Documentos de Académico
Documentos de Profesional
Documentos de Cultura
vocabulary
bunch of
cope with
instead of
reduce
schedule
to be honest
commitment
crowded into
keep oneself in shape
release
stress
trust (confiar)
confidence(confianza)
expectation
nourishment
resolve
tip
goals
conforting
content
happy go lucky
a helping hand
face to face
down in the dumps (deprimido)
fluent
resource (recurso)
hectic (frenetico)
pathway (camino)
expertise
motivation
satisfaction
state of mind
materialistic
REWARDING
wise
present past
arise arose
be was/were
became become
begin began
break broke
bring brought
build built
buy bought
catch caught
choose chose
came come
cost cost
do did
draw drew
dream dramt
drink drank
drive drove
eat ate
fall fell
feel felt
fight fought
find found
fly flew
forget forgot
freeze froze
get got
give gave
go went
grow grew
hang hung
hear heart
hurt hurt
keep kept
know knew
learn learnt
leave left
led led
lie lay
light lit
lose lost
make made
mean meant
find found
put put
pay paid
read read
rin run
rum ram
say said
see saw
sell sold
send sent
shot shoot
show showed
sing sang
sit sat
sleep slept
speak spoke
swin swun
take toke
teach taught
torn tore
tell told
understand understood
wear wore
win won
write wrote
group informal
to manage and deal with someting successful
in place of
make something smaller in size or importance
arrange an event for certain time
say the true
promise something
filled completely
stay goog physical condition
express a feeling you were not showing
life tense with dificult
believe in the honesty or goodnes of somebody
felling sure about your abilities.
strong hopes or beliefs that good things will have
food that is needed for life growht abd good health
to solve problem or dificulty
useful piece of information
estado mental
gratificante
sabio
2030
2031
Post - Inversin
2032
2033
Post - Inversin 2034
2035
2036
2037
2038
Recurso Unidad
MANO DE OBRA
OPERADOR DE EQUIPO LIVIANO hh
OPERADOR DE EQUIPO PESADO hh
OPERADOR DE GRUA hh
TOPOGRAFO hh
CAPATAZ hh
OPERARIO hh
OFICIAL hh
PEON hh
CAPACITADOR SOCIAL hh
MATERIALES
ALAMBRE NEGRO RECOCIDO # 8 kg
CLAVOS PARA MADERA CON CABEZA DE 3" kg
CLAVOS PARA MADERA CON CABEZA DE 4" kg
ARENA FINA m3
PIEDRA CHANCADA DE 1/2" m3
MATERIAL CLASIFICADO GRANULAR m3
AFIRMADO m3
Recurso Unidad
ARENA GRUESA m3
MATERIAL DE RELLENO m3
ASFALTO RC-250 gal
CEMENTO PORTLAND TIPO I (42.5 kg) bls
CINTA SEALADORA AMARILLA m
CINTA SEALADORA ROJA m
YESO DE 28 Kg bls
MATERIAL DIDACTICO u
ADITIVO DESMOLDEADOR DE ENCOFRADOS gal
ADITIVO CURADOR ANTISOL gal
TAPA DE CONCRETO ARMADO PARA BUZON DE 0.60 X 0.80 m u
FLETE TERRESTRE DESDE CAJAMARCA A BOLIVAR kg
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y glb
HERRAMIENTAS PARA LA OBRA
ALQUILER DE CASETA DE GUARDIANIA Y ALMACEN DE OBRA mes
ALQUILER DE OFICINA PARA LA OBRA mes
ALQUILER DE SS.HH. PORTALILES mes
AGUA m3
REFRIGERIO u
CARTEL DE OBRA glb
PRUEBAS DE CALIDAD DE CONCRETO ROTURA u
PRUEBAS PROCTOR MODIFICADO DE CAMPO u
BROCHA u
CORDEL m
TECNOPORT m2
PRUEBA DE DISEO DE MEZCLAS DE CONCRETO u
MADERA TORNILLO p2
TRIPLAY DE 4' X 8' X 16 mm pl
DISOLVENTE XILOL gal
PINTURA PARA TRAFICO BLANCA gal
EQUIPOS
HERRAMIENTAS MANUALES %MO
MIRAS Y JALONES hm
CAMION VOLQUETE 6 X 4 330 HP 10 m3 hm
CAMION CISTERNA 4 X 2 (AGUA) 2,000 gl hm
MOLDE METALICO PARA BUZON pza
COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP hm
RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton hm
RODILLO NEUMATICO AUTOPROPULSADO 81-100HP 5.5-20 ton hm
CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3 hm
Recurso Unidad
1939
1957
1974
1992
2010
2028
2046
2063
2081
Recurso
MANO DE OBRA
OPERADOR DE EQUIPO LIVIANO
OPERADOR DE EQUIPO PESADO
OPERADOR DE GRUA
TOPOGRAFO
CAPATAZ
OPERARIO
OFICIAL
PEON
CAPACITADOR SOCIAL
MATERIALES
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA MADERA CON CABEZA DE 4"
ARENA FINA
PIEDRA CHANCADA DE 1/2"
MATERIAL CLASIFICADO GRANULAR
AFIRMADO
Recurso
ARENA GRUESA
MATERIAL DE RELLENO
ASFALTO RC-250
CEMENTO PORTLAND TIPO I (42.5 kg)
CINTA SEALADORA AMARILLA
CINTA SEALADORA ROJA
YESO DE 28 Kg
MATERIAL DIDACTICO
ADITIVO DESMOLDEADOR DE ENCOFRADOS
ADITIVO CURADOR ANTISOL
TAPA DE CONCRETO ARMADO PARA BUZON DE 0.60 X 0.80 m
FLETE TERRESTRE DESDE CAJAMARCA A BOLIVAR
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y
HERRAMIENTAS PARA LA OBRA
ALQUILER DE CASETA DE GUARDIANIA Y ALMACEN DE OBRA
ALQUILER DE OFICINA PARA LA OBRA
ALQUILER DE SS.HH. PORTALILES
AGUA
REFRIGERIO
CARTEL DE OBRA
PRUEBAS DE CALIDAD DE CONCRETO ROTURA
PRUEBAS PROCTOR MODIFICADO DE CAMPO
BROCHA
CORDEL
TECNOPORT
PRUEBA DE DISEO DE MEZCLAS DE CONCRETO
MADERA TORNILLO
TRIPLAY DE 4' X 8' X 16 mm
DISOLVENTE XILOL
PINTURA PARA TRAFICO BLANCA
EQUIPOS
HERRAMIENTAS MANUALES
MIRAS Y JALONES
CAMION VOLQUETE 6 X 4 330 HP 10 m3
CAMION CISTERNA 4 X 2 (AGUA) 2,000 gl
MOLDE METALICO PARA BUZON
COMPACTADOR VIBRATORIO TIPO PLANCHA 7 HP
RODILLO LISO VIBRATORIO AUTOPROPULSADO 70-100 HP 7-9 ton
RODILLO NEUMATICO AUTOPROPULSADO 81-100HP 5.5-20 ton
CARGADOR SOBRE LLANTAS 100-115 HP 2-2.25 yd3
TRACTOR DE ORUGAS DE 190-240 HP
VIBRADOR DE CONCRETO 4 HP 1.50"
Recurso
MOTONIVELADORA DE 125 HP
MEZCLADORA DE CONCRETO TROMPO 8 HP 9 p3
GRUA HIDRAULICA AUTOPROPULSADA 127 HP 18 ton 9 m
NIVEL TOPOGRAFICO CON TRIPODE
TEODOLITO
SUBCONTRATOS
PROGRAMA DE CONTINGENCIA
Unidad Cantidad
hh 2,417.05
hh 1,482.46
hh 223.28
hh 496.25
hh 702.42
hh 27,202.81
hh 9,117.08
hh 66,634.26
hh 178.6
0
kg 831.75
kg 872.55
kg 129.13
m3 80.03
m3 4,549.43
m3 7,259.91
m3 1,562.62
Unidad Cantidad
m3 3,845.36
m3 1,200.50
gal 4,928.62
bls 57,453.06
m 4,001.67
m 4,001.67
bls 1,610.15
u 1.86
gal 64
gal 848.96
u 44.65
kg 2,509,855.47
glb 1.86
0
mes 13.02
mes 13.02
mes 26.05
m3 2,189.61
u 1.86
glb 1.86
u 93.02
u 306.96
u 6.68
m 10,150.20
m2 3,135.83
u 3.72
p2 19,453.27
pl 143.96
gal 32
gal 40.13
0
%MO 0
hm 1,022.31
hm 1,037.90
hm 80.46
pza 8.93
hm 1,516.78
hm 112.79
hm 51.42
hm 1,946.03
hm 366.31
hm 5,988.97
Unidad Cantidad
hm 378.42
hm 5,988.58
hm 55.81
he 493.78
hm 491.1
0
glb 1.86
Rubos COSTO
1 Mes
EXPEDIENTE TECNICO 232,272.17 94,013.39
SUPERVISION 139,363.30
OBRAS PROVISIONALES 71,086.97
TRABAJOS PRELIMINARES 234,740.98
MOVIMIENTO DE TIERRAS 826,394.25
PAVIMENTO RIGUIDO 4,468,740.97
PINTURA 21,361.41
TRABAJOS PRELIMINARES EN VEREDAS 19,005.37
MOVIMIENTO DE TIERRAS EN VEREDAS 262,066.03
CONCRETO DE VEREDAS 824,768.41
VARIOS 43,419.57 16105.2603
MITIGACION AMBIENTAL 20,000.00
TOTAL 7,163,219.43 S/. 110,118.65
Rubos COSTO
1 Mes
SUPERVISION 232,272.17 12.50%
EXPEDIENTE TECNICO 139,363.30 100.00%
OBRAS PROVISIONALES 71,086.97
TRABAJOS PRELIMINARES 234,740.98
MOVIMIENTO DE TIERRAS 826,394.25
PAVIMENTO RIGUIDO 4,468,740.97
PINTURA 21,361.41
TRABAJOS PRELIMINARES EN VEREDAS 19,005.37
MOVIMIENTO DE TIERRAS EN VEREDAS 262,066.03
CONCRETO DE VEREDAS 824,768.41
VARIOS 43,419.57 14.29%
MITIGACION AMBIENTAL 20,000.00
TOTAL 7,163,219.43 S/. 110,118.65
Rubos COSTO
1 Mes
SUPERVISION 139,363.30 17420.4128
EXPEDIENTE TECNICO 232,272.17 232272.1713
OBRAS PROVISIONALES 71,086.97 0.0000
TRABAJOS PRELIMINARES 234,740.98 0.0000
MOVIMIENTO DE TIERRAS 826,394.25 0.0000
PAVIMENTO RIGUIDO 4,468,740.97 0.000
PINTURA 21,361.41 0.0000
TRABAJOS PRELIMINARES EN VEREDAS 19,005.37 0.0000
MOVIMIENTO DE TIERRAS EN VEREDAS 262,066.03 0.0000
CONCRETO DE VEREDAS 824,768.41 0.0000
VARIOS 43,419.57 6202.80
MITIGACION AMBIENTAL 20,000.00 0.0000
TOTAL 7,163,219.43 255895.3798
GASTOS
Rubo COSTO (S./)
GENERALES (7%)
COSTOS
1
OPERACIN 0
SIN PROYECTO
MANTENIMIENTO 2560
OPERACIN 2500
CON PROYECTO
MANTENIMIENTO 6554
Tiempo de Ejecucin
2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes
60,932.42
36,171.77
287,979.45 287,979.45
807,250.44 807,250.44 807,250.44
12,770.74
11,689.35
160,906.25
334,276.83
16105.2603 16105.2603 16105.2603 16105.2603 16105.2603 16105.2603
S/. 401,188.90 S/. 1,111,335.15 S/. 823,355.70 S/. 835,045.05 S/. 189,782.25 S/. 350,382.09
Tiempo de Ejecucin
2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes
12.50% 12.50% 12.50% 12.50% 12.50% 12.50%
100.00%
100.00%
50.00% 50.00%
33.33% 33.33% 33.33%
100.00%
100.00%
100.00%
100.00%
14.29% 14.29% 14.29% 14.29% 14.29% 14.29%
S/. 401,188.90 S/. 1,111,335.15 S/. 823,355.70 S/. 835,045.05 S/. 189,782.25 S/. 350,382.09
Tiempo de Ejecucin
2 Mes 3 Mes 4 Mes 5 Mes 6 Mes 7 Mes
17420.4128 17420.4128 17420.4128 17420.4128 17420.4128 17420.4128
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
71086.9663 0.0000 0.0000 0.0000 0.0000 0.0000
234740.9760 0.0000 0.0000 0.0000 0.0000 0.0000
413197.1245 413197.1245 0.0000 0.0000 0.0000 0.0000
0.000 1489580.323 1489580.323 1489580.323 0.000 0.000
0.0000 0.0000 0.0000 0.0000 21361.4112 0.0000
0.0000 0.0000 0.0000 19005.3732 0.0000 0.0000
0.0000 0.0000 0.0000 0.0000 262066.0335 0.0000
0.0000 0.0000 0.0000 0.0000 0.0000 824768.4058
6202.80 6202.80 6202.80 6202.80 6202.80 6202.80
0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
742648.2754 1926400.6564 1513203.5319 1532208.9051 307050.6532 848391.6144
EXPEDIENTE INVERSION
UTILIDAD (7%) SUB TOTAL IGV 18% SUPERVICION
TECNICO TOTAL
71,469.61
42,427.04
675,560.81
2,840,550.43
14,979.21
13,710.82
188,732.14
392,084.10
132,232.66
23,940.00 28,080.00
S/. 23,940.00 4493840.21
% TOTAL
8 Mes
12.50% 100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00% 100.00%
S/. 23,940.00 4493840.21
% TOTAL
8 Mes
17420.4128 139363.30
0.0000 232272.17
0.0000 71086.97
0.0000 234740.98
0.0000 826394.25
0.000 4468740.97
0.0000 21361.41
0.0000 19005.37
0.0000 262066.03
0.0000 824768.41
0.00 43419.57
20000.0000 20000.00
37420.4128 7163219.43
0.000000000000
18 19 20
0 0 0
6820 2560 2560
2500 2500 2500
6554 19662 6554