OBRAS DE SANEAMIENTO

L.C1

L.C.2

L.A

PARAMETROS:

Clima clido, rea de lotes <90m2


Poblacin futura de 23000 habitantes
Zona comercial o industrial
Periodo de diseo de 20 aos
Dotacin: 150litros/hab. x da

Variacin de consumo

0.6< velocidad <3 m/ s

K 1=1.3 K 2=2.0

DISEO:
Agua contra incendio : 30l/s
Calculamos ahora

Qm

l
hab . dia
=39.931 l /seg
86400 seg

23000 hab150
Q m=

Qmd=k 1Qm =1.339.931=51.9103l/ seg


Qmh=k 2Qm=2.039.931=74.862 l/seg

HACIENDO UNA COMPARACION ENTRE:

79.862VS 81.9103

INGENIERIA CIVIL

Pgina 1

Q mh VS (Q md +30)

OBRAS DE SANEAMIENTO

CAUDAL QUE PASA POR LA LINEA DE ADUCCION

81.9103 l/seg

DIAMETROS COMERCIALES DE TUBERIA DE PVC: 1/2,3/4, 1 ,2 ,


3 ,4 ,6 ,8 ,10 ,12 ,14.

APLICAMOS HAZEN Y WILLIAMS

Q=0.0004264 C D 2.63 S0.54 DONDE C=140

PARA LA LINEA DE CONDUCCION 1 :

S=50 m/ Km

Reemplazando:

51.9103=0.0004264( 140 ) D2.63 (500.54 )


D1=5.872 pulg 6 pulg

PARA LA LINEA DE CONDUCCION 2:

S=

200190
=50 m/ Km
0.2

Reemplazando:
2.63
0.54
51.9103=0.0004264( 140 ) D (50 )

D 2=5.872 pulg 6 pulg

PARA LA LINEA DE ADUCCION:

S=

190170
=40 m/ Km
0.5

Reemplazando:

81.9103=0.0004264 (140 ) D 2.63 (400.54 )


D3=7.314 pulg 8 pulg

Volumen diario : 150 hab . dia 23000 hab .=3450000 l/dia=3450 m

Volumen del reservorio:

INGENIERIA CIVIL

25 volumen diario=0.253450=862.5 m3

Pgina 2

OBRAS DE SANEAMIENTO

CALCULO DE LAS PRDIDAS DE CARGA PARA CADA


TRAMO
1) TRAMO F PT
D=6 plg=0.1524 m

L=1 Km

C=140

T =25 C

=8.94107 m2 /seg

=0.0015 mm

Q=0.0004264 C D2.63 S0.54


Q=0.0004264 (140)(6)2.63

50
1

0.54

( )

Q=54.94 < seg

Entonces:
Q= AV
V =Q / A

V =3 .01 m/seg

R=VD /

INGENIERIA CIVIL

Pgina 3

OBRAS DE SANEAMIENTO

R=513114

2.51
=2 log
+
3.71 D R f
f

f =0. 013

h f =f

L V2
D 2g
h f =39.4 m

h L25 0=K e

V2
2g

K e =0.5

h L25 0=0. 23 m

V2
h L200 =K s
2g

K s =1

h L200 =0. 46 m

2) TRAMO PT R
D=6 plg=0.1524 m

L=0.20 Km

C=140

T =25 C =8.94107 m2 / seg

Q=0.0004264 C D

2.63

=0.0015 mm

0.54

Q=0.0004264 (140)(6)2.63

10
0.20

0.54

( )

Q=54.94 < seg

INGENIERIA CIVIL

Pgina 4

OBRAS DE SANEAMIENTO

Entonces:
Q= AV
V =Q / A

V =3.01 m/seg

R=VD /
R=513114

2.51
=2 log
+
3.71 D R f
f

f =0.013

h f =f

L V2
D 2g
h f =39.4 m
2

h L20 0=K e

V
2g

K e =0.5

h L20 0=0.23 m

h L19 0=K s

V2
2g

K s =1

h L19 0=0.46 m

3) TRAMO RESERVORIO-URBANIZACIN:

INGENIERIA CIVIL

Pgina 5

OBRAS DE SANEAMIENTO

D=8 plg=0.2032 m

L=0.5 Km

C=140

T =25 C
7

=0.0015 mm

=8.9410 m /seg

Q=0.0004264 C D

2.63

0.54

Q=0.0004264 (140)(8)2.63

20
0.50

0.54

( )

Q=103.8< seg

Entonces:
Q= AV
V =Q / A

V =3.2 m/seg

R=VD /
R=727337.8

2.51
=2 log
+
3.71
D
R f
f

f =0.012
2

h f =f

L V
D 2g
h f =15.41 m
2

h L190 =K e

V
2g

K e =0.5

h L190 =0.26 m

INGENIERIA CIVIL

Pgina 6

OBRAS DE SANEAMIENTO
2

h L170 =K s

V
2g

K s =1

h L170 =0.52 m

INGENIERIA CIVIL

Pgina 7