Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MONTOS
CONCEPTO
(S/.)
MONTO VALORIZADO EN EL PRESENTE PERIODO: 8,398,856.78
REAJUSTE #REF!
- REAJUSTE DE LA PRESENTE VALORIZACION #REF!
- REGULARIZACION REAJUSTE VALORIZACIONES ANTERIO #REF!
OTROS 0.00
- 0.00
VALORIZACIÓN CONTRACTUAL (V) 185,408,827.32 8,398,856.78 13,721,439.84 22,120,296.62 11.93% 163,288,530.70 88.07%
REAJUSTES (R)
VALORIZACIÓN N° 05 #REF! 155,953.03 #REF!
REGULARIZACIÓN #REF! -127,256.19 #REF!
TOTAL REAJUSTES #REF!
AMORTIZACIONES (A)
AMORTIZACION ADELANTO EN EFECTIVO 37,081,765.47 1,679,771.36 2,744,287.97 4,424,059.33 11.93% 32,657,706.14 88.07%
AMORTIZACION ADELANTO DE MATERIALES
METRADOS MENSUALES
Metrado Metrado
Item Partidas Und. Metrado Mes Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15
Contrato Acumulado
1 2 3 4 5 6 7 8 9 10
100 OBRAS PRELIMINARES
101.A MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO glb 1.00 0.02 0.35 0.13 0.10 0.05 0.05 0.02
102.B TOPOGRAFIA Y GEOREFERENCIACION km 36.14 0.93 14.84 7.28 6.63 0.93
103.A MANTENIMIENTO DE TRÁNSITO Y SEGURIDAD VIAL mes 19.00 1.00 5.00 1.00 1.00 1.00 1.00 1.00
104.B MANTENIMIENTO DE ACCESOS A CANTERAS, DME Y FUENTE DE AGUA km 7.20 0.00 1.62 0.80 0.82
104.C CAMINO DE ACCESOS PROVISIONALES km 0.92 0.00 0.92 0.80 0.12
108.A DRENAJE PREVENTIVO m 3,580.00 0.00 2,740.00 2,740.00
200 MOVIMIENTO DE TIERRAS
201.B DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS ha 14.46 0.00 11.59 0.61 9.94 0.00 1.04
202.B DEMOLICIÓN DE ESTRUCTURAS m3 465.89 0.00 5.01 3.30 1.71
202.K REMOCION DE ALCANTARILLAS m 171.10 0.00 14.58 9.72
4.86
205.B EXCAVACION EN EXPLANACIONES EN ROCA FIJA m3 453,786.04 79,182.20 130,752.06 12,026.90 129.48 4,805.79 34,607.69 79,182.20
205.B2 EXCAVACION EN EXPLANACIONES EN ROCA FRACTURADA m3 764,881.68 48,597.07 256,777.22 23,240.13 83,706.32 52,450.23 48,783.47 48,597.07
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN m3 447,576.86 23,734.64 150,055.44 13,824.65 38,177.63 31,705.19 42,613.33 23,734.64
205.G PERFILADO, NIVELACION Y COMPACTACION DE LA SUBRAZANTE EN ZONA DE m2 325,193.15 0.00 0.00
206.A REMOCIÓN DE DERRUMBES m3 121,578.47 0.00 0.00
210.A TERRAPLENES CON MATERIAL PROPIO m3 106,491.56 0.00 0.00
210.B TERRAPLENES CON MATERIAL DE CANTERA m3 16,478.77 10,799.59 16,149.19 5,349.60 10,799.59
220.A MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE EMPLEANDO SUELO EXIS m3 34,603.96 0.00 0.00
220.B MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE EMPLEANDO MATERIAL m3 16,596.83 8,690.00 8,690.00 8,690.00
221.F LIMPIEZA DE CUNETAS Y ALCANTARILLAS m3 2,366.51 0.00 0.00
230.A MATERIAL DE CANTERA m3 33,075.59 19,489.59 24,839.19 5,349.60 19,489.59
300 SUB BASE Y BASE
305.A BASE GRANULAR m3 122,852.70 0.00 0.00
BERMAS 0.00 0.00
305.B BASE GRANULAR PARA BERMAS m3 3,830.40 0.00 0.00
400 PAVIMENTO ASFÁLTICO
CALZADA 0.00 0.00
401.A IMPRIMACIÓN ASFÁLTICA m2 240,767.85 0.00 0.00
410.A PAVIMENTO DE CONCRETO ASFÁLTICO EN CALIENTE m3 29,005.93 0.00 0.00
420.C CEMENTO ASFÁLTICO PEN 85/100 kg 3,973,696.83 0.00 0.00
422.A ASFALTO DILUIDO MC-30 l 240,767.85 0.00 0.00
423.A FILLER MINERAL (CAL HIDRATADA) kg 645,382.02 0.00 0.00
424.A MEJORADOR DE ADHERENCIA kg 19,724.03 0.00 0.00
BERMAS 0.00 0.00
401.A IMPRIMACIÓN ASFÁLTICA PARA BERMAS m2 53,200.00 0.00 0.00
405.D TRATAMIENTO SUPERFICIAL BICAPA PARA BERMAS m2 53,200.00 0.00 0.00
421.A EMULSION ASFALTICA DE ROTURA RAPIDA CRS-1 PARA BERMAS l 196,840.00 0.00 0.00
422.A ASFALTO DILUIDO MC-30 PARA BERMAS l 53,200.00 0.00 0.00
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
METRADOS MENSUALES
Metrado Metrado
Item Partidas Und. Metrado Mes Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15
Contrato Acumulado
1 2 3 4 5 6 7 8 9 10
500 PAVIMENTO DE CONCRETO HIDRAULICO 0.00 0.00
501.D LOSA DE CONCRETO HIDRAULICO m3 944.40 0.00 0.00
501.G JUNTA LONGITUDINAL DE CONSTRUCCION m 573.72 0.00 0.00
501.H JUNTA TRANSVERSAL DE CONTRACCION m 1,335.86 0.00 0.00
501.l VEREDAS m3 118.58 0.00 0.00
614.A ENCOFRADO Y DESENCOFRADO m2 723.37 0.00 0.00
600 OBRAS DE ARTE Y DRENAJE
600.A ALCANTARILLAS TIPO TMC D=36" 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 11,818.94 1,410.18 3,570.59 544.15 355.93 1,260.33 1,410.18
605.A RELLENOS PARA ESTRUCTURAS m3 5,860.84 733.60 1,960.45 283.86 277.83 665.16 733.60
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 9.84 0.00 0.00
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 914.26 0.00 0.00
610.G CONCRETO CLASE G (F´C = 140 KG/CM2 + 30% PM) m3 195.52 0.00 0.00
614.A ENCOFRADO Y DESENCOFRADO m2 4,343.31 0.00 0.00
622.B TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIÁ m 1,596.50 198.45 511.91 70.47 76.94 166.05 198.45
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 2,055.78 0.00 0.00
641.E MAMPOSTERIA DE PIEDRA E = 0.80M m2 611.25 0.00 0.00
600.B ALCANTARILLAS TIPO TMC D=48" 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 2,325.09 48.25 340.81 146.95 16.07 129.54 48.25
605.A RELLENOS PARA ESTRUCTURAS m3 1,127.93 4.28 218.66 69.23 83.64 61.51 4.28
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 21.24 0.00 0.00
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 164.37 0.00 0.00
610.G CONCRETO CLASE G (F´C= 140 KG/CM2 + 30% PM) m3 34.44 0.00 0.00
614.A ENCOFRADO Y DESENCOFRADO m2 798.26 0.00 0.00
622.C TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIÁ m 314.28 0.00 41.35 12.15 17.05 12.15
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 318.90 0.00 0.00
641.E MAMPOSTERIA DE PIEDRA E= 0.80M m2 436.50 0.00 0.00
600.C ALCANTARILLAS TIPO TMC D=60" 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,148.37 0.00 0.00
605.A RELLENOS PARA ESTRUCTURAS m3 540.87 0.00 0.00
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 3.77 0.00 0.00
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 21.86 0.00 0.00
610.G CONCRETO CLASE G (F´C= 140 KG/CM2 + 30% PM) m3 33.44 0.00 0.00
614.A ENCOFRADO Y DESENCOFRADO m2 189.40 0.00 0.00
622.D TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.50M DE DIÁ m 101.25 0.00 0.00
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 204.40 0.00 0.00
641.E MAMPOSTERIA DE PIEDRA E = 0.80M m2 114.00 0.00 0.00
600.D ALCANTARILLAS TIPO TMC D=72" 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 308.39 308.39 308.39 308.39
605.A RELLENOS PARA ESTRUCTURAS m3 1,273.44 293.20 293.20 293.20
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
METRADOS MENSUALES
Metrado Metrado
Item Partidas Und. Metrado Mes Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15
Contrato Acumulado
1 2 3 4 5 6 7 8 9 10
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 7.01 0.00 0.00
610.G CONCRETO CLASE G (F´C = 140 KG/CM2 + 30% PM) m3 10.87 0.00 0.00
614.A ENCOFRADO Y DESENCOFRADO m2 60.94 0.00 0.00
622.E TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIÁ m 53.46 53.46 53.46 53.46
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 51.10 0.00 0.00
600.F SUBDRENES CON MATERIAL DRENANTE Y GEOTEXTIL 0.00 0.00
652.B SUBDRENES CON MATERIAL DENANTE Y GEOTEXTIL TIPO 1 m 2,704.00 0.00 0.00
600.G CUNETAS 0.00 0.00
635.A CUNETA TRIANGULAR REVESTIDA EN PLATAFORMA C1 m 38,320.00 0.00 0.00
635.C CUNETA EN ZONA URBANA m 548.00 0.00 0.00
635.E CUNETA TIPO BATEA m 298.00 0.00 0.00
635.F CUNETA TIPO CANAL m 260.00 0.00 0.00
636.D CANAL TRIANGULAR SIN REVESTIR EN BANQUETA m 11,957.00 0.00 0.00
600.H MUROS DE CONCRETO CICLOPEO 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 13,428.78 954.33 954.33 954.33
605.A RELLENOS PARA ESTRUCTURAS m3 9,879.96 0.00 0.00
605.B MATERIAL DE FILTRO m3 850.00 0.00 0.00
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 4,115.37 307.78 307.78 307.78
610.H CONCRETO CLASE H (F´C = 100KG/CM2) m3 2,394.13 11.64 11.64 11.64
614.A ENCOFRADO Y DESENCOFRADO m2 9,561.40 778.95 778.95 778.95
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 5,303.50 0.00 0.00
652.C TUBO DE DRENAJE D=3" m 3,235.31 109.44 109.44 109.44
652.D TUBO DE DRENAJE PERFORADO D=6" m 1,057.50 0.00 0.00
661.A JUNTA DE DILATACION m2 823.92 41.40 41.40 41.40
600.l MUROS DE CONCRETO ARMADO 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 36,430.96 880.93 1,691.69 810.76 880.93
605.A RELLENOS PARA ESTRUCTURAS m3 39,200.80 0.00 0.00 0.00
605.B MATERIAL DE FILTRO m3 1,924.50 0.00 0.00 0.00
610.D CONCRETO CLASE D (F´C = 210 KG/CM2) m3 7,459.06 377.75 506.35 128.60 377.75
610.H CONCRETO CLASE H (F´C = 100KG/CM2) m3 5,527.50 12.79 23.75 10.96 12.79
614.A ENCOFRADO Y DESENCOFRADO m2 18,728.92 1,173.39 1,248.19 74.80 1,173.39
615.A ACERO DE REFUERZO kg 386,460.76 17,003.57 26,276.05 9,272.48 17,003.57
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 8,368.00 0.00 0.00 0.00
652.C TUBO DE DRENAJE D=3" m 3,952.60 98.41 98.41 0.00 98.41
652.D TUBO DE DRENAJE PERFORADO D=6" m 1,085.00 0.00 0.00 0.00
661.A JUNTA DE DILATACION m2 1,491.81 86.35 86.35 0.00 86.35
600.K ESTABILIZACION DE TALUDES 0.00 0.00
692.B PERNOS DE ANCLAJE m 2,421.00 0.00 0.00
692.C MALLA DOBLE TORSION m2 6,138.00 0.00 0.00
600.O GAVIONES 0.00 0.00
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
METRADOS MENSUALES
Metrado Metrado
Item Partidas Und. Metrado Mes Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15
Contrato Acumulado
1 2 3 4 5 6 7 8 9 10
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,318.11 0.00 0.00
605.A RELLENOS PARA ESTRUCTURAS m3 661.27 0.00 0.00
655.B GAVIONES m3 672.30 0.00 0.00
600.Q SARDINELES 0.00 0.00
638.A SARDINEL PERALTADO m 667.08 0.00 0.00
638.B SARDINEL SUMERGIDO m 79.48 0.00 0.00
600.R BUZONES 0.00 0.00
662.A NIVELACION DE BUZONES u 1.00 0.00 0.00
600.S CAJA RECEPTORA 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,119.36 0.00 0.00
605.A RELLENOS PARA ESTRUCTURAS m3 581.94 0.00 0.00
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 18.87 0.00 0.00
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 244.12 0.00 0.00
614.A ENCOFRADO Y DESENCOFRADO m2 1,125.72 0.00 0.00
615.A ACERO DE REFUERZO kg 3,683.50 0.00 0.00
652.C1 TUBO DE DRENAJE D=3" PARA CAJA RECEPTORA m 149.46 0.00 0.00
600.T ALIVIADERO DE DESCARGA PARA CUNETAS 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 582.20 0.00 0.00
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 4,203.10 0.00 0.00
PUENTE UPAMAYO 0.00 0.00
1000 OBRAS PRELIMINARES 0.00 0.00
102.D TOPOGRAFIA Y GEOREFERENCIACION m2 924.04 0.00 0.00
1006 ACCESOS PROVISIONALES PARA PUENTE glb 1.00 0.00 0.00
1007 LIMPIEZA DE CAUCE m3 187.24 0.00 0.00
2000 DEMOLICIONES Y DESMONTAJES 0.00 0.00
2001 DEMOLICIÓN DE ESTRUCTURAS DE CONCRETO EN SECO m3 3.00 0.00 0.00
2002 DEMOLICIÓN DE ESTRUCTURAS DE CONCRETO BAJO AGUA m3 9.70 0.00 0.00
3000 SUB ESTRUCTURA 0.00 0.00
601.C EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN m3 1,539.20 0.00 0.00
601.D EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUA m3 812.90 0.00 0.00
605.A RELLENOS PARA ESTRUCTURAS CON MATERIAL DE CANTERA m3 2,348.14 0.00 0.00
610.D CONCRETO CLASE D (F´C = 210 KG/CM2) EN SECO m3 145.00 0.00 0.00
610.D1 CONCRETO CLASE D (F´C = 210 KG/CM2) BAJO AGUA m3 219.20 0.00 0.00
610.F CONCRETO CLASE F (F´C = 140 KG/CM2) PARA SOLADO m3 19.00 0.00 0.00
614.B ENCOFRADO Y DESENCOFRADO EN SECO (CARA NO VISTA) m2 330.60 0.00 0.00
614.C ENCOFRADO Y DESENCOFRADO CARAVISTA, EN SECO m2 159.80 0.00 0.00
614.D ENCOFRADO Y DESENCOFRADO BAJO AGUA (CARA NO VISTA) m2 136.40 0.00 0.00
615.A ACERO DE REFUERZO kg 34,954.00 0.00 0.00
4000 SUPERESTRUCTURA 0.00 0.00
4001 FALSO PUENTE m 9.23 0.00 0.00
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
METRADOS MENSUALES
Metrado Metrado
Item Partidas Und. Metrado Mes Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15
Contrato Acumulado
1 2 3 4 5 6 7 8 9 10
610.C CONCRETO CLASE C (F´C = 280 KG/CM2) m3 147.19 0.00 0.00
610.F CONCRETO CLASE F (F´C = 140 KG/CM2) PARA SOLADO m3 14.13 0.00 0.00
614.B ENCOFRADO Y DESENCOFRADO EN SECO (CARA NO VISTA) m2 162.53 0.00 0.00
614.C ENCOFRADO Y DESENCOFRADO CARAVISTA m2 254.60 0.00 0.00
615 ACERO DE REFUERZO kg 15,923.30 0.00 0.00
5000 PAVIMENTO ASFALTICO 0.00 0.00
402 RIEGO DE LIGA m2 152.18 0.00 0.00
410.A PAVIMENTO DE CONCRETO ASFÁLTICO EN CALIENTE m3 7.61 0.00 0.00
420.C CEMENTO ASFÁLTICO PEN 85/100 kg 1,042.37 0.00 0.00
423.A FILLER MINERAL (CAL HIDRATADA) kg 157.50 0.00 0.00
424.A MEJORADOR DE ADHERENCIA kg 5.33 0.00 0.00
6000 DRENAJE 0.00 0.00
605.B1 MATERIAL DE FILTRO PARA PUENTES m3 109.50 0.00 0.00
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 250.10 0.00 0.00
652.D TUBO DE DRENAJE EN ESTRIBOS D=6" PERFORADA m 109.20 0.00 0.00
652.F TUBO DE DRENAJE D=4" L=0.95 M (INC. SUMIDERO) u 2.00 0.00 0.00
652.F1 TUBO DE DRENAJE EN ESTRIBOS, D=4" l= 0.5m m 24.00 0.00 0.00
7000 VARIOS 0.00 0.00
661.A1 JUNTA DE DILATACION TIPO 1 m 37.60 0.00 0.00
661.A2 JUNTA DE DILATACION TIPO 2 m 36.30 0.00 0.00
7002 APOYO DE NEOPRENO u 28.00 0.00 0.00
7003 BRUÑA ROMPEAGUA m 10.15 0.00 0.00
7004 ACABADO DE VEREDAS m 20.29 0.00 0.00
7005 BARANDA METÁLICA m 41.39 0.00 0.00
700 TRANSPORTE 0.00 0.00
700.A TRANSPORTE DE MATERIAL GRANULAR D<= 1KM m3k 123,309.67 0.00 0.00
700.B TRANSPORTE DE MATERIAL GRANULAR D> 1KM m3k 1,593,278.61 0.00 0.00
700.C TRANSPORTE DE EXCEDENTES A DME D<= 1KM m3k 1,415,094.01 88,344.66 383,472.54 44,891.60 ### 51,478.36 94,565.49 88,344.66
700.D TRANSPORTE DE EXCEDENTES A DME D> 1KM m3k 9,627,818.62 163,077.56 593,325.19 47,990.76 61,170.44 95,132.51 ### ###
700.G TRANSPORTE DE MATERIAL DE CANTERA PARA TERRAPLENES D<= 1KM m3k 75,865.45 13,834.33 17,932.87 244.90 241.14 3,612.50 13,834.33
700.H TRANSPORTE DE MATERIAL DE CANTERA PARA TERRAPLENES D> 1KM m3k 381,068.22 44,553.31 53,187.42 842.48 1,616.16 6,175.47 44,553.31
700.I TRANSPORTE DE MATERIAL PROPIO PARA TERRAPLENES D<= 1KM m3k 39,748.99 0.00 0.00
700.J TRANSPORTE DE MATERIAL PROPIO PARA TERRAPLENES D> 1KM m3k 6,077.66 0.00 0.00
700.M TRANSPORTE DE ESCOMBROS D <= 1KM m3k 364.27 0.00 2.90 2.90
700.N TRANSPORTE DE ESCOMBROS D > 1KM m3k 5,114.14 0.00 1.31 1.31
700.K TRANSPORTE DE CARPETA ASFÁLTICA D<= 1KM m3k 28,147.01 0.00 0.00
700.L TRANSPORTE DE CARPETA ASFÁLTICA D> 1KM m3k 671,976.52 0.00 0.00
700.O TRANSPORTE DE ROCA D<= 1KM m3k 400.22 0.00 0.00
700.P TRANSPORTE DE ROCA D> 1KM m3k 11,345.03 0.00 0.00
800 SEÑALIZACION Y SEGURIDAD VIAL 0.00 0.00
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
METRADOS MENSUALES
Metrado Metrado
Item Partidas Und. Metrado Mes Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15
Contrato Acumulado
1 2 3 4 5 6 7 8 9 10
801.A SEÑALES PREVENTIVAS 0.60 x 0.60 m. u 22.00 0.00 0.00
801.B SEÑALES PREVENTIVAS 0.75 m x 0.75 m. u 183.00 0.00 0.00
802.D SEÑALES REGLAMENTARIAS RECTANGULAR 1.20 m x 0.80 m. u 140.00 0.00 0.00
803.B SEÑALES INFORMATIVA (0.45 m x 0.65 m) u 12.00 0.00 0.00
803.C SEÑALES INFORMATIVAS m2 167.28 0.00 0.00
804.A POSTES DE SOPORTE DE SEÑALES u 357.00 0.00 0.00
804.B ESTRUCTURA DE SOPORTE DE SEÑALES u 71.00 0.00 0.00
805.A POSTE DELINEADOR u 2,624.00 0.00 0.00
805.B TACHA RETROREFLECTIVA u 8,918.00 0.00 0.00
805.C TACHONES u 582.00 0.00 0.00
808 RESALTOS u 8.00 0.00 0.00
810.A MARCAS PERMANENTES EN EL PAVIMENTO m2 13,840.39 0.00 0.00
820.B BARRERA DE SEGURIDAD m 11,330.00 0.00 0.00
830.A POSTE DE KILOMETRAJE u 36.00 0.00 0.00
840.A PINTADO DE PARAPETOS DE MUROS Y ALCANTARILLAS m2 1,153.07 0.00 0.00
900 PROTECCIÓN AMBIENTAL 0.00 0.00
900.A PROGRAMA DE ABANDONO 0.00 0.00
902.A REVEGETACION ha 72.37 0.00 0.00
903.A SEMBRIO DE GRASS m2 803.54 0.00 0.00
906.A ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m3 1,735,428.20 123,884.03 513,914.92 50,325.50 ### 84,886.21 ### ###
907.A RESTAURACION AMBIENTAL DE CANTERAS m2 165,744.99 0.00 0.00
907.A1 RESTAURACION AMBIENTAL DE PLANTAS DE TRITURACION Y DE ASFALTO m2 20,000.00 0.00 0.00
907.B RESTAURACION AMBIENTAL DE AREAS AFECTADAS POR CAMPAMENTO Y AL m2 15,000.00 0.00 0.00
907.B1 RESTAURACION DE AREAS AFECTADAS POR PATIO DE MAQUINAS m2 5,000.00 0.00 0.00
901.B1 RETIRO Y ALMACENAMIENTO DE MATERIA ORGANICA (TOP SOIL) m2 7,698.65 0.00 7,698.65 7,698.65
901.B2 REPOSICION DE MATERIA ORGANICA (TOP SOIL) m2 7,698.65 0.00 0.00
910 SUB PROGRAMA DE SEÑALIZACION AMBIENTAL 0.00 0.00
911.A SEÑAL INFORMATIVA AMBIENTAL m2 35.08 0.00 0.00
912.A ESTRUCTURAS DE SOPORTE DE SEÑALES TIPO E-1 u 28.00 0.00 0.00
970 PROGRAMA DE MONITOREO 0.00 0.00
970.A MONITOREO DE LA CALIDAD DEL AGUA pto 9.00 0.00 8.00 8.00
970.B MONITOREO DE LA CALIDAD DEL AIRE pto 9.00 0.00 3.00 3.00
970.C MONITOREO DE LA CALIDAD DEL RUIDO pto 9.00 0.00 3.00 3.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
PLANILLA N° 05
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
Presupuesto Contratado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
100 OBRAS PRELIMINARES 5,940,865.96 1,762,212.27 200,596.89 1,962,809.16 3,978,056.80 33.04%
101.A MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO glb 1.00 2,417,385.60 2,417,385.60 0.33 797,737.25 0.02 48,347.71 0.35 846,084.96 0.65 1,571,300.64 35.00%
102.B TOPOGRAFIA Y GEOREFERENCIACION km 36.14 23,950.00 865,553.00 13.91 333,144.50 0.93 22,273.50 14.84 355,418.00 21.30 510,135.00 41.06%
103.A MANTENIMIENTO DE TRÁNSITO Y SEGURIDAD VIAL mes 19.00 129,975.68 2,469,537.92 4.00 519,902.72 1.00 129,975.68 5.00 649,878.40 14.00 1,819,659.52 26.32%
104.B MANTENIMIENTO DE ACCESOS A CANTERAS, DME Y FUENTE DE AGUA km 7.20 12,997.57 93,582.50 1.62 21,056.06 0.00 0.00 1.62 21,056.06 5.58 72,526.44 22.50%
104.C CAMINO DE ACCESOS PROVISIONALES km 0.92 82,504.94 75,904.54 0.92 75,904.54 0.00 0.00 0.92 75,904.54 0.00 0.00 100.00%
108.A DRENAJE PREVENTIVO m 3,580.00 5.28 18,902.40 2,740.00 14,467.20 0.00 0.00 2,740.00 14,467.20 840.00 4,435.20 76.54%
200 MOVIMIENTO DE TIERRAS 33,948,645.60 0.00 5,057,389.74 0.00 4,122,070.63 0.00 9,179,460.36 0.00 24,769,185.24 27.04%
201.B DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS ha 14.46 11,589.15 167,579.11 11.59 134,318.25 0.00 0.00 11.59 134,318.25 2.87 33,260.86 80.15%
202.B DEMOLICIÓN DE ESTRUCTURAS m3 465.89 137.19 63,915.45 5.01 687.32 0.00 0.00 5.01 687.32 460.88 63,228.13 1.08%
202.K REMOCION DE ALCANTARILLAS m 171.10 82.14 14,054.15 14.58 1,197.60 0.00 0.00 14.58 1,197.60 156.52 12,856.55 8.52%
205.B EXCAVACION EN EXPLANACIONES EN ROCA FIJA m3 453,786.04 24.75 11,231,204.49 51,569.86 1,276,354.04 79,182.20 1,959,759.45 130,752.06 3,236,113.49 323,033.98 7,995,091.00 28.81%
205.B2 EXCAVACION EN EXPLANACIONES EN ROCA FRACTURADA m3 764,881.68 12.43 9,507,479.28 208,180.15 2,587,679.26 48,597.07 604,061.58 256,777.22 3,191,740.84 508,104.46 6,315,738.44 33.57%
205.C EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN m3 447,576.86 6.97 3,119,610.71 126,320.80 880,455.98 23,734.64 165,430.44 150,055.44 1,045,886.42 297,521.42 2,073,724.29 33.53%
205.G PERFILADO, NIVELACION Y COMPACTACION DE LA SUBRAZANTE EN ZONA DE COR m2 325,193.15 3.11 1,011,350.70 0.00 0.00 0.00 0.00 0.00 0.00 325,193.15 1,011,350.70 0.00%
206.A REMOCIÓN DE DERRUMBES m3 121,578.47 10.80 1,313,047.48 0.00 0.00 0.00 0.00 0.00 0.00 121,578.47 1,313,047.48 0.00%
210.A TERRAPLENES CON MATERIAL PROPIO m3 106,491.56 13.55 1,442,960.64 0.00 0.00 0.00 0.00 0.00 0.00 106,491.56 1,442,960.64 0.00%
210.B TERRAPLENES CON MATERIAL DE CANTERA m3 16,478.77 10.85 178,794.65 5,349.60 58,043.16 10,799.59 117,175.55 16,149.19 175,218.71 329.58 3,575.94 98.00%
220.A MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE EMPLEANDO SUELO EXISTEN m3 34,603.96 101.10 3,498,460.36 0.00 0.00 0.00 0.00 0.00 0.00 34,603.96 3,498,460.36 0.00%
220.B MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE EMPLEANDO MATERIAL ADI m3 16,596.83 97.05 1,610,722.35 0.00 0.00 8,690.00 843,364.50 8,690.00 843,364.50 7,906.83 767,357.85 52.36%
221.F LIMPIEZA DE CUNETAS Y ALCANTARILLAS m3 2,366.51 23.60 55,849.64 0.00 0.00 0.00 0.00 0.00 0.00 2,366.51 55,849.64 0.00%
230.A MATERIAL DE CANTERA m3 33,075.59 22.18 733,616.59 5,349.60 118,654.13 19,489.59 432,279.11 24,839.19 550,933.23 8,236.40 182,683.36 75.10%
300 SUB BASE Y BASE 12,736,489.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,736,489.66 0.00%
305.A BASE GRANULAR m3 122,852.70 98.90 12,150,132.03 0.00 0.00 0.00 0.00 0.00 0.00 122,852.70 12,150,132.03 0.00%
BERMAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
305.B BASE GRANULAR PARA BERMAS m3 3,830.40 153.08 586,357.63 0.00 0.00 0.00 0.00 0.00 0.00 3,830.40 586,357.63 0.00%
400 PAVIMENTO ASFÁLTICO 19,637,002.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,637,002.06 0.00%
CALZADA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
401.A IMPRIMACIÓN ASFÁLTICA m2 240,767.85 1.64 394,859.27 0.00 0.00 0.00 0.00 0.00 0.00 240,767.85 394,859.27 0.00%
410.A PAVIMENTO DE CONCRETO ASFÁLTICO EN CALIENTE m3 29,005.93 256.85 7,450,173.12 0.00 0.00 0.00 0.00 0.00 0.00 29,005.93 7,450,173.12 0.00%
420.C CEMENTO ASFÁLTICO PEN 85/100 kg 3,973,696.83 2.19 8,702,396.06 0.00 0.00 0.00 0.00 0.00 0.00 3,973,696.83 8,702,396.06 0.00%
422.A ASFALTO DILUIDO MC-30 l 240,767.85 2.42 582,658.20 0.00 0.00 0.00 0.00 0.00 0.00 240,767.85 582,658.20 0.00%
423.A FILLER MINERAL (CAL HIDRATADA) kg 645,382.02 0.98 632,474.38 0.00 0.00 0.00 0.00 0.00 0.00 645,382.02 632,474.38 0.00%
424.A MEJORADOR DE ADHERENCIA kg 19,724.03 13.37 263,710.28 0.00 0.00 0.00 0.00 0.00 0.00 19,724.03 263,710.28 0.00%
BERMAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
401.A IMPRIMACIÓN ASFÁLTICA PARA BERMAS m2 53,200.00 1.49 79,268.00 0.00 0.00 0.00 0.00 0.00 0.00 53,200.00 79,268.00 0.00%
405.D TRATAMIENTO SUPERFICIAL BICAPA PARA BERMAS m2 53,200.00 5.43 288,876.00 0.00 0.00 0.00 0.00 0.00 0.00 53,200.00 288,876.00 0.00%
421.A EMULSION ASFALTICA DE ROTURA RAPIDA CRS-1 PARA BERMAS l 196,840.00 1.81 356,280.40 0.00 0.00 0.00 0.00 0.00 0.00 196,840.00 356,280.40 0.00%
422.A ASFALTO DILUIDO MC-30 PARA BERMAS l 53,200.00 2.42 128,744.00 0.00 0.00 0.00 0.00 0.00 0.00 53,200.00 128,744.00 0.00%
500 PAVIMENTO DE CONCRETO HIDRAULICO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
501.D LOSA DE CONCRETO HIDRAULICO m3 944.40 524.39 495,233.92 0.00 0.00 0.00 0.00 0.00 0.00 944.40 495,233.92 0.00%
501.G JUNTA LONGITUDINAL DE CONSTRUCCION m 573.72 58.45 33,533.93 0.00 0.00 0.00 0.00 0.00 0.00 573.72 33,533.93 0.00%
501.H JUNTA TRANSVERSAL DE CONTRACCION m 1,335.86 72.66 97,063.59 0.00 0.00 0.00 0.00 0.00 0.00 1,335.86 97,063.59 0.00%
501.l VEREDAS m3 118.58 674.49 79,981.02 0.00 0.00 0.00 0.00 0.00 0.00 118.58 79,981.02 0.00%
614.A ENCOFRADO Y DESENCOFRADO m2 723.37 71.54 51,749.89 0.00 0.00 0.00 0.00 0.00 0.00 723.37 51,749.89 0.00%
600 OBRAS DE ARTE Y DRENAJE 28,860,644.40 0.00 448,591.71 0.00 854,977.40 0.00 1,303,569.08 0.00 27,557,075.32 4.52%
600.A ALCANTARILLAS TIPO TMC D=36" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 11,818.94 30.46 360,004.91 2,160.41 65,806.09 1,410.18 42,954.08 3,570.59 108,760.17 8,248.35 251,244.74 30.21%
605.A RELLENOS PARA ESTRUCTURAS m3 5,860.84 42.21 247,386.06 1,226.85 51,785.34 733.60 30,965.26 1,960.45 82,750.59 3,900.39 164,635.47 33.45%
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 9.84 467.83 4,603.45 0.00 0.00 0.00 0.00 0.00 0.00 9.84 4,603.45 0.00%
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
PLANILLA N° 05
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
Presupuesto Contratado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 914.26 351.39 321,261.82 0.00 0.00 0.00 0.00 0.00 0.00 914.26 321,261.82 0.00%
610.G CONCRETO CLASE G (F´C = 140 KG/CM2 + 30% PM) m3 195.52 351.38 68,701.82 0.00 0.00 0.00 0.00 0.00 0.00 195.52 68,701.82 0.00%
614.A ENCOFRADO Y DESENCOFRADO m2 4,343.31 71.54 310,720.40 0.00 0.00 0.00 0.00 0.00 0.00 4,343.31 310,720.40 0.00%
622.B TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIÁMET m 1,596.50 462.25 737,982.13 313.46 144,896.89 198.45 91,733.51 511.91 236,630.40 1,084.59 501,351.73 32.06%
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 2,055.78 152.49 313,485.89 0.00 0.00 0.00 0.00 0.00 0.00 2,055.78 313,485.89 0.00%
641.E MAMPOSTERIA DE PIEDRA E = 0.80M m2 611.25 284.72 174,035.10 0.00 0.00 0.00 0.00 0.00 0.00 611.25 174,035.10 0.00%
600.B ALCANTARILLAS TIPO TMC D=48" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 2,325.09 30.46 70,822.24 292.56 8,911.38 48.25 1,469.70 340.81 10,381.07 1,984.28 60,441.17 14.66%
605.A RELLENOS PARA ESTRUCTURAS m3 1,127.93 42.21 47,609.93 214.38 9,048.98 4.28 180.66 218.66 9,229.64 909.27 38,380.29 19.39%
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 21.24 467.83 9,936.71 0.00 0.00 0.00 0.00 0.00 0.00 21.24 9,936.71 0.00%
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 164.37 351.39 57,757.97 0.00 0.00 0.00 0.00 0.00 0.00 164.37 57,757.97 0.00%
610.G CONCRETO CLASE G (F´C= 140 KG/CM2 + 30% PM) m3 34.44 351.38 12,101.53 0.00 0.00 0.00 0.00 0.00 0.00 34.44 12,101.53 0.00%
614.A ENCOFRADO Y DESENCOFRADO m2 798.26 71.54 57,107.52 0.00 0.00 0.00 0.00 0.00 0.00 798.26 57,107.52 0.00%
622.C TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIÁMET m 314.28 679.88 213,672.69 41.35 28,113.04 0.00 0.00 41.35 28,113.04 272.93 185,559.65 13.16%
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 318.90 152.49 48,629.06 0.00 0.00 0.00 0.00 0.00 0.00 318.90 48,629.06 0.00%
641.E MAMPOSTERIA DE PIEDRA E= 0.80M m2 436.50 284.72 124,280.28 0.00 0.00 0.00 0.00 0.00 0.00 436.50 124,280.28 0.00%
600.C ALCANTARILLAS TIPO TMC D=60" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,148.37 30.46 34,979.35 0.00 0.00 0.00 0.00 0.00 0.00 1,148.37 34,979.35 0.00%
605.A RELLENOS PARA ESTRUCTURAS m3 540.87 42.21 22,830.12 0.00 0.00 0.00 0.00 0.00 0.00 540.87 22,830.12 0.00%
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 3.77 467.83 1,763.72 0.00 0.00 0.00 0.00 0.00 0.00 3.77 1,763.72 0.00%
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 21.86 351.39 7,681.39 0.00 0.00 0.00 0.00 0.00 0.00 21.86 7,681.39 0.00%
610.G CONCRETO CLASE G (F´C= 140 KG/CM2 + 30% PM) m3 33.44 351.38 11,750.15 0.00 0.00 0.00 0.00 0.00 0.00 33.44 11,750.15 0.00%
614.A ENCOFRADO Y DESENCOFRADO m2 189.40 71.54 13,549.68 0.00 0.00 0.00 0.00 0.00 0.00 189.40 13,549.68 0.00%
622.D TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.50M DE DIÁMETR m 101.25 1,028.06 104,091.08 0.00 0.00 0.00 0.00 0.00 0.00 101.25 104,091.08 0.00%
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 204.40 152.49 31,168.96 0.00 0.00 0.00 0.00 0.00 0.00 204.40 31,168.96 0.00%
641.E MAMPOSTERIA DE PIEDRA E = 0.80M m2 114.00 284.72 32,458.08 0.00 0.00 0.00 0.00 0.00 0.00 114.00 32,458.08 0.00%
600.D ALCANTARILLAS TIPO TMC D=72" 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 308.39 30.46 9,393.56 0.00 0.00 308.39 9,393.56 308.39 9,393.56 0.00 0.00 100.00%
605.A RELLENOS PARA ESTRUCTURAS m3 1,273.44 42.21 53,751.90 0.00 0.00 293.20 12,375.97 293.20 12,375.97 980.24 41,375.93 23.02%
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 7.01 351.39 2,463.24 0.00 0.00 0.00 0.00 0.00 0.00 7.01 2,463.24 0.00%
610.G CONCRETO CLASE G (F´C = 140 KG/CM2 + 30% PM) m3 10.87 351.38 3,819.50 0.00 0.00 0.00 0.00 0.00 0.00 10.87 3,819.50 0.00%
614.A ENCOFRADO Y DESENCOFRADO m2 60.94 71.54 4,359.65 0.00 0.00 0.00 0.00 0.00 0.00 60.94 4,359.65 0.00%
622.E TUBERÍA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIÁMET m 53.46 1,315.87 70,346.41 0.00 0.00 53.46 70,346.41 53.46 70,346.41 0.00 0.00 100.00%
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 51.10 152.49 7,792.24 0.00 0.00 0.00 0.00 0.00 0.00 51.10 7,792.24 0.00%
600.F SUBDRENES CON MATERIAL DRENANTE Y GEOTEXTIL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
652.B SUBDRENES CON MATERIAL DENANTE Y GEOTEXTIL TIPO 1 m 2,704.00 760.45 2,056,256.80 0.00 0.00 0.00 0.00 0.00 0.00 2,704.00 2,056,256.80 0.00%
600.G CUNETAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
635.A CUNETA TRIANGULAR REVESTIDA EN PLATAFORMA C1 m 38,320.00 159.80 6,123,536.00 0.00 0.00 0.00 0.00 0.00 0.00 38,320.00 6,123,536.00 0.00%
635.C CUNETA EN ZONA URBANA m 548.00 861.00 471,828.00 0.00 0.00 0.00 0.00 0.00 0.00 548.00 471,828.00 0.00%
635.E CUNETA TIPO BATEA m 298.00 237.73 70,843.54 0.00 0.00 0.00 0.00 0.00 0.00 298.00 70,843.54 0.00%
635.F CUNETA TIPO CANAL m 260.00 574.83 149,455.80 0.00 0.00 0.00 0.00 0.00 0.00 260.00 149,455.80 0.00%
636.D CANAL TRIANGULAR SIN REVESTIR EN BANQUETA m 11,957.00 44.93 537,228.01 0.00 0.00 0.00 0.00 0.00 0.00 11,957.00 537,228.01 0.00%
600.H MUROS DE CONCRETO CICLOPEO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 13,428.78 30.46 409,040.64 0.00 0.00 954.33 29,068.89 954.33 29,068.89 12,474.45 379,971.75 7.11%
605.A RELLENOS PARA ESTRUCTURAS m3 9,879.96 42.21 417,033.11 0.00 0.00 0.00 0.00 0.00 0.00 9,879.96 417,033.11 0.00%
605.B MATERIAL DE FILTRO m3 850.00 177.59 150,951.50 0.00 0.00 0.00 0.00 0.00 0.00 850.00 150,951.50 0.00%
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 4,115.37 351.39 1,446,099.86 0.00 0.00 307.78 108,150.81 307.78 108,150.81 3,807.59 1,337,949.05 7.48%
610.H CONCRETO CLASE H (F´C = 100KG/CM2) m3 2,394.13 21.08 50,468.26 0.00 0.00 11.64 245.37 11.64 245.37 2,382.49 50,222.89 0.49%
614.A ENCOFRADO Y DESENCOFRADO m2 9,561.40 71.54 684,022.56 0.00 0.00 778.95 55,726.08 778.95 55,726.08 8,782.45 628,296.48 8.15%
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 5,303.50 4.76 25,244.66 0.00 0.00 0.00 0.00 0.00 0.00 5,303.50 25,244.66 0.00%
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
PLANILLA N° 05
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
Presupuesto Contratado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
652.C TUBO DE DRENAJE D=3" m 3,235.31 12.44 40,247.26 0.00 0.00 109.44 1,361.43 109.44 1,361.43 3,125.87 38,885.83 3.38%
652.D TUBO DE DRENAJE PERFORADO D=6" m 1,057.50 105.64 111,714.30 0.00 0.00 0.00 0.00 0.00 0.00 1,057.50 111,714.30 0.00%
661.A JUNTA DE DILATACION m2 823.92 129.90 107,027.21 0.00 0.00 41.40 5,377.86 41.40 5,377.86 782.52 101,649.35 5.02%
600.l MUROS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 36,430.96 30.46 1,109,687.04 810.76 24,695.75 880.93 26,833.13 1,691.69 51,528.88 34,739.27 1,058,158.16 4.64%
605.A RELLENOS PARA ESTRUCTURAS m3 39,200.80 42.21 1,654,665.77 0.00 0.00 0.00 0.00 0.00 0.00 39,200.80 1,654,665.77 0.00%
605.B MATERIAL DE FILTRO m3 1,924.50 177.59 341,771.96 0.00 0.00 0.00 0.00 0.00 0.00 1,924.50 341,771.96 0.00%
610.D CONCRETO CLASE D (F´C = 210 KG/CM2) m3 7,459.06 499.41 3,725,129.15 128.60 64,224.13 377.75 188,652.13 506.35 252,876.25 6,952.71 3,472,252.90 6.79%
610.H CONCRETO CLASE H (F´C = 100KG/CM2) m3 5,527.50 21.08 116,519.70 10.96 231.04 12.79 269.61 23.75 500.65 5,503.75 116,019.05 0.43%
614.A ENCOFRADO Y DESENCOFRADO m2 18,728.92 71.54 1,339,866.94 74.80 5,351.19 1,173.39 83,944.32 1,248.19 89,295.51 17,480.73 1,250,571.43 6.66%
615.A ACERO DE REFUERZO kg 386,460.76 4.91 1,897,522.33 9,272.48 45,527.88 17,003.57 83,487.53 26,276.05 129,015.41 360,184.71 1,768,506.92 6.80%
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 8,368.00 4.76 39,831.68 0.00 0.00 0.00 0.00 0.00 0.00 8,368.00 39,831.68 0.00%
652.C TUBO DE DRENAJE D=3" m 3,952.60 12.44 49,170.34 0.00 0.00 98.41 1,224.22 98.41 1,224.22 3,854.19 47,946.12 2.49%
652.D TUBO DE DRENAJE PERFORADO D=6" m 1,085.00 105.64 114,619.40 0.00 0.00 0.00 0.00 0.00 0.00 1,085.00 114,619.40 0.00%
661.A JUNTA DE DILATACION m2 1,491.81 129.90 193,786.12 0.00 0.00 86.35 11,216.87 86.35 11,216.87 1,405.46 182,569.25 5.79%
600.K ESTABILIZACION DE TALUDES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
692.B PERNOS DE ANCLAJE m 2,421.00 109.73 265,656.33 0.00 0.00 0.00 0.00 0.00 0.00 2,421.00 265,656.33 0.00%
692.C MALLA DOBLE TORSION m2 6,138.00 55.33 339,615.54 0.00 0.00 0.00 0.00 0.00 0.00 6,138.00 339,615.54 0.00%
600.O GAVIONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,318.11 30.46 40,149.63 0.00 0.00 0.00 0.00 0.00 0.00 1,318.11 40,149.63 0.00%
605.A RELLENOS PARA ESTRUCTURAS m3 661.27 42.21 27,912.21 0.00 0.00 0.00 0.00 0.00 0.00 661.27 27,912.21 0.00%
655.B GAVIONES m3 672.30 284.96 191,578.61 0.00 0.00 0.00 0.00 0.00 0.00 672.30 191,578.61 0.00%
600.Q SARDINELES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
638.A SARDINEL PERALTADO m 667.08 71.39 47,622.84 0.00 0.00 0.00 0.00 0.00 0.00 667.08 47,622.84 0.00%
638.B SARDINEL SUMERGIDO m 79.48 51.79 4,116.27 0.00 0.00 0.00 0.00 0.00 0.00 79.48 4,116.27 0.00%
600.R BUZONES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
662.A NIVELACION DE BUZONES u 1.00 5,714.00 5,714.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,714.00 0.00%
600.S CAJA RECEPTORA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 1,119.36 30.46 34,095.71 0.00 0.00 0.00 0.00 0.00 0.00 1,119.36 34,095.71 0.00%
605.A RELLENOS PARA ESTRUCTURAS m3 581.94 42.21 24,563.69 0.00 0.00 0.00 0.00 0.00 0.00 581.94 24,563.69 0.00%
610.E CONCRETO CLASE E (F´C = 175 KG/CM2) m3 18.87 467.83 8,827.95 0.00 0.00 0.00 0.00 0.00 0.00 18.87 8,827.95 0.00%
610.E1 CONCRETO F´C = 175 KG/CM2 + 30 % P.M m3 244.12 351.39 85,781.33 0.00 0.00 0.00 0.00 0.00 0.00 244.12 85,781.33 0.00%
614.A ENCOFRADO Y DESENCOFRADO m2 1,125.72 71.54 80,534.01 0.00 0.00 0.00 0.00 0.00 0.00 1,125.72 80,534.01 0.00%
615.A ACERO DE REFUERZO kg 3,683.50 4.91 18,085.99 0.00 0.00 0.00 0.00 0.00 0.00 3,683.50 18,085.99 0.00%
652.C1 TUBO DE DRENAJE D=3" PARA CAJA RECEPTORA m 149.46 12.44 1,859.28 0.00 0.00 0.00 0.00 0.00 0.00 149.46 1,859.28 0.00%
600.T ALIVIADERO DE DESCARGA PARA CUNETAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.E EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 582.20 30.46 17,733.81 0.00 0.00 0.00 0.00 0.00 0.00 582.20 17,733.81 0.00%
641.A EMBOQUILLADO DE PIEDRA E = 0.15M m2 4,203.10 152.49 640,930.72 0.00 0.00 0.00 0.00 0.00 0.00 4,203.10 640,930.72 0.00%
PUENTE UPAMAYO 1,040,697.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,040,697.78 0.00%
1000 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
102.D TOPOGRAFIA Y GEOREFERENCIACION m2 924.04 2.16 1,995.93 0.00 0.00 0.00 0.00 0.00 0.00 924.04 1,995.93 0.00%
1006 ACCESOS PROVISIONALES PARA PUENTE glb 1.00 65,031.59 65,031.59 0.00 0.00 0.00 0.00 0.00 0.00 1.00 65,031.59 0.00%
1007 LIMPIEZA DE CAUCE m3 187.24 5.93 1,110.33 0.00 0.00 0.00 0.00 0.00 0.00 187.24 1,110.33 0.00%
2000 DEMOLICIONES Y DESMONTAJES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2001 DEMOLICIÓN DE ESTRUCTURAS DE CONCRETO EN SECO m3 3.00 137.19 411.57 0.00 0.00 0.00 0.00 0.00 0.00 3.00 411.57 0.00%
2002 DEMOLICIÓN DE ESTRUCTURAS DE CONCRETO BAJO AGUA m3 9.70 173.18 1,679.85 0.00 0.00 0.00 0.00 0.00 0.00 9.70 1,679.85 0.00%
3000 SUB ESTRUCTURA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
601.C EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN m3 1,539.20 14.45 22,241.44 0.00 0.00 0.00 0.00 0.00 0.00 1,539.20 22,241.44 0.00%
601.D EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUA m3 812.90 17.51 14,233.88 0.00 0.00 0.00 0.00 0.00 0.00 812.90 14,233.88 0.00%
605.A RELLENOS PARA ESTRUCTURAS CON MATERIAL DE CANTERA m3 2,348.14 74.15 174,114.58 0.00 0.00 0.00 0.00 0.00 0.00 2,348.14 174,114.58 0.00%
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
PLANILLA N° 05
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
Presupuesto Contratado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
610.D CONCRETO CLASE D (F´C = 210 KG/CM2) EN SECO m3 145.00 499.41 72,414.45 0.00 0.00 0.00 0.00 0.00 0.00 145.00 72,414.45 0.00%
610.D1 CONCRETO CLASE D (F´C = 210 KG/CM2) BAJO AGUA m3 219.20 520.59 114,113.33 0.00 0.00 0.00 0.00 0.00 0.00 219.20 114,113.33 0.00%
610.F CONCRETO CLASE F (F´C = 140 KG/CM2) PARA SOLADO m3 19.00 467.82 8,888.58 0.00 0.00 0.00 0.00 0.00 0.00 19.00 8,888.58 0.00%
614.B ENCOFRADO Y DESENCOFRADO EN SECO (CARA NO VISTA) m2 330.60 71.54 23,651.12 0.00 0.00 0.00 0.00 0.00 0.00 330.60 23,651.12 0.00%
614.C ENCOFRADO Y DESENCOFRADO CARAVISTA, EN SECO m2 159.80 71.54 11,432.09 0.00 0.00 0.00 0.00 0.00 0.00 159.80 11,432.09 0.00%
614.D ENCOFRADO Y DESENCOFRADO BAJO AGUA (CARA NO VISTA) m2 136.40 107.54 14,668.46 0.00 0.00 0.00 0.00 0.00 0.00 136.40 14,668.46 0.00%
615.A ACERO DE REFUERZO kg 34,954.00 4.91 171,624.14 0.00 0.00 0.00 0.00 0.00 0.00 34,954.00 171,624.14 0.00%
4000 SUPERESTRUCTURA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4001 FALSO PUENTE m 9.23 6,263.41 57,811.27 0.00 0.00 0.00 0.00 0.00 0.00 9.23 57,811.27 0.00%
610.C CONCRETO CLASE C (F´C = 280 KG/CM2) m3 147.19 541.52 79,706.33 0.00 0.00 0.00 0.00 0.00 0.00 147.19 79,706.33 0.00%
610.F CONCRETO CLASE F (F´C = 140 KG/CM2) PARA SOLADO m3 14.13 467.82 6,610.30 0.00 0.00 0.00 0.00 0.00 0.00 14.13 6,610.30 0.00%
614.B ENCOFRADO Y DESENCOFRADO EN SECO (CARA NO VISTA) m2 162.53 71.54 11,627.40 0.00 0.00 0.00 0.00 0.00 0.00 162.53 11,627.40 0.00%
614.C ENCOFRADO Y DESENCOFRADO CARAVISTA m2 254.60 71.54 18,214.08 0.00 0.00 0.00 0.00 0.00 0.00 254.60 18,214.08 0.00%
615 ACERO DE REFUERZO kg 15,923.30 4.91 78,183.40 0.00 0.00 0.00 0.00 0.00 0.00 15,923.30 78,183.40 0.00%
5000 PAVIMENTO ASFALTICO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
402 RIEGO DE LIGA m2 152.18 4.24 645.24 0.00 0.00 0.00 0.00 0.00 0.00 152.18 645.24 0.00%
410.A PAVIMENTO DE CONCRETO ASFÁLTICO EN CALIENTE m3 7.61 248.80 1,893.37 0.00 0.00 0.00 0.00 0.00 0.00 7.61 1,893.37 0.00%
420.C CEMENTO ASFÁLTICO PEN 85/100 kg 1,042.37 2.18 2,272.37 0.00 0.00 0.00 0.00 0.00 0.00 1,042.37 2,272.37 0.00%
423.A FILLER MINERAL (CAL HIDRATADA) kg 157.50 0.93 146.48 0.00 0.00 0.00 0.00 0.00 0.00 157.50 146.48 0.00%
424.A MEJORADOR DE ADHERENCIA kg 5.33 12.73 67.85 0.00 0.00 0.00 0.00 0.00 0.00 5.33 67.85 0.00%
6000 DRENAJE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
605.B1 MATERIAL DE FILTRO PARA PUENTES m3 109.50 177.59 19,446.11 0.00 0.00 0.00 0.00 0.00 0.00 109.50 19,446.11 0.00%
650.H GEOTEXTIL NO TEJIDO CLASE 2 m2 250.10 4.76 1,190.48 0.00 0.00 0.00 0.00 0.00 0.00 250.10 1,190.48 0.00%
652.D TUBO DE DRENAJE EN ESTRIBOS D=6" PERFORADA m 109.20 105.64 11,535.89 0.00 0.00 0.00 0.00 0.00 0.00 109.20 11,535.89 0.00%
652.F TUBO DE DRENAJE D=4" L=0.95 M (INC. SUMIDERO) u 2.00 13.94 27.88 0.00 0.00 0.00 0.00 0.00 0.00 2.00 27.88 0.00%
652.F1 TUBO DE DRENAJE EN ESTRIBOS, D=4" l= 0.5m m 24.00 43.55 1,045.20 0.00 0.00 0.00 0.00 0.00 0.00 24.00 1,045.20 0.00%
7000 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
661.A1 JUNTA DE DILATACION TIPO 1 m 37.60 190.00 7,144.00 0.00 0.00 0.00 0.00 0.00 0.00 37.60 7,144.00 0.00%
661.A2 JUNTA DE DILATACION TIPO 2 m 36.30 6.00 217.80 0.00 0.00 0.00 0.00 0.00 0.00 36.30 217.80 0.00%
7002 APOYO DE NEOPRENO u 28.00 714.25 19,999.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 19,999.00 0.00%
7003 BRUÑA ROMPEAGUA m 10.15 24.23 245.93 0.00 0.00 0.00 0.00 0.00 0.00 10.15 245.93 0.00%
7004 ACABADO DE VEREDAS m 20.29 17.88 362.79 0.00 0.00 0.00 0.00 0.00 0.00 20.29 362.79 0.00%
7005 BARANDA METÁLICA m 41.39 596.60 24,693.27 0.00 0.00 0.00 0.00 0.00 0.00 41.39 24,693.27 0.00%
700 TRANSPORTE 25,584,080.89 0.00 2,030,301.29 0.00 785,342.62 0.00 2,815,643.91 0.00 22,768,436.98 11.01%
700.A TRANSPORTE DE MATERIAL GRANULAR D<= 1KM m3k 123,309.67 5.24 646,142.67 0.00 0.00 0.00 0.00 0.00 0.00 123,309.67 646,142.67 0.00%
700.B TRANSPORTE DE MATERIAL GRANULAR D> 1KM m3k 1,593,278.61 1.53 2,437,716.27 0.00 0.00 0.00 0.00 0.00 0.00 1,593,278.61 2,437,716.27 0.00%
700.C TRANSPORTE DE EXCEDENTES A DME D<= 1KM m3k 1,415,094.01 4.75 6,721,696.55 295,127.88 1,401,857.43 88,344.66 419,637.14 383,472.54 1,821,494.57 1,031,621.47 4,900,201.98 27.10%
700.D TRANSPORTE DE EXCEDENTES A DME D> 1KM m3k 9,627,818.62 1.38 13,286,389.70 430,247.63 593,741.73 163,077.56 225,047.03 593,325.19 818,788.76 9,034,493.43 12,467,600.94 6.16%
700.G TRANSPORTE DE MATERIAL DE CANTERA PARA TERRAPLENES D<= 1KM m3k 75,865.45 5.24 397,534.96 4,098.54 21,476.35 13,834.33 72,491.89 17,932.87 93,968.24 57,932.58 303,566.72 23.64%
700.H TRANSPORTE DE MATERIAL DE CANTERA PARA TERRAPLENES D> 1KM m3k 381,068.22 1.53 583,034.38 8,634.11 13,210.19 44,553.31 68,166.56 53,187.42 81,376.75 327,880.80 501,657.63 13.96%
700.I TRANSPORTE DE MATERIAL PROPIO PARA TERRAPLENES D<= 1KM m3k 39,748.99 5.24 208,284.71 0.00 0.00 0.00 0.00 0.00 0.00 39,748.99 208,284.71 0.00%
700.J TRANSPORTE DE MATERIAL PROPIO PARA TERRAPLENES D> 1KM m3k 6,077.66 1.53 9,298.82 0.00 0.00 0.00 0.00 0.00 0.00 6,077.66 9,298.82 0.00%
700.M TRANSPORTE DE ESCOMBROS D <= 1KM m3k 364.27 4.75 1,730.28 2.90 13.78 0.00 0.00 2.90 13.78 361.37 1,716.50 0.80%
700.N TRANSPORTE DE ESCOMBROS D > 1KM m3k 5,114.14 1.38 7,057.51 1.31 1.81 0.00 0.00 1.31 1.81 5,112.83 7,055.70 0.03%
700.K TRANSPORTE DE CARPETA ASFÁLTICA D<= 1KM m3k 28,147.01 9.64 271,337.18 0.00 0.00 0.00 0.00 0.00 0.00 28,147.01 271,337.18 0.00%
700.L TRANSPORTE DE CARPETA ASFÁLTICA D> 1KM m3k 671,976.52 1.48 994,525.25 0.00 0.00 0.00 0.00 0.00 0.00 671,976.52 994,525.25 0.00%
700.O TRANSPORTE DE ROCA D<= 1KM m3k 400.22 10.32 4,130.27 0.00 0.00 0.00 0.00 0.00 0.00 400.22 4,130.27 0.00%
700.P TRANSPORTE DE ROCA D> 1KM m3k 11,345.03 1.34 15,202.34 0.00 0.00 0.00 0.00 0.00 0.00 11,345.03 15,202.34 0.00%
800 SEÑALIZACION Y SEGURIDAD VIAL 4,500,263.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,500,263.30 0.00%
801.A SEÑALES PREVENTIVAS 0.60 x 0.60 m. u 22.00 120.00 2,640.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,640.00 0.00%
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
PLANILLA N° 05
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
Presupuesto Contratado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
801.B SEÑALES PREVENTIVAS 0.75 m x 0.75 m. u 183.00 160.00 29,280.00 0.00 0.00 0.00 0.00 0.00 0.00 183.00 29,280.00 0.00%
802.D SEÑALES REGLAMENTARIAS RECTANGULAR 1.20 m x 0.80 m. u 140.00 310.00 43,400.00 0.00 0.00 0.00 0.00 0.00 0.00 140.00 43,400.00 0.00%
803.B SEÑALES INFORMATIVA (0.45 m x 0.65 m) u 12.00 140.00 1,680.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,680.00 0.00%
803.C SEÑALES INFORMATIVAS m2 167.28 357.13 59,740.71 0.00 0.00 0.00 0.00 0.00 0.00 167.28 59,740.71 0.00%
804.A POSTES DE SOPORTE DE SEÑALES u 357.00 275.23 98,257.11 0.00 0.00 0.00 0.00 0.00 0.00 357.00 98,257.11 0.00%
804.B ESTRUCTURA DE SOPORTE DE SEÑALES u 71.00 2,330.92 165,495.32 0.00 0.00 0.00 0.00 0.00 0.00 71.00 165,495.32 0.00%
805.A POSTE DELINEADOR u 2,624.00 133.92 351,406.08 0.00 0.00 0.00 0.00 0.00 0.00 2,624.00 351,406.08 0.00%
805.B TACHA RETROREFLECTIVA u 8,918.00 8.75 78,032.50 0.00 0.00 0.00 0.00 0.00 0.00 8,918.00 78,032.50 0.00%
805.C TACHONES u 582.00 15.00 8,730.00 0.00 0.00 0.00 0.00 0.00 0.00 582.00 8,730.00 0.00%
808 RESALTOS u 8.00 4,858.30 38,866.40 0.00 0.00 0.00 0.00 0.00 0.00 8.00 38,866.40 0.00%
810.A MARCAS PERMANENTES EN EL PAVIMENTO m2 13,840.39 12.00 166,084.68 0.00 0.00 0.00 0.00 0.00 0.00 13,840.39 166,084.68 0.00%
820.B BARRERA DE SEGURIDAD m 11,330.00 303.20 3,435,256.00 0.00 0.00 0.00 0.00 0.00 0.00 11,330.00 3,435,256.00 0.00%
830.A POSTE DE KILOMETRAJE u 36.00 193.92 6,981.12 0.00 0.00 0.00 0.00 0.00 0.00 36.00 6,981.12 0.00%
840.A PINTADO DE PARAPETOS DE MUROS Y ALCANTARILLAS m2 1,153.07 12.50 14,413.38 0.00 0.00 0.00 0.00 0.00 0.00 1,153.07 14,413.38 0.00%
900 PROTECCIÓN AMBIENTAL 5,458,401.35 0.00 892,711.08 0.00 275,022.55 0.00 1,167,733.62 0.00 4,290,667.73 21.39%
900.A PROGRAMA DE ABANDONO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
902.A REVEGETACION ha 72.37 14,215.92 1,028,806.13 0.00 0.00 0.00 0.00 0.00 0.00 72.37 1,028,806.13 0.00%
903.A SEMBRIO DE GRASS m2 803.54 9.76 7,842.55 0.00 0.00 0.00 0.00 0.00 0.00 803.54 7,842.55 0.00%
906.A ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE m3 1,735,428.20 2.22 3,852,650.60 390,030.89 865,868.58 123,884.03 275,022.55 513,914.92 1,140,891.12 1,221,513.28 2,711,759.48 29.61%
907.A RESTAURACION AMBIENTAL DE CANTERAS m2 165,744.99 1.97 326,517.63 0.00 0.00 0.00 0.00 0.00 0.00 165,744.99 326,517.63 0.00%
907.A1 RESTAURACION AMBIENTAL DE PLANTAS DE TRITURACION Y DE ASFALTO m2 20,000.00 3.29 65,800.00 0.00 0.00 0.00 0.00 0.00 0.00 20,000.00 65,800.00 0.00%
907.B RESTAURACION AMBIENTAL DE AREAS AFECTADAS POR CAMPAMENTO Y ALMACE m2 15,000.00 3.29 49,350.00 0.00 0.00 0.00 0.00 0.00 0.00 15,000.00 49,350.00 0.00%
907.B1 RESTAURACION DE AREAS AFECTADAS POR PATIO DE MAQUINAS m2 5,000.00 3.29 16,450.00 0.00 0.00 0.00 0.00 0.00 0.00 5,000.00 16,450.00 0.00%
901.B1 RETIRO Y ALMACENAMIENTO DE MATERIA ORGANICA (TOP SOIL) m2 7,698.65 1.85 14,242.50 7,698.65 14,242.50 0.00 0.00 7,698.65 14,242.50 0.00 0.00 100.00%
901.B2 REPOSICION DE MATERIA ORGANICA (TOP SOIL) m2 7,698.65 1.85 14,242.50 0.00 0.00 0.00 0.00 0.00 0.00 7,698.65 14,242.50 0.00%
910 SUB PROGRAMA DE SEÑALIZACION AMBIENTAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
911.A SEÑAL INFORMATIVA AMBIENTAL m2 35.08 228.56 8,017.88 0.00 0.00 0.00 0.00 0.00 0.00 35.08 8,017.88 0.00%
912.A ESTRUCTURAS DE SOPORTE DE SEÑALES TIPO E-1 u 28.00 1,470.77 41,181.56 0.00 0.00 0.00 0.00 0.00 0.00 28.00 41,181.56 0.00%
970 PROGRAMA DE MONITOREO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
970.A MONITOREO DE LA CALIDAD DEL AGUA pto 9.00 300.00 2,700.00 8.00 2,400.00 0.00 0.00 8.00 2,400.00 1.00 300.00 88.89%
970.B MONITOREO DE LA CALIDAD DEL AIRE pto 9.00 3,000.00 27,000.00 3.00 9,000.00 0.00 0.00 3.00 9,000.00 6.00 18,000.00 33.33%
970.C MONITOREO DE LA CALIDAD DEL RUIDO pto 9.00 400.00 3,600.00 3.00 1,200.00 0.00 0.00 3.00 1,200.00 6.00 2,400.00 33.33%
COSTO DIRECTO 137,707,091.00 10,191,206.09 6,238,010.09 16,429,216.18 121,277,874.87
GASTOS GENERALES 33,931,027.22 2,511,113.18 1,537,045.68 4,048,158.86 29,882,868.37
ggf GASTOS GENERALES FIJOS 0.52% 716,076.87 52,994.27 32,437.65 85,431.92 630,644.95
ggv GASTOS GENERALES VARIABLES 24.12% 33,214,950.35 2,458,118.91 1,504,608.03 3,962,726.94 29,252,223.42
util UTILIDAD 10.00% 13,770,709.10 1,019,120.61 623,801.01 1,642,921.62 12,127,787.49
TOTAL PRESUPUESTO OFERTADO, SIN I.G.V. 185,408,827.32 13,721,439.88 8,398,856.78 22,120,296.66 163,288,530.73
REAJUSTE
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
FACTOR
AVANCE PROGRAMADO AVANCE REAL DE REAJUSTE PROGRAMADO REAJUSTE REAJUSTE DEFINITIVO
VALORIZACION MES DE
REAJUST ACUMULAD REAJUSTE REGULARIZACION DEL
MENSUAL ACUMULADO MENSUAL ACUMULADO REAJUSTE MENSUAL MENSUAL ACUMULADO MENSUAL ACUMULADO
E O PROVISIONAL REAJUSTE
PROVISIONAL
Nº MES (A) (APA) (B) (ARA) (K) C = A x (K-1) D = B x (K-1) (SRR) D = B x (K-1) (SRR)
(SRP)
1 Nov-14 326,520.47 326,520.47 2,391,403.74 2,391,403.74 Oct-14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 Dec-14 687,931.36 1,014,451.84 4,005,408.77 6,396,812.51 Nov-14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 Jan-15 2,509,765.56 3,524,217.40 2,538,948.88 8,935,761.39 Dec-14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 Feb-15 3,674,682.48 7,198,899.88 4,785,678.45 ### Jan-15 #REF! #REF! #REF! #REF! #REF!
5 Mar-15 4,556,948.60 11,755,848.48 8,398,856.78 ### Feb-15 #REF! #REF! #REF! #REF! #REF!
6 Apr-15 6,162,207.84 17,918,056.32 Mar-15
7 May-15 9,268,390.92 27,186,447.24 Apr-15
8 Jun-15 13,019,066.69 40,205,513.93 May-15
9 Jul-15 16,927,839.55 57,133,353.48 Jun-15
10 Aug-15 19,837,984.43 76,971,337.91 Jul-15
11 Sep-15 20,044,152.00 97,015,489.91 Aug-15
12 Oct-15 20,271,798.65 ### Sep-15
13 Nov-15 20,106,628.63 ### Oct-15
14 Dec-15 14,353,395.51 ### Nov-15
15 Jan-16 10,288,757.81 ### Dec-15
16 Feb-16 7,775,333.73 ### Jan-16
17 Mar-16 7,064,547.93 ### Feb-16
18 Apr-16 5,681,161.78 ### Mar-16
19 May-16 2,851,713.38 ### Apr-16
FORMULA POLINOMICA
EXPEDIENTE TECNICO
K = 0.296 * (MTCr / MTCo) + 0.199 * (ALVr / ALVo) + 0.178 * (CMHr / CMHo) + 0.050 * (IPAr / IPAo) + 0.104 * (DBr / DBo)+ 0.173*(AMTr / AMTo)
REAJUSTE, AMORTIZACION y DEDUCCION DE REAJUSTE QUE NO CORRESPONDE POR ADELANTO EN EFECTIVO - VALORIZACION DE LA OBRA PRINCIPAL
SIMBOLO Feb-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14
publicado publicado publicado proyectado proyectado proyectado proyectado proyectado proyectado proyectado proyectado
SIMBOLO TOTAL Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14
VAL-1 VAL-2 VAL-3 VAL-4 VAL-5 VAL-6 VAL-7 VAL-8 VAL-9 VAL-10
"V" 996,029.53 6,652.80 131,994.88 857,381.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00
" K " provisional #REF! 1.048 #REF! 0.000 0.000 0.000 0.000 0.000 0.000 0.000
" R " provisional #REF! #REF! 6,335.75 #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
REGULARIZAR S/. : #REF! #REF! #REF! #REF! 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA:COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
MO 47 MANO DE OBRA INC. LEYES SOCIALES #REF! #REF! 100.00% 497.55 #REF! 523.70 #REF! 523.70 #REF! 523.70 #REF!
CCA 3 ACERO DE CONSTRUCCIÓN CORRUGADO #REF! #REF! 23.485% 469.34 #REF! 481.01 #REF! 491.87 #REF! 495.36 #REF!
20 CEMENTO ASFÁLTICO #REF! 46.212% ### 2,010.06 ### ###
21 CEMENTO PORTLAND TIPO I #REF! 30.303% 354.74 366.81 375.64 375.64
D 30 DÓLAR MAS INFLACION DEL MERCADO USA #REF! #REF! 100.00% 378.78 #REF! 396.99 #REF! 403.12 #REF! 404.73 #REF!
P 53 PETROLEO DIESSEL #REF! #REF! 100.00% 923.90 #REF! 881.51 #REF! 875.55 #REF! 837.14 #REF!
M 49 MAQUINARIA Y EQUIPO IMPORTADO #REF! #REF! 100.00% 246.08 #REF! 255.29 #REF! 259.41 #REF! 261.11 #REF!
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR #REF! #REF! 100.00% 392.28 #REF! 403.02 #REF! 404.55 #REF! 403.94 #REF!
#REF!
COEFICIENTE DE REAJUSTE ( K ) = #REF! #REF! #REF! #REF!
RESOLUCIÓN JEFATURAL N° 140-2020-INEI
Cod. 1 2 3 4 5 6 Cod. 1 2 3 4
01 989.69 989.69 989.69 989.69 989.69 989.69 02 575.97 575.97 575.97 575.97
03 554.21 554.21 554.21 554.21 554.21 554.21 04 573.71 972.01 1054.89 595.92
05 452.66 217.49 437.63 608.45 (*) 618.29 06 946.49 946.49 946.49 946.49
07 705.90 705.90 705.90 705.90 705.90 705.90 08 871.67 871.67 871.67 871.67
09 291.57 291.57 291.57 291.57 291.57 291.57 10 434.77 434.77 434.77 434.77
11 258.90 258.90 258.90 258.90 258.90 258.90 12 321.80 321.80 321.80 321.80
13 1604.47 1604.47 1604.47 1604.47 1604.47 1604.47 14 263.67 263.67 263.67 263.67
17 643.65 707.43 713.64 858.99 749.66 890.20 16 354.83 354.83 354.83 354.83
19 777.24 777.24 777.24 777.24 777.24 777.24 18 314.26 314.26 314.26 314.26
21 471.42 423.68 449.56 452.97 449.56 419.52 20 1886.14 1886.14 1886.14 1886.14
23 439.25 439.25 439.25 439.25 439.25 439.25 22 (*) (*) (*) (*)
27 492.63 492.63 492.63 492.63 492.63 492.63 24 234.40 234.40 234.40 234.40
31 389.49 389.49 389.49 389.49 389.49 389.49 26 387.06 387.06 387.06 387.06
33 884.05 884.05 884.05 884.05 884.05 884.05 28 611.57 611.57 611.57 594.24
37 310.98 310.98 310.98 310.98 310.98 310.98 30 518.60 518.60 518.60 518.60
39 464.67 464.67 464.67 464.67 464.67 464.67 32 479.33 479.33 479.33 479.33
41 437.48 437.48 437.48 437.48 437.48 437.48 34 479.38 479.38 479.38 479.38
43 747.02 716.97 955.06 681.42 1119.62 937.97 38 442.85 973.02 891.57 570.95
45 330.25 330.25 330.25 330.25 330.25 330.25 40 402.43 469.93 443.25 350.10
47 619.99 619.99 619.99 619.99 619.99 619.99 42 312.04 312.04 312.04 312.04
49 328.68 328.68 328.68 328.68 328.68 328.68 44 392.64 392.64 392.64 392.64
51 314.69 314.69 314.69 314.69 314.69 314.69 46 460.36 460.36 460.36 460.36
53 758.33 758.33 758.33 758.33 758.33 758.33 48 378.13 378.13 378.13 378.13
55 518.83 518.83 518.83 518.83 518.83 518.83 50 685.07 685.07 685.07 685.07
57 425.04 425.04 425.04 425.04 425.04 425.04 52 330.35 330.35 330.35 330.35
59 212.21 212.21 212.21 212.21 212.21 212.21 54 453.72 453.72 453.72 453.72
61 248.66 248.66 248.66 248.66 248.66 248.66 56 590.14 590.14 590.14 590.14
65 255.79 255.79 255.79 255.79 255.79 255.79 60 295.99 295.99 295.99 295.99
69 389.45 327.82 428.87 488.52 269.39 451.51 62 478.62 478.62 478.62 478.62
71 660.29 660.29 660.29 660.29 660.29 660.29 64 348.21 348.21 348.21 348.21
73 570.79 570.79 570.79 570.79 570.79 570.79 66 739.85 739.85 739.85 739.85
77 342.82 342.82 342.82 342.82 342.82 342.82 68 271.58 271.58 271.58 271.58
70 218.25 218.25 218.25 218.25
72 449.11 449.11 449.11 449.11
78 521.39 521.39 521.39 521.39
80 110.67 110.67 110.67 110.67
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N° 136-2020-INEI.
L 2020
5 6
575.97 575.97
374.92 760.59
946.49 946.49
871.67 871.67
434.77 434.77
321.80 321.80
263.67 263.67
354.83 354.83
314.26 314.26
1886.14 1886.14
(*) (*)
234.40 234.40
387.06 387.06
611.57 611.57
518.60 518.60
479.33 479.33
479.38 479.38
(*) 638.56
272.89 331.41
312.04 312.04
392.64 392.64
460.36 460.36
378.13 378.13
685.07 685.07
330.35 330.35
453.72 453.72
590.14 590.14
295.99 295.99
478.62 478.62
348.21 348.21
739.85 739.85
271.58 271.58
218.25 218.25
449.11 449.11
521.39 521.39
110.67 110.67
obados mediante
RESOLUCIÓN JEFATURAL N° 214-2021-INEI
Cod. 1 2 3 4 5 6 Cod. 1 2 3 4
01 ### ### ### ### ### 1204.51 02 839.89 839.89 839.89 839.89
03 819.35 819.35 819.35 819.35 819.35 819.35 04 641.69 1059.54 ### 609.44
05 483.79 237.93 451.40 608.22 (*) 668.58 06 1592.07 1592.07 ### ###
07 ### ### ### ### ### 1068.55 08 1329.83 1329.83 ### ###
09 433.86 433.86 433.86 433.86 433.86 433.86 10 546.80 546.80 546.80 546.80
11 283.26 283.26 283.26 283.26 283.26 283.26 12 347.28 347.28 347.28 347.28
13 ### ### ### ### ### 2260.17 14 297.96 297.96 297.96 297.96
17 812.37 ### 887.21 930.38 899.76 977.98 16 371.78 371.78 371.78 371.78
19 ### ### ### ### ### 1231.51 18 530.44 530.44 530.44 530.44
21 479.04 423.68 449.56 452.97 449.56 426.76 20 2863.64 2863.64 ### ###
23 439.25 439.25 439.25 439.25 439.25 439.25 22 (*) (*) (*) (*)
27 580.32 580.32 580.32 580.32 580.32 580.32 24 261.21 261.21 261.21 261.21
31 394.01 394.01 394.01 394.01 394.01 394.01 26 412.32 412.32 412.32 412.32
33 ### ### ### ### ### 1005.79 28 720.43 720.43 720.43 671.92
37 381.03 381.03 381.03 381.03 381.03 381.03 30 650.49 650.49 650.49 650.49
39 489.40 489.40 489.40 489.40 489.40 489.40 32 502.72 502.72 502.72 502.72
41 567.71 567.71 567.71 567.71 567.71 567.71 34 632.42 632.42 632.42 632.42
43 880.58 918.99 ### 827.90 ### 1206.49 38 485.26 1114.41 ### 576.41
45 373.29 373.29 373.29 373.29 373.29 373.29 40 405.49 505.73 440.25 360.31
47 633.53 633.53 633.53 633.53 633.53 633.53 42 453.25 453.25 453.25 453.25
49 401.37 401.37 401.37 401.37 401.37 401.37 44 448.36 448.36 448.36 448.36
51 429.49 429.49 429.49 429.49 429.49 429.49 46 599.43 599.43 599.43 599.43
53 ### ### ### ### ### 1015.30 48 402.00 402.00 402.00 402.00
55 573.50 573.50 573.50 573.50 573.50 573.50 50 807.08 807.08 807.08 807.08
57 731.68 731.68 731.68 731.68 731.68 731.68 52 393.14 393.14 393.14 393.14
59 229.66 229.66 229.66 229.66 229.66 229.66 54 448.57 448.57 448.57 448.57
61 361.42 361.42 361.42 361.42 361.42 361.42 56 1052.69 1052.69 ### ###
65 319.69 319.69 319.69 319.69 319.69 319.69 60 385.02 385.02 385.02 385.02
69 390.93 327.82 428.87 488.52 269.39 451.51 62 523.47 523.47 523.47 523.47
71 660.29 660.29 660.29 660.29 660.29 660.29 64 364.45 364.45 364.45 364.45
73 865.85 865.85 865.85 865.85 865.85 865.85 66 1066.83 1066.83 ### ###
77 390.03 390.03 390.03 390.03 390.03 390.03 68 485.12 485.12 485.12 485.12
70 218.25 218.25 218.25 218.25
72 579.66 579.66 579.66 579.66
78 590.88 590.88 590.88 590.88
80 111.75 111.75 111.75 111.75
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N°207-2021-INEI.
EL 2021
5 6
839.89 839.89
358.11 795.14
1592.07 ###
1329.83 ###
546.80 546.80
347.28 347.28
297.96 297.96
371.78 371.78
530.44 530.44
2863.64 ###
(*) (*)
261.21 261.21
412.32 412.32
720.43 720.43
650.49 650.49
502.72 502.72
632.42 632.42
(*) 681.50
272.89 331.41
453.25 453.25
448.36 448.36
599.43 599.43
402.00 402.00
807.08 807.08
393.14 393.14
448.57 448.57
1052.69 ###
385.02 385.02
523.47 523.47
364.45 364.45
1066.83 ###
485.12 485.12
218.25 218.25
579.66 579.66
590.88 590.88
111.75 111.75
obados mediante
RESOLUCIÓN JEFATURAL N° 240-2021-INEI
Cod. 1 2 3 4 5 6 Cod. 1 2 3 4
01 1208.30 1208.30 1208.30 1208.30 1208.30 1208.30 02 821.15 821.15 821.15 821.15
03 818.31 818.31 818.31 818.31 818.31 818.31 04 641.56 1056.17 1189.34 610.50
05 488.61 243.22 455.97 605.94 (*) 675.73 06 1582.54 1582.54 1582.54 1582.54
07 1064.67 1064.67 1064.67 1064.67 1064.67 1064.67 08 1326.79 1326.79 1326.79 1326.79
09 436.09 436.09 436.09 436.09 436.09 436.09 10 563.38 563.38 563.38 563.38
11 283.68 283.68 283.68 283.68 283.68 283.68 12 348.42 348.42 348.42 348.42
13 2287.21 2287.21 2287.21 2287.21 2287.21 2287.21 14 312.30 312.30 312.30 312.30
17 810.94 1032.77 908.31 934.83 894.09 982.78 16 371.78 371.78 371.78 371.78
19 1236.10 1236.10 1236.10 1236.10 1236.10 1236.10 18 530.61 530.61 530.61 530.61
21 487.39 423.68 449.56 452.97 449.56 433.82 20 2880.45 2880.45 2880.45 2880.45
23 439.25 439.25 439.25 439.25 439.25 439.25 22 (*) (*) (*) (*)
27 583.29 583.29 583.29 583.29 583.29 583.29 24 272.47 272.47 272.47 272.47
31 394.48 394.48 394.48 394.48 394.48 394.48 26 411.18 411.18 411.18 411.18
33 1010.39 1010.39 1010.39 1010.39 1010.39 1010.39 28 724.13 724.13 724.13 674.38
37 383.59 383.59 383.59 383.59 383.59 383.59 30 655.20 655.20 655.20 655.20
39 491.36 491.36 491.36 491.36 491.36 491.36 32 507.42 507.42 507.42 507.42
41 629.90 629.90 629.90 629.90 629.90 629.90 34 644.06 644.06 644.06 644.06
43 892.43 950.83 1170.22 835.94 1317.21 1206.64 38 488.06 1120.03 1013.13 572.07
45 393.97 393.97 393.97 393.97 393.97 393.97 40 405.49 505.02 446.58 360.31
47 653.54 653.54 653.54 653.54 653.54 653.54 42 454.33 454.33 454.33 454.33
49 405.85 405.85 405.85 405.85 405.85 405.85 44 458.09 458.09 458.09 458.09
51 477.71 477.71 477.71 477.71 477.71 477.71 46 599.70 599.70 599.70 599.70
53 1026.56 1026.56 1026.56 1026.56 1026.56 1026.56 48 400.24 400.24 400.24 400.24
55 599.57 599.57 599.57 599.57 599.57 599.57 50 811.18 811.18 811.18 811.18
57 761.79 761.79 761.79 761.79 761.79 761.79 52 394.27 394.27 394.27 394.27
59 229.66 229.66 229.66 229.66 229.66 229.66 54 453.46 453.46 453.46 453.46
61 376.77 376.77 376.77 376.77 376.77 376.77 56 1120.04 1120.04 1120.04 1120.04
65 328.44 328.44 328.44 328.44 328.44 328.44 60 385.02 385.02 385.02 385.02
69 390.93 327.82 428.87 488.52 269.39 451.51 62 524.37 524.37 524.37 524.37
71 660.29 660.29 660.29 660.29 660.29 660.29 64 364.45 364.45 364.45 364.45
73 881.41 881.41 881.41 881.41 881.41 881.41 66 1095.74 1095.74 1095.74 1095.74
77 390.88 390.88 390.88 390.88 390.88 390.88 68 494.82 494.82 494.82 494.82
70 218.25 218.25 218.25 218.25
72 582.82 582.82 582.82 582.82
78 592.70 592.70 592.70 592.70
80 109.98 109.98 109.98 109.98
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N°231-2021-INEI.
DEL 2021
5 6
821.15 821.15
358.11 808.80
1582.54 1582.54
1326.79 1326.79
563.38 563.38
348.42 348.42
312.30 312.30
371.78 371.78
530.61 530.61
2880.45 2880.45
(*) (*)
272.47 272.47
411.18 411.18
724.13 724.13
655.20 655.20
507.42 507.42
644.06 644.06
(*) 691.42
272.89 331.41
454.33 454.33
458.09 458.09
599.70 599.70
400.24 400.24
811.18 811.18
394.27 394.27
453.46 453.46
1120.04 1120.04
385.02 385.02
524.37 524.37
364.45 364.45
1095.74 1095.74
494.82 494.82
218.25 218.25
582.82 582.82
592.70 592.70
109.98 109.98
obados mediante
RESOLUCIÓN JEFATURAL N° 265-2021-INEI
Cod. 1 2 3 4 5 6 Cod. 1 2 3 4
01 ### ### ### ### ### 1211.24 02 802.66 802.66 802.66 802.66
03 798.59 798.59 798.59 798.59 798.59 798.59 04 641.95 1067.86 ### 610.17
05 491.74 244.75 460.18 601.28 (*) 679.50 06 1545.91 1545.91 ### ###
07 ### ### ### ### ### 1050.75 08 1304.42 1304.42 ### ###
09 426.33 426.33 426.33 426.33 426.33 426.33 10 562.46 562.46 562.46 562.46
11 280.48 280.48 280.48 280.48 280.48 280.48 12 346.74 346.74 346.74 346.74
13 ### ### ### ### ### 2484.47 14 312.00 312.00 312.00 312.00
17 808.12 ### 922.34 941.73 894.09 994.46 16 371.78 371.78 371.78 371.78
19 ### ### ### ### ### 1226.95 18 517.48 517.48 517.48 517.48
21 487.39 445.24 472.84 452.97 472.84 442.59 20 3048.53 3048.53 ### ###
23 461.83 461.83 461.83 461.83 461.83 461.83 22 (*) (*) (*) (*)
27 570.25 570.25 570.25 570.25 570.25 570.25 24 278.85 278.85 278.85 278.85
31 392.71 392.71 392.71 392.71 392.71 392.71 26 409.93 409.93 409.93 409.93
33 990.58 990.58 990.58 990.58 990.58 990.58 28 707.92 707.92 707.92 663.15
37 382.56 382.56 382.56 382.56 382.56 382.56 30 642.27 642.27 642.27 642.27
39 494.23 494.23 494.23 494.23 494.23 494.23 32 507.42 507.42 507.42 507.42
41 638.30 638.30 638.30 638.30 638.30 638.30 34 665.62 665.62 665.62 665.62
43 899.6 959.24 ### 836.14 ### 1204.83 38 491.72 1133.76 ### 570.66
45 399.47 399.47 399.47 399.47 399.47 399.47 40 405.49 504.21 455.36 360.31
47 653.54 653.54 653.54 653.54 653.54 653.54 42 449.25 449.25 449.25 449.25
49 400.19 400.19 400.19 400.19 400.19 400.19 44 473.46 473.46 473.46 473.46
51 465.17 465.17 465.17 465.17 465.17 465.17 46 602.29 602.29 602.29 602.29
53 ### ### ### ### ### 1066.96 48 396.27 396.27 396.27 396.27
55 640.22 640.22 640.22 640.22 640.22 640.22 50 793.09 793.09 793.09 793.09
57 777.68 777.68 777.68 777.68 777.68 777.68 52 394.63 394.63 394.63 394.63
59 234.50 234.50 234.50 234.50 234.50 234.50 54 453.97 453.97 453.97 453.97
61 373.27 373.27 373.27 373.27 373.27 373.27 56 1158.53 1158.53 ### ###
65 324.54 324.54 324.54 324.54 324.54 324.54 60 385.02 385.02 385.02 385.02
69 390.93 327.82 428.87 488.52 269.39 451.51 62 521.59 521.59 521.59 521.59
71 660.29 660.29 660.29 660.29 660.29 660.29 64 364.45 364.45 364.45 364.45
73 885.84 885.84 885.84 885.84 885.84 885.84 66 1125.07 1125.07 ### ###
77 402.19 402.19 402.19 402.19 402.19 402.19 68 487.60 487.60 487.60 487.60
70 218.25 218.25 218.25 218.25
72 600.88 600.88 600.88 600.88
78 584.70 584.70 584.70 584.70
80 110.75 110.75 110.75 110.75
(*) Sin Producción.
Nota: El cuadro incluye los índices unificados de código: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante
Resolución Jefatural N°252-2021-INEI.
EL 2021
5 6
802.66 802.66
358.11 816.96
1545.91 1545.9
1304.42 1304.4
562.46 562.46
346.74 346.74
312.00 312.00
371.78 371.78
517.48 517.48
3048.53 ###
(*) (*)
278.85 278.85
409.93 409.93
707.92 707.92
642.27 642.27
507.42 507.42
665.62 665.62
(*) 698.28
272.89 331.41
449.25 449.25
473.46 473.46
602.29 602.29
396.27 396.27
793.09 793.09
394.63 394.63
453.97 453.97
1158.53 ###
385.02 385.02
521.59 521.59
364.45 364.45
1125.07 ###
487.60 487.60
218.25 218.25
600.88 600.88
584.70 584.70
110.75 110.75
obados mediante
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
SUPERVISOR: CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
AVANCE DE LA OBRA
CONTRATO PRINCIPAL - VALORIZACIÓN Nº 05
MARZO 2015
VALORIZACIONES DE OBRA PROGRAMADAS (S/.) VALORIZACIONES DE OBRA EJECUTADAS (S/.) SITUACION DE OBRA
PERIODO (Avances Acumulados)
PARCIAL ACUMULADO % PARCIAL ACUMULADO %
SUPERVISOR: CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
FORMULA GENERAL
De = ( A x V / C ) x ( Kr / Ka - 1 )
donde : datos :
De = Deduccion del reajuste que no corresponde del componente
en soles de la valorizacion mensual
A= Monto del Adelanto S/. 37,081,765.47
C= Monto del Contrato S/. 185,408,827.32
Kr = Factor de Reajuste del mes respectivo #REF!
Ka = Factor de Reajuste al mes que se otorgó el adelanto (Oct-2014) = #REF!
|
100.0%
90.0%
LEYENDA
40.0%
30.0%
20.0%
10.0%
0.0%
November-14 January-15 March-15 May-15 July-15 September-15 November-15 January-16 March-16 May-16
INICIO
Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16
VALORIZACION PROGRAM ### 0.18% 0.55% 1.90% 3.88% 6.34% 9.66% 14.66% 21.68% 30.81% 41.51% 52.33% 63.26% 74.10% 81.84% 87.39% 91.59% 95.40% 98.46% 100.00% ###
ACUMULADA(%) REAL ### 1.29% 3.45% 4.82% 7.40% 11.93%
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS CONTRATISTA : COSAPI S.A.
ENTIDAD : MINISTERIO DE TRANPORTES Y COMUNICACIONES - MTC- PROVIAS NACIONAL SUPERVISOR : CONSORCIO SUPERVISOR IMPERIAL II
UBICACIÓN : DISTRITO PAMPAS / PROV. TAYACAJA / DPTO. HUANCAVELICA PLAZO EJECUCIÓN : 570 DIAS CALENDARIOS
VALOR REF. : S/. 202’669,808.36 inc. IGV FECHA DE INICIO : 07/11/2014
MONTO DE CONTRATO : S/. 218’782,416.24 inc. IGV FECHA DE TÉRMINO : 29/05/2016
25,000,000.00
20,271,798.65 20,106,628.63
19,837,984.43 20,044,152.00
20,000,000.00
MONTO PARCIAL S/.
16,927,839.55
15,000,000.00 14,353,395.51
13,019,066.69
abr-15
5,681,161.78
4,785,678.45
5,000,000.00 4,556,948.60
4,005,408.77
3,674,682.48
2,851,713.38
2,391,403.74 2,538,948.88
2,509,765.56
687,931.36
326,520.47
0.00
nov-14 dic-14 ene-15 feb-15 mar-15 abr-15 may-15 jun-15 jul-15 ago-15 sep-15 oct-15 nov-15 dic-15 ene-16 feb-16 mar-16 abr-16 may-16
PROGRAMADO REAL
MESES
MESES nov-14 dic-14 ene-15 feb-15 mar-15 abr-15 may-15 jun-15 jul-15 ago-15 sep-15 oct-15 nov-15 dic-15 ene-16 feb-16 mar-16 abr-16 may-16
MONTO PROG. 326,520.47 687,931.36 2,509,765.56 3,674,682.48 4,556,948.60 6,162,207.84 9,268,390.92 13,019,066.69 16,927,839.55 19,837,984.43 20,044,152.00 20,271,798.65 20,106,628.63 14,353,395.51 10,288,757.81 7,775,333.73 7,064,547.93 5,681,161.78 2,851,713.38
SUPERVISOR: CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
V.- MONTO A FACTURAR (I + IV) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ENTIDAD: MINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) PROVIAS NACIONAL
OBRA : REHABILITACIÓN Y MEJORAMIENTO DE LA CARRETERA DV. IMPERIAL - PAMPAS
CONTRATISTA: COSAPI S.A.
CONSORCIO SUPERVISOR IMPERIAL II (ACRUTA & TAPIA INGENIEROS S.A.C. - MOTLIMA CONSULTORES S.A. – GOC S.A.)
SUPERVISOR:
PAGOS AL CONTRATISTA
Acumulado nov-14 dic-14 ene-15 feb-15 mar-15 abr-15 may-15 jun-15 jul-15 ago-15
CONCEPTO
(S/.) Val 1 Val 2 Val 3 Val 4 Val 5 Val 6 Val 7 Val 8 Val 9 Val 10
OBRA PRINCIPAL
- Monto Bruto Valorizado 22,120,296.62 2,391,403.74 4,005,408.77 2,538,948.88 4,785,678.45 8,398,856.78
- Reajuste de la Valorización 63,565.61 57,393.69 68,091.95 30,467.39 0.00 (92,387.42)
- Regularización del Reajuste de la Valorización Anterior (155,184.63) (16,739.83) (20,027.04) (90,489.32) (27,928.44)
- Deducción Reajuste que no corresponde - Adelanto Directo 91,273.73 5,476.14 5,950.66 22,432.87 57,414.06
- Regul. Deducción Reajuste que no corresponde - Adelanto 30,309.50 3,269.50 3,911.54 17,673.68 5,454.78
- Amortización del Adelanto Directo (4,424,059.33) (478,280.75) (801,081.75) (507,789.78) (957,135.69) ###
- Amortización por Adelanto de Materiales 0.00
- Retención de Reajuste por Retraso 0.00
- IGV 3,190,716.27 354,693.00 587,596.46 369,263.10 680,068.80 1,199,094.91
I.- MONTO FACTURADO POR OBRA PRINCIPAL 20,916,917.77 2,325,209.68 3,852,021.24 2,420,724.75 4,458,228.79 7,860,733.31 0.00 0.00
OBRAS ADICIONALES
- Monto Bruto Valorizado
- Reajuste de la Valorización
- Regularización del Reajuste de la Valorización Anterior
- Deducción Reajuste que no corresponde - Adelanto Directo
- Regul. Deducción Reajuste que no corresponde - Adelanto
- Amortización del Adelanto Directo
- Amortización por Adelanto de Materiales
- Retención de Reajuste por Retraso
- IGV
II.- MONTO FACTURADO POR ADICIONALES
III.- TOTAL FACTURADO (I + II + III) 20,916,917.77 2,325,209.68 3,852,021.24 2,420,724.75 4,458,228.79 7,860,733.31 0.00 0.00
AVANCE DE LA OBRA AL MES DE #REF!
VALORIZACIONES DE OBRA PROGRAMADAS (S/.) VALORIZACIONES DE OBRA EJECUTADAS (S/.) Situación de Obra
(Avances
Periodo Acumulados)
Parcial Adicionales Deductivos Total Acumulado % Parcial Adicionales Total Acumulado %
### #REF!
Presupuesto Contratado Presupuestos Deductivos Presupuesto Actualizado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Metrados Presup. Metrados Presupuesto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Ded Nº 1 de Deduct. con Ded. con Ded. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
1 OBRAS PRELIMINARES #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
101.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
102.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
103.A #REF!
107.A #REF! #REF! #REF! #REF! #REF! (0.70) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
108.A #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 MOVIMIENTO DE TIERRAS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
202.M #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
202.K #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
205.E #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
205.F #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
205.G #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
206.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
208.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
220.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
210.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 SUB BASES - BASES #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
305.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 PAVIMENTOS ### (722,478.97) 24,944,248.17 #REF! #REF! #REF! #REF! #REF!
401.A Imprimación Asfáltica m2 653,734.41 1.03 673,346.44 0.00 653,734.41 673,346.44 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
410.A Carpeta Asfáltica en caliente m3 48,405.61 194.45 9,412,470.86 0.00 48,405.61 9,412,470.86 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
420.D Cemento Asfáltico PEN 120/150 kg ### 1.83 ### 0.00 ### 12,224,352.91 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
422.A Líquido Diluído MC - 30 L 784,481.29 1.92 1,506,204.08 0.00 784,481.29 1,506,204.08 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
423.D Aditivo mejorador de Adherencia kg 333,998.71 5.54 1,850,352.85 ### (722,478.97) 203,587.34 1,127,873.88 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 OBRAS DE ARTE Y DRENAJE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
601.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
602.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
605.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
605.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.D #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.E #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.F #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.G #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.H #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
610.I #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
611.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
615.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
622.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
622.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
622.D #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
624.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
635.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
635.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
635.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
636.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
650.G #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
650.H #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
655.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
655.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
655.d #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
670.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ENTIDADMINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) CONTRATISTA CONSORCIO VIAL TRUJILLO
PROVIAS NACIONAL
OBRA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO DESVIO OTUZCO - DESVIO CALLACUYAN SUPERVISION
### #REF!
Presupuesto Contratado Presupuestos Deductivos Presupuesto Actualizado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Metrados Presup. Metrados Presupuesto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Ded Nº 1 de Deduct. con Ded. con Ded. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
680.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ENTIDADMINISTERIO DE TRANSPORTES Y COMUNICACIONES (MTC) CONTRATISTA CONSORCIO VIAL TRUJILLO
PROVIAS NACIONAL
OBRA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TRUJILLO - SHIRAN - HUAMACHUCO
TRAMO DESVIO OTUZCO - DESVIO CALLACUYAN SUPERVISION
### #REF!
Presupuesto Contratado Presupuestos Deductivos Presupuesto Actualizado Acumulado Presente Acumulado Saldo por %
Código Descripción de la Partida Unidad Metrados Precio Monto Metrados Presup. Metrados Presupuesto Anterior Valorización Actual Valorizar Avance
Contratados Unitario S/. Ded Nº 1 de Deduct. con Ded. con Ded. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Metrado Monto S/. Acumul.
7 TRANSPORTE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.C #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.D #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.E #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.F #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.G #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.H #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
700.J #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8 SEÑALIZACION Y SEGURIDAD VIAL #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
801.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
802.I #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
803.C #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
804.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
805.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
810.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
820.D #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
820.E #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
820.F #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
825.B #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
830.A #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 MEDIO AMBIENTE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
903.G #REF! #REF! #REF! #REF! #REF! (14.74) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
906.B #REF! #REF! #REF! #REF! #REF! ### #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.A #REF! #REF! #REF! #REF! #REF! (14.74) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.G #REF! #REF! #REF! #REF! #REF! (0.45) #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.J #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.I #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.K #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.L #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.M #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.N #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
907.O #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
COSTO DIRECTO #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS GENERALES #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ggf GASTOS GENERALES FIJOS 1.80% #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ggv GASTOS GENERALES VARIABLES ### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
util UTILIDAD ### #REF! #REF! #REF! #REF! #REF! #REF! #REF!
TOTAL PRESUPUESTO OFERTADO, SIN I.G.V. #REF! #REF! #REF! #REF! #REF! #REF! #REF!