Está en la página 1de 1

CALCULO DE P80 Y F80

100.00

10.00

F80 P80

1.00
10 100 1000 10000 100000

% SOL. L/S
ALIMEN. CICLON 83.39 0.20 % Solidos =(Grav Espec)*((densidad)-1)/(Densidad)*((Grav Espec)-1))*100
OVERFLOW 36.36 1.75 L/S = Dilucin de pulpa = (100-%sol.)/%sol
UNDERFLOW 81.60 0.23 % sol. = 100 * (d - 1) * Gs
(Gs - 1) d

F80 P80 D50 D50(C) Wi


(m) (m) (m) (m) Kw-H/TM Wi = (W/TC)/((10/(Raiz(P80)))-(10/(Raiz(F80))))
9406 600 170.00 210 40.66

Malla Under Over Abertura


Peso Peso EFIC.(R) EFIC.(C) Prom. (m) Bypass
20 4.09 0.02 99.47 99.39 841.00 0.14
35 10.57 0.42 96.14 95.52 633.00
48 7.30 1.27 85.14 82.78 362.50
65 6.71 2.83 70.31 65.58 256.00
100 5.46 5.00 52.21 44.61 181.00
150 3.16 4.13 43.35 34.34 128.00
200 1.71 3.95 30.20 19.11 88.40
270 1.32 4.49 22.77 10.49 61.90
325 0.36 1.23 22.78 10.50 49.00
400 0.28 0.92

Under peso = [(TMSH UF) * ( % Peso UF)] / 100

Over peso = [(TMSH OF) * ( % Peso OF)] / 100

Eficiencia real = [(peso UF) * 100] / [SUMA(peso UF + Peso OF)]

Eficiencia corregida = {(Efic. real) / [100 - (By pass)]} * 100


(1 - By pass)

Abertura prom (um) = [(Abertura sup) + (Abertura inf)] / 2

By pass = {[100 * (TMSH UF)] / [(% sol. UF) - (TMSH UF)]}


{[100 * (TMSH Alim Mol)] / [(% Sol OF) - (TMSH Alim Mol)]} + {[100 * (TMSH UF)] / [(% Sol UF) - (TMSH UF)]}
=(100*I48/F103-I48)/((100*E24/F102-E24)+(100*I48/F103-I48))
% Eficiencia

CALCULO DE D50 Y D50(C)


100.00

10.00

Corregida
Real

1.00 Micrones (um)


10.00 100.00 1000.00

También podría gustarte