Está en la página 1de 43

Tablas para convertir velocidad maxima en velocidad promedio

Ratio =

peso vehiculo
HP

TABLA N 01
Long Pormedio
(ft)
0
200
201
400
401
600
601
1000
1001 1500
1501 2000
2001 2500
2501 3500
3501 mas

Ratio =

Ratio =

Horiz. arranque
desde MPH
0.0
0.40
0.40
0.51
0.51
0.56
0.56
0.67
0.67
0.75
0.75
0.80
0.80
0.84
0.84
0.87
0.87
0.94

peso vehiculo
HP

TABLA N 02
Long Pormedio
(ft)
0
200
201
400
401
600
601
1000
1001 1500
1501 2000
2001 2500
2501 3500
3501 mas

Unid. en mov.
nivel 0
0.0
0.65
0.65
0.70
0.70
0.75
0.75
0.81
0.81
0.88
0.88
0.91
0.91
0.95
0.95
0.97
0.97
0.99

Cuando entra a
Co(-)
0.0
0.67
0.72
0.77
0.83
0.90
0.93
0.95
0.98
-

300-380 lb/HP

Horiz. arranque
desde MPH
0.0
0.39
0.39
0.48
0.48
0.54
0.54
0.61
0.61
0.68
0.68
0.74
0.74
0.78
0.78
0.84
0.84
0.92

peso vehiculo
HP

TABLA N 03
Long Pormedio
(ft)
0
200
201
400
401
600
601
1000
1001 1500
1501 2000
2001 2500

< 300 lb/HP

Unid. en mov.
nivel 0
0.0
0.62
0.62
0.67
0.67
0.70
0.70
0.75
0.75
0.79
0.79
0.84
0.84
0.87
0.87
0.90
0.90
0.93

Cuando entra a
Co(-)
0.0
0.64
0.68
0.75
0.83
0.88
0.91
0.93
0.95
-

> 380 lb/HP

Horiz. arranque
desde MPH
0.0
0.33
0.33
0.41
0.41
0.46
0.46
0.53
0.53
0.59
0.59
0.62
0.62
0.65

Unid. en mov.
nivel 0
0.0
0.55
0.55
0.58
0.58
0.65
0.65
0.75
0.75
0.77
0.77
0.83
0.83
0.86

Cuando entra a
Co(-)
0.0
0.56
0.64
0.70
0.78
0.84
0.88
-

2501
3501

3500
mas

0.65
0.70

0.70
0.75

0.86
0.90

0.90
0.93

0.90
0.92

DATOS DEL CATALOGO

elocidad promedio

MODELO

KOMATSU
830E
330896
2650
860000
529104

Peso unitario =

potencia =
Peso cargado
capacidad
Ratio con Carga=

O
A
M

A-B
B-C
C-D
D-E
E-F
F-G
G-H
H-I
I-J
J-K
K-L

Long

(m)

(ft)

152.179
190.823
162.148
59.2055
184.328
96.5288
64.5227
186.327
183.501
134.705
298.982

499.146
625.899
531.846
194.194
604.596
316.615
211.634
611.153
601.884
441.832
980.662

% grad

% RR

0%
7%
8%
7%
7%
9%
8%
8%
9%
2%
7%

3%
3%
3%
3%
3%
3%
3%
3%
3%
3%
3%

peso vacio=
HP

RETORNO
TR

K-L
J-K
I-J

Cuando entra a
Co(-)
Co(+)
0.56
1.0
0.64
1.0
0.70
1.0
0.78
1.0
0.84
1.0
0.88
1.0
0.90
1.0

Long

Ratio sin Carga=

Cuando entra a
Co(-)
Co(+)
0.64
1.0
0.68
1.0
0.75
1.0
0.83
1.0
0.88
1.0
0.91
1.0
0.93
1.0
0.95
1.0
0.97
1.0

peso carga.=
HP

IDA
TR

Cuando entra a
Co(-)
Co(+)
0.67
1.0
0.72
1.0
0.77
1.0
0.83
1.0
0.90
1.0
0.93
1.0
0.95
1.0
0.98
1.0
0.99
1.0

H-I
G-H
F-G
E-F
D-E
C-D
B-C
A-B

Long

Long

(m)

(ft)

298.982
134.705
183.501
186.327
64.5227
96.5288
184.328
59.2055
162.148
190.823
152.179

980.662
441.832
601.884
611.153
211.634
316.615
604.596
194.194
531.846
625.899
499.146

% grad

% RR

7%
2%
9%
8%
8%
9%
7%
7%
8%
7%
0%

3%
3%
3%
3%
3%
3%
3%
3%
3%
3%
3%

0.92
0.95

1.0
1.0

330896
2650
860000
529104

lb
HP
lb
lb

240 Tn

324.53 lb/HP

860000
2650

% SR (+)

V. entr.

V. salida

(MPH)

(MPH)

0
33
9.5
8.8
9.5
9.5
8
8.8
8.8
8
20.5

33
9.5
8.8
9.5
9.5
8
8.8
8.8
8
20.5
9.5

3%
10%
11%
10%
10%
12%
11%
11%
12%
5%
10%

Factor

0.54
1
1
1
1
1
1
1
1
1
1

V. prom. V. prom. tiempo


(MPH)

(ft/min)

(min)

17.82
9.5
8.8
9.5
9.5
8
8.8
8.8
8
20.5
9.5

1568.16
836
774.4
836
836
704
774.4
774.4
704
1804
836

0.32
0.75
0.69
0.23
0.72
0.45
0.27
0.79
0.85
0.24
1.17
6.49

124.87 lb/HP

330896
2650

,
% SR (-)

12%
5%
12%
11%
11%
12%
10%
10%
11%
10%
3%

V. entr.

V. salida

(MPH)

(MPH)

0
0
37
27
27
27
27
27
27
27
27

27
37
27
27
27
27
37
37
27
27
37

Factor

0.67
0.56
1
1
1
1
1
1
1
1
1

V. prom. V. prom. tiempo


(MPH)

(ft/min)

(min)

18.09
20.72
27
27
27
27
37
37
27
27
37

1591.92
1823.36
2376
2376
2376
2376
3256
3256
2376
2376
3256

0.62
0.24
0.25
0.26
0.09
0.13
0.19
0.06
0.22
0.26
0.15
2.48

DESC.
A
B
C
D
E
F
G
H
I
J
K
L

TRAMO
A-B
B-C
C-D
D-E
E-F
F-G
G-H
H-I
I-J
J-K
K-L

X
549,518
549,646
549,814
549,958
550,006
550,124
550,105
550,062
549,891
549,729
549,613
549,316

RUTA OPTIMA
Y
64,701
64,784
64,874
64,946
64,981
65,122
65,216
65,264
65,336
65,421
65,490
65,506

Z
3,506
3,506
3,520
3,534
3,538
3,550
3,559
3,565
3,580
3,596
3,598
3,619

DISTANCIA
152.18
190.82
162.15
59.21
184.33
96.53
64.52
186.33
183.50
134.70
298.98

PENDIENTE
0%
7%
8%
7%
7%
9%
8%
8%
9%
2%
7%

TABLA N1 CALC. DEL TIEMPO DE CICLO DE TRABAJO EN "s"


BCY
4
5
6
7

m
3
4
5
5.5

E
18
20
21
21

M
23
25
26
26

M-H
28
29
30
30

H
32
33
34
34

22

27

31

35

10

23

28

32

36

12
15

9
11.5

24
26

29
30

32
33

37
38

20
25
30

15
19
21

27
29
31

32
34
36

35
37
39

40
42
44

35
40
45
50
55

23
25
27
29
31

33
35
37
39
41

38
40
42
44
46

41
43
45
47
49

46
48
50
52
54

TABLA N2 FACTOR DE CORRECCION POR


PROFUNDIDAD DE EXCAVACION
prof.excav.

F.

de correc.del tiempo de ciclo

40%

60%

1.25

1.1

TABLA N3 FACTOR DE CORRECCION POR ANGULO DE GIRO


angulo de giro
fac. de correc

45

60

0.64

75
0.9

90

0.95

120
1

1.1

TABLA N 4 EFECTIVIDAD DE OPERACIN


condiciones del
lugar de trabajo
excelente
bueno
regular
malo

condiciones del operador


excelente
bueno regular malo
0.83
0.76
0.72
0.63

0.8
0.73
0.69
0.61

0.77
0.7
0.66
0.59

0.77
0.64
0.6
0.54

DATOS
Tiempo W/ao
Guardia/dia
Horas/Guardia

365
2
10

dias
G.
Hrs

banco

2.5 Tn/m3

f.esponjamiento
f.excavacion

5%
100%
120

Angulo de giro

f.llenado

80%

RENDIMIENTO PALA
:
CAPACIDAD PALA
TIEMPO POR PASE
RENDIMIENTO (Tn/Hrs)

82 Tn/Ps
3.30 min
3,780

TIEMPO TOTAL DE CARGUIO:


80%

100%

1.02

a) Toneladas x pase de Pala:


Tn/pase

150
1.2

180

Tns/Ps d Pala

1.3
b) tiempo del ciclo por Pase:
Time/Ps

Tiempo/Ps

Tiemp. ida
Tiemp. vuelta
Cap. Cuchara
Cap. Camion
Tiem. est. y manio.
Tiempo descarga
F. operacion
F. operacion

82

Tn/Ps

F.excavacion x F. giro x tiempo giro

1.1

min

5/ 6

T.c(s)
F.P.EXC

48
1

F.G.

1.1

Cap. Cuchara (Yd) x F. llenado x banco


F. esponjamiento

6.49
2.48
42.8
240
0.5
1.5
50

min

c) N Pasadas a cargar el Camion:

min
m3

N Psds

Cap. Carg Cam.

Tn/Pase

Tn

min
min
min

(tabla 1)
(tabla 2)

N Pasadas

2.944

d) Tiempo de Llenado del camion:

(tabla 3)
T. Llen. Cam

T. llen. Cam

N Ps x Tiempo/Ps

3.30

e) Tiempo del ciclo del camion:


T Ciclo Cam

T. Ciclo Cam.
Prod/hora

T Llen. + T estc , man

14.27

Cap. Camion x 60

Ciclo Camion

Prod/hora
Prod. efc .Cam.

Prod efc Cam.

1,009

Prod. Horaria x

841

Prod. Hora
Prod. Efect

Flot. d Cam Req. =

Flota Cam. Req


N Cam/Pala

N Cam./Pala

=
=

4.49

T Cic Cam
T Llen. Cam + T e

= 3.7552632

ap. Carg Cam.

Tn/Pase

Pasadas

Ps x Tiempo/Ps

min

Llen. + T estc , maniobra + T descar + T ida-vuelta

min

Cap. Camion x 60
Ciclo Camion

Tn/Hora
Prod. Horaria x F. oper.

Tn/Cam
Prod. Horaria
Prod. Efectiva

4
T Cic Cam
T Llen. Cam + T est. Maniob

Cam/Pla

Semana

34

FECHA
EQUIPO
CAM. 01
CAM. 02
CAM. 03
CAM. 04
%DM CA

8/19/2016
Friday
0.5
0.5
0.5
0.5
98%

EQUIPO
PALA-05
%DM PALA 01

8/19/2016
Friday
1.2
95%

FECHA
EQUIPO
CAM. 01
CAM. 02
CAM. 03
CAM. 04
TOTAL

FECHA
EQUIPO
PALA-05
TOTAL

FECHA
EQUIPO
CAM. 01
CAM. 02
CAM. 03
CAM. 04
TOTAL

FECHA
EQUIPO
PALA-05
TOTAL

Mes

8/20/2016
Saturday
0.5
0.5
0.5
0.5
98%

8/21/2016
Sunday
0.5
0.5
0.5
0.5
98%

8/22/2016
Monday
0.5
0.5
0.5
0.5
98%

8/20/2016
Saturday
1.2
95%

8/21/2016
Sunday
1.2
95%

8/22/2016
Monday
3
88%

8/20/2016
Saturday
98%
98%
98%
98%
98%

DISPONIBILIDAD MECAN
8/21/2016 8/22/2016
Sunday
Monday
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%

8/19/2016
Friday
95%
95%

8/20/2016
Saturday
95%
95%

DISPONIBILIDAD MECAN
8/21/2016 8/22/2016
Sunday
Monday
95%
88%
95%
88%

8/19/2016
Friday
91%
91%
91%
91%
91%

USO DISPONIBILIDAD MECANICA (


8/20/2016 8/21/2016 8/22/2016
Saturday
Sunday
Monday
91%
91%
83%
91%
91%
83%
91%
91%
83%
91%
91%
83%
91%
91%
83%

8/19/2016
Friday
93%
93%

USO DISPONIBILIDAD MECANICA


8/21/2016 8/22/2016
Sunday
Monday
93%
93%
93%
93%

8/19/2016
Friday
98%
98%
98%
98%
98%

8/20/2016
Saturday
93%
93%

UTILIZACIN (%U) - CA

FECHA
EQUIPO
CAM. 01
CAM. 02
CAM. 03
CAM. 04
TOTAL

FECHA
EQUIPO
PALA-05
TOTAL

8/19/2016
Friday
89%
89%
89%
89%
89%

8/19/2016
Friday
89%
89%

8/20/2016
Saturday
89%
89%
89%
89%
89%

8/21/2016
Sunday
89%
89%
89%
89%
89%

8/22/2016
Monday
81%
81%
81%
81%
81%

8/20/2016
Saturday
89%
89%

UTILIZACIN (%U) - P
8/21/2016 8/22/2016
Sunday
Monday
89%
81%
89%
81%

8/23/2016 8/24/2016 8/25/2016


Tuesday Wednesday Thursday
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
98%
98%
98%

8/26/2016
Friday
0.5
0.5
0.5
0.5
98%

8/27/2016
TOTAL HRAS
Saturday
0.5
4.5
0.5
4.5
0.5
4.5
0.5
4.5
98%
98%

8/23/2016 8/24/2016 8/25/2016


Tuesday Wednesday Thursday
1.2
1.2
1.2
95%
95%
95%

8/26/2016
Friday
1.2
95%

8/27/2016
TOTAL HRAS
Saturday
1.2
12.6
95%
94%

NIBILIDAD MECANICA (%DM)


8/23/2016 8/24/2016
42607
Tuesday Wednesday Thursday
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%
98%

42608
Friday
98%
98%
98%
98%
98%

42609
Saturday
98%
98%
98%
98%
98%

NIBILIDAD MECANICA (%DM)


8/23/2016 8/24/2016 8/25/2016
Tuesday Wednesday Thursday
95%
95%
95%
95%
95%
95%

8/26/2016
Friday
95%
95%

8/27/2016
Saturday
95%
95%

LIDAD MECANICA (%DM) - CAMIONES


8/23/2016 8/24/2016 8/25/2016
Tuesday Wednesday Thursday
91%
91%
91%
91%
91%
91%
91%
91%
91%
91%
91%
91%
91%
91%
91%

8/26/2016
Friday
91%
91%
91%
91%
91%

8/27/2016
Saturday
91%
91%
91%
91%
91%

BILIDAD MECANICA (%DM) - PALA 05


8/23/2016 8/24/2016 8/25/2016
Tuesday Wednesday Thursday
93%
93%
93%
93%
93%
93%

8/26/2016
Friday
93%
93%

8/27/2016
Saturday
93%
93%

IZACIN (%U) - CAMIONES

TOTAL
98%
98%
98%
98%
98%

TOTAL
94%
94%

TOTAL
90%
90%
90%
90%
90%

SEMANA
93%
93%

8/23/2016 8/24/2016 8/25/2016


Tuesday Wednesday Thursday
89%
89%
89%
89%
89%
89%
89%
89%
89%
89%
89%
89%
89%
89%
89%

8/26/2016
Friday
89%
89%
89%
89%
89%

8/27/2016
Saturday
89%
89%
89%
89%
89%

LIZACIN (%U) - PALA 05


8/23/2016 8/24/2016 8/25/2016
Tuesday Wednesday Thursday
89%
89%
89%
89%
89%
89%

8/26/2016
Friday
89%
89%

8/27/2016
Saturday
89%
89%

TOTAL
88%
88%
88%
88%
88%

SEMANA
88%
88%

RENDIMIENTO
TAJO - BOTADERO
FECHA
EQUIPO
CAM. 01
CAM. 02
CAM. 03
CAM. 04
TOTAL

EQUIPO
PALA-05

EQUIPO
CAM. 01
CAM. 02
CAM. 03
CAM. 04

1009.11

D
8/19/2016
viernes
21,494
21,494
21,494
21,494
85,976

8/20/2016
sbado
21,494
21,494
21,494
21,494
85,976

8/19/2016

8/20/2016

22.8

22.8

viernes
8/19/2016

sbado
8/20/2016

HORAS DE

HORAS TOTALE
22.80
22.80
22.80
22.80

22.80
22.80
22.80
22.80

Tn

8/21/2016
domingo
21,494
21,494
21,494
21,494
85,976

Almuerzo = 1.5 Hrs.


DESMONTE - PALA 01
8/22/2016 8/23/2016 8/24/2016
lunes
martes
mircoles
20,015
21,494
21,494
20,015
21,494
21,494
20,015
21,494
21,494
20,015
21,494
21,494
80,061
85,976
85,976

8/25/2016
jueves
21,494
21,494
21,494
21,494
85,976

8/26/2016
viernes
21,494
21,494
21,494
21,494
85,976

8/21/2016 8/22/2016 8/23/2016 8/24/2016 8/25/2016


HORAS DE UTILIZACIN DE LA PALA - 05
22.8
21
22.8
22.8
22.8

8/26/2016

domingo
lunes
martes
mircoles
jueves
8/21/2016 8/22/2016 8/23/2016 8/24/2016 8/25/2016
HORAS TOTALES DE UTILIZACIN DE CAMIONES
22.80
21.00
22.80
22.80
22.80
22.80
21.00
22.80
22.80
22.80
22.80
21.00
22.80
22.80
22.80
22.80
21.00
22.80
22.80
22.80

viernes
8/26/2016

22.8

22.80
22.80
22.80
22.80

CAPACIDAD DE MOVIMIENTO
DESMONTE
RENDIMIENTO PALA

8/27/2016
sbado
21,494
21,494
21,494
21,494
85,976

FECHA
DESMONTE
MINERAL
MINERAL + DESMONTE

8/19/2016
85,976
0
85,976

100,000

8/27/2016

90,000

22.8

85,976

85,976

8/19/2016

8/20/2016

80,000
70,000
60,000

sbado
8/27/2016
22.80
22.80
22.80
22.80

TMS

50,000
40,000
30,000
20,000
10,000
0

MIENTO
RENDIMIENTO PALA

8/20/2016
85,976
0
85,976

TMS
3780

PRODUCCION Tn/Dia
90,714

8/21/2016
85,976
0
85,976

TOTAL
90,713.77

PRODUCCIN MINA
8/22/2016
8/23/2016
80,061
85,976
0
0
80,061
85,976

8/24/2016
85,976
0
85,976

ROCA TOTAL

85,976

85,976

85,976
80,061

8/20/2016

8/21/2016

8/22/2016

8/23/2016

8/25/2016
85,976
0
85,976

8/26/2016
85,976
0
85,976

8/27/2016
85,976
0
85,976

SEMANA
767,871
0
767,871

85,976

85,976

85,976

8/23/2016

8/24/2016

8/25/2016

BLOQUES

VOLUMEN (X1000)

DENSIDAD
(G/Tn)

3505099-113
3505100-118
3505100-119
3505102-178
TOTAL

147
102
47
12
307

2.5
2.5
2.5
2.5
2.50

STOCK DESMONTE

767,871

PLAN SEMANAL
N SEMANAS
DIAS

566,313
1.4
9

TONELAJE
(Tn)
366,427
253,902
116,599
30,943
767,871

Cu
(%)

TIPO
MATERIAL

0.012
0.001
0.001
0.015
0.007

DESMONTE
DESMONTE
DESMONTE
DESMONTE
DESMONTE

PLAN DE PERFORACIN
PRECORTE
BUFFER
FILAS DE 7 TAL PRODUCCION
RENDIMIENTO DE PERFORADORA PRODUCCIN
RENDIMIENTO DE PERFORADORA PRECORTE
RENDIMIENTO DE PERFORADORA BUFFER
HORAS TOTALES PERFORACION PRODUCCION
HORAS TOTALES PERFORACION PRECORTE
HORAS TOTALES PERFORACION BUFFER
DIAS PERFORACION PRODUCCION
DIAS DE PERFORACION PRECORTE
DIAS PERFORACION BUFFER

N
TALADROS
42
28
18
1 Tal
1 Tal
1 Tal
31.5
21
14
1
1
1

N
TALADROS
42
28
126
/15 min
/30 min
/30 min
Hrs
Hrs
Hrs
DIAS
DIAS
DIAS

FECHA
EQUIPO
PERF-07
%DM PERF

8/19/2016
viernes
0.50
0.50

HORAS DE MANTENIMIENTO DE
8/20/2016
8/21/2016
sbado
domingo
0.50
0.50
0.50
0.50

FECHA
EQUIPO
PERF-07
%DM PERF

8/19/2016
viernes
98%
98%

DISPONIBILIDAD MECANICA DE L
8/20/2016
8/21/2016
sbado
domingo
98%
98%
98%
98%

FECHA
EQUIPO
HRS
TOTAL HRS

8/19/2016
viernes
21.00
21.00

HORAS DE USO DE LA PER


8/20/2016
8/21/2016
sbado
domingo
14.00
23.50
14.00
23.50

FECHA
EQUIPO
PERF-07
%UDM PERF

8/19/2016
viernes
89%
89%

USO DE LA DISPONIBILIDAD MECANIC


8/20/2016
8/21/2016
sbado
domingo
60%
100%
60%
100%

8/19/2016
viernes
88%
88%

UTILIZACIN DE LA PERF
8/21/2016
domingo
98%
98%

FECHA
EQUIPO
PERF-07
%U PERF

8/20/2016
sbado
58%
58%

MANTENIMIENTO DE LA PERFORADORA-07
8/22/2016
8/23/2016
8/24/2016
lunes
martes
mircoles
0.50
24.00
24.00
0.50
24.00
24.00

8/25/2016
TOTAL HRAS
jueves
24.00
74.00
24.00
74.00

IDAD MECANICA DE LA PERFORADORA-07


8/22/2016
8/23/2016
8/24/2016
lunes
martes
mircoles
98%
0%
0%
98%
0%
0%

8/25/2016
jueves
0%
0%

AS DE USO DE LA PERFORADORA-07
8/22/2016
8/23/2016
8/24/2016
lunes
martes
mircoles
8.00
0.00
0.00
8.00
0.00
0.00

8/25/2016
jueves
0.00
0.00

ONIBILIDAD MECANICA DE LA PERFORADORA-07


8/22/2016
8/23/2016
8/24/2016
lunes
martes
mircoles
34%
0%
0%
34%
0%
0%

8/25/2016
jueves
0%
0%

LIZACIN DE LA PERFORADORA-07
8/22/2016
8/23/2016
lunes
martes
33%
0%
33%
0%

8/25/2016
jueves
0%
0%

8/24/2016
mircoles
0%
0%

TOTAL
56%
56%

TOTAL
66.50
66.50

TOTAL
71%
71%

TOTAL
40%
40%

SECUE
DIAS
FECHAS
PRODUCCION DE DESMONTE
PERFORACION TALADROS - PRODUCCION
PERFORACION TALADROS - BUFFER
PERFORACION TALADROS - PRECORTE
PREPARACION Y DISPARO DE VOLADURA

DIAS
FECHAS
HRS EFFECTIVAS DE PRODUCCION DE DESMONTE
HRS EFECTIVAS PERFORACION TALADROS - PRODUCCION
HRS EFECTIVAS PERFORACION TALADROS - BUFFER
HRS EFECTIVAS PERFORACION TALADROS - PRECORTE
PREPARACION Y DISPARO DE VOLADURA

DIAS
FECHAS
PRODUCCION DE DESMONTE (TMS)
PERFORACION TALADROS - PRODUCCION (TAL)
PERFORACION TALADROS - BUFFER (TAL)
PERFORACION TALADROS - PRECORTE (TAL)
PREPARACION Y DISPARO DE VOLADURA

SECUENCIA DE ACTIVIDADES
viernes
sbado
domingo
lunes
8/19/2016
8/20/2016
8/21/2016
8/22/2016

viernes
8/19/2016
22.80

HORAS
sbado
domingo
8/20/2016
8/21/2016
22.80
22.80
31.50
14.00

lunes
8/22/2016
21.00

martes
8/23/2016

mircoles
8/24/2016

martes
8/23/2016
22.80

mircoles
8/24/2016
22.80

martes
8/23/2016
85976.17

mircoles
8/24/2016
85976.17

21.00
3.00

viernes
8/19/2016
85976.17

PRODUCCION
sbado
domingo
8/20/2016
8/21/2016
85976.17
85976.17
126.00
28.00

lunes
8/22/2016
80061.19

42.00
1.00

jueves
8/25/2016

viernes
8/26/2016

sbado
8/27/2016

jueves
8/25/2016
22.80

viernes
8/26/2016
22.80

sbado
8/27/2016
22.80

jueves
8/25/2016
85976.17

viernes
8/26/2016
85976.17

sbado
8/27/2016
85976.17

También podría gustarte