Está en la página 1de 35

PANEL: CONTROL DE AVAN

Apr-22 Apr-22
PRODUCCIÓN TOTAL (INC.
PREVISTO ADICIONALES) TOTAL
AVANCE
MONTO MONTO PUENTES
AMBIENTAL
6,541,872.22 2,364,727.35 36%
TRANSPORTE
O. COMPLEMENTARIAS
Gráfico Comparativo: Proyección vs. Ejecutado DRENAJE
7.00 MM 6.54 MM
PAVIMENTOS
MOVIMIENTO DE TIERRAS
6.00 MM 0.00

5.00 MM

4.00 MM TOTAL
PUENTES
3.00 MM AMBIENTAL
2.36 MM TRANSPORTE
2.00 MM O. COMPLEMENTARIAS
DRENAJE
1.00 MM PAVIMENTOS
MOVIMIENTO DE TIERRAS
0.00 MM 0
CR20
L: CONTROL DE AVANCE DE OBRA

PRODUCCIÓN TOTAL POR ÁREAS


TOTAL 2.36 MM
PUENTES 0.00 MM
AMBIENTAL 0.07 MM
TRANSPORTE 0.11 MM
O. COMPLEMENTARIAS 0.02 MM
DRENAJE 1.10 MM
PAVIMENTOS 0.55 MM
MOVIMIENTO DE TIERRAS 0.46 MM
0.00 MM 2.00 MM 4.00 MM 6.00 MM 8.00 MM 10.00 MM

AVANCE TOTAL POR AREAS


TOTAL 36%
PUENTES
AMBIENTAL 44%
TRANSPORTE 29%
O. COMPLEMENTARIAS 4%
DRENAJE 38%
PAVIMENTOS 39%
MOVIMIENTO DE TIERRAS 38%
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
10.00 MM

90% 100%
Apr-22 Apr-22 Apr-22

P.U. PRODUCCIÓN TOTAL (INC.


PREVISTO CR20
DESCRIPCION UND. CONTRATO ADICIONALES) AVANCE
(S/.) CANT. MONTO CANT. MONTO CANT. MONTO

TRAMO I: Abr-2022 6,541,872.22 2,364,727.35 2,364,727.35 36%


MOVIMIENTO DE TIERRAS 1,201,960.00 458,654.79 458,654.79 38%
EXCAVACION EN ROCA FIJA M3 26.14 21,840.00 570,897.60 11,359.66 296,941.47 11,359.66 296,941.47 52%
EXCAVACION EN ROCA SUELTA M3 14.72 24,960.00 367,411.20 4,896.86 72,081.75 4,896.86 72,081.75 20%
EXCAVACION EN MATERIAL SUELTO M3 3.86 33,280.00 128,460.80 16,451.60 63,503.16 16,451.60 63,503.16 49%
REMOCION DE DERRUMBES M3 7.20 10,000.00 72,000.00 3,220.00 23,184.00 3,220.00 23,184.00 32%
TERRAPLENES M3 8.68 3,640.00 31,595.20 - - - - 0%
PERFILADO Y COMPACTADO DE SUBRASANTE EN ZONAS DE CORTE M2 1.75 - - 1,682.52 2,944.41 1,682.52 2,944.41
MATERIAL DE CANTERA PARA RELLENOS M3 8.68 3,640.00 31,595.20 - - - - 0%
PAVIMENTOS 1,421,300.92 554,297.36 554,297.36 39%
CAPAS ANTICONTAMINANTES SUBBASES Y BASES - 57,469.94 - 52,431.03 52,431.03 91%
BASE GRANULAR M3 54.65 1,051.60 57,469.94 959.40 52,431.03 959.40 52,431.03 91%
PAVIMENTOS FLEXIBLES - 1,363,830.98 - 501,866.33 501,866.33 37%
IMPRIMACION ASFALTICA M2 1.12 32,650.00 36,568.00 7,106.55 7,959.34 7,106.55 7,959.34 22%
PAVIMENTO DE CONCRETO ASFALTICO CALIENTE M3 257.03 2,307.14 593,004.19 877.49 225,540.90 877.49 225,540.90 38%
CEMENTO ASFALTICO KG 1.94 312,322.16 605,904.98 118,787.39 230,447.54 118,787.39 230,447.54 38%
ASFALTOS LÍQUIDOS L 1.90 35,262.00 66,997.80 7,675.07 14,582.64 7,675.07 14,582.64 22%
FILLER KG 1.09 53,848.65 58,695.03 20,480.58 22,323.84 20,480.58 22,323.84 38%
MEJORADORES DE ADHERENCIA KG 2.13 1,249.29 2,660.98 475.15 1,012.07 475.15 1,012.07 38%
DRENAJE 2,875,094.76 1,103,385.68 1,103,385.68 38%
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 17.10 4,668.72 79,835.11 2,544.32 43,507.93 2,544.32 43,507.93 54%
RELLENOS PARA ESTRUCTURAS M3 55.37 2,829.25 156,655.77 1,620.51 89,727.64 1,620.51 89,727.64 57%
RELLENO PARA SUELO REFORZADO M3 122.21 891.83 108,990.54 - - - - 0%
CONCRETO CLASE C (F'C = 280 KG/CM2) M3 639.21 598.07 382,293.05 168.74 107,862.37 168.74 107,862.37 28%
CONCRETO CLASE D (F'C = 210 KG/CM2) M3 606.66 550.29 333,839.60 278.60 169,017.34 278.60 169,017.34 51%
CONCRETO CLASE E (F'C = 175 KG/CM2) M3 587.13 93.73 55,034.37 10.68 6,267.82 10.68 6,267.82 11%
CONCRETO CLASE F (F'C = 140 KG/CM2) M3 574.11 41.59 23,877.23 - - - - 0%
CONCRETO CLASE G (F'C = 140 KG/CM2 + 25%PM) M3 549.12 364.49 200,148.20 100.50 55,187.99 100.50 55,187.99 28%
CONCRETO CLASE H (F'C = 100 KG/CM2) M3 543.73 128.23 69,720.92 65.59 35,662.82 65.59 35,662.82 51%
ENCOFRADO Y DESENCOFRADO M2 63.88 3,480.25 222,318.32 1,589.17 101,516.32 1,589.17 101,516.32 46%
ACERO DE REFUERZO KG 5.57 91,693.45 510,732.53 40,267.85 224,291.94 40,267.85 224,291.94 44%
CUNETAS REVESTIDAS EN CONCRETO TIPO C1 M 210.06 880.00 184,852.80 676.65 142,137.10 676.65 142,137.10 77%
CUNETAS REVESTIDAS EN CONCRETO TIPO C2 M 671.92 500.00 335,960.00 17.10 11,492.39 17.10 11,492.39 3%
GEOTEXTIL NO TEJIDO CLASE 1 M2 10.19 - - 2,459.02 25,057.38 2,459.02 25,057.38
GEOTEXTIL NO TEJIDO CLASE 2 M2 19.40 1,578.02 30,613.59 843.85 16,370.73 843.85 16,370.73 53%
TUBERIA PERFORADA DE PVC-SAP D=3" M 21.81 231.69 5,053.10 112.08 2,444.40 112.08 2,444.40 48%
TUBERIA PERFORADA DE PVC-SAP D=6" M 83.17 504.52 41,960.93 244.77 20,357.52 244.77 20,357.52 49%
JUNTA PARA MUROS M2 17.33 146.98 2,547.16 25.55 442.87 25.55 442.87 17%
JUNTA PARA BADENES M 17.33 607.63 10,530.23 - - - - 0%
JUNTA UNION LOSA-EMBOQUILLADO M 17.33 459.81 7,968.51 - - - - 0%
GEOCOMPUESTO DE DRENAJE M2 34.80 71.60 2,491.68 - - - - 0%
TUBERIA TMC ø=48" M 593.48 76.14 45,187.57 30.78 18,267.31 30.78 18,267.31 40%
FILTRO DRENANTE M3 169.50 365.59 61,968.35 199.26 33,773.81 199.26 33,773.81 55%
MALLA ELECTROSOLDADA M2 15.72 160.00 2,515.20 - - - - 0%
OBRAS COMPLEMENTARIAS 489,043.68 17,186.12 17,186.12 4%
EMBOQUILLADO DE PIEDRA E=0.15 M. M2 80.86 236.62 19,132.85 39.60 3,202.36 39.60 3,202.36 17%
EMBOQUILLADO DE PIEDRA E=0.20 M. M2 107.73 467.52 50,365.93 4.87 524.65 4.87 524.65 1%
PIEDRA ASENTADA M3 651.29 493.47 321,392.08 19.47 12,683.22 19.47 12,683.22 4%
DEMOLICION DE ESTRUCTURAS M3 228.54 3.40 775.89 3.40 775.89 3.40 775.89 100%
ELEMENTO MURO DE SUELO REFORZADO M3 122.21 796.80 97,376.93 - - - - 0%
TRANSPORTE 387,105.66 113,858.48 113,858.48 29%
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 M. Y 1,000 M. m3k 1.09 4,128.61 4,500.18 2,270.32 2,474.65 2,270.32 2,474.65 55%
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1,000 M. m3k 0.71 70,374.00 49,965.54 7,537.38 5,351.54 7,537.38 5,351.54 11%
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS ENTRE 120 M. Y 1,000 M. m3k 1.09 70,470.40 76,812.74 31,022.14 33,814.14 31,022.14 33,814.14 44%
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE 1,000 M. m3k 0.71 320,320.00 227,427.20 75,593.52 53,671.40 75,593.52 53,671.40 24%
TRANSPORTE DE MEZCLAS ASFALTICAS PARA DISTANCIAS HASTA 1,000 M. m3k 1.70 - - 877.49 1,491.73 877.49 1,491.73
TRANSPORTE DE MEZCLAS ASFALTICAS PARA DISTANCIAS MAYORES DE 1,000 M. m3k 0.83 - - 12,284.84 10,196.42 12,284.84 10,196.42
TRANSPORTE DE MATERIAL DE DERRUMBES PARA DISTANCIAS MAYORES DE 1,000 M m3k 0.71 40,000.00 28,400.00 9,660.00 6,858.60 9,660.00 6,858.60 24%
PROTECCIÓN AMBIENTAL 167,367.20 73,677.59 73,677.59 44%
PROGRAMA DE ABANDONO DE OBRA - 167,367.20 - 73,677.59 73,677.59 44%
DISPOSICION Y CONFORMACION DE DEPOSITOS DE MATERIAL EXCEDENTE m3 2.09 80,080.00 167,367.20 35,252.44 73,677.59 35,252.44 73,677.59 44%
PARTIDAS NUEVAS - 43,667.33 43,667.33
Apr-22 Apr-22 Apr-22

P.U. PRODUCCIÓN TOTAL (INC.


PREVISTO CR20
DESCRIPCION UND. CONTRATO ADICIONALES) AVANCE
(S/.) CANT. MONTO CANT. MONTO CANT. MONTO
Riego de Liga m2 1.12 - - 20,391.00 22,837.92 20,391.00 22,837.92
Emulsion Asfaltica L 2.27 - - 9,175.95 20,829.41 9,175.95 20,829.41

COSTO DIRECTO S/ 6,541,872.22 S/ 2,364,727.35 S/ 2,364,727.35 36%


PREVISTO 6,541,872.22
INCIDENCIA 36.1%
P.U.
ITEM DESCRIPCION UND. CONTRATO
(S/.)

200 MOVIMIENTO DE TIERRAS


202.A EXCAVACION EN ROCA FIJA M3 26.14
202.B EXCAVACION EN ROCA SUELTA M3 14.72
202.C EXCAVACION EN MATERIAL SUELTO M3 3.86
203.A REMOCION DE DERRUMBES M3 7.20
205. A TERRAPLENES M3 8.68
210.A PERFILADO Y COMPACTADO DE SUBRASANTE EN ZONAS DE CORTE M2 1.75
211.A MATERIAL DE CANTERA PARA RELLENOS M3 8.68
400 PAVIMENTOS
400 CAPAS ANTICONTAMINANTES SUBBASES Y BASES
403.A BASE GRANULAR M3 54.65
400 PAVIMENTOS FLEXIBLES
416.A IMPRIMACION ASFALTICA M2 1.12
423.A PAVIMENTO DE CONCRETO ASFALTICO CALIENTE M3 257.03
426.A CEMENTO ASFALTICO KG 1.94
428.A ASFALTOS LÍQUIDOS L 1.90
429.A FILLER KG 1.09
430.A MEJORADORES DE ADHERENCIA KG 2.13
500 DRENAJE
501.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS M3 17.10
502.A RELLENOS PARA ESTRUCTURAS M3 55.37
502.B RELLENO PARA SUELO REFORZADO M3 122.21
503.C CONCRETO CLASE C (F'C = 280 KG/CM2) M3 639.21
503.D CONCRETO CLASE D (F'C = 210 KG/CM2) M3 606.66
503.E CONCRETO CLASE E (F'C = 175 KG/CM2) M3 587.13
503.F CONCRETO CLASE F (F'C = 140 KG/CM2) M3 574.11
503.G1 CONCRETO CLASE G (F'C = 140 KG/CM2 + 25%PM) M3 549.12
503.H CONCRETO CLASE H (F'C = 100 KG/CM2) M3 543.73
503.I ENCOFRADO Y DESENCOFRADO M2 63.88
504.A ACERO DE REFUERZO KG 5.57
510.A1 CUNETAS REVESTIDAS EN CONCRETO TIPO C1 M 210.06
510.A2 CUNETAS REVESTIDAS EN CONCRETO TIPO C2 M 671.92
511.A1 GEOTEXTIL NO TEJIDO CLASE 1 M2 10.19
511.A2 GEOTEXTIL NO TEJIDO CLASE 2 M2 19.40
515.A TUBERIA PERFORADA DE PVC-SAP D=3" M 21.81
515.D TUBERIA PERFORADA DE PVC-SAP D=6" M 83.17
516.A JUNTA PARA MUROS M2 17.33
516.B JUNTA PARA BADENES M 17.33
516.C JUNTA UNION LOSA-EMBOQUILLADO M 17.33
518.A GEOCOMPUESTO DE DRENAJE M2 34.80
519.A TUBERIA TMC ø=48" M 593.48
523.A FILTRO DRENANTE M3 169.50
524.A MALLA ELECTROSOLDADA M2 15.72
600 OBRAS COMPLEMENTARIAS
601.B EMBOQUILLADO DE PIEDRA E=0.15 M. M2 80.86
601.C EMBOQUILLADO DE PIEDRA E=0.20 M. M2 107.73
601.D PIEDRA ASENTADA M3 651.29
604.F DEMOLICION DE ESTRUCTURAS M3 228.54
606.A ELEMENTO MURO DE SUELO REFORZADO M3 122.21
700 TRANSPORTE
700.A TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 M. Y 1,00 m3k 1.09
700.B TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1,000 M m3k 0.71
700.C TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS ENTRE 120 M. Y 1,000 m3k 1.09
700.D TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE 1,000 M m3k 0.71
700.E TRANSPORTE DE MEZCLAS ASFALTICAS PARA DISTANCIAS HASTA 1,000 M. m3k 1.70
700.F TRANSPORTE DE MEZCLAS ASFALTICAS PARA DISTANCIAS MAYORES DE 1,000 M. m3k 0.83
700.I TRANSPORTE DE MATERIAL DE DERRUMBES PARA DISTANCIAS MAYORES DE 1,000 m3k 0.71
900 PROTECCIÓN AMBIENTAL
910 PROGRAMA DE ABANDONO DE OBRA
901.A DISPOSICION Y CONFORMACION DE DEPOSITOS DE MATERIAL EXCEDENTE m3 2.09

COSTO DIRECTO
Apr-22

PREVISTO
31/03/22 al 06/04/22

CANT. MONTO 31-Mar 1-Apr 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr CANT.
6,541,872.22
1,201,960.00
21,840.00 570,897.60 191.90 1,338.92 920.03 607.55 3,058.39
24,960.00 367,411.20 379.00 164.67 543.67
33,280.00 128,460.80 1,979.93 607.70 836.98 946.62 4,371.2
10,000.00 72,000.00 410.00 831.67 315.83 1,557.50
3,640.00 31,595.20 -
- - 139.90 139.90
3,640.00 31,595.20 - - - - - - - -
1,421,300.92
57,469.94 -
1,051.60 57,469.94 116.67 110.00 65.61 94.17 386.45
1,363,830.98 -
32,650.00 36,568.00 1,249.80 1,249.80
2,307.14 593,004.19 -
312,322.16 605,904.98 - - - - - - - -
35,262.00 66,997.80 - - - - - - 1,349.78 1,349.78
53,848.65 58,695.03 - - - - - - - -
1,249.29 2,660.98 - - - - - - - -
2,875,094.76
4,668.72 79,835.11 -
2,829.25 156,655.77 -
891.83 108,990.54 -
598.07 382,293.05 -
550.29 333,839.60 -
93.73 55,034.37 -
41.59 23,877.23 -
364.49 200,148.20 -
128.23 69,720.92 -
3,480.25 222,318.32 -
91,693.45 510,732.53 -
880.00 184,852.80 -
500.00 335,960.00 -
- - -
1,578.02 30,613.59 -
231.69 5,053.10 -
504.52 41,960.93 -
146.98 2,547.16 -
607.63 10,530.23 -
459.81 7,968.51 -
71.60 2,491.68 -
76.14 45,187.57 -
365.59 61,968.35 -
160.00 2,515.20 -
489,043.68
236.62 19,132.85 -
467.52 50,365.93 -
493.47 321,392.08 -
3.40 775.89 -
796.80 97,376.93 -
387,105.66
4,128.61 4,500.18 102.67 96.80 - - 57.74 - 82.87 340.07
70,374.00 49,965.54 128.33 121.00 - - 72.17 - 103.59 425.09
70,470.40 76,812.74 2,244.73 1,857.93 1,546.16 - - - 1,367.67 7,016.49
320,320.00 227,427.20 5,101.67 4,222.56 3,514.00 - - - 3,108.33 15,946.56
- - - - - - - - - -
- - - - - - - - - -
40,000.00 28,400.00 1,230.00 2,495.00 947.50 - - - - 4,672.50
167,367.20
167,367.20 -
80,080.00 167,367.20 2,550.83 2,111.28 1,757.00 - - - 1,554.17 7,973.28
6,541,872.22
PRODU

07/04/22 al 13/04/22 14/04/22 al 2

7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr CANT. 14-Apr 15-Apr 16-Apr

210.17 953.19 631.86 762.50 3,091.15 5,648.87 1,232.00


619.50 1,423.92 147.38 261.25 2,452.04 325.38
1,895.50 648.48 1,305.06 2,353.13 660.93 6,863.1 1,398.46
619.17 91.67 308.33 1,019.17 476.67

-
651.89 444.08 1,095.97 123.78
- - - - - - - - - - -

-
541.05 541.05
-
- 1,249.80 - 1,114.95 2,271.50 4,636.25 1,220.50
160.72 60.58 197.24 418.54
- - 21,756.99 8,200.84 26,700.28 - - 56,658.1 - - -
- 1,349.78 - - - 1,204.15 2,453.22 5,007.15 1,318.14 - -
- - 3,751.20 1,413.94 4,603.50 - - 9,768.64 - - -
- - 87.03 32.80 106.80 - - 226.63 - - -

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

- - 476.12 - - - - 476.12 - - -
- - 595.15 - - - - 595.15 - - -
- 1,852.99 1,954.63 - 2,957.53 2,871.44 3,531.73 13,168.32 2,601.13 - -
- 4,211.33 4,442.33 - 6,721.67 6,526.00 8,026.67 29,928.00 5,911.67 - -
- - 160.72 60.58 197.24 - - 418.54 - - -
- - 2,250.08 848.12 2,761.31 - - 5,859.51 - - -
- 1,857.50 275.00 - 925.00 - - 3,057.50 1,430.00 - -

-
- 2,105.67 2,221.17 - 3,360.83 3,263.00 4,013.33 14,964.00 2,955.83 - -
PRODUCCIÓN

14/04/22 al 20/04/22 21/04/22 al 27/04/22

17-Apr 18-Apr 19-Apr 20-Apr CANT. 21-Apr 22-Apr 23-Apr 24-Apr 25-Apr 26-Apr

625.89 428.80 365.71 2,652.40


344.52 701.47 529.79 1,901.15
883.76 1,262.23 1,672.83 5,217.28
166.67 643.33
-
104.78 218.10 446.66
- - - - - - - - - - -

-
31.90 - 31.90
-
1,220.50
112.87 222.25 123.83 458.95
- 15,279.81 30,087.04 16,762.44 62,129.29 - - - - - -
- - - - 1,318.14 - - - - - -
- 2,634.45 5,187.42 2,890.08 10,711.95 - - - - - -
- 61.12 120.35 67.05 248.52 - - - - - -

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

- 28.07 - - 28.07 - - - - - -
- 35.09 - - 35.09 - - - - - -
- 1,631.67 2,105.40 2,260.13 8,598.33 - - - - - -
- 3,708.33 4,785.00 5,136.67 19,541.67 - - - - - -
- 112.87 222.25 123.83 458.95 - - - - - -
- 1,580.22 3,111.56 1,733.55 6,425.33 - - - - - -
- - - 500.00 1,930.00 - - - - - -

-
- 1,854.17 2,392.50 2,568.33 9,770.83 - - - - - -
4/22 28/04/22 al 04/05/22

27-Apr CANT. 28-Apr 29-Apr 30-Apr 1-May 2-May 3-May 4-May CANT.

- -
- -
- -
- -
- -
- -
- - - - - - - - - -

- -
- -
- -
- -
- -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -

- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

- -
- - - - - - - - - -
Apr-22

31/03/22 al 06/04/22

TMC MC MURO BADEN D. RIB.ENR.DME DIQ.DME SUBD PUENTE CUNETAS


CUNETA-ZANJA
DEM.REP DME
Y LIMP DE CUNETAS

21.67 - 57.87 - - - - - - -
13.03 56.45 - - - - - - - -
- - - - - - - - - -
- - - 10.30 - - - - - -
- - 8.80 - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - 7.96 - - - - - - -
- 0.67 1.75 0.26 - - - - - -
- - 51.64 - - - - - - -
- - - - - - - - - -
- - - - - - - - - 280.00
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - 7.70 - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
6.48 - - - - - - - - -

- - - -
-
-
-
- - - - -
- - - - -
- - - -
11.47 49.67 - - - - - -
52.13 225.79 - - - - - -
19.07 - 50.93 - - - - -
86.68 - 231.48 - - - - -

- - - -
- - - -
21.67 - 57.87 - - - - -
Apr-22

07/04/22 al 13/04/22

CANT. TMC MC MURO BADEN D. RIB.ENR.DME DIQ.DME SUBD PUENTE CUNETAS


CUNETA-ZANJA DME

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
79.54 75.14 - 1,256.58 41.99 - -
69.48 94.89 - 936.11 - - -
- - - - - - -
10.30 - - - 117.28 - -
8.80 - 9.87 141.77 - - -
- 5.12 3.25 - - - -
- - - - - - -
7.96 - - 75.35 - - -
2.67 - - 12.73 10.43 - -
51.64 17.50 81.00 571.68 92.96 - -
- - 1,376.58 9,061.26 9,102.45 - -
280.00 - - - - - - 148.90
- - - - - - - 17.10
- - - - - - ### -
- - - 531.03 - - - -
7.70 - - 30.80 - - - -
- - - 155.77 - - - -
- - - 25.55 - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
6.48 12.56 - - - - - -
- - - 125.40 - - - -
- - - - - - - -
- -
- 32.22 - -
- - 4.87 -
- - - -
- - 3.40 - - -
- - - - - -
-
61.14 83.50 - 823.78 - - - - -
277.92 379.56 - 3,744.45 - - - - -
69.99 66.13 - 1,105.79 36.95 - - - -
318.15 300.57 - 5,026.32 167.96 - - - -
-
-
-
-
-
79.54 75.14 - 1,256.58 41.99 - - - -
OBRAS DE ARTE

14/04/22 al 20/04/22

DEM.REP Y LIMP DE CUNETAS


CANT. TMC MC MURO BADEN D. RIB.ENR.DME DIQ.DME SUBD PUENTE CUNETAS
CUNETA-ZANJA DME

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,373.71 93.27 40.10 910.26 47.45 - - - - - -
1,031.00 27.31 4.24 488.48 - - - - - - -
- - - - - - - - - - -
117.28 - - - 41.16 - - - - - -
151.64 - 15.23 102.94 - - - - - - -
8.37 2.30 - - - - - - - - -
- - - - - - - - - - -
75.35 - - 17.19 - - - - - - -
23.15 - - 21.27 18.49 - - - - - -
763.15 10.66 66.69 634.42 62.62 - - - - - -
19,540.29 - ### ### 6,648.23 - - - - - -
148.90 - - - - - - - - - 247.75
17.10 - - - - - - - - - -
2,336.07 - - - - - 122.95 - - - -
531.03 - - 312.82 - - - - - - -
30.80 - 0.04 73.54 - - - - - - -
155.77 - - 88.99 - - - - - - -
25.55 - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
12.56 11.75 - - - - - - - - -
125.40 - - 73.85 - - - - - - -
- - - - - - - - - - -
-
32.22 7.38 - - - - - - - -
4.87 - - - - - - - - - -
- - - - 19.47 - - - - - -
3.40
-
-
907.28 24.04 3.73 429.86 - - - - -
4,124.00 ### 16.94 ### - - - - -
1,208.87 82.08 35.28 801.03 41.76 - - - -
5,494.86 ### ### ### 189.80 - - - -
-
-
-
-
-
1,373.71 93.27 40.10 910.26 47.45 - - - -
21/04/22 al 27/04/22

DEM.REP Y LIMP DE CUNETAS


CANT. TMC MC MURO BADEN D. RIB.ENR.DME
DIQ.DMESUBD PUENTE CUNETAS

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,091.07
520.03
-
41.16
118.17
2.30
-
17.19
39.76
774.38
20,727.56
247.75
-
122.95
312.82
73.58
88.99
-
-
-
-
11.75
73.85
- - - - - - -
-
7.38
-
19.47
-
-
-
457.63 - - - - - - - -
2,080.12 - - - - - - - -
960.14 - - - - - - - -
4,364.28 - - - - - - - -
-
-
-
-
-
1,091.07 - - - - - - - -
28/04/22 al 04/05/22

CUNETA-ZANJA
DEM.REP DME
Y LIMP DE CUNETAS
CANT. TMC MC MURO BADEN D. RIB.ENR.DME
DIQ.DMESUBD PUENTE

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - - - - - -
- - - - - - - - -
-
-
-
-
-
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
-
-
-
-
-
- - - - - - - -
PRODUCCIÓN TOTAL (INC. ADICIONALES)
5/22 % AVANCE

CUNETAS
CUNETA-ZANJA
DEM.REP DME
Y LIMP DE CUNETAS
CANT. CANT. MONTO
2,321,060.02 35.48%
- - 458,654.79 38.16%
- 11,359.66 296,941.47 52.01%
- 4,896.86 72,081.75 19.62%
- 16,451.60 63,503.16 49.43%
- 3,220.00 23,184.00 32.20%
- - - 0.00%
- 1,682.52 2,944.41
- - - 0.00%
- - 554,297.36 39.00%
- - 52,431.03 91.23%
- 959.40 52,431.03 91.23%
- - 501,866.33 36.80%
- 7,106.55 7,959.34 21.77%
- 877.49 225,540.90 38.03%
- 118,787.39 230,447.54 38.03%
- 7,675.07 14,582.64 21.77%
- 20,480.58 22,323.84 38.03%
- 475.15 1,012.07 38.03%
- - 1,103,385.68 38.38%
- 2,544.32 43,507.93 54.50%
- 1,620.51 89,727.64 57.28%
- - - 0.00%
- 168.74 107,862.37 28.21%
- 278.60 169,017.34 50.63%
- 10.68 6,267.82 11.39%
- - - 0.00%
- 100.50 55,187.99 27.57%
- 65.59 35,662.82 51.15%
- 1,589.17 101,516.32 45.66%
- 40,267.85 224,291.94 43.92%
- 676.65 142,137.10 76.89%
- 17.10 11,492.39 3.42%
- 2,459.02 25,057.38
- 843.85 16,370.73 53.48%
- 112.08 2,444.40 48.37%
- 244.77 20,357.52 48.52%
- 25.55 442.87 17.39%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- 30.78 18,267.31 40.43%
- 199.26 33,773.81 54.50%
- - - 0.00%
- - - 17,186.12 3.51%
- - 39.60 3,202.36 16.74%
- 4.87 524.65 1.04%
- 19.47 12,683.22 3.95%
- 3.40 775.89 100.00%
- - - 0.00%
- - 113,858.48 29.41%
- - 2,270.32 2,474.65 54.99%
- - 7,537.38 5,351.54 10.71%
- - 31,022.14 33,814.14 44.02%
- - 75,593.52 53,671.40 23.60%
- 877.49 1,491.73
- 12,284.84 10,196.42
- 9,660.00 6,858.60 24.15%
- - 73,677.59 44.02%
- - 73,677.59 44.02%
- - 35,252.44 73,677.59 44.02%
2,321,060.02 35.48%
OBSERVACIONES

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
x
x
x
CANTON

03/03/22 al 09/03/22

TMC MC MURO BADEN SUBD

- - 127.63 -
- - 473.54 -
- - - -
- - - -
- - 11.69 -
- - - -
- - - -
- - 101.59 -
- - 3.35 4.85
- - 268.78 -
- - 371.89 -
- - - -
- - - -
- - - -
- - 279.26 -
- - 36.27 -
- - 81.02 -
- - 15.49 -
- - - -
- - - -
- - - -
- - - -
- - 60.51 -
- - - -
- - - -
- - - -
36.35 79.58 - -
- - - 13.41

- 416.72 - -
- 1,894.16 - -
- 112.32 - -
- 510.54 - -

- - - -

- 127.63 - -
CR20

+ 0

PUENTE TOTAL TMC MC MURO BADEN D. RIB.

127.63 181.41 52.41 204.86 102.34

473.54 32.58 - 125.51 -

- - - - -

- - - - -

11.69 0.75 4.02 231.01 -

- 14.36 - - -

- - - - -

101.59 - - 78.06 -

8.20 - - 8.05 3.29

268.78 70.45 - 741.80 33.68

371.89 66.24 163.84 10,911.25 3,738.58

- - - - -

- - - - -

- - - - -

279.26 - - 196.52 -

36.27 - - 82.07 -

81.02 - - 59.60 -

15.49 - - 6.41 -
- - - - -

- - - - -

- - - - -

- 26.73 - - -

60.51 - - 33.25 -

- - - - -
- - - - -

- 27.28 - - - -

115.93 29.95 - - - -

13.41 26.36 - - - -

- 416.72 28.67 - 110.44 - -

- 1,894.16 130.32 - 502.02 - -

- 112.32 159.64 46.12 180.28 90.05 -

- 510.54 725.65 209.64 819.44 409.34 -

- -

-
- 127.63 181.41 52.41 204.86 102.34 -
03/03/22 al 09/03/22

ENR.DME DIQ.DME SUBD PUENTE CUNETASCUNETA-ZANJA


DEM.REP
DMEY LIMP DE CUNETAS
CANT.

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
541.02
158.09
-
-
235.78
14.36
-
78.06
11.34
845.93
14,879.92
-
-
-
196.52
82.07
59.60
6.41
-
-
-
26.73
33.25
-
- - - -
- - - 27.28
- - - 29.95
- - - 26.36
-
-
-
- - - 139.11
- - - 632.34
- - - 476.10
- - - 2,164.07
-
-
-
-
-