OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
VALORIZACION VALORIZACION
VALORIZACION
CONCEPTOS ACUMULADA ACUMULADA SALDO (S/.)
ACTUAL (S/.)
ANTERIOR (S/.) ACTUAL (S/.)
1.0 VALORIZACION
1.1 MONTO VALORIZACION 0.00 0.00 0.00 4,138,744.30
1.2 REAJUSTE DE VALORIZACIÓN 0.00 0.00 0.00
2.0 AMORTIZACIONES
2.1 ADELANTO DIRECTO 0.00 0.00 0.00 413,874.43
2.2 ADELANTO DE MATERIALES 0.00 30,076.20 30,076.20 0.00
3.0 DEDUCCIONES
3.1 POR EL ADELANTO DIRECTO 0.00 0.00 0.00
3.3 POR EL ADELANTO POR MATERIALES 0.00 0.00 0.00
OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
PRECIO
PRECIO ACUMULADO ANTERIOR AVANCE DEL MES ACUMULADO ACTUAL SALDO
PARTIDA DESCRIPCION UND METRADO UNITARI METRADOVALORIZADO % METRADOVALORIZADO % METRADOVALORIZADO % METRADO VALORIZADO %
PARCIAL S/.
O S/.
OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
Fórmula Polinómica:
K= 0.313 Jr/Jo + 0.106 Mr/Mo + 0.279 CAHr/CAHo + 0.102 Er/Eo +0.200 GUr/GUo
% JUN. 2015 JUL. 2016 AGO. 2016 SET. 2016 OCT. 2016
MON ELEMENTO COEF.
COD. IU MON INICIAL Partic. IU BASE IU K IU K IU K IU K
1 MANO DE OBRA 47 J 0.313 100.00% 523.15 544.59 0.326 0.000 0.000 0.000
2 MADERA NACIONAL PARA ENCOFRADO 43 M 0.106 100.00% 794.10 829.45 0.111 0.000 0.000 0.000
3 CEMENTO PORTLAND TIPO I 21 CAH 0.279 59.61% 389.65 389.65 0.166 0.000 0.000 0.000
AGREGADO GRUESO 05 11.24% 396.59 404.23 0.032 0.000 0.000 0.000
HORMIGON 38 29.15% 861.50 864.73 0.082 0.000 0.000 0.000
4 MAQUINARIA Y EQUIPO IMPORTADO 49 E 0.102 100.00% 268.53 291.08 0.111 0.000 0.000 0.000
5 INDICE GENERAL DE PRECIOS AL CONSUMIDO 39 GU 0.200 100.00% 405.50 419.35 0.207 0.000 0.000 0.000
OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
CUADRO DE REINTEGROS
PROGRAMADO EJECUTADO
Valorización "K" del Mes Reajuste Valorización "K" del Mes Reajuste
MES VAL Nº Valorización Reajuste Valorización Reajuste Reajuste
Programada Programado Ejecutada reconocido
Programada Mes K (K-1) Ejecutada Mes K (K-1) Ejecutado
Acumulada Acumulada
Aug-2016 01 S/. 206,937.22 S/. 206,937.22 JUL. 2016 1.035 0.035 S/. 7,242.80 S/. 0.00 S/. 0.00 JUL. 2016 1.035 0.035 S/. 0.00 S/. 0.00
Sep-2016 02 S/. 413,874.43 S/. 620,811.65
Oct-2016 03 S/. 620,811.65 S/. 1,241,623.29
Nov-2016 04 S/. 827,748.86 S/. 2,069,372.15
Dec-2016 05 S/. 827,748.86 S/. 2,897,121.01
Jan-2017 06 S/. 620,811.65 S/. 3,517,932.66
Feb-2017 07 S/. 413,874.43 S/. 3,931,807.09
Mar-2017 08 S/. 206,937.22 S/. 4,138,744.30
OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
CURVA "S"
Programado vs Ejecutado
100.00%
90.00%
80.00%
70.00%
% de Avance
Acumulado
60.00% Ejecutado
% de Avance
Acumulado
Programado
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
Inicio de obra 42583 42614 42644 42675 42705 42736 42767 42795
Programado Inicio
Aug-2016
de obra Sep-2016 Oct-2016 Nov-2016 Dec-2016 Jan-2017 Feb-2017 Mar-2017
Monto###
mes S/. 206,937.22 S/. 413,874.43 S/. 620,811.65 S/. 827,748.86 S/. 827,748.86 S/. 620,811.65 S/. 413,874.43 S/. 206,937.22
###
Monto Acumulados S/. 206,937.22 S/. 620,811.65 ### ### ### ### ### ###
###
% de avance del mes 5.00% 10.00% 15.00% 20.00% 20.00% 15.00% 10.00% 5.00%
% de Avance Acumulado
###
Programado
5.00% 15.00% 30.00% 50.00% 70.00% 85.00% 95.00% 100.00%
Ejecutado
Monto###
mes S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
###
Monto Acumulados S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
###
% de avance del mes 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% de Avance Acumulado
###
Ejecutado
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00%
VALORIZACION Nº 01 AL 31 DE AGOSTO DEL 2016
OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
Amortización Actual (Agosto 2016) 0.00 Deducción Actual (Agosto 2016) 0.00
VALORIZACION Nº 01 AL 31 DE AGOSTO DEL 2016
OBRA : PROYECTO INTEGRACION VIAL TACNA - LA PAZ, TRAMO: TACNA - COLLPA (FRONTERA CON BOLIVIA) SUB TRAMO: KM 43+610 @ KM 94+000
CONTRATO : 0092-2016-MTC/20
PROPIETARIO : MTC - PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - PROVIAS NACIONAL
CONTRATISTA : INGENIEROS CIVILES Y CONTRATISTAS GENERALES S.A.
SUPERVISION : HOB CONSULTORES S.A.
Formula 01 ESTRUCTURAS
IU 03 Incidencia 0.121
Material Acero Corrugado % 100.000%
Adelanto Nº 01 ### Io 439.58
Fecha Pago Oct-2010 Ia 513.17
Saldo Deflatado ###
01 03 Oct-10 03 01 0.121 100.000% 439.58 513.17 Nov-2010 #REF! 0.00 1,807,149.43 - - #REF! -
01 04 Nov-10 03 01 0.121 100.000% 439.58 513.17 Dec-2010 #REF! 0.00 1,807,149.43 - - #REF! -
Deducción Actual (Setiembre 2011) 0.00 Amortización Actual (Setiembre 2011 0.00
VALORIZACION Nº 01 AL 31 DE AGOSTO DEL 2016
OBRA :
CONTRATO :
PROPIETARIO :
CONTRATISTA :
SUPERVISION :
CUADRO DE AMORTIZACIONES
Adelanto Directo
Amortización Acumulada Anterior Amortización Actual Amortización Acumulada a la Fecha Saldo por Amortizar
Monto Contrato (Sin I.G.V.) Concepto Monto Otorgado
Amortizado % Amortizado % Amortizado % Monto %
S/. 4,138,744.30 Adelanto Directo (10.00 % Monto Contr S/. 413,874.43 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% ### 100.00%
Total Otorgado S/. 413,874.43 S/. 0.00 0.00% S/. 0.00 0.00% S/. 0.00 0.00% ### 100.00%
OBRA :
CLIENTE :
CONTRATISTA :
SUPERVISION :
VALORIZACION DE OBRA Nº 01
AMORTIZACION POR 1º ADELANTO DE MATERIALES
CEMENTO PORTLAND T- I
DATOS DEL ADELANTO DE MATERIALES
Fecha del Adelanto otorgado 11/15/2007
Ad : Monto del Adelanto Otorgado PRIMER PAGO 300,000.00 sin IGV
Monto del Adelanto TOTAL Otorgado 300,000.00 sin IGV
C : Monto del Contrato 4,138,744.30 sin IGV
Ka : Coeficiente a la fecha del adelanto AGO.2016 1.035
MONTO AMORTIZACION
VALORIZACION
VALORIZADO MES ACUMULADO POR AMORTIZAR
VALORIZACION AMORTIZACION
DEDUCCION DEDUCCION QUE NO DEDUCCION A
DEDUCCION PAGADA
MONTO (Soles) DE ADELANTO Imr Ima Imo CALCULADA CORRESPONDE CONSIDERAR EN LA
Nº PERIODO V A De (A DEDUCIR) VALORIZACION
VALORIZACION Nº 13
MES DE SETIEMBRE 2008
VALORIZACION AVANCE PROG SIN IGV AVANCE REAL SIN IGV FACTOR REINTEGRO PROG REINTEGRO REAL REINTEGRO ESTADO DE
DE PAGADO A RECONOCER LA OBRA
MENSUAL ACUM MENSUAL ACUM REAJUSTE MENSUAL ACUMUL MENSUAL ACUMUL
Nº MES (A) (APA) (B) (ARA) (K-1) C = A x (K-1) (SRP) D = B x (K-1) (SRR)
01 Aug-07 237,133.73 237,133.73 581,523.87 581,523.87 0.026 6,165.48 6,165.48 15,119.62 15,119.62 15,119.62 ADELANTADA
0.00
02 Sep-07 294,963.08 532,096.81 413,714.61 995,238.48 0.026 7,669.04 13,834.52 10,756.58 25,876.20 10,756.58 ADELANTADA
Oct-07 413,714.61 0.017 5,014.37 9,045.65 7,033.15 16,919.05 -3,723.43
Nov-07 413,714.61 0.022 6,489.19 11,706.13 9,101.72 21,895.25 2,068.57
0.00
03 Oct-07 838,055.02 1,370,151.83 1,317,873.11 2,313,111.59 0.017 14,246.94 23,292.58 22,403.84 39,322.90 22,403.84 ADELANTADA
Nov-07 1,317,873.11 0.022 18,437.21 30,143.34 28,993.21 50,888.45 4,660.59
Dec-08 1,317,873.11 0.021 17,599.16 28,773.19 27,675.34 48,575.34 610.91 0.00
04 Nov-07 1,140,467.35 2,510,619.18 1,640,282.31 3,953,393.90 0.022 25,090.28 55,233.62 36,086.21 86,974.67 36,086.21 ADELANTADA
Dec-08 1,640,282.31 0.021 23,949.81 52,723.00 34,445.93 83,021.27 -1,640.28
Jan-08 1,640,282.31 0.024 27,371.22 60,254.86 39,366.78 94,881.45 4,920.85 0.00
05 Dec-08 1,420,322.93 3,930,942.11 2,168,123.20 6,121,517.58 0.021 29,826.78 82,549.78 45,530.59 128,551.87 34,349.82 ADELANTADA
Jan-08 2,168,123.20 0.024 34,087.75 94,342.61 52,034.96 146,916.42 17,685.14
Feb-08 2,168,123.20 0.032 45,450.33 125,790.15 69,379.94 195,888.56 17,344.98 0.00
06 Jan-08 2,443,781.79 6,374,723.90 3,112,238.09 9,233,755.67 0.024 58,650.76 152,993.37 74,693.71 221,610.14 74,693.71 ADELANTADA
Feb-08 3,112,238.09 0.032 78,201.02 203,991.16 99,591.62 295,480.18 24,897.91
Mar-08 3,112,238.09 0.036 87,976.14 229,490.06 112,040.57 332,415.20 12,448.95 0.00
07 Feb-08 2,567,460.05 8,942,183.95 2,825,587.55 12,059,343.22 0.032 82,158.72 286,149.89 90,418.80 385,898.98 90,418.80 ADELANTADA
Mar-08 2,825,587.55 0.036 92,428.56 321,918.62 101,721.15 434,136.36 11,302.35
Apr-08 2,825,587.55 0.062 159,182.52 554,415.40 175,186.43 747,679.28 73,465.28 0.00
08 Mar-08 2,905,680.11 11,847,864.06 2,940,870.10 15,000,213.32 0.036 104,604.48 426,523.11 105,871.32 540,007.68 105,871.32 ADELANTADA
Apr-08 2,940,870.10 0.062 180,152.17 734,567.57 182,333.95 930,013.23 76,462.63
May-08 2,940,870.10 0.100 290,568.01 1,184,786.41 294,087.01 1,500,021.33 111,753.06 0.00
09 Apr-08 2,526,288.90 14,374,152.96 3,233,138.78 18,233,352.10 0.062 156,629.91 891,197.48 200,454.60 1,130,467.83 200,454.60 ADELANTADA
May-08 3,233,138.78 0.100 252,628.89 1,437,415.30 323,313.88 1,823,335.21 122,859.28
Jun-08 3,233,138.78 0.136 343,575.29 1,954,884.80 439,706.87 2,479,735.89 116,392.99 0.00
10 May-08 3,310,065.55 17,684,218.51 1,180,616.18 19,413,968.28 0.100 331,006.56 1,768,421.85 118,061.62 1,941,396.83 118,061.62 ATRASADA
Jun-08 1,180,616.18 0.136 450,168.92 2,405,053.72 160,563.80 2,640,299.69 42,502.18
Jul-08 1,180,616.18 0.175 579,261.47 3,094,738.24 206,607.83 3,397,444.45 46,044.03 0.00
11 Jun-08 3,625,798.36 21,310,016.88 2,055,292.44 21,469,260.72 0.136 493,108.58 2,898,162.30 279,519.77 2,919,819.46 279,519.77 ATRASADA
Jul-08 2,055,292.44 0.175 634,514.71 3,729,252.95 359,676.18 3,757,120.63 80,156.41
Aug-08 2,055,292.44 0.191 692,527.49 4,070,213.22 392,560.86 4,100,628.80 32,884.68
12 Jul-08 4,168,186.88 25,478,203.76 2,057,560.76 23,526,821.48 0.175 729,432.70 4,458,685.66 360,073.13 4,117,193.76 360,073.13 ATRASADA
Aug-08 2,057,560.76 0.191 796,123.70 4,866,336.92 392,994.11 4,493,622.90 32,920.98
Sep-08 2,057,560.76 0.191 796,123.70 4,866,336.92 392,994.11 4,493,622.90 0.00
13 Aug-08 2,956,032.67 2,956,032.67 1,900,382.47 1,900,382.47 0.191 564,602.24 564,602.24 362,973.05 362,973.05 362,973.05 ATRASADA
Sep-08 1,900,382.47 0.191 564,602.24 564,602.24 362,973.05 362,973.05 0.00
Oct-08 1,900,382.47 0.191 564,602.24 564,602.24 362,973.05 362,973.05 0.00
PRECIO
ITEM DESCRIPCION UND METRADO PARCIAL TOTAL
UNIT
Total 4,883,718.27
RELACION DE INSUMOS
IU DESCRIPCION UND CANTIDAD PRECIO PARCIAL
MANO DE OBRA
47 CAPATAZ HH 1,893.66 20.50 38,820.03
47 OPERARIO HH 18,293.02 18.60 340,250.17
47 OFICIAL HH 12,428.80 15.50 192,646.40
47 PEON HH 52,424.88 13.80 723,463.34
MATERIALES
02 CLAVO KG 896.00 4.50 4,032.00
02 Alambre p/encofrar KG 2,240.00 4.50 10,080.00
43 MADERA P2 85,120.00 5.00 425,600.00
21 CEMENTO PORTLAND TIPO I (42.5KG) BLS 36,960.00 18.60 687,456.00
05 PIEDRA MEDIANA M3 4,320.00 30.00 129,600.00
38 HORMIGON M3 8,160.00 40.00 326,400.00
30 AGUA M3 1,632.00 6.00 9,792.00
TOTAL 3,310,995.44
0.00
INCIDENCIA
0.009
0.082
0.047
1,295,179.94 0.175 0.313 0.313 100%
0.001
0.002 0.003 0.000 0.003 3.21%
0.103 0.103 0.106 100% 0.103 96.79%
0.166 0.166 0.166 59.61%
0.031 0.031 0.279 0.031 11.24%
0.079 0.081 0.081 29.15%
1,592,960.00 0.002 0.000 0.000 0.279 100%
MANO DE OBRA
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 0.35 0.02
49 Tractor Sobre Oruga HM 1.00 0.0219 320.00 7.01 7.03
MANO DE OBRA
47 CAPATAZ HH 0.10 0.0457 20.5 0.94
47 OPERARIO HH 1.00 0.4567 18.6 8.49
47 PEON HH 3.00 1.3701 13.8 18.91 28.34
MATERIALES
-
- -
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 28.34 1.42
49 Plancha compact. HM 1.00 0.4567 12.00 5.48 6.90
MANO DE OBRA
MATERIALES
05 PIEDRA MEDIANA M3 0.4500 30.00 13.50
05 HORMIGON M3 0.8500 40.00 34.00
21 CEMENTO PORTLAND TIPO I (42.5KG) BOL 3.8500 18.60 71.61
30 AGUA M3 0.1700 6.00 1.02 120.13
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 51.96 2.60
49 -
48 MEZCLADORA CONCRETO TAMBOR 11P3 -HM 1.00 0.2740 20.00 5.48 8.08
MANO DE OBRA
47 CAPATAZ HH 0.13 0.0320 20.5 0.66
47 OPERARIO HH 1.35 0.3200 18.6 5.95
47 OFICIAL HH 1.35 0.3200 15.5 4.96 11.57
MATERIALES
Madera tornillo p/encofrado P2 3.8000 5.00 19.00
Clavo p/encofrar Kg 0.0400 4.50 0.18
Alambre p/encofrar Kg 0.1000 4.50 0.45 19.63
EQUIPO
37 HERRAMIENTAS MANUALES %MO 5.0000 11.57 0.58
- 0.58
M3
29,000.00
63.80
635.10
580.00
635.10
M3
18,600.00
850.02
8,494.62
25,483.86
-
-
26,412.00
8,494.62
M3
9,600.00
263.04
2,630.40
5,260.80
26,305.92
4,320.00
8,160.00
36,960.00
1,632.00
24,960.00
-
2,630.40
M3
22,400.00
716.80
7,168.00
7,168.00
85,120.00
896.00
2,240.00
12,992.00
1ER ADELANTO 1 2 3=1x2 4 5
MATERIAL P.U.
Monto
Val. Nº FECHA UTILIZADO a la fecha lma lmo
(a P.B.)
Bls. P.B.