CALENDARIO DE AVANCE DE OBRA VALORIZADO (A FECHA DE INICIO DE OBRA)

PROVINCIA DE ICA"- I ETAPA ZONA SUR. (C.U.I. N° 2314322)


Y PEATONAL EN LA URB SAN MIGUEL, DEL DISTRITO DE ICA, 20 DE JULIO DEL 2021
"MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR
CBRA PROVINCIAL DE ICA MES 03 (01 AL 30 SETIEERE MES 04 (01 AL 17 OCTUBRE
ENTIDAD MUNICIPALIDAD MES 01 (20 AL 31JULIO) MES O2 (01 AL 31 AGOSTO)
METRADO PARCAL METRAD FARCA
UND METRADO PRECIO PARCIAL ETRADO PARCIAL METRADo PARCIAL

CERAS PREININARES| 55.00% 0


0.45 3,170.82 45.00% 0.00% 0.55 3,875 45
01 MOVILIZACION YDESMOVILIZACKON DE EQUIPOS YMAQUINARLAS glb| 100 7,046.277,04627
jOFRAS PROVSONALS 0.00% 0.00 0.005
CARTEL DE OBRAIMPRESION DE BANNER DE 3.60 MX 240M (SOPO und 1.00 1,255.73 100.00%
100 1,25573 1255 73 4 00 456.00 2.00 16 67%
CASETA DE ALMACEN Y GUARDIANIA CTRIPLAY Y PARANTES DE 1,368.00 2.00 228.00 4.00 456.00 33.33% 50.00% 22800
12.00 114.00 16.67%
02 02 O0 4939.92 53.33% 0 60 2,963 95 L 20.00%
BAADERATORNILLO CAANINA 13.33% 1.00 4,939.92 33.33% 380.00 20 00%
MANTENIMIENTO DE TRANSITO TEMPORAL (DURANTE LA OBRA) mes 3.00 4939 9 2 |14,819.76 0.40 1,975.97| 600.00| 33.33% o.80
01 02 03 3 00 I 600.00 1,800.00 0.40 240.00L13.33% 1.00 600.00|3.33%
01 02 04 SERVICIOS HGIENOS (SANITARIO PORTATI)-SECCION 1.50 m. x 1|mes
01e3 StouRDAO YSALUO EN E TRABAJO 1,718.36 0.15 1,718.36 15.00%
DEL PLAN DE 0.15 1,718.36 15.00% 0.15 30.00
ELABORACION, IMPLEMENTACiON Y ADMINISTRACION PLAN DE gIb 1.00 11,455.74 11,455.74 0.55 6,300.66 55.00%
01 03.01 2.00 266.98 L 323
SEGURIDAD Y SALUD EN EL TRABAJO_
5.606.58 67.74% 9.00 1,201.41| 14.52% 9.00 1,201.41 17.74 %
EQUIPOS DE PROTECCION PERSONAL und 62.00 133.49 8,276.38 42.00 .2 1,448.81 30 00% 724.40 L 10.00
01 03.02 0.20 1,448.81 20.00%
O1 03 0S SENALIZACION TEMPORAL DE SEGURIOAD 1.00 7,244.04 7,244.04 0.50 3622.02 50.00% 361.98 54.00% .21 230.35 21.005
0103 04 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS glb 1.00 1,096.92 1,096.92 . 142.60 13.00% 361.98 5.006 2,969.13 54 00% 1889.45 21.00%
glb 1.00 8,997.36 8,997.36 0.13 1,169.66 13.00% 0.33 2,969.13 33.00%
JCAPACITACION EN SEGURIDAD YSALUD (DURANTE LA OBRA)_
2,032.75 33.33% 4,878.58 ,219.0 20.00%
U1.0 VARKOS 3,252.40 813.10 13.33% 8,130.98 2,032.75 3.33% 8,130 98
O1.040 m2 24,392.94| 0.25 L 8,098.24 0.002% L 24,392.94|_6,098.24 100.00%
LIMPIEZA DURANTE LA EJECUCION DE LA OBRAA 0.00% 0076
01 0402 LIMPIEZA FINAL DE LA OBRA m2 | 24,392.94 _0.25 6,098.24

AESTRUCTURA VEHCULAR
OBRAS PRELIMINARES .00% 0.00%
m3 1,186.71 106.42 126,289.68 850.00 90,457.00 _71.63% 336.71 35,832.68 | 28.37% 0.00
2 01 0101 DEMOLICION DE PAVIMENTO RIGIDO CON EQUIPO .00%
88.69 13,763.80 51.73 4,587.93 33.33% 103.46 9,1/5.8 66.6/%|
EQUIPO m3 155.19 0.00%
O2 O1 0 02 JOEMOLICION DE PAVIMENTO FLEXIBLE CON m2 10,738.38 1.00 10,738.38 3,579.46| 3,579.46 33.33% 7,158.92 7,158.92 6667%*|
O O OS KAZO, NVELACION Y REPLANTEO DE OBRA
02 91.02 OVENTO DE CRRAS_ 0.007% 0.00
m3 4,083.54 5.31 21,683.60 0.006 4,083.54 21,683.80 100.00%
02 01 02 01 CORTEA NIVEL DE SUBRASANTE CONEQUIPO 0.00% 0.00%
4.02 43,168.29 0.00% 10,738.38 43,168,29 100.0% 0.00% 0. 00%
02 01 02 02 1CONFORMACKON YCOMPACTACION DE LA SUBRASANTE CON EQUIP m2|10,738.38 92,069.89 1,808.48 | 30,689.96|_33.33%%3,616.97 61,379.92| 66.67%|
02 01 02 03 ELIMINACION DE MATERIAL EXCEDENTE YDE DEMOLICION m35425.45 16.97
02.01.03 SUB BASE GRANULAR 10,190.70 80,608.44L 94.90% 547 68 4332.15 .10% 0.00%
84,940.59 0.00%
0201.03
A O 01CONFORMACION DE SUB BASE GRANULAR E=O 15M m210.738.38 7.91
BASE GRANULAR 12.55% 0.00%
02.01 04 01 CONFORMACION DE BASE GRANULAR E=0.20M m210,738.38| 10.25 110,068 40 0.00% 9,390.70 96,254.72 87.45% 134768 13,813.72
02.01 0- PAVI VIMEN 0.00% 10,738.38 L 54,65835 100.00% .007
m2 10,738.38 5.09 54,658.35 0.00%
0201 05 01 MPRIMACION ASFALTICA 100.00% .00
m2 10,738.38 L 32.31 348,957.06 0.00% 0.00% 10738.38346,957.06
02 01.05 02 JCARPETA ASFALTICA EN CAUENTE E=5 CM
02 01.05 SAROINELES SUMERGlOOS
0.00 0.00% ).00% 0.0076
02 01 08 0101DEMOLICION DE SARDINELES EXISTENTES CON EQUIPO m3167.29 133.02 22,252.92 167.29 22,252.92 100.00% 0.00%
00 2,986.58 2,986.58 2,986.58| 100.00%
02 01 06 0102 TRAZ0, NIVELACION YREPLANTEO DE OBRA m2,988.58
0.00% 93.01% 9. 439.92 O.S9 0.00
02 01 08 02 01EXCAVACION MANUAL EN SUELO DURO PARA SARDINELES | m3 134,40 46 80 6289.92 125.00 5,85000
0.00% 6,216.11L 93.01%| 467.35 6.99%| 0.00%
| m3 393 84 16.97 6.683.463 30 | 27 54
02 01 06 02 02ELIMINACION DE MATERIAL EXCEDENTE YDE DEMOLICION
O 0 08 03 CONCRE TO SiMPLE 0.0076
m3 134 40 354.74 47,677.06 0.00% 12500 44,342.50 93.01% 9.40 3,334 56| 6.99%
02 01 06030CONCRETO FC175KGCM2 EN SARDINELES 0.007%
m2 907.16 L 43.90 39,824.32 0.00% 844.00 37,051.60 93.04% 63.16 2,772.72 6.96%|
02 01 06 03oENCOFRADO YDESENCOFRADO EN SARDINEL 0.00
0.006 2,777.0| 971.95|_92.98% 209.58 3.35 7.02% O.00%
m 2,986.58 0.35 1,045.30
02 0106 03 0CURADO DE CONCRETO EN SARDINEL (7DIAS
02 01 06 04 JUNTAS ASFALTICAS 0.00% 0 00% 1.20 456.41I100.00%
02 01 06 04 01JUNTAS ASFALTICASEN SARDINELES m 101.20 4.51 456.41
02 01.07 NTERFERENCIAS .0076 | 0 00% 0%%
und 22.00 384.33 8,455.28 22.00 8,455 26 10000%
02 0107 01 NIVELACION DE TAPAS DE BUZONES CONSTRUCCION DE BUZON
EXISTENTE Y 1.00 0.00%
BUZON und 200 1734 46 3,408.02 1.00 00% 1,734.4 50.00% 0.00%
02 01 07.02 EMOUCION DE 1,73446
|H=100-2 00m.DE DE CONCRETO
TAPAEXISTENTEY
CONBUZON YMARCODE FIERRO 0 00% 11.00
07 03 EMOUCION
CONSTRUCCION DE BUZONN
und 11.00 2,184.89 24,033.79 24,033.79 100.00% 0.00% 0.00%
02 01
- H=2 00-3 00m,CON TAPA DE CONCRETO YMARCO DE FIERRO
DE BUZON EXISTENTEY CONSTRUCCION DE BUZON 4.00 0 00%
02.01 07 04 DEMOLICION und 4.00 2,034 77 10,539 08 0.00% 10,539.0810000% 0.00%
H=3 004 00m, CON TAPA DE CONCRETO YMARCO DE FIERRO
und 6.00 683 37 4,100.22 .00% 6.00 4,100.22 100.00% 0.00% 0%
02.01 07.05 EBILITACION DE BUZON EXISTENTE H=1 00-3.00m, CON TAPA DE
02 02
cONCRETOY MARCO DE FIERRO
INF RAESTRUCTURA PEATONAL
02 02.01 VEREDAS GeNSRUetORAeKt 3.A.C.
CONSTRUCTORA CKL S.AC.
***for****eo***************
Ing. Rony Aldo Cåceres Junes
peraAMANDO ORAMENO CALDERON CESAR LUCANA ANAMPA RESIDENTE OE OURA
RONNYGERENTE GENERALL
INGEIER0 CiVIL
2

E1EEEEEE

313133

3 B | l 8 3 8 82Z

888|8 8

388 333

EEEEE E

lg8 68

85s8
8|8 5s33|8l8|3|8
13S S8838SS
CALENDARIO DE AVANCE DE OBRA VALORIZADO (A FECHA DE INICIO DE OBRA)
MEJORAMENTO DEL SERVCO DE TRANSITABILIDADVEHICULAR Y PEATONAL EN LA URB SAN MIGUEL OEL DISTRITO DE ICA, PROVINCIA DE ICA"- 1I ETAPA ZONA SUR (CUI N 2314322)
ENTL NKCIAJDAD PROViNCIAL DE KA 20DE JULIODEL 2021
MES 01 120 AL 31 JULIO) MES 02 (01 AL 31 AGOSTO) MES 03 (01 AL 30 SETIEMERE) MES 04 01 AL 17OCTUBRE
METRADO PRECIO PARCIAL METRADO PARCIAL ETRADO
METRADO PARCIAL METRADO PARCIAL
AREA E TRABAAO (ANTES DE INICIAR DURANTEma 5,241.770 13 33% 13.104226 100 13,104 26 33 33%
300 13,104 26 39,312.78 40 1.00 33.33% 7,6256 20.00%
ORRA
0.005
NTES 18600 7767 15,223.32 0.00% 130.00 10,097.10 66,33% 6600 5,126 22 33.57S
o 00% 080 15 220 24 L 50 00%
SaNS DOs 10 25367 06 25 367 05 0.40 10 148 8240 00
REVENCON YCON glb 1.00 130 463.76 130,463 76 0.04 5,218 55| 4.00% 43,053.04 0.33 43,053 04 33 00% 0.30 39 139 13 3000%
O DEL COVID-19_
2,294, 587.41 226,619.22 1,268,468.96 653,076.12 146,423.12
GENERALES
OS TOR 8,879. 28 4,571.5 1 1,024.9
16,062.11 1,586.33
14,526.29 81,308.86 41,862. 18 9,385 72
GASTOS VARABLES 6.4T 08S.05
OTAL STOS CENERALES7.1 (5 16,112.62 90,188.14 46,433.71 10,410.6
L 163,145.16
15,704.7 87,904.90 45,258.1 10,147.11
159,014.91
S TOTAL A5C 2,616,74748 258,436.55 1,446,562.00 744,768.00
,058.24 SS.58
471,014.55 46,518.58 -460,381.15
SNTO FOTAL DELAOFERTA 3,087,762.03 304,955.13 9.8763% 1,706,943.16 55 2809% 878,826.24 28.45t65| 197,037 49 83812

CONSTRUCTORA CKL S.A.C. cONSTRuCTORA CKL .S.A.C.


LPAN FERNANDO ORMENO CALDERON pONN CESAR LUCANA ANAMPA
RONNY Ing. R9ny Aidó Caceres nes
GERENTE GENERAL RESIDENTE OE UsRA
NGENIEROC.L
(1.P. N6137