Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Costos de Producción
MP S/ 22.00 S/ 19.00
MOD S/ 7.00 S/ 10.00
CIF S/ 2.28 S/ 3.80
Total S/ 31.28 S/ 32.80
Costos de Producción
DETALLE SMALL MEDIUM
MP S/ 22.00 S/ 19.00
MOD S/ 7.00 S/ 10.00
CIF
1. Servicios de Ingenieria S/ 0.04 S/ 0.07
2. Reparacion de maquinaria S/ 1.03 S/ 1.38
3. Recepción S/ 0.43 S/ 0.59
4. Empaque S/ 0.24 S/ 0.17
5. Supervision de la Produccion S/ 0.14 S/ 0.49
S/ 1.88 S/ 2.70
Total S/ 30.88 S/ 31.70
SOLUCIÓN
a) SERVICIOS DE INGENIERIA
Servicios de Ingenieria S/ 8,000.00
Total 25
c) RECEPCION
Recepcion S/ 65,000.00
Total 190
d) EMPAQUE
Empaque S/ 32,000.00
Total 27
e) SUPERVISION DE LA PRODUCCION
SUPERVISION DE LA S/ 45,680.00
PRODUCCION
Total 40
S/ 8.00
S/ 9.00
S/ 3.04
S/ 20.04
Pantalon
TOTAL
S/ 2.28
S/ 3.80
S/ 3.04
LARGE
S/ 8.00
S/ 9.00
S/ 0.32
S/ 1.72
S/ 2.28
S/ 1.38
S/ 1.90
S/ 7.60
S/ 24.60
S/ 320.00
S/ 0.69
S/ 342.11
S/ 1,185.19
S/ 1,142.00