Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Informe Molienda
Informe Molienda
“Análisis Granulométrico”
GRUPO N°02
Laboratorio de Operaciones en Ingeniería Química
Integrantes: Mallqui Parian, Mayte Briggite
Porras Cornejo, Sofía Sthefany
Quispe Contreras, Nataly Wenny
Rodriguez Pino, Melissa Beatriz
Docente: Ing.
LIMA – PERÚ
16/05/2019
SUMARIO
2
ÍNDICE GENERAL
SUMARIO....................................................................................................................... 2
ÍNDICE GENERAL.......................................................................................................... 3
Índice de tablas................................................................................................................. 3
Índice de figuras............................................................................................................... 3
INTRODUCCIÓN............................................................................................................ 4
PROCEDIMIENTO.......................................................................................................... 4
DATOS EXPERIMENTALES...........................................................................................7
RESULTADOS CALCULADOS........................................................................................8
DISCUCIONES..............................................................................................................18
CONCLUSIONES..........................................................................................................18
BIBLIOGRAFÍA............................................................................................................18
APÉNDICES..................................................................................................................18
Índice de tablas
Índice de figuras
Figura 1 Proceso de cuarteo..........................................................................................................4
Figura 2 Medición de velocidad de molino...................................................................................4
Figura 3 Proceso de tamizado.......................................................................................................5
Figura 4 Adición de material de molienda al molino....................................................................5
Figura 5 Vertido de mineral en tamices finos................................................................................6
3
INTRODUCCIÓN
PROCEDIMIENTO
La muestra original se tamizo pasando por la malla N°6, hasta obtener una masa de 1300 gramos,
luego esta se colocó sobre una lona ubicada encima de la mesa de trabajo; posteriormente, se formó
una especie de cono con la muestra para aplanarlo con el fin de obtener una superficie regular.
Después, se dividió la muestra en 4 cuadrantes, descartando dos de ellas situadas opuestamente. Se
volvió a realizar el proceso hasta obtener una masa final de 301 gramos.
4
Proceso de tamizado antes de la molienda
Para el cálculo del work índex, es necesario hallar el F 80 de la muestra antes de pasar por molienda.
Para este proceso se selecciona un juego de tamices con aberturas menores a la malla N° 6 y con
una variación de tamaño regular estas son las mallas N° 8,10, 16, 30,50 y 100, donde la malla de
menor abertura es la malla de corte seleccionada para este laboratorio. El tamizado se realiza por
cinco minutos, luego se masa el material retenido en cada malla y se registra los datos para el
análisis granulométrico posterior.
Primera corrida
Proceso de molienda
Se seleccionaron los tamaños de material de molienda (compuesta por bolas de diámetro variable
entre 1.5” y 2.5”) y la cantidad de cada uno de ellos con la misma disposición a la del laboratorio
anterior (producir un producto más fino) para realizar la primera corrida. El molino opera a una
velocidad de 73 rpm y es alimentado con 752 gramos de carga seca preparada a –6 mallas. Se
realizó el proceso de molienda con 100 vueltas. Después, se retiró el material con sumo cuidado,
haciendo uso de una brocha para desprender el material de zonas difíciles de alcanzar.
5
Figura 4 Adición de material de molienda al molino
Se realiza el proceso de tamizado por 5 minutos, donde se separará y masa el producto (- malla N°
100) y el resto de material luego de ser masado; reingresa al molino añadiéndose además una
cantidad de muestra original (- malla N°6) igual a la masa del producto en esta corrida manteniendo
los 752 gramos de alimento constante.
Segunda corrida
El número de revoluciones para esta nueva corrida se determina en función a la cantidad de material
molido por cada revolución (g/rev) obtenido en el paso anterior; y se calcula el Gbp1.
Se realiza el proceso de molienda otra vez, se separa como se indica en la corrida 1, se procede a
calcular el número de vueltas para la tercera corrida y el Gbp2
Esta misma operación se repite durante varias etapas hasta observar que los gbp calculados son casi
constantes y se seleccionan los tres últimos de estos para calcular el promedio y ese será el gbp
resultante.
6
Figura 6 Proceso de molienda
Para el cálculo del work índex, es necesario hallar el P 80 de la muestra antes de pasar por molienda.
Para este proceso se selecciona un juego de tamices con aberturas menores a la malla N° 100 y con
una variación de tamaño regular estas son las mallas N° 120,140, 200, 230 y 270. El tamizado se
realiza por cinco minutos, luego se masa el material retenido en cada malla y se registra los datos
para el análisis granulométrico posterior.
7
DATOS EXPERIMENTALES
Tabla 3 velocidad
Tiempo (minutos ) vueltas
1 73
1 73
1 74
8
Tabla 3 Datos de los pesos retenidos en los tamices después de la molienda
Tabla 4 Datos de las masas y volúmenes para la prueba de densidad aparente antes de la molienda
Masa (g) Volumen (ml)
64 77
147 170
241 273
Tabla 5 Datos de las masas y volúmenes para la prueba de densidad aparente después de la
molienda
Masa (g) Volumen (ml)
262 216
304 214
207 170
RESULTADOS CALCULADOS
9
8 2378 50 [3364-2378] 2871.0 2828.35 2786.34
10 1682 17 [2378-1682] 2030.0 1999.95 1970.34
16 1000 34 [1682-1000] 1341.0 1296.92 1254.29
Ciego Ciego 60 <1000
TOTAL 439
Peso
MALLA f(x) G(x) F(x)
Retenido (g)
2 15 3.425 3.425 96.575
4 197 44.977 48.402 51.598
6 65 14.840 63.242 36.758
8 50 11.416 74.658 25.342
10 17 3.881 78.539 21.461
16 34 7.763 86.302 13.698
Ciego 60 13.699 100.000 0.000
TOTAL 438
Peso
MALLA f(x) G(x) F(x)
Retenido (g)
30 0 0.000 0.000 100.000
50 21 2.524 2.524 97.476
70 126 15.144 17.668 82.332
10
140 360 43.269 60.938 39.063
200 152 18.269 79.207 20.793
230 95 11.418 90.625 9.375
Ciego 78 9.375 100.000 0.000
TOTAL 832
GGS RR
Ln[F(x)/10 Ln{Ln[100/G(
Ln(x) Ln(x)
0] x)]}
9.00282 -0.03485 9.00282 1.21612
8.65600 -0.66169 8.65600 -0.32072
8.30906 -1.00082 8.30906 -0.78046
7.96242 -1.37270 7.96242 -1.23013
7.61579 -1.53894 7.61579 -1.42058
7.20117 -1.98790 7.20117 -1.91514
GGS RR
0 1.5
7 7.5 8 8.5 9 9.5 1
f(x) = 1.02 x − 9.4
-0.5
R² = 0.97 0.5 f(x) = 1.55 x − 13.31
R² = 0.88
0
-1
7 7.5 8 8.5 9 9.5
-0.5
-1.5 -1
-1.5
-2
-2
-2.5 -2.5
Gráfica 1 Gráficas GGS y RR usando el promedio aritmético antes de molienda
Entonces:
1.0218
x
GGS : F ( x )=100∗ ( 9903.3 )
Con el factor de correlación: ( R2 )GGS =0.9715
11
1.5475
x
[
RR :F ( x )=100∗ 1−e
−( 5454.5 ) ]
Con el factor de correlación: ( R2 ) RR=0.8755
Tabla 10 Regresión lineal para GGS y RR usando el promedio aritmético después de molienda
|
GGS RR
Ln[F(x)/ Ln{Ln[100/
Ln(x) Ln(x)
100] G(x)]}
6.58617 0.00000 6.58617 -
6.10925 -0.02556 6.10925 1.30273
5.54518 -0.19441 5.54518 0.55008
5.06890 -0.94001 5.06890 -0.70255
4.50535 -1.57054 4.50535 -1.45625
4.23411 -2.36712 4.23411 -2.31831
GG RR
0 1.5
4 f(x)
4.5 = 0.99
5 x −5.5
6.13 6 6.5 7 f(x) = 1.91 x − 10.26
1
-0.5
R² = 0.88 R² = 0.98
0.5
-1 0
4 4.5 5 5.5 6 6.5
-0.5
-1.5 -1
-1.5
-2
-2
-2.5 -2.5
Entonces:
0.9884
x
GGS : F ( x )=100∗ ( 493.35 )
Con el factor de correlación: ( R2 )GGS =0.8762
1.9111
x
[
RR :F ( x )=100∗ 1−e
−( 214.23 ) ]
Con el factor de correlación: ( R2 ) RR=0.9844
12
Usando el Promedio Geométrico:
Para la regresión lineal de ambas funciones:
Tabla 3 Regresión lineal para GGS y RR usando el promedio geométrico antes de la molienda
GGS RR
Ln[F(x)/ Ln{Ln[100/
Ln(x) Ln(x)
100] G(x)]}
9.00282 -0.03485 9.00282 1.21612
8.65600 -0.66169 8.65600 -0.32072
8.30906 -1.00082 8.30906 -0.78046
7.96242 -1.37270 7.96242 -1.23013
7.61579 -1.53894 7.61579 -1.42058
7.20117 -1.98790 7.20117 -1.91514
GGS RR
0 1.5
7 7.5 8 8.5 9 9.5
f(x) = 1.01 x − 9.32 1
-0.5
R² = 0.97 0.5
f(x) = 1.53 x − 13.17
-1 0 R² = 0.87
7 7.5 8 8.5 9 9.5
-0.5
-1.5 -1
-1.5
-2
-2
-2.5 -2.5
Entonces:
1.0135
x
GGS : F ( x )=100∗ ( 9814.47 )
Con el factor de correlación: ( R2 )GGS =0.9706
1.5336
x
[
RR :F ( x )=100∗ 1−e
−( 5378.93 ) ]
Con el factor de correlación: ( R2 )GGS =0.873
13
Tabla 4 Regresión lineal para GGS y RR usando el promedio geométrico después de la molienda
GGS RR
Ln[F(x)/ Ln{Ln[100/
Ln(x) Ln(x)
100] G(x)]}
6.57108 0.00000 6.57108 -
6.05036 -0.02556 6.05036 1.30273
5.53018 -0.19441 5.53018 0.55008
5.01001 -0.94001 5.01001 -0.70255
4.49046 -1.57054 4.49046 -1.45625
4.23031 -2.36712 4.23031 -2.31831
GG RR
0 1.5
4 f(x)
4.5 = 0.99
5 x −5.5
6.12 6 6.5 7 f(x) = 1.96 x − 10.44
1
-0.5
R² = 0.87 R² = 0.99
0.5
-1 0
4 4.5 5 5.5 6 6.5
-0.5
-1.5 -1
-1.5
-2
-2
-2.5 -2.5
Entonces:
0.9922
x
GGS : F ( x )=100∗ ( 478.25 )
Con el factor de correlación: ( R2 )GGS =0.869
1.9587
x
RR :F ( x )=100∗ 1−e[ −( 206.56 ) ]
Con el factor de correlación: ( R2 )GGS =0.9878
14
Para la regresión lineal de ambas funciones:
Tabla 5 Regresión lineal para GGS y RR usando el promedio armónico antes de molienda
GGS RR
Ln[F(x)/ Ln{Ln[100/
Ln(x) Ln(x)
100] G(x)]}
8.97295 -0.03485 8.97295 1.21612
8.62600 -0.66169 8.62600 -0.32072
8.27920 -1.00082 8.27920 -0.78046
7.93248 -1.37270 7.93248 -1.23013
7.58596 -1.53894 7.58596 -1.42058
7.13432 -1.98790 7.13432 -1.91514
GGS RR
0 1.5
7 7.5 8 8.5 9 9.5 1
-0.5 f(x) = 1.01 x − 9.23
R² = 0.97 0.5
f(x) = 1.52 x − 13.03
-1 0 R² = 0.87
-0.5 7 7.5 8 8.5 9 9.5
-1.5 -1
-1.5
-2
-2
-2.5 -2.5
Entonces:
1.0053
x
GGS : F ( x )=100∗ ( 9718.98 )
Con el factor de correlación: ( R2 )GGS =0.9695
1.5197
x
RR :F ( x )=100∗ 1−e [ −( 5306.53 ) ]
Con el factor de correlación: ( R2 )GGS =0.8705
15
Tabla 6 Regresión lineal para GGS y RR usando el promedio armónico después de molienda
GGS RR
Ln[F(x)/ Ln{Ln[100/
Ln(x) Ln(x)
100] G(x)]}
6.55599 0.00000 6.55599 -
5.99146 -0.02556 5.99146 1.30273
5.51519 -0.19441 5.51519 0.55008
4.95112 -0.94001 4.95112 -0.70255
4.47558 -1.57054 4.47558 -1.45625
4.22652 -2.36712 4.22652 -2.31831
GG RR
0 1.5
4 f(x)
4.5 = 0.99
5 x 5.5
− 6.116 6.5 7
R² = 0.86 1 f(x) = 2.01 x − 10.62
-0.5 R² = 0.99
0.5
-1 0
-0.5 4 4.5 5 5.5 6 6.5
-1.5 -1
-1.5
-2
-2
-2.5 -2.5
Entonces:
0.9946
x
GGS : F ( x )=100∗ ( 464.26 )
Con el factor de correlación: ( R2 )GGS =0.8606
2.0057
x
RR :F ( x )=100∗ 1−e [ −( 199.12 ) ]
Con el factor de correlación: ( R2 ) RR=0.98
16
Tabla 7 Cuadro comparativo de los factores de correlación antes de molienda
GGS RR
Aritmético 0.9715 0.855
Geométrico 0.9706 0.873
Armónico 0.9695 0.8705
Tabla 10 Valores de d80 (µm) para los tres casos después de molienda
GGS RR
Aritmético 393.647 274.80
Geométrico 381.93 263.39
Armónico 370.958 252.44
17
Densidad Aparente antes de molienda
Volumen Densidad
Muestra Masa (g)
(ml) (g/ml)
1 262 216 1.213
2 304 214 1.421
3 207 170 1.218
Volumen Densidad
Muestra Masa (g)
(ml) (g/ml)
1 64 77 0.8312
2 147 170 0.8647
3 241 273 0.8828
Velocidad
Tiempo (min) vueltas
(rpm)
1 73 73
1 73 73
1 74 74
18
73.3 rpm
% V C experimental= x 100 %=74.41 %
98.51 rpm
Cálculo de porcentaje de error
DISCUCIONES
CONCLUSIONES
Para la función de distribución de mineral antes de la molienda se seleccionó el modelo GGS con el
promedio geométrico entre los tamices seleccionados, con un d80 de 7874.94 micrómetros. Por otra
parte, para la función de distribución después del proceso de molienda se seleccionó el modelo RR
usando el promedio geométrico entre los tamices con un d80 de 263.39 micrómetros.
Al comparar los valores de d80 obtenidos en los procesos de trituración obtenidos en el laboratorio
presente, como en el anterior, se obtuvo una variación que representa un porcentaje de error 2.88%.
19
BIBLIOGRAFÍA
APÉNDICES
20