HOJA DE METRADOS - COLUMNAS

PROYECTO : PROY. VIVIENDA MULTIPLICAR POR PARA KG/ML


FECHA : DICIEMBRE DEL 2020 TIPO 1 2 3 4 5 6
A CARGO : ING. ED ROYER f 1/4" 3/8" 1/2" 5/8" 3/4" 1" HOJA
UBICACIÓN : AREQUIPA - PIEDRA SANTA HOJA : ACERO 03 w /m 0.25 0.56 0.994 1.552 2.235 3.973 7
% DESP. 2% 3% 5% 7% 8% 10%

TIP Nro Nro LONG. FIERRO (Kg) PARCIAL


ITEM - DESCRIPCION
O f
VECES PIEZA PIEZA 1/4" 3/8" 1/2" 5/8" 3/4" 1" kg
C-1 NIVEL 1
0.65 0.65 COLUMNA C-2 (0.25X0.25) 5 3/4" 6 4 7.67 411.42 411.4
0.2213 cm. Ø1/2"
10cm. Ø 3/8"
7.5cm. Ø 1/4"
4 5/8" 6 6 7.67 428.54 428.5
0.0
6.77

6.77

0.57

0.0
ESTRIBO 2 3/8" 6 90 1.78 538.27 538.3
0.25 0.25

C-2 NIVEL 1
0.65 0.65 COLUMNA C-2 (0.25X0.25) 5 3/4" 4 4 7.67 274.28 274.3
0.2213 cm. Ø1/2"
10cm. Ø 3/8"
7.5cm. Ø 1/4"
4 5/8" 4 4 7.67 190.46 190.5
0.0
6.77

6.77

0.42

0.0
ESTRIBO 2 3/8" 6 90 1.48 447.55 447.6
0.25 0.25

RESUMEN DE METRADO POR ø DE ACERO 1/4" 3/8" 1/2" 5/8" 3/4" 1"
TOTAL (KG/ TIPO DE ACERO) 0 985.82 0 619 685.7 0 2290.522
TOTAL (KG/ACERO) + DESPERDICIO 0 1015 0 662.33 740.55 0
2418.282
ACERO EN VARILLAS (VAR) ø=1/4 en Kg 0 201.5 0.0 47.4 37 0