 100% 99,313.95 48.31% 106,246.25 51.69% 205,560.20 100.00% 0.00 0.00%