MANTENIMIENTO DE CAPTACION 01
PANEL FOTOFRAFICO
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICION SANITARIA DE EXCRETAS
DEL ANEXO CABRACANCHA EN LA C. PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA
DE ACOMAYO - DEPARTAMENTO DEL CUSCO
CORRESPONDIENTE AL MES DE AGOSTO 2021
AVANCES
PRESUPUESTO SALDO
ITEM
2 PARTIDAS NUEVAS 36,744.39 18,608.45 6.33% - 0.00% 18,608.45 6.33% 18,135.94 49.36%
4 PARTIDAS CON MAYORES METRADOS 61,710.59 19,737.72 10.09% 250.37 0.13% 19,988.09 10.22% 41,722.50 67.61%
COSTOS DIRECTO TOTAL 294,068.81 160,824.36 54.69% 2,420.56 0.82% 163,244.92 55.51% 130,823.89 44.49%
GASTOS GENERALES (20.2%) 29.3% 86,189.69 47,023.06 54.56% 312.74 0.36% 47,335.80 54.92% 38,853.89 45.08%
GASTOS SUPERVISION (4.4%) 6.4% 18,875.71 10,139.88 53.72% 53.82 0.29% 10,193.70 54.00% 8,682.01 46.00%
EXPEDIENTE TECNICO (2.5%) 3.6% 10,500.00 10,500.00 100.00% - 0.00% 10,500.00 100.00% - 0.00%
LIQUIDACION (3.9%) 5.7% 16,726.52 - 0.00% - 0.00% - 0.00% 16,726.52 100.00%
TOTAL VALORIZACION 426,360.73 228,487.30 53.59% 2,787.12 0.65% 231,274.42 54.24% 195,086.31 45.76%
COSTOS DIRECTO TOTAL 294,068.81 160,824.36 54.69% 2,420.56 0.82% 163,244.92 55.51% 130,823.89 44.49%
GASTOS GENERALES (20.2%) 29.3% 86,189.69 47,023.06 54.56% 312.74 0.36% 47,335.80 54.92% 38,853.89 45.08%
GASTOS SUPERVISION (4.4%) 6.4% 18,875.71 10,139.88 53.72% 53.82 0.29% 10,193.70 54.00% 8,682.01 46.00%
EXPEDIENTE TECNICO (2.5%) 3.6% 10,500.00 10,500.00 100.00% - 0.00% 10,500.00 100.00% - 0.00%
LIQUIDACION (3.9%) 5.7% 16,726.52 - 0.00% - 0.00% - 0.00% 16,726.52 100.00%
TOTAL VALORIZACION 426,360.73 228,487.30 53.59% 2,787.12 0.65% 231,274.42 54.24% 195,086.31 45.76%
13.- DATOS DE PERSONAL DEL PROYECTO: Según Expediente Técnico Actualmente en Obra Observación
Total de Personal: Categoría 0 21
Residente : RO 1
Supervisor / Inspector : IO 1
Asistente Técnico : A Tec. 1
Profecional I : PR-1 0 Se viene Tomando Personal
Asistente Administrativo : A Adm. 1 (Mano de Obra No
Topógrafo : T 0 Calificada) del Propio Sector.
Las inclemencias
Operador de Maquinaria II : OPER_MAQ_II 0 climatologicas y la distancia
Guardian : GUARD 0 de la obra tiene como
Almacenero : Alm 1 consecuencia los bajos
Maestro de Obra : MO 1 rendimientos.
Operarios II : Op II 2
Operarios I : Op I 1
Oficiales : Of I 4
Peones : P 8
CURVA "S" DE AVANCE FISICO PROGRAMADO Vs EJECUTADO
PROYECTO :MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE EXCRETAS DEL ANEXO
CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO -
DEPARTAMENTO DE CUSCO".
PROGRAMADO EJECUTADO
Nº PERIODO S/, PORCENTAJE S/, PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMUL. MENSUAL ACUMULADO MENSUAL ACUMUL.
INICIO 0.00% 0.00%
1 Dec-20 43,069.34 43,069.34 10.45% 10.45% 16,560.87 16,560.87 4.02% 4.02%
2 Jan-21 89,869.13 132,938.47 21.80% 32.25% 23,220.92 39,781.78 5.63% 9.65%
3 Feb-21 85,036.75 217,975.22 20.63% 52.88% 35,299.16 75,080.94 8.56% 18.21%
4 Mar-21 56,811.39 274,786.61 13.78% 66.66% 60,252.23 135,333.17 14.62% 32.83%
5 Apr-21 19,282.20 294,068.81 4.68% 71.34% 25,491.19 160,824.36 6.18% 39.02%
6 May-21 0.00 294,068.81 0.00% 71.34% - 160,824.36 0.00% 39.02%
7 Jun-21 2,849.43 296,918.24 0.69% 72.03% 2,420.56 163,244.92 0.59% 39.60%
8 Jul-21 55,202.93 352,121.17 13.39% 85.42% 77,071.10 240,316.02 18.70% 58.30%
9 Aug-21 31,317.20 383,438.37 7.60% 93.02% 240,316.02 0.00% 58.30%
10 sep-21 28,769.09 412,207.46 6.98% 100.00% 240,316.02 0.00% 58.30%
TOTALES (CD) 412,207.46 412,207.46 100.00% 100.00% 240,316.02 240,316.02 58.30% 58.30%
0
1
4 .
1
2
5
4
%
2
0
. %
0
8 R
P
0
.
4 G
O
%
2 R M
A A O
D
100.00% 100.00%
ACUMULADO
% AVANCE
93.02%
85.42%
80.00% 72.03%
71.34% 71.34%
66.66%
PROGRAMADO
EJECUTADO
60.00% 52.88% 58.30% 58.30% 58.30%
18.21%
20.00%
10.45% 9.65%
4.02%
0.00%
0.00%
0 1 1 1 1 1 1 1 1 1
INIC IO Dec -2 Jan -2 Feb -2 Mar -2 Ap r-2 May-2 Ju n -2 Ju l-2 Au g-2 sep -2
CURVA "S" DE AVANCE FINANCIERO PROGRAMADO Vs EJECUTADO
PROYECTO :":MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE EXCRETAS DEL ANEXO
CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO -
DEPARTAMENTO DE CUSCO".
PROGRAMADO EJECUTADO
Nº PERIODO S/, PORCENTAJE S/, PORCENTAJE
INICIO MENSUAL ACUMULADO MENSUAL ACUMUL.
0.00% MENSUAL ACUMULADO MENSUAL ACUMUL.
0.00%
1 Dec-20 63,251.35 63,251.35 10.45% 10.45% 163,786.53 163,786.53 27.06% 27.06%
2 Ene-21 131,981.22 195,232.57 21.80% 32.25% - 163,786.53 0.00% 27.06%
3 Feb-21 124,884.41 320,116.98 20.63% 52.88% 40,263.03 204,049.56 6.65% 33.71%
4 Mar-21 83,432.83 403,549.81 13.78% 66.66% 133,085.32 337,134.88 21.98% 55.69%
5 Apr-21 28,317.71 431,867.52 4.68% 71.34% 37,544.00 374,678.88 6.20% 61.89%
6 May-21 0.00 431,867.52 0.00% 71.34% 44,893.52 419,572.40 7.42% 69.31%
7 Jun-21 4,184.65 436,052.18 0.69% 72.03% 1,774.00 421,346.40 0.29% 69.60%
8 Jul-21 81,070.66 517,122.84 13.39% 85.42% 421,346.40 0.00% 69.60%
9 Aug-21 45,992.23 563,115.07 7.60% 93.02% 421,346.40 0.00% 69.60%
10 Sep-21 42,250.10 605,365.17 6.98% 100.00% 421,346.40 0.00% 69.60%
TOTALES 605,365.17 605,365.17 100.00% 100.00% 421,346.40 421,346.40 69.60% 69.60%
1
7
2
.
0 8
1
2
.
0
6
4
2
8
5 9
1
0
1
8
7
2
3 2
0
1
8
0 8
2
3
1
5
0 1
9
7 P
0 O
R
7
2
. R
G
5
0 A
8
5 M
2 D
A
2
3 O
2
7 0
8 1
5
1 100.00%
93.02%
ACUMULADO
% AVANCE
85.42%
0.8
71.34% 71.34% 72.03%
69.31% 69.60%
69.60% 69.60% 69.60%PROGRAMADO 0 0 0
66.66%
61.89% EJECUTADO 0 0 0
0.6
52.88% 55.69%
0.4
32.25% 33.71%
27.06% 27.06%
0.2
10.45%
0 0.00%
6 1 8 6 7 7 2 2 3 4
4418 En e-2 4422 4425 4 42 8 4 4 31 4 4 37 4440 4443 4446
AVANCE FISICO Y FINANCIERO DE LA OBRA
(EXP. TÉCNICO + ADICIONALES - DEDUCTIVO DE OBRA)
PROYECTO
MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE
EXCRETAS DEL ANEXO CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE
ACOMAYO - PROVINCIA DE ACOMAYO - DEPARTAMENTO DE CUSCO
AVANCE FINANCIERO
EVALUACION
EJECUTADO %
AVANCE ANTERIOR (ABRIL) #REF! #REF!
AVANCE DEL MES (MAYO - JUNIO) #REF! #REF!
UND
ITEM DESCRIPCION SEGÚN
EXPE.
SALDO
ANTERIOR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MES TOTAL
01 INSTALACIONES ELECTRICAS
02 PISOS Y PAVIMENTOS - - -
02.01 CONCRETO F'C = 140 KG/CM2 (PISO DE CONCRETO) M3 4.54 0.38 0.38 0.38 4.16
02.03 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 59.85 4.40 4.40 4.40 55.45
03.01 TARRAJEO INTERIOR Y EXTERIOR DEL MODULO m2 526.79 53.87 53.87 53.87 472.92
04 MANTENIMIENTO DE CAPTACION - - -
04.01 TARRAJEO INTERIOR MORTERO C:A MEZCLA 1:2 CON IMPERMEABILIZANTE m2 6.44 6.44 6.44 6.44 -
04.02 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4 m2 8.04 8.04 8.04 8.04 -
04.03 PINTADO DE MURO EXTERIOR CON LATEX ACRILICO (SUPERLATEX O SIMILAR) m2 10.67 10.67 10.67 10.67 -
05 PROTECCION DE CAPTACION - - -
05.02 MADERA ROLLIZO DE EUCALIPTO D=3"X1.70 M. UND 24 16.00 8.00 24.00 24.00 -
06 RESERVORIO DE 5M3 - - -
06.01.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) M3 2.65 - - 2.65
06.01.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8" M3 1.87 - - 1.87
06.01.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDRADO m2 1.08 - - 1.08
06.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) m2 49.86 - - 49.86
06.01.05 REVESTIMIENTOS - - -
06.01.06.01 SUMINISTRO E INSTALACION DE HIPOCLORADOR: TIPO DIFUSOR UND 3 3.00 3.00 3.00 -
06.01.07.01 SUMINISTRO E INSTALACION DE TAPA SANITARIA METALICA 0.60 x 0.60 mts, UND 2 - - 2.00
06.01.09 PINTURA - - -
06.01.09.01 PINTURA CON LATEX EN MUROS EXTERIORES m2 40.22 40.22 40.22 40.22 -
06.01.09.02 PINTURAANTICORROSIVA PARA TAPAS SANITARIAS METÁLICAS m2 0.72 0.72 0.72 0.72 -
06.01.10.09 POSTE DE TUBO DE NEGRO ESTRUCTURAL CUADRADO x 2" L=3.10 m. INC/PINTADO UND 13 - - 13.00
SUMINISTRO E INSTALACION DE MALLA METALICA PROTECTORA CON ALAMBRE N° 12 INC. ALAMBRE DE PUAS P/RESERVORIO H
06.01.10.10 m 20 - - 20.00
MALLA= 2 M.
06.02.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) M3 1.43 - - 1.43
06.02.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m ML 18 - - 18.00
06.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS. M3 2.14 0.14 0.14 0.14 2.00
06.02.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2 M3 0.1 0.10 0.10 0.10 -
06.02.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON PIEDRA CHANCADA M3 1.06 1.06 1.06 1.06 -
06.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE) m2 7.83 7.83 7.83 7.83 -
06.02.04.03 ACERO CORRUGADO Ø= 1/4",FY= 4,200 KG/CM2 GRADO 60 KG 12.35 7.35 7.35 7.35 5.00
06.02.05 REVESTIMIENTOS - - -
06.02.05.01 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4 m2 18.1 18.10 18.10 18.10 -
06.02.06.01 SUMINISTRO E INSTALACIÓN DE VÁLVULAS Y ACCESORIOS EN CASETA DE VALV. RESERVORIO ENT. 1" SALE 1 1/2" UND 3 3.00 3.00 3.00 -
06.02.07.01 SUMINISTRO E INSTALACION DE TAPA SANITARIA METALICA 0.60 x 0.60 mts, UND 2 2.00 2.00 2.00 -
06.02.08 PINTURA - - -
06.02.08.01 PINTURA CON LATEX EN MUROS EXTERIORES m2 4.1 4.10 4.10 4.10 -
06.02.08.02 PINTURAANTICORROSIVA PARA TAPAS SANITARIAS METÁLICAS m2 1.2 1.20 1.20 1.20 -
07 VIGA INCLINADA - - -
07.01 CONCRETO f 'c=210 kg/cm2 CON PIEDRA CHANCADA M3 2.14 0.25 0.25 0.25 1.89
07.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg 286.02 21.68 21.68 21.68 264.34
07.04 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4 m2 16.8 1.50 1.50 1.50 15.30
08 RED DE CONDUCCION - - -
08.01.01 ACABADOS - - -
08.01.01.01 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4 m2 5.46 5.46 5.46 5.46 -
08.01.01.02 PINTURA CON LATEX EN MUROS EXTERIORES m2 5.46 5.46 5.46 5.46 -
08.01.02 TUBERIAS - - -
08.01.02.02 ESTRUCTURA METALICA PARA TUBERIA GALVANIZADO EN PASE AEREO (N° 1) glb 1 - - 1.00
09.01 PUERTA METALICA 0.75X1.90M. SEGUN DISEÑO PARA UBS UND 21 5.00 5.00 10.00 20.00 20.00 1.00
09.02 VENTANA 0.7 X 0.40m DE MARCO DE PERFIL ANGULAR DE 2X2" UND 21 15.00 5.00 20.00 20.00 1.00
mayores metrados
02 SEGURIDAD, SALUD Y PLAN DE VIGILANCIA - - -
04 LINEA DE CONDUCCION - - -
04.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts. ML 64.687 64.69 64.69 64.69 -0.00
04.01.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION mes 0.23517 0.24 0.24 0.24 -
04.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m ML 64.69 22.69 42.00 64.69 64.69 -
04.02.02 EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70 ML 106.1657 106.17 106.17 106.17 -0.00
04.02.04 REFINE, NIVELACION TERRENO CON ROCA SUELTA P/TUB. H= 0.70 M ML 64.69 64.69 64.69 64.69 -
04.02.05 CAMA DE APOYO P/TUB. H= 0.10 M ML 170.8557 150.86 20.00 170.86 170.86 -0.00
04.02.07 RELLENO COMPACTADO P/TUB. H=0.7 M. C/MATERIAL DE PRESTAMO ML 170.8557 108.86 42.00 20.00 170.86 170.86 -0.00
04.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.019, C-10 DE 33 mm (Ø 1") ML 130.86 20.00 20.00 170.86 170.86 -0.00
170.8557
04.04.01 PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA ML 170.86 170.86 170.86 -0.00
170.8557
06 RED DE DISTRIBUCION - - -
06.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts. ML 185.81 185.81 185.81 -0.00
185.806
06.01.02 TRAZO Y REPLANTEO INICIAL m 185.81 185.81 185.81 -0.00
185.806
06.01.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION mes 4.8 4.80 4.80 4.80 -
06.02.01 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m ML 180.81 5.00 185.81 185.81 -0.00
185.806
06.02.02 REFINE, NIVELACION TERRENO CON TIERRA COMPACTA P/TUB. H 0.70 M ML 180.81 5.00 185.81 185.81 -0.00
185.806
06.02.03 CAMA DE APOYO P/TUB. H= 0.10 M ML 180.81 5.00 185.81 185.81 -0.00
185.806
06.02.04 RELLENO COMPACTADO P/TUB. H= 0.70 M C/MATERIAL PROPIO ML 152.82 28.00 5.00 185.82 185.82 -0.01
185.806
06.03.01 SUMINISTRO E INSTALACION TUBERIA NTP 399.019, C-10 DE 26.5 mm (Ø 3/4") ML 180.81 5.00 185.81 185.81 -0.00
185.806
07 INSTALACIONES DOMICILIARIAS (6 UND.) - - -
08.01.03 ALBAÑILERIA - - -
08.01.03.01 MURO DE LADRILLO KK DE ARCILLA EN SOGA MEZCLA 1:4 (CEMENTO:ARENA) m2 4.47 4.47 4.47 0.89
5.364
08.01.04 OBRAS DE CONCRETO SIMPLE - - -
08.01.04.01 CONCRETO F'C = 140 KG/CM2 + 30% DE P.G. P/CIMIENTO M3 1.35 1.35 1.35 0.08
1.4296
08.01.04.02 CONCRETO ARMADO - - -
08.01.04.02.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 1.62 1.19 1.19 1.19 0.43
08.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 17.856 14.88 14.88 14.88 2.98
08.01.04.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 75.57 75.57 75.57 15.52
91.0924
08.01.04.03 REVOQUES ENLUCIDOS Y MOLDURAS - - -
08.01.04.03.01 TARRAJEO MEZCLA 1:3 Y COLOREADO CON OCRE_x000D_ M2 2.71 2.71 2.71 32.64
35.353
08.01.04.04 VALVULAS Y ACCESORIOS - - -
08.01.05.10.01 PICAPORTES EN PUERTA DE 4"-UBS UND 2.00 2.00 1.00 5.00 5.00 1.00
6
08.01.05.10.02 TIRADOR PARA PUERTA UND 2.00 2.00 1.00 5.00 5.00 1.00
6
08.01.05.10.03 BISAGRAS PARA PUERTA UBS DE 3" UND 18 6.00 6.00 3.00 15.00 15.00 3.00
08.01.05.11 PINTURA - - -
08.01.05.11.01 PINTURA EN MUROS EXTERIORES E INTERIORES (02 MANOS) m2 22.34 22.34 22.33 22.33 22.33 22.33 134.00 134.00 24.63
158.625
08.01.06 INSTALACIONES SANITARIAS - - -
08.01.06.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto - - 12.00
12
08.01.06.01.02 VALVULA COMPUERTA DE BRONCE DE 1/2" und - - 6.00
6
08.01.06.01.03 ACCESORIOS PVC SAP EN REDES DE DISTRIBUCION GLB 0.5 - - 0.50
08.01.06.02.04 INSTALACION DE TUBERIA DE PVC SAL 4" m 42.40 42.40 42.40 49.10
91.5
08.01.06.02.05 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza - - 6.00
6
08.01.06.02.06 SALIDA DE VENTILACION DE 2" GLB - - 0.50
0.5
08.01.06.02.07 INODORO TANQUE BAJO BLANCO UND - - 6.00
6
8.02 BIODIGESTOR Y POZOS DE FILTRACION - - -
08.04.01.01 CAJA OCTOGONAL PARA INTERRUPTOR SIMPLE pto 5.00 5.00 5.00 1.00
6
08.04.02 CANALIZACION - - -
PROGRAMDO - ET
06 RED DE DISTRIBUCION - - -
06.04.05 CONCRETO f'c=175 kg/cm2 EN CAJA DE VALVULA CON PIEDRA CHANCADA M3 1.91 1.09 1.09 1.09 0.82
06.04.06 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA C:A 1:4 m2 6.64 6.64 6.64 4.96
11.6
06.04.07 SUMINISTRO E INSTALACION DE TAPA SANITARIA METALICA 0.40 x 0.40 mts. UND 3.57 3.57 3.57 6.43
10
06.04.08 SUMINISTRO E INSTALACION DE VALVULA DE CONTROL DE 1" EN RED DE DISTRIBUCIÓN UND 1.57 1.57 1.57 1.43
3
06.04.09 SUMINISTRO E INSTALACION DE VALVULA DE CONTROL DE 3/4" EN RED DE DISTRIBUCIÓN UND 1.14 1.14 1.14 4.86
6
06.04.10 SUMINISTRO E INSTALACION DE VALVULA DE CONTROL DE 1/2" EN RED DE DISTRIBUCIÓN UND 0.86 0.86 0.86 0.14
1
06.04.12 RELLENO CON MATERIAL PERMEABLE 1/2" M3 0.024242 0.39 0.39 0.39 -0.37
06.05.07 ASENTADO DE PIEDRA MEDIANA CON CONCRETO Fc=100 KG/CM2 E=0.20 M. m2 13.54715 0.14 0.14 0.14 13.41
06.05.08 TARRAJEO EN INTERIORES Y EXTERIORES ACABADO CON CEMENTO Y ARENA C:A 1:4 m2 1.16 1.16 1.16 14.08
15.24358
06.05.09 SUMINISTRO E INSTALACION DE TAPA SANITARIA METALICA 0.40 x 0.40 mts. UND 1.00 1.00 1.00 15.94
16.94
06.05.10 SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE 1/2" EN RED DE DISTRIBUCIÓN UND 0.63 0.63 0.63 18.01
18.63642
06.05.11 SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE 3/4" EN RED DE DISTRIBUCIÓN UND 0.38 0.38 0.38 19.95
20.33285
06.05.12 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METÁLICAS m2 0.32 0.32 0.32 21.71
22.02927
06.05.13 RELLENO CON MATERIAL PERMEABLE 1/2" M3 0.07 0.07 0.07 23.66
23.7257
8 UBS - LETRINA CON BIODIGESTOR (15 UND) - - -
08.01.05.10 CERRAJERIA - - -
08.01.05.10.01 PICAPORTES EN PUERTA DE 4"-UBS UND 7.00 3.00 5.00 15.00 15.00 -
15
08.01.05.10.02 TIRADOR PARA PUERTA UND 15 7.00 3.00 5.00 15.00 15.00 -
08.01.05.10.03 BISAGRAS PARA PUERTA UBS DE 3" UND 21.00 9.00 15.00 45.00 45.00 -
45
08.01.05.11.01 PINTURA EN MUROS EXTERIORES E INTERIORES (02 MANOS) m2 119.50 119.50 119.50 358.50 358.50 -
358.5
8.02 BIODIGESTOR Y POZOS DE FILTRACION - - -
MAYORES METRADO 01
02 SEGURIDAD, SALUD Y PLAN DE VIGILANCIA - - -
PARTIDAS NUEVAS 01
1 OBRAS PROVISIONALES - - -
m3 concreto ###
m2 tarrajeo
m3 acentado de muro
TARRAJEO
OBRA : "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE EXCRETAS DEL ANEXO CABRACA
DEPARTAMENTO DE CUSCO”
LUNES 02/08/2021
8.02 BIODIGESTOR Y POZOS DE FILTRACION
DESCRIPCIÓN
DESCRIPCIÓN
MARTES 03/08/2021
8.02 BIODIGESTOR Y POZOS DE FILTRACION
DESCRIPCIÓN
PROGRAMADO - ET
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
JUEVES 05/08/2021
8.02 BIODIGESTOR Y POZOS DE FILTRACION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
VIERNES 06/08/202
8.02 BIODIGESTOR Y POZOS DE FILTRACION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
SABADO 07/08/2021
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
MARTES 10/08/2021
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
06 RED DE DISTRIBUCION
DESCRIPCIÓN
PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS METÁLICAS
06 RED DE DISTRIBUCION
DESCRIPCIÓN
JUEVES 19/08/2021
8 UBS - LETRINA CON BIODIGESTOR (15 UND) - CERRAJERIA
DESCRIPCIÓN
DESCRIPCIÓN
VIERNES 20/08/202
8 UBS - LETRINA CON BIODIGESTOR (15 UND) - CERRAJERIA
DESCRIPCIÓN
DESCRIPCIÓN
SABADO 21/08/2021
8 UBS - LETRINA CON BIODIGESTOR (15 UND) - CERRAJERIA
DESCRIPCIÓN
MIERCOLES 25/08/20
10 IMPLEMENTACION DEL PLAN DE MANEJO AMBIENTAL
DESCRIPCIÓN
DESCRIPCIÓN
DESCRIPCIÓN
JUEVES 26/08/2021
1 OBRAS PROVISIONALES
DESCRIPCIÓN
1 OBRAS PROVISIONALES
DESCRIPCIÓN
VIERNES 27/08/202
8 UBS - LETRINA CON BIODIGESTOR (15 UND) - CERRAJERIA
DESCRIPCIÓN
DESCRIPCIÓN
DESCRIPCIÓN
SABADO 28/08/2021
08.04 INSTALACIONES ELECTRICAS
DESCRIPCIÓN
TUBERIAS PVC-SAP ELECTRICA DE 20MM
DESCRIPCIÓN
DESCRIPCIÓN
DESCRIPCIÓN
MARTES 31/08/2021
8 UBS - LETRINA CON BIODIGESTOR (15 UND) - CERRAJERIA
DESCRIPCIÓN
DESCRIPCIÓN
DESCRIPCIÓN
11 PLACA RECORDATORIA
DESCRIPCIÓN
PLACA RECORDATORIA
RADOS - de 01 a 31 AGOSTO 2021
EXCRETAS DEL ANEXO CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO -
DEPARTAMENTO DE CUSCO”
LUNES 02/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 4 4.00
TOTAL METRADO 4.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 1.00
TOTAL METRADO 1.00
MARTES 03/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 4 4.00
TOTAL METRADO 4.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 1.00 4.50 1.44 0.50 3.24
TOTAL METRADO 3.24
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 1.50 4.00 3.35 0.50 10.06
TOTAL METRADO 10.06
ERCOLES 04/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 1.50 4.00 3.35 0.50 10.06
TOTAL METRADO 10.06
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 4.00 2.86 11.42
TOTAL METRADO 11.42
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 3.75 2.90 0.10 1.09
TOTAL METRADO 1.09
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 3.02 2.20 6.64
TOTAL METRADO 6.64
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 1 3.57 3.57
TOTAL METRADO 3.57
JUEVES 05/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 4 4.00
TOTAL METRADO 4.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 1.50 2.00 3.35 0.50 5.03
TOTAL METRADO 5.03
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 1 1.57 1.57
TOTAL METRADO 1.57
ELEMENTOS DE MEDIDA
UND.
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 1 1.14 1.14
TOTAL METRADO 1.14
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 1 0.86 0.86
TOTAL METRADO 0.86
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 0.39 1.00 0.39
TOTAL METRADO 0.39
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 0.73 0.73
TOTAL METRADO 0.73
IERNES 06/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 0.57 1.00 0.57
TOTAL METRADO 0.57
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 1.50 3.99 3.00 0.50 8.97
8.97
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 3.13 0.64 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 0.60 0.60 0.53 0.19
TOTAL METRADO 0.19
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M 1 67.50 67.50
TOTAL METRADO 67.50
ABADO 07/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 0.60 0.60 0.24 0.09
TOTAL METRADO 0.09
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 0.60 0.60 0.38 0.14
TOTAL METRADO 0.14
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 1.20 0.97 1.16
TOTAL METRADO 1.16
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 1 1.00
TOTAL METRADO 1.00
MARTES 10/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 1.50 3.98 3.00 0.50 8.96
8.96
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 0.63 0.63
TOTAL METRADO 0.63
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 0.38 0.38
TOTAL METRADO 0.38
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 0.32 0.32
TOTAL METRADO 0.32
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M3 1 0.07 1.00 0.07
TOTAL METRADO 0.07
JUEVES 19/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 119.50 119.50
TOTAL METRADO 119.50
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 1.00
TOTAL METRADO 1.00
IERNES 20/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 119.50 119.50
TOTAL METRADO 119.50
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 2 2.00
TOTAL METRADO 2.00
ABADO 21/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M2 1 119.50 119.50
TOTAL METRADO 119.50
ERCOLES 25/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 1.00 1.00
TOTAL METRADO 1.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 0.50 0.50
TOTAL METRADO 0.50
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
MES 1 1.00 1.00
TOTAL METRADO 1.00
JUEVES 26/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 0.50 0.50
TOTAL METRADO 0.50
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 0.50 0.50
TOTAL METRADO 0.50
IERNES 27/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 7 7.00
TOTAL METRADO 7.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 7 7.00
TOTAL METRADO 7.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 21 21.00
TOTAL METRADO 21.00
ABADO 28/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
M 1 57.20 57.20
TOTAL METRADO 57.20
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 9 9.00
TOTAL METRADO 9.00
MARTES 31/08/2021
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
UND. 15 15.00
TOTAL METRADO 15.00
ELEMENTOS DE MEDIDA
UND.
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
GBL 1 1.00
TOTAL METRADO 1.00
HOJA DE METRADOS - de 01 a 31 AGOS
OBRA : "MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE EXCRETAS DEL ANEXO CABRACANCHA EN
DEPARTAMENTO DE CUSCO”
LUNES 02/08/2021
MAYOR METRADO
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06.02.03 CAMA DE APOYO P/TUB. H= 0.10 M ML
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
MARTES 03/08/2021
MAYOR METRADO
DESCRIPCIÓN UND.
08.02.04 BIODIGESTOR
DESCRIPCIÓN UND.
08.02.04 BIODIGESTOR
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
MIERCOLES 04/08/2021
08 UBS - LETRINA CON BIODIGESTOR (21 UND)
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
JUEVES 05/08/2021
8.02 BIODIGESTOR Y POZOS DE FILTRACION
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
VIERNES 06/08/2021
04 MANTENIMIENTO DE CAPTACION
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
04 MANTENIMIENTO DE CAPTACION
DESCRIPCIÓN UND.
04 MANTENIMIENTO DE CAPTACION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
SABADO 07/08/2021
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
LUNES 09/08/2021
COLOCACION D
COLOCACION DE TAPAS EN CAJA DE LODOS
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
MARTES 10/08/2021
PARTIDA NUEVA 02
02 PISOS Y PAVIMENTOS
DESCRIPCIÓN UND.
02 PISOS Y PAVIMENTOS
DESCRIPCIÓN UND.
02 PISOS Y PAVIMENTOS
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
MAYOR METRADO
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
MIERCOLES 11/08/2021
MAYOR METRADO
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
JUEVES 12/08/2021
03 TARRAJEO INTERIOR Y EXTERIOR DEL MODULO
DESCRIPCIÓN UND.
07 VIGA INCLINADA
DESCRIPCIÓN UND.
07 VIGA INCLINADA
DESCRIPCIÓN UND.
07 VIGA INCLINADA
DESCRIPCIÓN UND.
MAYOR METRADO
08.02.04 BIODIGESTOR
DESCRIPCIÓN UND.
08.02.04 BIODIGESTOR
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
06 RED DE DISTRIBUCION
DESCRIPCIÓN UND.
VIERNES 13/08/2021
PARTIDA NUEVA 01
07 VIGA INCLINADA
DESCRIPCIÓN UND.
MAYORES METRADOS
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB. A= 0.60 m H= 0.70 ML.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
SABADO 14/08/2021
MAYORES METRADOS
05 PROTECCION DE CAPTACION
DESCRIPCIÓN UND.
MADERA ROLLIZO DE EUCALIPTO D=3"X1.70 M. UND.
05 PROTECCION DE CAPTACION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
04 LINEA DE CONDUCCION
DESCRIPCIÓN UND.
LUNES 16/08/2021
06.02 CASETA DE VALVULAS PARA RESERVORIOS
DESCRIPCIÓN UND.
MARTES 17/08/2021
08.01.05.11 PINTURA
DESCRIPCIÓN UND.
PINTURA BITUMINOSA M2
º MANTENIMIENTO DE PASE AEREO 10 ML. (01 UNIDAD) EN RED DE CONDUCCION
DESCRIPCIÓN UND.
MIERCOLES 18/08/2021
MAYOR METRADO
08.01.05.11 PINTURA
DESCRIPCIÓN UND.
JUEVES 19/08/2021
08.01.05.11 PINTURA
DESCRIPCIÓN UND.
VIERNES 20/08/2021
08.01.05.11 PINTURA
DESCRIPCIÓN UND.
SABADO 21/08/2021
06.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
DESCRIPCIÓN UND.
08.01.05.11 PINTURA
DESCRIPCIÓN UND.
LUNES 23/08/2021
08.01.05.11 PINTURA
DESCRIPCIÓN UND.
MARTES 24/08/2021
06 RESERVORIO DE 5M3
DESCRIPCIÓN UND.
06 RESERVORIO DE 5M3
DESCRIPCIÓN UND.
MIERCOLES 25/08/2021
MAYOR METRADO
05 PROTECCION DE CAPTACION
DESCRIPCIÓN UND.
MALLA GANADERA DE 1.2X100M ML
05 PROTECCION DE CAPTACION
DESCRIPCIÓN UND.
01 INSTALACIONES ELECTRICAS
DESCRIPCIÓN UND.
LUMINARIAS UND.
01 INSTALACIONES ELECTRICAS
DESCRIPCIÓN UND.
CANALIZACION UND.
JUEVES 26/08/2021
MAYOR METRADO
01 INSTALACIONES ELECTRICAS
DESCRIPCIÓN UND.
01 INSTALACIONES ELECTRICAS
DESCRIPCIÓN UND.
LUMINARIAS UND.
DESCRIPCIÓN UND.
VIERNES 27/08/2021
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
SABADO 28/08/2021
09 PUERTA Y VENTANA METALICA
DESCRIPCIÓN UND.
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
MARTES 31/08/2021
09 PUERTA Y VENTANA METALICA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
08.01.05.10 CERRAJERIA
DESCRIPCIÓN UND.
EXCRETAS DEL ANEXO CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO -
DEPARTAMENTO DE CUSCO”
LUNES 02/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 4.80 4.80
TOTAL METRADO 4.80
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 180.81 180.81
TOTAL METRADO 180.81
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 10.00 10.00
TOTAL METRADO 10.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
MARTES 03/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 67.50 67.50
TOTAL METRADO 67.50
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 19.10 19.10
TOTAL METRADO 19.10
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 22.69 22.69
TOTAL METRADO 22.69
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1 2.05 1.20 12.30
TOTAL METRADO 12.30
ERCOLES 04/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 1 0.81 0.50 1.62
TOTAL METRADO 1.62
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1 2.50 1.08 13.50
TOTAL METRADO 13.50
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1 1.00 0.67 0.60 2.02
TOTAL METRADO 2.02
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1 2.50 1.08 13.50
TOTAL METRADO 13.50
JUEVES 05/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1.00 0.89 4.47
TOTAL METRADO 4.47
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.20 1.13 1.35
TOTAL METRADO 1.35
IERNES 06/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1 3.00 2.15 6.44
TOTAL METRADO 6.44
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1 3.50 2.30 8.04
TOTAL METRADO 8.04
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1 3.70 2.88 10.67
TOTAL METRADO 10.67
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 130.86 130.86
TOTAL METRADO 130.86
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 170.86 170.86
TOTAL METRADO 170.86
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 33.80 33.80
TOTAL METRADO 33.80
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 42.40 42.40
TOTAL METRADO 42.40
ABADO 07/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.19 1.00 1.19
TOTAL METRADO 1.19
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 14.88 1.00 14.88
TOTAL METRADO 14.88
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 75.57 1.00 75.57
TOTAL METRADO 75.57
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 2.71 2.71
TOTAL METRADO 2.71
LUNES 09/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
12 1.00 12.00
TOTAL METRADO 12.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1 108.86 108.86
TOTAL METRADO 108.86
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 1.04 1.00 4.16
TOTAL METRADO 4.16
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 1.00 1.00 0.81 3.24
TOTAL METRADO 3.24
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 2 2.10 2.46 0.81 25.15
TOTAL METRADO 25.15
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 1.70 1.68 11.42
TOTAL METRADO 11.42
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 1.45 1.45 0.13 1.09
TOTAL METRADO 1.09
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 1.66 1.00 6.64
TOTAL METRADO 6.64
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 3.57
TOTAL METRADO 3.57
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1.57 1.57
TOTAL METRADO 1.57
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1.14 1.14
TOTAL METRADO 1.14
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
4 0.60 0.60 0.27 0.39
TOTAL METRADO 0.39
MARTES 10/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 2.65 1.30 0.11 0.38
TOTAL METRADO 0.38
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 2.00 1.38 2.76
TOTAL METRADO 2.76
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 3.19 1.38 4.40
TOTAL METRADO 4.40
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 28.00 28.00
TOTAL METRADO 28.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 15.00 15.00
TOTAL METRADO 15.00
ERCOLES 11/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 42.00 42.00
TOTAL METRADO 42.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 64.69 64.69
TOTAL METRADO 64.69
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 150.86 150.86
TOTAL METRADO 150.86
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 42.00 42.00
TOTAL METRADO 42.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 20.00 20.00
TOTAL METRADO 20.00
JUEVES 12/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
8 2.69 2.50 53.87
TOTAL METRADO 53.87
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.40 1.20 0.15 0.25
TOTAL METRADO 0.25
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22 21.68
TOTAL METRADO 21.68
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 2.60 1.21 3.15
TOTAL METRADO 3.15
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 15.00 15.00
TOTAL METRADO 15.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 15.00 15.00
TOTAL METRADO 15.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 5.00 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 5.00 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 5.00 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 5.00 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 5.00 5.00
TOTAL METRADO 5.00
IERNES 13/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.50 1.00 1.50
TOTAL METRADO 1.50
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 106.17 106.17
TOTAL METRADO 106.17
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 20.00 20.00
TOTAL METRADO 20.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 20.00 20.00
TOTAL METRADO 20.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 20.00 20.00
TOTAL METRADO 20.00
ABADO 14/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
16 16.00
TOTAL METRADO 16.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
0.20 0.20
TOTAL METRADO 0.20
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
64.69 64.69
TOTAL METRADO 64.69
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
170.86 170.86
TOTAL METRADO 170.86
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
0.23517 0.23517
TOTAL METRADO 0.24
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
0.23517 0.23517
TOTAL METRADO 0.24
LUNES 16/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 0.10 1.00 0.10
TOTAL METRADO 0.10
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
18.10 18.10
TOTAL METRADO 18.10
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
7.83 7.83
TOTAL METRADO 7.83
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1.06 1.00 1.06
TOTAL METRADO 1.06
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 4.10 4.10
TOTAL METRADO 4.10
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.20 1.20
TOTAL METRADO 1.20
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 7 7.35
TOTAL METRADO 7.35
MARTES 17/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22.34 22.34
TOTAL METRADO 22.34
DE CONDUCCION
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
8 0.30 2.20 5.28
2 0.30 0.30 0.18
TOTAL METRADO 5.46
DE CONDUCCION
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
8 0.30 2.20 5.28
2 0.30 0.30 0.18
TOTAL METRADO 5.46
DE CONDUCCION
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
8 0.30 2.20 5.28
2 0.30 0.30 0.18
TOTAL METRADO 5.46
ERCOLES 18/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 0.60 0.60
TOTAL METRADO 0.60
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 0.60 0.60
TOTAL METRADO 0.60
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00 1.00 0.14 0.14
0.14
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22.34 22.34
TOTAL METRADO 22.34
JUEVES 19/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22.33 22.33
TOTAL METRADO 22.33
IERNES 20/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22.33 22.33
TOTAL METRADO 22.33
ABADO 21/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22.33 22.33
TOTAL METRADO 22.33
LUNES 23/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 22.33 22.33
TOTAL METRADO 22.33
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
MARTES 24/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 40.22 40.22
TOTAL METRADO 40.22
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1 0.72 0.72
TOTAL METRADO 0.72
ERCOLES 25/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 0.40 0.40
TOTAL METRADO 0.40
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
8 8.00
TOTAL METRADO 8.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 78.48 78.48
TOTAL METRADO 78.48
JUEVES 26/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 1 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
15 1 15.00
TOTAL METRADO 15.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
3 3.56 10.67
TOTAL METRADO 10.67
IERNES 27/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
15 15.00
TOTAL METRADO 15.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
6 6.00
TOTAL METRADO 6.00
ABADO 28/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
5 5.00
TOTAL METRADO 5.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
2 2.00
TOTAL METRADO 2.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
6 6.00
TOTAL METRADO 6.00
MARTES 31/08/2021
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
10 10.00
TOTAL METRADO 10.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00
TOTAL METRADO 1.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
1 1.00
TOTAL METRADO 1.00
ELEMENTOS DE MEDIDA
Cant. NºVº Area (m2) Largo (m) Ancho (m) Altura (m) Sub-total
3 3.00
TOTAL METRADO 3.00
ELEMENTOS DE MEDIDA
NºVº fac. f Longitud (m) Ancho (m) Alto (m) Sub-total
0.70 1.50 4.20
0.70 1.50 4.20
TOTAL METRADO 8.40
ELEMENTOS DE MEDIDA
NºVº fac. f Longitud (m) Ancho (m) Alto (m) Sub-total
0.70 1.50 4.20
0.70 1.50 4.20
TOTAL METRADO 8.40
PARTIDAS DEL EXPEDIENTE TECNICO VALORIZACION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL - 2021
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE ACOMAYO EJECUCION PRESUPUESTAL DIRECTA
META : 056 FUENTE DE FINANCIAMIENTO CANON
: Y SOBRE CANON
OBRA/PIP :MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE
EXCRETAS DEL ANEXO CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE MES / AÑO : ABRIL - 2021
ACOMAYO - PROVINCIA DE ACOMAYO - DEPARTAMENTO DE CUSCO
MONTO 426,360.73
DESCRIPCION PRESUPUESTO BASE AVANCE ACUMULADO ANTERIOR AVANCE MES ACTUAL AVANCE ACUMULADO ACTUAL SALDOS
ITEM
DE LA PARTIDA UND METRADO PRECIO SUB-TOTAL METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL % METRADO PARCIAL %
01.01 ALMACEN, DEPOSITO (NO INCLUYE DESMONTAJE) m2 70.00 55.60 3,892.00 70.00 3,892.00 100.00% - 0.00% 70.00 3,892.00 100.00% - - 0.00%
01.02 CARTEL DE OBRA 3.60 x 2.40 UND 1.00 471.70 471.70 1.00 471.70 100.00% - 0.00% 1.00 471.70 100.00% - - 0.00%
02 SEGURIDAD, SALUD Y PLAN DE VIGILANCIA 0.00 14,226.00 14,226.00 - 14,226.00 -
02.01 SEGURIDAD Y SALUD -
ELABORACION, IMPLEMENTACION Y
02.01.01 ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD GLB 1.00 1,100.00 1,100.00 1.00 1,100.00 100.00% - 0.00% 1.00 1,100.00 100.00% - - 0.00%
EN EL TRABAJO
02.01.02 EQUIPOS DE PROTECCION PERSONAL glb 1.00 3,976.00 3,976.00 1.00 3,976.00 100.00% - 0.00% 1.00 3,976.00 100.00% - - 0.00%
02.01.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 750.00 750.00 1.00 750.00 100.00% - 0.00% 1.00 750.00 100.00% - - 0.00%
02.01.04 CAPACITACION EN SEGURIDAD Y SALUD mes 2.00 1,200.00 2,400.00 2.00 2,400.00 100.00% - 0.00% 2.00 2,400.00 100.00% - - 0.00%
02.01.05 PRUEBAS RAPIDAS COVID-19 glb 1.00 6,000.00 6,000.00 1.00 6,000.00 100.00% - 0.00% 1.00 6,000.00 100.00% - - 0.00%
03 CONSTRUCCION DE CAPTACIONES - 0.00 15,622.32 6,095.70 - 6,095.70 9,526.61
03.01 CAPTACION NORMAL (02 UNIDADES)
03.01.01 TRABAJOS PRELIMINARES
DEMOLICION MANUAL DE ESTRUCTURAS DE
03.01.01.01 M3 2.75 52.50 144.38 2.75 144.38 100.00% - 0.00% 2.75 144.38 100.00% - - 0.00%
CONCRETO
03.01.01.02 LIMPIEZA DE TERRENO MANUAL m2 72.00 0.21 15.12 72.00 15.12 100.00% - 0.00% 72.00 15.12 100.00% - - 0.00%
03.01.01.03 TRAZO NIVELES Y REPLANTEO M2 72.00 0.96 69.13 72.00 69.13 100.00% - 0.00% 72.00 69.13 100.00% - - 0.00%
03.01.01.04 TRAZO Y REPLANTEO DURANTE LA EJECUCION mes 0.27 536.11 144.75 0.27 144.75 100.00% - 0.00% 0.27 144.75 100.00% - - 0.00%
03.01.02 MOVIMIENTO DE TIERRAS
03.01.02.01 EXCAVACION MANUAL EN TERRENO COMPACTO M3 14.97 13.73 205.54 14.97 205.54 100.00% - 0.00% 14.97 205.54 100.00% - - 0.00%
ELIMINACION DE MATERIAL EXCEDENTE D= 30
03.01.02.02 M3 14.65 6.87 100.65 14.65 100.65 100.00% - 0.00% 14.65 100.65 100.00% - - 0.00%
MTS.
03.01.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 14.35 0.52 7.46 14.35 7.46 100.00% - 0.00% 14.35 7.46 100.00% - - 0.00%
03.01.02.04 RELLENO COMPACTADO MANUAL PROPIO M3 2.25 6.03 13.57 2.25 13.57 100.00% - 0.00% 2.25 13.57 100.00% - - 0.00%
03.01.03 OBRAS DE CONCRETO SIMPLE
CONCRETO f 'c=210 kg/cm2 CON PIEDRA CHANCADA
03.01.03.01 M3 1.38 789.66 1,089.73 1.38 1,089.73 100.00% - 0.00% 1.38 1,089.73 100.00% - - 0.00%
EN MUROS Y BASE DE CAPTACION
CONCRETO F'C= 100 KG/CM2 C/HORMIGON PARA
03.01.03.02 SELLO DE PROTECCION, SOLADO DE CAMARA HUMEDA M3 1.73 390.26 675.15 1.73 675.15 100.00% - 0.00% 1.73 675.15 100.00% - - 0.00%
Y RELLENO IMPERMEABLE
DADO DE PROTECCION TUBERIA DE REBOSE
03.01.03.03 M3 0.05 607.56 30.38 0.05 30.38 100.00% - 0.00% 0.05 30.38 100.00% - - 0.00%
CONCRETO F'C = 140 KG/CM2
ASENTADO DE PIEDRA MEDIANA CON CONCRETO
03.01.03.04 m2 0.40 93.72 37.49 0.40 37.49 100.00% - 0.00% 0.40 37.49 100.00% - - 0.00%
Fc=100 KG/CM2 E=0.20 M.
ENCOFRADO Y DESENCOFRADO NORMAL PARA
03.01.03.05 m2 18.84 23.55 443.68 18.84 443.68 100.00% - 0.00% 18.84 443.68 100.00% - - 0.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
03.01.04 OBRAS DE CONCRETO ARMADO
CONCRETO f 'c=210 kg/cm2 EN PAREDES Y LOSA DE
03.01.04.01 M3 1.29 789.66 1,018.66 1.29 1,018.66 100.00% - 0.00% 1.29 1,018.66 100.00% - - 0.00%
CAMARA HUMEDA DE CAPTACION
ENCOFRADO Y DESENCOFRADO NORMAL PARA
03.01.04.02 m2 14.50 23.55 341.48 14.50 341.48 100.00% - 0.00% 14.50 341.48 100.00% - - 0.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
ACERO CORRUGADO Ø= 3/8", FY= 4,200 KG/CM2
03.01.04.03 KG 70.30 3.90 274.17 70.30 274.17 100.00% - 0.00% 70.30 274.17 100.00% - - 0.00%
GRADO 60
03.01.05 REVESTIMIENTOS -
TARRAJEO INTERIOR CON MORTERO C:A MEZCLA
03.01.05.01 m2 14.33 20.80 298.06 14.33 298.06 100.00% - 0.00% 14.33 298.06 100.00% - - 0.00%
1:2 CON IMPERMEABILIZANTE
TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA
03.01.05.02 m2 17.56 16.64 292.20 17.56 292.20 100.00% - 0.00% 17.56 292.20 100.00% - - 0.00%
1:4
03.01.06 VALVULAS Y ACCESORIOS -
SUMINISTRO E INSTALACION DE ACCESORIOS EN
03.01.06.01 UND 1.00 208.00 208.00 1.00 208.00 100.00% - 0.00% 1.00 208.00 100.00% - - 0.00%
CAPTACION SALIDA D=1" REBOSE DE 2"
SUMINISTRO E INSTALACION DE ACCESORIOS EN
03.01.06.02 UND 1.00 210.38 210.38 - - 0.00% - 0.00% - - 0.00% 1.00 210.38 100.00%
CAPTACION SALIDA D=1 1/2" REBOSE DE 2"
03.01.07 LECHO FILTRANTE -
03.01.07.01 RELLENO CON MATERIAL PERMEABLE 1" - 2" M3 2.31 75.87 175.26 2.31 175.26 100.00% - 0.00% 2.31 175.26 100.00% - - 0.00%
03.01.07.02 RELLENO CON MATERIAL PERMEABLE 1/2" - 3/4" M3 3.08 75.87 233.68 3.08 233.68 100.00% - 0.00% 3.08 233.68 100.00% - - 0.00%
03.01.08 TAPAS SANITARIAS -
SUMINISTRO E INSTALACION DE TAPA SANITARIA
03.01.08.01 UND 2.00 73.44 146.88 2.00 146.88 100.00% - 0.00% 2.00 146.88 100.00% - - 0.00%
METALICA 0.60 x 0.60 mts,
SUMINISTRO E INSTALACION DE TAPA SANITARIA
03.01.08.02 UND 2.00 65.15 130.30 2.00 130.30 100.00% - 0.00% 2.00 130.30 100.00% - - 0.00%
METALICA 0.50 x 0.50 mts.
03.01.09 LIMPIEZA Y DESINFECCION -
03.01.09.01 LIMPIEZA Y DESINFECCION EN CAPTACIONES UND 2.00 44.05 88.10 - - 0.00% - 0.00% - - 0.00% 2.00 88.10 100.00%
03.01.10 PINTURA -
03.01.10.01 PINTURA CON LATEX EN MUROS EXTERIORES m2 88.14 3.61 318.19 - - 0.00% - 0.00% - - 0.00% 88.14 318.19 100.00%
PINTURA ANTICORROSIVA PARA TAPAS
03.01.10.02 m2 2.01 3.75 7.54 - - 0.00% - 0.00% - - 0.00% 2.01 7.54 100.00%
SANITARIAS METÁLICAS
03.01.11 PROTECCION DE CAPTACION -
03.01.11.01 TRAZO NIVELES Y REPLANTEO M2 88.14 0.96 84.61 - - 0.00% - 0.00% - - 0.00% 88.14 84.61 100.00%
03.01.11.02 EXCAVACION MANUAL EN TERRENO COMPACTO M3 2.01 13.73 27.60 - - 0.00% - 0.00% - - 0.00% 2.01 27.60 100.00%
ELIMINACION DE MATERIAL EXCEDENTE D= 30
03.01.11.03 M3 138.74 6.87 953.14 - - 0.00% - 0.00% - - 0.00% 138.74 953.14 100.00%
MTS.
03.01.11.04 CONCRETO f'c=140 kg/cm2 + 70% PM M3 1.08 183.81 198.51 - - 0.00% - 0.00% - - 0.00% 1.08 198.51 100.00%
POSTE DE TUBO DE NEGRO ESTRUCTURAL
03.01.11.05 UND 18.00 30.47 548.46 - - 0.00% - 0.00% - - 0.00% 18.00 548.46 100.00%
CUADRADO x 2" L=1.8
SUMINISTRO m. INC/PINTADO
E INSTALACION DE MALLA METALICA
03.01.11.06 PROTECTORA CON ALAMBRE N° 12 INC. ALAMBRE DE m 46.00 121.07 5,569.22 - - 0.00% - 0.00% - - 0.00% 46.00 5,569.22 100.00%
PUAS P/CAPTACION H MALLA= 1 M.
03.01.11.07 PUERTA METALICA CON MALLA OLIMPICA UND 2.00 760.43 1,520.86 - - 0.00% - 0.00% - - 0.00% 2.00 1,520.86 100.00%
04 LINEA DE CONDUCCION 0.00 16,249.70 16,249.70 - 16,249.70 -
04.01 TRABAJOS PRELIMINARES -
04.01.01 LIMPIEZA DE TERRENO MANUAL A= 1.00 mts. ML 997.08 0.41 408.80 997.08 408.80 100.00% - 0.00% 997.08 408.80 100.00% - - 0.00%
04.01.02 TRAZO Y REPLANTEO INICIAL m 997.08 0.53 528.45 997.08 528.45 100.00% - 0.00% 997.08 528.45 100.00% - - 0.00%
04.01.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION mes 0.73 536.11 391.36 0.73 391.36 100.00% - 0.00% 0.73 391.36 100.00% - - 0.00%
04.02 MOVIMIENTO DE TIERRAS -
EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA
04.02.01 ML 765.57 4.33 3,314.92 765.57 3,314.92 100.00% - 0.00% 765.57 3,314.92 100.00% - - 0.00%
P/TUB. A= 0.60 m H= 0.7m
EXCAV. ZANJA EN TERRENO CON ROCA SUELTA P/TUB.
04.02.02 ML 231.51 8.71 2,016.45 231.51 2,016.45 100.00% - 0.00% 231.51 2,016.45 100.00% - - 0.00%
A= 0.60 m H= 0.70
REFINE, NIVELACION TERRENO CON TIERRA
04.02.03 ML 765.57 0.52 398.10 765.57 398.10 100.00% - 0.00% 765.57 398.10 100.00% - - 0.00%
COMPACTA P/TUB. H 0.70 M
REFINE, NIVELACION TERRENO CON ROCA SUELTA
04.02.04 ML 231.51 0.73 169.00 231.51 169.00 100.00% - 0.00% 231.51 169.00 100.00% - - 0.00%
P/TUB. H= 0.70 M
04.02.05 CAMA DE APOYO P/TUB. H= 0.10 M ML 997.08 1.87 1,864.54 997.08 1,864.54 100.00% - 0.00% 997.08 1,864.54 100.00% - - 0.00%
RELLENO COMPACTADO P/TUB. H= 0.70 M
04.02.06 ML 883.08 2.66 2,348.99 883.08 2,348.99 100.00% - 0.00% 883.08 2,348.99 100.00% - - 0.00%
C/MATERIAL PROPIO
RELLENO COMPACTADO P/TUB. H=0.7 M.
04.02.07 ML 114.00 8.24 939.36 114.00 939.36 100.00% - 0.00% 114.00 939.36 100.00% - - 0.00%
C/MATERIAL DE PRESTAMO
SUMINISTRO E INSTALACION DE TUBERIAS Y
04.03 -
ACCESORIOS
SUMINISTRO E INSTALACION TUBERIA NTP 399.019,
04.03.01 ML 997.08 3.12 3,110.89 997.08 3,110.89 100.00% - 0.00% 997.08 3,110.89 100.00% - - 0.00%
C-10 DE 33 mm (Ø 1")
SUMINISTRO DE ACCESORIOS PVC EN LINEA DE
04.03.02 GLB 1.00 53.13 53.13 1.00 53.13 100.00% - 0.00% 1.00 53.13 100.00% - - 0.00%
CONDUCCION
COLOCACION DE ACCESORIOS PVC EN LINEA DE
04.03.03 UND 20.00 2.88 57.60 20.00 57.60 100.00% - 0.00% 20.00 57.60 100.00% - - 0.00%
CONDUCCION
4.04 PRUEBA HIDRAULICA Y DESINFECCION - -
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE
04.04.01 ML 997.08 0.65 648.10 997.08 648.10 100.00% - 0.00% 997.08 648.10 100.00% - - 0.00%
AGUA
5.00 RESERVORIO DE 2M3 18,105.55 - - - 18,105.55
5.01 CONSTRUCCION DE RESERVORIO APOYADO
05.01.01 TRABAJOS PRELIMINARES
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 36.00 0.55 19.80 - 0.00% - 0.00% - - 0.00% 36.00 19.80 100.00%
05.01.01.02 TRAZO NIVELES Y REPLANTEO M2 36.00 0.96 34.56 - 0.00% - 0.00% - - 0.00% 36.00 34.56 100.00%
05.01.01.03 TRAZO Y REPLANTEO DURANTE LA EJECUCION mes 0.43 536.11 230.53 - 0.00% - 0.00% - - 0.00% 0.43 230.53 100.00%
05.01.02 MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TIERRA PARA
05.01.02.01 M3 1.56 13.73 21.42 - 0.00% - 0.00% - - 0.00% 1.56 21.42 100.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
ELIMINACION DE MATERIAL EXCEDENTE D= 30
05.01.02.02 M3 1.79 6.87 12.30 - 0.00% - 0.00% - - 0.00% 1.79 12.30 100.00%
MTS.
05.01.03 OBRAS DE CONCRETO SIMPLE
05.01.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8" M3 3.04 94.40 286.98 - 0.00% - 0.00% - - 0.00% 3.04 286.98 100.00%
SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE
05.01.03.02 m2 15.19 10.19 154.79 - 0.00% - 0.00% - - 0.00% 15.19 154.79 100.00%
EMPEDRADO
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.01 CONCRETO f 'c=210 kg/cm2 CON PIEDRA CHANCADA M3 3.60 789.66 2,842.78 - 0.00% - 0.00% - - 0.00% 3.60 2,842.78 100.00%
ENCOFRADO Y DESENCOFRADO NORMAL PARA
05.01.04.02 m2 23.92 23.55 563.32 - 0.00% - 0.00% - - 0.00% 23.92 563.32 100.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
ACERO CORRUGADO Ø= 3/8", FY= 4,200 KG/CM2
05.01.04.03 KG 399.97 3.90 1,559.88 - 0.00% - 0.00% - - 0.00% 399.97 1,559.88 100.00%
GRADO 60
05.01.05 REVESTIMIENTOS
TARRAJEO INTERIOR CON MORTERO C:A MEZCLA
05.01.05.01 m2 13.10 20.80 272.48 - 0.00% - 0.00% - - 0.00% 13.10 272.48 100.00%
1:2 CON IMPERMEABILIZANTE
TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA
05.01.05.02 m2 18.36 16.64 305.51 - 0.00% - 0.00% - - 0.00% 18.36 305.51 100.00%
1:4
SUMINISTRO E INSTALACION DE ACCESORIOS PARA
05.01.06 -
RESERVORIO
SUMINISTRO E INSTALACION DE HIPOCLORADOR:
05.01.06.01 UND 3.00 188.22 564.66 - - 0.00% - 0.00% - - 0.00% 3.00 564.66 100.00%
TIPO DIFUSOR
SUMINISTRO E INSTALACION DE ACCESORIOS EN
05.01.06.02 UND 3.00 144.18 432.54 - - 0.00% - 0.00% - - 0.00% 3.00 432.54 100.00%
RESERVORIO
05.01.07 TAPAS SANITARIAS -
SUMINISTRO E INSTALACION DE TAPA SANITARIA
05.01.07.01 UND 3.00 73.44 220.32 - 0.00% - 0.00% - - 0.00% 3.00 220.32 100.00%
METALICA 0.60 x 0.60 mts,
05.01.08 LIMPIEZA Y DESINFECCION -
05.01.08.01 LIMPIEZA Y DESINFECCION EN RESERVORIO UND 3.00 44.05 132.15 - 0.00% - 0.00% - - 0.00% 3.00 132.15 100.00%
05.01.09 PINTURA -
05.01.09.01 PINTURA CON LATEX EN MUROS EXTERIORES m2 45.82 3.61 165.41 - - 0.00% - 0.00% - - 0.00% 45.82 165.41 100.00%
PINTURA ANTICORROSIVA PARA TAPAS
05.01.09.02 m2 2.16 3.75 8.10 - - 0.00% - 0.00% - - 0.00% 2.16 8.10 100.00%
SANITARIAS METÁLICAS
05.01.10 PROTECCION DE RESERVORIO
05.01.10.01 LIMPIEZA DE TERRENO MANUAL m2 7.20 0.21 1.51 - 0.00% - 0.00% - - 0.00% 7.20 1.51 100.00%
05.01.10.02 TRAZO NIVELES Y REPLANTEO M2 27.90 0.96 26.78 - 0.00% - 0.00% - - 0.00% 27.90 26.78 100.00%
05.01.10.03 EXCAVACION MANUAL EN TERRENO COMPACTO M3 1.46 13.73 20.05 - 0.00% - 0.00% - - 0.00% 1.46 20.05 100.00%
ELIMINACION DE MATERIAL EXCEDENTE D= 30
05.01.10.04 M3 1.62 6.87 11.13 - 0.00% - 0.00% - - 0.00% 1.62 11.13 100.00%
MTS.
05.01.10.05 CONCRETO CICLOPEO f'c=140 kg/cm2 + 70 % PM. M3 1.25 193.39 241.74 - 0.00% - 0.00% - - 0.00% 1.25 241.74 100.00%
POSTE DE TUBO DE NEGRO ESTRUCTURAL
05.01.10.06 UND 13.00 39.88 518.44 - 0.00% - 0.00% - - 0.00% 13.00 518.44 100.00%
CUADRADO x 2" L=3.10 m. INC/PINTADO
SUMINISTRO E INSTALACION DE MALLA METALICA
05.01.10.07 PROTECTORA CON ALAMBRE N° 12 INC. ALAMBRE DE m 24.00 130.29 3,126.96 - 0.00% - 0.00% - - 0.00% 24.00 3,126.96 100.00%
PUAS P/RESERVORIO H MALLA= 2 M.
05.01.10.08 PUERTA METALICA CON MALLA OLIMPICA UND 3.00 674.78 2,024.34 - 0.00% - 0.00% - - 0.00% 3.00 2,024.34 100.00%
05.02 CASETA DE VALVULAS PARA RESERVORIOS
05.02.01 TRABAJOS PRELIMINARES
05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.04 0.55 2.77 - 0.00% - 0.00% - - 0.00% 5.04 2.77 100.00%
05.02.01.02 TRAZO NIVELES Y REPLANTEO M2 5.04 0.96 4.84 - 0.00% - 0.00% - - 0.00% 5.04 4.84 100.00%
06.04.01 TRAZO NIVELES Y REPLANTEO M2 7.30 0.96 7.01 1.04 1.00 14.29% #REF! 3.99 56.99% #REF! #REF! #REF! #REF! #REF! #REF!
EXCAVACION MANUAL EN TIERRA PARA
06.04.02 M3 5.70 13.73 78.26 0.81 11.18 14.29% #REF! 44.49 56.84% #REF! #REF! #REF! #REF! #REF! #REF!
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.04.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS. M3 44.00 6.87 302.28 6.29 43.18 14.29% #REF! 172.78 57.16% #REF! #REF! #REF! #REF! #REF! #REF!
ENCOFRADO Y DESENCOFRADO NORMAL PARA
06.04.04 m2 20.00 23.55 471.00 2.86 67.29 14.29% #REF! 268.94 57.10% #REF! #REF! #REF! #REF! #REF! #REF!
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CONCRETO f'c=175 kg/cm2 EN CAJA DE VALVULA CON
06.04.05 M3 1.91 702.95 1,342.63 0.27 191.80 14.29% #REF! 766.22 57.07% #REF! #REF! #REF! #REF! #REF! #REF!
PIEDRA CHANCADA
TARRAJEO EN INTERIORES Y EXTERIORES ACABADO
06.04.06 m2 11.60 19.22 222.95 1.66 31.85 14.29% #REF! 127.62 57.24% #REF! #REF! #REF! #REF! #REF! #REF!
CON CEMENTO Y ARENA C:A 1:4
SUMINISTRO E INSTALACION DE TAPA SANITARIA
06.04.07 UND 10.00 60.15 601.50 1.43 85.93 14.29% 3.57 214.82 35.71% 5.00 300.75 50.00% 5.00 300.75 50.00%
METALICA 0.40 x 0.40 mts.
SUMINISTRO E INSTALACION DE VALVULA DE
06.04.08 UND 3.00 73.72 221.16 0.43 31.59 14.29% 1.57 115.85 52.38% 2.00 147.44 66.67% 1.00 73.72 33.33%
CONTROL DE 1" EN RED DE DISTRIBUCIÓN
SUMINISTRO E INSTALACION DE VALVULA DE
06.04.09 UND 6.00 64.92 389.52 0.86 55.65 14.29% 1.14 74.01 19.00% 2.00 129.65 33.29% 4.00 259.87 66.71%
CONTROL DE 3/4" EN RED DE DISTRIBUCIÓN
SUMINISTRO E INSTALACION DE VALVULA DE
06.04.10 UND 1.00 65.04 65.04 0.14 9.29 14.29% 0.86 55.75 85.71% 1.00 65.04 100.00% - - 0.00%
CONTROL DE 1/2" EN RED DE DISTRIBUCIÓN
PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS
06.04.11 m2 3.20 3.49 11.17 0.46 1.60 14.29% - 0.00% 0.46 1.60 14.29% 2.74 9.57 85.71%
METÁLICAS
06.04.12 RELLENO CON MATERIAL PERMEABLE 1/2" M3 0.72 75.87 54.63 0.10 7.80 14.29% #REF! 29.59 54.17% #REF! #REF! #REF! #REF! #REF! #REF!
06.05 SUMINISTRO E INST. DE VALVULAS DE PURGA - 0.00
06.05.01 TRAZO NIVELES Y REPLANTEO M2 5.84 0.96 5.61 0.73 0.70 12.50% 0.73 0.70 12.50% 1.46 1.40 25.00% 4.38 4.20 75.00%
EXCAVACION MANUAL EN TIERRA PARA
06.05.02 M3 4.56 13.73 62.61 0.57 7.83 12.50% 0.57 7.83 12.50% 1.14 15.65 25.00% 3.42 46.96 75.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.05.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS. M3 143.41 6.87 985.23 17.93 123.15 12.50% 17.93 123.15 12.50% 35.85 246.31 25.00% 107.56 738.92 75.00%
ENCOFRADO Y DESENCOFRADO NORMAL PARA
06.05.04 m2 16.00 23.55 376.80 2.00 47.10 12.50% 2.00 47.10 12.50% 4.00 94.20 25.00% 12.00 282.60 75.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
CONCRETO f'c=175 kg/cm2 EN CAJA DE VALVULA CON
06.05.05 M3 1.53 702.95 1,075.51 0.19 134.44 12.50% 0.19 134.44 12.50% 0.38 268.88 25.00% 1.15 806.64 75.00%
PIEDRA
DADO CHANCADA
DE PROTECCION TUBERIA DE REBOSE
06.05.06 M3 0.72 607.56 437.44 0.09 54.68 12.50% 0.09 54.68 12.50% 0.18 109.36 25.00% 0.54 328.08 75.00%
CONCRETO
ASENTADOF'C =DE
140 KG/CM2
PIEDRA MEDIANA CON CONCRETO
06.05.07 m2 1.13 93.72 105.90 0.14 13.24 12.50% 0.14 13.24 12.50% 0.28 26.48 25.00% 0.85 79.43 75.00%
Fc=100 KG/CM2 E=0.20 M.
TARRAJEO EN INTERIORES Y EXTERIORES ACABADO
06.05.08 m2 9.28 19.22 178.36 1.16 22.30 12.50% 1.16 22.30 12.50% 2.32 44.59 25.00% 6.96 133.77 75.00%
CON CEMENTO Y ARENA C:A 1:4
SUMINISTRO E INSTALACION DE TAPA SANITARIA
06.05.09 UND 8.00 60.15 481.20 1.00 60.15 12.50% 1.00 60.15 12.50% 2.00 120.30 25.00% 6.00 360.90 75.00%
METALICA 0.40 x 0.40 mts.
SUMINISTRO E INSTALACION DE VALVULA DE
06.05.10 UND 5.00 63.54 317.70 0.63 39.71 12.50% 0.63 39.71 12.50% 1.25 79.43 25.00% 3.75 238.28 75.00%
PURGA DE 1/2" EN RED DE DISTRIBUCIÓN
SUMINISTRO E INSTALACION DE VALVULA DE
06.05.11 UND 3.00 76.08 228.24 0.38 28.53 12.50% 0.38 28.53 12.50% 0.75 57.06 25.00% 2.25 171.18 75.00%
PURGA DE 3/4" EN RED DE DISTRIBUCIÓN
PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS
06.05.12 m2 2.56 3.49 8.93 0.32 1.12 12.50% 0.32 1.12 12.50% 0.64 2.23 25.00% 1.92 6.70 75.00%
METÁLICAS
06.05.13 RELLENO CON MATERIAL PERMEABLE 1/2" M3 0.58 75.87 44.00 0.07 5.50 12.50% 0.07 5.50 12.50% 0.15 11.00 25.00% 0.44 33.00 75.00%
PASE AEREO 10 ML. (01 UNIDAD) EN RED DE
06.06 - 0.00
DISTRIBUCION
06.06.01 COLUMNA DE SOPORTE - 0.00
06.06.01.01 TRABAJOS PRELIMINARES - 0.00
06.06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.40 0.21 0.50 - 0.00% - 0.00% - - 0.00% 2.40 0.50 100.00%
06.06.01.01.02 TRAZO NIVELES Y REPLANTEO M2 2.40 0.96 2.30 - 0.00% - 0.00% - - 0.00% 2.40 2.30 100.00%
06.06.01.02 MOVIMIENTO DE TIERRAS - 0.00
EXCAVACION MANUAL EN TIERRA PARA
06.06.01.02.01 M3 2.64 13.73 36.25 - 0.00% - 0.00% - - 0.00% 2.64 36.25 100.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.06.01.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 2.40 0.52 1.25 - 0.00% - 0.00% - - 0.00% 2.40 1.25 100.00%
06.06.01.02.03 RELLENO COMPACTADO MANUAL PROPIO M3 1.33 6.03 8.02 - 0.00% - 0.00% - - 0.00% 1.33 8.02 100.00%
ELIMINACION DE MATERIAL EXCEDENTE D= 30
06.06.01.02.04 M3 1.57 6.87 10.79 - 0.00% - 0.00% - - 0.00% 1.57 10.79 100.00%
MTS.
06.06.01.03 OBRAS DE CONCRETO - 0.00
06.06.01.03.01 CONCRETO F'C= 100 KG/CM2 PARA SOLADOS M3 0.24 222.71 53.45 - 0.00% - 0.00% - - 0.00% 0.24 53.45 100.00%
06.06.01.03.02 CONCRETO F'C= 210 KG/CM2 PARA ZAPATAS M3 0.96 352.06 337.98 - - 0.00% - 0.00% - - 0.00% 0.96 337.98 100.00%
06.06.01.03.03 CONCRETO f 'c=210 kg/cm2 PARA COLUMNAS M3 0.50 357.31 178.66 - - 0.00% - 0.00% - - 0.00% 0.50 178.66 100.00%
ACERO DE REFUERZO FY=4200 KG/CM2 EN
06.06.01.03.04 kg 38.11 4.29 163.49 - - 0.00% - 0.00% - - 0.00% 38.11 163.49 100.00%
ZAPATAS
ACERO DE REFUERZO FY=4200 KG/CM2 EN
06.06.01.03.05 kg 66.20 4.29 284.00 - - 0.00% - 0.00% - - 0.00% 66.20 284.00 100.00%
COLUMNAS
06.06.01.03.06 ENCOFRADO Y DESENCOFRADO EN ZAPATAS m2 3.52 17.88 62.94 - - 0.00% - 0.00% - - 0.00% 3.52 62.94 100.00%
06.06.01.03.07 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 6.72 17.88 120.15 - - 0.00% - 0.00% - - 0.00% 6.72 120.15 100.00%
06.06.01.04 ACABADOS - 0.00
TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA
06.06.01.04.01 m2 5.28 16.64 87.86 - 0.00% - 0.00% - - 0.00% 5.28 87.86 100.00%
1:4
06.06.01.04.02 PINTURA CON LATEX EN MUROS EXTERIORES m2 5.28 3.61 19.06 - 0.00% - 0.00% - - 0.00% 5.28 19.06 100.00%
06.06.01.04.03 PINTURA BITUMINOSA m2 4.96 4.51 22.37 - - 0.00% - 0.00% - - 0.00% 4.96 22.37 100.00%
06.06.02 CAMARA DE ANCLAJE - 0.00
06.06.02.01 TRABAJOS PRELIMINARES - 0.00
06.06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1.45 0.21 0.30 - - 0.00% - 0.00% - - 0.00% 1.45 0.30 100.00%
06.06.02.01.02 TRAZO NIVELES Y REPLANTEO M2 1.45 0.96 1.39 - - 0.00% - 0.00% - - 0.00% 1.45 1.39 100.00%
06.06.02.02 MOVIMIENTO DE TIERRAS - 0.00
EXCAVACION MANUAL EN TIERRA PARA
06.06.02.02.01 M3 0.94 13.73 12.91 - - 0.00% - 0.00% - - 0.00% 0.94 12.91 100.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.06.02.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 1.45 0.52 0.75 - - 0.00% - 0.00% - - 0.00% 1.45 0.75 100.00%
ELIMINACION DE MATERIAL EXCEDENTE D= 30
06.06.02.02.03 M3 1.13 6.87 7.76 - - 0.00% - 0.00% - - 0.00% 1.13 7.76 100.00%
MTS.
06.06.02.03 OBRAS DE CONCRETO - 0.00
ENCOFRADO Y DESENCOFRADO NORMAL PARA
06.06.02.03.01 m2 0.68 23.55 16.01 - - 0.00% - 0.00% - - 0.00% 0.68 16.01 100.00%
ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.06.02.03.02 CONCRETO F'C = 175 KG/CM2 M3 1.08 702.95 759.19 - - 0.00% - 0.00% - - 0.00% 1.08 759.19 100.00%
06.06.03 ELEMENTOS METÁLICOS DE SOPORTE - 0.00
ACCESORIOS METALICOS DE ANCLAJE Y SOPORTE
06.06.03.01 UND 1.00 535.32 535.32 - - 0.00% - 0.00% - - 0.00% 1.00 535.32 100.00%
DE CABLE
06.06.03.02 CABLE TIPO BOA 6x19 DE 1/2" m 21.60 13.28 286.85 - - 0.00% - 0.00% - - 0.00% 21.60 286.85 100.00%
06.06.03.03 CABLE TIPO BOA 6x19 DE 1/4" m 7.38 10.32 76.16 - - 0.00% - 0.00% - - 0.00% 7.38 76.16 100.00%
06.06.03.04 ABRAZADERA DE PLATINA DE 3/16" + PERNO DE 1/4" UND 18.00 9.71 174.78 - - 0.00% - 0.00% - - 0.00% 18.00 174.78 100.00%
06.06.04 TUBERIAS - 0.00
SUMINISTRO E INSTALACIÓN DE TUBERIA HDPE
06.06.04.01 m 16.44 4.92 80.88 - - 0.00% - 0.00% - - 0.00% 16.44 80.88 100.00%
LISA DN (20mm) NTP-ISO
SUMINISTRO 4427 H.
E INSTALACION DE TUBERIA PVC NTP
06.06.04.02 m 0.60 3.02 1.81 - - 0.00% - 0.00% - - 0.00% 0.60 1.81 100.00%
339.002 DN 3/4"
06.06.04.03 EMPALME DE TUBERIA HDPE A TUBERIA PVC Ø 3/4" UND 2.00 3.83 7.66 - - 0.00% - 0.00% - - 0.00% 2.00 7.66 100.00%
06.07 PRUEBA HIDRAULICA Y DESINFECCION - 0.00
PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE
06.07.01 ML 480.00 0.65 312.00 - - 0.00% - 0.00% - - 0.00% 480.00 312.00 100.00%
AGUA
07 INSTALACIONES DOMICILIARIAS (16 UND.) - 0.00 4,390.47 4,390.47 - 4,390.47 -
07.01 TRABAJOS PRELIMINARES - 0.00
07.01.01 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS m 160.00 0.53 84.80 160.00 84.80 100.00% - 0.00% 160.00 84.80 100.00% - - 0.00%
07.01.02 TRAZO Y REPLANTEO DURANTE LA EJECUCION mes 1.33 536.04 712.93 1.33 712.93 100.00% - 0.00% 1.33 712.93 100.00% - - 0.00%
07.02 MOVIMIENTO DE TIERRAS -
EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA
07.02.01 ML 160.00 4.33 692.80 160.00 692.80 100.00% - 0.00% 160.00 692.80 100.00% - - 0.00%
P/TUB. A= 0.60 m H= 0.7m
07.02.02 CAMA DE APOYO P/TUB. H= 0.10 M ML 160.00 1.45 232.00 160.00 232.00 100.00% - 0.00% 160.00 232.00 100.00% - - 0.00%
RELLENO COMPACTADO P/TUB. H= 0.70 M
07.02.03 ML 160.00 2.66 425.60 160.00 425.60 100.00% - 0.00% 160.00 425.60 100.00% - - 0.00%
C/MATERIAL PROPIO
07.03 SUMINISTRO E INSTALACION DE ACCESORIOS - 0.00
SUMINISTRO E INSTALACION TUBERIA NTP 399.019,
07.03.01 ML 75.00 2.70 202.50 75.00 202.50 100.00% - 0.00% 75.00 202.50 100.00% - - 0.00%
C-10 DE 21 mm (Ø 1/2")
SUMINISTRO E INSTALACION DE VALVULA DE PASO
07.03.02 UND 16.00 127.49 2,039.84 16.00 2,039.84 100.00% - 0.00% 16.00 2,039.84 100.00% - - 0.00%
EN CONEXION DOMICILIARIA
8.00 UBS - LETRINA CON BIODIGESTOR (15 UND) - 0.00 93,411.42 72,346.95 8,305.77 80,652.73 12,758.69
8.01 INST. DOMIC./LAVADERO DE CONCRETO (15 UND) - 0.00
08.01.01 TRABAJOS PRELIMINARES - 0.00
08.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 40.50 0.21 8.51 40.50 8.51 100.00% - 0.00% 40.50 8.51 100.00% - - 0.00%
08.01.01.02 TRAZO Y REPLANTEO DE ESTRUCTURAS m2 40.50 0.96 38.88 40.50 38.88 100.00% - 0.00% 40.50 38.88 100.00% - - 0.00%
08.01.01.03 CINTA PLASTICA SEÑALIZADORA m 509.60 0.28 142.69 509.60 142.69 100.00% - 0.00% 509.60 142.69 100.00% - - 0.00%
08.01.02 MOVIMIENTO DE TIERRAS - 0.00
08.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 6.08 11.77 71.56 6.08 71.56 100.00% - 0.00% 6.08 71.56 100.00% - - 0.00%
RELLENO Y COMPACTACION CON MATERIAL
08.01.02.02 M3 2.03 18.94 38.45 2.03 38.45 100.00% - 0.00% 2.03 38.45 100.00% - - 0.00%
PROPIOELIMINACION DE MATERIAL EXCEDENTE D= 30
08.01.02.03 M3 10.13 6.87 69.59 10.13 69.59 100.00% - 0.00% 10.13 69.59 100.00% - - 0.00%
MTS.
08.01.02.04 NIVELACION INTERIOR APISONADO MANUAL m2 40.50 1.38 55.89 40.50 55.89 100.00% - 0.00% 40.50 55.89 100.00% - - 0.00%
08.01.03 ALBAÑILERIA - 0.00
MURO DE LADRILLO KK DE ARCILLA EN SOGA
08.01.03.01 m2 13.41 66.97 898.07 13.41 898.07 100.00% - 0.00% 13.41 898.07 100.00% - - 0.00%
MEZCLA 1:4 (CEMENTO:ARENA)
08.01.04 OBRAS DE CONCRETO SIMPLE - 0.00
CONCRETO F'C = 140 KG/CM2 + 30% DE P.G.
08.01.04.01 M3 4.05 322.05 1,304.30 4.05 1,304.30 100.00% - 0.00% 4.05 1,304.30 100.00% - - 0.00%
P/CIMIENTO
08.01.04.02 CONCRETO ARMADO - 0.00
08.01.04.02.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 3.56 789.66 2,811.19 3.56 2,811.19 100.00% - 0.00% 3.56 2,811.19 100.00% - - 0.00%
ENCOFRADO Y DESENCOFRADO PARA
08.01.04.02.02 m2 44.64 33.24 1,483.83 44.64 1,483.83 100.00% - 0.00% 44.64 1,483.83 100.00% - - 0.00%
COLUMNAS
08.01.04.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 226.31 3.80 859.98 226.31 859.98 100.00% - 0.00% 226.31 859.98 100.00% - - 0.00%
08.01.04.03 REVOQUES ENLUCIDOS Y MOLDURAS - 0.00
TARRAJEO MEZCLA 1:3 Y COLOREADO CON
08.01.04.03.01 M2 88.40 11.33 1,001.57 88.40 1,001.57 100.00% - 0.00% 88.40 1,001.57 100.00% - - 0.00%
OCRE_x000D_
08.01.04.04 VALVULAS Y ACCESORIOS - 0.00
08.01.04.04.01 ACCESORIOS LAVATORIO UND 15.00 167.05 2,505.75 15.00 2,505.75 100.00% - 0.00% 15.00 2,505.75 100.00% - - 0.00%
08.01.05 CASETA PARA UBS - 0.00
08.01.05.01 TRABAJOS PRELIMINARES - 0.00
08.01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 85.50 0.21 17.96 85.50 17.96 100.00% - 0.00% 85.50 17.96 100.00% - - 0.00%
08.01.05.01.02 TRAZO Y REPLANTEO DE ESTRUCTURAS m2 85.50 0.96 82.08 85.50 82.08 100.00% - 0.00% 85.50 82.08 100.00% - - 0.00%
08.01.05.02 MOVIMIENTO DE TIERRAS - 0.00
08.01.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 24.75 11.77 291.31 24.75 291.31 100.00% - 0.00% 24.75 291.31 100.00% - - 0.00%
ELIMINACION DE MATERIAL EXCEDENTE D= 30
08.01.05.02.02 M3 30.94 6.87 212.56 30.94 212.56 100.00% - 0.00% 30.94 212.56 100.00% - - 0.00%
MTS.
08.01.05.03 CIMIENTO CORRIDO - 0.00
CONCRETO F'C = 140 KG/CM2 + 30% DE P.G.
08.01.05.03.01 M3 19.68 322.05 6,337.94 19.68 6,337.94 100.00% - 0.00% 19.68 6,337.94 100.00% - - 0.00%
P/CIMIENTO
08.01.05.04 SOBRECIMIENTO - 0.00
08.01.05.04.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS M3 2.84 219.90 624.52 2.84 624.52 100.00% - 0.00% 2.84 624.52 100.00% - - 0.00%
ENCOFRADO Y DESENCOFRADO DE
08.01.05.04.02 m2 37.88 28.23 1,069.35 37.88 1,069.35 100.00% - 0.00% 37.88 1,069.35 100.00% - - 0.00%
SOBRECIMIENTO HASTA 0.30 M. DE ALTO
08.01.05.05 PISOS Y PAVIMENTOS - 0.00
08.01.05.05.01 CONCRETO F'C = 140 KG/CM2 (PISO DE CONCRETO) M3 4.16 308.00 1,281.28 - 0.00% - 0.00% - - 0.00% 4.16 1,281.28 100.00%
08.01.05.05.02 VEREDA DE CONCRETO DE e=4" m2 91.52 41.16 3,766.96 - 0.00% - 0.00% - - 0.00% 91.52 3,766.96 100.00%
08.01.05.05.03 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 40.49 20.16 816.28 - 0.00% - 0.00% - - 0.00% 40.49 816.28 100.00%
08.01.05.06.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 6.03 789.66 4,761.65 6.03 4,761.65 100.00% - 0.00% 6.03 4,761.65 100.00% - - 0.00%
ENCOFRADO Y DESENCOFRADO PARA
08.01.05.06.02 m2 74.40 33.24 2,473.06 74.40 2,473.06 100.00% - 0.00% 74.40 2,473.06 100.00% - - 0.00%
COLUMNAS
08.01.05.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 659.71 3.80 2,506.90 659.71 2,506.90 100.00% - 0.00% 659.71 2,506.90 100.00% - - 0.00%
08.01.05.09.01 VIGA DE MADERA TORNILLO 2"X3"X2.90M und 40.00 13.62 544.80 - - 0.00% - 0.00% - - 0.00% 40.00 544.80 100.00%
08.01.05.09.02 VIGA DE MADERA TORNILLO 2"X2"X2.90M und 25.48 11.05 281.55 - - 0.00% - 0.00% - - 0.00% 25.48 281.55 100.00%
08.01.05.09.03 CORREAS DE MADERA TORNILLO 2" X 2" L=3.65M und 63.70 12.64 805.17 63.70 805.17 100.00% - 0.00% 63.70 805.17 100.00% - - 0.00%
08.01.05.09.04 COBERTURA CON TEJA ANDINA m2 55.91 44.84 2,507.00 55.91 2,507.00 100.00% - 0.00% 55.91 2,507.00 100.00% - - 0.00%
08.01.05.10 CERRAJERIA - 0.00
08.01.05.10.01 PICAPORTES EN PUERTA DE 4"-UBS UND 15.00 3.20 48.00 - - 0.00% 15.00 48.00 100.00% 15.00 48.00 100.00% - - 0.00%
08.01.05.10.02 TIRADOR PARA PUERTA UND 15.00 5.00 75.00 - - 0.00% 15.00 75.00 100.00% 15.00 75.00 100.00% - - 0.00%
08.01.05.10.03 BISAGRAS PARA PUERTA UBS DE 3" UND 45.00 11.64 523.80 - - 0.00% 45.00 523.80 100.00% 45.00 523.80 100.00% - - 0.00%
08.01.05.11 PINTURA - 0.00
PINTURA EN MUROS EXTERIORES E INTERIORES
08.01.05.11.01 m2 358.50 4.94 1,770.99 - - 0.00% 358.50 1,770.99 100.00% 358.50 1,770.99 100.00% - - 0.00%
(02 MANOS)
08.01.06 INSTALACIONES SANITARIAS - 0.00
08.01.06.01 INSTALACIONES DE AGUA FRIA - 0.00
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP
08.01.06.01.01 pto 30.00 21.13 633.90 30.00 633.90 100.00% - 0.00% 30.00 633.90 100.00% - - 0.00%
1/2"
08.01.06.01.02 VALVULA COMPUERTA DE BRONCE DE 1/2" und 15.00 49.99 749.85 15.00 749.85 100.00% - 0.00% 15.00 749.85 100.00% - - 0.00%
ACCESORIOS PVC SAP EN REDES DE
08.01.06.01.03 GLB 1.00 87.73 87.73 1.00 87.73 100.00% - 0.00% 1.00 87.73 100.00% - - 0.00%
DISTRIBUCION
PRUEBA HIDRAULICA Y DESINFECCION EN REDES
08.01.06.01.04 ML 75.00 0.65 48.75 75.00 48.75 100.00% - 0.00% 75.00 48.75 100.00% - - 0.00%
DE AGUA
DUCHA CROMADA 1 LLAVE, INCLUIDO
08.01.06.01.05 UND 15.00 55.30 829.50 15.00 829.50 100.00% - 0.00% 15.00 829.50 100.00% - - 0.00%
ACCESORIOS
08.01.06.02 INSTALACIONES DE DESAGUE - 0.00
08.01.06.02.01 SALIDA DE DESAGUE EN PVC DE 4" pto 15.00 105.18 1,577.70 15.00 1,577.70 100.00% - 0.00% 15.00 1,577.70 100.00% - - 0.00%
08.01.06.02.02 SALIDA DE DESAGUE EN PVC DE 2" pto 45.00 66.06 2,972.70 45.00 2,972.70 100.00% - 0.00% 45.00 2,972.70 100.00% - - 0.00%
08.01.06.02.03 INSTALACION DE TUBERIA DE PVC SAL 2" m 117.00 16.85 1,971.45 117.00 1,971.45 100.00% - 0.00% 117.00 1,971.45 100.00% - - 0.00%
08.01.06.02.04 INSTALACION DE TUBERIA DE PVC SAL 4" m 97.50 25.87 2,522.33 97.50 2,522.33 100.00% - 0.00% 97.50 2,522.33 100.00% - - 0.00%
08.01.06.02.05 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 15.00 57.41 861.15 15.00 861.15 100.00% - 0.00% 15.00 861.15 100.00% - - 0.00%
08.01.06.02.06 SALIDA DE VENTILACION DE 2" GLB 1.00 487.04 487.04 1.00 487.04 100.00% - 0.00% 1.00 487.04 100.00% - - 0.00%
08.01.06.02.07 INODORO TANQUE BAJO BLANCO UND 15.00 174.01 2,610.15 15.00 2,610.15 100.00% - 0.00% 15.00 2,610.15 100.00% - - 0.00%
8.02 BIODIGESTOR Y POZOS DE FILTRACION - 0.00
08.02.01 TRABAJOS PRELIMINARES - 0.00
08.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 86.78 0.21 18.22 86.78 18.22 100.00% - 0.00% 86.78 18.22 100.00% - - 0.00%
08.02.01.02 TRAZO Y REPLANTEO m2 86.78 0.50 43.39 86.78 43.39 100.00% - 0.00% 86.78 43.39 100.00% - - 0.00%
08.02.02 MOVIMIENTO DE TIERRAS - 0.00
08.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 79.12 11.77 931.24 79.12 931.24 100.00% - 0.00% 79.12 931.24 100.00% - - 0.00%
RELLENO COMPACTADO MANUAL MATERIAL
08.02.02.02 M3 55.74 18.94 1,055.72 55.74 1,055.72 100.00% - 0.00% 55.74 1,055.72 100.00% - - 0.00%
PROPIO.
08.02.02.03 ELIMINACION MATERIAL EXCEDENTE (D=30 m) M3 26.43 8.24 217.78 26.43 217.78 100.00% - 0.00% 26.43 217.78 100.00% - - 0.00%
08.02.03 CONCRETO SIMPLE - 0.00
08.02.03.01 CONCRETO F'C= 100 KG/CM2 M3 1.18 222.71 262.80 1.18 262.80 100.00% - 0.00% 1.18 262.80 100.00% - - 0.00%
08.02.04 BIODIGESTOR - 0.00
08.02.04.01 SUMINSTRO Y COLOCACION DE BIODIGESTOR UND 15.00 814.75 12,221.25 13.00 10,591.75 86.67% 2.00 1,629.50 13.33% 15.00 12,221.25 100.00% - - 0.00%
08.02.04.02 CAJA DE REGISTRO DE LODOS UND 15.00 200.45 3,006.75 - - 0.00% 15.00 3,006.75 100.00% 15.00 3,006.75 100.00% - - 0.00%
08.02.04.03 INSTALACION DE TUBERIA DE PVC SAL 2" m 67.50 16.85 1,137.38 - - 0.00% 67.50 1,137.38 100.00% 67.50 1,137.38 100.00% - - 0.00%
08.03 INSTALACION DE POZO DE PERCOLACION - 0.00
08.03.01 TRABAJOS PRELIMINARES - 0.00
TRAZO Y REPLANTEO INICIAL C/EQUIPO PARA
08.03.01.01 M2 26.00 4.14 107.64 26.00 107.64 100.00% - 0.00% 26.00 107.64 100.00% - - 0.00%
ESTRUCTURAS
08.03.01.02 LIMPIEZA MANUAL DE TERRENO-ESTRUCTURAS M2 26.00 0.41 10.66 26.00 10.66 100.00% - 0.00% 26.00 10.66 100.00% - - 0.00%
08.03.01.03 CINTA PLASTICA SEÑALIZADORA m 372.40 0.28 104.27 372.40 104.27 100.00% - 0.00% 372.40 104.27 100.00% - - 0.00%
08.03.02 MOVIMIENTO DE TIERRAS - 0.00
08.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 26.00 11.77 306.02 26.00 306.02 100.00% - 0.00% 26.00 306.02 100.00% - - 0.00%
RETIRO Y ACOMODO DE MATERIAL EXCEDENTE
08.03.02.02 M3 26.00 6.87 178.62 26.00 178.62 100.00% - 0.00% 26.00 178.62 100.00% - - 0.00%
HASTA DIST. PROM.=30M
08.03.02.03 ELIMINACION MATERIAL EXCEDENTE (D=30 m) M3 26.00 8.24 214.24 26.00 214.24 100.00% - 0.00% 26.00 214.24 100.00% - - 0.00%
08.04 INSTALACIONES ELECTRICAS - 0.00
08.04.01 SALIDAS ELECTRICAS - 0.00
08.04.01.01 CAJA OCTOGONAL PARA INTERRUPTOR SIMPLE pto 15.00 19.13 286.95 15.00 286.95 100.00% - 0.00% 15.00 286.95 100.00% - - 0.00%
08.04.02 CANALIZACION - 0.00
08.04.02.01 TUBERIAS PVC-SAP ELECTRICA DE 20MM m 52.70 2.17 114.36 - 0.00% 52.70 114.36 100.00% 52.70 114.36 100.00% - - 0.00%
09 CONTROL DE CALIDAD - 0.00 2,240.00 780.00 - 780.00 1,460.00
09.01 TRAZO Y REPLANTEO AL FINALIZAR LA OBRA glb 1.00 500.00 500.00 - - 0.00% - 0.00% - - 0.00% 1.00 500.00 100.00%
09.02 DISEÑO DE MEZCLAS UND 2.00 350.00 700.00 - - 0.00% - 0.00% - - 0.00% 2.00 700.00 100.00%
09.03 ROTURA DE BRIQUETAS UND 40.00 26.00 1,040.00 30.00 780.00 75.00% - 0.00% 30.00 780.00 75.00% 10.00 260.00 25.00%
10 IMPLEMENTACION DEL PLAN DE MANEJO AMBIENTAL - 0.00 3,286.20 1,856.50 1,069.70 2,926.20 360.00
PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y
10.01 - 0.00
LIQUIDOS
IMPLEMENTACION DE TACHOS Y/O CILINDROS
10.01.01 glb 1.00 176.00 176.00 1.00 176.00 100.00% - 0.00% 1.00 176.00 100.00% - - 0.00%
PROVISIONALES PARA ALMACENAR RESIDUOS
MANEJO DE RESIDUOS DE OBRA DURANTE LA
10.01.02 glb 1.00 720.00 720.00 1.00 720.00 100.00% - 0.00% 1.00 720.00 100.00% - - 0.00%
EJECUCION
10.02 PROGRAMA DE MITIGACION AMBIENTAL - 0.00
ADQUISICION Y COLOCACION DE CINTAS DE
10.02.01 glb 1.00 932.00 932.00 1.00 932.00 100.00% - 0.00% 1.00 932.00 100.00% - - 0.00%
SEGURIDAD
10.02.02 IMPLEMENTACION DE KITS ANTIDERRAME glb 1.00 360.00 360.00 - - 0.00% - 0.00% - - 0.00% 1.00 360.00 100.00%
10.03 PROGRAMA DE CIERRE - 0.00
10.03.01 DESMONTAJE DE OBRAS PROVISIONALES glb 1.00 1,041.20 1,041.20 - - 0.00% 1.00 1,041.20 100.00% 1.00 1,041.20 100.00% - - 0.00%
10.03.02 MANEJO DE RESIDUOS DE OBRA glb 1.00 57.00 57.00 0.50 28.50 50.00% 0.50 28.50 50.00% 1.00 57.00 100.00% - - 0.00%
1 COSTO DIRECTO 195,613.83 133,366.57 68.18% - 11,787.97 6.03% #REF! #REF! #REF! #REF!
2 GASTOS GENERALES 14.41% 28,189.21 16,443.02 58.33% 1,698.72 6.03% 18,141.74 64.36% 10,047.47 35.64%
3 GASTOS SUPERVISION 2.48% 4,851.22 2,829.76 58.33% 292.34 6.03% 3,122.10 64.36% 1,729.12 35.64%
4 EXPEDIENTE TECNICO 5.37% 10,500.00 10,500.00 100.00% 0.00 0.00% 10,500.00 100.00% 0.00 0.00%
7 TOTAL VALORIZACION (1) + (2) + (3) + (4) + (5) + (6) 245,693.63 163,139.34 66.40% 13,779.03 5.61% #REF! #REF! #REF! #REF!
DESCRIPCION PRESUPUESTO BASE
ITEM
DE LA PARTIDA UND METRADO
1 OBRAS PROVISIONALES
02 SEGURIDAD, SALUD Y PLAN DE VIGILANCIA
02.01 SEGURIDAD Y SALUD
02.01.02 EQUIPOS DE PROTECCION PERSONAL glb 1.00
02.01.04 CAPACITACION EN SEGURIDAD Y SALUD mes 2.00
5 RESERVORIO DE 5M3
05.01.02 MOVIMIENTO DE TIERRAS
05.01.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS M3 1.56
05.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS. M3 1.79
05.01.03 OBRAS DE CONCRETO SIMPLE
05.01.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8" M3 3.21
05.01.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDR m2 5.80
05.01.04 OBRAS DE CONCRETO ARMADO
05.01.04.01 CONCRETO f 'c=210 kg/cm2 CON PIEDRA CHANCADA M3 2.72
05.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCT m2 21.92
05.01.04.03 ACERO CORRUGADO Ø= 3/8", FY= 4,200 KG/CM2 GRADO 60 KG 572.25
05.01.05 REVESTIMIENTOS
05.01.05.01 TARRAJEO INTERIOR CON MORTERO C:A MEZCLA 1:2 C m2 2.80
05.01.05.02 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4 m2 3.50
05.01.09 PINTURA
05.01.09.01 PINTURA CON LATEX EN MUROS EXTERIORES m2 15.00
05.01.09.02 PINTURA ANTICORROSIVA PARA TAPAS SANITARIAS ME m2 1.16
8 UBS - LETRINA CON BIODIGESTOR (15 UND)
8.01 INST. DOMIC./LAVADERO DE CONCRETO (15 UND)
08.01.01 TRABAJOS PRELIMINARES
08.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 18.00
08.01.01.02 TRAZO Y REPLANTEO DE ESTRUCTURAS m2 18.00
08.01.01.03 CINTA PLASTICA SEÑALIZADORA m 450.00
08.01.02 MOVIMIENTO DE TIERRAS
08.01.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 2.50
08.01.02.02 RELLENO Y COMPACTACION CON MATERIAL PROPIO M3 0.90
08.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS. M3 4.80
08.01.02.04 NIVELACION INTERIOR APISONADO MANUAL m2 16.80
08.01.03 ALBAÑILERIA
08.01.03.01 MURO DE LADRILLO KK DE ARCILLA EN SOGA MEZCLA m2 5.50
08.01.04 OBRAS DE CONCRETO SIMPLE
08.01.04.01 CONCRETO F'C = 140 KG/CM2 + 30% DE P.G. P/CIMIENTO M3 2.15
08.01.04.02 CONCRETO ARMADO
08.01.04.02.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 1.50
08.01.04.02.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 18.95
08.01.04.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 95.56
08.01.04.03 REVOQUES ENLUCIDOS Y MOLDURAS
08.01.04.03.01 TARRAJEO MEZCLA 1:3 Y COLOREADO CON OCRE_x000D M2 35.40
08.01.04.04 VALVULAS Y ACCESORIOS
08.01.04.04.01 ACCESORIOS LAVATORIO UND 6.00
08.01.05 CASETA PARA UBS
08.01.05.01 TRABAJOS PRELIMINARES
08.01.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 37.50
08.01.05.01.02 TRAZO Y REPLANTEO DE ESTRUCTURAS m2 37.50
08.01.05.02 MOVIMIENTO DE TIERRAS
08.01.05.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 11.25
08.01.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS. M3 13.50
08.01.05.03 CIMIENTO CORRIDO
08.01.05.03.01 CONCRETO F'C = 140 KG/CM2 + 30% DE P.G. P/CIMIENTO M3 3.85
08.01.05.04 SOBRECIMIENTO
08.01.05.04.01 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS M3 1.18
08.01.05.04.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO HAS m2 17.75
08.01.05.05 PISOS Y PAVIMENTOS
08.01.05.05.01 CONCRETO F'C = 140 KG/CM2 (PISO DE CONCRETO) M3 1.45
08.01.05.05.02 VEREDA DE CONCRETO DE e=4" m2 36.60
08.01.05.05.03 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 16.36
08.01.05.06 CONCRETO ARMADO
08.01.05.06.01 CONCRETO EN COLUMNAS f'c=210 kg/cm2 M3 1.12
08.01.05.06.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 30.12
08.01.05.06.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 275.60
08.01.05.07 ALBAÑILERIA
08.01.05.07.01 MURO DE LADRILLO KK 9X1X24CM, APAREJO DE SOGA Cm2 60.60
08.01.05.08 CARPINTERIA DE MADERA
08.01.05.08.01 PUERTA DE MADERA CON MARCO DE MADERA PARA C und 6.00
08.01.05.08.02 VENTANA DE MADERA INC.MALLA MOSQUETERO PARA m2 24.48
08.01.05.09 COBERTURA DE CASETA
08.01.05.09.01 VIGA DE MADERA TORNILLO 2"X3"X2.90M und 16.00
08.01.05.09.02 VIGA DE MADERA TORNILLO 2"X2"X2.90M und 10.20
08.01.05.09.03 CORREAS DE MADERA TORNILLO 2" X 2" L=3.65M und 25.48
08.01.05.09.04 COBERTURA CON TEJA ANDINA m2 105.10
08.01.05.10 CERRAJERIA
08.01.05.10.01 PICAPORTES EN PUERTA DE 4"-UBS UND 6.00
08.01.05.10.02 TIRADOR PARA PUERTA UND 6.00
08.01.05.10.03 BISAGRAS PARA PUERTA UBS DE 3" UND 18.00
08.01.05.11 PINTURA
08.01.05.11.01 PINTURA EN MUROS EXTERIORES E INTERIORES (02 MA m2 145.50
08.01.06 INSTALACIONES SANITARIAS
08.01.06.01 INSTALACIONES DE AGUA FRIA
08.01.06.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 30.00
08.01.06.01.02 VALVULA COMPUERTA DE BRONCE DE 1/2" und 6.00
08.01.06.01.03 ACCESORIOS PVC SAP EN REDES DE DISTRIBUCION GLB 2.00
08.01.06.01.05 DUCHA CROMADA 1 LLAVE, INCLUIDO ACCESORIOS UND 6.00
08.01.06.02 INSTALACIONES DE DESAGUE
08.01.06.02.01 SALIDA DE DESAGUE EN PVC DE 4" pto 30.00
08.01.06.02.02 SALIDA DE DESAGUE EN PVC DE 2" pto 35.00
08.01.06.02.03 INSTALACION DE TUBERIA DE PVC SAL 2" m 80.00
08.01.06.02.04 INSTALACION DE TUBERIA DE PVC SAL 4" m 60.00
08.01.06.02.05 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 6.00
08.01.06.02.06 SALIDA DE VENTILACION DE 2" GLB 2.00
08.01.06.02.07 INODORO TANQUE BAJO BLANCO UND 6.00
8.02 BIODIGESTOR Y POZOS DE FILTRACION
08.02.01 TRABAJOS PRELIMINARES
08.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 37.50
08.02.01.02 TRAZO Y REPLANTEO m2 37.50
08.02.02 MOVIMIENTO DE TIERRAS
08.02.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 31.80
08.02.02.02 RELLENO COMPACTADO MANUAL MATERIAL PROPIO. M3 22.20
08.02.02.03 ELIMINACION MATERIAL EXCEDENTE (D=30 m) M3 11.52
08.02.03 CONCRETO SIMPLE
08.02.03.01 CONCRETO F'C= 100 KG/CM2 M3 0.50
08.02.04 BIODIGESTOR
08.02.04.01 SUMINSTRO Y COLOCACION DE BIODIGESTOR UND 6.00
08.02.04.02 CAJA DE REGISTRO DE LODOS UND 6.00
08.02.04.03 INSTALACION DE TUBERIA DE PVC SAL 2" m 37.50
08.03 INSTALACION DE POZO DE PERCOLACION
08.03.01 TRABAJOS PRELIMINARES
08.03.01.01 TRAZO Y REPLANTEO INICIAL C/EQUIPO PARA ESTRUCTU M2 8.64
08.03.01.02 LIMPIEZA MANUAL DE TERRENO-ESTRUCTURAS M2 8.64
08.03.01.03 CINTA PLASTICA SEÑALIZADORA m 150.00
08.03.02 MOVIMIENTO DE TIERRAS
08.03.02.01 EXCAVACION MANUAL EN TERRENO NORMAL M3 13.20
08.03.02.02 RETIRO Y ACOMODO DE MATERIAL EXCEDENTE HASTA DM3 13.20
08.03.02.03 ELIMINACION MATERIAL EXCEDENTE (D=30 m) M3 15.84
08.04 INSTALACIONES ELECTRICAS
08.04.01 SALIDAS ELECTRICAS
08.04.01.01 CAJA OCTOGONAL PARA INTERRUPTOR SIMPLE pto 6.00
1 COSTO DIRECTO
PRESUPUESTO BASE AVANCE ACUMULADO ANTERIOR AVANCE MES ACTUAL
PRECIO SUB-TOTAL METRADO PARCIAL % METRADO PARCIAL
33.72 - -
13.73 21.42 - - 0.00% -
6.87 12.30 - - 0.00% -
362.13 - -
94.40 303.02 - - 0.00% -
10.19 59.10 - - 0.00% -
4,895.87 - -
789.66 2,147.88 - 0.00% -
23.55 516.22 - 0.00% -
3.90 2,231.78 - 0.00% -
116.48 - -
20.80 58.24 - 0.00% -
16.64 58.24 - 0.00% -
58.50 - -
3.61 54.15 - - 0.00% -
3.75 4.35 - - 0.00% -
147.06 - -
0.21 3.78 - - 0.00% -
0.96 17.28 - - 0.00% -
0.28 126.00 - - 0.00% -
102.63 - -
11.77 29.43 - - 0.00% -
18.94 17.05 - - 0.00% -
6.87 32.98 - - 0.00% -
1.38 23.18 - - 0.00% -
368.34 - -
66.97 368.34 - - 0.00% -
692.41 - -
322.05 692.41 - - 0.00% -
2,177.52 - -
789.66 1,184.49 - - 0.00% -
33.24 629.90 - - 0.00% -
3.80 363.13 - - 0.00% -
401.08 - -
11.33 401.08 - - 0.00% -
1,002.30 - -
167.05 1,002.30 - - 0.00% -
43.88 - -
0.21 7.88 - 0.00% -
0.96 36.00 - 0.00% -
225.16 - -
11.77 132.41 - 0.00% -
6.87 92.75 - 0.00% -
1,239.89 - -
322.05 1,239.89 - - 0.00% -
760.56 - -
219.90 259.48 - - 0.00% -
28.23 501.08 - - 0.00% -
2,282.87 - -
308.00 446.60 - - 0.00% -
41.16 1,506.46 - - 0.00% -
20.16 329.82 - - 0.00% -
2,932.89 - -
789.66 884.42 - 0.00% -
33.24 1,001.19 - - 0.00% - -
3.80 1,047.28 - - 0.00% -
4,249.88 - -
70.13 4,249.88 - 0.00% -
2,427.78 - -
272.07 1,632.42 - - 0.00% -
32.49 795.36 - - 0.00% -
5,365.38 - -
13.62 217.92 - - 0.00% -
11.05 112.71 - - 0.00% -
12.64 322.07 - 0.00% -
44.84 4,712.68 - 0.00% -
258.72 - -
3.20 19.20 - - 0.00% -
5.00 30.00 - - 0.00% -
11.64 209.52 - - 0.00% -
718.77 - -
4.94 718.77 - - 0.00% -
1,441.10 - -
21.13 633.90 - - 0.00% -
49.99 299.94 - - 0.00% -
87.73 175.46 - - 0.00% -
55.30 331.80 - - 0.00% -
10,730.30 - -
105.18 3,155.40 - - 0.00% -
66.06 2,312.10 - - 0.00% -
16.85 1,348.00 - - 0.00% -
25.87 1,552.20 - - 0.00% -
57.41 344.46 - - 0.00% -
487.04 974.08 - - 0.00% -
174.01 1,044.06 - - 0.00% -
26.63 - -
0.21 7.88 - - 0.00% -
0.50 18.75 - - 0.00% -
889.68 - -
11.77 374.29 - - 0.00% -
18.94 420.47 - - 0.00% -
8.24 94.92 - - 0.00% -
111.36 - -
222.71 111.36 - - 0.00% -
6,723.08 - -
814.75 4,888.50 - - 0.00% -
200.45 1,202.70 - - 0.00% -
16.85 631.88 - - 0.00% -
81.31 - -
4.14 35.77 - - 0.00% -
0.41 3.54 - - 0.00% -
0.28 42.00 - - 0.00% -
376.57 - -
11.77 155.36 - - 0.00% -
6.87 90.68 - - 0.00% -
8.24 130.52 - - 0.00% -
114.78 - -
19.13 114.78 - - 0.00% -
10,352.00 -
50.00% 1.00 7,952.00 100.00% - - 0.00%
50.00% 2.00 2,400.00 100.00% - - 0.00%
- 33.72
0.00% - - 0.00% 1.56 21.42 100.00%
0.00% - - 0.00% 1.79 12.30 100.00%
- 362.13
0.00% - - 0.00% 3.21 303.02 100.00%
0.00% - - 0.00% 5.80 59.10 100.00%
- 4,895.87
0.00% - - 0.00% 2.72 2,147.88 100.00%
0.00% - - 0.00% 21.92 516.22 100.00%
0.00% - - 0.00% 572.25 2,231.78 100.00%
- 116.48
0.00% - - 0.00% 2.80 58.24 100.00%
0.00% - - 0.00% 3.50 58.24 100.00%
- 58.50
0.00% - - 0.00% 15.00 54.15 100.00%
0.00% - - 0.00% 1.16 4.35 100.00%
- 147.06
0.00% - - 0.00% 18.00 3.78 100.00%
0.00% - - 0.00% 18.00 17.28 100.00%
0.00% - - 0.00% 450.00 126.00 100.00%
- 102.63
0.00% - - 0.00% 2.50 29.43 100.00%
0.00% - - 0.00% 0.90 17.05 100.00%
0.00% - - 0.00% 4.80 32.98 100.00%
0.00% - - 0.00% 16.80 23.18 100.00%
- 368.34
0.00% - - 0.00% 5.50 368.34 100.00%
- 692.41
0.00% - - 0.00% 2.15 692.41 100.00%
- 2,177.52
0.00% - - 0.00% 1.50 1,184.49 100.00%
0.00% - - 0.00% 18.95 629.90 100.00%
0.00% - - 0.00% 95.56 363.13 100.00%
- 401.08
0.00% - - 0.00% 35.40 401.08 100.00%
- 1,002.30
0.00% - - 0.00% 6.00 1,002.30 100.00%
- 43.88
0.00% - - 0.00% 37.50 7.88 100.00%
0.00% - - 0.00% 37.50 36.00 100.00%
- 225.16
0.00% - - 0.00% 11.25 132.41 100.00%
0.00% - - 0.00% 13.50 92.75 100.00%
- 1,239.89
0.00% - - 0.00% 3.85 1,239.89 100.00%
- 760.56
0.00% - - 0.00% 1.18 259.48 100.00%
0.00% - - 0.00% 17.75 501.08 100.00%
- 2,282.87
0.00% - - 0.00% 1.45 446.60 100.00%
0.00% - - 0.00% 36.60 1,506.46 100.00%
0.00% - - 0.00% 16.36 329.82 100.00%
- 2,932.89
0.00% - - 0.00% 1.12 884.42 100.00%
0.00% - - 0.00% 30.12 1,001.19 100.00%
0.00% - - 0.00% 275.60 1,047.28 100.00%
- 4,249.88
0.00% - - 0.00% 60.60 4,249.88 100.00%
- 2,427.78
0.00% - - 0.00% 6.00 1,632.42 100.00%
0.00% - - 0.00% 24.48 795.36 100.00%
- 5,365.38
0.00% - - 0.00% 16.00 217.92 100.00%
0.00% - - 0.00% 10.20 112.71 100.00%
0.00% - - 0.00% 25.48 322.07 100.00%
0.00% - - 0.00% 105.10 4,712.68 100.00%
- 258.72
0.00% - - 0.00% 6.00 19.20 100.00%
0.00% - - 0.00% 6.00 30.00 100.00%
0.00% - - 0.00% 18.00 209.52 100.00%
- 718.77
0.00% - - 0.00% 145.50 718.77 100.00%
- 1,441.10
0.00% - - 0.00% 30.00 633.90 100.00%
0.00% - - 0.00% 6.00 299.94 100.00%
0.00% - - 0.00% 2.00 175.46 100.00%
0.00% - - 0.00% 6.00 331.80 100.00%
- 10,730.30
0.00% - - 0.00% 30.00 3,155.40 100.00%
0.00% - - 0.00% 35.00 2,312.10 100.00%
0.00% - - 0.00% 80.00 1,348.00 100.00%
0.00% - - 0.00% 60.00 1,552.20 100.00%
0.00% - - 0.00% 6.00 344.46 100.00%
0.00% - - 0.00% 2.00 974.08 100.00%
0.00% - - 0.00% 6.00 1,044.06 100.00%
- 26.63
0.00% - - 0.00% 37.50 7.88 100.00%
0.00% - - 0.00% 37.50 18.75 100.00%
- 889.68
0.00% - - 0.00% 31.80 374.29 100.00%
0.00% - - 0.00% 22.20 420.47 100.00%
0.00% - - 0.00% 11.52 94.92 100.00%
- 111.36
0.00% - - 0.00% 0.50 111.36 100.00%
- 6,723.08
0.00% - - 0.00% 6.00 4,888.50 100.00%
0.00% - - 0.00% 6.00 1,202.70 100.00%
0.00% - - 0.00% 37.50 631.88 100.00%
- 81.31
0.00% - - 0.00% 8.64 35.77 100.00%
0.00% - - 0.00% 8.64 3.54 100.00%
0.00% - - 0.00% 150.00 42.00 100.00%
- 376.57
0.00% - - 0.00% 13.20 155.36 100.00%
0.00% - - 0.00% 13.20 90.68 100.00%
0.00% - - 0.00% 15.84 130.52 100.00%
- 114.78
0.00% - - 0.00% 6.00 114.78 100.00%
1 COSTO DIRECTO
2 GASTOS GENERALES 157.85%
3 GASTOS SUPERVISION 38.17%
4 EXPEDIENTE TECNICO #DIV/0!
5 GASTOS DE EVALUACION #DIV/0!
4 LIQUIDACION 32.42%
5 TOTAL VALORIZACION (1) + (2) + (3) + (4) + (5) + (6)
TO BASE AVANCE ACUMULADO ANTERIOR AVANCE MES ACTUAL
SUB-TOTAL METRADO PARCIAL % METRADO PARCIAL %
6,500.00 6,500.00 3,250.00
1,500.00 1.00 1,500.00 100.00% 0.50 750.00 50.00%
5,000.00 1.00 5,000.00 100.00% 0.50 2,500.00 50.00%
9,484.86 - -
56.65 - - 0.00% - 0.00%
29.62 - - 0.00% - 0.00%
3,225.60 - - 0.00% - 0.00%
6,172.99 - - 0.00% - 0.00%
39.19 - -
14.99 - - 0.00% - 0.00%
24.19 - - 0.00% - 0.00%
38.44 - -
32.63 - - 0.00% - 0.00%
5.81 - - 0.00% - 0.00%
1,100.00 - -
1,006.05 - - 0.00% - 0.00%
93.95 - - 0.00% - 0.00%
24.40 - -
13.31 - - 0.00% - 0.00%
11.09 - - 0.00% - 0.00%
654.44 - -
154.44 - - 0.00% - 0.00%
500.00 - - 0.00% - 0.00%
2,453.07 - -
2,453.07 - - 0.00% - 0.00%
2,250.00 1,000.00 250.00
1,050.00 20.00 1,000.00 95.24% 5.00 250.00 23.81%
1,200.00 - - 0.00% - 0.00%
13,200.00 - 13,200.00
6,000.00 - - 0.00% 1.00 6,000.00 100.00%
7,200.00 - - 0.00% 1.00 7,200.00 100.00%
1,000.00 - 1,000.00
1,000.00 - - 0.00% 1.00 1,000.00 100.00%
- 9,484.86
- - 0.00% 2.50 56.65 100.00%
- - 0.00% 8.25 29.62 100.00%
- - 0.00% 336.00 3,225.60 100.00%
- - 0.00% 403.20 6,172.99 100.00%
- 39.19
- - 0.00% 12.60 14.99 100.00%
- - 0.00% 12.60 24.19 100.00%
- 38.44
- - 0.00% 1.80 32.63 100.00%
- - 0.00% 0.96 5.81 100.00%
- 1,100.00
- - 0.00% 2.50 1,006.05 100.00%
- - 0.00% 13.44 93.95 100.00%
- 24.40
- - 0.00% 0.80 13.31 100.00%
- - 0.00% 0.80 11.09 100.00%
- 654.44
- - 0.00% 6.00 154.44 100.00%
- - 0.00% 1.00 500.00 100.00%
- 2,453.07
- - 0.00% 147.42 2,453.07 100.00%
1,250.00 1,000.00
25.00 1,250.00 119.05% (4.00) -200.00 -19.05%
- - 0.00% 1.00 1,200.00 100.00%
13,200.00 -
1.00 6,000.00 100.00% - - 0.00%
1.00 7,200.00 100.00% - - 0.00%
1,000.00 -
1.00 1,000.00 100.00% - - 0.00%
01 INSTALACIONES ELECTRICAS
01.01 TERMOMAGNETICO
01.02 LUMINARIAS
02 PISOS Y PAVIMENTOS
02.01 CONCRETO F'C = 140 KG/CM2 (PISO DE CONCRETO)
02.02 VEREDA DE CONCRETO DE e=8"
02.03 ENCOFRADO Y DESENCOFRADO PARA VEREDAS
03 TARRAJEO INTERIOR Y EXTERIOR DEL MODULO
03.01 TARRAJEO INTERIOR Y EXTERIOR DEL MODULO
04 MANTENIMIENTO DE CAPTACION
04.01 TARRAJEO INTERIOR MORTERO C:A MEZCLA 1:2 CON IMPERMEABILIZANTE
04.02 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4
04.03 PINTADO DE MURO EXTERIOR CON LATEX ACRILICO (SUPERLATEX O SIMILAR)
05 PROTECCION DE CAPTACION
05.01 MALLA GANADERA DE 1.2X100M
05.02 MADERA ROLLIZO DE EUCALIPTO D=3"X1.70 M.
06 RESERVORIO DE 5M3
06.01.01 TRABAJOS PRELIMINARES
06.01.01.01 LIMPIEZA DE TERRENO MANUAL
06.01.01.02 TRAZO NIVELES Y REPLANTEO
06.01.02 MOVIMIENTO DE TIERRAS
06.01.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE D= 10 MTS.
06.01.03 OBRAS DE CONCRETO SIMPLE
06.01.03.01 EMPEDRADO PARA SOLADOS h=20 cm. CON P.G. 8"
06.01.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=2", SOBRE EMPEDRADO
06.01.04 OBRAS DE CONCRETO ARMADO
06.01.04.01 CONCRETO f 'c=210 kg/cm2 CON PIEDRA CHANCADA
06.01.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.01.04.04 ACERO CORRUGADO Ø= 3/8",FY= 4,200 KG/CM2 GRADO 60
06.01.05 REVESTIMIENTOS
06.01.05.01 TARRAJEO CON IMPERMEABILIZANTES
06.01.05.02 TARRAJEO EXTERIORES ACABADO CON MORTERO
06.01.06 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
06.01.06.01 SUMINISTRO E INSTALACION DE HIPOCLORADOR: TIPO DIFUSOR
06.01.06.02 SUMINISTRO E INSTALACION DE ACCESORIOS EN RESERVORIO
06.01.07 TAPAS SANITARIAS
06.01.07.01 SUMINISTRO E INSTALACION DE TAPA SANITARIA METALICA 0.60 x 0.60 mts,
06.01.08 LIMPIEZA Y DESINFECCION
06.01.08.01 LIMPIEZA Y DESINFECCION EN RESERVORIO
06.01.09 PINTURA
06.01.09.01 PINTURA CON LATEX EN MUROS EXTERIORES
06.01.09.02 PINTURAANTICORROSIVA PARA TAPAS SANITARIAS METÁLICAS
06.01.10 PROTECCION DE RESERVORIO
06.01.10.01 LIMPIEZA DE TERRENO MANUAL
06.01.10.02 TRAZO NIVELES Y REPLANTEO
06.01.10.03 EXCAVACION MANUAL EN TERRENO COMPACTO
06.01.10.04 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS.
06.01.10.05 REFINE Y NIVELACION EN TERRENO NORMAL
06.01.10.06 SOLADOS CONCRETO f'c=100 kg/cm2 h=2"
06.01.10.07 CONCRETO F'C = 175KG/CM2
06.01.10.08 ENCOFRADO Y DESENCOFRADO
06.01.10.09 POSTE DE TUBO DE NEGRO ESTRUCTURAL CUADRADO x 2" L=3.10 m. INC/PINTADO
SUMINISTRO E INSTALACION DE MALLA METALICA PROTECTORA CON ALAMBRE N° 12 INC. ALAMBRE DE
06.01.10.10
PUAS P/RESERVORIO H MALLA= 2 M.
06.01.10.11 PUERTA METALICA CON MALLA OLIMPICA
06.02 CASETA DE VALVULAS PARA RESERVORIOS
06.02.01 TRABAJOS PRELIMINARES
06.02.01.01 LIMPIEZA DE TERRENO MANUAL
06.02.01.02 TRAZO NIVELES Y REPLANTEO
06.02.02 MOVIMIENTO DE TIERRAS
06.02.02.01 EXCAVACION MANUAL EN TIERRA PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.02.02.02 EXCAV. ZANJA EN TERRENO CON TIERRA COMPACTA P/TUB. A= 0.60 m H= 0.7m
06.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE D= 30 MTS.
06.02.03 OBRAS DE CONCRETO SIMPLE
06.02.03.01 DADO DE PROTECCION TUBERIA DE REBOSE CONCRETO F'C = 140 KG/CM2
06.02.04 OBRAS DE CONCRETO ARMADO
06.02.04.01 CONCRETO f 'c=210 kg/cm2 PARA OBRAS DE ARTE CON PIEDRA CHANCADA
06.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE ARTE)
06.02.04.03 ACERO CORRUGADO Ø= 1/4",FY= 4,200 KG/CM2 GRADO 60
06.02.05 REVESTIMIENTOS
06.02.05.01 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4
06.02.06 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RESERVORIO
SUMINISTRO E INSTALACIÓN DE VÁLVULAS Y ACCESORIOS EN CASETA DE VALV. RESERVORIO ENT. 1"
06.02.06.01
SALE 1 1/2"
06.02.07 TAPAS SANITARIAS
06.02.07.01 SUMINISTRO E INSTALACION DE TAPA SANITARIA METALICA 0.60 x 0.60 mts,
06.02.08 PINTURA
06.02.08.01 PINTURA CON LATEX EN MUROS EXTERIORES
06.02.08.02 PINTURAANTICORROSIVA PARA TAPAS SANITARIAS METÁLICAS
07 VIGA INCLINADA
07.01 CONCRETO f 'c=210 kg/cm2 CON PIEDRA CHANCADA
07.02 ACERO DE REFUERZO FY=4200 KG/CM2
07.03 ENCOFRADO Y DESENCOFRADO DE VIGAS
07.04 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4
08 RED DE CONDUCCION
08.01 MANTENIMIENTO DE PASE AEREO 10 ML. (01 UNIDAD) EN RED DE CONDUCCION
08.01.01 ACABADOS
08.01.01.01 TARRAJEO EXTERIOR CON MORTERO C:A MEZCLA 1:4
08.01.01.02 PINTURA CON LATEX EN MUROS EXTERIORES
08.01.01.03 PINTURA BITUMINOSA
08.01.02 TUBERIAS
_x0008_SUMINISTRO E INSTALACIÓN DE TUBERIA GALVANIZADO 10M DE 1"_x000D_
08.01.02.01
COSTO DIRECTO
GASTOS GENERALES
GASTOS SUPERVISION
EXPEDIENTE TECNICO
GASTOS DE EVALUACION
LIQUIDACION
PRESUPUESTO PROGRAMADO ANTERIOR
P. Unit. Presup.
Unid. Metrado METRADO VALORIZADO %
S/. S/.
0 - 0.00%
UND 3.00 606.60 1,819.80
0 - 0.00%
m 10.00 5.21 52.10
glb 1.00 501.58 501.58 0 - 0.00%
m2 0.60 4.12 2.47 0 - 0.00%
m 24.42 4.12 100.61 0 - 0.00%
- 0.00% 0 - 0.00%
20 1,048.20 95.24% 20 1,048.20 95.24%
- 0.00% 0 - 0.00%
- 0.00% 0 - 0.00%
- 0.00% 0 - 0.00%
- 0.00% 0 - 0.00%
#REF!
SALDO
METRADO VALORIZADO %
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
0.20 1.466 10.99%
4.00 2.2 100.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
0.10 41.6321714285714 4.76%
13.62 85.806 4.76%
1.87 105.281 4.76%
0.80 15.896 4.76%
- 0 0.00%
- 0 0.00%
- 0 0.00%
4,013.70 3.50%
1,787.30 3.50%
432.28 3.50%
- 0.00%
(255.33) 25.27%
10,504.99 100.00%
ITEMS
02
02.01.02
02.01.04
04
04.01.01
04.01.02
04.01.03
04.02.01
04.02.02
04.02.04
04.02.05
04.02.07
04.03.01
04.04.01
06
06.01.01
06.01.02
06.01.03
06.02.01
06.02.02
06.02.03
06.02.04
06.03.01
07
07.01.01
07.01.02
07.02.01
07.02.02
07.02.03
07.03.01
07.03.02
08
08.01.01.01
08.01.01.02
08.01.02
08.01.02.01
08.01.02.04
08.01.03
08.01.03.01
08.01.04
08.01.04.01
08.01.04.02
08.01.04.02.01
08.01.04.02.02
08.01.04.02.03
08.01.04.03
08.01.04.03.01
08.01.04.04
08.01.04.04.01
08.01.05
08.01.05.01
08.01.05.01.01
08.01.05.01.02
08.01.05.02
08.01.05.02.01
08.01.05.02.02
08.01.05.03
08.01.05.03.01
08.01.05.04
08.01.05.04.01
08.01.05.04.02
08.01.05.05
08.01.05.05.01
08.01.05.06
08.01.05.06.01
08.01.05.06.03
08.01.05.07
08.01.05.07.01
08.01.05.09
08.01.05.09.03
08.01.05.09.04
08.01.05.10
08.01.05.10.01
08.01.05.10.02
08.01.05.10.03
08.01.05.11
08.01.05.11.01
08.01.06
08.01.06.01
08.01.06.01.01
08.01.06.01.02
08.01.06.01.03
08.01.06.01.04
08.01.06.01.05
08.01.06.02
08.01.06.02.01
08.01.06.02.02
08.01.06.02.03
08.01.06.02.04
08.01.06.02.05
08.01.06.02.06
08.01.06.02.07
8.02
08.02.01
08.02.01.01
08.02.01.02
08.02.02
08.02.02.01
08.02.02.01
08.02.02.02
08.02.02.03
08.02.03
08.02.03.01
08.02.04
08.02.04.01
08.02.04.02
08.02.04.03
8.03
08.03.01
08.03.01.01
08.03.01.02
08.03.01.03
08.03.02
08.03.02.01
08.03.02.02
08.03.02.03
08.04
08.04.01
08.04.01.01
08.04.02
08.04.02.01
PRESUPUES
PARTIDAS
Unid.
COSTO DIRECTO
PRESUPUESTO PROGRAMADO ANTERIOR
P. Unit. Presup.
Metrado METRADO VALORIZADO %
S/. S/.
31.62875 -
31.62875 11.77 372.27 26.36 310.20 83.33%
22.2914451 18.94 422.20 18.58 351.91 83.35%
10.56505887 8.24 87.06 7.8 64.27 73.83%
-
- 0.00% 26.36 310.20 83.33%
1.94 36.74 8.70% 20.52 388.65 92.05%
1.00 8.24 9.47% 8.80 72.51 83.29%
METRADO VALORIZADO %
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0.0000000 0.00%
- 0.0000000 0.00%
- 0 0.00%
- 0.0000 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
- 0 0.00%
31.63 0
5.27 62.0720375000001 16.67%
1.77 33.5511701940002 7.95%
1.77 14.5440850887998 16.71%
12,285.96 21.00%
RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA N° 07
: MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE EXCRETAS DEL ANEXO CABRACANCHA EN LA C.C. DE
PROYECTO PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO - DEPARTAMENTO DE CUSCO
1 PROGRAMADO C.D. 195,613.83 133,366.57 32.35% 11,787.97 2.86% 145,154.53 35.21% 50,459.30 12.24%
2 PARTIDAS NUEVAS Nº1 36,744.39 7,500.00 1.82% 17,700.00 4.29% 25,200.00 6.11% 11,544.39 2.80%
PARTIDAS NUEVAS Nº2 114,808.62 85,793.95 20.81% 25,000.98 6.07% 110,794.93 26.88% 4,013.69 0.97%
MAYORES METRADOS Nº2 58,492.06 28,799.95 6.99% 17,406.15 4.22% 46,206.10 11.21% 12,285.96 2.98%
-
542,988.01
_________________________________ ___________________________
RESIDENTE DE OBRA INSPECTOR DE OBRA
: ING. GUILDO HUANCAHUIRE BRAVO : ING. JULIO CESAR LUNA HUAMANI
FORMATO N° 12-B:
SEGUIMIENTO A LA EJECUCIÓN DE INVERSIONES
(La información registrada en este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
I. DATOS GENERALES
Código único de inversiones N° 2501253 Código de la UP
Nombre de la inversión MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y DISPOSICIÓN SANITARIA DE EXCRETAS DEL ANEXO CABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO - DEPARTAMENTO DE CUSCO"
Unidad Ejecutora de Inversiones Municipalidad Provincial de Acomayo Modalidad de ejecución ADMINISTRACIÓN DIRECTA
Programada Actualizada Programada Actualizada Final* Programada Actualizada Final* Programada Actualizada Final* Programada Actualizada Final*
Actuaciones preparatorias Fecha de convocatoria Fecha de integración de bases Fecha de buena pro Fecha de suscripción
Item / Fechas
Programada Actualizada Programada Actualizada Final * Programada Actualizada Final * Programada Actualizada Final * Programada
Infraestructura
Equipamiento
Otros**
2. Fechas de ejecución física
Fecha Programada Actualizada Final
Inicio 12/21/2020 Monto del Contrato
Culminación 8/27/2021 Monto actualizado del Contrato 245 693.63
3. Avance físico - Metas físicas (%) 79.15%
Año 1 - 2021 ….. Año 2-2021
Item
ene feb mar abr may jun jul ago sep oct nov dic … ene feb mar abr may jun jul ago sep oct nov
Accion 1.- SEGURIDAD, SALUD Y PLAN DE VIGILANCIA
- - - - - - - - - … - - - - - - - - - - -
Avance físico programado
- - - - - - - - - - - - - - - - -
- - - - 38486.11 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - -
anterior 14226.00 5176.00 3188.00 22590.00 50216.34 - - - - - - - - - - - - -
Avance físico real
actual 0.00% S/ 5,176.00 3188.00 8364.00 18592.72 - - - - - - - - - - - - -
Accion 1.- CONSTRUCCION DE CAPTACION DE AGUA:Mejoramiento de Captaciones 0
- - - - 0.00% - - - - - … - - - - - - - - - - -
Avance físico programado
- - - - 0.00% - - - - - - - - - - - - -
- - - - 17542.90 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - -
anterior 6095.70 0.00% - 0.00% 6095.70 13550.42 - - - - - - - - - - - - -
Avance físico real
actual 0.00% - 2,670.99 2670.99 5937.47 - - - - - - - - - - - - -
Accion 2.- RENOVACION DE LINEA DE CONDUCCION:Mejoramiento de linea de conduccion. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- - - - 37578.90 - - - - - - - - - - - - -
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - - -
Avance físico actualizado
- 16087.29 - 0.00% - 16087.29 35761.17 - - - - - - - - - - - - -
- 0.00 - 3866.66% 165.17% 40.32 89.63 - - - - - - - - - - - - -
Avance físico real
- - - 0.00% - - - - - - - - - - - - -
FORMATO N° 12-B:
SEGUIMIENTO A LA EJECUCIÓN DE INVERSIONES
(La información registrada en este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
Accion 3.- CONSTRUCCION DE RESERVORIO: Mejoramiento de reservorio. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- - - - 137862.00
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - -
Avance físico actualizado
- - - 0.00 0.00 - - - - - - - - - - - - -
- - - - 0.00 0.00 - - - - - - - - - - - - -
Avance físico real
- - - 0.00 - - - - - - - - - - - - -
Accion 4.- CONSTRUCCION DE RED DE DISTRIBUCION:Mejoramiento de red de distribucion. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- - - - 0.00% - - - - - - - - - - - - -
- - - 46902.91 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - -
- 13057.54 0 13057.54 29026.20 - - - - - - - - - - - - -
Avance físico real
- S/ 2,412.49 - S/ 5,051.98 7464.47 16593.12 - - - - - - - - - - - - -
Accion 5.- IMPLEMENTACION DE CONEXIÓN DOMICILIARIA:Instalaciones Domiciliarias. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- - - - 0.00% - - - - - - - - - - - - -
- - - - - 15454.33 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - - -
- 4390.47 2350.61 6741.08 14985.06 - - - - - - - - - - - - -
Avance físico real
- - - 0.00 0.00 0.00 - - - - - - - - - - - - -
Accion 06.- CONTRUCCION DE LETRINAS SANITARIAS: UBS letrinas con biodigestor. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- S/ 80,652.73 - S/ 28,560.78 26,724.83 0.00% - - - - - - - - - - - - -
- - - - 20,509.87 231084.98 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - -
- 72346.96 23261.28 19815.36 115423.60 256580.39 - - - - - - - - - - - - -
Avance físico real
- 8305.77 - 5299.50 6909.47 20514.74 45603.15 - - - - - - - - - - - - -
Accion 07.- IMPLEMENTACION DE INFORMACION:Control de Calidad. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- - - - 0.00% - - - - - - - - - - - - -
- - - - 11937.01 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - -
- 780.00 1000.00 1780.00 3956.84 - - - - - - - - - - - - -
Avance físico real
- - - 250.00 250.00 555.74 - - - - - - - - - - - - -
Accion 08.- IMPLEMENTACION DE INFORMACION Plan conjunto,operación y mantenimento. 0
- - - - 0.00% - - - - - - - - - - - - -
Avance físico programado
- - - - 0.00%
- - - - - 6138.87 - - - - - - - - - - - - -
Avance físico actualizado
- PROG MM1 PN1 MM2 PN2 - - - - - - - - - - - - - -
- 1856.50 1856.50 4126.90 - - - - - - - - - - - - -
Avance físico real
- S/ 2,926.00 - S/ 13,200.00 16126.00 35847.22 - - - - - - - - - - - - -
542988.01 531422.37 770484.60
Componente 01. Adecuada y suficiente infraestructura para el servicio de agua y eliminación de excretas. 491448.24 90.51% 239062.23 97.87 531422.36539 292360.14 531422.37
Componente 02. Suficientes conocimientos de educación sanitaria. 39974.12 7.36% 2.2229457393
531422.37
Avance físico global (%) S/ 123,219.04 Resumen de Valorización/Informe de avance (Adjuntar documento) Fotos (Adjuntar)
FORMATO N° 12-B:
SEGUIMIENTO A LA EJECUCIÓN DE INVERSIONES
(La información registrada en este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
IV. EJECUCIÓN FINANCIERA 1121.619869058 S/0.01 S/1.01 S/124,340.66
Avance financiero de la inversión 12434066.2% 9,580.46 S/124,340.66
Años Año 2020 … Año 2021
Avance
2020-2021 marzo abr may jun jul ago sep oct nov dic … ene feb mar abr may jun jul ago sep oct nov
605,365.17 - 63,251.35 … 131,981.22 124,884.41 83,432.83 28,317.71 0.00 4,184.65 81,070.66 45,992.23 42,250.10 - -
Avance financiero programado
- - - 10.45% … 21.80% 20.63% 13.78% 4.68% 0.00% 0.69% 13.39% 7.60% 6.98% - -
423,876.40 - - 163,786.53 … - 40,263.03 ### 37,544.00 44,893.52 1,774.00 2,530.00 - - - -
Avance financiero actualizado
- - - - - - 27.06% 6.65% 21.98% 6.20% 7.42% 0.29% 0.42% - - - -
- - - - - - … - - - - - - - - - - -
Avance final (Devengado/Girado) ***
- - - - - … - - - - - - - - - - -
V. ESTADO SITUACIONAL SE CULMINA LA CONSTRUCCION DE LOS UBS(20 UND) DEDUCIENDO 01 MODULO DEBIDO A DUPLICIDAD DE BENEFICIARIO Y SE REALIZA EL INTERNAMIENTO DE LOS SALDOS DE MATERIALES DE LA CONSTRUCCION DE UBS PENDIENTE DE EJECUCION
Descripción:
1. Se considera la construcción de una adecuada infraestructura para la transitabilidad vehicular:
Pavimento rígido con concreto f´c = 210 kg/cm2 en un área de 531.84 m2 y e=0.20 m, sub base granular de e=0.20 m, acero liso de 5/8” en juntas de construcción y contracción, acero corrugado de temperatura de 6 mm.
2. Se considera la construcción de una adecuada infraestructura para la transitabilidad peatonal:
Construcción de 187.28 m2 de veredas con concreto f'c=175 kg/cm2 con base de piedra de 6” con un espesor total de e=0.20m.
Construcción de 74.20 ml de sardineles con concreto f'c=175 kg/cm2, de ancho 0.15m y altura 0.45m.
Construcción de 416.54 m2 de gradas de concreto f'c=175 kg/cm2 en el Psje. Tres cruces y Psje. Hilario Richarte.
3. Se considera la construcción de una adecuada infraestructura para la evacuación de aguas pluviales:
Construcción de 268.10 m2 de canal de evacuación de aguas pluviales con 126.20 m en Jr. Vista Alegre, 92.62 m en el Psje. Tres Cruces y 173.20 m en el Psje. Hilario Richarte, incluye 20.90 ml de sumidero metálico.
4. Se considera la construcción de una adecuada infraestructura para la protección contra deslizamientos:
Construcción de 189.00 m de muros de contención con concreto armado de f´c=210kg/cm2 y acero f’y=4200 kg/cm2, con alturas de pantalla variables (según se especifica en los planos) en el Jr. Vista alegre. Se tiene 441.21 m3 de concreto con juntas de contracción cada 5.00 m de e=1” y un sistema de drenaje de aguas subterráneas.
3. Mencionar que no se cuenta con un buen acceso a la obra por lo que va dificultar la provicion de materiales en vehiculos grandes.
4. El lugar donde se viene ejecutando la obra no se cuenta con espacios amplios los cuales dificultaran el almacenamiento de los agregados, cementos y fierros.
5. Tambien cabe mencionar que no se tiene la partida de acarreo de material; ya que en los pasajes tres cruces y psj Hilario Richarte va ha ser nesesario dicha partida devido a que no se cuenta con via de acceso por la parte de arriba.
2/
Especificaciones Técnicas, Términos de Referencia y/o Estudios Definitivos de Ingeniería.
3/
Modificaciones en calendario de procedimiento de selección, Atrasos y/o paralizaciones, Resolución de contrato, Resolución de Convenio, Falta de disponibilidad de terreno, Permisos y licencias, Otras autorizaciones, Interferencias, Arbitraje, Falta de recursos financieros, Supervisor/Inspector, Riesgo no identificado, Discrepancias (Valorización observada, etc.), Recepción observada u Otro.
* Información será extraída del Sistema Electrónico de Contrataciones del Estado (SEACE) operado por el Organismo Supervisor de las Contrataciones del Estado (OSCE); excepto cuando la ejecución de proyectos de inversión se realiza mediante el mecanismo de Obras por Impuestos (OxI), Asociación Público Privado (APP).
En el caso la inversión se ejecute por Administración directa, la UEI no registrará información sobre el procedimiento de selección de la ejecución física.
* * Otros: Mobiliario, Intangibles, Vehículos, Terreno e Infraestructura natural.
*** Información será extraída del Portal de Transparencia Económica - Consulta Amigable de Ejecución del Gasto del Ministerio de Economía y Finanzas.
Las UEI registrarán información dependiendo del estado en que se encuentre la inversión.
FORMATO N° 12-B:
MIENTO A LA EJECUCIÓN DE INVERSIONES
n este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
ABRACANCHA EN LA C.C. DE PITUMARCA DEL DISTRITO DE ACOMAYO - PROVINCIA DE ACOMAYO - DEPARTAMENTO DE CUSCO"
Actualizada
Año 2-2021
dic
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
FORMATO N° 12-B:
MIENTO A LA EJECUCIÓN DE INVERSIONES
n este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
FORMATO N° 12-B:
MIENTO A LA EJECUCIÓN DE INVERSIONES
n este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
Año 2021
dic
-
-
-
-
-
-
BENEFICIARIO Y SE REALIZA EL INTERNAMIENTO DE LOS SALDOS DE MATERIALES DE LA CONSTRUCCION DE UBS PENDIENTE DE EJECUCION
de temperatura de 6 mm.
de sumidero metálico.
Vista alegre. Se tiene 441.21 m3 de concreto con juntas de contracción cada 5.00 m de e=1” y un sistema de drenaje de aguas subterráneas.
do el material al botadero indicado, asimismo indicar botaderos fue autorizado por la Inspección a fin de que no haga daño al medio ambiente.
ereda.
ros de contención.
actividades.
tadero indicado, asimismo indicar botaderos fue autorizado por la Inspección a fin de que no haga daño al medio ambiente.
dió, de manera que se alcanzó el ancho y la profundidad de diseño; en la excavación se tuvo cuidado de que no se produzcan deslizamientos del material de las paredes laterales, respetando los taludes mencionados en el REGLAMENTO
s de suelo con el fin de garantizar la seguridad de los trabajadores esencialmente y la de la infraestructura instalada en las inmediaciones de las excavaciones. También se tomara en cuenta las especificaciones que se tiene en el REGLAMENTO
e para que conserven su rigidez. Para lo cual se utilizó tablas de madera corriente y listones de madera corriente esto para el encofrado de zapatas de muro de contención MC-03.
y el agrietamiento en el concreto como consecuencia de los cambios de temperatura ambiental y de la retracción del concreto para esto se utilizó Tecknoport de 1”.
FORMATO N° 12-B:
MIENTO A LA EJECUCIÓN DE INVERSIONES
n este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
FORMATO N° 12-B:
MIENTO A LA EJECUCIÓN DE INVERSIONES
n este formato tiene carácter de Declaración Jurada - D.S. N° 284-2018-EF)
Acciones a seguir:
, Otras autorizaciones, Interferencias, Arbitraje, Falta de recursos financieros, Supervisor/Inspector, Riesgo no identificado, Discrepancias (Valorización observada, etc.), Recepción observada u Otro.
cución de proyectos de inversión se realiza mediante el mecanismo de Obras por Impuestos (OxI), Asociación Público Privado (APP).