Documentos de Académico
Documentos de Profesional
Documentos de Cultura
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA 3.60 X 2.40 SEGUN MODELO GENERAL
02 OBRAS EXTERIORES
0.01 TRABAJOS PRELIMINARES
02.01.01 LIMPIEZA DE TERRENO MANUAL
VEREDA HALL DE INGRESO
VEREDA ALAMEDA DE INGRESO
VEREDA RAMPA DE INGRESO
VEREDA IZAMIENTO
VEREDA ALAMEDA DE INGRESO
03.02.02 EXCAVACIONES
03.02.02.01 EXCAVACION MANUAL PARA LOSA HASTA 0.10 M DE PROFUNDIDAD EN TERRENO NORMAL
VEREDA IZAMIENTO
EN MODULO DE AULAS
03.05 OTROS
03.05.01 ASTA DE BANDERA TUBO NEGRO DE 4" INCL. INSTALACION Y PINTADO
EN PEDESTAL
EN EL CENTRO
N"
Depto. : JUNIN
Prov. : JAUJA
Dist. : MASMA
Lugar : UCHUBAMBA
176.33 M2
1.00 AREA 42.59 42.59
1.00 13.25 2.00 26.50
1.00 53.88 1.20 64.66
1.00 AREA 16.08 16.08
1.00 13.25 2.00 26.50
176.33 M2
1.00 AREA 42.59 42.59
1.00 13.25 2.00 26.50
1.00 53.88 1.20 64.66
1.00 AREA 16.08 16.08
1.00 13.25 2.00 26.50
211.03 M2
1.00 69.40 0.50 34.70
1.00 AREA 42.59 42.59
1.00 13.25 2.00 26.50
1.00 53.88 1.20 64.66
1.00 AREA 16.08 16.08
1.00 13.25 2.00 26.50
1,133.27 M3
1.00 30.00 20.00 0.80 480.00
1.00 23.48 10.30 0.80 193.48
2.00 27.90 10.30 0.80 459.79
DOS (OBRAS EXTERIORES)
EN EL CENTRO
N"
Depto. : JUNIN
Prov. : JAUJA
Dist. : MASMA
Lugar : UCHUBAMBA
1,200.00 M2
1.00 30.00 20.00 600.00
1.00 30.00 20.00 600.00
5.96 M3
6.00 23.48 0.25 0.10 3.52
6.00 10.30 0.25 0.10 1.55
2.00 9.00 0.25 0.10 0.45
4.00 4.40 0.25 0.10 0.44
36.09 M3
1 69.40 0.80 0.65 36.09
IO DE 30.0 M 1,392.53 M3
1.00 1,114.03 1.25 1,392.53
8.63 M3
1 69.40 0.20 0.60 8.33
1.00 9.90 0.20 0.15 0.30
50.66 M3
176.33 M2
DOS (OBRAS EXTERIORES)
EN EL CENTRO
N"
Depto. : JUNIN
Prov. : JAUJA
Dist. : MASMA
Lugar : UCHUBAMBA
11.91 M3
6.00 23.48 AREA 0.05 7.04
6.00 10.30 AREA 0.05 3.09
2.00 9.00 AREA 0.05 0.90
4.00 4.40 AREA 0.05 0.88
83.40 M2
6.00 23.48 0.35 49.31
6.00 10.30 0.35 21.63
2.00 9.00 0.35 6.30
4.00 4.40 0.35 6.16
1.70 M3
1.00 1.60 1.25 0.55 1.10
1.00 1.30 0.85 0.15 0.17
1.00 1.00 AREA 0.11 0.11
1.00 1.00 AREA 0.32 0.32
3.50 M2
1.00 5.70 0.25 1.43
1.00 4.30 0.15 0.65
1.00 1.30 0.85 0.71
1.00 2.90 AREA 0.25 0.73
17.17 KG
17.17
2.00 UND
2.00 1.00 2.00
3.00 UND
3.00 1.00 3.00
DOS (OBRAS EXTERIORES)
EN EL CENTRO
N"
Depto. : JUNIN
Prov. : JAUJA
Dist. : MASMA
Lugar : UCHUBAMBA
9.00 ML
6.00 1.50 9.00
176.33 M2
1.00 AREA 42.59 42.59
1.00 13.25 2.00 26.50
1.00 53.88 1.20 64.66
1.00 AREA 16.08 16.08
1.00 13.25 2.00 26.50
PLANILLA DE METRADOS ACERO EN PEDESTAL (ESTRUCTURAS)
: "MEJORAMIENTO DE LA INSTITUCIN EDUCATIVA INTEGRADO UCHUBAMBA EN EL CENTRO POBLADO DE UCHUBAMBA, DISTRITO DE MASMA,
Proy.
PROVINCIA DE JAUJA - JUNN"
Respon. : MUNICIPALIDAD DISTRITAL DE MASMA Provincia : JAUJA
Fecha : MAYO - 2015 Distrito : MASMA
Formula : OBRAS EXTERIORES Localidad : UCHUBAMBA
LONGITUD CANTIDAD
N DE
ITEM PARTIDA DESCRIPCION TIPO PARCIAL DE 1" 3/4" 5/8" 1/2"
(ML) ELEMENTOS VECES
03.04.03 ACERO fy=4200 kg/cm2 GRADO 60 EN PEDESTAL
PEDESTAL
Acero Principal Horizon 3/8" 0.95 8.00 1.00
Acero Principal
3/8" 2.20 5.00 1.00
Vertical
LOSA
Acero Principal
3/8" 1.00 6.00 1.00
Horizontal
Acero Principal
3/8" 1.25 4.00 1.00
Vertical
TOTAL (ML) - - - -
4.04 2.26 1.60 1.02
TOTAL
- - - -
(KG)
ISTRITO DE MASMA,
3/8" 1/4"
7.60
11.00
6.00
5.00
29.60 -
0.58 0.25
17.17 -
17.17
17.17