VIAS

Ml ancho e cantidad
Principales 567.4 6 0.15 1
pasillos Mz1 201.8 4 0.15 1
pasillos Mz2 367.1 4 0.15 1
pasillos Mz3 699.2 4 0.15 1
TOTAL

PLUVIAL
Ml Vr/m VrTotal
Principales 1444.36 $ 36,246.00 $ 52,352,272.56
pasillos Mz1 846.58 $ 36,246.00 $ 30,685,138.68
pasillos Mz2 847.02 $ 36,246.00 $ 30,701,086.92
TOTAL $ 108,738.00 $ 113,738,498.16

ALCANTARILLADO
Ml Vr/m VrTotal
Principales 766 $ 124,374.00 $ 95,270,484.00
pasillos Mz1 599.27 $ 124,374.00 $ 74,533,606.98
pasillos Mz2 679.37 $ 124,374.00 $ 84,495,964.38
TOTAL $ 373,122.00 $ 254,300,055.36

ACUEDUCTO
Ml Vr/m VrTotal
Principales 897.47 $ 70,771.00 $ 63,514,849.37
pasillos Mz1 786.57 $ 70,771.00 $ 55,666,345.47
pasillos Mz2 603.89 $ 70,771.00 $ 42,737,899.19
TOTAL $ 212,313.00 $ 161,919,094.03
S
area Vr/m3 VrTotal
3404.4 $ 751,980.00 $ 384,006,106.80
807.2 $ 751,980.00 $ 91,049,738.40
1468.4 $ 751,980.00 $ 165,631,114.80
2796.8 $ 751,980.00 $ 315,470,649.60
$ 3,007,920.00 $ 956,157,609.60

SUMIDEROS
CANTIDAD Vr/m VrTotal
Principales 19 $ 833,812.00 $ 15,842,428.00
TOTAL $ 833,812.00 $ 15,842,428.00

TUBERIA ALCANTARILLADO A RED PRINCIPAL


m CANTIDAD Vr/m VrTotal
Principales 7.8 19 $ 833,812.00 $ 15,842,428.00
TOTAL $ 833,812.00 $ 15,842,428.00

$ 496,861,577.39
MANHOLE
CANTIDAD Vr/m VrTotal
Principales 36 $ 1,800,000.00 $ 64,800,000.00
TOTAL $ 1,800,000.00 $ 64,800,000.00
Ml ancho espesor profundidad
princilaes 457.6 6 0.15 1.5
calle 60 109.8 3 0.15 1.5
C1-C5 144.09 4 0.15 1.5
C6-C11 262.21 4 0.15 1.5
TOTAL

MANHOLE
CANTIDAD Vr/m VrTotal
Principales 24 $ 1,800,000.00 $ 43,200,000.00
TOTAL $ 1,800,000.00 $ 43,200,000.00
excavacion m3 Vr/m3 VrTotal
4118.4 $ 751,980.00 $ 309,695,443.20
494.1 $ 751,980.00 $ 37,155,331.80
864.54 $ 751,980.00 $ 65,011,678.92
1573.26 $ 751,980.00 $ 118,306,005.48
$ 530,168,459.40

ACUEDUCTO ALCANTAR
Ml Vr/m VrTotal
Principales 729.16 $ 70,771.00 $ 51,603,382.36 Principales
ETAPA1 474.56 $ 70,771.00 $ 33,585,085.76 ETAPA1
TOTAL $ 141,542.00 $ 85,188,468.12 TOTAL

PLUVIAL
Ml Vr/m VrTotal
Principales 234.39 $ 36,246.00 $ 8,495,699.94
ETAPA1 704.89 $ 36,246.00 $ 25,549,442.94
TOTAL $ 72,492.00 $ 34,045,142.88

710,698,746.84
6,289,369.44
276,732,255.41
408,809,013.67
ALCANTARILLADO
Ml Vr/m VrTotal
386.76 $ 124,374.00 $ 48,102,888.24
443.68 $ 124,374.00 $ 55,182,256.32
TOTAL $ 248,748.00 $ 103,285,144.56