Está en la página 1de 61

RESUMEN GENERAL DE VALORIZACIÓN DE OBRA Nº 01

(DEL 27/01/2023 AL 31/01/2023)


RESUMEN GENERAL DE VALORIZACIÓN
: RENOVACION DE PUENTE; EN EL(LA) CAMINO VECINAL R250381 (PUENTE EL MILAGRO), EN LA LOCALIDAD CORAZON JESUS, DISTRITO DE ALEXANDER VON
● Obra
HUMBOLDT, PROVINCIA PADRE ABAD, DEPARTAMENTO UCAYALI
● Entidad : MUNICIPALIDAD PROVINCIAL DE PADRE ABAD ● Monto Referencial (con IGV) : S/ 556,837.60
● Contratista : HT CONSTRUCTORES Y SERVICIOS E.I.R.L. ● Plazo de Ejecucion : 90 d. c.
● Residente : ING. MARTIN C. VALDIVIESO ECHEVARRIA ● Monto Contratado (con IGV) : S/ 556,115.64
● Supervisor : ING. FRANKLIN W. TRINIDAD TRUJILLO ● Monto Contratado (sin IGV) : S/ 471,284.44
Monto Valorización
Descripción
Contractual Anterior Actual Acumulado % Av. Acum. Saldo
1.- VALORIZACIÓN CONTRACTUAL (V) S/ 556,115.64 S/ 14,935.14 S/ 14,935.14 S/ 541,180.50
(01) COSTO DIRECTO S/ 401,728.18 - 10,788.88 10,788.88 390,939.30
(02) GASTOS GENERALES12.31% S/ 49,469.85 - 1,328.57 1,328.57 48,141.28
(03) UTILIDAD 5.00% S/ 20,086.41 - 539.44 539.44 19,546.97
2.69%
(04) SUB TOTAL REFERENCIAL S/ 471,284.44 - 12,656.90 12,656.90 458,627.55
(05) I.G.V. 18.00% S/ 84,831.20 2,278.24 2,278.24 82,552.96
(06) MONTO TOTAL CONTRATADO (INC IGV) S/ 556,115.64 #REF! 14,935.14 14,935.14 541,180.50
2.- REAJUSTES (R) - - -
Fórm.01 REAJUSTE - - -
3.- DEDUCCIONES DE REAJUSTES QUE NO CORRESPONDEN (D) - - -
* ADELANTO DIRECTO - - -
ADELANTO DIRECTO - - -
* ADELANTO DE MATERIALES - - -
ADELANTO DE MATERIALES Nº 1 - - -
4.- VALORIZACIÓN BRUTA (VB)=(V)+(R)-(D) S/ 556,115.64 - 14,935.14 14,935.14 541,180.50
5.- AMORTIZACIONES (A) - 1,493.51 1,493.51 54,118.05
* ADELANTO DIRECTO S/ 55,611.56 - 1,493.51 1,493.51 54,118.05
* ADELANTO DE MATERIALES
6.- VALORIZACIÓN NETA (VN)=(VB)-(A) S/ 556,115.64 - 13,441.62 13,441.62
7.- OTROS (O) - 0.00 0.00
* MULTAS POR ATRASOS INJUSTIFICADOS
* INTERESES POR MORA EN EL PAGO DE VALORIZACIONES
* OTROS
8.- MONTO A FACTURAR INC. IGV (VF)=(VN)+(O) S/ 556,115.64 - 13,441.62 13,441.62
11.- RETENCIONES INCL. IGV (S) S/ 55,611.56 - 1,493.51 1,493.51
* POR FIEL CUMPLIMIENTO S/ 55,611.56 - 1,493.51 1,493.51
* OTROS

12.- MONTO LÍQUIDO A PAGAR (ML)=(MF)-(S) S/ 500,504.08 - 11,948.11 11,948.11

-1-
#REF!
#REF!
FÓRMULA 01: OBRAS PROVISIONALES
Obra
● #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
Form.01 OBRAS PROVISIONALES
01 OBRAS PROVISIONALES
01.01 CONSTRUCCIONES PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 2.40 x 3. und 1.00 - Err:504 Err:504 Err:504
01.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA m2 90.00 - Err:504 Err:504 Err:504
01.01.03 CERCO PROVISIONAL DE SEGURIDAD Y PROTECCI m 508.50 - Err:504 Err:504 Err:504
01.01.04 SERVICIOS HIGIENICOS PARA EL PERSONAL OBRE und 2.00 - Err:504 Err:504 Err:504
01.02 INSTALACIONES PROVISIONALES
01.02.01 INSTALACION DE AGUA PARA LA OBRA GLB 1.00 - Err:504 Err:504 Err:504
01.02.02 INSTALACION DE ENERGIA ELECTRICA PARA LA GLB 1.00 - Err:504 Err:504 Err:504
01.02.03 ENERGIA ELECTRICA PARA LA CONSTRUCCION mes 6.00 - Err:504 Err:504 Err:504
01.03 MOVILIZACION DE EQUIPOS Y TRANSPORTE DE MA
01.03.01 TRANSPORTE DE MATERIALES GLB 1.00 - Err:504 Err:504 Err:504
01.03.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 - Err:504 Err:504 Err:504
01.04 DEMOLICIONES
01.04.01 DESMONTAJE DE PUERTAS pza 14.00 - Err:504 Err:504 Err:504
01.04.02 DESMONTAJE DE VENTANAS pza 9.00 - Err:504 Err:504 Err:504
01.04.03 DESMONTAJE DE ARTEFACTOS DE ILUMINACION pza 10.00 - Err:504 Err:504 Err:504
01.04.04 DESMONTAJE DE APARATOS SANITARIOS pza 8.00 - Err:504 Err:504 Err:504
01.04.05 DESMONTAJE DE CERCO METALICO m 345.90 - Err:504 Err:504 Err:504
01.04.06 DESMONTAJE DE BARANDAS METALICAS m 6.18 - Err:504 Err:504 Err:504
01.04.07 DESMONTAJE DE BARANDAS DE MADERA m 24.40 - Err:504 Err:504 Err:504
01.04.08 DESMONTAJE DE CORREAS Y TECHO DE CALAMI m2 15.82 - Err:504 Err:504 Err:504
01.04.09 DEMOLICION DE MUROS DE LADRILLO KING KONGm2 449.92 - Err:504 Err:504 Err:504
01.04.10 DEMOLICION DE MUROS DE ADOBE m2 158.62 - Err:504 Err:504 Err:504
01.04.11 DEMOLICION DE MUROS DE TRIPLAY m 16.75 - Err:504 Err:504 Err:504
01.04.12 DEMOLICION DE SOBRECIMIENTO DE CONCRETO m3 11.63 - Err:504 Err:504 Err:504
01.04.13 DEMOLICION DE CIMIENTOS DE CONCRETO SIMPL m3 18.61 - Err:504 Err:504 Err:504
01.04.14 DEMOLICION DE PISOS DE CONCRETO C/EQUIPO m2 271.08 - Err:504 Err:504 Err:504
01.04.15 DEMOLICION DE LAVADERO DE CONCRETO und 1.00 - Err:504 Err:504 Err:504
01.04.16 DEMOLICION DE VIGAS DE CONCRETO ARMADO C m3 19.39 - Err:504 Err:504 Err:504
01.04.17 DEMOLICION DE COLUMNAS DE CONCRETO ARM m3 8.68 - Err:504 Err:504 Err:504
01.04.18 DEMOLICION DE ZAPATAS DE CONCRETO ARMAD m3 13.50 - Err:504 Err:504 Err:504
01.04.19 DEMOLICION DE ESCALERA DE CONCRETO ARMA m3 2.74 - Err:504 Err:504 Err:504
01.04.20 DEMOLICION DE BLOQUES DE CONCRETO C/EQUI m3 301.06 - Err:504 Err:504 Err:504
01.04.21 DEMOLICION DE TRIBUNAS DE CONCRETO C/EQUIPm3 286.41 - Err:504 Err:504 Err:504
*

-2-
#REF!
#REF!
FÓRMULA 03: PISOS EXTERIORES Y JARDINERIA
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
Form.03 PISOS EXTERIORES Y JARDINERIA
03 PISOS EXTERIORES Y JARDINERIA
03.01 PISOS EXTERIORES
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 380.40 - Err:504 Err:504 Err:504
03.01.01.02 TRAZO Y REPLANTEO m2 380.40 - Err:504 Err:504 Err:504
03.01.02 MOVIMIENTO DE TIERRAS
03.01.02.01 EXCAVACION EN TERRENO NORMAL PARA V m3 76.08 - Err:504 Err:504 Err:504
03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 95.10 - Err:504 Err:504 Err:504
03.01.02.03 NIVELACION, REFINE Y COMPACTADO m2 380.40 - Err:504 Err:504 Err:504
03.01.02.04 BASE AFIRMADO DE 4" CON EQUIPO LIVIANO m2 380.40 - Err:504 Err:504 Err:504
03.01.03 VEREDAS
03.01.03.01 CONCRETO EN VEREDAS FC=140 KG/CM2 m3 221.94 - Err:504 Err:504 Err:504
03.01.03.02 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 178.81 - Err:504 Err:504 Err:504
03.01.04 JUNTAS DE SEPARACION
03.01.04.01 JUNTAS ASFALTICAS 1" m 438.28 - Err:504 Err:504 Err:504
03.02 JARDINERIA
03.02.01 TRATAMIENTO DE AREAS VERDES
03.02.01.01 PREPARACION DE TERRENO C/TIERRA AGRICOLA m2 197.47 - Err:504 Err:504 Err:504
03.02.01.02 CORTE Y TRASLADO DE PASTO (CHAMPA) Y C m2 197.47 - Err:504 Err:504 Err:504
03.02.01.03 PLANTACION DE ESPECIES ORNAMENTALES und 40.00 - Err:504 Err:504 Err:504
*

-3-
#REF!
#REF!
FÓRMULA 04: CAMPO DE FUTBOL Y RETIRO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
Form.04 CAMPO DE FUTBOL Y RETIRO
04 CAMPO DE FUTBOL Y RETIRO
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 6,586.27 - Err:504 Err:504 Err:504
04.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CO m2 6,586.27 - Err:504 Err:504 Err:504
04.02 MOVIMIENTO DE TIERRAS
04.02.01 CORTE SUPERFICIAL LATERAL CON MAQUINARIA m3 1,975.88 - Err:504 Err:504 Err:504
04.02.02 REFINE, NIVELACION Y COMPACTACION EN ZONA m2 6,586.27 - Err:504 Err:504 Err:504
04.02.03 EXCAVACION DE ZANJAS DE HASTA H=1.00 M. m3 911.24 - Err:504 Err:504 Err:504
04.02.04 RELLENO DE ZANJA C/GRAVA 1/2" - 3/4" P/TUB. D m3 365.32 - Err:504 Err:504 Err:504
04.02.05 RELLENO Y COMPACTADO CON ARENA P/TUB. RI m3 142.35 - Err:504 Err:504 Err:504
04.02.06 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 129.22 - Err:504 Err:504 Err:504
04.02.07 CAMA DE APOYO PARA TUBERIA E=5cm. m2 1,380.94 - Err:504 Err:504 Err:504
04.02.08 PRIMERA CAPA ARENA GRUESA E=5" m2 6,586.27 - Err:504 Err:504 Err:504
04.02.09 EXTENDIDO, NIVELADO Y COMPACTADO CON M m2 6,586.27 - Err:504 Err:504 Err:504
04.02.10 SEGUNDA CAPA TIERRA VEGETAL Y ARENA E=5" m2 6,586.27 - Err:504 Err:504 Err:504
04.02.11 COMPACTACION DE TIERRA ARICOLA CON MAQU m2 6,586.27 - Err:504 Err:504 Err:504
04.02.12 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 3,171.58 - Err:504 Err:504 Err:504
04.03 CONCRETO SIMPLE
04.03.01 CIMENTACION DE ARCO, MODULO DE SUPLENTES
04.03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CO m3 3.78 - Err:504 Err:504 Err:504
04.04 CONCRETO ARMADO
04.04.01 CAJA DE REGISTRO
04.04.01.01 CONCRETO EN CAJA DE REGISTRO F'C=175 KG/C m3 1.72 - Err:504 Err:504 Err:504
04.04.01.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE RE m2 18.32 - Err:504 Err:504 Err:504
04.04.01.03 ACERO EN CAJA DEREGISTRO GRADO 60 kg 17.50 - Err:504 Err:504 Err:504
04.04.02 CUNETAS DE EVACUACION
04.04.02.01 CONCRETO EN CUNETAS F'C=175 KG/CM2 m3 81.68 - Err:504 Err:504 Err:504
04.04.02.02 ENCOFRADO Y DESENCOFRADO DE CUNETA m2 108.90 - Err:504 Err:504 Err:504
04.04.02.03 ACERO EN CUNETA DE EVACUACION GRADO 60 kg 1,236.88 - Err:504 Err:504 Err:504
04.05 ADITAMENTOS VARIOS
04.05.01 ARCO DE FUTBOLO SEGUN DISEÑO (INCLUYE MAL und 2.00 - Err:504 Err:504 Err:504
04.05.02 MODULO DE SUPLENTES SEGUN DISEÑO (INCLU und 2.00 - Err:504 Err:504 Err:504
04.05.03 MODULO DE ARBITROS SEGUN DISEÑO (INCLUY und 1.00 - Err:504 Err:504 Err:504
04.05.04 REJILLA DE FIERRO GALVANIZADO A=35 CM (PLATINm 330.00 - Err:504 Err:504 Err:504
04.06 JUNTAS
04.06.01 JUNTAS WATER STOP DE 4" m 40.70 - Err:504 Err:504 Err:504
04.07 REVOQUES ENLUCIDOS Y MOLDURAS
04.07.01 TARRAJEO CON ADITIVO IMPERMEABILIZANTE MO m2 363.00 - Err:504 Err:504 Err:504
04.08 SISTEMA DE DRENAJE
04.08.01 SUMINISTRO E INSTALACION DE TUBERIA ADVAN m 1,491.10 - Err:504 Err:504 Err:504
04.08.02 SUMINISTRO Y COLOCACION DE CODO ADS N12 4" und 104.00 - Err:504 Err:504 Err:504
04.08.03 SUMINISTRO Y COLOCACION DE TEE REDUCTORA Aund 52.00 - Err:504 Err:504 Err:504
04.08.04 SUMINISTRO E INSTALACION DE TUBERIA DE PO m 328.70 - Err:504 Err:504 Err:504
04.08.05 SUMINISTRO E INSTALACION DE TUBERIA DE PO m 60.00 - Err:504 Err:504 Err:504
04.09 SISTEMA DE RIEGO
04.09.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-UF ISm 31.85 - Err:504 Err:504 Err:504
04.09.02 SUMINISTRO E INSTALACION DE TUBERIA HDPE ISO m 117.80 - Err:504 Err:504 Err:504
04.09.03 SUMINISTRO E INSTALACION DE TUBERIA HDPE ISO m 468.00 - Err:504 Err:504 Err:504
04.09.04 SUMINISTRO Y COLOCACION DE CODO HDPE ISO 44 und 3.00 - Err:504 Err:504 Err:504
04.09.05 SUMINISTRO Y COLOCACION DE TEE HDPE ISO 442 und 8.00 - Err:504 Err:504 Err:504
04.09.06 ASPERSORES TIPO FALCON (qa=1.26m3/hr), Rm=14.9 und 40.00 - Err:504 Err:504 Err:504
04.09.07 SUMINISTRO Y COLOCACION DE REDUCCION HDPE und 8.00 - Err:504 Err:504 Err:504
04.09.08 VALVULA COMPUERTA DE BRONCE ROSCADA DE 1 und 8.00 - Err:504 Err:504 Err:504
04.09.09 CAJA DE REGISTRO PARA VALVULA DE 10" X 1 pza 8.00 - Err:504 Err:504 Err:504
04.10 INSTALACION DE GRAMADO
04.10.01 PREPARACION Y DESINFECCION DEL SUSTRATO m2 6,586.27 - Err:504 Err:504 Err:504
04.10.02 SEMBRADO DE GRASS m2 6,586.27 - Err:504 Err:504 Err:504
04.10.03 NIVELACION Y COMPACTADO POST SIEMBRA m2 6,586.27 - Err:504 Err:504 Err:504
04.10.04 DESHIERBO Y FERTILIZACION m2 6,586.27 - Err:504 Err:504 Err:504
04.10.05 CORTE DE GRASS MECANIZADO m2 6,586.27 - Err:504 Err:504 Err:504
*

-4-
#REF!
#REF!
FÓRMULA 05: CERCO PERIMETRICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
Form.05 CERCO PERIMETRICO
05 CERCO PERIMETRICO
05.01 CERCO PERIMETRICO DE ALBAÑILERIA EXTERIOR
05.01.01 TRABAJOS PRELIMINARES
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 46.37 - Err:504 Err:504 Err:504
05.01.01.02 TRAZO Y REPLANTEO m2 46.37 - Err:504 Err:504 Err:504
05.01.02 MOVIMIENTO DE TIERRAS
05.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 M m3 51.00 - Err:504 Err:504 Err:504
05.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CARG m3 63.75 - Err:504 Err:504 Err:504
05.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 63.75 - Err:504 Err:504 Err:504
05.01.03 CONCRETO SIMPLE
05.01.03.01 CIMIENTOS CORRIDOS
05.01.03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS C m3 37.09 - Err:504 Err:504 Err:504
05.01.03.02 SOBRECIMIENTOS
05.01.03.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENT m3 7.43 - Err:504 Err:504 Err:504
05.01.03.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIM m2 99.01 - Err:504 Err:504 Err:504
05.01.04 CONCRETO ARMADO
05.01.04.01 COLUMNAS
05.01.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.40 - Err:504 Err:504 Err:504
05.01.04.01.02 ACERO EN COLUMNAS F'Y = 4200 KG/CM GRAD kg 1,212.84 - Err:504 Err:504 Err:504
05.01.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 131.40 - Err:504 Err:504 Err:504
05.01.04.02 VIGAS
05.01.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.25 - Err:504 Err:504 Err:504
05.01.04.02.02 ACERO EN VIGAS F'Y = 4200 KG/CM2 GRADO 60 kg 1,204.39 - Err:504 Err:504 Err:504
05.01.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN V m2 40.75 - Err:504 Err:504 Err:504
05.01.05 MUROS, TABIQUES Y PLACAS
05.01.05.01 MURO DE SOGA LADRILLO KK 18 HUECOS MEZCL m2 204.80 - Err:504 Err:504 Err:504
05.01.06 REVOQUES ENLUCIDOS Y MOLDURAS
05.01.06.01 TARRAJEO EN INTERIORES ACABADO CON CEME m2 210.23 - Err:504 Err:504 Err:504
05.01.06.02 TARRAJEO EN EXTERIORES ACABADO CON CEM m2 95.21 - Err:504 Err:504 Err:504
05.01.06.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON m2 117.00 - Err:504 Err:504 Err:504
05.01.06.04 TARRAJEO DE SUPERFICIE DE VIGAS PERALTADA m2 23.56 - Err:504 Err:504 Err:504
05.01.06.05 BRUÑAS DE 1 x 1 CM. m 369.82 - Err:504 Err:504 Err:504
05.01.07 CARPINTERIA METALICA
05.01.07.01 PORTON METALICO CON MALLA 3.00X2.40 M. T und 2.00 - Err:504 Err:504 Err:504
05.01.07.02 PUERTA METALICA CON MALLA 0.90X2.40 M. TI und 1.00 - Err:504 Err:504 Err:504
05.01.08 PINTURA EN GENERAL
05.01.08.01 PINTURA LATEX EN MUROS INTERIORES 2 MANO m2 210.23 - Err:504 Err:504 Err:504
05.01.08.02 PINTURA LATEX EN MUROS EXTERIORES 2 MAN m2 95.21 - Err:504 Err:504 Err:504
05.01.08.03 PINTURA LATEX EN COLUMNAS m2 117.00 - Err:504 Err:504 Err:504
05.01.08.04 PINTURA LATEX EN VIGAS m2 23.56 - Err:504 Err:504 Err:504
05.02 CERCO METALICO INTERIOR
05.02.01 TRABAJOS PRELIMINARES
05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 76.80 - Err:504 Err:504 Err:504
05.02.01.02 TRAZO Y REPLANTEO m2 76.80 - Err:504 Err:504 Err:504
05.02.02 MOVIMIENTO DE TIERRAS
05.02.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 M m3 83.11 - Err:504 Err:504 Err:504
05.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CARG m3 99.73 - Err:504 Err:504 Err:504
05.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 99.73 - Err:504 Err:504 Err:504
05.02.03 CONCRETO SIMPLE
05.02.03.01 SOLADOS
05.02.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMENT m2 55.40 - Err:504 Err:504 Err:504
05.02.03.02 CIMIENTOS CORRIDOS
05.02.03.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS C m3 11.07 - Err:504 Err:504 Err:504
05.02.03.03 SOBRECIMIENTOS
05.02.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENT m3 30.72 - Err:504 Err:504 Err:504
05.02.03.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIM m2 153.60 - Err:504 Err:504 Err:504
05.02.04 REVOQUES ENLUCIDOS Y MOLDURAS
05.02.04.01 TARRAJEO DE SUPERFICIE DE SOBRECIMIENTO m2 516.20 - Err:504 Err:504 Err:504
05.02.05 JUNTAS DE SEPARACION
05.02.05.01 JUNTA DE DILATACION CON TEKNOPORT E=1" m2 8.92 - Err:504 Err:504 Err:504
05.02.06 CARPINTERIA METALICA

-5-
#REF!
#REF!
FÓRMULA 05: CERCO PERIMETRICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
05.02.06.01 CERCO CON MALLA OLIMPICA GALVANIZADA S und 574.20 - Err:504 Err:504 Err:504
05.02.06.02 PORTON METALICO CON MALLA 1.20X2.20 M. T und 7.00 - Err:504 Err:504 Err:504
05.02.06.03 PORTON METALICO CON REJAS 2.40 X 2.50 M. und 1.00 - Err:504 Err:504 Err:504
05.02.07 PINTURA EN GENERAL
05.02.07.01 PINTURA LATEX EN SOBRECIMIENTO 2 MANOS m2 230.40 - Err:504 Err:504 Err:504
05.02.07.02 PINTURA EN CARPINTERIA METALICA CON ES m2 1,148.40 - Err:504 Err:504 Err:504
*

-6-
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo

Form.06
TRIBUNA, AREA ADMINISTRATIVA Y
SS.HH. PUBLICO
06 TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PU
06.01 ESTRUCTURAS TRIBUNA NORTE
06.01.01 TRABAJOS PRELIMINARES
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,429.00 - Err:504 Err:504 Err:504
06.01.01.02 TRAZO Y REPLANTEO m2 1,429.00 - Err:504 Err:504 Err:504
06.01.02 MOVIMIENTO DE TIERRAS
06.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1 m3 207.14 - Err:504 Err:504 Err:504
06.01.02.02 EXCAVACION PARA ZAPATAS DE 1.70 m3 1,349.31 - Err:504 Err:504 Err:504
06.01.02.03 RELLENO Y COMPACTADO CON MATERIAL m3 885.92 - Err:504 Err:504 Err:504
06.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 838.17 - Err:504 Err:504 Err:504
06.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 838.17 - Err:504 Err:504 Err:504
06.01.02.06 NIVELACION, REFINE Y COMPACTADO m2 1,003.91 - Err:504 Err:504 Err:504
06.01.02.07 BASE AFIRMADO DE 4" CON EQUIPO LIVIA m2 91.05 - Err:504 Err:504 Err:504
06.01.03 CONCRETO SIMPLE
06.01.03.01 SOLADOS
06.01.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 m2 613.34 - Err:504 Err:504 Err:504
06.01.03.02 CIMIENTOS CORRIDOS
06.01.03.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIE m3 157.96 - Err:504 Err:504 Err:504
06.01.03.03 SOBRECIMIENTOS
06.01.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBREC m3 34.80 - Err:504 Err:504 Err:504
06.01.03.03.02 ENCOFRADO Y DESENCOFRADO EN SO m2 325.26 - Err:504 Err:504 Err:504
06.01.04 CONCRETO ARMADO
06.01.04.01 ZAPATAS
06.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 368.00 - Err:504 Err:504 Err:504
06.01.04.01.02 ACERO EN ZAPATAS GRADO 60 kg 14,965.89 - Err:504 Err:504 Err:504
06.01.04.02 VIGAS DE CIMENTACION
06.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION m3 42.42 - Err:504 Err:504 Err:504
06.01.04.02.02 ACERO EN VIGAS DE CIMENTACION GRA kg 11,898.72 - Err:504 Err:504 Err:504
06.01.04.03 COLUMNAS
06.01.04.03.01 CONCRETO EN COLUMNETAS F'C=175 KG m3 37.20 - Err:504 Err:504 Err:504
06.01.04.03.02 CONCRETO EN COLUMNAS F'C=210 KG/C m3 133.79 - Err:504 Err:504 Err:504
06.01.04.03.03 ACERO EN COLUMNAS F'Y = 4200 KG/CM kg 26,260.38 - Err:504 Err:504 Err:504
06.01.04.03.04 ENCOFRADO Y DESENCOFRADO CARA m2 1,574.53 - Err:504 Err:504 Err:504
06.01.04.04 PLACAS DE CONCRETO
06.01.04.04.01 CONCRETO EN PLACAS DE CONCRETO F' m3 24.98 - Err:504 Err:504 Err:504
06.01.04.04.02 ACERO EN PLACAS DE CONCRETO GRADO kg 2,420.01 - Err:504 Err:504 Err:504
06.01.04.04.03 ENCOFRADO Y DESENCOFRADO CARA m2 199.79 - Err:504 Err:504 Err:504
06.01.04.05 VIGAS
06.01.04.05.01 CONCRETO EN VIGUETAS F'C=175 KG/CM m3 1.11 - Err:504 Err:504 Err:504
06.01.04.05.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 221.50 - Err:504 Err:504 Err:504
06.01.04.05.03 ACERO EN VIGAS F'Y = 4200 KG/CM2 GRA kg 24,921.40 - Err:504 Err:504 Err:504
06.01.04.05.04 ENCOFRADO Y DESENCOFRADO CARAVI m2 955.85 - Err:504 Err:504 Err:504
06.01.04.06 LOSA MACIZA
06.01.04.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSA m3 33.29 - Err:504 Err:504 Err:504
06.01.04.06.02 ACERO EN LOSAS MACIZAS F'Y = 4200 kg 3,856.49 - Err:504 Err:504 Err:504
06.01.04.06.03 ENCOFRADO Y DESENCOFRADO NORMA m2 166.25 - Err:504 Err:504 Err:504
06.01.04.07 LOSA ALIGERADA
06.01.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C= m3 25.81 - Err:504 Err:504 Err:504
06.01.04.07.02 ACERO EN LOSAS ALIGERADAS F'Y = 4 kg 1,798.55 - Err:504 Err:504 Err:504
06.01.04.07.03 ENCOFRADO Y DESENCOFRADO NORM m2 263.76 - Err:504 Err:504 Err:504
06.01.04.07.04 LADRILLO HUECO DE ARCILLA 20X30 und 1,819.27 - Err:504 Err:504 Err:504
06.01.04.07.05 LADRILLO HUECO DE ARCILLA 15X30 und 377.85 - Err:504 Err:504 Err:504
06.01.04.08 ESCALERAS
06.01.04.08.01 CONCRETO EN ESCALERAS F'C=210 KG/C m3 30.60 - Err:504 Err:504 Err:504
06.01.04.08.02 ACERO EN ESCALERAS F'y= 4200 KG/CM kg 1,898.83 - Err:504 Err:504 Err:504
06.01.04.08.03 ENCOFRADO Y DESENCOFRADO NORMA m2 115.66 - Err:504 Err:504 Err:504
06.01.04.09 GRADERIAS

-7-
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
06.01.04.09.01 CONCRETO EN GRADERIA F'C=210 KG/CM m3 283.18 - Err:504 Err:504 Err:504
06.01.04.09.02 ACERO EN GRADERIA FY=4200 KG/CM2 kg 22,195.06 - Err:504 Err:504 Err:504
06.01.04.09.03 ENCOFRADO Y DESENCOFRADO CARAV m2 1,574.69 - Err:504 Err:504 Err:504
06.02 ESTRUCTURAS TRIBUNA SUR
06.02.01 TRABAJOS PRELIMINARES
06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,259.67 - Err:504 Err:504 Err:504
06.02.01.02 TRAZO Y REPLANTEO m2 1,259.67 - Err:504 Err:504 Err:504
06.02.02 MOVIMIENTO DE TIERRAS
06.02.02.01 EXCAVACION PARA CIMIENTOS HASTA 1 m3 79.20 - Err:504 Err:504 Err:504
06.02.02.02 EXCAVACION PARA ZAPATAS DE 1.70 m3 819.27 - Err:504 Err:504 Err:504
06.02.02.03 RELLENO Y COMPACTADO CON MATERIAL m3 453.38 - Err:504 Err:504 Err:504
06.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 556.36 - Err:504 Err:504 Err:504
06.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 556.36 - Err:504 Err:504 Err:504
06.02.02.06 NIVELACION, REFINE Y COMPACTADO m2 387.52 - Err:504 Err:504 Err:504
06.02.03 CONCRETO SIMPLE
06.02.03.01 SOLADOS
06.02.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 m2 473.86 - Err:504 Err:504 Err:504
06.02.03.02 CIMIENTOS CORRIDOS
06.02.03.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIE m3 55.20 - Err:504 Err:504 Err:504
06.02.03.03 SOBRECIMIENTOS
06.02.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBREC m3 11.98 - Err:504 Err:504 Err:504
06.02.03.03.02 ENCOFRADO Y DESENCOFRADO EN SO m2 130.32 - Err:504 Err:504 Err:504
06.02.04 CONCRETO ARMADO
06.02.04.01 ZAPATAS
06.02.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 285.86 - Err:504 Err:504 Err:504
06.02.04.01.02 ACERO EN ZAPATAS GRADO 60 kg 7,939.48 - Err:504 Err:504 Err:504
06.02.04.02 COLUMNAS
06.02.04.02.01 CONCRETO EN COLUMNETAS F'C=175 KG m3 1.46 - Err:504 Err:504 Err:504
06.02.04.02.02 CONCRETO EN COLUMNAS F'C=210 KG/C m3 39.78 - Err:504 Err:504 Err:504
06.02.04.02.03 ACERO EN COLUMNAS F'Y = 4200 KG/CM kg 14,067.15 - Err:504 Err:504 Err:504
06.02.04.02.04 ENCOFRADO Y DESENCOFRADO CARA m2 163.87 - Err:504 Err:504 Err:504
06.02.04.03 PLACAS DE CONCRETO
06.02.04.03.01 CONCRETO EN PLACAS DE CONCRETO F' m3 100.26 - Err:504 Err:504 Err:504
06.02.04.03.02 ACERO EN PLACAS DE CONCRETO GRADO kg 15,689.15 - Err:504 Err:504 Err:504
06.02.04.03.03 ENCOFRADO Y DESENCOFRADO CARA m2 828.00 - Err:504 Err:504 Err:504
06.02.04.04 VIGAS
06.02.04.04.01 CONCRETO EN VIGUETAS F'C=175 KG/CM m3 1.27 - Err:504 Err:504 Err:504
06.02.04.04.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 197.73 - Err:504 Err:504 Err:504
06.02.04.04.03 ACERO EN VIGAS F'Y = 4200 KG/CM2 GRA kg 21,525.48 - Err:504 Err:504 Err:504
06.02.04.04.04 ENCOFRADO Y DESENCOFRADO CARAVI m2 1,364.96 - Err:504 Err:504 Err:504
06.02.04.05 LOSA MACIZA
06.02.04.05.01 CONCRETO F'C=210 KG/CM2 PARA LOSA m3 33.29 - Err:504 Err:504 Err:504
06.02.04.05.02 ACERO EN LOSAS MACIZAS F'Y = 4200 kg 3,856.49 - Err:504 Err:504 Err:504
06.02.04.05.03 ENCOFRADO Y DESENCOFRADO NORMA m2 166.25 - Err:504 Err:504 Err:504
06.02.04.06 ESCALERAS
06.02.04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/C m3 38.25 - Err:504 Err:504 Err:504
06.02.04.06.02 ACERO EN ESCALERAS F'y= 4200 KG/CM kg 2,373.54 - Err:504 Err:504 Err:504
06.02.04.06.03 ENCOFRADO Y DESENCOFRADO NORMA m2 144.57 - Err:504 Err:504 Err:504
06.02.04.07 GRADERIAS
06.02.04.07.01 CONCRETO EN GRADERIA F'C=210 KG/CM m3 283.18 - Err:504 Err:504 Err:504
06.02.04.07.02 ACERO EN GRADERIA FY=4200 KG/CM2 kg 22,195.06 - Err:504 Err:504 Err:504
06.02.04.07.03 ENCOFRADO Y DESENCOFRADO CARAV m2 1,574.69 - Err:504 Err:504 Err:504
06.03 ESTRUCTURAS METALICAS Y COBERTURA
06.03.01 TIJERALES METALICOS
06.03.01.01 TIJERAL METALICO TIPO 1 und 2.00 - Err:504 Err:504 Err:504
06.03.01.02 TIJERAL METALICO TIPO 2 und 2.00 - Err:504 Err:504 Err:504
06.03.01.03 TIJERAL METALICO TIPO 3 und 4.00 - Err:504 Err:504 Err:504
06.03.01.04 TIJERAL METALICO TIPO 4 und 2.00 - Err:504 Err:504 Err:504
06.03.01.05 TIJERAL METALICO TIPO 5 und 2.00 - Err:504 Err:504 Err:504

-8-
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
06.03.01.06 TIJERAL METALICO TIPO 6 und 2.00 - Err:504 Err:504 Err:504
06.03.01.07 TIJERAL METALICO TIPO 7 und 2.00 - Err:504 Err:504 Err:504
06.03.01.08 TIJERAL METALICO TIPO 8 und 4.00 - Err:504 Err:504 Err:504
06.03.02 CORREA METALICA
06.03.02.01 VIGUETAS METALICAS TIPICAS T-01 m 614.18 - Err:504 Err:504 Err:504
06.03.02.02 VIGUETAS METALICAS TIPICAS T-02 m 190.03 - Err:504 Err:504 Err:504
06.03.02.03 ARRIOSTRES ENTRE VIGUETAS VERTICAL m 1,094.40 - Err:504 Err:504 Err:504
06.03.03 TENSOR
06.03.03.01 TENSOR DE TIJERALES CON CABLE TIPO und 20.00 - Err:504 Err:504 Err:504
06.03.04 ARRIOSTRE
06.03.04.01 ARRIOSTRES ENTRE TIJERALES CRUZ SA m 3,600.00 - Err:504 Err:504 Err:504
06.03.05 COBERTURA
06.03.05.01 COBERTURA PLANCHA METALICA AL-0.5 m2 1,211.95 - Err:504 Err:504 Err:504
06.03.06 TRABAJOS ESPECIALES
06.03.06.01 MONTAJE DE TIJERALES und 20.00 - Err:504 Err:504 Err:504
06.03.06.02 MONTAJE DE VIGUETAS und 105.00 - Err:504 Err:504 Err:504
06.04 MUROS Y TABIQUES
06.04.01 MURO DE CABEZA LADRILLO KK 18 HUECOS m2 287.46 - Err:504 Err:504 Err:504
06.04.02 MURO DE SOGA LADRILLO KK 18 HUECOS M m2 1,299.70 - Err:504 Err:504 Err:504
06.05 REVOQUES ENLUCIDOS Y MOLDURAS
06.05.01 TARRAJEO PRIMARIO RAYADO C/MORTERO 1 m2 419.42 - Err:504 Err:504 Err:504
06.05.02 TARRAJEO EN INTERIORES ACABADO CON C m2 2,305.49 - Err:504 Err:504 Err:504
06.05.03 TARRAJEO EN EXTERIORES ACABADO CON m2 891.61 - Err:504 Err:504 Err:504
06.05.04 TARRAJEO DE SUPERFICIE DE COLUMNAS C m2 51.26 - Err:504 Err:504 Err:504
06.05.05 TARRAJEO DE ARISTAS DE COLUMNAS MEZCLm 186.40 - Err:504 Err:504 Err:504
06.05.06 TARRAJEO DE SUPERFICIE DE VIGAS PERAL m2 48.90 - Err:504 Err:504 Err:504
06.05.07 TARRAJEO DE ARISTAS DE VIGAS MEZCLA 1:5 m 73.80 - Err:504 Err:504 Err:504
06.05.08 VESTIDURA DE DERRAMES ANCHO=15 CM. m 578.81 - Err:504 Err:504 Err:504
06.05.09 BRUÑAS DE 1 x 1 CM. m 2,220.30 - Err:504 Err:504 Err:504
06.06 JUNTAS DE SEPARACION
06.06.01 JUNTA SISMICA CON TEKNOPORT 1" m 561.70 - Err:504 Err:504 Err:504
06.07 PISOS Y PAVIMENTOS
06.07.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 1,391.43 - Err:504 Err:504 Err:504
06.07.02 CONTRAPISO DE 48 MM. m2 1,821.98 - Err:504 Err:504 Err:504
06.07.03 PISO DE CERAMICO ANTIDESLIZANTE DE C m2 851.02 - Err:504 Err:504 Err:504
06.07.04 PISO CEMENTO PULIDO Y BRUÑADO E = 2.5 m2 1,022.61 - Err:504 Err:504 Err:504
06.08 CIELORRASOS
06.08.01 CIELORRASO CON MEZCLA CEMENTO ARENA m 12 324.90 - Err:504 Err:504 Err:504
06.09 FALSO CIELORRASOS
06.09.01 FALSO CIELO RASO DE BALDOSA DE FIBRA m2 463.55 - Err:504 Err:504 Err:504
06.10 VEREDAS
06.10.01 CONCRETO EN VEREDAS FC=140 KG/CM2 m3 20.34 - Err:504 Err:504 Err:504
06.10.02 ENCOFRADO Y DESENCOFRADO PARA VERE m2 74.73 - Err:504 Err:504 Err:504
06.11 RAMPAS
06.11.01 CONCRETO EN RAMPA F'C=140 KG/CM² m3 4.65 - Err:504 Err:504 Err:504
06.11.02 ENCOFRADO Y DESENCOFRADO EN RAMPA m2 0.51 - Err:504 Err:504 Err:504
06.12 LOSA CONCRETO P/LAV. OVALIN
06.12.01 CONCRETO EN LOSA P/LAV. OVALIN F'C = 1 m3 1.60 - Err:504 Err:504 Err:504
06.12.02 ENCOFRADO Y DESENCOFRADO EN LOSA P/ m2 19.70 - Err:504 Err:504 Err:504
06.13 CONTRAZOCALOS
06.13.01 CONTRAZOCALO DE PORCELANATO H=10 CM m 223.76 - Err:504 Err:504 Err:504
06.13.02 CONTRAZOCALO DE CEMENTO PULIDO H=1 m 279.30 - Err:504 Err:504 Err:504
06.13.03 CONTRAZOCALO EXTERIOR CEMENTO S/C m2 82.43 - Err:504 Err:504 Err:504
06.14 ZOCALOS
06.14.01 ZOCALO DE CERAMICO DE COLOR DE 30X45 m2 419.42 - Err:504 Err:504 Err:504
06.15 REVESTIMIENTO DE GRADAS Y ESCALERAS
06.15.01 REVESTIMIENTO PULIDO DE PASOS Y CONTR m2 262.98 - Err:504 Err:504 Err:504
06.15.02 REVESTIMIENTO PULIDO EN GRADERIAS DE m2 4,263.02 - Err:504 Err:504 Err:504
06.16 CARPINTERIA DE MADERA

-9-
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
06.16.01 PUERTA DE MADERA CEDRO TABLERO REB m2 92.52 - Err:504 Err:504 Err:504
06.16.02 PUERTA CONTRAPLACADA 35 MM. C/TRIPL m2 5.76 - Err:504 Err:504 Err:504
06.16.03 VENTANA DE MADERA m2 12.51 - Err:504 Err:504 Err:504
06.16.04 COLOCACION DE PUERTAS DE MADERA und 35.00 - Err:504 Err:504 Err:504
06.16.05 COLOCACION DE VENTANAS DE MADERA und 35.00 - Err:504 Err:504 Err:504
06.17 CARPINTERIA METALICA
06.17.01 PUERTA DE ALUMINIO EN DUCHAS m2 19.20 - Err:504 Err:504 Err:504
06.17.02 VENTANA CON SISTEMA VITROVEN CON BA m2 3.00 - Err:504 Err:504 Err:504
06.17.03 VENTANA METALICA CON BARRAS DE SEGURm2 90.72 - Err:504 Err:504 Err:504
06.17.04 DIVISION METALICA P/SS. HH. m2 205.98 - Err:504 Err:504 Err:504
06.17.05 PUERTA METALICA PARA SS. HH. m2 79.92 - Err:504 Err:504 Err:504
06.17.06 BARANDA METALICA CON TUBO REDONDO E m 170.00 - Err:504 Err:504 Err:504
06.18 CERRAJERIA
06.18.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 108.00 - Err:504 Err:504 Err:504
06.18.02 BISAGRA P/PUERTA T/PIVOT EN SS.HH. pza 148.00 - Err:504 Err:504 Err:504
06.18.03 CERROJO DE FIERRO EN PUERTAS METALICA pza 74.00 - Err:504 Err:504 Err:504
06.18.04 CERRADURA DE DOS GOLPES pza 36.00 - Err:504 Err:504 Err:504
06.19 VIDRIOS, CRISTALES Y SIMILARES
06.19.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,008.43 - Err:504 Err:504 Err:504
06.20 PINTURA EN GENERAL
06.20.01 PINTURA LATEX EN MUROS INTERIORES 2 m2 2,305.49 - Err:504 Err:504 Err:504
06.20.02 PINTURA LATEX EN MUROS EXTERIORES 2 m2 1,028.33 - Err:504 Err:504 Err:504
06.20.03 PINTURA LATEX EN COLUMNAS m2 123.26 - Err:504 Err:504 Err:504
06.20.04 PINTURA LATEX EN VIGAS 02 MANOS m2 198.70 - Err:504 Err:504 Err:504
06.20.05 PINTURA LATEX EN DERRAMES E=0.15 M. m 578.81 - Err:504 Err:504 Err:504
06.20.06 PINTURA LATEX EN CIELO RASO (2 MANOS) m2 324.90 - Err:504 Err:504 Err:504
06.20.07 PINTURA C/ESMALTE EN CONTRAZOCALO 0 m2 110.36 - Err:504 Err:504 Err:504
06.20.08 PINTURA C/BARNIZ EN CARPINTERIA DE M m2 196.56 - Err:504 Err:504 Err:504
06.20.09 PINTURA EN CARPINTERIA METALICA CON m2 411.96 - Err:504 Err:504 Err:504
06.20.10 PINTURA EN VENTANAS METALICAS C/ESM m2 187.44 - Err:504 Err:504 Err:504
06.20.11 PINTURA EN BARANDAS METALICAS m 453.78 - Err:504 Err:504 Err:504
06.21 APARATOS Y ACCESORIOS SANITARIOS
06.21.01 INODORO TANQUE BAJO COLOR (INC. ACC pza 51.00 - Err:504 Err:504 Err:504
06.21.02 LAVATORIO DE PARED DE COLOR (INC. AC pza 55.00 - Err:504 Err:504 Err:504
06.21.03 URINARIO TIPO PICO DE LORO (INC. ACCE pza 24.00 - Err:504 Err:504 Err:504
06.21.04 DUCHAS CROMADAS DE CABEZA GIRATOR pza 11.00 - Err:504 Err:504 Err:504
06.21.05 LAVADERO DE ACERO INOXIDABLE (INC. pza 1.00 - Err:504 Err:504 Err:504
06.22 SISTEMA DE DESAGUE
06.22.01 SALIDAS DE DESAGUE
06.22.01.01 SALIDA DE DESAGUE EN PVC 1 1/ 2" pto 79.00 - Err:504 Err:504 Err:504
06.22.01.02 SALIDA DE DESAGUE EN PVC 2" pto 12.00 - Err:504 Err:504 Err:504
06.22.01.03 SALIDA DE DESAGUE EN PVC 4" pto 51.00 - Err:504 Err:504 Err:504
06.22.02 SALIDAS DE VENTILACION
06.22.02.01 SALIDA DE VENTILACION P/DESAGUE EN PVpto 79.00 - Err:504 Err:504 Err:504
06.22.02.02 SALIDA DE VENTILACION P/DESAGUE EN P pto 12.00 - Err:504 Err:504 Err:504
06.22.02.03 SALIDA DE VENTILACION P/DESAGUE EN P pto 51.00 - Err:504 Err:504 Err:504
06.22.03 TUBERIA DE PVC PARA RED DE DESAGUE Y
06.22.03.01 TUBERIA DE PVC SAL 2" m 280.51 - Err:504 Err:504 Err:504
06.22.03.02 TUBERIA DE PVC SAL 3" m 56.83 - Err:504 Err:504 Err:504
06.22.03.03 TUBERIA DE PVC SAL 4" m 426.12 - Err:504 Err:504 Err:504
06.22.04 CAMARA DE INSPECCION
06.22.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 1.00 - Err:504 Err:504 Err:504
06.22.05 ACCESORIOS PARA RED DE DESAGUE
06.22.05.01 CODO PVC SAL 2"X45° pza 98.00 - Err:504 Err:504 Err:504
06.22.05.02 CODO PVC SAL 3"X45° pza 31.00 - Err:504 Err:504 Err:504
06.22.05.03 CODO PVC SAL 4"X45° pza 80.00 - Err:504 Err:504 Err:504
06.22.05.04 CODO PVC SAL 2"X90° pza 199.00 - Err:504 Err:504 Err:504
06.22.05.05 CODO PVC SAL 3"X90° pza 48.00 - Err:504 Err:504 Err:504
06.22.05.06 CODO PVC SAL 4"X90° pza 85.00 - Err:504 Err:504 Err:504

- 10 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
06.22.05.07 YEE PVC SAL CON REDUCCION DE 3" a 2" pza 13.00 - Err:504 Err:504 Err:504
06.22.05.08 YEE PVC SAL CON REDUCCION DE 4" a 2" pza 21.00 - Err:504 Err:504 Err:504
06.22.05.09 YEE PVC SAL CON REDUCCION DE 4" a 3" pza 7.00 - Err:504 Err:504 Err:504
06.22.05.10 YEE DOBLE PVC SAP 4" pza 1.00 - Err:504 Err:504 Err:504
06.22.05.11 AMPLIACIÓN EXCÉNTRICA Ø 4x3'' pza 3.00 - Err:504 Err:504 Err:504
06.22.05.12 AMPLIACIÓN EXCÉNTRICA Ø 2x4'' pza 2.00 - Err:504 Err:504 Err:504
06.22.05.13 AMPLIACIÓN EXCÉNTRICA Ø 3x4'' pza 2.00 - Err:504 Err:504 Err:504
06.22.05.14 YEE PVC SAL 2" pza 63.00 - Err:504 Err:504 Err:504
06.22.05.15 YEE PVC SAL 3" pza 17.00 - Err:504 Err:504 Err:504
06.22.05.16 YEE PVC SAL 4" pza 51.00 - Err:504 Err:504 Err:504
06.22.05.17 TEE PVC SAL 2" pza 1.00 - Err:504 Err:504 Err:504
06.22.05.18 TEE PVC SAL Ø 3" und 1.00 - Err:504 Err:504 Err:504
06.22.05.19 TEE PVC SAL 4" pza 2.00 - Err:504 Err:504 Err:504
06.22.05.20 SIFÓN PARA PLACA DE Ø 2'' pza 11.00 - Err:504 Err:504 Err:504
06.22.05.21 TAPA DE REGISTRO DE 2" und 38.00 - Err:504 Err:504 Err:504
06.22.05.22 TAPA DE REGISTRO DE 4" und 1.00 - Err:504 Err:504 Err:504
06.22.06 REDES DE DISTRIBUCION
06.22.06.01 TUBERIA DE PVC SAL 2" m 107.04 - Err:504 Err:504 Err:504
06.22.06.02 EXCAVACION DE ZANJAS DE 0.40x0.50 PA m 107.04 - Err:504 Err:504 Err:504
06.22.06.03 RELLENO Y COMPACTADO DE ZANJAS DE m 107.04 - Err:504 Err:504 Err:504
06.23 SISTEMA DE AGUA FRIA
06.23.01 SALIDAS DE AGUA FRIA
06.23.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE P pto 142.00 - Err:504 Err:504 Err:504
06.23.02 REDES DE DISTRIBUCION
06.23.02.01 TUBERIA DE PVC C-10 Ø 2 1/2" m 21.17 - Err:504 Err:504 Err:504
06.23.02.02 TUBERIA DE PVC C-10 Ø 2" m 154.55 - Err:504 Err:504 Err:504
06.23.02.03 TUBERIA DE PVC C-10 Ø 1 1/2" m 69.57 - Err:504 Err:504 Err:504
06.23.02.04 TUBERIA DE PVC C-10 Ø 1 1/4" m 51.88 - Err:504 Err:504 Err:504
06.23.02.05 TUBERIA DE PVC SAP C-10 ø 1" m 80.23 - Err:504 Err:504 Err:504
06.23.02.06 TUBERIA DE PVC C-10 Ø3/4" m 171.83 - Err:504 Err:504 Err:504
06.23.02.07 TUBERIA DE PVC C-10 Ø1/2" m 273.93 - Err:504 Err:504 Err:504
06.23.02.08 EXCAVACION DE ZANJAS DE 0.30x0.40 PA m 823.16 - Err:504 Err:504 Err:504
06.23.02.09 RELLENO Y COMPACTADO DE ZANJAS DE m 823.16 - Err:504 Err:504 Err:504
06.23.03 ACCESORIOS DE REDES DE AGUA
06.23.03.01 CODO PVC SAP 1/2" x 90º PARA AGUA pza 400.00 - Err:504 Err:504 Err:504
06.23.03.02 CODO PVC SAP 3/4" x 90º PARA AGUA pza 64.00 - Err:504 Err:504 Err:504
06.23.03.03 CODO PVC SAP 1" x 90º PARA AGUA pza 57.00 - Err:504 Err:504 Err:504
06.23.03.04 CODO PVC SAP 1 1/4" x 90º PARA AGUA pza 1.00 - Err:504 Err:504 Err:504
06.23.03.05 CODO PVC SAP 2" x 90º und 10.00 - Err:504 Err:504 Err:504
06.23.03.06 TEE PVC SAP Ø 1/2" PARA AGUA und 123.00 - Err:504 Err:504 Err:504
06.23.03.07 TEE PVC SAP Ø 3/4" PARA AGUA und 41.00 - Err:504 Err:504 Err:504
06.23.03.08 TEE PVC SAP Ø 1" PARA AGUA und 15.00 - Err:504 Err:504 Err:504
06.23.03.09 TEE PVC SAP Ø 1 1/4" PARA AGUA und 9.00 - Err:504 Err:504 Err:504
06.23.03.10 TEE PVC SAP Ø 2" und 2.00 - Err:504 Err:504 Err:504
06.23.03.11 UNION UNIVERSAL PVC SAP 1/2" und 2.00 - Err:504 Err:504 Err:504
06.23.03.12 REDUCCION PVC SAP Ø 2 1/2" A 2" und 4.00 - Err:504 Err:504 Err:504
06.23.03.13 REDUCCION PVC SAP Ø 2" A 1 1/4" und 2.00 - Err:504 Err:504 Err:504
06.23.03.14 REDUCCION PVC SAP Ø 1 1/4" A 3/4" und 6.00 - Err:504 Err:504 Err:504
06.23.03.15 REDUCCION PVC SAP Ø 3/4" A 1/2" und 64.00 - Err:504 Err:504 Err:504
06.23.03.16 REDUCCION PVC SAP Ø 1 1/4" A 1" und 7.00 - Err:504 Err:504 Err:504
06.23.03.17 REDUCCION PVC SAP Ø 1" A 3/4" und 14.00 - Err:504 Err:504 Err:504
06.23.03.18 REDUCCION PVC SAP Ø 1/2" A 1/4" und 50.00 - Err:504 Err:504 Err:504
06.23.03.19 REDUCCION PVC SAP Ø 1 1/2" A 1 1/4" und 4.00 - Err:504 Err:504 Err:504
06.23.03.20 REDUCCION PVC SAP Ø 2 1/2" A 1 1/2" und 1.00 - Err:504 Err:504 Err:504
06.23.03.21 REDUCCION PVC SAP Ø 1" A 1/2" und 6.00 - Err:504 Err:504 Err:504
06.23.03.22 REDUCCION PVC SAP Ø 2" A 1 1/2" und 3.00 - Err:504 Err:504 Err:504
06.23.03.23 REDUCCION PVC SAP Ø 1 1/2" A 1" PARA A und 1.00 - Err:504 Err:504 Err:504
06.23.04 LLAVES Y VALVULAS
06.23.04.01 VALVULA DE COMPUERTA 2 1/2" pza 1.00 - Err:504 Err:504 Err:504

- 11 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
06.23.04.02 VALVULA DE COMPUERTA 1" und 7.00 - Err:504 Err:504 Err:504
06.23.04.03 VALVULA DE COMPUERTA 3/4" und 20.00 - Err:504 Err:504 Err:504
06.24 SISTEMA DE AGUA CALIENTE
06.24.01 SALIDAS DE AGUA CALIENTE
06.24.01.01 SALIDA DE AGUA CALIENTE CON TUBERIA pto 79.00 - Err:504 Err:504 Err:504
06.24.02 REDES DE DISTRIBUCION
06.24.02.01 TUBERIA DE PVC C-10 Ø 2 1/2" m 21.17 - Err:504 Err:504 Err:504
06.24.02.02 TUBERIA DE PVC C-10 Ø 2" m 154.55 - Err:504 Err:504 Err:504
06.24.02.03 TUBERIA DE PVC C-10 Ø 1 1/2" m 69.57 - Err:504 Err:504 Err:504
06.24.02.04 TUBERIA DE PVC C-10 Ø 1 1/4" m 51.88 - Err:504 Err:504 Err:504
06.24.02.05 TUBERIA DE PVC SAP C-10 ø 1" m 80.23 - Err:504 Err:504 Err:504
06.24.02.06 TUBERIA DE PVC C-10 Ø3/4" m 171.83 - Err:504 Err:504 Err:504
06.24.02.07 TUBERIA DE PVC C-10 Ø1/2" m 273.93 - Err:504 Err:504 Err:504
06.24.02.08 EXCAVACION DE ZANJAS DE 0.30x0.40 PA m 823.16 - Err:504 Err:504 Err:504
06.24.02.09 RELLENO Y COMPACTADO DE ZANJAS DE m 823.16 - Err:504 Err:504 Err:504
06.24.03 ACCESORIOS DE REDES DE AGUA CALIENTE
06.24.03.01 CODO PVC SAP 1/2" x 90º PARA AGUA pza 400.00 - Err:504 Err:504 Err:504
06.24.03.02 CODO PVC SAP 3/4" x 90º PARA AGUA pza 64.00 - Err:504 Err:504 Err:504
06.24.03.03 CODO PVC SAP 1" x 90º PARA AGUA pza 57.00 - Err:504 Err:504 Err:504
06.24.03.04 CODO PVC SAP 1 1/4" x 90º PARA AGUA pza 1.00 - Err:504 Err:504 Err:504
06.24.03.05 TEE PVC SAP Ø 1/2" PARA AGUA und 123.00 - Err:504 Err:504 Err:504
06.24.03.06 TEE PVC SAP Ø 3/4" PARA AGUA und 41.00 - Err:504 Err:504 Err:504
06.24.03.07 TEE PVC SAP Ø 1" PARA AGUA und 15.00 - Err:504 Err:504 Err:504
06.24.03.08 TEE PVC SAP Ø 1 1/4" PARA AGUA und 9.00 - Err:504 Err:504 Err:504
06.24.03.09 REDUCCION PVC SAP Ø 2 1/2" A 2" und 3.00 - Err:504 Err:504 Err:504
06.24.03.10 REDUCCION PVC SAP Ø 2" A 1 1/4" und 2.00 - Err:504 Err:504 Err:504
06.24.03.11 REDUCCION PVC SAP Ø 1 1/4" A 3/4" und 6.00 - Err:504 Err:504 Err:504
06.24.03.12 REDUCCION PVC SAP Ø 3/4" A 1/2" und 64.00 - Err:504 Err:504 Err:504
06.24.03.13 REDUCCION PVC SAP Ø 1 1/4" A 1" und 7.00 - Err:504 Err:504 Err:504
06.24.03.14 REDUCCION PVC SAP Ø 1" A 3/4" und 14.00 - Err:504 Err:504 Err:504
06.24.03.15 REDUCCION PVC SAP Ø 1/2" A 1/4" und 50.00 - Err:504 Err:504 Err:504
06.24.03.16 REDUCCION PVC SAP Ø 1 1/2" A 1 1/4" und 4.00 - Err:504 Err:504 Err:504
06.24.03.17 REDUCCION PVC SAP Ø 2 1/2" A 1 1/2" und 1.00 - Err:504 Err:504 Err:504
06.24.03.18 REDUCCION PVC SAP Ø 1" A 1/2" und 6.00 - Err:504 Err:504 Err:504
06.24.03.19 REDUCCION PVC SAP Ø 2" A 1 1/2" und 3.00 - Err:504 Err:504 Err:504
06.24.03.20 REDUCCION PVC SAP Ø 1 1/2" A 1" PARA A und 1.00 - Err:504 Err:504 Err:504
06.25 LLAVES Y VALVULAS
06.25.01 VALVULA DE COMPUERTA 2 1/2" pza 1.00 - Err:504 Err:504 Err:504
06.25.02 VALVULA DE COMPUERTA 1" und 7.00 - Err:504 Err:504 Err:504
06.25.03 VALVULA DE COMPUERTA 3/4" und 20.00 - Err:504 Err:504 Err:504
06.26 EQUIPOS DE BOMBEO
06.26.01 BOMBA MONOFÁSICA HF 70B DE 2HP pza 1.00 - Err:504 Err:504 Err:504
06.26.02 BOMBA MONOFÁSICA HF 70B DE 1.5HP pza 1.00 - Err:504 Err:504 Err:504
06.26.03 CALENTADOR A GAS 01-01-0-067 MASTER FL pza 1.00 - Err:504 Err:504 Err:504
06.27 SISTEMA DE DESAGUE PLUVIAL
06.27.01 TUBERIA DE BAJADA Y DISTRIBUCION PVC S m 109.28 - Err:504 Err:504 Err:504
06.27.02 CODO PVC SAL 4"X90° und 23.00 - Err:504 Err:504 Err:504
06.27.03 COLUMNETA DE SOPORTE DE TUBERIA DE und 13.00 - Err:504 Err:504 Err:504
06.28 INSTALACIONES ELECTRICAS
06.28.01 OBRAS PRELIMINARES
06.28.01.01 TRAZO, NIVELACION Y REPLANTEO m 244.88 - Err:504 Err:504 Err:504
06.28.01.02 EXCAVACION MANUAL PARA REDES ELEC m3 122.44 - Err:504 Err:504 Err:504
06.28.01.03 RELLENO COMPACTADO A MANO CON MA m3 117.54 - Err:504 Err:504 Err:504
06.28.01.04 CAMA DE ARENA PARA POYO DE TUBERIA m3 24.49 - Err:504 Err:504 Err:504
06.28.01.05 CINTA SEÑALIZADORA m 244.88 - Err:504 Err:504 Err:504
06.28.01.06 ELIMINACION DE MATERIAL EXCEDENTE m3 6.12 - Err:504 Err:504 Err:504
06.28.01.07 BUZONES ELECTRICOS und 8.00 - Err:504 Err:504 Err:504
06.28.02 CANALIZACION Y/O TUBERIAS
06.28.02.01 TUBERIA PVC-SAP ELECTRICAS DE Ø25mm m 1,465.73 - Err:504 Err:504 Err:504

- 12 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
06.28.02.02 TUBERIA PVC-SAP ELECTRICAS DE Ø80mm m 668.75 - Err:504 Err:504 Err:504
06.28.02.03 TUBERIA CONDUIT EMT DE Ø25mm m 145.95 - Err:504 Err:504 Err:504
06.28.03 SALIDAS ELECTRICAS
06.28.03.01 SALIDA CON CAJA OCTOGONAL DE 100x1 pto 254.00 - Err:504 Err:504 Err:504
06.28.03.02 SALIDA CON CAJA RECTANGULAR DE 100 pto 107.00 - Err:504 Err:504 Err:504
06.28.04 TABLEROS GENERAL Y DE DISTRIBUCIÓN
06.28.04.01 TAB TG - 3Ø/220V. / 60 Hz. / 25KA. und 1.00 - Err:504 Err:504 Err:504
06.28.04.02 TAB TS-1 - 3Ø/220V. / 60 Hz. / 1KA. und 1.00 - Err:504 Err:504 Err:504
06.28.04.03 TAB TS-2 - 3Ø/220V. / 60 Hz. / 1KA. und 1.00 - Err:504 Err:504 Err:504
06.28.04.04 TAB T-CB - 3Ø/220V. / 60 Hz. / 25KA. und 1.00 - Err:504 Err:504 Err:504
06.28.05 CONDUCTORES ELECTRICOS
06.28.05.01 CABLE TIPO NH-80 - 4.0 mm2 m 1,026.36 - Err:504 Err:504 Err:504
06.28.05.02 CABLE TIPO NH-80 - 6.0 mm2 m 405.05 - Err:504 Err:504 Err:504
06.28.05.03 CABLE TIPO N2XOH - 10.0 mm2 m 240.14 - Err:504 Err:504 Err:504
06.28.05.04 CABLE TIPO N2XOH - 95.0 mm2 m 165.00 - Err:504 Err:504 Err:504
06.28.06 CONDUCTOR ELECTRICO PARA PUESTA A T
06.28.06.01 CONDUCTOR COBRE DESNUDO DE 35.00M m 543.03 - Err:504 Err:504 Err:504
06.28.07 SISTEMA DE PUESTA A TIERRA
06.28.07.01 PUESTA A TIERRA und 2.00 - Err:504 Err:504 Err:504
06.28.08 EQUIPOS LUMINARIAS ADOSADOS EN TECHO
06.28.08.01 LUMINARIA MODULAR LED 3400lm DEL und 27.00 - Err:504 Err:504 Err:504
06.28.08.02 LUMINARIA MODULAR LED 4000lm DE 3 und 42.00 - Err:504 Err:504 Err:504
06.28.08.03 LUMINARIA LED 1100lm DE 22W, EMPOTR und 76.00 - Err:504 Err:504 Err:504
06.28.08.04 LUMINARIA MODULAR LED HERMETICO 3 und 84.00 - Err:504 Err:504 Err:504
06.28.08.05 LUMINARIA MODULAR LED 2700lm DE 55 und 16.00 - Err:504 Err:504 Err:504
06.28.08.06 LUMINARIA MODULAR LED 1200lm DE 1 und 9.00 - Err:504 Err:504 Err:504
06.28.09 ACCESORIOS ELECTRICOS
06.28.09.01 SUMINISTRO E INSTALACION DE INTERR und 42.00 - Err:504 Err:504 Err:504
06.28.09.02 SUMINISTRO E INSTALACION DE INTE und 6.00 - Err:504 Err:504 Err:504
06.28.09.03 SUMINISTRO E INSTALACION DE TOMAC und 61.00 - Err:504 Err:504 Err:504
06.28.09.04 SUMINISTRO E INSTALACION DE CAJA D und 10.00 - Err:504 Err:504 Err:504
06.28.09.05 SUMINISTRO E INSTALACION DE CAJA D und 14.00 - Err:504 Err:504 Err:504
06.28.09.06 SUMINISTRO E INSTALACION DE CAJA D und 1.00 - Err:504 Err:504 Err:504
06.28.10 PRUEBA DE RECEPCION DE OBRA
06.28.10.01 PRUEBAS DE PUESTAS A TIERRA GLB 1.00 - Err:504 Err:504 Err:504
06.28.10.02 PRUEBAS DE CALIDAD DE LA ENERGIA GLB 1.00 - Err:504 Err:504 Err:504
06.28.10.03 PRUEBAS DE CONTINUIDAD GLB 1.00 - Err:504 Err:504 Err:504
06.28.10.04 PRUEBAS DE ILUMINACION GLB 1.00 - Err:504 Err:504 Err:504
06.28.10.05 PRUEBAS DE FUNCIONAMIENTO DE EQUI GLB 1.00 - Err:504 Err:504 Err:504
*

- 13 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
Form.08 PLAN DE MANEJO AMBIENTAL
08 PLAN DE MANEJO AMBIENTAL
08.01 PREVENTIVAS, CORRECTIVAS Y/O MITIGACIO
08.01.01 SUB PROGRAMA DE MANEJO DE RESIDUOS
08.01.01.01 INSTALACION DE CONTENEDORES PARA und 1.00 - Err:504 Err:504 Err:504
08.01.01.02 INSTALACION DE CONTENEDORES PARA und 1.00 - Err:504 Err:504 Err:504
08.01.01.03 TRANSPORTE Y DISPOSICIÓN FINAL DE RS t 0.10 - Err:504 Err:504 Err:504
08.01.02 SUB PROGRAMA DE SALUD LOCAL (CONTROL
08.01.02.01 ALTERACIÓN DE LA CALIDAD DEL AIRE (RieGLB 1.50 - Err:504 Err:504 Err:504
08.01.03 SUB PROGRAMA DE CAPACITACION AMBIE
08.01.03.01 CHARLA AL PERSONAL GLB 1.00 - Err:504 Err:504 Err:504
08.01.03.02 CHARLA A LOS POBLADORES GLB 1.00 - Err:504 Err:504 Err:504
08.01.03.03 TRIPTICOS CON TEMAS AMBIENTALES A4 GLB 1.00 - Err:504 Err:504 Err:504
08.01.03.04 POLOS CON LOGOS AMBIENTALES und 100.00 - Err:504 Err:504 Err:504
08.01.03.05 JUEGO AMBIENTAL (LUDO) TAMAÑO OFIC und 1.00 - Err:504 Err:504 Err:504
08.01.04 SUB PROGRAMA DE SEGURIDAD Y SALUD
08.01.04.01 EQUIPOS DE PROTECCION PERSONAL und 10.00 - Err:504 Err:504 Err:504
08.01.04.02 SEÑALIZACION DE ZONAS DE TRABAJO und 5.00 - Err:504 Err:504 Err:504
08.01.04.03 EXAMENES PREOCUPACIONALES Y OCUPA und 15.00 - Err:504 Err:504 Err:504
08.01.04.04 CREACIÓN DE COMITÉ DE SEGURIDAD Y GLB 1.00 - Err:504 Err:504 Err:504
08.01.04.05 BOTIQUÍN IMPLEMENTARIO GLB 3.00 - Err:504 Err:504 Err:504
08.01.05 SEÑALIZACIONES AMBIENTALES
08.01.05.01 LETREROS DE SEÑALIZACIÓN AMBIENTAL und 5.00 - Err:504 Err:504 Err:504
08.02 PROGRAMA DE PREVENSION DE PERDIDAS Y
08.02.01 SUB PROGRAMA DE PREVENCION Y RESPUE
08.02.01.01 EXTINTOR und 1.00 - Err:504 Err:504 Err:504
08.02.01.02 SEÑALIZACION DE EVACUACIÓN, SEGÚN und 4.00 - Err:504 Err:504 Err:504
08.02.01.03 SIMULACRO DE INCENDIO GLB 1.00 - Err:504 Err:504 Err:504
08.02.02 SUB PROGRAMA DE PREVENCION Y RESPUE
08.02.02.01 CHARLAS INFORMATIVAS DE EVACUACIÓ und 3.00 - Err:504 Err:504 Err:504
08.02.02.02 EQUIPOS DE PRIMEROS AUXILIOS und 1.00 - Err:504 Err:504 Err:504
08.02.02.03 SIMULACRO DE SISMO und 2.00 - Err:504 Err:504 Err:504
08.02.03 SUB PROGRAMA DE PREVENCION Y RESPU
08.02.03.01 CHARLA DE 5MINUTOS ANTE RESPUESTA und 6.00 - Err:504 Err:504 Err:504
08.02.03.02 CAPACITACION DE PRIMEROS AUXILIOS und 2.00 - Err:504 Err:504 Err:504
08.03 PROGRAMA DE MONITOREO Y SEGUIMIENTO
08.03.01 MONITOREO AMBIENTAL
08.03.01.01 MONITOREO DE AIRE und 2.00 - Err:504 Err:504 Err:504
08.03.01.02 MONITOREO DE RUIDO und 3.00 - Err:504 Err:504 Err:504
08.03.01.03 MONITOREO DE SUELO und 3.00 - Err:504 Err:504 Err:504
08.04 ASUNTOS SOCIALES
08.04.01 SUB PROGRAMA DE MONITOREO DE DEUDA
08.04.01.01 MATERIALES PARA LA DIFUSIÓN mll 2.00 - Err:504 Err:504 Err:504
08.04.01.02 CHARLAS A TRABAJADORES E INFORMAC und 6.00 - Err:504 Err:504 Err:504
08.04.02 CONTRATACION DE MANO DE OBRA LOCAL
08.04.02.01 REUNIÓN INFORMATIVA PARA LA CONT GLB 1.00 - Err:504 Err:504 Err:504
08.04.03 PARTICIPACION CIUDADANA
08.04.03.01 CREACIÓN DE COMITÉ DE VIGILANCIA GLB 1.00 - Err:504 Err:504 Err:504
08.05 CIERRE Y ABANDONO
08.05.01 COMPONENTE AMBIENTAL
08.05.01.01 RECUPERACIÓN Y REVEGETACIÓN DE ÁRE GLB 1.00 - Err:504 Err:504 Err:504
09 SEGURIDAD Y SALUD OCUPACIONAL
09.01 SEGURIDAD
09.01.01 PLAN DE SALUD Y SEGURIDAD EN EL TRABA
09.01.01.01 IMPLEMENTACION Y ADMINISTRACIÓN D GLB 1.00 - Err:504 Err:504 Err:504
09.01.01.02 DESARROLLO DEL PLAN DE SALUD Y SEG GLB 1.00 - Err:504 Err:504 Err:504
09.01.01.03 CAPACITACIÓN EN SEGURIDAD Y SALUD mes 6.00 - Err:504 Err:504 Err:504

- 14 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
09.01.02 SEÑALIZACION EN OBRA
09.01.02.01 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 - Err:504 Err:504 Err:504
09.01.03 EQUIPOS DE PROTECCION PERSONAL
09.01.03.01 EQUIPOS DE PROTECCION PERSONAL jgo 30.00 - Err:504 Err:504 Err:504
09.01.03.02 EQUIPOS DE PROTECCION COLECTIVO GLB 1.00 - Err:504 Err:504 Err:504
09.01.04 PROGRAMA DE RESPUESTAS ANTE EMERGE
09.01.04.01 RECURSOS PARA RESPUESTAS ANTE EM GLB 1.00 - Err:504 Err:504 Err:504
09.02 SALUD EN OBRA
09.02.01 PLAN SARS-COV-2 (COVID-19)
09.02.01.01 ACTIVIDADES PREVIAS
09.02.01.01.01 ACTIVIDADES PREVIAS AL INICIO DE OB
09.02.01.01.01.01 PRUEBAS RAPIDAS und 10.00 - Err:504 Err:504 Err:504
09.02.01.01.02 INFORMACIÓN DE SENSIBILIZACIÓN
09.02.01.01.02.01 PANELES INFORMATIVOS und 1.00 - Err:504 Err:504 Err:504
09.02.01.01.03 LIMPIEZA Y DESINFECCIÓN DE AMBIENT
09.02.01.01.03.01 EQUIPOS PARA LIMPIEZA Y DESINF GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.01.03.02 INSUMOS PARA LIMPIEZA Y DESIN mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.03.03 EPP PARA LIMPIEZA Y DESINFECCI mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.04 LIMPIEZA Y DESINFECCIÓN DE IMPL
09.02.01.01.04.01 INSUMOS PARA LIMPIEZA Y DESIN mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.04.02 INSUMOS PARA LIMPIEZA Y DESINF mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.05 PREVENCIÓN Y CONTROL DE PERSONAL
09.02.01.01.05.01 EPP PREVENCIÓN Y CONTROL - RIESGO mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.05.02 INSUMOS LAVADO DE MANOS mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.05.03 INSUMOS DESINFECCION DE MANOS mes 1.00 - Err:504 Err:504 Err:504
09.02.01.01.05.04 ADECUACION DE LAVA MANOS GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.01.06 MOVILIZACION Y DEMOVILIZACION DE
09.02.01.01.06.01 MOVILIZACION Y DESMOVILIZACIO VJE 1.00 - Err:504 Err:504 Err:504
09.02.01.02 ACTIVIDADES EJECUCIÓN
09.02.01.02.01 ACTIVIDADES PREVIAS AL INICIO DE OB
09.02.01.02.01.01 PRUEBAS RAPIDAS und 30.00 - Err:504 Err:504 Err:504
09.02.01.02.02 RECURSOS HUMANOS PARA PREVENCIO
09.02.01.02.02.01 PERSONAL PARA PREVENCIÓN Y CONT mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.03 EQUIPOS PARA EVALUACIÓN DE DESCAR
09.02.01.02.03.01 EQUIPOS PARA EVALUACIÓN DE DESCA GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.02.04 INFORMACIÓN DE SENSIBILIZACIÓN
09.02.01.02.04.01 PANELES INFORMATIVOS und 1.00 - Err:504 Err:504 Err:504
09.02.01.02.05 LIMPIEZA Y DESINFECCIÓN DE AMBIENT
09.02.01.02.05.01 EQUIPOS PARA LIMPIEZA Y DESI GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.02.05.02 INSUMOS PARA LIMPIEZA Y DESI mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.05.03 EPP PARA LIMPIEZA Y DESINFECC mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.06 LIMPIEZA Y DESINFECCIÓN DE EQUIPO
09.02.01.02.06.01 INSUMOS PARA LIMPIEZA Y DESINFE mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.06.02 INSUMOS PARA LIMPIEZA Y DESINF mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.07 PREVENCIÓN Y CONTROL DE PERSONAL
09.02.01.02.07.01 EPP PREVENCIÓN Y CONTROL - RIESG mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.07.02 EPP PREVENCIÓN Y CONTROL - RIESGO mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.07.03 INSUMOS LAVADO DE MANOS mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.07.04 INSUMOS DESINFECCION DE MANOS mes 6.00 - Err:504 Err:504 Err:504
09.02.01.02.07.05 ADECUACION DE LAVA MANOS GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.02.08 MOVILIZACION Y DEMOVILIZACION DE
09.02.01.02.08.01 MOVILIZACION Y DESMOVILIZACIO VJE 1.00 - Err:504 Err:504 Err:504
09.02.01.03 ACTIVIDADES POST EJECUCIÓN
09.02.01.03.01 ACTIVIDADES PREVIAS AL INICIO DE OB
09.02.01.03.01.01 PRUEBAS RAPIDAS und 10.00 - Err:504 Err:504 Err:504
09.02.01.03.02 INFORMACIÓN DE SENSIBILIZACIÓN
09.02.01.03.02.01 PANELES INFORMATIVOS und 1.00 - Err:504 Err:504 Err:504

- 15 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Modalidad #REF!
Presupuesto Base Metrados
Ítem Descripción Und. Metrado Anterior Actual Acumulado Saldo
09.02.01.03.03 LIMPIEZA Y DESINFECCIÓN DE AMBIENT
09.02.01.03.03.01 EQUIPOS PARA LIMPIEZA Y DESINF GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.03.03.02 INSUMOS PARA LIMPIEZA Y DESIN mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.03.03 EPP PARA LIMPIEZA Y DESINFECCI mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.04 LIMPIEZA Y DESINFECCIÓN DE IMPL
09.02.01.03.04.01 INSUMOS PARA LIMPIEZA Y DESIN mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.04.02 INSUMOS PARA LIMPIEZA Y DESINF mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.05 PREVENCIÓN Y CONTROL DE PERSONAL
09.02.01.03.05.01 EPP PREVENCIÓN Y CONTROL - RIESGO mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.05.02 INSUMOS LAVADO DE MANOS mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.05.03 INSUMOS DESINFECCION DE MANOS mes 1.00 - Err:504 Err:504 Err:504
09.02.01.03.05.04 ADECUACION DE LAVA MANOS GLB 1.00 - Err:504 Err:504 Err:504
09.02.01.03.06 MOVILIZACION Y DEMOVILIZACION DE
09.02.01.03.06.01 MOVILIZACION Y DESMOVILIZACIO VJE 1.00 - Err:504 Err:504 Err:504
*

- 16 -
RESUMEN DE VALORIZACIÓN DE OBRA Nº 02
(DEL 01/01/2024 AL 31/01/2024)

: RENOVACION DE PUENTE; EN EL(LA) CAMINO VECINAL R250381 (PUENTE EL MILAGRO), EN LA LOCALIDAD CORAZON JESUS, DISTRITO DE ALEXANDER
● Obra
VON HUMBOLDT, PROVINCIA PADRE ABAD, DEPARTAMENTO UCAYALI
● Entidad : MUNICIPALIDAD PROVINCIAL DE PADRE ABAD ● Presupuesto Referencial (con IGV) : S/ 556,837.60
● Contratista : HT CONSTRUCTORES Y SERVICIOS E.I.R.L. ● Presupuesto Contratado (con IGV) : S/ 556,115.64
● Residente : ING. MARTIN C. VALDIVIESO ECHEVARRIA ● Plazo de Ejecución (d.c.) : 90 d.c.
● Supervisor : ING. FRANKLIN W. TRINIDAD TRUJILLO ● Fecha de Inicio de Ejecución : 27/12/2023
● Modalidad : SUMA ALZADA ● Fecha de Término de Ejecución : 26/04/2024

Monto Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción
Contractual Anterior % Actual % Av. Acum. Acumulado % Av. Acum. Saldo % Av. Acum.

(01) COSTO DIRECTO S/ 401,728.18 10,788.88 70,487.75 81,276.63 320,451.56


(02) GASTOS GENERALES 12.31% S/ 49,469.85 1,328.57 8,680.04 10,008.61 39,461.24
(03) UTILIDAD 5.00% S/ 20,086.41 539.44 3,524.39 4,063.83 16,022.58
2.69% 17.55% 20.23% 79.77%
(04) SUB TOTAL REFERENCIAL S/ 471,284.44 12,656.90 82,692.18 95,349.07 375,935.37
(05) I.G.V. 18.00% S/ 84,831.20 2,278.24 14,884.59 17,162.83 67,668.37
(06) MONTO TOTAL CONTRATADO (INC IGV) S/ 556,115.64 14,935.14 97,576.77 112,511.91 443,603.74

VALORIZACIÓN CONTRACTUAL (Sin IGV) 471,284.44 12,656.90 2.69% 82,692.18 17.55% 95,349.07 20.23% 375,935.37 79.77%

- 17 -
#REF!
#REF!
FÓRMULA 01: OBRAS PROVISIONALES
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
Form.01 OBRAS PROVISIONALES
01 OBRAS PROVISIONALES
01.01 CONSTRUCCIONES PROVISIONALES
01.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 2.40 x 3. und 1.00 608.06 608.06 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA m2 90.00 73.55 6,619.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.01.03 CERCO PROVISIONAL DE SEGURIDAD Y PROTECC m 508.50 8.92 4,535.82 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.01.04 SERVICIOS HIGIENICOS PARA EL PERSONAL OBR und 2.00 285.44 570.88 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.02 INSTALACIONES PROVISIONALES
01.02.01 INSTALACION DE AGUA PARA LA OBRA GLB 1.00 195.65 195.65 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.02.02 INSTALACION DE ENERGIA ELECTRICA PARA LA GLB 1.00 250.00 250.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.02.03 ENERGIA ELECTRICA PARA LA CONSTRUCCION mes 6.00 250.00 1,500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.03 MOVILIZACION DE EQUIPOS Y TRANSPORTE DE MA
01.03.01 TRANSPORTE DE MATERIALES GLB 1.00 ### ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.03.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 ### ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04 DEMOLICIONES
01.04.01 DESMONTAJE DE PUERTAS pza 14.00 3.24 45.36 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.02 DESMONTAJE DE VENTANAS pza 9.00 3.24 29.16 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.03 DESMONTAJE DE ARTEFACTOS DE ILUMINACION pza 10.00 6.51 65.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.04 DESMONTAJE DE APARATOS SANITARIOS pza 8.00 6.51 52.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.05 DESMONTAJE DE CERCO METALICO m 345.90 1.23 425.46 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.06 DESMONTAJE DE BARANDAS METALICAS m 6.18 0.65 4.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.07 DESMONTAJE DE BARANDAS DE MADERA m 24.40 0.45 10.98 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.08 DESMONTAJE DE CORREAS Y TECHO DE CALAMI m2 15.82 1.62 25.63 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.09 DEMOLICION DE MUROS DE LADRILLO KING KONGm2 449.92 7.59 3,414.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.10 DEMOLICION DE MUROS DE ADOBE m2 158.62 4.55 721.72 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.11 DEMOLICION DE MUROS DE TRIPLAY m 16.75 0.57 9.55 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.12 DEMOLICION DE SOBRECIMIENTO DE CONCRETO m3 11.63 36.57 425.31 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.13 DEMOLICION DE CIMIENTOS DE CONCRETO SIMPL m3 18.61 36.57 680.57 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.14 DEMOLICION DE PISOS DE CONCRETO C/EQUIPO m2 271.08 11.81 3,201.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.15 DEMOLICION DE LAVADERO DE CONCRETO und 1.00 22.77 22.77 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.16 DEMOLICION DE VIGAS DE CONCRETO ARMADO C m3 19.39 61.16 1,185.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.17 DEMOLICION DE COLUMNAS DE CONCRETO ARM m3 8.68 112.46 976.15 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.18 DEMOLICION DE ZAPATAS DE CONCRETO ARMAD m3 13.50 67.91 916.79 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.19 DEMOLICION DE ESCALERA DE CONCRETO ARMA m3 2.74 56.59 155.06 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.20 DEMOLICION DE BLOQUES DE CONCRETO C/EQUI m3 301.06 61.42 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
01.04.21 DEMOLICION DE TRIBUNAS DE CONCRETO C/EQUIPm3 286.41 61.42 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
*

- 18 -
#REF!
#REF!
FÓRMULA 01: OBRAS PROVISIONALES
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %

(01) COSTO DIRECTO 163,459.81 - Err:504 Err:504 Err:504


(02) GASTOS GENERALES 8.00% 13,076.78 - Err:504 Err:504 Err:504
(03) UTILIDAD 7.00% 11,442.19 - Err:504 Err:504 Err:504
0.00% Err:504 Err:504 Err:504
(04) SUB TOTAL REFERENCIAL 187,978.78 - Err:504 Err:504 Err:504
(05) FACTOR DE RELACIÓN #REF!
(06) MONTO TOTAL CONTRATADO (SIN IGV) #REF! #REF! Err:504 Err:504 Err:504

- 19 -
VALORIZACIÓN DE OBRA Nº 02
(DEL 01/01/2024 AL 31/01/2024)
: RENOVACION DE PUENTE; EN EL(LA) CAMINO VECINAL R250381 (PUENTE EL MILAGRO), EN LA LOCALIDAD CORAZON JESUS, DISTRITO DE ALEXANDER VON HUMBOLDT, PROVINCIA PADRE
● Obra
ABAD, DEPARTAMENTO UCAYALI
● Entidad : MUNICIPALIDAD PROVINCIAL DE PADRE ABAD ● Presupuesto Referencial (con IGV) : S/ 556,837.60
● Contratista : HT CONSTRUCTORES Y SERVICIOS E.I.R.L. ● Presupuesto Contratado (Con IGV) : S/ 556,115.64
● Residente : ING. MARTIN C. VALDIVIESO ECHEVARRIA CIP 40444 ● Plazo de Ejecución (d.c.) 90 d.c.
● Supervisor : ING. FRANKLIN W. TRINIDAD TRUJILLO CIP 133111 ● Fecha de Inicio de Ejecución : 27/01/2023
● Modalidad : SUMA ALZADA ● Fecha de Término de Ejecución : 26/04/2023
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
01 OBRAS PROVICIONALES Y TRABAJOS PRELIMINARES
01.01 TRABAJOS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 ### 27,051.08 0.10 2,705.11 10.00% 0.40 ### 40.00% 0.50 ### 50.00% 0.50 ### 99.50%
01.01.02 DESBROCE Y LIMPIEZA DE TERRENO ha 0.33 2,610.31 861.40 0.03 86.14 10.00% 0.30 775.26 90.00% 0.33 861.40 100.00% - - 99.00%
01.01.03 TRAZO, NIVELES Y REPLANTEO INICAL m2 3,300.00 1.97 6,501.00 330.00 650.10 10.00% 2,970.00 5,850.90 90.00% 3,300.00 6,501.00 100.00% - - 99.00%
01.01.04 CONTROL TOPOGRAFICO EN PROCESO CONSTRUC mes 3.00 5,533.80 16,601.40 - 0.00% 1.00 5,533.80 33.33% 1.00 5,533.80 33.33% 2.00 ### 99.67%
01.01.05 MANTENIMIENTO DE TRANSITO TEMPORAL Y SE glb 1.00 1,931.99 1,931.99 - 0.00% 0.33 637.56 33.00% 0.33 637.56 33.00% 0.67 1,294.43 99.67%
01.01.06 DESMONTAJE DE PUENTE DE MADERA EXISTENTE und 1.00 2,315.60 2,315.60 1.00 2,315.60 100.00% 0.00% 1.00 2,315.60 100.00% - - 99.00%
01.01.07 TRANSPORTE Y ELIMINACION DE MATERIAL EX m3 18.00 10.10 181.80 - - 0.00% 18.00 181.80 100.00% 18.00 181.80 100.00% - - 99.00%
01.02 OBRAS PROVISIONALES
01.02.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 M und 1.00 1,200.00 1,200.00 - - 0.00% 1.00 1,200.00 100.00% 1.00 1,200.00 100.00% - - 99.00%
01.02.02 CAMPAMENTO Y ALMACEN glb 1.00 ### 11,264.30 0.10 1,126.43 10.00% 0.90 ### 90.00% 1.00 ### 100.00% - - 99.00%
01.02.03 INSTALACION PASE PROVISIONAL glb 1.00 1,328.90 1,328.90 0.10 132.89 10.00% 0.90 1,196.01 90.00% 1.00 1,328.90 100.00% - - 99.00%
01.02.04 HABILITACION PASE PROVISIONAL glb 1.00 1,327.90 1,327.90 - - 0.00% 1.00 1,327.90 100.00% 1.00 1,327.90 100.00% - - 99.00%
01.03 SEGURIDAD Y SALUD -
01.03.01 SEGURIDAD Y SALUD glb 1.00 2,455.00 2,455.00 - 0.00% 0.33 810.15 33.00% 0.33 810.15 33.00% 0.67 1,644.85 99.67%
02 SUB ESTRUCTURA
02.01 EXCAVACION P/ESTRUCTURAS EN MATERIAL COMU m3 361.80 10.74 3,885.73 - 0.00% 361.80 3,885.73 100.00% 361.80 3,885.73 100.00% - - 99.00%
02.02 EXCAVACION P/ESTRUCTURAS EN MATERIAL COM m3 268.00 12.55 3,363.40 - 0.00% 135.00 1,694.25 50.37% 135.00 1,694.25 50.37% 133.00 1,669.15 99.50%
02.03 SOLADOS PARA ZAPATAS DE f´c = 100 kg/cm2 m2 81.20 29.98 2,434.38 - 0.00% 40.60 1,217.19 50.00% 40.60 1,217.19 50.00% 40.60 1,217.19 99.50%
02.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 9,375.53 7.48 70,128.96 504.36 3,772.61 5.38% 3,371.51 ### 35.96% 3,875.87 ### 41.34% 5,499.66 ### 99.59%
02.05 ENCOFRADO CARA SUCIA BAJO AGUA m2 116.50 96.91 11,290.02 - - 0.00% - 0.00% 0.00 - 0.00% 116.50 ### 100.00%
02.06 ENCOFRADO CARA SUCIA EN SECO m2 120.70 91.33 11,023.53 - - 0.00% - 0.00% 0.00 - 0.00% 120.70 ### 100.00%
02.07 ENCOFRADO CARA VISTA EN SECO m2 36.86 115.70 4,264.70 - - 0.00% - 0.00% 0.00 - 0.00% 36.86 4,264.70 100.00%
02.08 CONCRETO f'c=210 kg/cm2 BAJO AGUA m3 77.40 552.87 42,792.14 - - 0.00% - 0.00% 0.00 - 0.00% 77.40 ### 100.00%
02.09 CONCRETO f'c=210 kg/cm2 EN SECO m3 21.80 505.30 11,015.54 - - 0.00% - 0.00% 0.00 - 0.00% 21.80 ### 100.00%
02.10 RELLENO DE ESTRUCTURAS CON MATERIAL DE CA m3 349.30 82.68 28,880.12 - - 0.00% - 0.00% 0.00 - 0.00% 349.30 ### 100.00%
02.11 RELLENO DE ESTRUCTURAS CON MATERIAL PROPI m3 52.30 28.42 1,486.37 - - 0.00% - 0.00% 0.00 - 0.00% 52.30 1,486.37 100.00%
02.12 ELIMINACION DE MATERIAL EXCEDENTE D<1 Km m3 721.80 10.03 7,239.65 - - 0.00% - 0.00% 0.00 - 0.00% 721.80 7,239.65 100.00%
03 SUPERESTRUCTURA
03.01 LOSAS Y VEREDA DE CONCRETO
03.01.01 ENCOFRADO DE LOSA CARA VISTA EN SECO m2 64.80 105.14 6,813.07 - - 0.00% - 0.00% 0.00 - 0.00% 64.80 6,813.07 100.00%

- 20 -
03.01.02 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 2,969.00 7.48 22,208.12 - - 0.00% - 0.00% 0.00 - 0.00% 2,969.00 ### 100.00%
03.01.03 CONCRETO f'c=280 Kg/cm2 SUPERESTRUCTURA m3 22.80 578.58 13,191.62 - - 0.00% - 0.00% 0.00 - 0.00% 22.80 ### 100.00%
04 VARIOS
04.01 JUNTA DE DILATACION METALICA m 9.60 226.75 2,176.80 - - 0.00% - 0.00% 0.00 - 0.00% 9.60 2,176.80 100.00%
04.02 APOYO DE NEOPRENO m 9.60 649.58 6,235.97 - - 0.00% - 0.00% 0.00 - 0.00% 9.60 6,235.97 100.00%
04.03 TUBOS DE DRENAJE und 32.00 41.92 1,341.44 - - 0.00% - 0.00% 0.00 - 0.00% 32.00 1,341.44 100.00%
04.04 ACABADO DE VEREDAS m 19.00 23.71 450.49 - - 0.00% - 0.00% 0.00 - 0.00% 19.00 450.49 100.00%
04.05 BARANDAS METALICAS PARA PUENTES m 19.00 474.00 9,006.00 - - 0.00% - 0.00% 0.00 - 0.00% 19.00 9,006.00 100.00%
04.06 PRUEBA DE CARGA EN PUENTES glb 1.00 ### 12,766.80 - - 0.00% - 0.00% 0.00 - 0.00% 1.00 ### 100.00%
04.07 LOSA DE APROXIMACION
04.07.01 CONCRETO f'c=210 kg/cm2 m3 10.26 540.15 5,541.94 - - 0.00% - 0.00% 0.00 - 0.00% 10.26 5,541.94 100.00%
04.07.02 ENCOFRADO Y DESENCOFRADO m2 4.00 58.75 235.00 - - 0.00% - 0.00% 0.00 - 0.00% 4.00 235.00 100.00%
04.07.03 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 349.53 7.48 2,614.48 - - 0.00% - 0.00% 0.00 - 0.00% 349.53 2,614.48 100.00%
05 ACCESOS
05.01 EXCAVACION EN EXPLANACIONES EN MATERIAL m3 64.43 7.05 454.23 - - 0.00% - 0.00% 0.00 - 0.00% 64.43 454.23 100.00%
05.02 MEJORAMIENTO DE SUELOS A NIVEL DE SUBRASA m2 191.09 19.37 3,701.41 - - 0.00% - 0.00% 0.00 - 0.00% 191.09 3,701.41 100.00%
05.03 TERREPLEN m3 66.81 80.09 5,350.81 - - 0.00% - 0.00% 0.00 - 0.00% 66.81 5,350.81 100.00%
05.04 AFIRMADO m3 89.06 87.98 7,835.50 - - 0.00% - 0.00% 0.00 - 0.00% 89.06 7,835.50 100.00%
05.05 TRANSPORTE DE MATERIAL GRANULAR D<=1 KM m3k 155.87 4.15 646.86 - - 0.00% - 0.00% 0.00 - 0.00% 155.87 646.86 100.00%
05.06 TRANSPORTE DE MATERIAL GRANULAR D>1 KM m3k 1,792.55 0.96 1,720.85 - - 0.00% - 0.00% 0.00 - 0.00% 1,792.55 1,720.85 100.00%
05.07 ELIMINACION DE MATERIAL EXCEDENTE m3 80.53 9.71 781.95 - - 0.00% - 0.00% 0.00 - 0.00% 80.53 781.95 100.00%
06 PROTECCION DE RIVERA
06.01 ENCAUSAMIENTO CON MAQUINARIA m3 517.50 7.66 3,964.05 - - 0.00% - 0.00% 0.00 - 0.00% 517.50 3,964.05 100.00%
07 SEÑALIZACION
07.01 SEÑAL PREVENTIVA
07.01.01 SEÑAL PREVENTIVA und 3.00 1,012.60 3,037.80 - - 0.00% - 0.00% 0.00 - 0.00% 3.00 3,037.80 100.00%
07.02 SEÑAL INFORMATIVA
07.02.01 SEÑAL DE IMFORMACION GENERAL m2 3.24 1,107.40 3,587.98 - - 0.00% - 0.00% 0.00 - 0.00% 3.24 3,587.98 100.00%
07.02.02 ESTRUCTURA DE SOPORTE P/SEÑAL INFORMATIV und 2.00 1,029.45 2,058.90 - - 0.00% - 0.00% 0.00 - 0.00% 2.00 2,058.90 100.00%
07.02.03 CIMENTACION Y MONTAJE DE SEÑAL INFORMATI und 2.00 463.19 926.38 - - 0.00% - 0.00% 0.00 - 0.00% 2.00 926.38 100.00%
08 IMPACTO AMBIENTAL -
08.01 PROGRAMA DE SEGUIMIENTO Y VIGILANCIA mes 3.00 3,525.00 10,575.00 - - 0.00% - 0.00% 0.00 - 0.00% 3.00 ### 100.00%
08.02 PROGRAMACION DE ABANDONO DE OBRA -
08.02.01 REACONDICIONAMIENTO DEL ÁREA DEL CAMPA ha 0.37 1,387.43 513.35 - - 0.00% - 0.00% 0.00 - 0.00% 0.37 513.35 100.00%
08.02.02 COMPACTACION DE MATERIAL EXCEDENTE Y m3 820.33 3.86 3,166.47 - - 0.00% - 0.00% 0.00 - 0.00% 820.33 3,166.47 100.00%

(01) COSTO DIRECTO 401,728.18 10,788.88 70,487.75 81,276.63 320,451.56


(02) GASTOS GENERALES 12.31% 49,469.85 1,328.57 8,680.04 10,008.61 39,461.24
(03) UTILIDAD 5.00% 20,086.41 539.44 3,524.39 4,063.83 16,022.58
2.69% 17.55% 20.23% 79.77%
(04) SUB TOTAL 471,284.44 12,656.90 82,692.18 95,349.07 375,935.37
(05) I.G.V. 18.00% 84,831.20 2,278.24 14,884.59 17,162.83 67,668.37
(06) MONTO TOTAL CONTRATADO 556,115.64 14,935.14 97,576.77 112,511.91 443,603.74

- 21 -
- 22 -
#REF!
#REF!
FÓRMULA 03: PISOS EXTERIORES Y JARDINERIA
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
Form.03 PISOS EXTERIORES Y JARDINERIA
03 PISOS EXTERIORES Y JARDINERIA
03.01 PISOS EXTERIORES
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 380.40 1.90 722.76 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.01.02 TRAZO Y REPLANTEO m2 380.40 1.23 467.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.02 MOVIMIENTO DE TIERRAS
03.01.02.01 EXCAVACION EN TERRENO NORMAL PARA V m3 76.08 7.65 582.01 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 95.10 8.66 823.57 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.02.03 NIVELACION, REFINE Y COMPACTADO m2 380.40 2.22 844.49 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.02.04 BASE AFIRMADO DE 4" CON EQUIPO LIVIANO m2 380.40 10.05 3,823.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.03 VEREDAS
03.01.03.01 CONCRETO EN VEREDAS FC=140 KG/CM2 m3 221.94 277.72 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.03.02 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 178.81 22.13 3,957.07 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.01.04 JUNTAS DE SEPARACION
03.01.04.01 JUNTAS ASFALTICAS 1" m 438.28 6.38 2,796.23 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.02 JARDINERIA
03.02.01 TRATAMIENTO DE AREAS VERDES
03.02.01.01 PREPARACION DE TERRENO C/TIERRA AGRICOLA m2 197.47 15.02 2,966.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.02.01.02 CORTE Y TRASLADO DE PASTO (CHAMPA) Y m2 197.47 20.69 4,085.65 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
03.02.01.03 PLANTACION DE ESPECIES ORNAMENTALES und 40.00 20.40 816.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
*

(01) COSTO DIRECTO 83,521.87 - Err:504 Err:504 Err:504


(02) GASTOS GENERALES 8.00% 6,681.75 - Err:504 Err:504 Err:504
(03) UTILIDAD 7.00% 5,846.53 - Err:504 Err:504 Err:504
0.00% Err:504 Err:504 Err:504
(04) SUB TOTAL REFERENCIAL 96,050.15 - Err:504 Err:504 Err:504
(05) FACTOR DE RELACIÓN #REF!
(06) MONTO TOTAL CONTRATADO (SIN IGV) #REF! #REF! Err:504 Err:504 Err:504

- 23 -
#REF!
#REF!
FÓRMULA 04: CAMPO DE FUTBOL Y RETIRO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
Form.04 CAMPO DE FUTBOL Y RETIRO
04 CAMPO DE FUTBOL Y RETIRO
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 6,586.27 1.90 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR CO m2 6,586.27 1.45 9,550.09 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02 MOVIMIENTO DE TIERRAS
04.02.01 CORTE SUPERFICIAL LATERAL CON MAQUINARIA m3 1,975.88 7.65 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.02 REFINE, NIVELACION Y COMPACTACION EN ZONA m2 6,586.27 3.86 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.03 EXCAVACION DE ZANJAS DE HASTA H=1.00 M. m3 911.24 32.54 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.04 RELLENO DE ZANJA C/GRAVA 1/2" - 3/4" P/TUB. D m3 365.32 116.22 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.05 RELLENO Y COMPACTADO CON ARENA P/TUB. RI m3 142.35 73.00 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.06 RELLENO Y COMPACTADO CON MATERIAL PROPIO m3 129.22 11.01 1,422.71 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.07 CAMA DE APOYO PARA TUBERIA E=5cm. m2 1,380.94 6.77 9,348.96 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.08 PRIMERA CAPA ARENA GRUESA E=5" m2 6,586.27 5.37 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.09 EXTENDIDO, NIVELADO Y COMPACTADO CON M m2 6,586.27 2.72 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.10 SEGUNDA CAPA TIERRA VEGETAL Y ARENA E=5" m2 6,586.27 8.37 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.11 COMPACTACION DE TIERRA ARICOLA CON MAQU m2 6,586.27 1.81 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.02.12 ELIMINACION DE MATERIAL EXCEDENTE (CARGU m3 3,171.58 8.66 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.03 CONCRETO SIMPLE
04.03.01 CIMENTACION DE ARCO, MODULO DE SUPLENTES
04.03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CO m3 3.78 183.84 694.92 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.04 CONCRETO ARMADO
04.04.01 CAJA DE REGISTRO
04.04.01.01 CONCRETO EN CAJA DE REGISTRO F'C=175 KG/C m3 1.72 463.70 797.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.04.01.02 ENCOFRADO Y DESENCOFRADO EN CAJA DE RE m2 18.32 67.61 1,238.62 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.04.01.03 ACERO EN CAJA DEREGISTRO GRADO 60 kg 17.50 4.43 77.53 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.04.02 CUNETAS DE EVACUACION
04.04.02.01 CONCRETO EN CUNETAS F'C=175 KG/CM2 m3 81.68 356.41 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.04.02.02 ENCOFRADO Y DESENCOFRADO DE CUNETA m2 108.90 31.61 3,442.33 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.04.02.03 ACERO EN CUNETA DE EVACUACION GRADO 60 kg 1,236.88 4.43 5,479.38 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.05 ADITAMENTOS VARIOS
04.05.01 ARCO DE FUTBOLO SEGUN DISEÑO (INCLUYE MA und 2.00 3,928.01 7,856.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.05.02 MODULO DE SUPLENTES SEGUN DISEÑO (INCLU und 2.00 7,935.59 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.05.03 MODULO DE ARBITROS SEGUN DISEÑO (INCLUY und 1.00 3,360.14 3,360.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.05.04 REJILLA DE FIERRO GALVANIZADO A=35 CM (PLATIm 330.00 102.36 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.06 JUNTAS
04.06.01 JUNTAS WATER STOP DE 4" m 40.70 27.75 1,129.43 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 24 -
#REF!
#REF!
FÓRMULA 04: CAMPO DE FUTBOL Y RETIRO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
04.07 REVOQUES ENLUCIDOS Y MOLDURAS
04.07.01 TARRAJEO CON ADITIVO IMPERMEABILIZANTE MOm2 363.00 25.96 9,423.48 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.08 SISTEMA DE DRENAJE
04.08.01 SUMINISTRO E INSTALACION DE TUBERIA ADVAN m 1,491.10 56.31 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.08.02 SUMINISTRO Y COLOCACION DE CODO ADS N12 4" und 104.00 85.03 8,843.12 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.08.03 SUMINISTRO Y COLOCACION DE TEE REDUCTORA Aund 52.00 89.53 4,655.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.08.04 SUMINISTRO E INSTALACION DE TUBERIA DE PO m 328.70 42.27 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.08.05 SUMINISTRO E INSTALACION DE TUBERIA DE PO m 60.00 85.32 5,119.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09 SISTEMA DE RIEGO
04.09.01 SUMINISTRO E INSTALACION DE TUBERIA PVC-UF ISm 31.85 26.51 844.34 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.02 SUMINISTRO E INSTALACION DE TUBERIA HDPE ISOm 117.80 42.70 5,030.06 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.03 SUMINISTRO E INSTALACION DE TUBERIA HDPE ISOm 468.00 37.72 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.04 SUMINISTRO Y COLOCACION DE CODO HDPE ISO 44und 3.00 68.14 204.42 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.05 SUMINISTRO Y COLOCACION DE TEE HDPE ISO 442 und 8.00 68.14 545.12 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.06 ASPERSORES TIPO FALCON (qa=1.26m3/hr), Rm=14.9 und 40.00 228.01 9,120.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.07 SUMINISTRO Y COLOCACION DE REDUCCION HDPEund 8.00 68.14 545.12 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.08 VALVULA COMPUERTA DE BRONCE ROSCADA DE 1und 8.00 152.06 1,216.48 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.09.09 CAJA DE REGISTRO PARA VALVULA DE 10" X 1 pza 8.00 128.50 1,028.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.10 INSTALACION DE GRAMADO
04.10.01 PREPARACION Y DESINFECCION DEL SUSTRATO m2 6,586.27 2.04 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.10.02 SEMBRADO DE GRASS m2 6,586.27 0.85 5,598.33 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.10.03 NIVELACION Y COMPACTADO POST SIEMBRA m2 6,586.27 2.18 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.10.04 DESHIERBO Y FERTILIZACION m2 6,586.27 1.05 6,915.58 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
04.10.05 CORTE DE GRASS MECANIZADO m2 6,586.27 0.89 5,861.78 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
*

(01) COSTO DIRECTO 614,765.45 - Err:504 Err:504 Err:504


(02) GASTOS GENERALES 8.00% 49,181.24 - Err:504 Err:504 Err:504
(03) UTILIDAD 7.00% 43,033.58 - Err:504 Err:504 Err:504
0.00% Err:504 Err:504 Err:504
(04) SUB TOTAL REFERENCIAL 706,980.27 - Err:504 Err:504 Err:504
(05) FACTOR DE RELACIÓN #REF!
(06) MONTO TOTAL CONTRATADO (SIN IGV) #REF! #REF! Err:504 Err:504 Err:504

- 25 -
#REF!
#REF!
FÓRMULA 05: CERCO PERIMETRICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
Form.05 CERCO PERIMETRICO
05 CERCO PERIMETRICO
05.01 CERCO PERIMETRICO DE ALBAÑILERIA EXTERIOR
05.01.01 TRABAJOS PRELIMINARES
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 46.37 1.90 88.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.01.02 TRAZO Y REPLANTEO m2 46.37 1.23 57.04 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.02 MOVIMIENTO DE TIERRAS
05.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 M m3 51.00 32.54 1,659.54 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 63.75 18.22 1,161.53 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 63.75 8.66 552.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.03 CONCRETO SIMPLE
05.01.03.01 CIMIENTOS CORRIDOS
05.01.03.01.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS C m3 37.09 183.84 6,818.63 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.03.02 SOBRECIMIENTOS
05.01.03.02.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENT m3 7.43 269.90 2,005.36 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.03.02.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIM m2 99.01 26.06 2,580.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.04 CONCRETO ARMADO
05.01.04.01 COLUMNAS
05.01.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 8.40 427.85 3,593.94 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.04.01.02 ACERO EN COLUMNAS F'Y = 4200 KG/CM GRAD kg 1,212.84 4.43 5,372.88 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.04.01.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 131.40 40.89 5,372.95 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.04.02 VIGAS
05.01.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 3.25 400.46 1,301.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.04.02.02 ACERO EN VIGAS F'Y = 4200 KG/CM2 GRADO 60 kg 1,204.39 4.43 5,335.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 40.75 46.36 1,889.17 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.05 MUROS, TABIQUES Y PLACAS
05.01.05.01 MURO DE SOGA LADRILLO KK 18 HUECOS MEZCLm2 204.80 61.26 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.06 REVOQUES ENLUCIDOS Y MOLDURAS
05.01.06.01 TARRAJEO EN INTERIORES ACABADO CON CEME m2 210.23 19.58 4,116.30 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.06.02 TARRAJEO EN EXTERIORES ACABADO CON CEM m2 95.21 23.22 2,210.78 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.06.03 TARRAJEO DE SUPERFICIE DE COLUMNAS CON m2 117.00 27.84 3,257.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.06.04 TARRAJEO DE SUPERFICIE DE VIGAS PERALTADAm2 23.56 32.45 764.52 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.06.05 BRUÑAS DE 1 x 1 CM. m 369.82 7.30 2,699.69 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.07 CARPINTERIA METALICA
05.01.07.01 PORTON METALICO CON MALLA 3.00X2.40 M. T und 2.00 1,350.00 2,700.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.07.02 PUERTA METALICA CON MALLA 0.90X2.40 M. T und 1.00 950.00 950.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.08 PINTURA EN GENERAL
05.01.08.01 PINTURA LATEX EN MUROS INTERIORES 2 MAN m2 210.23 8.97 1,885.76 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 26 -
#REF!
#REF!
FÓRMULA 05: CERCO PERIMETRICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
05.01.08.02 PINTURA LATEX EN MUROS EXTERIORES 2 MAN m2 95.21 9.62 915.92 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.08.03 PINTURA LATEX EN COLUMNAS m2 117.00 10.12 1,184.04 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.01.08.04 PINTURA LATEX EN VIGAS m2 23.56 10.70 252.09 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02 CERCO METALICO INTERIOR
05.02.01 TRABAJOS PRELIMINARES
05.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 76.80 1.90 145.92 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.01.02 TRAZO Y REPLANTEO m2 76.80 1.23 94.46 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.02 MOVIMIENTO DE TIERRAS
05.02.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 M m3 83.11 32.54 2,704.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 99.73 18.22 1,817.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 99.73 8.66 863.66 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.03 CONCRETO SIMPLE
05.02.03.01 SOLADOS
05.02.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMEN m2 55.40 30.72 1,701.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.03.02 CIMIENTOS CORRIDOS
05.02.03.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS C m3 11.07 183.84 2,035.11 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.03.03 SOBRECIMIENTOS
05.02.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENT m3 30.72 269.90 8,291.33 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.03.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIM m2 153.60 26.06 4,002.82 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.04 REVOQUES ENLUCIDOS Y MOLDURAS
05.02.04.01 TARRAJEO DE SUPERFICIE DE SOBRECIMIENTO m2 516.20 25.34 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.05 JUNTAS DE SEPARACION
05.02.05.01 JUNTA DE DILATACION CON TEKNOPORT E=1" m2 8.92 11.45 102.13 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.06 CARPINTERIA METALICA
05.02.06.01 CERCO CON MALLA OLIMPICA GALVANIZADA S und 574.20 157.56 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.06.02 PORTON METALICO CON MALLA 1.20X2.20 M. T und 7.00 1,411.80 9,882.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.06.03 PORTON METALICO CON REJAS 2.40 X 2.50 M. und 1.00 1,100.00 1,100.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.07 PINTURA EN GENERAL
05.02.07.01 PINTURA LATEX EN SOBRECIMIENTO 2 MANOS m2 230.40 9.91 2,283.26 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
05.02.07.02 PINTURA EN CARPINTERIA METALICA CON ES m2 1,148.40 12.15 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
*

(01) COSTO DIRECTO 223,799.98 - Err:504 Err:504 Err:504


(02) GASTOS GENERALES 8.00% 17,904.00 - Err:504 Err:504 Err:504
(03) UTILIDAD 7.00% 15,666.00 - Err:504 Err:504 Err:504
0.00% Err:504 Err:504 Err:504
(04) SUB TOTAL REFERENCIAL 257,369.98 - Err:504 Err:504 Err:504
(05) FACTOR DE RELACIÓN #REF!
(06) MONTO TOTAL CONTRATADO (SIN IGV) #REF! #REF! Err:504 Err:504 Err:504

- 27 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
Form.06 TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
06 TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
06.01 ESTRUCTURAS TRIBUNA NORTE
06.01.01 TRABAJOS PRELIMINARES
06.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,429.00 1.90 2,715.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.01.02 TRAZO Y REPLANTEO m2 1,429.00 1.23 1,757.67 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02 MOVIMIENTO DE TIERRAS
06.01.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 M m3 207.14 32.54 6,740.34 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02.02 EXCAVACION PARA ZAPATAS DE 1.70 M. A m3 1,349.31 10.89 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02.03 RELLENO Y COMPACTADO CON MATERIAL PROP m3 885.92 11.01 9,753.98 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 838.17 18.22 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 838.17 8.66 7,258.55 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02.06 NIVELACION, REFINE Y COMPACTADO m2 1,003.91 2.22 2,228.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.02.07 BASE AFIRMADO DE 4" CON EQUIPO LIVIANO m2 91.05 10.05 915.05 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.03 CONCRETO SIMPLE
06.01.03.01 SOLADOS
06.01.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMEN m2 613.34 50.69 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.03.02 CIMIENTOS CORRIDOS
06.01.03.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS C m3 157.96 183.84 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.03.03 SOBRECIMIENTOS
06.01.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENT m3 34.80 269.90 9,392.52 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.03.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIM m2 325.26 26.06 8,476.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04 CONCRETO ARMADO
06.01.04.01 ZAPATAS
06.01.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 368.00 345.71 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.01.02 ACERO EN ZAPATAS GRADO 60 kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.02 VIGAS DE CIMENTACION
06.01.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= m3 42.42 356.91 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.02.02 ACERO EN VIGAS DE CIMENTACION GRADO 60 kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.03 COLUMNAS
06.01.04.03.01 CONCRETO EN COLUMNETAS F'C=175 KGC/M2 m3 37.20 389.74 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.03.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 133.79 427.85 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.03.03 ACERO EN COLUMNAS F'Y = 4200 KG/CM GRAD kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.03.04 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 1,574.53 79.18 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.04 PLACAS DE CONCRETO
06.01.04.04.01 CONCRETO EN PLACAS DE CONCRETO F'C= 21 m3 24.98 468.92 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.04.02 ACERO EN PLACAS DE CONCRETO GRADO 60 kg 2,420.01 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 28 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.01.04.04.03 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 199.79 84.96 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.05 VIGAS
06.01.04.05.01 CONCRETO EN VIGUETAS F'C=175 KG/CM2 m3 1.11 321.79 357.19 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.05.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 221.50 400.46 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.05.03 ACERO EN VIGAS F'Y = 4200 KG/CM2 GRADO 60 kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.05.04 ENCOFRADO Y DESENCOFRADO CARAVISTA E m2 955.85 76.05 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.06 LOSA MACIZA
06.01.04.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MAC m3 33.29 366.24 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.06.02 ACERO EN LOSAS MACIZAS F'Y = 4200 KG/CM kg 3,856.49 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 166.25 36.07 5,996.64 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.07 LOSA ALIGERADA
06.01.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 K m3 25.81 345.71 8,922.78 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.07.02 ACERO EN LOSAS ALIGERADAS F'Y = 4200 KG kg 1,798.55 4.43 7,967.58 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.07.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 263.76 37.13 9,793.41 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.07.04 LADRILLO HUECO DE ARCILLA 20X30X30 C und 1,819.27 3.56 6,476.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.07.05 LADRILLO HUECO DE ARCILLA 15X30X30 C und 377.85 3.37 1,273.35 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.08 ESCALERAS
06.01.04.08.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 30.60 468.92 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.08.02 ACERO EN ESCALERAS F'y= 4200 KG/CM2 GRAD kg 1,898.83 4.43 8,411.82 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.08.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 115.66 50.42 5,831.58 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.09 GRADERIAS
06.01.04.09.01 CONCRETO EN GRADERIA F'C=210 KG/CM2 m3 283.18 366.24 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.09.02 ACERO EN GRADERIA FY=4200 KG/CM2 GRADO kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.01.04.09.03 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 1,574.69 81.88 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02 ESTRUCTURAS TRIBUNA SUR
06.02.01 TRABAJOS PRELIMINARES
06.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,259.67 1.90 2,393.37 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.01.02 TRAZO Y REPLANTEO m2 1,259.67 1.23 1,549.39 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.02 MOVIMIENTO DE TIERRAS
06.02.02.01 EXCAVACION PARA CIMIENTOS HASTA 1.40 M m3 79.20 32.54 2,577.17 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.02.02 EXCAVACION PARA ZAPATAS DE 1.70 M. A m3 819.27 10.89 8,921.85 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.02.03 RELLENO Y COMPACTADO CON MATERIAL PROP m3 453.38 11.01 4,991.71 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 556.36 18.22 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.02.05 ELIMINACION DE MATERIAL EXCEDENTE (CAR m3 556.36 8.66 4,818.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.02.06 NIVELACION, REFINE Y COMPACTADO m2 387.52 2.22 860.29 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.03 CONCRETO SIMPLE
06.02.03.01 SOLADOS

- 29 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.02.03.01.01 SOLADO DE E = 4" MEZCLA C:H 1:12 CEMEN m2 473.86 50.69 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.03.02 CIMIENTOS CORRIDOS
06.02.03.02.01 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS C m3 55.20 183.84 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.03.03 SOBRECIMIENTOS
06.02.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENT m3 11.98 269.90 3,233.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.03.03.02 ENCOFRADO Y DESENCOFRADO EN SOBRECIM m2 130.32 26.06 3,396.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04 CONCRETO ARMADO
06.02.04.01 ZAPATAS
06.02.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 285.86 345.71 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.01.02 ACERO EN ZAPATAS GRADO 60 kg 7,939.48 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.02 COLUMNAS
06.02.04.02.01 CONCRETO EN COLUMNETAS F'C=175 KGC/M2 m3 1.46 389.74 569.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.02.02 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 39.78 427.85 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.02.03 ACERO EN COLUMNAS F'Y = 4200 KG/CM GRAD kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.02.04 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 163.87 79.18 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.03 PLACAS DE CONCRETO
06.02.04.03.01 CONCRETO EN PLACAS DE CONCRETO F'C= 21 m3 100.26 468.92 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.03.02 ACERO EN PLACAS DE CONCRETO GRADO 60 kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.03.03 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 828.00 84.96 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.04 VIGAS
06.02.04.04.01 CONCRETO EN VIGUETAS F'C=175 KG/CM2 m3 1.27 321.79 408.67 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.04.02 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 197.73 400.46 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.04.03 ACERO EN VIGAS F'Y = 4200 KG/CM2 GRADO 60 kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.04.04 ENCOFRADO Y DESENCOFRADO CARAVISTA E m2 1,364.96 76.05 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.05 LOSA MACIZA
06.02.04.05.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MAC m3 33.29 366.24 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.05.02 ACERO EN LOSAS MACIZAS F'Y = 4200 KG/CM kg 3,856.49 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.05.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 166.25 36.07 5,996.64 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.06 ESCALERAS
06.02.04.06.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 38.25 468.92 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.06.02 ACERO EN ESCALERAS F'y= 4200 KG/CM2 GRAD kg 2,373.54 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.06.03 ENCOFRADO Y DESENCOFRADO NORMAL EN m2 144.57 50.42 7,289.22 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.07 GRADERIAS
06.02.04.07.01 CONCRETO EN GRADERIA F'C=210 KG/CM2 m3 283.18 366.24 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.07.02 ACERO EN GRADERIA FY=4200 KG/CM2 GRADO kg ### 4.43 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.02.04.07.03 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 1,574.69 81.88 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03 ESTRUCTURAS METALICAS Y COBERTURA

- 30 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.03.01 TIJERALES METALICOS
06.03.01.01 TIJERAL METALICO TIPO 1 und 2.00 2,654.11 5,308.22 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.02 TIJERAL METALICO TIPO 2 und 2.00 2,866.52 5,733.04 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.03 TIJERAL METALICO TIPO 3 und 4.00 3,110.13 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.04 TIJERAL METALICO TIPO 4 und 2.00 3,306.13 6,612.26 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.05 TIJERAL METALICO TIPO 5 und 2.00 3,526.04 7,052.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.06 TIJERAL METALICO TIPO 6 und 2.00 3,616.84 7,233.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.07 TIJERAL METALICO TIPO 7 und 2.00 3,699.56 7,399.12 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.01.08 TIJERAL METALICO TIPO 8 und 4.00 3,803.85 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.02 CORREA METALICA
06.03.02.01 VIGUETAS METALICAS TIPICAS T-01 m 614.18 55.52 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.02.02 VIGUETAS METALICAS TIPICAS T-02 m 190.03 62.56 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.02.03 ARRIOSTRES ENTRE VIGUETAS VERTICAL m 1,094.40 5.51 6,030.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.03 TENSOR
06.03.03.01 TENSOR DE TIJERALES CON CABLE TIPO BOA ( und 20.00 1,106.26 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.04 ARRIOSTRE
06.03.04.01 ARRIOSTRES ENTRE TIJERALES CRUZ SAN AND m 3,600.00 19.37 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.05 COBERTURA
06.03.05.01 COBERTURA PLANCHA METALICA AL-0.50 MM. m2 1,211.95 37.98 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.06 TRABAJOS ESPECIALES
06.03.06.01 MONTAJE DE TIJERALES und 20.00 506.73 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.03.06.02 MONTAJE DE VIGUETAS und 105.00 316.71 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.04 MUROS Y TABIQUES
06.04.01 MURO DE CABEZA LADRILLO KK 18 HUECOS MEZC m2 287.46 106.53 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.04.02 MURO DE SOGA LADRILLO KK 18 HUECOS MEZCLA m2 1,299.70 63.69 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05 REVOQUES ENLUCIDOS Y MOLDURAS
06.05.01 TARRAJEO PRIMARIO RAYADO C/MORTERO 1:5 m2 419.42 18.28 7,667.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTm2 2,305.49 19.58 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.03 TARRAJEO EN EXTERIORES ACABADO CON CEMEN m2 891.61 23.22 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.04 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CE m2 51.26 27.84 1,427.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.05 TARRAJEO DE ARISTAS DE COLUMNAS MEZCLA 1:5,m 186.40 5.13 956.23 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.06 TARRAJEO DE SUPERFICIE DE VIGAS PERALTADAS m2 48.90 32.45 1,586.81 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.07 TARRAJEO DE ARISTAS DE VIGAS MEZCLA 1:5, e=1 m 73.80 5.34 394.09 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.08 VESTIDURA DE DERRAMES ANCHO=15 CM. m 578.81 12.54 7,258.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.05.09 BRUÑAS DE 1 x 1 CM. m 2,220.30 7.30 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.06 JUNTAS DE SEPARACION
06.06.01 JUNTA SISMICA CON TEKNOPORT 1" m 561.70 5.32 2,988.24 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 31 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.07 PISOS Y PAVIMENTOS
06.07.01 FALSO PISO DE 4" DE CONCRETO 1:10 m2 1,391.43 29.15 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.07.02 CONTRAPISO DE 48 MM. m2 1,821.98 23.57 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.07.03 PISO DE CERAMICO ANTIDESLIZANTE DE COLOR m2 851.02 54.55 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.07.04 PISO CEMENTO PULIDO Y BRUÑADO E = 2.5 CM. m2 1,022.61 18.60 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.08 CIELORRASOS
06.08.01 CIELORRASO CON MEZCLA CEMENTO ARENA 1:5, e m2 324.90 22.95 7,456.46 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.09 FALSO CIELORRASOS
06.09.01 FALSO CIELO RASO DE BALDOSA DE FIBRA MINERAm2 463.55 408.37 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.10 VEREDAS
06.10.01 CONCRETO EN VEREDAS FC=140 KG/CM2 m3 20.34 296.98 6,040.57 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.10.02 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 74.73 22.13 1,653.77 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.11 RAMPAS
06.11.01 CONCRETO EN RAMPA F'C=140 KG/CM² m3 4.65 277.72 1,291.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.11.02 ENCOFRADO Y DESENCOFRADO EN RAMPA m2 0.51 44.82 22.86 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.12 LOSA CONCRETO P/LAV. OVALIN
06.12.01 CONCRETO EN LOSA P/LAV. OVALIN F'C = 140 KG/ m3 1.60 393.34 629.34 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.12.02 ENCOFRADO Y DESENCOFRADO EN LOSA P/LAV. m2 19.70 44.82 882.95 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.13 CONTRAZOCALOS
06.13.01 CONTRAZOCALO DE PORCELANATO H=10 CM. m 223.76 15.40 3,445.90 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.13.02 CONTRAZOCALO DE CEMENTO PULIDO H=10CM m 279.30 9.56 2,670.11 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.13.03 CONTRAZOCALO EXTERIOR CEMENTO S/COLORE m2 82.43 17.57 1,448.30 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.14 ZOCALOS
06.14.01 ZOCALO DE CERAMICO DE COLOR DE 30X45 CM. m2 419.42 58.12 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.15 REVESTIMIENTO DE GRADAS Y ESCALERAS
06.15.01 REVESTIMIENTO PULIDO DE PASOS Y CONTRAPASOm2 262.98 21.98 5,780.30 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.15.02 REVESTIMIENTO PULIDO EN GRADERIAS DE TRIB m2 4,263.02 21.98 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.16 CARPINTERIA DE MADERA
06.16.01 PUERTA DE MADERA CEDRO TABLERO REBAJADO m2 92.52 456.27 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.16.02 PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4M m2 5.76 190.42 1,096.82 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.16.03 VENTANA DE MADERA m2 12.51 105.27 1,316.93 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.16.04 COLOCACION DE PUERTAS DE MADERA und 35.00 56.41 1,974.35 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.16.05 COLOCACION DE VENTANAS DE MADERA und 35.00 37.62 1,316.70 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.17 CARPINTERIA METALICA
06.17.01 PUERTA DE ALUMINIO EN DUCHAS m2 19.20 206.50 3,964.80 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.17.02 VENTANA CON SISTEMA VITROVEN CON BARRAS m2 3.00 220.00 660.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.17.03 VENTANA METALICA CON BARRAS DE SEGURIDAD m2 90.72 180.00 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 32 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.17.04 DIVISION METALICA P/SS. HH. m2 205.98 195.01 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.17.05 PUERTA METALICA PARA SS. HH. m2 79.92 317.14 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.17.06 BARANDA METALICA CON TUBO REDONDO ELECTRm 170.00 130.51 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.18 CERRAJERIA
06.18.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza 108.00 11.07 1,195.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.18.02 BISAGRA P/PUERTA T/PIVOT EN SS.HH. pza 148.00 19.69 2,914.12 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.18.03 CERROJO DE FIERRO EN PUERTAS METALICAS PAR pza 74.00 14.55 1,076.70 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.18.04 CERRADURA DE DOS GOLPES pza 36.00 81.76 2,943.36 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.19 VIDRIOS, CRISTALES Y SIMILARES
06.19.01 VIDRIOS SEMIDOBLES INCOLORO CRUDO p2 1,008.43 6.29 6,343.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20 PINTURA EN GENERAL
06.20.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 2,305.49 11.19 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.02 PINTURA LATEX EN MUROS EXTERIORES 2 MANO m2 1,028.33 12.61 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.03 PINTURA LATEX EN COLUMNAS m2 123.26 12.61 1,554.31 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.04 PINTURA LATEX EN VIGAS 02 MANOS m2 198.70 13.33 2,648.67 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.05 PINTURA LATEX EN DERRAMES E=0.15 M. m 578.81 2.72 1,574.36 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.06 PINTURA LATEX EN CIELO RASO (2 MANOS) m2 324.90 15.52 5,042.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.07 PINTURA C/ESMALTE EN CONTRAZOCALO 02 MAN m2 110.36 8.76 966.75 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.08 PINTURA C/BARNIZ EN CARPINTERIA DE MADERA m2 196.56 14.36 2,822.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.09 PINTURA EN CARPINTERIA METALICA CON ESM m2 411.96 14.41 5,936.34 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.10 PINTURA EN VENTANAS METALICAS C/ESMALTE m2 187.44 17.14 3,212.72 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.20.11 PINTURA EN BARANDAS METALICAS m 453.78 5.16 2,341.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.21 APARATOS Y ACCESORIOS SANITARIOS
06.21.01 INODORO TANQUE BAJO COLOR (INC. ACCESORI pza 51.00 185.07 9,438.57 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.21.02 LAVATORIO DE PARED DE COLOR (INC. ACCESOR pza 55.00 109.44 6,019.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.21.03 URINARIO TIPO PICO DE LORO (INC. ACCESORIO pza 24.00 89.82 2,155.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.21.04 DUCHAS CROMADAS DE CABEZA GIRATORIA Y pza 11.00 195.64 2,152.04 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.21.05 LAVADERO DE ACERO INOXIDABLE (INC. ACCES pza 1.00 338.20 338.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22 SISTEMA DE DESAGUE
06.22.01 SALIDAS DE DESAGUE
06.22.01.01 SALIDA DE DESAGUE EN PVC 1 1/ 2" pto 79.00 79.95 6,316.05 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.01.02 SALIDA DE DESAGUE EN PVC 2" pto 12.00 85.63 1,027.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.01.03 SALIDA DE DESAGUE EN PVC 4" pto 51.00 100.27 5,113.77 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.02 SALIDAS DE VENTILACION
06.22.02.01 SALIDA DE VENTILACION P/DESAGUE EN PVC 1 1 pto 79.00 55.97 4,421.63 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.02.02 SALIDA DE VENTILACION P/DESAGUE EN PVC 2" pto 12.00 51.11 613.32 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.02.03 SALIDA DE VENTILACION P/DESAGUE EN PVC 4" pto 51.00 68.66 3,501.66 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 33 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.22.03 TUBERIA DE PVC PARA RED DE DESAGUE Y VENT
06.22.03.01 TUBERIA DE PVC SAL 2" m 280.51 23.42 6,569.54 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.03.02 TUBERIA DE PVC SAL 3" m 56.83 25.19 1,431.55 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.03.03 TUBERIA DE PVC SAL 4" m 426.12 28.80 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.04 CAMARA DE INSPECCION
06.22.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 1.00 143.46 143.46 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05 ACCESORIOS PARA RED DE DESAGUE
06.22.05.01 CODO PVC SAL 2"X45° pza 98.00 8.97 879.06 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.02 CODO PVC SAL 3"X45° pza 31.00 25.50 790.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.03 CODO PVC SAL 4"X45° pza 80.00 32.79 2,623.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.04 CODO PVC SAL 2"X90° pza 199.00 9.08 1,806.92 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.05 CODO PVC SAL 3"X90° pza 48.00 25.40 1,219.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.06 CODO PVC SAL 4"X90° pza 85.00 33.17 2,819.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.07 YEE PVC SAL CON REDUCCION DE 3" a 2" pza 13.00 26.44 343.72 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.08 YEE PVC SAL CON REDUCCION DE 4" a 2" pza 21.00 14.27 299.67 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.09 YEE PVC SAL CON REDUCCION DE 4" a 3" pza 7.00 26.44 185.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.10 YEE DOBLE PVC SAP 4" pza 1.00 27.95 27.95 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.11 AMPLIACIÓN EXCÉNTRICA Ø 4x3'' pza 3.00 27.95 83.85 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.12 AMPLIACIÓN EXCÉNTRICA Ø 2x4'' pza 2.00 27.95 55.90 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.13 AMPLIACIÓN EXCÉNTRICA Ø 3x4'' pza 2.00 27.95 55.90 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.14 YEE PVC SAL 2" pza 63.00 10.18 641.34 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.15 YEE PVC SAL 3" pza 17.00 26.50 450.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.16 YEE PVC SAL 4" pza 51.00 14.15 721.65 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.17 TEE PVC SAL 2" pza 1.00 23.53 23.53 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.18 TEE PVC SAL Ø 3" und 1.00 8.90 8.90 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.19 TEE PVC SAL 4" pza 2.00 16.13 32.26 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.20 SIFÓN PARA PLACA DE Ø 2'' pza 11.00 33.36 366.96 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.21 TAPA DE REGISTRO DE 2" und 38.00 18.60 706.80 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.05.22 TAPA DE REGISTRO DE 4" und 1.00 23.77 23.77 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.06 REDES DE DISTRIBUCION
06.22.06.01 TUBERIA DE PVC SAL 2" m 107.04 23.42 2,506.88 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.06.02 EXCAVACION DE ZANJAS DE 0.40x0.50 PARA TUB m 107.04 5.70 610.13 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.22.06.03 RELLENO Y COMPACTADO DE ZANJAS DE 0.40x m 107.04 2.84 303.99 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23 SISTEMA DE AGUA FRIA
06.23.01 SALIDAS DE AGUA FRIA
06.23.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAPpto 142.00 46.97 6,669.74 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02 REDES DE DISTRIBUCION

- 34 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.23.02.01 TUBERIA DE PVC C-10 Ø 2 1/2" m 21.17 13.57 287.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.02 TUBERIA DE PVC C-10 Ø 2" m 154.55 13.33 2,060.15 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.03 TUBERIA DE PVC C-10 Ø 1 1/2" m 69.57 12.36 859.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.04 TUBERIA DE PVC C-10 Ø 1 1/4" m 51.88 11.35 588.84 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.05 TUBERIA DE PVC SAP C-10 ø 1" m 80.23 9.99 801.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.06 TUBERIA DE PVC C-10 Ø3/4" m 171.83 13.93 2,393.59 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.07 TUBERIA DE PVC C-10 Ø1/2" m 273.93 15.19 4,161.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.08 EXCAVACION DE ZANJAS DE 0.30x0.40 PARA TUB m 823.16 3.25 2,675.27 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.02.09 RELLENO Y COMPACTADO DE ZANJAS DE 0.30 m 823.16 2.84 2,337.77 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03 ACCESORIOS DE REDES DE AGUA
06.23.03.01 CODO PVC SAP 1/2" x 90º PARA AGUA pza 400.00 4.40 1,760.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.02 CODO PVC SAP 3/4" x 90º PARA AGUA pza 64.00 3.90 249.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.03 CODO PVC SAP 1" x 90º PARA AGUA pza 57.00 18.32 1,044.24 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.04 CODO PVC SAP 1 1/4" x 90º PARA AGUA pza 1.00 24.10 24.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.05 CODO PVC SAP 2" x 90º und 10.00 18.69 186.90 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.06 TEE PVC SAP Ø 1/2" PARA AGUA und 123.00 5.15 633.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.07 TEE PVC SAP Ø 3/4" PARA AGUA und 41.00 6.30 258.30 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.08 TEE PVC SAP Ø 1" PARA AGUA und 15.00 6.48 97.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.09 TEE PVC SAP Ø 1 1/4" PARA AGUA und 9.00 6.06 54.54 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.10 TEE PVC SAP Ø 2" und 2.00 8.64 17.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.11 UNION UNIVERSAL PVC SAP 1/2" und 2.00 9.07 18.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.12 REDUCCION PVC SAP Ø 2 1/2" A 2" und 4.00 6.82 27.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.13 REDUCCION PVC SAP Ø 2" A 1 1/4" und 2.00 3.07 6.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.14 REDUCCION PVC SAP Ø 1 1/4" A 3/4" und 6.00 6.07 36.42 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.15 REDUCCION PVC SAP Ø 3/4" A 1/2" und 64.00 4.87 311.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.16 REDUCCION PVC SAP Ø 1 1/4" A 1" und 7.00 6.17 43.19 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.17 REDUCCION PVC SAP Ø 1" A 3/4" und 14.00 5.32 74.48 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.18 REDUCCION PVC SAP Ø 1/2" A 1/4" und 50.00 3.07 153.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.19 REDUCCION PVC SAP Ø 1 1/2" A 1 1/4" und 4.00 6.27 25.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.20 REDUCCION PVC SAP Ø 2 1/2" A 1 1/2" und 1.00 6.67 6.67 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.21 REDUCCION PVC SAP Ø 1" A 1/2" und 6.00 5.40 32.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.22 REDUCCION PVC SAP Ø 2" A 1 1/2" und 3.00 6.25 18.75 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.03.23 REDUCCION PVC SAP Ø 1 1/2" A 1" PARA AGUA und 1.00 4.56 4.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.04 LLAVES Y VALVULAS
06.23.04.01 VALVULA DE COMPUERTA 2 1/2" pza 1.00 105.70 105.70 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.04.02 VALVULA DE COMPUERTA 1" und 7.00 72.24 505.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.23.04.03 VALVULA DE COMPUERTA 3/4" und 20.00 72.85 1,457.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 35 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.24 SISTEMA DE AGUA CALIENTE
06.24.01 SALIDAS DE AGUA CALIENTE
06.24.01.01 SALIDA DE AGUA CALIENTE CON TUBERIA DE C pto 79.00 90.42 7,143.18 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02 REDES DE DISTRIBUCION
06.24.02.01 TUBERIA DE PVC C-10 Ø 2 1/2" m 21.17 13.57 287.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.02 TUBERIA DE PVC C-10 Ø 2" m 154.55 13.33 2,060.15 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.03 TUBERIA DE PVC C-10 Ø 1 1/2" m 69.57 12.36 859.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.04 TUBERIA DE PVC C-10 Ø 1 1/4" m 51.88 11.35 588.84 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.05 TUBERIA DE PVC SAP C-10 ø 1" m 80.23 9.99 801.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.06 TUBERIA DE PVC C-10 Ø3/4" m 171.83 13.93 2,393.59 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.07 TUBERIA DE PVC C-10 Ø1/2" m 273.93 15.19 4,161.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.08 EXCAVACION DE ZANJAS DE 0.30x0.40 PARA TUB m 823.16 3.25 2,675.27 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.02.09 RELLENO Y COMPACTADO DE ZANJAS DE 0.30 m 823.16 2.84 2,337.77 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03 ACCESORIOS DE REDES DE AGUA CALIENTE
06.24.03.01 CODO PVC SAP 1/2" x 90º PARA AGUA pza 400.00 4.40 1,760.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.02 CODO PVC SAP 3/4" x 90º PARA AGUA pza 64.00 3.90 249.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.03 CODO PVC SAP 1" x 90º PARA AGUA pza 57.00 18.32 1,044.24 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.04 CODO PVC SAP 1 1/4" x 90º PARA AGUA pza 1.00 24.10 24.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.05 TEE PVC SAP Ø 1/2" PARA AGUA und 123.00 5.15 633.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.06 TEE PVC SAP Ø 3/4" PARA AGUA und 41.00 6.30 258.30 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.07 TEE PVC SAP Ø 1" PARA AGUA und 15.00 6.48 97.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.08 TEE PVC SAP Ø 1 1/4" PARA AGUA und 9.00 6.06 54.54 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.09 REDUCCION PVC SAP Ø 2 1/2" A 2" und 3.00 6.82 20.46 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.10 REDUCCION PVC SAP Ø 2" A 1 1/4" und 2.00 3.07 6.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.11 REDUCCION PVC SAP Ø 1 1/4" A 3/4" und 6.00 6.07 36.42 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.12 REDUCCION PVC SAP Ø 3/4" A 1/2" und 64.00 4.87 311.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.13 REDUCCION PVC SAP Ø 1 1/4" A 1" und 7.00 6.17 43.19 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.14 REDUCCION PVC SAP Ø 1" A 3/4" und 14.00 5.32 74.48 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.15 REDUCCION PVC SAP Ø 1/2" A 1/4" und 50.00 3.07 153.50 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.16 REDUCCION PVC SAP Ø 1 1/2" A 1 1/4" und 4.00 6.27 25.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.17 REDUCCION PVC SAP Ø 2 1/2" A 1 1/2" und 1.00 6.67 6.67 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.18 REDUCCION PVC SAP Ø 1" A 1/2" und 6.00 5.40 32.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.19 REDUCCION PVC SAP Ø 2" A 1 1/2" und 3.00 6.25 18.75 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.24.03.20 REDUCCION PVC SAP Ø 1 1/2" A 1" PARA AGUA und 1.00 4.56 4.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.25 LLAVES Y VALVULAS
06.25.01 VALVULA DE COMPUERTA 2 1/2" pza 1.00 105.70 105.70 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.25.02 VALVULA DE COMPUERTA 1" und 7.00 72.24 505.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 36 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.25.03 VALVULA DE COMPUERTA 3/4" und 20.00 72.85 1,457.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.26 EQUIPOS DE BOMBEO
06.26.01 BOMBA MONOFÁSICA HF 70B DE 2HP pza 1.00 1,250.00 1,250.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.26.02 BOMBA MONOFÁSICA HF 70B DE 1.5HP pza 1.00 1,120.00 1,120.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.26.03 CALENTADOR A GAS 01-01-0-067 MASTER FLOWS 6 pza 1.00 712.54 712.54 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.27 SISTEMA DE DESAGUE PLUVIAL
06.27.01 TUBERIA DE BAJADA Y DISTRIBUCION PVC SAL 4" m 109.28 26.54 2,900.29 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.27.02 CODO PVC SAL 4"X90° und 23.00 8.82 202.86 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.27.03 COLUMNETA DE SOPORTE DE TUBERIA DE DESAG und 13.00 46.47 604.11 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28 INSTALACIONES ELECTRICAS
06.28.01 OBRAS PRELIMINARES
06.28.01.01 TRAZO, NIVELACION Y REPLANTEO m 244.88 1.64 401.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.01.02 EXCAVACION MANUAL PARA REDES ELECTRICA m3 122.44 32.54 3,984.20 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.01.03 RELLENO COMPACTADO A MANO CON MATERIA m3 117.54 28.47 3,346.36 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.01.04 CAMA DE ARENA PARA POYO DE TUBERIA m3 24.49 12.70 311.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.01.05 CINTA SEÑALIZADORA m 244.88 0.83 203.25 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.01.06 ELIMINACION DE MATERIAL EXCEDENTE (TRA m3 6.12 9.22 56.43 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.01.07 BUZONES ELECTRICOS und 8.00 347.99 2,783.92 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.02 CANALIZACION Y/O TUBERIAS
06.28.02.01 TUBERIA PVC-SAP ELECTRICAS DE Ø25mm m 1,465.73 9.99 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.02.02 TUBERIA PVC-SAP ELECTRICAS DE Ø80mm m 668.75 24.22 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.02.03 TUBERIA CONDUIT EMT DE Ø25mm m 145.95 32.02 4,673.32 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.03 SALIDAS ELECTRICAS
06.28.03.01 SALIDA CON CAJA OCTOGONAL DE 100x100x50 pto 254.00 9.57 2,430.78 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.03.02 SALIDA CON CAJA RECTANGULAR DE 100x55x5 pto 107.00 9.49 1,015.43 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.04 TABLEROS GENERAL Y DE DISTRIBUCIÓN
06.28.04.01 TAB TG - 3Ø/220V. / 60 Hz. / 25KA. und 1.00 2,519.91 2,519.91 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.04.02 TAB TS-1 - 3Ø/220V. / 60 Hz. / 1KA. und 1.00 708.51 708.51 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.04.03 TAB TS-2 - 3Ø/220V. / 60 Hz. / 1KA. und 1.00 858.60 858.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.04.04 TAB T-CB - 3Ø/220V. / 60 Hz. / 25KA. und 1.00 994.85 994.85 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.05 CONDUCTORES ELECTRICOS
06.28.05.01 CABLE TIPO NH-80 - 4.0 mm2 m 1,026.36 8.43 8,652.21 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.05.02 CABLE TIPO NH-80 - 6.0 mm2 m 405.05 10.44 4,228.72 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.05.03 CABLE TIPO N2XOH - 10.0 mm2 m 240.14 12.73 3,056.98 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.05.04 CABLE TIPO N2XOH - 95.0 mm2 m 165.00 58.96 9,728.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.06 CONDUCTOR ELECTRICO PARA PUESTA A TIERRA
06.28.06.01 CONDUCTOR COBRE DESNUDO DE 35.00MM2 m 543.03 10.38 5,636.65 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 37 -
#REF!
#REF!
FÓRMULA 06: TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
06.28.07 SISTEMA DE PUESTA A TIERRA
06.28.07.01 PUESTA A TIERRA und 2.00 1,069.78 2,139.56 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.08 EQUIPOS LUMINARIAS ADOSADOS EN TECHO
06.28.08.01 LUMINARIA MODULAR LED 3400lm DEL TIPO und 27.00 106.64 2,879.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.08.02 LUMINARIA MODULAR LED 4000lm DE 36W, A und 42.00 105.74 4,441.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.08.03 LUMINARIA LED 1100lm DE 22W, EMPOTRADO E und 76.00 45.71 3,473.96 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.08.04 LUMINARIA MODULAR LED HERMETICO 3000lm und 84.00 189.78 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.08.05 LUMINARIA MODULAR LED 2700lm DE 55W, SU und 16.00 359.27 5,748.32 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.08.06 LUMINARIA MODULAR LED 1200lm DE 18W, AD und 9.00 107.39 966.51 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.09 ACCESORIOS ELECTRICOS
06.28.09.01 SUMINISTRO E INSTALACION DE INTERRUPTOR und 42.00 34.99 1,469.58 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.09.02 SUMINISTRO E INSTALACION DE INTERRUPT und 6.00 45.58 273.48 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.09.03 SUMINISTRO E INSTALACION DE TOMACORRIE und 61.00 47.78 2,914.58 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.09.04 SUMINISTRO E INSTALACION DE CAJA DE PASO und 10.00 42.61 426.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.09.05 SUMINISTRO E INSTALACION DE CAJA DE PAS und 14.00 38.51 539.14 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.09.06 SUMINISTRO E INSTALACION DE CAJA DE PASO und 1.00 64.78 64.78 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.10 PRUEBA DE RECEPCION DE OBRA
06.28.10.01 PRUEBAS DE PUESTAS A TIERRA GLB 1.00 500.00 500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.10.02 PRUEBAS DE CALIDAD DE LA ENERGIA GLB 1.00 500.00 500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.10.03 PRUEBAS DE CONTINUIDAD GLB 1.00 500.00 500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.10.04 PRUEBAS DE ILUMINACION GLB 1.00 500.00 500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
06.28.10.05 PRUEBAS DE FUNCIONAMIENTO DE EQUIPOS E GLB 1.00 1,500.00 1,500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
*

(01) COSTO DIRECTO 4,144,708.65 - Err:504 Err:504 Err:504


(02) GASTOS GENERALES 8.00% 331,576.69 - Err:504 Err:504 Err:504
(03) UTILIDAD 7.00% 290,129.61 - Err:504 Err:504 Err:504
0.00% Err:504 Err:504 Err:504
(04) SUB TOTAL REFERENCIAL 4,766,414.95 - Err:504 Err:504 Err:504
(05) FACTOR DE RELACIÓN #REF!
(06) MONTO TOTAL CONTRATADO (SIN IGV) #REF! #REF! Err:504 Err:504 Err:504

- 38 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
Form.08 PLAN DE MANEJO AMBIENTAL
08 PLAN DE MANEJO AMBIENTAL
08.01 PREVENTIVAS, CORRECTIVAS Y/O MITIGACION
08.01.01 SUB PROGRAMA DE MANEJO DE RESIDUOS SOLID
08.01.01.01 INSTALACION DE CONTENEDORES PARA RESID und 1.00 246.23 246.23 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.01.02 INSTALACION DE CONTENEDORES PARA RESID und 1.00 98.01 98.01 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.01.03 TRANSPORTE Y DISPOSICIÓN FINAL DE RS - PE t 0.10 3,500.00 350.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.02 SUB PROGRAMA DE SALUD LOCAL (CONTROL DE P
08.01.02.01 ALTERACIÓN DE LA CALIDAD DEL AIRE (Riego pe GLB 1.50 4,500.00 6,750.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.03 SUB PROGRAMA DE CAPACITACION AMBIENTAL
08.01.03.01 CHARLA AL PERSONAL GLB 1.00 885.76 885.76 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.03.02 CHARLA A LOS POBLADORES GLB 1.00 1,518.12 1,518.12 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.03.03 TRIPTICOS CON TEMAS AMBIENTALES A4 GLB 1.00 500.00 500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.03.04 POLOS CON LOGOS AMBIENTALES und 100.00 18.00 1,800.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.03.05 JUEGO AMBIENTAL (LUDO) TAMAÑO OFICIO PL und 1.00 12.00 12.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.04 SUB PROGRAMA DE SEGURIDAD Y SALUD OCUPA
08.01.04.01 EQUIPOS DE PROTECCION PERSONAL und 10.00 365.00 3,650.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.04.02 SEÑALIZACION DE ZONAS DE TRABAJO und 5.00 384.19 1,920.95 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.04.03 EXAMENES PREOCUPACIONALES Y OCUPACION und 15.00 180.00 2,700.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.04.04 CREACIÓN DE COMITÉ DE SEGURIDAD Y SALUD GLB 1.00 409.04 409.04 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.04.05 BOTIQUÍN IMPLEMENTARIO GLB 3.00 250.00 750.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.01.05 SEÑALIZACIONES AMBIENTALES
08.01.05.01 LETREROS DE SEÑALIZACIÓN AMBIENTAL (0.9 und 5.00 345.02 1,725.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02 PROGRAMA DE PREVENSION DE PERDIDAS Y CONT
08.02.01 SUB PROGRAMA DE PREVENCION Y RESPUESTA D
08.02.01.01 EXTINTOR und 1.00 240.00 240.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.01.02 SEÑALIZACION DE EVACUACIÓN, SEGÚN LUGA und 4.00 345.02 1,380.08 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.01.03 SIMULACRO DE INCENDIO GLB 1.00 750.00 750.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.02 SUB PROGRAMA DE PREVENCION Y RESPUESTA
08.02.02.01 CHARLAS INFORMATIVAS DE EVACUACIÓN und 3.00 409.09 1,227.27 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.02.02 EQUIPOS DE PRIMEROS AUXILIOS und 1.00 600.00 600.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.02.03 SIMULACRO DE SISMO und 2.00 750.00 1,500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.03 SUB PROGRAMA DE PREVENCION Y RESPUESTA
08.02.03.01 CHARLA DE 5MINUTOS ANTE RESPUESTAS DE und 6.00 220.00 1,320.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.02.03.02 CAPACITACION DE PRIMEROS AUXILIOS und 2.00 400.00 800.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.03 PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBI
08.03.01 MONITOREO AMBIENTAL

- 39 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
08.03.01.01 MONITOREO DE AIRE und 2.00 980.00 1,960.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.03.01.02 MONITOREO DE RUIDO und 3.00 200.00 600.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.03.01.03 MONITOREO DE SUELO und 3.00 200.00 600.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.04 ASUNTOS SOCIALES
08.04.01 SUB PROGRAMA DE MONITOREO DE DEUDAS LOC
08.04.01.01 MATERIALES PARA LA DIFUSIÓN mll 2.00 70.00 140.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.04.01.02 CHARLAS A TRABAJADORES E INFORMACIÓN und 6.00 201.00 1,206.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.04.02 CONTRATACION DE MANO DE OBRA LOCAL
08.04.02.01 REUNIÓN INFORMATIVA PARA LA CONTRATAC GLB 1.00 200.00 200.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.04.03 PARTICIPACION CIUDADANA
08.04.03.01 CREACIÓN DE COMITÉ DE VIGILANCIA GLB 1.00 400.00 400.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
08.05 CIERRE Y ABANDONO
08.05.01 COMPONENTE AMBIENTAL
08.05.01.01 RECUPERACIÓN Y REVEGETACIÓN DE ÁREAS V GLB 1.00 4,500.00 4,500.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09 SEGURIDAD Y SALUD OCUPACIONAL
09.01 SEGURIDAD
09.01.01 PLAN DE SALUD Y SEGURIDAD EN EL TRABAJO
09.01.01.01 IMPLEMENTACION Y ADMINISTRACIÓN DEL PL GLB 1.00 450.00 450.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.01.01.02 DESARROLLO DEL PLAN DE SALUD Y SEGURIDA GLB 1.00 150.00 150.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.01.01.03 CAPACITACIÓN EN SEGURIDAD Y SALUD mes 6.00 11.38 68.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.01.02 SEÑALIZACION EN OBRA
09.01.02.01 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 1.00 479.97 479.97 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.01.03 EQUIPOS DE PROTECCION PERSONAL
09.01.03.01 EQUIPOS DE PROTECCION PERSONAL jgo 30.00 256.58 7,697.40 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.01.03.02 EQUIPOS DE PROTECCION COLECTIVO GLB 1.00 202.86 202.86 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.01.04 PROGRAMA DE RESPUESTAS ANTE EMERGENCIAS
09.01.04.01 RECURSOS PARA RESPUESTAS ANTE EMERGE GLB 1.00 255.00 255.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02 SALUD EN OBRA
09.02.01 PLAN SARS-COV-2 (COVID-19)
09.02.01.01 ACTIVIDADES PREVIAS
09.02.01.01.01 ACTIVIDADES PREVIAS AL INICIO DE OBRA
09.02.01.01.01.01 PRUEBAS RAPIDAS und 10.00 42.37 423.70 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.02 INFORMACIÓN DE SENSIBILIZACIÓN
09.02.01.01.02.01 PANELES INFORMATIVOS und 1.00 113.60 113.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.03 LIMPIEZA Y DESINFECCIÓN DE AMBIENTES
09.02.01.01.03.01 EQUIPOS PARA LIMPIEZA Y DESINFECCIO GLB 1.00 17.45 17.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.03.02 INSUMOS PARA LIMPIEZA Y DESINFECCI mes 1.00 9.89 9.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504

- 40 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
09.02.01.01.03.03 EPP PARA LIMPIEZA Y DESINFECCION DE mes 1.00 25.10 25.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.04 LIMPIEZA Y DESINFECCIÓN DE IMPLEMEN
09.02.01.01.04.01 INSUMOS PARA LIMPIEZA Y DESINFECCI mes 1.00 19.66 19.66 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.04.02 INSUMOS PARA LIMPIEZA Y DESINFECCIO mes 1.00 5.16 5.16 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.05 PREVENCIÓN Y CONTROL DE PERSONAL
09.02.01.01.05.01 EPP PREVENCIÓN Y CONTROL - RIESGO BAJO mes 1.00 0.85 0.85 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.05.02 INSUMOS LAVADO DE MANOS mes 1.00 11.23 11.23 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.05.03 INSUMOS DESINFECCION DE MANOS mes 1.00 14.28 14.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.05.04 ADECUACION DE LAVA MANOS GLB 1.00 196.61 196.61 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.01.06 MOVILIZACION Y DEMOVILIZACION DE PERSO
09.02.01.01.06.01 MOVILIZACION Y DESMOVILIZACION DE VJE 1.00 150.00 150.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02 ACTIVIDADES EJECUCIÓN
09.02.01.02.01 ACTIVIDADES PREVIAS AL INICIO DE OBRA
09.02.01.02.01.01 PRUEBAS RAPIDAS und 30.00 42.37 1,271.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.02 RECURSOS HUMANOS PARA PREVENCION Y
09.02.01.02.02.01 PERSONAL PARA PREVENCIÓN Y CONTROL mes 6.00 3,000.00 ### - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.03 EQUIPOS PARA EVALUACIÓN DE DESCARTE
09.02.01.02.03.01 EQUIPOS PARA EVALUACIÓN DE DESCARTE GLB 1.00 146.89 146.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.04 INFORMACIÓN DE SENSIBILIZACIÓN
09.02.01.02.04.01 PANELES INFORMATIVOS und 1.00 113.60 113.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.05 LIMPIEZA Y DESINFECCIÓN DE AMBIENTES
09.02.01.02.05.01 EQUIPOS PARA LIMPIEZA Y DESINFECC GLB 1.00 169.43 169.43 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.05.02 INSUMOS PARA LIMPIEZA Y DESINFECC mes 6.00 9.89 59.34 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.05.03 EPP PARA LIMPIEZA Y DESINFECCION D mes 6.00 65.03 390.18 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.06 LIMPIEZA Y DESINFECCIÓN DE EQUIPOS DE
09.02.01.02.06.01 INSUMOS PARA LIMPIEZA Y DESINFECCION mes 6.00 19.66 117.96 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.06.02 INSUMOS PARA LIMPIEZA Y DESINFECCIO mes 6.00 5.23 31.38 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.07 PREVENCIÓN Y CONTROL DE PERSONAL
09.02.01.02.07.01 EPP PREVENCIÓN Y CONTROL - RIESGO MEDI mes 6.00 6.67 40.02 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.07.02 EPP PREVENCIÓN Y CONTROL - RIESGO BAJO mes 6.00 0.85 5.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.07.03 INSUMOS LAVADO DE MANOS mes 6.00 11.23 67.38 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.07.04 INSUMOS DESINFECCION DE MANOS mes 6.00 14.28 85.68 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.07.05 ADECUACION DE LAVA MANOS GLB 1.00 196.61 196.61 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.02.08 MOVILIZACION Y DEMOVILIZACION DE PERSO
09.02.01.02.08.01 MOVILIZACION Y DESMOVILIZACION DE VJE 1.00 150.00 150.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03 ACTIVIDADES POST EJECUCIÓN
09.02.01.03.01 ACTIVIDADES PREVIAS AL INICIO DE OBRA

- 41 -
#REF!
#REF!
FÓRMULA 08: PLAN DE MANEJO AMBIENTAL
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!
Presupuesto Base Avance Anterior Avance Actual Avance Acumulado Saldo por Valorizar
Ítem Descripción Und. Metrado Precio Parcial Metrado Monto % Metrado Monto % Metrado Monto % Metrado Monto %
09.02.01.03.01.01 PRUEBAS RAPIDAS und 10.00 42.37 423.70 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.02 INFORMACIÓN DE SENSIBILIZACIÓN
09.02.01.03.02.01 PANELES INFORMATIVOS und 1.00 113.60 113.60 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.03 LIMPIEZA Y DESINFECCIÓN DE AMBIENTES
09.02.01.03.03.01 EQUIPOS PARA LIMPIEZA Y DESINFECCIO GLB 1.00 17.45 17.45 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.03.02 INSUMOS PARA LIMPIEZA Y DESINFECCI mes 1.00 9.89 9.89 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.03.03 EPP PARA LIMPIEZA Y DESINFECCION DE mes 1.00 25.10 25.10 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.04 LIMPIEZA Y DESINFECCIÓN DE IMPLEMEN
09.02.01.03.04.01 INSUMOS PARA LIMPIEZA Y DESINFECCI mes 1.00 19.66 19.66 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.04.02 INSUMOS PARA LIMPIEZA Y DESINFECCIO mes 1.00 5.23 5.23 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.05 PREVENCIÓN Y CONTROL DE PERSONAL
09.02.01.03.05.01 EPP PREVENCIÓN Y CONTROL - RIESGO BAJO mes 1.00 0.85 0.85 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.05.02 INSUMOS LAVADO DE MANOS mes 1.00 11.23 11.23 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.05.03 INSUMOS DESINFECCION DE MANOS mes 1.00 14.28 14.28 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.05.04 ADECUACION DE LAVA MANOS GLB 1.00 196.61 196.61 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
09.02.01.03.06 MOVILIZACION Y DEMOVILIZACION DE PERSO
09.02.01.03.06.01 MOVILIZACION Y DESMOVILIZACION DE VJE 1.00 150.00 150.00 - - 0.00% Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
*

(01) COSTO DIRECTO 72,861.87 - Err:504 Err:504 Err:504


(02) GASTOS GENERALES 8.00% 5,828.95 - Err:504 Err:504 Err:504
(03) UTILIDAD 7.00% 5,100.33 - Err:504 Err:504 Err:504
0.00% Err:504 Err:504 Err:504
(04) SUB TOTAL REFERENCIAL 83,791.15 - Err:504 Err:504 Err:504
(05) FACTOR DE RELACIÓN #REF!
(06) MONTO TOTAL CONTRATADO (SIN IGV) #REF! #REF! Err:504 Err:504 Err:504

- 42 -
CONTROL HASTA VALORIZACIÓN DE OBRA Nº 02
(DEL 01/01/2024 AL 31/01/2024)
CONTROL GRÁFICO DE AVANCE PROGRAMADO Vs. EJECUTADO
RENOVACION DE PUENTE; EN EL(LA) CAMINO VECINAL R250381 (PUENTE EL MILAGRO), EN
● Obra LA LOCALIDAD CORAZON JESUS, DISTRITO DE ALEXANDER VON HUMBOLDT, PROVINCIA
PADRE ABAD, DEPARTAMENTO UCAYALI
● Entidad : MUNICIPALIDAD PROVINCIAL DE PADRE ABAD
● Contratista : HT CONSTRUCTORES Y SERVICIOS E.I.R.L.
● Residente : ING. MARTIN C. VALDIVIESO ECHEVARRIA
● Supervisor : ING. FRANKLIN W. TRINIDAD TRUJILLO
● Monto Referencial : S/ 556,837.60 Incl. IGV
● Monto Contratado : S/ 556,115.64 Incl. IGV

FORMULA GENERAL

VALORIZACIONES % AVANCE PROGRAMADO % AVANCE EJECUTADO COMPARACIÓN


Nº DESDE HASTA PARCIAL ACUMULADO PARCIAL ACUMULADO DESFASE SITUACIÓN
0 0.00% 0.00%
1 01 12/27/2023 12/31/2023 1.51% 1.51% 2.69% 2.69% 1.18% ADELANTADO
2 02 1/1/2024 1/31/2024 21.51% 23.01% 17.55% 20.23% -2.78% RETRASADO
3 03 2/1/2024 2/29/2024 35.87% 58.89%
4 04 3/1/2024 3/25/2024 41.11% 100.00%

CURVA "S" DE AVANCE PROGRAMADO Vs. EJECUTADO


100.00%
AVANCE MENSUAL ACUMU-

100%
90% Avance Acumulado Programado
80% Avance Acumulado Ejecutado
70%
58.89%
60%
LADO (%)

50%
40%
30% 23.01%
20%
10% 20.23%
0.00% 1.51%
0% 0.00% 2.69%
0 1 2 3 4
VALORIZACIONES

GRÁFICO DE BARRAS DE CONTROL DE AVANCE PROGRAMADO Vs.


EJECUTADO
100.00%
AVANCE MENSUAL ACUMU-

100%
90% Avance Acumulado Programado
80% Avance Acumulado Ejecutado
70% 58.89%
60%
LADO (%)

50%
40%
30% 23.01% 20.23%
20%
10% 1.51% 2.69%
0%
1 2 3 4
VALORIZACIONES

- 43 -
#REF!
#REF!
CÁLCULO DEL COEFICIENTE DE REAJUSTE ESTIMADO (Kr) POR CADA FÓRMULA POLINÓMICA
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!

NOTA: El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de
retraso, para la presente valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 01 : OBRAS PROVISIONALES


K = 0.082x(Mr/Mo) + 0.06x(Dr/Do) + 0.728x(Mr/Mo) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-
47 100.000% 0.082 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.082 M 0.082x(Mr/Mo)

30 100.000% 0.060 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
2 0.060 D + 0.06x(Dr/Do)

48 100.000% 0.728 MAQUINARIA Y EQUIPO NACIONAL #REF! #REF! #REF!


3 0.728 M + 0.728x(Mr/Mo)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


4 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

FÓRMULA 02 : BOLETERIA

K = 0.387x(Mr/Mo) + 0.098x(Ar/Ao) + 0.129x(Cr/Co) + 0.138x(Ar/Ao) + 0.118x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.387 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.387 M 0.387x(Mr/Mo)

5 100.000% 0.098 AGREGADO GRUESO #REF! #REF! #REF!


2 0.098 A + 0.098x(Ar/Ao)

21 100.000% 0.129 CEMENTO PORTLAND TIPO I #REF! #REF! #REF!


3 0.129 C + 0.129x(Cr/Co)

2 100.000% 0.138 ACERO DE CONSTRUCCION LISO #REF! #REF! #REF!


4 0.138 A + 0.138x(Ar/Ao)

30 100.000% 0.118 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
5 0.118 D + 0.118x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


6 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

FÓRMULA 03 : PISOS EXTERIORES Y JARDINERIA

K = 0.273x(Mr/Mo) + 0.209x(Ar/Ao) + 0.277x(Cr/Co) + 0.059x(Mr/Mo) + 0.052x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.273 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.273 M 0.273x(Mr/Mo)

5 100.000% 0.209 AGREGADO GRUESO #REF! #REF! #REF!


2 0.209 A + 0.209x(Ar/Ao)

21 100.000% 0.277 CEMENTO PORTLAND TIPO I #REF! #REF! #REF!


3 0.277 C + 0.277x(Cr/Co)

48 100.000% 0.059 MAQUINARIA Y EQUIPO NACIONAL #REF! #REF! #REF!


4 0.059 M + 0.059x(Mr/Mo)

30 100.000% 0.052 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
5 0.052 D + 0.052x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


6 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

- 44 -
#REF!
#REF!
CÁLCULO DEL COEFICIENTE DE REAJUSTE ESTIMADO (Kr) POR CADA FÓRMULA POLINÓMICA
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!

NOTA: El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de
retraso, para la presente valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 04 : CAMPO DE FUTBOL Y RETIRO

K = 0.291x(Mr/Mo) + 0.148x(Ar/Ao) + 0.059x(Ar/Ao) + 0.159x(Mr/Mo) + 0.213x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.291 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.291 M 0.291x(Mr/Mo)

5 100.000% 0.148 AGREGADO GRUESO #REF! #REF! #REF!


2 0.148 A + 0.148x(Ar/Ao)

2 100.000% 0.059 ACERO DE CONSTRUCCION LISO #REF! #REF! #REF!


3 0.059 A + 0.059x(Ar/Ao)

48 100.000% 0.159 MAQUINARIA Y EQUIPO NACIONAL #REF! #REF! #REF!


4 0.159 M + 0.159x(Mr/Mo)

30 100.000% 0.213 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
5 0.213 D + 0.213x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


6 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

FÓRMULA 05 : CERCO PERIMETRICO

K = 0.324x(Mr/Mo) + 0.1x(Cr/Co) + 0.383x(Ar/Ao) + 0.063x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.324 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.324 M 0.324x(Mr/Mo)

21 100.000% 0.100 CEMENTO PORTLAND TIPO I #REF! #REF! #REF!


2 0.100 C + 0.1x(Cr/Co)

2 100.000% 0.383 ACERO DE CONSTRUCCION LISO #REF! #REF! #REF!


3 0.383 A + 0.383x(Ar/Ao)

30 100.000% 0.063 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
4 0.063 D + 0.063x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


5 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

FÓRMULA 06 : TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUBLICO

K = 0.291x(Mr/Mo) + 0.103x(Cr/Co) + 0.062x(Ar/Ao) + 0.227x(Ar/Ao) + 0.091x(Mr/Mo) + 0.096x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.291 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.291 M 0.291x(Mr/Mo)

21 100.000% 0.103 CEMENTO PORTLAND TIPO I #REF! #REF! #REF!


2 0.103 C + 0.103x(Cr/Co)

5 100.000% 0.062 AGREGADO GRUESO #REF! #REF! #REF!


3 0.062 A + 0.062x(Ar/Ao)

2 100.000% 0.227 ACERO DE CONSTRUCCION LISO #REF! #REF! #REF!


4 0.227 A + 0.227x(Ar/Ao)

45 100.000% 0.091 MADERA TERCIADA PARA ENCOF. #REF! #REF! #REF!


5 0.091 M + 0.091x(Mr/Mo)

30 100.000% 0.096 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
6 0.096 D + 0.096x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


7 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

- 45 -
#REF!
#REF!
CÁLCULO DEL COEFICIENTE DE REAJUSTE ESTIMADO (Kr) POR CADA FÓRMULA POLINÓMICA
● Obra #REF!
● Entidad #REF! ● Presupuesto Referencial (con IGV) #REF!
● Contratista #REF! ● Presupuesto Contratado (Con IGV) #REF!
● Residente #REF! ● Plazo de Ejecución (d.c.) #REF!
● Supervisor #REF! ● Fecha de Inicio de Ejecución #REF!
● Modalidad #REF! ● Fecha de Término de Ejecución #REF!

NOTA: El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de
retraso, para la presente valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 07 : TANQUE CISTERNA Y ELEVADO

K = 0.368x(Mr/Mo) + 0.113x(Cr/Co) + 0.064x(Ar/Ao) + 0.215x(Ar/Ao) + 0.11x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.368 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.368 M 0.368x(Mr/Mo)

21 100.000% 0.113 CEMENTO PORTLAND TIPO I #REF! #REF! #REF!


2 0.113 C + 0.113x(Cr/Co)

5 100.000% 0.064 AGREGADO GRUESO #REF! #REF! #REF!


3 0.064 A + 0.064x(Ar/Ao)

2 100.000% 0.215 ACERO DE CONSTRUCCION LISO #REF! #REF! #REF!


4 0.215 A + 0.215x(Ar/Ao)

30 100.000% 0.110 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
5 0.110 D + 0.11x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


6 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

FÓRMULA 08 : PLAN DE MANEJO AMBIENTAL

K = 0.362x(Mr/Mo) + 0.096x(Mr/Mo) + 0.412x(Dr/Do) + 0.13x(Ir/Io)

Monomio Coeficiente de Término de Índice % de CI de cada Io Ir Kr


Símbolo Descripción del Insumo
Nº Incidencia (CI) Monomio Unificado (IU) Incidencia Insumo #REF! #REF! #REF!
-

47 100.000% 0.362 MANO DE OBRA (INCLUIDO LEYES SOCIALES) #REF! #REF! #REF!
1 0.362 M 0.362x(Mr/Mo)

48 100.000% 0.096 MAQUINARIA Y EQUIPO NACIONAL #REF! #REF! #REF!


2 0.096 M + 0.096x(Mr/Mo)

30 100.000% 0.412 DOLAR MAS INFLACION MERCADO USA (GENERAL PONDE #REF! #REF! #REF!
3 0.412 D + 0.412x(Dr/Do)

39 100.000% 0.130 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! #REF!


4 0.130 I + 0.13x(Ir/Io)

1.000 Coeficiente de Reajuste Correspondiente al Mes de: #REF! #REF!

- 46 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 01 : OBRAS PROVISIONALES


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 47 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 02 : BOLETERIA
Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 48 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 03 : PISOS EXTERIORES Y JARDINERIA


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 49 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 04 : CAMPO DE FUTBOL Y RETIRO


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 50 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 05 : CERCO PERIMETRICO


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 51 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 06 : TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUB


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 52 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 07 : TANQUE CISTERNA Y ELEVADO


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 53 -
#REF!
#REF!
CÁLCULO DE REINTEGRO POR REAJUSTE A CUENTA (SIN IGV)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
R = Val x (Kr-1)
DONDE:
R = Reintegro por Reajuste de Valorización (A cuenta)
Val = Monto de la Valorización Mensual (Sin IGV)
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la presente
valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

FÓRMULA 08 : PLAN DE MANEJO AMBIENTAL


Reajuste
Valorización Avance Coeficiente de Reajuste Reintegro
R = Val x (Kr-1)
Nº Mes Programado Ejecutado Mes Kr Programado Ejecutado Reconocido
VAL. Nº 01 #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF! #REF! #REF!

Reintegro Acumulado Anterior #REF!


Reintegro Actual Err:504
Reintegro Acumulado Actual #REF!

- 54 -
VALORIZACIÓN DE OBRA Nº 04
(DEL 20/04/2022 AL 30/04/2022)
RESUMEN DE AMORTIZACIONES DEL ADELANTO DIRECTO
: MEJORAMIENTO DE LOS SERVICIOS DEPORTIVOS DEL ESTADIO
● Obra MUNICIPAL DE LA CIUDAD PANAO, DISTRITO DE PANAO, PROVINCIA DE
PACHITEA, REGIÓN DE HUÁNUCO
● Entidad : MUNICIPALIDAD PROVINCIAL DE PACHITEA
● Contratista : CONSORCIO MONUMENTAL
● Residente : ING. FRANKLIN W. TRINIDAD TRUJILLO
● Supervisor : ING. BECQUER P. ESPINOZA SAMANIEGO
● Monto Referencial (con IGV) : S/ 7,382,784.52
● Factor de Relación : 0.99996
● Monto Contratado (con IGV) : S/ 7,382,505.63
● Monto Contratado (sin IGV) : S/ 6,256,360.70

FORMULA:
Aad = (A/C)xVal = %AxVal
DONDE:
Aad = Amortización del Adelanto Directo
A = Monto del Adelanto Directo Otorgado sin IGV
Val = Monto de la Valorización Bruta Incl. Factor de Relación
C = Monto del Contrato Principal sin IGV
%A = Porcentaje de Adelanto Directo Otorgado

DATOS DEL ADELANTO DIRECTO OTORGADO


Monto Adel. Monto Adel.
Fecha Máx. % Máximo Monto Máximo % Adelanto Fecha de Pago
Otorgado Otorgado
a Socilitar a Solicitar a Solicitar Otorgado del Adelanto
(con IGV) (sin IGV)
10/30/2021 10.00% 738,250.56 738,250.56 625,636.07 10.00% 12/7/2021
CÁLCULO DE LAS AMORTIZACIONES DEL ADELANTO DIRECTO
Monto % del Amortización Monto por Saldo a
Valorización
Valorizado Adelanto (A/C)xVal Amortizar Amortizar
Nº Mes (a)=Val (b)=A/C=%A (c)=(b)x(a) (d) (e)=(d)-(c)
VAL. Nº 01 December-2021 237,360.22 10.00% 23,736.02 625,636.07 601,900.05
VAL. Nº 02 January-2022 929,902.12 10.00% 92,990.21 601,900.05 508,909.84
VAL. Nº 03 February-2022 571,555.53 10.00% 57,155.55 508,909.84 451,754.29
VAL. Nº 04 March-2022 - 10.00% - 451,754.29 451,754.29
VAL. Nº 05 April-2022 32,690.95 10.00% 3,269.09 451,754.29 448,485.20

Amortización Acumulada a: Apr-2022 177,150.87


Amortización Acumulado Anterior 173,881.78
Amortización Actual 3,269.09
Amortización Acumulado Actual 177,150.87

- 55 -
#REF!
#REF!
DEDUCCIÓN DEL REINTEGRO QUE NO CORRESPONDE POR EL
OTORGAMIENTO DEL ADELANTO DIRECTO (A CUENTA)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
FORMULA:
Dad = (ValxA/C) x (Kr/Kad-1) = (Amort) x (Kr/Kad-1)
DONDE:
Dad = Deducción del Reajuste Generado por el Adelanto Directo
A = Monto del Adelanto Directo Otorgado sin IGV
Val = Monto de la Valorización Bruta Incl. Factor de Relación (sin IGV)
C = Monto del Contrato Principal sin IGV
Kr = Coeficiente de Reajuste considerado para la presente Valorización (un mes atrasado)
Kad = Coeficiente de Reajuste correspondiente al mes en que se otorgó el Adelanto Directo
Amort = Amortizacion por el Adelanto Directo
NOTA:
* El cálculo del coeficiente de reajuste (Kr) real se calcula con los índices unificados (IU) a la fecha de cancelación de la
valorización (normalmente un mes siguiente), como la publicación de los IU se realizan con un mes de retraso, para la
presente valorización se asumirá los IU ya publicados (del mes anterior), por lo que los reajustes reales serán regularizados en
valorizaciones posteriores o en la liquidación de obra.

Monto Monto Adel. Monto Adel.


Fecha Máxima % Máximo % Adelanto Fecha de Pago
Máximo Otorgado Otorgado
a Socilitar a Solicitar Otorgado del Adelanto
a Solicitar (con IGV) (sin IGV)

#REF! 10.00% #REF! #REF! #REF! #REF! #REF!

FÓRMULA 01 : OBRAS PROVISIONALES

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Kad Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(Kr/Kad-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

FÓRMULA 02 : BOLETERIA

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)

- 56 -
#REF!
#REF!
DEDUCCIÓN DEL REINTEGRO QUE NO CORRESPONDE POR EL
OTORGAMIENTO DEL ADELANTO DIRECTO (A CUENTA)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

FÓRMULA 03 : PISOS EXTERIORES Y JARDINERIA

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

FÓRMULA 04 : CAMPO DE FUTBOL Y RETIRO

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

- 57 -
#REF!
#REF!
DEDUCCIÓN DEL REINTEGRO QUE NO CORRESPONDE POR EL
OTORGAMIENTO DEL ADELANTO DIRECTO (A CUENTA)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

FÓRMULA 05 : CERCO PERIMETRICO

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

FÓRMULA 06 : TRIBUNA, AREA ADMINISTRATIVA Y SS.HH. PUB

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

- 58 -
#REF!
#REF!
DEDUCCIÓN DEL REINTEGRO QUE NO CORRESPONDE POR EL
OTORGAMIENTO DEL ADELANTO DIRECTO (A CUENTA)
● Obra #REF!
● Entidad #REF!
● Contratista #REF!
● Residente #REF!
● Supervisor #REF!
● Monto Referencial (con IGV) #REF!
● Factor de Relación #REF!
● Monto Contratado (con IGV) #REF!
● Monto Contratado (sin IGV) #REF!

FÓRMULA 07 : TANQUE CISTERNA Y ELEVADO

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

FÓRMULA 08 : PLAN DE MANEJO AMBIENTAL

Monto Coeficiente de Reaj. Coef. Reaj. Amortización Operación Deducción


Valorización
Valorizado de la Valorización Ka Actual de Coef. K (D)

Nº Mes (Val) Mes Kr #REF! (1)=(ValxA/C) (2)=(K/Ka-1) (1)x(2)


VAL. Nº 01 #REF! #REF! #REF! #REF! #VALUE! #REF! #VALUE!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total #VALUE! #VALUE!
Deducción Acumulado Anterior #VALUE!
Deducción Actual Err:504
Deducción Acumulado Actual #VALUE!

- 59 -
LIQUIDACIÓN FINAL DE CONTRATO DE OBRA

MEMORIA DE LIQUIDACIÓN
● Obra #REF!
● Entidad #REF!
● Contratista #REF! ● Plazo de Ejecución #REF!
● Residente #REF! ● Ampliación de Plazo : 0 dc
● Supervisor #REF! ● Ampl. Plazo Excep. : 0 dc
● Monto Referencial (con IGV) #REF! ● Total Plazo Ejec. #REF!
● Factor de Relación #REF! ● Inicio de Obra #REF!
● Monto Contratado (con IGV) #REF! ● Fin de Obra #REF!
● Adicional Nº 01 (con IGV) : S/ 0.00 ● Suspensión de Plazo : 0 dc
● Deductivo Nº 01 (con IGV) : S/ 0.00 ● Reinicio de Obra : 0 dc
● Monto Total Obra (con IGV) #REF! ● Fin Real de Obra : 30/11/2021

Costo Final de Obra Montos Pagados Saldo por Pagar


Descripción
(S/) (S/) (S/)

1.- VALORIZACIÓN SIN REAJUSTE #VALUE! #REF! #VALUE!


VAL. Nº 01 #REF! #VALUE! 237,351.25 #VALUE!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!

2.- REAJUSTES DE LA VALORIZACIÓN #REF! #REF! #REF!


VAL. Nº 01 #REF! #REF! 6,396.76 #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

3.- DEDUCCIONES DE REAJUSTES QUE NO CORRESPONDEN #VALUE! #VALUE! #VALUE!


* POR ADELANTO DIRECTO #VALUE! #VALUE! #VALUE!
* POR ADELANTO DE MATERIALES 1,541.98 1,541.98 -

4.- VALORIZACIÓN BRUTA (1+2-3) #VALUE! #REF! #VALUE!

5.- AMORTIZACIONES #REF! #REF! #REF!


* ADELANTO DIRECTO #REF! 177,150.87 #REF!
* ADELANTO DE MATERIALES #REF! #REF! #REF!

6.- VALORIZACIÓN NETA (4-5) #VALUE! #REF! #VALUE!

7.- OTROS - - -
* MULTAS POR ATRASOS INJUSTIFICADOS - - -
* MULTA POR ATRASO EN LA ENTREGA DE OBRA - - -
* INTERESES POR MORA EN EL PAGO DE VALORIZACIONES - - -
* MAYORES GASTOS GENERALES AMPL. DE PLAZO - - -
* OTROS CONCEPTOS - - -

8.- MONTO NETO FACTURABLE SIN IGV (6+7) #VALUE! #REF! #VALUE!

9.- IMP. GENERAL A LAS VENTAS (IGV)=18%(8) #VALUE! #REF! #VALUE!

10.- MONTO NETO FACTURABLE CON IGV (8+9) #VALUE! #REF! #VALUE!

11.- RETENCIONES INCL. IGV -


* POR FIEL CUMPLIMIENTO
* POR RETRASO EN OBRA PRINCIPAL - - -
* POR RETRASO EN ADICIONALES DE OBRA - - -
* POR DEDUCTIVO DE OBRA - - -
* OTROS - - -

- 60 -
LIQUIDACIÓN FINAL DE CONTRATO DE OBRA

MEMORIA DE LIQUIDACIÓN
● Obra #REF!
● Entidad #REF!
● Contratista #REF! ● Plazo de Ejecución #REF!
● Residente #REF! ● Ampliación de Plazo : 0 dc
● Supervisor #REF! ● Ampl. Plazo Excep. : 0 dc
● Monto Referencial (con IGV) #REF! ● Total Plazo Ejec. #REF!
● Factor de Relación #REF! ● Inicio de Obra #REF!
● Monto Contratado (con IGV) #REF! ● Fin de Obra #REF!
● Adicional Nº 01 (con IGV) : S/ 0.00 ● Suspensión de Plazo : 0 dc
● Deductivo Nº 01 (con IGV) : S/ 0.00 ● Reinicio de Obra : 0 dc
● Monto Total Obra (con IGV) #REF! ● Fin Real de Obra : 30/11/2021

12.- MONTO LÍQUIDO A PAGAR (10-11) #VALUE! #REF! #VALUE!

13.- MONTO FINAL DE OBRA (12) #VALUE! #REF! #VALUE!

SALDO A FAVOR DEL CONTRATISTA #VALUE!


1.- DEVOLUCIÓN DE RETENCIÓN POR FIEL CUMPLIMIENTO -
* DE CONTRATO PRINCIPAL -
* DE ADICIONAL DE OBRA Nº 01 -
* OTROS -

2.- A FACTURAR CON IGV #VALUE!


* SALDO DE VALORIZACIONES #VALUE!
* SALDO DE VALORIZACIONES DE ADELANTOS #REF!
* REAJUSTE DE VALORIZACIONES #REF!
* GASTOS GENERALES -
* IGV #VALUE!
* MULTA POR ATRAZO EN LA ENTREGA DE OBRA -
* OTROS -

- 61 -