Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Variación de a a (valores interpolados basados en Terzaghi, Peck y Mesri, 1996) MODELO GEOTECNICO Esfuerzos Geoestáticos (ton/m2)
Calcular la capacidad de carga ultima neta del pilote
(Cu/Pa) a a Vs Cu/Pa 0.00 10.00 20.00 30.00 40.00 50.00 60.00
0.0 0.5 1.0 1.5 2.0 2.5 3.0 0
0.1 1.000 1.0 NAF
0.000 c= 6.00 ton/m2
0.2 0.920 g = 1.67 ton/m3
0.3 0.820 0.100 9.0 gsat= 1.72 ton/m3 5
ESTRATO I DE ARCILLA
0.4 0.740 f
R
=4
0.800
30
0.900
4 3 2
a = 0.026(Cu/Pa) - 0.2233(Cu/Pa) + 0.7498(Cu/Pa) - 1.1983(Cu/Pa) + 1.1187 Series1 Series2 Series3
R² = 0.9994
2
Pa=Presión Atmosférica = 100Kn/m
DATOS:
2
P DISEÑO (ton) = 150 NAF= 1.00 m
D= 1.60 m ER (m) = 3.00 m (Espesor Relleno)
P= 5.03 m
2
Ap= 2.0106 m F.S.= 2.00
3
g concreto = 2.4 ton/m FR SIS EXTR 0.65
NEGATIVA
FRICCIÓN
(*) 4 3 2
a = 0.026(Cu/Pa) - 0.2233(Cu/Pa) + 0.7498(Cu/Pa) - 1.1983(Cu/Pa) + 1.1187
Qsis compres adm=(Qp+Qs-Wpp)/F.S. (FR SIS COMPR) QUsis ext adm=((QUsis)/F.S.) FR Extr (ton)
0.45
Cu
a= C
2
Cu
kf=1-(senf)
LFN o Hf (m)
Pa
d=0.8f
Hasta ESPESOR gm o g sat s suelo U s' o s'o cu cu f= (*) a C u Qp
desde (m) (m) (m) (ton/m3) g (ton/m )
3
L (ton/m2) (ton/m2) (ton/m2) (ton/m2) (ton/m2) (ton/m2) f f (*)
a (ton/m2) Qs (ton) (ton) WPP (ton) QULT NETA COMP (ton) Qadm SIS COMP (ton) QULT SIS EXTRACCIÓN (ton) Qadm SIS EXTRACCIÓN (ton)
0 0 0.000 0.000 0.00 0.00 0.00 0 0 0 0 0 0 0 0.000 0.000 0.000 0.000 0.00 0.00 0 0 0 0 0 0
0.0 1.0 1.0 1.670 1.670 1.00 0.00 1.67 0.00 1.670 1.67 6.00 6.00 4.00 4.00 3.20 0.588 0.629 0.281 0.930 3.773 18.96 108.57 4.83 0.00 122.71 55.22 23.79 7.73
1.0 3.0 2.0 1.720 1.703 3.00 0.00 5.11 2.00 3.110 2.63 6.00 6.00 4.00 4.00 3.20 0.588 0.629 0.345 0.930 3.773 56.89 108.57 14.48 0.00 150.99 67.95 71.37 23.19
3.0 7.0 4.0 1.720 1.713 7.00 4.00 11.99 6.00 5.990 4.55 6.00 6.00 4.00 4.00 3.20 0.588 0.629 0.441 0.930 3.773 132.75 108.57 33.78 7.16 200.38 90.17 166.53 54.12
7.0 10.0 3.0 1.720 1.715 10.00 7.00 17.15 9.00 8.150 5.63 6.00 6.00 4.00 4.00 3.20 0.588 0.629 0.486 0.930 3.773 189.64 108.57 48.25 21.97 227.99 102.60 237.90 77.32
10.0 13.0 3.0 1.780 1.730 13.00 10.00 22.49 12.00 10.490 6.75 10.00 6.92 5.00 4.23 3.38 0.679 0.583 0.494 0.926 4.038 263.86 180.96 62.73 47.63 334.45 150.50 326.60 106.14
13.0 18.0 5.0 1.780 1.744 18.00 15.00 31.39 17.00 14.390 8.87 10.00 7.78 5.00 4.44 3.56 0.763 0.546 0.531 0.923 4.248 384.36 180.96 86.86 113.05 365.41 164.43 471.22 153.15
18.0 23.0 5.0 1.780 1.752 23.00 20.00 40.29 22.00 18.290 10.92 10.00 8.26 5.00 4.57 3.65 0.810 0.527 0.567 0.920 4.355 503.48 180.96 110.99 206.92 366.53 164.94 614.46 199.70
23.0 28.0 5.0 1.780 1.757 28.00 25.00 49.19 27.00 22.190 12.93 10.00 8.57 5.00 4.64 3.71 0.841 0.516 0.602 0.919 4.420 622.05 180.96 135.11 329.29 338.61 152.37 757.16 246.08
28.0 30.0 2.0 1.780 1.703 30.00 27.00 52.75 29.00 23.750 13.60 10.00 8.67 5.00 4.67 3.73 0.850 0.512 0.612 0.919 4.439 669.40 180.96 144.76 373.99 331.60 149.22 814.16 264.60
Capacidad de Carga Admisibles Métdo a, en suelos arcillosos CONSIDERANDO LA FRICCIÓN NEGATIVA ER (m) = 3.0
Capacidad de Carda Admisibles Sísmicas (ton) TAREA: METODO ALFA ENTREGA: antes del termino del día: 09/03/2022
0 50 100 150 200 250 300 P DISEÑO (ton) = 400 D= ? m
0.00 Lf (m) = ? Lf= ? m
0.00 28.00 F.S.= 2.0
150.00 28.00 FR SIS COMPRES= 0.90 FR SIS EXTR 0.65
DPILOTE (m)= 1.60 TAREA CARGA DE DISEÑO Pdiseño= 400.0 ton
5.00
P DISEÑO (ton) = 150 DETERMINAR PILOTE CIRCULAR D= ? m
Lf (m) = 28.0 LONGITUD DE DISEÑO DEL PILOTE Lpf= ? m
ESTRATIGRAFÍA
2
ESTRATO I Cu= 6 ton/m NAF= 1.00 m
10.00
Espesor 10.00 m f= 4
g= 1.67 ton/m
3
2
ESTRATO II Cu= 10 ton/m
15.00 Espesor 24.00 m f= 5
Profundidad en (m)
g= 1.75 ton/m
3
25.00
30.00
35.00