Está en la página 1de 1

B

A B C C1 D E F G H I J K L M N Ñ O P Q

1 1
ZONA DE FUTURA AMPLIACION
SUB ESTACION
ELECTRICA
P10

ZONA DE TRABAJO ZONA DE TRABAJO


1a ACCESO PARA V= 30.00 m3 V= 30.00 m3 V= 30.00 m3
P9 CARGA DE SILOS Laminator Rotary Cutter Intel Part Gas Tunnel Oven Outlet Part Cooling Conveypr
SILOS DE HARINA
N.P.T. = +0.30

1b C Cto V5
P4
Cutting and Elevator
ZONA DE TRABAJO ZONA DE TRABAJO

A
D2
Packing Machine
LINEA DE PRODUCCION
P1
Limpieza
VEREDA
P2
Puerta de Ingreso
Maquinas y Equipos
N.P.T. = +0.15 N.P.T. = +0.15 N.P.T. = +0.15
2
V4 SHM 16
N.P.T. = +0.15 15 MANTENIMIENTO
14
13 DE EQUIPOS Y
12
HERRAMIENTAS
11 P11 P14 P14

VEST. H. Cto
Limpieza
10
9 3 3
P13
8 ZONA DE TRABAJO
6 P7
P10 P10
P4 5
4 N.P.T. = +0.15
V6
3
ZONA DE TRABAJO
SHH
2
1 E2
ESTACIONAMIENTOS
P14
VISITA
4 P13 4
ZONA DE P14

D
V7 P2
TRANSITO DE
1c ALAMCEN DE INSUMOS 1 P10 P10 ALAMCEN DE INSUMOS 2
ALAMCEN DE PRODUCTOS TERMINADOS
P10
P7

V8 P10 DESCARGA N.P.T. = +0.15


VEST. M. N.P.T. = +0.15
N.P.T. = +-0.00 N.P.T. = +0.15 ZONA ALAMCEN DE CAJAS BOLSAS
P4 N.P.T. = +0.15 CONTROL
TRANSITO MESA
V1
E INGRESO DE P10 DE TRABAJO ZONA DE ALAMCEN DE PRODUCTOS TERMINADOS
N.P.T. = +0.15

PERSONAL PERSONAL
N.P.T. = +0.15 CARGA Y DESPACHO
SH. N.P.T. = +0.15

A P3
V2 C1 CONTROL
CALIDAD
P14
N.P.T. = +0.15

P14 P10
N.P.T. = +0.15

1d
P16
P15

5 N.P.T. = +0.15 N.P.T. = +0.15 N.P.T. = +0.15


5
P5
N.P.T. = +0.15 N.P.T. = +0.15 N.P.T. = +0.15
CONTROL

V3 ESPERA P5

N.P.T. = +-0.00 ESTACIONAMIENTOS


P8
F G H I J K L M N Ñ O P Q
1e N.P.T. = +0.15

C C
N.P.T. = +-0.00

Ingreso de Camiones N.P.T. = +-0.00


E3
1f N.P.T. = +-0.00

E1

1g P12

ESTACIONAMIENTOS
N.P.T. = +-0.00

PATIO DE MANIOBRAS
CAMIONES
N.P.T. = +-0.00

P7

1h
RESIDUOS
LIMP. SOLIDOS
N.P.T. = +0.30

VEREDA Pozo de Agua


ZONA DE FUTURA AMPLIACION
N.P.T. = +0.15

Cisterna
Filtro

1i ESTACIONAMIENTOS P6

V= 5000 Lt
N.P.T. = +0.30

N.P.T. = +-0.00 T. Elevado ESTACIONAMIENTOS


1j
V= 2500 Lt

T. Elevado

V= 2500 Lt

B
1k
B

1l

PLANTA - 1er. NIVEL


ESC. : 1/100

También podría gustarte