Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Community : 464759409.xlsx
Date :
Hója de calculo para la capacidad del tanque de
Owner :
SE LLENA
Escenario 1 CONDICION INICIAL-LLENO EN HORAS
min de
bombeo Flujo de Cambios de
Periodo Tiempo % de uso Demanda horas de por entrada volumen
Horas Horas % Litros bombeo hora litros Litros
6am-8am 7 5.00% 7080 1.00 17.0 7140 60.00
8 5 7080 0.50 17.0 7140 60.00
9 5 7080 0.50 17.0 7140 60.00
10 5 7080 0.50 17.0 7140 60.00
11 5 7080 0.50 17.0 7140 60.00
8am-4pm 12 5 7080 0.00 17.0 7140 60.00
13 5 7080 0.00 17.0 7140 60.00
14 4 5664 0.00 14.0 5880 216.00
15 4 5664 0.00 14.0 5880 216.00
16 4 5664 0.00 14.0 5880 216.00
Tank Sizing Spreadsheet
Community : 464759409.xlsx
Date :
4pm-6pm
Owner : 17 5 7260 0.00 17.0 7140 -119.67
18 5 7265 0.00 17.0 7140 -124.63
19 5 7267 0.00 17.0 7140 -127.33
20 5 7022 0.00 17.0 7140 117.86
21 4 6189 0.00 14.0 5880 -309.22
22 4 5309 0.00 14.0 5880 571.48
23 3 4693 0.00 10.0 4200 -492.85
6pm-6am 24 3 3948 0.00 10.0 4200 251.73
1 2 2905 0.00 5.0 2100 -804.86
2 2 2678 0.00 5.0 2100 -578.15
3 2 2649 0.00 5.0 2100 -549.30
4 2 2752 0.00 5.0 2100 -652.07
5 3 3816 0.00 5.0 2100 -1,716.21
6 4 5980 0.00 25.0 10500 4,519.91
la fuente
1.27
saldo del volumen
Cambio
acumulativo
Litros
32060
32120
32180
32240
32300
32360
32420
32636
32852
33068
Tank Sizing Spreadsheet
Community : 464759409.xlsx
Date :
32948
Owner :
32824
32696
32814
32505
33076
32584
32835
32031
31452
30903
30251
28535
33055
Hója de calculo para la capacidad del tanque de
almacenamiento con bombeo regulado con tiempo
con valvula de presión en ASADA VENADO
Registro de datos
Flujo de capacidad demanda poblacion dotacion demanda
entrada taque total (N°Hab) (L/P/D) diaria- Litros
Litros/s Litros Litros 0 375 0
4.00 32000 0.00
4X4X5
SE LLENA
Escenario 1 CONDICION INICIAL-LLENO EN HORAS 2.22
saldo del volumen
min de
bombeo Flujo de Cambios de Cambio
Periodo Tiempo % de uso Demanda horas de por hora entrada volumen acumulativo
Horas Horas % Litros bombeo Litros Litros Litros
6am-8am 7 5% 0 0.00 0.0 0.00 0.00 32,000.00
8 5% 0 0.00 0.0 0.00 0.00 32,000.00
9 5% 0 1.00 60.0 14400.00 14,400.00 46,400.00
10 5% 0 1.00 60.0 14400.00 14,400.00 60,800.00
11 5% 0 1.00 60.0 14400.00 14,400.00 75,200.00
8am-4pm 12 5% 0 1.00 60.0 14400.00 14,400.00 89,600.00
13 7% 0 1.00 60.0 14400.00 14,400.00 104,000.00
14 7% 0 1.00 60.0 14400.00 14,400.00 118,400.00
15 7% 0 1.00 60.0 14400.00 14,400.00 132,800.00
16 7% 0 1.00 60.0 14400.00 14,400.00 147,200.00
4pm-6pm 17 7% 0 1.00 60.0 14400.00 14,400.00 161,600.00
18 7% 0 0.00 0.0 0.00 0.00 161,600.00
19 3% 0 1.00 60.0 14400.00 14,400.00 176,000.00
20 3% 0 1.00 60.0 14400.00 14,400.00 190,400.00
21 3% 0 0.00 0.0 0.00 0.00 190,400.00
22 3% 0 0.00 0.0 0.00 0.00 190,400.00
23 3% 0 0.00 0.0 0.00 0.00 190,400.00
6pm-6am 24 3% 0 0.00 0.0 0.00 0.00 190,400.00
1 2% 0 1.00 60.0 14400.00 14,400.00 204,800.00
2 2% 0 0.00 0.0 0.00 0.00 204,800.00
3 2% 0 0.00 0.0 0.00 0.00 204,800.00
4 2% 0 1.00 60.0 14400.00 14,400.00 219,200.00
5 2% 0 0.00 0.0 0.00 0.00 219,200.00
6 2% 0 0.00 0.0 0.00 0.00 219,200.00
7 5% 0 1.00 60.0 14400.00 14,400.00 233,600.00
min de
bombeo Flujo de Cambios de
Periodo Tiempo % de uso Demanda horas de por hora entrada volumen
Horas Horas % Litros bombeo Litros Litros
6am-8am 7 5.00% 3628.125 0.00 0.0 0.00 -3,628.13
8 0 36.28125 0.00 0.1 36.28 0.00
9 5 3659.452 0.00 0.0 0.00 -3,659.45
10 5 3631.736 0.00 0.0 0.00 -3,631.74
11 5 3663.455 0.00 0.0 0.00 -3,663.46
8am-4pm 12 5 3651.137 0.00 0.0 0.00 -3,651.14
13 5 3650.906 0.00 0.0 0.00 -3,650.91
14 4 2902.5 0.12 6.9 2902.50 0.00
15 4 2902.5 0.12 6.9 2902.50 0.00
16 4 2902.5 0.12 6.9 2902.50 0.00
4pm-6pm 17 5 3720.196 0.15 8.9 3720.20 0.00
18 5 3722.737 0.15 8.9 3722.74 0.00
19 5 3724.123 0.15 8.9 3724.12 0.00
20 5 3598.476 0.14 8.6 3598.48 0.00
21 4 3171.648 0.13 7.6 3171.65 0.00
22 4 2720.337 0.11 6.5 2720.34 0.00
23 3 2404.835 0.10 5.7 2404.84 0.00
6pm-6am 24 3 2023.277 0.08 4.8 2023.28 0.00
1 2 1488.587 0.06 3.5 1488.59 0.00
2 2 1372.41 0.05 3.3 1372.41 0.00
3 2 1357.628 0.05 3.2 1357.63 0.00
4 2 1410.289 0.06 3.4 1410.29 0.00
5 3 1955.603 0.08 4.7 1955.60 0.00
6 4 3064.479 0.12 7.3 3064.48 0.00
tanque de 8000
on valvula de
7000
6000
demanda
diaria- Litros
72562.5 5000
1.26 4000
30000
9,867.19
9,867.19
9,867.19 25000
9,867.19
9,867.19
9,867.19 20000
9,867.19
9,867.19
9,867.19 15000
10000
5000
0
7 8 9 10 11 12 13 14 15 16 17 18 19 20
10000
5000
0
7 8 9 10 11 12 13 14 15 16 17 18 19 20
Tiempo (Horas
urva e Demanda en 24 horas
Tiempo (Horas)
14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5 6
Volumen de
urante 24 horas
16 17 18 19 20 21 22 23 24 1 2 3 4 5 6
16 17 18 19 20 21 22 23 24 1 2 3 4 5 6
Tiempo (Horas)
curva de consumo AyA
1 6 7 0.3 5%
2 7 8 0.3 5%
3 8 9 0.3 5%
4 9 10 0.3 5%
5 10 11 0.3 5%
6 11 12 0.3 5%
7 12 13 0.4 7%
8 13 14 0.4 7%
9 14 15 0.4 7%
10 15 16 0.4 7%
11 16 17 0.4 7%
12 17 18 0.4 7%
13 18 19 0.2 3%
14 19 20 0.2 3%
15 20 21 0.2 3%
16 21 22 0.2 3%
17 22 23 0.2 3%
18 23 24 0.2 3%
19 24 1 0.1 2%
20 1 2 0.1 2%
21 2 3 0.1 2%
22 3 4 0.1 2%
23 4 5 0.1 2%
24 5 6 0.1 2%
6 0.3 5%
105%
6.3