PLANILLA DE METRADOS

OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR OCTUBRE 2013

PLANILLA DE METRADOS DE ACERO EN COLUMNAS

LONG. DE # BARRA X # ELEMENT. # DE


DESCRIPCION Ø BARRA ELEMENT. IGUALES PISOS 1/4" 3/8" 1/2" 5/8" 3/4" 1"

PLACAS
PL-01
1er piso

longitudinal 1/2" 3.94 4 1 1 15.76


estribos 3/8" 1.04 16 1 1 16.64
longitudinal 3/8" 3.94 8 2 1 63.04
TRANSVERSAL 3/8" 2.60 16 2 1 83.20

longitudinal 1/2" 7.01 18 1 1 126.18

estribos 3/8" 1.47 31 1 1 45.57


estribos 3/8" 1.47 31 1 1 45.57
estribos 3/8" 1.84 31 1 1 57.04

PL-02

1er A 3 er piso

longitudinal 1/2" 7.01 4 1 1 28.04


estribos 3/8" 5.34 16 2 1 170.88
longitudinal 1/2" 3.94 4 1 1 15.76
estribos 3/8" 5.34 31 2 1 331.08
PLACA
3/8" 7.01 14 2 1 196.28
3/8" 1.86 18 2 1 66.96
3/8" 2.71 12 2 1

PL-03
longitudinal 1/2" 7.01 8 1 1 56.08
3/8" 7.01 14 1 1 98.14
3/8" 0.62 31 1 1 19.22
3/8" 0.62 31 1 1 19.22
3/8" 2.16 31 1 1 66.96

Página 1
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR OCTUBRE 2013

PLANILLA DE METRADOS DE ACERO EN COLUMNAS

LONG. DE # BARRA X # ELEMENT. # DE


DESCRIPCION Ø BARRA ELEMENT. IGUALES PISOS 1/4" 3/8" 1/2" 5/8" 3/4" 1"

TOTAL (m) 0.00 1279.80 241.82 0.00 0.00 0.00


TOTAL (Kg) 0.00 742.28 246.66 0.00 0.00 0.00
TOTAL Ø (Kg) = 988.94 KG

Página 2
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

PLANILLA DE METRADOS DE ACERO

ACERO EN MURO DE CONTENCION


LONG.
DE # BARRA # ELEM. # DE
DESCRIPCION Ø X ELEM. IGUA LES PISOS 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA
EJE 1-1 ENTRE A-J
LONGITUDINAL
CORTE 1-1 /CORTE2-2/ CORTE 3-3
3/8" 11.02 14 2 1 308.56
LONGITUDINAL
CORTE2-2/ CORTE 3-3 3/8" 4.30 26 2 1 223.60
TRANSVERSAL
CORTE 1-1 3/8" 3.69 13 2 1 95.94
TRANSVERSAL
CORTE 2-2 3/8" 9.04 18 2 1 325.44
TRANSVERSAL
CORTE 3-3 3/8" 9.04 17 2 1 307.36

LONGITUDINAL
CORTE 4-4 3/8" 3.36 40 2 1 268.80
TRANSVERSAL
CORTE 4-4 3/8" 9.02 16 2 1 288.64

LONGITUDINAL
CORTE 7-7 3/8" 5.71 46 2 1 525.32
TRANSVERSAL
CORTE 7-7 3/8" 9.25 22 2 1 407.00

LONGITUDINAL
CORTE 10-10 3/8" 6.08 27 2 1 328.32
TRANSVERSAL
CORTE 10-10 3/8" 6.37 26 2 1 331.24

EJE 4-4 ENTRE A-J


LONGITUDINAL
CORTE 1-1 3/8" 4.45 14 2 1 124.60
TRANSVERSAL
CORTE 1-1 3/8" 3.69 16 2 1 118.08

LONGITUDINAL
CORTE 3-3 3/8" 6.86 40 2 1 548.80
TRANSVERSAL
CORTE 3-3 3/8" 8.89 28 2 1 497.84

LONGITUDINAL
CORTE 18-18 3/8" 3.61 54 2 1 389.88
TRANSVERSAL
CORTE 18-18 3/8" 11.64 15 2 1 349.20

LONGITUDINAL
CORTE 16-16 3/8" 2.66 46 2 1 244.72
TRANSVERSAL
CORTE 16-16 3/8" 9.99 12 2 1 239.76

LONGITUDINAL
CORTE 15-15 3/8" 8.05 46 2 1 740.60
TRANSVERSAL
CORTE 15-15 3/8" 9.99 36 2 1 719.28
HORIZONTALES
EJE J-J ENTRE 1-4
LONGITUDINAL
CORTE 11-11 /CORTE 12-12 3/8" 4.70 4 2 1 37.60
TRANSVERSAL
CORTE 11-11 /CORTE 12-12 3/8" 1.84 15 2 1 55.20

TOTAL (m) 0.00 7475.78 0.00 0.00 0.00 0.00


TOTAL (Kg) 0.00 4335.95 0.00 0.00 0.00 0.00
TOTAL Ø (Kg) = 4335.95 KG

N° VARILLAS 0 831 0 0 0 0

ACERO EN MUROS PLACAS


LONG.
# BARRA # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
X ELEM. IGUA LES PISOS
BARRA

Página 3
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

PLANILLA DE METRADOS DE ACERO

ACERO EN MURO DE CONTENCION


LONG.
DE # BARRA # ELEM. # DE
DESCRIPCION Ø X ELEM. IGUA LES PISOS 1/4" 3/8" 1/2" 5/8" 3/4" 1"
LONG.
BARRA # BARRA # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
X ELEM. IGUA LES PISOS
BARRA
EJE 2-2 ENTRE H´-J
LONGITUDINAL
CORTE 14-14 3/8" 4.78 4 2 1 38.24
TRANSVERSAL
CORTE 14-14 3/8" 1.17 15 2 1 35.10

EJE 3-3 ENTRE H-H´


LONGITUDINAL
CORTE 13-13 3/8" 1.55 2 2 1 6.20
TRANSVERSAL
CORTE 13-13 3/8" 1.24 2 2 1 4.96

EJE 3-3 ENTRE G´-H


LONGITUDINAL
CORTE 9-9 3/8" 1.23 20 2 1 49.20
TRANSVERSAL
CORTE 9-9 3/8" 5.09 3 2 1 30.54

EJE 1´ -1´ ENTRE F-F´

LONGITUDINAL
CORTE 6-6 3/8" 2.35 5 2 1 23.50
TRANSVERSAL
CORTE 6-6 3/8" 2.14 7 2 1 29.96

EJE 1´´-1´´ ENTRE E´-F


LONGITUDINAL
CORTE 5-5 3/8" 1.35 6 2 1 16.20
TRANSVERSAL
CORTE 5-5 3/8" 2.29 3 2 1 13.74

EJE E-E ENTRE 1-1"


LONGITUDINAL
CORTE 5-5 3/8" 2.45 6 2 1 29.40
TRANSVERSAL
CORTE 5-5 3/8" 2.29 9 2 1 41.22

EJE F-F ENTRE 1´-1´´


LONGITUDINAL
CORTE 6-6 3/8" 1.25 7 2 1 17.50
TRANSVERSAL
CORTE 6-6 3/8" 2.14 1 2 1 4.28

EJE F´-F´ ENTRE 1-1´

LONGITUDINAL
CORTE 6-6 3/8" 2.00 5 2 1 20.00
TRANSVERSAL
CORTE 6-6 3/8" 2.14 7 2 1 29.96
TOTAL (m) 0.00 390.00 0.00 0.00 0.00 0.00
TOTAL (Kg) 0.00 226.20 0.00 0.00 0.00 0.00
TOTAL Ø (Kg) = 226.20 KG

N° VARILLAS 0 43 0 0 0 0

ACERO EN SARDINELES -JARDIN


LONG.
# BARRA # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA X ELEM. IGUA LES PISOS

EJE H´-H´ ENTRE 3-3´


LONGITUDINAL
CORTE 13-13 3/8" 1.78 2 2 1 7.12
TRANSVERSAL
CORTE 13-13 3/8" 1.64 5 2 1 16.40

EJE F´-F´ ENTRE 3-4


LONGITUDINAL
CORTE 17-17 3/8" 2.94 7 2 1 41.16

Página 4
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

PLANILLA DE METRADOS DE ACERO

ACERO EN MURO DE CONTENCION


LONG.
DE # BARRA # ELEM. # DE
DESCRIPCION Ø X ELEM. IGUA LES PISOS 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA

TRANSVERSAL
CORTE 17-17 3/8" 2.49 14 2 1 69.72

EJE G-G ENTRE 3-4


LONGITUDINAL
CORTE 17-17 3/8" 3.52 13 2 1 91.52
TRANSVERSAL
CORTE 17-17 3/8" 3.00 16 2 1 96.00

EJE G´-G´ ENTRE 3-4


LONGITUDINAL
CORTE 17-17 3/8" 3.41 5 2 1 34.10
TRANSVERSAL
CORTE 17-17 3/8" 2.14 13 2 1 55.64

Página 5
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

LONG.
# BARRA X # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA ELEM. IGUA LES PISOS

ACERO EN ZAPATAS
5/8" 3.05 5 1 1 15.25
Z-01 5/8" 1.00 15 1 1 15.00
5/8" 5.65 5 1 1 28.25
Z-02 5/8" 1.00 28 1 1 28.00
5/8" 6.15 5 1 1 30.75
Z-02 5/8" 1.00 25 1 1 25.00
5/8" 2.10 12 2 1 50.40
Z-03 5/8" 2.30 11 2 1 50.60
5/8" 1.80 10 2 1 36.00
Z-04 5/8" 2.00 10 2 1 40.00
5/8" 0.80 5 8 1 32.00
Z-05 5/8" 1.00 4 8 1 32.00
5/8" 1.20 8 1 1 9.60
Z-06 5/8" 1.50 6 1 1 9.00
5/8" 1.00 8 2 1 16.00
Z-07 5/8" 1.50 5 2 1 15.00
5/8" 1.40 25 1 1 35.00
Z-08 5/8" 5.00 8 1 1 40.00
5/8" 3.15 31 1 1 97.65
Z-08 5/8" 6.20 16 1 1 99.20

TOTAL (m) 0.00 0.00 0.00 704.70 0.00 0.00


TOTAL (Kg) 0.00 0.00 0.00 1127.52 0.00 0.00
TOTAL Ø (Kg) = 1296.65 KG

N° VARILLAS 0 0 0 78 0 0

ACERO EN LOSA

PRIMER PISO
1/2" 8.70 9 1 1 78.30
3/8" 3.40 9 1 1 30.60
3/8" 2.80 9 1 1 25.20
3/8" 1.05 9 1 1 9.45
PAÑO 01 1/2" 2.80 9 1 1 25.20
3/8" 2.10 9 1 1 18.90
1/2" 2.90 9 1 1 26.10
1/2" 2.50 9 1 1 22.50
3/8" 1.20 9 1 1 10.80

1/2" 8.90 3 1 1 26.70


3/8" 3.40 3 1 1 10.20
3/8" 2.80 3 1 1 8.40
3/8" 2.80 3 1 1 8.40
PAÑO02
3/8" 2.10 3 1 1 6.30
3/8" 1.10 3 1 1 3.30
3/8" 2.90 3 1 1 8.70
3/8" 2.30 3 1 1 6.90

3/8" 2.75 7 1 1 19.25


3/8" 0.90 7 1 1 6.30
3/8" 2.10 7 1 1 14.70
3/8" 2.70 7 1 1 18.90
PAÑO03 3/8" 3.40 7 1 1 23.80
3/8" 10.90 7 1 1 76.30
1/2" 3.10 7 1 1 21.70
1/2" 2.30 7 1 1 16.10
3/8" 3.90 7 1 1

3/8" 2.75 3 1 1 8.25


3/8" 1.10 3 1 1 3.30
3/8" 2.20 3 1 1 6.60
3/8" 2.70 3 1 1 8.10
3/8" 11.60 3 1 1 34.80
PAÑO 04
3/8" 3.40 3 1 1 10.20
5/8" 3.10 3 1 1 9.30
1/2" 2.30 3 1 1 6.90
3/8" 4.00 3 1 1 12.00
3/8" 1.70 3 1 1

3/8" 2.75 3 1 1 8.25


3/8" 1.10 3 1 1 3.30
3/8" 2.70 3 1 1 8.10
3/8" 2.10 3 1 1 6.30
3/8" 11.60 3 1 1 34.80
PAÑO 05
3/8" 3.50 3 1 1 10.50
1/2" 3.10 3 1 1 9.30
1/2" 2.30 3 1 1 6.90
3/8" 4.20 3 1 1 12.60
3/8" 1.70 3 1 1 5.10

Página 6
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

LONG.
# BARRA X # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA ELEM. IGUA LES PISOS

3/8" 6.10 8 1 1 48.80


3/8" 1.90 8 1 1 15.20
PAÑO 06 3/8" 1.10 8 1 1 8.80
3/8" 6.20 8 1 1 49.60
3/8" 1.90 8 1 1 15.20

3/8" 6.25 5 1 1 31.25


3/8" 1.95 5 1 1 9.75
PAÑO 07
3/8" 1.10 5 1 1 5.50
3/8" 1.10 5 1 1 5.50

3/8" 2.80 11 1 1 30.80


PAÑO 08
3/8" 2.15 11 1 1 23.65

SEGUNDO PISO

1/2" 2.10 11 1 1 23.10


3/8" 3.45 11 1 1 37.95
3/8" 9.80 11 1 1 107.80
PAÑO 01
3/8" 3.40 11 1 1 37.40
1/2" 2.00 11 1 1 22.00
3/8" 3.70 11 1 1 40.70

1/2" 2.10 4 1 1 8.40


3/8" 3.45 4 1 1 13.80
3/8" 9.80 4 1 1 39.20
PAÑO 02
3/8" 3.40 4 1 1 13.60
1/2" 2.00 4 1 1 8.00
3/8" 6.95 4 1 1 27.80

3/8" 2.10 6 1 1 12.60


3/8" 3.60 6 1 1 21.60
3/8" 7.10 6 1 1 42.60
3/8" 3.30 6 1 1 19.80
PAÑO 03
1/2" 2.30 6 1 1 13.80
5/8" 3.10 6 1 1 18.60
1/2" 3.90 6 1 1 23.40
1/2" 5.60 6 1 1 33.60

3/8" 2.10 3 1 1 6.30


3/8" 3.60 3 1 1 10.80
3/8" 7.10 3 1 1 21.30
3/8" 3.30 3 1 1 9.90
PAÑO 04
1/2" 2.30 3 1 1 6.90
5/8" 3.10 3 1 1 9.30
1/2" 3.90 3 1 1 11.70
1/2" 5.80 3 1 1 17.40

3/8" 2.10 5 1 1 10.50


3/8" 3.60 5 1 1 18.00
3/8" 7.10 5 1 1 35.50
3/8" 3.30 5 1 1 16.50
PAÑO 05 1/2" 2.30 5 1 1 11.50
5/8" 3.10 5 1 1 15.50
1/2" 4.10 5 1 1 20.50
1/2" 5.95 5 1 1 29.75
3/8" 1.65 5 1 1

3/8" 3.10 9 1 1 27.90


3/8" 5.10 9 1 1 45.90
PAÑO 06
3/8" 3.10 9 1 1 27.90
3/8" 5.10 9 1 1 45.90

3/8" 5.30 4 1 1 21.20


3/8" 3.10 4 1 1 12.40
PAÑO 07
3/8" 1.00 4 1 1 4.00

3/8" 3.90 13 1 1 50.70


3/8" 1.20 13 1 1 15.60
PAÑO 07
3/8" 1.30 13 1 1 16.90

SEGUNDO PISO

1/2" 9.60 10 1 1 96.00


3/8" 3.63 10 1 1 36.30
3/8" 3.50 10 1 1 35.00
PAÑO 01
1/2" 2.10 10 1 1 21.00
1/2" 2.10 10 1 1 21.00
3/8" 3.80 10 1 1 38.00

1/2" 2.10 4 1 1 8.40


3/8" 3.40 4 1 1 13.60
1/2" 9.70 4 1 1 38.80
PAÑO 02.

Página 7
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

LONG.
# BARRA X # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA ELEM. IGUA LES PISOS
PAÑO 02.
3/8" 3.40 4 1 1 13.60
3/8" 6.90 4 1 1 27.60
1/2" 2.00 4 1 1 8.00

3/8" 2.10 5 1 1 10.50


3/8" 3.50 5 1 1 17.50
3/8" 6.95 5 1 1 34.75
3/8" 3.30 5 1 1 16.50
PAÑO 03 1/2" 2.30 5 1 1 11.50
5/8" 3.10 5 1 1 15.50
1/2" 3.90 5 1 1 19.50
1/2" 3.60 5 1 1 18.00
3/8" 1.60 5 1 1 8.00

3/8" 2.10 10 1 1 21.00


3/8" 3.60 10 1 1 36.00
3/8" 6.95 10 1 1 69.50
3/8" 3.35 10 1 1 33.50
PAÑO 04. 1/2" 2.30 10 1 1 23.00
5/8" 3.10 10 1 1 31.00
1/2" 4.10 10 1 1 41.00
1/2" 5.95 10 1 1 59.50
3/8" 1.70 10 1 1 17.00

3/8" 3.10 12 1 1 37.20


3/8" 5.10 12 1 1 61.20
PAÑO 05
3/8" 5.10 12 1 1 61.20
3/8" 3.10 12 1 1 37.20

1/2" 3.90 12 1 1 46.80


3/8" 1.20 12 1 1 14.40
PAÑO 06
3/8" 1.20 12 1 1 14.40
1 1
TOTAL (m) 0.00 2188.65 882.25 99.20 0.00 0.00
TOTAL (Kg) 0.00 1269.42 899.90 158.72 0.00 0.00
TOTAL Ø (Kg) = 3026.44 KG

N° VARILLAS 0 243 98 11 0 0

ACERO EN ZAPATAS
PRIMER PISO
3/8" 2.90 6 1 1 17.40
3/8" 1.50 6 1 1 9.00
3/8" 2.95 7 1 1 20.65
3/8" 2.45 7 1 1 17.15

3/8" 4.30 8 1 1 34.40


3/8" 3.60 8 1 1 28.80
3/8" 3.10 11 1 1 34.10
3/8" 1.90 11 1 1 20.90
3/8" 4.85 6 1 1 29.10
3/8" 6.10 6 1 1 36.60
3/8" 2.80 14 1 1 39.20
3/8" 2.40 14 1 1 33.60
3/8" 1.30 14 1 1 18.20
3/8" 6.10 19 1 1 115.90
3/8" 6.40 19 1 1 121.60
3/8" 3.80 32 1 1 121.60
3/8" 4.40 32 1 1 140.80
3/8" 3.30 6 1 1 19.80
3/8" 3.70 6 1 1 22.20
3/8" 4.30 6 1 1 25.80
3/8" 4.70 6 1 1 28.20
3/8" 2.60 13 1 1 33.80
3/8" 2.20 13 1 1 28.60
3/8" 3.95 9 1 1 35.55
3/8" 3.25 9 1 1 29.25
3/8" 5.15 2 1 1 10.30
3/8" 5.15 2 1 1 10.30
3/8" 1.15 22 1 1 25.30
3/8" 1.60 22 1 1 35.20

SEGUNDO PISO
3/8" 2.30 14 1 1 32.20
3/8" 1.30 14 1 1 18.20
3/8" 2.60 14 1 1 36.40
3/8" 2.95 6 1 1 17.70

3/8" 2.85 14 1 1 39.90


3/8" 2.35 14 1 1 32.90
3/8" 1.30 14 1 1 18.20
3/8" 7.00 5 1 1 35.00
3/8" 4.70 5 1 1 23.50
3/8" 4.30 8 1 1 34.40
3/8" 3.55 8 1 1 28.40

Página 8
OCTUBRE 2013
PLANILLA DE METRADOS
OBRA: CONSTRUCCION DE VIVIENDA MULTIFAMILIAR

LONG.
# BARRA X # ELEM. # DE
DESCRIPCION Ø DE 1/4" 3/8" 1/2" 5/8" 3/4" 1"
BARRA ELEM. IGUA LES PISOS

3/8" 1.90 16 1 1 30.40


3/8" 3.10 16 1 1 49.60
3/8" 5.70 2 1 1 11.40
3/8" 0.60 26 1 1 15.60
3/8" 1.90 26 1 1 49.40
TECER PISO
3/8" 2.40 14 1 1 33.60
3/8" 1.30 14 1 1 18.20
3/8" 2.90 14 1 1 40.60
3/8" 2.90 6 1 1 17.40
3/8" 7.00 6 1 1 42.00
3/8" 4.70 6 1 1 28.20
3/8" 2.25 7 1 1 15.75
3/8" 1.30 7 1 1 9.10
3/8" 2.85 7 1 1 19.95
3/8" 3.10 15 1 1 46.50
3/8" 1.90 15 1 1 28.50
3/8" 3.60 9 1 1 32.40
3/8" 4.30 9 1 1 38.70
3/8" 5.70 2 2 1 22.80
3/8" 1.90 20 1 1 38.00
3/8" 0.70 20 1 1 14.00
3/8" 1 1 0.00
3/8" 0.00
3/8" 0.00
3/8" 0.00

TOTAL (m) 0.00 2062.20 0.00 0.00 0.00 0.00


TOTAL (Kg) 0.00 1196.08 0.00 0.00 0.00 0.00
TOTAL Ø (Kg) = 1375.49 KG

N° VARILLAS 0 229 0 0 0 0

Página 9
DESCRIPCION CANT. ALTURA ANCHO METRADO TOTAL
LONGITUD
SOLADOS 115.20 m2
HORIZONTAL
EJE A-A/1-5 1.00 0.60 3.85 2.31
1.00 1.05 3.60 3.78
1.00 1.05 5.80 6.09

EJE E-E/1-5 1.00 0.50 15.40 7.70


3.00 0.80 1.00 2.40

VERTICALES
EJE 1-1 /A-E 1.00 0.50 20.20 10.10
4.00 0.80 1.00 3.20

EJE 5-5 /A-E 1.00 0.50 20.30 10.15


1.00 1.00 6.15 6.15
2.00 1.00 1.50 3.00

INTERIOR
1.00 1.50 1.20 1.80
1.00 0.80 0.80 0.64
1.00 3.15 3.15 9.92
1.00 1.30 1.70 2.21
1.00 1.40 5.00 7.00
1.00 0.80 4.30 3.44
1.00 0.50 2.20 1.10
1.00 1.80 2.00 3.60
1.00 2.10 2.30 4.83
1.00 0.50 2.15 1.08
1.00 0.50 2.90 1.45
1.00 0.50 2.70 1.35
1.00 0.50 2.90 1.45
1.00 0.50 3.10 1.55
1.00 2.10 2.30 4.83
1.00 1.80 2.00 3.60

CONCRETO ZAPATAS 43.34 M3

4.00 0.60 1.00 0.80 1.92


1.00 0.60 2.10 2.30 2.90
1.00 0.60 1.80 2.00 2.16
1.00 0.60 3.05 2.00 3.66
1.00 0.60 1.00 5.60 3.36
1.00 0.60 1.00 5.20 3.12
1.00 0.60 2.10 2.30 2.90
1.00 0.60 1.80 2.00 2.16
1.00 0.60 1.50 1.00 0.90
1.00 0.60 1.20 1.50 1.08
1.00 0.60 0.80 0.80 0.38
1.00 0.60 3.15 3.15 5.95
1.00 0.60 3.05 1.30 2.38
1.00 0.60 1.50 3.65 3.29
3.00 0.60 1.00 0.80 1.44
2.00 0.60 1.50 1.00 1.80

CIMIENTO CORRIDO 26.13 M3

EJE 1-1/A-E 1.00 0.60 0.50 20.20 6.06


EJE 5-5/A-E 1.00 0.60 0.50 20.30 6.09
EJE E-E /1-5 1.00 0.60 0.50 15.40 4.62
EJE E-E /1-6 1.00 0.60 0.50 3.90 1.17
1.00 0.60 0.50 3.10 0.93
1.00 0.60 0.50 2.15 0.65
1.00 0.60 0.80 4.30 2.06
1.00 0.60 0.50 2.70 0.81
1.00 0.60 0.50 2.90 0.87
1.00 0.60 0.50 1.65 0.50

CONCRETO VIGA DE CIMENTACION 1.01 M3

VC01 1.00 0.25 0.70 5.50 0.96

CONCRETO COLUMNAS 36.55 M3

C1(0.25*0.50) 7.00 3.40 0.25 0.50 2.98


C1(0.25*0.50) 1.00 5.75 0.25 0.50 0.72
C2(0.25*0.25) 1.00 3.40 0.25 0.25 0.21
C3(0.30*0.50) 4.00 15.35 0.30 0.50 9.21
C4(0.30*0.55) 1.00 15.35 0.30 0.55 2.53
C5(0.30*0.50) 2.00 15.35 0.30 0.50 4.61
C6(0.30*0.50) 1.00 15.35 0.30 0.50 2.30
C7(0.25*0.50) 2.00 10.40 0.25 0.50 2.60
C8(0.25*0.50) 2.00 18.50 0.25 0.50 4.63
C8(0.25*0.50) 1.00 15.35 0.25 0.50 1.92
C9(0.25*0.15) 7.00 2.50 0.25 0.15 0.66
C10(0.25*0.40) 1.00 3.30 0.25 0.40 0.33
C11(0.25*0.40) 1.00 3.30 0.25 0.40 0.33
C12(0.25*0.25) 1.00 3.30 0.25 0.25 0.21
CONCRETO PLACAS 79.00 M3
PL-01 1 15.70 0.25 3.80 14.92
PL-03 1 18.10 0.25 3.65 16.52
2 18.10 0.25 1.80 16.29
PL-02 1 18.10 0.25 3.85 17.42
PL-04 1 15.70 0.25 1.70 6.67
MURO DE CONTENCION 114.40 M3
2 3.20 0.25 20.00 32.00
2 3.20 0.25 15.00 24.00
2 3.20 0.25 30.00 48.00

COLUMNETAS PARA TABIQUERIA 0.00 M3


ENCOFRADO DE SEMI SOTANO
EJE A-B/1-6
Ca 10
Cb 1
Cc € 1.00

EJE B-C/1-6
Ca 10

EJE C-D/1-6
Ca 5

ENCOFRADO DE PRIMER PISO


EJE A-B/1-6
Ca € 2.00
Ce € 1.00
EJE B-C/1-6
Ca 10

concreto en muro de contencion 66.37 M3


EJE A-A
CORTE 4-4 1.00 3.35 0.30 7.00 7.04
CORTE 5-5 1.00 3.35 0.30 1.40 1.41
CORTE 5A-5A 1.00 1.45 0.30 1.30 0.57

EJE 1-1
CORTE 3-3 1.00 3.35 0.25 18.25 15.28

EJE E-E
CORTE 2-2 1.00 3.35 0.25 4.40 3.69
CORTE1-1 1.00 3.35 0.25 1.70 1.42
CORTE 11-11 1.00 4.15 0.25 3.65 3.79
CORTE 11A-11A 1.00 4.00 0.25 2.60 2.60
CORTE 10-10 1.00 3.75 0.25 1.70 1.59

EJE 5-5
CORTE 7-7 1.00 3.35 0.25 1.40 1.17
CORTE 7A-7A 1.00 3.35 0.25 6.10 5.11
CORTE 8-8 1.00 3.40 0.25 7.60 6.46

INTERIORES

EJE 3'-3'
CORTE 12-12 1.00 5.75 0.25 2.70 3.88
CORTE 17-17 1.00 2.55 0.20 1.65 0.84
CORTE 18-18 1.00 2.00 0.25 4.80 2.40
CORTE 14-14 1.00 3.20 0.25 2.75 2.20
CORTE 15-15 1.00 2.30 0.25 3.10 1.78
CORTE 9-9 1.00 3.05 0.25 3.60 2.75
CORTE 13-13 1.00 2.90 0.25 3.30 2.39

CONCRETO LOSA ALIGERADA H=20 37.09 M3

SEMISOTANO
PAÑO 01 1.00 0.09 8.25 0.72
PAÑO 02 1.00 0.09 11.75 1.03
PAÑO 03 1.00 0.09 14.20 1.24
PAÑO 04 1.00 0.09 15.00 1.31
PAÑO 05 1.00 0.09 12.05 1.05
PAÑO 06 1.00 0.09 4.45 0.39
PAÑO 07 1.00 0.09 5.50 0.48
PAÑO 08 1.00 0.09 2.90 0.25
PAÑO 09 1.00 0.09 5.65 0.49
PAÑO 10 1.00 0.09 3.55 0.31
PAÑO 11 1.00 0.09 8.55 0.75

ENSL ALT 1.00 0.20 2.55 0.51


1.00 0.20 3.80 0.76
1.00 0.20 2.80 0.56
1.00 0.20 2.70 0.54
1.00 0.20 1.00 0.20
PRIMER PISO
PAÑO 01 1.00 0.09 24.35 2.13
PAÑO 02 1.00 0.09 40.30 3.53
PAÑO 03 1.00 0.09 32.90 2.88
PAÑO 04 1.00 0.09 8.90 0.78
PAÑO 05 1.00 0.09 16.50 1.44
1.00 0.20 3.60 0.72

SEGUNDO PISO
PAÑO 01 1.00 0.09 43.35 3.79
PAÑO 02 1.00 0.09 40.30 3.53
PAÑO 03 1.00 0.09 24.40 2.14
PAÑO 04 1.00 0.09 16.60 1.45
PAÑO 05 1.00 0.20 3.65 0.73

LOSA ALIGERADA H=25 21.43 M3

SEMISOTANO
PAÑO 01 1.00 0.10 15.60 1.56
PAÑO 02 1.00 0.10 10.45 1.05
PAÑO 03 1.00 0.10 19.40 1.94
PAÑO 04 1.00 0.10 7.50 0.75
PAÑO 05 1.00 0.10 6.55 0.66

PRIMER PISO
PAÑO 01 1.00 0.10 13.40 1.34
PAÑO 02 1.00 0.10 17.10 1.71
1.00 0.25 4.85 1.21

SEGUNDO PISO
PAÑO 01 1.00 0.10 33.10 3.31
1.00 0.25 5.40 1.35

CISTENA 1.00 0.10 41.60 4.16


ASCENSOR 1.00 0.10 4.50 0.45

LOSA MACISA H=20 24.50 M3

SEMISOTANO
PAÑO 01 1.00 0.20 3.95 0.79
PAÑO 02 1.00 0.20 21.15 4.23
PAÑO 03 1.00 0.20 16.15 3.23
PAÑO 04 1.00 0.20 1.95 0.39

PRIMER PISO
PAÑO 01 1.00 0.20 5.40 1.08
PAÑO 02 1.00 0.20 3.95 0.79
PAÑO 03 1.00 0.20 2.70 0.54
PAÑO 04 1.00 0.20 2.60 0.52

SEGUNDO PISO
PAÑO 01 1.00 0.20 3.65 0.73
PAÑO 02 1.00 0.20 2.90 0.58
PAÑO 03 1.00 0.20 5.40 1.08
PAÑO 04 1.00 0.20 2.85 0.57

TERCER PISO
PAÑO 01 1.00 0.20 16.30 3.26
PAÑO 02 1.00 0.20 17.55 3.51
DESCRIPCION CANT. ALTURA ANCHO LARGO METRADO TOTAL
ENCOFRADO ZAPATAS 93.81 M2

4.00 1.00 0.80 8.64


1.00 2.10 2.30 5.28
1.00 1.80 2.00 4.56
1.00 3.05 2.00 6.06
1.00 1.00 5.60 7.92
1.00 1.00 5.20 7.44
1.00 2.10 2.30 5.28
1.00 1.80 2.00 4.56
1.00 1.50 1.00 3.00
1.00 1.20 1.50 3.24
1.00 0.80 0.80 1.92
1.00 3.15 3.15 7.56
1.00 3.05 1.30 5.22
1.00 1.50 3.65 6.18
3.00 1.00 0.80 6.48
2.00 1.50 1.00 6.00

ENCOFRADO EN CIMIENTO CORRIDOS 102.19 M2


2.00 0.60 12.95 15.54
2.00 0.60 15.40 18.48
2.00 0.60 20.20 24.24
2.00 0.60 20.25 24.30
2.00 0.60 1.65 1.98
2.00 0.60 2.90 3.48
2.00 0.60 2.70 3.24
2.00 0.60 2.90 3.48
2.00 0.60 2.15 2.58

ENCOFRADO VIGA DE CIMENTACION 2.89 M2

VC01 € 2.00 0.25 € 5.50 2.75

ENCOFRADO COLUMNAS 265.01 M3

C1(0.25*0.50) 7.00 3.40 0.50 23.80


C1(0.25*0.50) 1.00 5.75 0.50 5.75
C2(0.25*0.25) 1.00 3.40 0.25 1.70
C3(0.30*0.50) 4.00 15.35 0.50 61.40
C4(0.30*0.55) 1.00 15.35 0.55 16.89
C5(0.30*0.50) 2.00 15.35 0.50 30.70
C6(0.30*0.50) 1.00 15.35 0.50 15.35
C7(0.25*0.50) 2.00 10.40 0.50 20.80
C8(0.25*0.50) 2.00 18.50 0.50 37.00
C8(0.25*0.50) 1.00 15.35 0.50 15.35
C9(0.25*0.15) 7.00 2.50 0.15 5.25
C10(0.25*0.40) 1.00 3.30 0.40 2.64
C11(0.25*0.40) 1.00 3.30 0.40 2.64
C12(0.25*0.25) 1.00 3.30 0.25 1.65

ENCOFRADO PLACAS 631.97 M3


PL-01 1 15.70 3.80 119.32
PL-03 1 18.10 3.65 132.13
2 18.10 1.80 130.32
PL-02 1 18.10 3.85 139.37
PL-04 1 15.70 1.70 53.38

ENCOFRADO COLUMNAS 0.00 M2

ENCOFRADO EN VIGAS 53.85 M2


HORIZONTALES
H-H/2-3 CORTE B-B (0.1*0.2) 1.00 0.20 0.10 5.55 2.24
G-G/1-3 V101(0.25*0.50) 1.00 0.50 0.25 7.45 7.58
E-E/1-3 CORTE VA (0.25*0.20) 1.00 0.20 0.25 1.75 0.75
F-F/2-3 CORTE VA (0.25*0.20) 1.00 0.20 0.25 4.05 1.67
E-E/1-3 CORTE VA (0.25*0.20) 1.00 0.20 0.25 8.45 3.43

VERTICALES
1-1/E-G VS(0.25*0.20) 1.00 0.25 0.20 5.45 2.78
2-2/E-G CORTE VA (0.25*0.20) 2.00 0.20 0.25 4.65 3.82
2´-2´/E-G V103 (0.15*0.50) 1.00 0.50 0.50 3.90 4.15
3-3/E-F´ CORTE VS1 (0.15*0.20) 1.00 0.20 0.15 3.55 1.45

SEGUNDO PISO
HORIZONTAL
G´-G´ /2-3 V201(0.15*0.50) 1.00 0.50 0.15 3.95 4.03
G-G /2-3 V202(0.25*0.50) 1.00 0.50 0.25 4.95 5.08

VERTICALES
2-2/D-H V204 (0.25*0.50) 1.00 0.50 0.25 7.50 7.63
2-2/G-H V206 (0.15*0.50) 1.00 0.50 0.15 1.10 1.18
1-1/D-F VS(0.25*0.20) 1.00 0.20 0.25 3.00 1.25
EJE A-A ENTRE 2´Y 3 VA( 0.25*0.20) 2.00 0.20 0.25 2.00 1.70
EJE 3´-3´ ENTRE A-C VS( 0.25*0.20) 2.00 0.20 0.25 3.10 2.58

ENCOFRADO EN LOSA ALIGERADA 45.36 M2


PRIMER PISO
PAÑO 01 1.00 0.80 3.95 3.16
PAÑO 02 1.00 3.90 7.45 29.06
PAÑO 03 1.00 1.30 8.45 10.99

ENCOFRADO EN LOSA MACISA 7.98 M2


PRIMER PISO
PAÑO 01 1.00 1.15 1.10 1.27

SEGUNDO PISO
PAÑO 01 1.00 3.95 1.05 4.15
1.00 3.65 0.60 2.19

ENCOFRADO EN ESCALERA 18.69 M2


ESCALERA 01
1 1.00 1.40 1.40
20 0.20 1.40 5.60
1 1.00 3.70 3.70
1 1.40 0.65 0.91
1 1.00 0.90 0.90
ESCALERA 02
2 0.40 0.78 0.62
6 0.20 1.85 2.22
1 0.40 1.55 0.62
1 0.20 1.90 0.38
1 0.20 2.00 0.40
1 0.20 1.20 0.24

ENCOFRADO DE MESA DE CONCRETO 5.78 M2


2.00 0.45 3.25 2.93
2.00 0.15 3.25 0.98
2.00 0.55 0.85 0.94
2.00 0.15 0.55 0.17
2.00 0.15 0.85 0.26

ENCOFRADO EN VEREDA 3.89 M2


VEREDA COCHERA 2.00 0.25 5.00 2.50
1.00 0.25 1.20 0.30
VEREDA DE ESCALERA 2.00 0.20 1.85 0.74

ENCOFRADO EN DINTELES 4.53 M2


4.00 0.15 0.80 0.48
8.00 0.35 1.30 3.64

CONCRETO LOSA ALIGERADA H=20 254.38 M3

SEMISOTANO
PAÑ O 01 1.00 1.00 8.25 8.25
PAÑ O 02 1.00 1.00 11.75 11.75
PAÑ O 03 1.00 1.00 14.20 14.20
PAÑ O 04 1.00 1.00 15.00 15.00
PAÑ O 05 1.00 1.00 12.05 12.05
PAÑ O 06 1.00 1.00 4.45 4.45
PAÑ O 07 1.00 1.00 5.50 5.50
PAÑ O 08 1.00 1.00 2.90 2.90
PAÑ O 09 1.00 1.00 5.65 5.65
PAÑ O 10 1.00 1.00 3.55 3.55
PAÑ O 11 1.00 1.00 8.55 8.55

ENSL ALT 1.00 1.00 2.55 2.55


1.00 1.00 3.80 3.80
1.00 1.00 2.80 2.80
1.00 1.00 2.70 2.70
1.00 1.00 1.00 1.00

PRIMER PISO
PAÑ O 01 1.00 1.00 24.35 24.35
PAÑ O 02 1.00 1.00 40.30 40.30
PAÑ O 03 1.00 1.00 32.90 32.90
PAÑ O 04 1.00 1.00 8.90 8.90
PAÑ O 05 1.00 1.00 16.50 16.50
1.00 1.00 3.60 3.60

LOSA ALIGERADA H=25 197.40 M3

SEMISOTANO
PAÑ O 01 1.00 1.00 15.60 15.60
PAÑ O 02 1.00 1.00 10.45 10.45
PAÑ O 03 1.00 1.00 19.40 19.40
PAÑ O 04 1.00 1.00 7.50 7.50
PAÑ O 05 1.00 1.00 6.55 6.55

PRIMER PISO
PAÑ O 01 1.00 1.00 13.40 13.40
PAÑ O 02 1.00 1.00 17.10 17.10
1.00 1.00 4.85 4.85

SEGUNDO PISO
PAÑ O 01 1.00 1.00 33.10 33.10
1.00 1.00 5.40 5.40

CISTENA 1.00 1.00 41.60 41.60


ASCENSOR 1.00 1.00 4.50 4.50

LOSA MACISA H=20 122.48 M3

SEMISOTANO
PAÑ O 01 1.00 1.00 3.95 3.95
PAÑ O 02 1.00 1.00 21.15 21.15
PAÑ O 03 1.00 1.00 16.15 16.15
PAÑ O 04 1.00 1.00 1.95 1.95

PRIMER PISO
PAÑ O 01 1.00 1.00 5.40 5.40
PAÑ O 02 1.00 1.00 3.95 3.95
PAÑ O 03 1.00 1.00 2.70 2.70
PAÑ O 04 1.00 1.00 2.60 2.60

SEGUNDO PISO
PAÑ O 01 1.00 1.00 3.65 3.65
PAÑ O 02 1.00 1.00 2.90 2.90
PAÑ O 03 1.00 1.00 5.40 5.40
PAÑ O 04 1.00 1.00 2.85 2.85

TERCER PISO
PAÑ O 01 1.00 1.00 16.30 16.30
PAÑ O 02 1.00 1.00 17.55 17.55
DESCRIPCION CANT. ALTURA ANCHO LARGO

EXCAVACION MASIVA

0.00 HASTA 1.27 1.00 1.27 297.35


1.27 HASTA 1.52 1.00 0.25 297.35
1.52 HASTA 3.61 1.00 2.09 66.48

EXCAVACION LOCALIZADA

CIMIENTACION
EJE 1-1/A-C 1.00 0.60 0.50 10.24
EJE A-A/3-4 1.00 0.60 0.50 3.83
EJE 5-5/B-C 1.00 0.60 0.50 4.54
EJE 5-5/C-E 1.00 0.60 0.50 6.57
EJE 1-1/C-E 3.00 0.60 0.50 5.93
EJE E-E/1-4 1.00 0.60 0.50 5.27
EJE E-E/4-5 1.00 0.60 0.80
1.00 0.60 0.50
1.00 0.60 0.50
1.00 0.60 0.50
ZAPATAS
EJE 1-1/C-B 2.00 0.60 1.00 0.80
EJE A-A/1-3 1.00 0.60 1.00 3.03
EJE A-A/4-5 1.00 0.60 1.00 5.73
EJE 5-5/A-B 1.00 0.60 3.05 5.17
EJES B-3 1.00 0.60 2.10 2.30
EJE 5-5/C-D 2.00 0.60 1.00 1.50
PLACA 2 1.00 0.60 1.40 4.97
C1/EJE E-E 3.00 0.60 0.80 1.00
EJE 1-1/E-C 3.00 0.60
1.00 0.60 1.40
3.00 0.60 0.80
1.00 0.60 3.15
1.00 0.60 3.05
1.00 0.60 1.50
3.00 0.60 1.00
2.00 0.60 1.50
METRADO TOTAL

709.10 M3 VALO N01 3/24/2017


VALO N02 4/8/2017
377.63
74.34
138.94

52.60 M3

3.07
1.15
1.36
1.97
5.34
1.58
0.00
0.00
0.00
0.00

0.96
1.82
3.44
9.46
2.90
1.80
4.17
1.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

También podría gustarte