Está en la página 1de 3

CALCULO DE MATERIALES

ZAPATAS
Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)
DESCRIPCION cantidad area altura Total m3
Zapatas 10 0.64 0.6 3.84 37.36 2.04 2.00 0.71

CIMENTACION
Area de total Hormigón
DESCRIPCION h cimiento Cemento (bls) P.G. (m3) Agua (m3)
cimentacion m3 (m3)
cimentacion corte 1 - 1 14.40 0.95 13.68 36.39 12.45 6.70 2.19
cimentacion corte 3 - 3 3.10 0.75 2.33 6.18 2.12 1.14 0.37
cimentacion corte 2 - 3 1.58 0.95 1.50 3.99 1.37 0.74 0.24
TOTAL 17.51 46.57 15.93 8.58 2.80

SOBRECIMIENTO
Area de total Hormigón
DESCRIPCION h cimiento Cemento (bls) P.M. (m3) Agua (m3)
cimentacion m3 (m3)
cimentacion corte 1 - 1 12.28 0.40 4.91 17.94 4.77 2.01 0.79
cimentacion corte 3 - 3 3.10 0.40 1.24 4.53 1.20 0.51 0.20
cimentacion corte 2 - 3 1.58 0.40 0.63 2.31 0.61 0.26 0.10
TOTAL 6.79 24.77 6.58 2.78 1.09

COLUMNAS 1° PISO
DESCRIPCION Cantidad Area Altura Total m3 Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)

Columnas C-1 4 0.10 3.00 1.1592 11.28 0.61 0.60 0.22


Columnas C-2 6 0.07 3.00 1.215 11.82 0.64 0.63 0.23
Columnas C-3 1 0.06 2.45 0.147 1.43 0.08 0.08 0.03
Columnas C-4 2 0.04 2.45 0.18375 1.79 0.10 0.10 0.03
Columnas C-5 2 0.07 3.00 0.435 4.23 0.23 0.23 0.08
TOTAL 3.14 30.55 1.66 1.63 0.58

COLUMNAS 2° PISO
DESCRIPCION Cantidad Area Altura Total m3 Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)

Columnas C-1 4 0.10 2.90 1.12056 10.90 0.59 0.58 0.21


Columnas C-2 6 0.07 2.90 1.1745 11.43 0.62 0.61 0.22
Columnas C-5 2 0.07 2.90 0.4205 4.09 0.22 0.22 0.08
TOTAL 2.72 26.42 1.44 1.41 0.51

VIGAS 1° PISO
DESCRIPCION Cantidad Area Altura Total m3 Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)

V - P 15 X 40 2 1.59 0.40 1.272 12.38 0.67 0.66 0.24


VA - 1 15 X 40 2 0.54 0.40 0.432 4.20 0.23 0.22 0.08
VA - 2 30 X 20 2 1.08 0.20 0.432 4.20 0.23 0.22 0.08
VA - 3 20 X 50 1 2.38 0.20 0.475 4.62 0.25 0.25 0.09
VA - 4 25 X 20 1 0.80 0.20 0.16 1.56 0.08 0.08 0.03
TOTAL 2.77 26.96 1.47 1.44 0.52

VIGAS 2° PISO
DESCRIPCION Cantidad Area Altura Total m3 Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)

V - P 15 X 40 2 1.59 0.40 1.272 12.38 0.67 0.66 0.24


VA - 1 15 X 40 2 0.54 0.40 0.432 4.20 0.23 0.22 0.08
VA - 2 30 X 20 2 1.08 0.20 0.432 4.20 0.23 0.22 0.08
VA - 3 20 X 50 1 2.38 0.20 0.475 4.62 0.25 0.25 0.09
VA - 4 25 X 20 1 0.80 0.20 0.16 1.56 0.08 0.08 0.03
TOTAL 2.77 26.96 1.47 1.44 0.52
TECHO ALIGERADO 1° PISO
Vol concreto
DESCRIPCION Area N Ladrillos Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)
(m3)

PAÑO 1 11.68 105.00 1.07 11 0.57 0.56 0.2


PAÑO 2 0.57 5.00 0.05 0.5 0.03 0.03 0.01
PAÑO 3 1.52 14.00 0.14 1.5 0.07 0.07 0.03
PAÑO 4 9.20 81.00 0.85 8.5 0.45 0.44 0.16
PAÑO 5 5.22 46.00 0.48 5 0.25 0.25 0.09
TOTAL 251.00 2.59 26.50 1.37 1.35 0.49

TECHO ALIGERADO 2° PISO


Vol concreto
DESCRIPCION Area N Ladrillos Cemento (bls) Piedra (m3) Arena (m3) Agua (m3)
(m3)

PAÑO 1 11.68 105.00 1.07 11 0.57 0.56 0.2


PAÑO 2 0.57 5.00 0.05 0.5 0.03 0.03 0.01
PAÑO 3 1.52 14.00 0.14 1.5 0.07 0.07 0.03
PAÑO 4 9.20 81.00 0.85 8.5 0.45 0.44 0.16
PAÑO 5 5.22 46.00 0.48 5 0.25 0.25 0.09
TOTAL 251.00 2.59 26.50 1.37 1.35 0.49

MUROS 1° PISO
LADRILLOS (UND) Mortero (m3)

DESCRIPCIÓN Cantidad
Mortero
ml Altura (ml) Total m2 Ladrillos Longitud Altura (ml) Total m2
m3
(und)

Muros 17.9 2.45 43.855 17.9 2.45 43.855


Muros en vanos (ventana) 5.56 0.5 2.78 5.56 0.5 2.78
Muros en (ventana a 1.5) 2.05 1.25 2.5625 2140 2.05 1.25 2.5625 1.00
Muros en (ventana alta) 0.85 2.05 1.7425 0.85 2.05 1.7425
TOTAL 50.94 TOTAL 50.94

MUROS 2° PISO
LADRILLOS (UND) Mortero (m3)
DESCRIPCIÓN Cantidad
Mortero
ml Altura (ml) Total m2 Ladrillos Longitud Altura (ml) Total m2
m3
(und)
Muros 29.24 2.7 78.948 29.24 2.7 78.948
Muros en vanos (ventana) 5.41 0.75 4.0575 3486 5.41 0.75 4.0575 1.58
TOTAL 83.0055 TOTAL 83.0055

TARRAJEO (m3) - 1° Piso TARRAJEO (m3) - 2° Piso


Longitud Altura (ml) Total m2 Longitud Altura (ml) Total m2
Muros 32.22 2.7 86.994 56.2 2.7 151.74
Muros en vanos (ventana) 11.12 0.75 8.34 10.82 0.75 8.115
Muros en (ventana a 1.5) 4.1 1.5 6.15
Muros en (ventana alta) 1.7 2.3 3.91
TOTAL 105.394 TOTAL 159.855

ESCALERA 1° PISO ESCALERA 2° PISO


ARA ANCHO Total m3 ARA ANCHO Total m3
1.058 0.85 0.8993 1.1103 0.85 0.943755
TOTAL 0.8993 TOTAL 0.943755

ACERO DE 1° PISO
Tipo 1/4" 8mm 3/8" 1/2" 5/8"
Acero en Zapata 8.06
Acero en Escalera 3 9.00
Acero en columnas Long 6 38.00
Acero en columnas Estribos 11 86
Acero en Techo 15 6 11.00
Acero en Vigas Longitudinales 43.00 2
Acero en Vigas Transversales (Estribos) 23
TOTAL 26 86 38 109.06 2

También podría gustarte