Está en la página 1de 16

AÑO PERIODOS HORAS DE TRABAJO Simple Moving Average

𝑌_𝑡
1 30 30 forecast s.e.
2 37 37
3 25 25 37 0
1
4 35 35 25 0
5 20 20 35 0
6 > 20 0

MAE MSE MAPE


12.3333333 156.333333 0.5052381

Simple Moving Average

30 forecast s.e.
37
25
35 31
20 30 5.52268051
> 27.5 6.37377439

MAE MSE MAPE


7 58 0.30714286
alpha 0.05

Forecast
lower upper
40
37 37 35
25 25 30
35 35 25
actual
20

value
20 20
forecast
15
10
5
0
1 2 3 4
time

alpha 0.05
Forecast
lower upper 40
35
30
25
19.1757451 40.8242549 actual
20
value

15.0076317 39.9923683 forecast


15
10
5
0
1 2 3 4
time
actual
forecast

actual
forecast
AÑO PERIODOS HORAS DE TRABAJO PREDICCIÓN ERROR
𝑌_𝑡 Y ̂_𝑝𝑟𝑒𝑑 𝑒=𝑌_𝑝𝑟𝑒𝑑−(𝑌_𝑑𝑎𝑡𝑜 ) ̂ 𝑒= 〖𝑎𝑏𝑠 (𝑌 〗 _𝑝−(𝑌_𝑑 ) ̂)
1 30
2 37
3 25
1
4 35 20.206750813977 -14.7932491860227
5 20 20.000000001733 1.73268688286043E-09
6 17.834505792551

Error Promedio ME -739.66%


Error Absoluto medio MAE 739.66%
Error absoluto medio re MAPE 21.13%
ERROR ABSOLUTO ERROR MEDIO t Pesos de ponderacion
𝑒= 〖𝑎𝑏𝑠 (𝑌 〗 _𝑝−(𝑌_𝑑
𝑒= 〖𝑎𝑏𝑠 (𝑌 〗 _𝑝−(𝑌_𝑑 ) ̂)/(𝑌_𝑑 ) ̂
) ̂ ) 1 0.207208088177349 PRED
2 0.280372845052258
40
3 0.155091778087001
35
suma 0.642672711316608
14.7932491860227 0.422664262457792 30
1.7326868828604E-09 8.66343441430218E-11 25
20
15
10
5
0
0 1 2

Colu
PREDICCION

1 2 3 4 5 6 7

Column C Column D
AÑO PERIODOS HORAS DE TRABAJO Exponential Smoothing
𝑌_𝑡
1 30 alpha 0.29761905
2 37
3 25 30 forecast s.e.
1
4 35 37 37
5 20 25 37
6 35 33.4285714 12
20 33.8962585 8.55772714
> 29.7604673 10.6391633

MAE MSE MAPE


9.15589569 113.191796 0.40657029
sig level 0.05

Forecast
40
lower upper 35
30
25
20 actual

value
9.90900361 56.9481392 forecast
17.1234215 50.6690955 15
8.90809036 50.6128442 10
5
0
1 2 3 4
time
actual
forecast

4
AÑO PERIODOS HORAS DE TRABAJO PREDICCIÓN ERROR
𝑌_𝑡 Y ̂_𝑝𝑟𝑒𝑑 𝑒=𝑌_𝑝𝑟𝑒𝑑−(𝑌_𝑑𝑎𝑡𝑜 ) ̂ 𝑒= 〖𝑎𝑏𝑠 (𝑌 〗 _𝑝−(𝑌_𝑑 ) ̂)
1 30 33.8 3.8
2 37 31.6 -5.4
3 25 29.4 4.4
4 35 27.2 -7.8
5 20 25 5
6 22.8
1
7 20.6
8 18.4
9 16.2
10 14
11 11.8
12 9.6
13 7.4
14 5.2
2
15 3
16 0.8

Error Promedio ME 0.00%


Error Absoluto medio MAE 528.00%
Error absoluto medio re MAPE 18.43%
ERROR ABSOLUTO ERROR MEDIO
𝑒= 〖𝑎𝑏𝑠 (𝑌 〗 _𝑝−(𝑌_𝑑
𝑒= 〖) ̂)𝑎𝑏𝑠 (𝑌 〗 _𝑝−(𝑌_𝑑 ) ̂)/(𝑌_𝑑 ) ̂ PREDICCION
3.8 0.126666666666667
40
5.4 0.145945945945946
4.4 0.176 35
7.8 0.222857142857143 30
f(x) = − 2.2 x + 36
5 0.25 R² = 0.245436105476673
25

20

15

10

0
0 1 2 3 4 5 6
DICCION

6673

4 5 6 7
AÑO PERIODOS HORAS DE TRABAJO Holt's Linear Trend
𝑌_𝑡
1 30 30 u v
2 37 37 37 0
3 25 25 33.7142857 -3.28571429
4 35 35 31.6802721 -2.03401361
5 20 20 27.0050211 -4.67525105
1
6 >
7 >
8 >
9 >
10 >

alpha beta MAE


0.27380952 1 8.73922902
sig level 0.05

forecast s.e. lower upper Forecast


40
37
35
30.4285714 12 6.90900361 53.9481392
30
29.6462585 9.08014205 11.8495071 47.4430099
25
22.32977 9.27268861 4.15563428 40.5039057
20

value
17.654519 10.5720306 -3.06628033 38.3753182
15
12.9792679 13.0301288 -12.5593153 38.517851
10
8.30401684 16.5204288 -24.0754286 40.6834622
5
3.62876579 20.8346179 -37.2063349 44.4638665
0
1 2 3 4
MSE MAPE
time
85.9827541 0.36430839
recast

actual
forecast
Técnicas predicción ERROR

Promedio Movil (2) 50.524%


Promedio Movil (3) 30.714%
Promedio ponderado 21.133%
Suavizacion exponencial 40.657%
Regresion Lineal 18.429%
Modelo Holt 36.431%

También podría gustarte