RESUMEN LIQUIDACION DE OBRA

Obra: “MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y SU ENTORNO DE LA AVEN


Contrato C/EXP : 607357.257247972
Contrato S/EXP : S/. 607,357.26
Adelanto Efe: S/. 60,735.73
Adelanto Mat: -

MONTOS
CONCEPTO MONTOS PAGADOS
RECALCULADOS

(A) DE LAS VALORIZACIONES inc. IGV


VAL-01 S/. 81,048.00 S/. 86,072.98
VAL-02 S/. 191,946.16 S/. 203,846.82
VAL-03 S/. 244,866.16 S/. 249,487.22
VAL-04 S/. 89,496.93 S/. 105,606.38
TOTAL VALORIZACIONES S/. 607,357.25 S/. 645,013.40
(B) REAJUSTES DE PRECIOS
VAL-01 S/. 1,722.92
VAL-02 S/. 4,595.17
VAL-03 S/. 4,680.56
VAL-04 S/. 967.26
TOTAL REAJUSTES S/. 11,965.91
(C) DEDUCCION DE REAJUSTES
VAL-01 S/. 12.40
VAL-02 S/. 63.26
VAL-03 S/. 48.15
VAL-04 S/. -36.77
TOTAL DEDUCCIONES S/. -87.04
(D) ADELANTOS OTORGADOS
ADELANTO DIRECTO
AMORTIZACION ADELANTO DIRECTO S/. 71,668.16
ADELANTO DE MATERIALES
AMORTIZACION DE ADELANTO DE MATERIALES
TOTAL ADELANTOS S/. 71,668.16
(E)SUB TOTAL (A+B+C+D) S/. 619,236.12 S/. 716,681.56
(F) I.G.V. 18% S/. 111,462.50
(G) COSTO OBRA PRINCIPAL S/. 730,698.62 S/. 716,681.56

(H) PENALIDADES
Concepto Multa por aplicar S/. Multa aplicada S/.
Multa por demora en termino de obra S/. - S/. -

(I) SALDO A CANCELAR


Monto a cancelar en efectivo
Multa a cancelar por IGV

RESUMEN DE SALDOS
A cargo del
Item Concepto Contratista
Efectivo IGV

I AUTORIZADO Y PAGADO
- En efectivo S/. -
- I.G.V. S/. -

II ADELANTOS
- En efectivo S/. -
- I.G.V. S/. -

III FONDO DE GARANTIA


- En efectivo S/. -
- I.G.V. S/. -

TOTAL S/. S/. - S/. -

SALDO A FAVOR DEL CONTRATISTA


- En Efectivo S/. 14,017.06
- En IGV S/. -

TOTAL: S/. 14,017.06

SON : CATORCE MIL DIESISIETE CON 06/100 SOLES


BRA

ILIDAD PEATONAL Y SU ENTORNO DE LA AVENIDA BOLOGNESI"

SALDO

S/. 14,017.06

Saldo por descontar S/.


S/. -

S/. 14,017.06
A favor del
Contratista
Efectivo IGV

S/. 14,017.06
S/. -

S/. -
S/. -

S/. -
S/. -

S/. 14,017.06 S/. -


VERIFICACION DEL REINTEGRO MAXIMO -LIQUIDACIÓN DE OBR

Obra “MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y SU ENTORNO DE LA AVENIDA BOLOGNESI"


Ubicación : TACNA
Contratista : CONSORCIO VIAL TACNA
Entidad : MUNICIPALIDAD PROVINCIAL DE TACNA

FORMULA: MEJORAMIENTO DE PASAJE PEATONAL

Reintegro Reintegro Ac.


FORMULA VAL Nº Monto Ejecutado Kr
Ejecutado Ejecutado
01 66,012.07 1.022 1,452.27 1,452.27
02 180,401.90 1.024 4,329.65 5,781.92
1
03 108,958.02 1.023 2,506.03 8,287.95
04 12,445.28 1.022 273.80 8,561.75
TOTAL 367,817.27 8,561.75

FORMULA: EQUIPAMIENTO URBANO Y PROTECCION DEL ENTORNO

Reintegro Reintegro Ac.


FORMULA VAL Nº Monto Ejecutado Kr
Ejecutado Ejecutado
01 15,035.93 1.018 270.65 270.65
02 11,544.28 1.023 265.52 536.17
1
03 135,908.15 1.016 2,174.53 2,710.70
04 77,051.66 1.009 693.46 3,404.16
TOTAL 239,540.02 3,404.16
O -LIQUIDACIÓN DE OBRA

A BOLOGNESI"

Reintegro Reintegro A Saldo Rein.


Reintegro Neto
Reconocido Pagar Reconocido
1,452.27 1,452.27 1,452.27 1,452.27
4,329.65 4,329.65 4,329.65 4,329.65
2,506.03 2,506.03 2,506.03 2,506.03
273.80 273.80 273.80 273.80
8,561.75 8,561.75 8,561.75 8,561.75

Reintegro Reintegro A Saldo Rein.


Reintegro Neto
Reconocido Pagar Reconocido
270.65 270.65 270.65 270.65
265.52 265.52 265.52 265.52
2,174.53 2,174.53 2,174.53 2,174.53
693.46 693.46 693.46 693.46
3,404.16 3,404.16 3,404.16 3,404.16

TOTAL REINTEGRO 11,965.91


FORMULAS POLINOMIC

Obra “MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y SU ENTORNO DE LA AVENIDA BOLOGNESI"


Ubicación : TACNA
Contratista : CONSORCIO VIAL TACNA
Entidad : MUNICIPALIDAD PROVINCIAL DE TACNA
Area Geografica 04

FORMULA POLINOMICA : 01 - MEJORAMIENTO DE PASAJE PEATONAL

K = 0.347*(MOr / MOo) + 0.074*(AGr / AGo) + 0.098*(CEr / CEo) + 0.076*(ACr / ACo) + 0.083*(Dr / Do)0.322*(GGUr / GGUo)

Indice % COEF. P.BASE


DESCRIPCION
INEI Simbolo INC. INCID. Dec-15
47 MANO DE OBRA INC. LEYES SOCI MO 100.00% 0.347 544.59
05 AGREGADO GRUESO AG 100.00% 0.074 604.65
21 CEMENTO PORTLAND TIPO I CE 100.00% 0.098 431.73
03 ACERO DE CONSTRUC. CORRUG AC 44.74% 0.076 468.66
43 MADERA NACIONAL PARA 55.26% 0.076 624.50
29 ENCOF. Y CARPINT.
DÓLAR D 39.76% 0.083 468.04
49 MAQUINARIA Y EQUIPO 60.24% 0.083 302.95
39 IMPORTADO
INDICE GENERAL DE PRECIOS GGU 100.00% 0.322 422.67
AL CONSUMIDOR

1.000 K=

FORMULA POLINOMICA : 02 - EQUIPAMIENTO URBANO Y PROTECCION DEL ENTORNO

K = 0.096*(MOr / MOo) + 0.305*(AAEr / AAEo) + 0.067*(PALr / PALo) + 0.112*(TANGr / TANGo) + 0.420*(GGUr / GGUo)

Indice % COEF. P.BASE


DESCRIPCION
INEI Simbolo INC. INCID. Dec-15
47 MANO DE OBRA INC. LEYES SOCI MO 100.00% 0.096 544.59
11 ARTEFACTO DE ALUMBRADO EXT AAE 100.00% 0.305 245.36
51 PERFIL DE ACERO LIVIANO PAL 100.00% 0.067 252.23
21 CEMENTO PORTLAND TIPO I TANG 21.43% 0.112 431.73
48 MAQUINARIA Y EQUIPO 21.43% 0.112 364.86
54 NACIONALLATEX
PINTURA 18.75% 0.112 376.53
65 TUBERIA DE ACERO NEGRO Y/O 38.39% 0.112 241.96
39 GALVANIZADO
INDICE GENERAL DE PRECIOS GGU 100.00% 0.420 422.67
AL CONSUMIDOR

1.000 K=
FORMULAS POLINOMICAS DE REAJUSTE (K)

AD VAL 01 VAL 02 VAL 03


Oct-16 Nov-16 Dec-16 Jan-17
Indice Kr Indice Kr Indice Kr Indice
562.24 0.358 562.24 0.358 562.24 0.358 563.25
604.91 0.074 604.83 0.074 601.30 0.074 603.02
431.73 0.098 431.73 0.098 431.73 0.098 431.73
464.71 0.034 468.62 0.034 470.17 0.034 464.67
641.80 0.043 642.94 0.043 648.93 0.044 637.44
476.53 0.034 479.51 0.034 477.78 0.034 470.06
303.44 0.050 304.74 0.050 304.12 0.050 299.32
433.63 0.330 434.89 0.331 436.35 0.332 437.38

1.021 1.022 1.024

AD VAL 01 VAL 02 VAL 03


Oct-16 Nov-16 Dec-16 Jan-17
Indice Kr Indice Kr Indice Kr Indice
562.24 0.099 562.24 0.099 562.24 0.099 563.25
246.36 0.306 247.33 0.307 246.86 0.307 243.25
264.41 0.070 266.56 0.071 279.97 0.074 270.80
431.73 0.024 431.73 0.024 431.73 0.024 431.73
368.83 0.024 369.67 0.024 369.41 0.024 367.86
375.63 0.021 377.56 0.021 377.56 0.021 377.56
222.10 0.039 223.93 0.040 226.31 0.040 221.11
433.63 0.431 434.89 0.432 436.35 0.434 437.38

1.014 1.018 1.023


VAL 03 VAL 04
Jan-17 Feb-17
Kr Indice Kr
0.359 563.25 0.359
0.074 602.70 0.074
0.098 431.73 0.098
0.034 456.59 0.033
0.043 637.78 0.043
0.033 461.49 0.033
0.049 293.65 0.048
0.333 438.80 0.334

1.023 1.022

VAL 03 VAL 04
Jan-17 Feb-17
Kr Indice Kr
0.099 563.25 0.099
0.302 238.07 0.296
0.072 263.40 0.070
0.024 431.73 0.024
0.024 365.19 0.024
0.021 402.49 0.022
0.039 215.22 0.038
0.435 438.80 0.436

1.016 1.009
DEDUCCION POR EL ADELANTO DIRECTO

Obra “MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y SU ENTORNO DE LA AVENIDA BOLOGNESI"


Ubicación : TACNA
Contratista : CONSORCIO VIAL TACNA
Entidad : MUNICIPALIDAD PROVINCIAL DE TACNA

Adelanto Directo, sin IGV (A) = S/. 60,735.73 10.00%


Monto del Contrato, sin IGV (C) = S/. 607,357.25

FORMULA POLINOMICA : 02 - EQUIPAMIENTO URBANO Y PROTECCION DEL ENTORNO

Valorización Indices del mes del


Pago del Adel.
Nº Mes a pagarse la Val Monto Reajuste
Directo
V K Ka
1 OCTUBRE-2016 66,012.07 1.022 1.021
2 NOVIEMBRE-2016 180,401.90 1.024 1.021
3 DICIEMBRE-2016 108,958.02 1.023 1.021
4 ENERO-2017 12,445.28 1.022 1.021
SUB-TOTAL 367,817.27

FORMULA POLINOMICA : 02 - EQUIPAMIENTO URBANO Y PROTECCION DEL ENTORNO

Valorización Indices del mes del


Pago del Adel.
Nº Mes a pagarse la Val Monto Reajuste
Directo
V K Ka
1 OCTUBRE-2016 15,035.93 1.018 1.014
2 NOVIEMBRE-2016 11,544.28 1.023 1.014
3 DICIEMBRE-2016 135,908.15 1.016 1.014
4 ENERO-2017 77,051.66 1.009 1.014
SUB-TOTAL 239,540.02

607,357.29
TOTAL DEDUCCIONES
VENIDA BOLOGNESI"

Ka = OCTUBRE 2016

Deduccion

D = V*A/C (K / Ka - 1)
6.47
53.01
21.34
1.22
82.04

Deduccion

D = V*A/C (K / Ka - 1)
5.93
10.25
26.81
-37.99
5.00

87.04
RESUMEN DE VALORIZACIONES Y PAG

Obra: “MEJORAMIENTO DE LA TRANSITABILIDAD PEATONAL Y SU ENTORNO DE LA AVENIDA BOLOGNESI"


Contrato C/EXP : S/. 607,357.26 (S/IGV)
Contrato S/EXP : S/. 607,357.26 (S/IGV)
Adelanto Efe: S/. 60,735.73 (S/IGV)
Adelanto Mat: - (S/IGV)

Contrato Principal REAJUSTE Amortizacion de


Monto S/IGV Monto Adelantos (D)
Valorizacion S/. S/. En Efectivo Para Mater.

C R D1 D2

Exp Tecnico 0.00 0.00 0.00


VAL. 01 81048 8,104.80 0.00
VAL. 02 191946.16 19,194.62 0.00
VAL. 03 244866.16 33,436.31 0.00
VAL. 04 89496.93 0.00 0.00
TOTAL 607,357.25 - 60,735.73 -

Adelato Efectivo
Nota: El Contratista Solicito S/IGV S/. 60,735.73 10.00%
Se ha Otorgado S/IGV S/. 60,735.73
Adelato Materiales
Nota: El Contratista Solicito C/IGV S/. 0.00
Se ha Otorgado S/IGV S/. 0.00 0.00%
DE VALORIZACIONES Y PAGOS EFECTUADOS

A AVENIDA BOLOGNESI"

VALORIC. Deducciones NETO PAGADO S/.


Fondo de
NETA
Garantia Efectivo
(VN) Directo Materiales IGV 18% TOTAL
VN = C - D FG = 5% C VN - FG - E

0.00 0.00 0.00 0.00


72,943.20 0.00 0.00 0.00 72,943.20 13,129.78 86,072.98
172,751.54 0.00 0.00 0.00 172,751.54 31,095.28 203,846.82
211,429.85 0.00 0.00 0.00 211,429.85 38,057.37 249,487.22
89,496.93 0.00 0.00 0.00 89,496.93 16,109.45 105,606.38
546,621.52 - - - 546,621.52 98,391.88 645,013.40

ADELANTOS S/IGV NETO PAGADO TOTAL


Nº En Efectivo Materiales Efectivo IGV 18%

01 60,735.73 60,735.73 10,932.43 71,668.16

60,735.73 - 60,735.73 10,932.43 716,681.56


Fecha de
Cobranza

NOV-2016
DIC-2016
ENE-2017
FEB-2018

Fecha Cob.
Oct-16 Nov-16
FORMULA
VAL 1 VAL 2

FORMULA POLINOMICA : 01 - MEJORAMIENTO DE PASAJE


S/. 55,942.43 S/. 152,882.95
PEATONAL

S/. 499.98 S/. 5,715.48


FORMULA POLINOMICA : 02 - EQUIPAMIENTO URBANO Y
PROTECCION DEL ENTORNO
S/. 12,242.33 S/. 4,067.80

COSTO DIRECTO S/. 68,684.74 S/. 162,666.23

GASTOS GENERALES 10% 6,868.47 16,266.62

UTILIDAD 8% 5,494.78 13,013.30

SUBTOTAL S/. 81,048.00 S/. 191,946.16

Oct-16 Nov-16
FORMULA
VAL 1 VAL 2

FORMULA POLINOMICA : 01 - MEJORAMIENTO DE PASAJE


S/. 55,942.43 S/. 152,882.95
PEATONAL

COSTO DIRECTO S/. 55,942.43 S/. 152,882.95

GASTOS GENERALES 10% 5,594.24 15,288.30

UTILIDAD 8% 4,475.39 12,230.64

SUBTOTAL S/. 66,012.07 S/. 180,401.90

Oct-16 Nov-16
FORMULA
VAL 1 VAL 2

S/. 499.98 S/. 5,715.48


FORMULA POLINOMICA : 02 - EQUIPAMIENTO URBANO Y
PROTECCION DEL ENTORNO
S/. 12,242.33 S/. 4,067.80

COSTO DIRECTO S/. 12,742.31 S/. 9,783.28

GASTOS GENERALES 10% 1,274.23 978.33

UTILIDAD 8% 1,019.38 782.66

SUBTOTAL S/. 15,035.93 S/. 11,544.28


Dec-16 Jan-17

VAL 3 VAL 4

S/. 92,337.30 S/. 10,546.84

S/. 106,210.15 S/. 39,004.83

S/. 8,966.24 S/. 26,293.18

S/. 207,513.69 S/. 75,844.85

20,751.37 7,584.49

16,601.10 6,067.59

S/. 244,866.16 S/. 89,496.93 S/. 607,357.22

Dec-16 Jan-17

VAL 3 VAL 4

S/. 92,337.30 S/. 10,546.84

S/. 92,337.30 S/. 10,546.84

9,233.73 1,054.68

7,386.98 843.75

S/. 108,958.02 S/. 12,445.28 S/. 367,817.27

Dec-16 Jan-17

VAL 3 VAL 4

S/. 106,210.15 S/. 39,004.83

S/. 8,966.24 S/. 26,293.18

S/. 115,176.39 S/. 65,298.01

11,517.64 6,529.80

9,214.11 5,223.84

S/. 135,908.15 S/. 77,051.66 S/. 239,540.02 607,357.29 607,357.25