Está en la página 1de 5

CUADRO DE ELEMENTOS DE CIMENTACIÓN

VC.T-2.3
Referencias Dimensiones (cm) Canto (cm) Armado inf. X Armado inf. Y Armado sup. X Armado sup. Y
C.2.3
C8

C14
C9
C1 195x195 60 7Ø3/4"c/26 7Ø3/4"c/26 7Ø3/4"c/26 7Ø3/4"c/26
C2 195x125 60 5Ø3/4"c/26 7Ø3/4"c/26
C3 140x180 60 7Ø3/4"c/26 5Ø3/4"c/26 7Ø3/4"c/26 5Ø3/4"c/26

VC.T-1.3
C4 200x200 60 7Ø3/4"c/26 7Ø3/4"c/26 7Ø3/4"c/26 7Ø3/4"c/26
VC.T-3

C7 168x178 60 7Ø3/4"c/26 6Ø3/4"c/26 7Ø3/4"c/26 6Ø3/4"c/26


.3

C8 165x220 60 8Ø3/4"c/26 6Ø3/4"c/26 8Ø3/4"c/26 6Ø3/4"c/26


(C5-C6) 765x255 60 10Ø3/4"c/26 29Ø3/4"c/26 10Ø3/4"c/26 29Ø3/4"c/26
C13 C11
C6
(C9-C14) 630x210 60 8Ø3/4"c/26 24Ø3/4"c/26 8Ø3/4"c/26 24Ø3/4"c/26
(C10-C12) 635x235 60 15Ø3/4"c/15 41Ø3/4"c/15 15Ø3/4"c/15 41Ø3/4"c/15
C.2.3

(C11-C13) 635x160 60 7Ø1"c/21 52Ø3/4"c/12 7Ø1"c/21 52Ø3/4"c/12

C12

C10

C5
Tabla de vigas centradoras
40
VC.S-3.1 40
VC.T-2.3

VC.T-1.3
Arm. sup.: 5Ø1"
Arm. sup.: 4Ø5/8"
VC.T-3.3

Arm. inf.: 5Ø1"


Arm. inf.: 3Ø5/8"

VC.S-3.1

60

50
Arm. piel: 1x2Ø1/2"
Arm. piel: 1x2Ø1/2"
Estribos: 1xØ3/8"c/20
Estribos: 1xØ3/8"c/20
C1 VC.T-2.3

C.2.3
C2

C3
VC.T-2.3 40 40
C4
VC.T-2.3 VC.T-3.3
Arm. sup.: 4Ø3/4" Arm. sup.: 5Ø1"
60 Arm. inf.: 3Ø5/8" Arm. inf.: 3Ø5/8"

60
Arm. piel: 1x2Ø1/2" Arm. piel: 1x2Ø1/2"
Estribos: 1xØ3/8"c/20 Estribos: 1xØ3/8"c/20

PROYECTO: UBICACION : DISEÑÒ: CONTIENE: OBSERVACIONES: PLANO N°:

ING. ELKIN LOZANO ESTR-TITI-CAR-V1


MAT. 13202251194BLV PLANTA DE CIMENTACION ESCALA: FECHA:
INDICADA OCT-2023
MR TITI. CARTAGENA, BOLÍVAR. DISEÑÒ:

ING. ELKIN LOZANO


DIGITALIZÓ:

ING. ELKIN LOZANO


PLANO: TIPO: Civil REV:

MAT. 13202251194BLV MAT. 13202251194BLV


01 01 05 DE RV-1
Marco 9 V-118: IPE 140

Marco 8
C14

V-114: IPE
Marco 10

C13
DG:2xHE 160 A

V-110: IPE
(HE 200 A)

C1
300
V-119:
0 IPE 300

(HE 200 A)
0

300
Marco 5

(HE 200 A)
C12
Marco 11

(HE 200 A)
Marco 3
Marco 2
V-120: IPE 450 V-121: IPE 140
Marco 1

Marco 6
Marco 4
V-122: IPE 140 V-123: IPE 140 V-124: IPE 140 V-125: IPE 140 V-126: IPE 140
Marco 12

V-115: IPE
300
V-106: IPE 330
V-104: IPE 300
V-101: IPE 300

V-127: IPE 140 V-128: IPE 140 V-129: IPE 140 V-130: IPE 140 V-131: IPE 140
Marco 13

DG:2xHE 160
A

V-111: IPE 30
V-108: IPE 30

0
0
V-132: IPE 140 V-133: IPE 140 V-134: IPE 140 V-135: IPE 140 V-136: IPE 140

0
Marco 14
C9

C2
C10
(HE 200 A)

(HE 220 A)
V-139:

(HE 240 A)
IPE 55
0
V-137: IPE 550
V-138: IPE 550
Marco 15

V-140: IPE 14
0

PROYECTO:
C11

Marco 16 V-141: IPE 14


0
(HE 220 A)

V-143: IPE 14
0
Marco 18 V-144: IPE 14
0
V-145: IPE 14
MarV-
co14 0
172: IPE 140
V-146: IPE 14
0
V-147: IPE 14
0

Tipo 8
V-148: IPE 14
0
Marco 19 V-149: IPE 14
0

V-116: IPE 30
V-150: IPE 14
0

0
V-151: IPE 14
0
V-102: IPE 300

V-152: IPE 14
0

C3
(HE 200 A)
V-153: IPE 14
0
Marco 20 V-154: IPE 14
0
V-155: IPE 14
0
V-156: IPE 14
0
V-157: IPE 14
0

V-113: IPE 55

MR TITI.
0
V-112: IPE 55
C8

0
(HE 200 A)

V-109: IPE 55
0

V-158: IPE 14
0
Marco 21 V-159: IPE 14
0
V-107: IPE 550
V-105: IPE 550

V-160: IPE 14
0
V-161: IPE 14
0
V-162: IPE 14
0

V-164: IPE 14
0
Marco 23 V-165: IPE 14
0
MarV-
co1622
3: IPE 140
V-166: IPE 14
0
V-167: IPE 14
0
V-168: IPE 14
0

V-117: IPE 30
0

UBICACION :
V-169: IPE 14
0
Tipo 8
V-170: IPE 14
0
Marco 24
V-171: IPE 14
0
V-172: IPE 14
0
V-103: IPE 300

V-173: IPE 14
0
V-174: IPE 14
0
Marco 7

V-175: IPE 55
Marco 25 0
C4
(HE 240 A)

V-176: IPE 55
0
C5

V-177: IPE 55
0
(HE 240 A)
C6
(HE 220 A)
C7
(HE 200 A)

CARTAGENA, BOLÍVAR.
DISEÑÒ:
DISEÑÒ:
Marco 8 V-217: IPE 140
Marco 7
C14

V-213: IPE

Marco 9
C13

DG:2xHE 160 A
V-210: IPE
(HE 200 A)

C1
330

V-218:
1 IPE 300
(HE 200 A)

1
330
Marco 5

(HE 200 A)
C12

Marco 10
(HE 200 A)
Marco 3

ING. ELKIN LOZANO


ING. ELKIN LOZANO

MAT. 13202251194BLV
MAT. 13202251194BLV
Marco 2

V-219: IPE 450


V-220: IPE 120
Marco 1

Marco 6
Marco 4

V-221: IPE 140 V-222: IPE 140 V-223: IPE 140 V-224: IPE 140 V-225: IPE 140
Marco 11
1

V-214: IPE
330
V-206: IPE 330
V-204: IPE 330
V-201: IPE 330

V-226: IPE 140 V-227: IPE 140 V-228: IPE 140 V-229: IPE 140 V-230: IPE 140
Marco 12

CONTIENE:

DIGITALIZÓ:
DG:2xHE 160
A

V-211: IPE 33
V-208: IPE 33

0
0

V-231: IPE 140 V-232: IPE 140 V-233: IPE 140 V-234: IPE 140 V-235: IPE 140
1

Marco 13
C9

C2
C10
(HE 200 A)

(HE 220 A)

V-238:
(HE 240 A)

IPE 55
0
ING. ELKIN LOZANO
MAT. 13202251194BLV

V-236: IPE 550


V-237: IPE 550
Marco 14

V-239: IPE 14
0
C11

Marco 15 V-240: IPE 14


0
(HE 220 A)

V-241: IPE 14
0
PLANTA DE CIMENTACION

Marco 16
V-242: IPE 14
0
V-243: IPE 14
0
V-244: IPE 14
0
V-245: IPE 14
0
V-215: IPE 33
0

V-246: IPE 14
0
Marco 17
V-247: IPE 14
0
V-248: IPE 14
0
V-249: IPE 14
0
V-202: IPE 330

V-250: IPE 14
0
C3

V-251: IPE 14
0
(HE 200 A)

Marco 18
V-252: IPE 14
OBSERVACIONES:

0
V-253: IPE 14
0
V-254: IPE 14
0
V-255: IPE 14
0
V-212: IPE 55
C8

0
(HE 200 A)

V-209: IPE 55

V-256: IPE 14
0
0

Marco 19
V-257: IPE 14
0
V-207: IPE 550
V-205: IPE 550

V-258: IPE 14
0
V-259: IPE 14
0
V-260: IPE 14
0

V-261: IPE 14
0
Marco 20
V-262: IPE 14
0
V-263: IPE 14
0
V-264: IPE 14
0
V-265: IPE 14
0
V-216: IPE 33
0

PLANO:
ESCALA:
PLANO N°:

V-266: IPE 14
0
Marco 21
V-267: IPE 14
0
02

V-268: IPE 14
0
V-203: IPE 330

V-269: IPE 14
0
V-270: IPE 14
0
TIPO:

V-271: IPE 55
Marco 22 0
INDICADA
C4

DE
(HE 240 A)

Civil

V-272: IPE 55
0
FECHA:
C5

V-273: IPE 55
0
(HE 240 A)
C6

02 05
(HE 220 A)

ESTR-TITI-CAR-V1
C7
(HE 200 A)

REV:
OCT-2023

RV-1
C1 C2 C4 C6 C9 C12
+7.240 +7.240 +7.240 +7.240 +7.240 +7.240

Cubierta Cubierta Cubierta Cubierta Cubierta Cubierta

+6.690 +6.690
+6.590 +6.590 +6.590 +6.590

B B B B B B B B B B B B

HE 200 A HE 220 A HE 240 A HE 220 A HE 200 A HE 200 A

Sección B-B Sección B-B Sección B-B Sección B-B Sección B-B Sección B-B
+3.000 +3.000 +3.000 +3.000 +3.000 +3.000

Planta 1 Planta 1 Planta 1 Planta 1 Planta 1 Planta 1

+2.450 +2.450
+2.350 +2.350 +2.350 +2.350

A A A A A A A A A A A A

HE 200 A HE 220 A HE 240 A HE 220 A HE 200 A HE 200 A


+0.000 +0.000 +0.000 +0.000 +0.000 +0.000
Sección A-A Sección A-A Sección A-A Sección A-A Sección A-A Sección A-A
Planta baja Planta baja Planta baja Planta baja Planta baja Planta baja
Vista XX Vista XX Vista XX Vista XX Vista XX Vista XX

Escala 1:100 Escala 1:100 Escala 1:100 Escala 1:100 Escala 1:100 Escala 1:100

C5-C10 C8 C11 C14 C13


+7.240 +7.240 +7.240 +7.240 +7.240 +7.240

Cubierta Cubierta Cubierta Cubierta Cubierta Cubierta

+6.810 +6.810 +6.810 +6.810


+6.590 +6.590

B B B B B B B B B B B B

HE 200 A HE 240 A HE 200 A HE 220 A HE 200 A HE 200 A

Sección B-B Sección B-B Sección B-B Sección B-B Sección B-B Sección B-B
+3.000 +3.000 +3.000 +3.000 +3.000 +3.000

Planta 1 Planta 1 Planta 1 Planta 1 Planta 1 Planta 1

+2.600 +2.600 +2.600 +2.570


+2.350 +2.350

A A A A A A A A A A A A

HE 200 A HE 240 A HE 200 A HE 220 A HE 200 A HE 200 A


+0.000 +0.000 +0.000 +0.000 +0.000 +0.000
Sección A-A Sección A-A Sección A-A Sección A-A Sección A-A Sección A-A
Planta baja Planta baja Planta baja Planta baja Planta baja Planta baja
Vista XX Vista XX Vista XX Vista XX Vista XX Vista XX

Escala 1:100 Escala 1:100 Escala 1:100 Escala 1:100 Escala 1:100 Escala 1:100

PROYECTO: UBICACION : DISEÑÒ: CONTIENE: OBSERVACIONES: PLANO N°:

ING. ELKIN LOZANO ESTR-TITI-CAR-V1


MAT. 13202251194BLV DESPIECE DE COLUMNAS ESCALA: FECHA:
INDICADA OCT-2023
MR TITI. CARTAGENA, BOLÍVAR. DISEÑÒ:

ING. ELKIN LOZANO


DIGITALIZÓ:

ING. ELKIN LOZANO


PLANO: TIPO: Civil REV:

MAT. 13202251194BLV MAT. 13202251194BLV


03 03 05 DE RV-1
VC.T-2.3 [C2 - C1]
VC.T-3.3 [(C11-C13) - (C9-C14)]
C2 C1
(C11-C13) (C9-C14)
17
98 99 248 181
C.2.3 [(C10-C12) - (C11-C13)] 89 176 73 213 82
C1 40
40
(C10-C12) (C11-C13) 31
31
C1 C1
125 149 39 86 81

10
60

51
C7 15 15

10
60

51
180 180 40
7Ø3/4"c/26 L=238 7Ø3/4"c/26 L=238 31
14Ø3/8"c/20
C7 C7 11Ø3/8"c/20 L=183
L=183 90 9

40

31
30

30
4Ø3/4" L=659
72 9

10
18 18 5Ø1" L=608
151 161
6Ø3/8"c/15

31
22
L=143

42
7Ø3/4"c/26 L=216 6Ø3/4"c/26 L=221 30 30
2Ø5/8" L=334

33

30

60
40

60

60
60

20

23
30 30 ARM. PIEL 2X1Ø1/2" L=618
2Ø5/8" L=334

23
ARM. PIEL 2X1Ø1/2" L=566 60 8

30

30

26
60
7Ø3/4"c/26 L=238 7Ø3/4"c/26 L=238 479 3Ø5/8" L=622
70 7

26
3Ø5/8" L=576 58 9

5
73 9 643

30
33

7Ø3/4"c/26 L=216 6Ø3/4"c/26 L=221 634


(C5-C6)

C6

C5 C6 C5

195
20
211 346 208 235 VC.T-3.3 [C2 - (C10-C12)]
29Ø3/4"c/26 L=298
C2 (C10-C12)
178

30
10Ø3/4"c/26 L=808 C.2.3 [C3 - C2]
25
114 395 125 149

30
C3 C2
40
195 31
92 90 165 99 98

10 40

60

51
31
168
C2 22Ø3/8"c/20

40

31
C8

60
L=183

10
C3 11 5Ø1" L=787 100
C2 C2 13Ø3/8"c/15
C8 C8 L=143
30 30

42
18 C3 C3 2Ø5/8" L=415
98 98 108
15

30

30
150 110 110 15 10Ø3/4"c/26 L=808 29Ø3/4"c/26 L=298
125 90 90
8Ø3/4"c/26 L=215
7Ø3/4"c/26 L=190
34

40
6Ø3/4"c/26 L=263

33

60
5Ø3/4"c/26 L=223

60
30

20
30
30 2Ø5/8" L=415 30
60

23
ARM. PIEL 2X1Ø1/2" L=707
545
9 40

26
3Ø5/8" L=711
30

32

255
12 39

60
5Ø3/4"c/26 L=238 7Ø3/4"c/26 L=171

60
808

30
34

6Ø3/4"c/26 L=263

30
8Ø3/4"c/26 L=215

33
7Ø3/4"c/26 L=190 5Ø3/4"c/26 L=223
125

VC.T-1.3 [(C5-C6) - C7]


765
(C5-C6) C7

18
558 208 144 150
195 VC.T-2.3 [C1 - (C10-C12)]
180

40
220

31
C1 (C10-C12)

50

41

10
15
180 325 118 126

40 9Ø3/8"c/20
L=163
31 77 12
4Ø5/8" L=617

26
140
10

60

51
165
18Ø3/8"c/20
L=183
(C9-C14) 9 4Ø3/4" L=750 88

50

60
31
C14 C9 C9
(C11-C13) C13

10
15 15
C13 C11 C11 470 145 195

22
8Ø3/4"c/26 L=678 ARM. PIEL 2X1Ø1/2" L=596
19 24Ø3/4"c/26 L=255
555 61 80 80
61 10
33

31

60
7Ø1"c/21 L=699

26
3Ø5/8" L=599
41

59 12
52Ø3/4"c/12 L=203

22
ARM. PIEL 2X1Ø1/2" L=710 1079
30

8 58

25
3Ø5/8" L=714
9 57

764

60
60

VC.T-2.3 [C8 - C7]


VC.T-2.3 [C4 - C3]

31
33

8Ø3/4"c/26 L=678 24Ø3/4"c/26 L=255


C8 C7
C4 C3
30
41

52Ø3/4"c/12 L=203 20
20 116 111 330 179
7Ø1"c/21 L=699
180 333 91 90
40
40 31
31

10

60

51
10
60

51
19Ø3/8"c/20
210

18Ø3/8"c/20 L=183
L=183 70 4Ø3/4" L=733 12
14 84
160

4Ø3/4" L=753

31
21
31

60
635 630

60

23
ARM. PIEL 2X1Ø1/2" L=699

23
(C10-C12) ARM. PIEL 2X1Ø1/2" L=693
C12 47 10
C4 13 54

26

26
C12 C10 C10 3Ø5/8" L=696
3Ø5/8" L=702
C4 C4 14 52
18 45 12
497 120 118 118
20 20 713
180 180 756
15Ø3/4"c/15 L=678
7Ø3/4"c/26 L=243 7Ø3/4"c/26 L=243
30

41Ø3/4"c/15 L=278
30

30

30

VC.S-3.1 [C4 - (C5-C6)]

C4 (C5-C6)

20
181 241 211 554 C.2.3 [(C9-C14) - C8]
40
60

31 (C9-C14) C8
60

485 145 265 87 138


10
60

51

40
30

30

15Ø3/4"c/15 L=678 41Ø3/4"c/15 L=278 14Ø3/8"c/20 31


30

30

7Ø3/4"c/26 L=243 7Ø3/4"c/26 L=243 L=183


14 5Ø1" L=812 123

40

31

10
19Ø3/8"c/15
42

L=143
50 2Ø5/8" L=598 50

40
60

60
235
200

20
23

ARM. PIEL 2X1Ø1/2" L=718 39 2Ø5/8" L=574 39

12 49
1120
42

5Ø1" L=784
14 94

200 1208
635

PROYECTO: UBICACION : DISEÑÒ: CONTIENE: OBSERVACIONES: PLANO N°:

ING. ELKIN LOZANO ESTR-TITI-CAR-V1


MAT. 13202251194BLV DESPIECE DE CIMENTACION ESCALA: FECHA:
INDICADA OCT-2023
MR TITI. CARTAGENA, BOLÍVAR. DISEÑÒ:

ING. ELKIN LOZANO


DIGITALIZÓ:

ING. ELKIN LOZANO


PLANO: TIPO: Civil REV:

MAT. 13202251194BLV MAT. 13202251194BLV


04 04 05 DE RV-1
Tipo 1 Tipo 2 UNIONES SOLDADAS EN ESTRUCTURA METÁLICA
NORMA:

35 65
100
50 50

50 50
100

100
ANSI/AISC 360-10: Specification for Structural Steel Buildings Chapter J. Design of Connections.

35 65

35 65
100

100
Bisel 15 x 15
Bisel 15 x 15 MATERIALES:
65 220 65
50 5 5 50 - Perfiles (Material base): A572 50ksi.
58.7 58.7 350
55 55 - Material de aportación (soldaduras): Electrodos de las series E90XX y E70XX. Para los materiales
Rigidizadores x - x (e = 6.4 mm) Rigidizadores y - y (e = 6.4 mm)
Rigidizadores y - y (e = 6.4 mm) empleados y el procedimiento de soldadura SMAW (Arco eléctrico con electrodo revestido), se
cumplen las condiciones de compatibilidad entre materiales exigidas por el artículo J.2.6.
Pilar Pilar
Pilar Pilar HE 220 A HE 220 A
HE 200 A HE 200 A DEFINICIONES PARA SOLDADURAS EN ÁNGULO:
- Garganta efectiva: es igual a la menor distancia medida desde la raíz a la cara plana teórica de la
A A A A soldadura (J.2.2a).
A A A A
- Lado del cordón: es el menor de los dos lados situados en las caras de fusión del mayor triángulo
que puede ser inscrito en la sección de la soldadura (AWS D1.1/D1.1M:2002 Annex B).
6 E70XX
E70XX 6 6 E70XX - Raíz de la soldadura: es la intersección de las caras de fusión (AWS D1.1/D1.1M:2002 Annex B).
6 SMAW
SMAW 6 6 E70XX E70XX 6 SMAW
E70XX 6 6 SMAW SMAW 6 - Longitud efectiva del cordón de soldadura: es igual a la longitud total de la soldadura con
SMAW 6 dimensiones uniformes, incluidos los retornos (art. 2.3.2.1 of AWS D1.1/D1.1M:2002).
Placa base Placa base
Placa base Placa base 350x350x15.9 350x350x15.9
300x300x12.7 300x300x12.7 DISPOSICIONES CONSTRUCTIVAS:
1) Las prescripciones consideradas en este proyecto se aplican a uniones soldadas donde:
Alzado Vista lateral Alzado Vista lateral
- Los aceros de las piezas a unir tienen un límite elástico no mayor que 100 ksi [690 MPa] REFERENCIAS Y SIMBOLOGÍA
E90XX (artículo 1.2 (1) AWS D1.1/D1.1M:2002). Para la representación de los símbolos de soldaduras se consideran las indicaciones de la norma
Pernos de anclaje E90XX Pernos de anclaje SMAW 9 Placa base: 15.9 mm - Los espesores de las piezas a unir son al menos de 1/8 in [3mm] (artículo 1.2 (2) AWS ANSI/AWS A2.4-98 'STANDARD SYMBOLS FOR WELDING, BRAZING, AND NONDESTRUCTIVE
4 Ø 12.7 SMAW 9 Placa base: 12.7 mm E70XX 6 Ø 15.9
SMAW 6 D1.1/D1.1M:2002). EXAMINATION'.
Mortero de nivelación: 20 mm Mortero de nivelación: 20 mm - Las piezas soldadas no son de sección tubular.

40
30

MÉTODO DE REPRESENTACIÓN DE SOLDADURAS


E70XX E70XX 2) En soldaduras a tope de penetración total o parcial se cumple que: Conforme a la figura 2 de ANSI/AWS A2.4-98 y a los tipos de soldaduras empleadas en este proyecto,

500
500

SMAW 7 SMAW 7
se desarrolla el siguiente esquema de representación de una soldadura:
240

300

270

350
- La longitud efectiva de las soldaduras de penetración total o parcial es igual a la dimensión de
las piezas unidas perpendicular a la dirección de las tensiones de tracción o compresión. (art.
Placa base 2.3.1.1 of AWS D1.1/D1.1M:2002). Referencias:
30

Hormigón: f'c=250 Placa base Hormigón: f'c=250 1: flecha (conexión entre 2 y 6)

40
300x300x12.7 350x350x15.9
Orientar anclaje al centro de la placa - En soldaduras de penetración total, la garganta efectiva es igual al menor espesor de las piezas 2: línea de referencia
30 240 30 Orientar anclaje al centro de la placa unidas (art. 2.3.1.2 of AWS D1.1/D1.1M:2002). 5 3: símbolo de soldadura
40 135 135 40
300 - En soldaduras de penetración parcial, el espesor mínimo de la garganta efectiva cumple con los 4: símbolo soldadura perimetral.
2
350
valores de la siguiente tabla:
4 5: símbolo de soldadura en el lugar de montaje.
Anclaje de los pernos Ø 12.7, 1 D 6: línea del dibujo que identifica la unión propuesta.
Sección A - A Anclaje de los pernos Ø 15.9, S: profundidad del bisel. En soldaduras en ángulo, es el lado del
A-325 (liso) Sección A - A Tabla J2.3 ANSI/AISC 360-10 S(E) L
A-325 (liso) 3 cordón de soldadura.
Menor espesor de las piezas a Espesor mínimo de garganta 6 (E): tamaño del cordón en soldaduras a tope.
Escala 1:15 Escala 1:15 unir efectiva L: longitud efectiva del cordón de soldadura
(mm) (mm) D: dato suplementario. En general, la serie de electrodo a utilizar
Menor o igual que 6 3 y el proceso precualificado de soldeo.
Menor o igual que 13 5 La información relacionada con el lado de la unión soldada a la que apunta la flecha, se coloca por
Menor o igual que 19 6 debajo de la línea de referencia, mientras que para el lado opuesto, se indica por encima de la línea de
Menor o igual que 38 8 referencia:
Menor o igual que 57 10
OS OS OS
Menor o igual que 150 13 AS AS AS

Mayor que 150 16 AS OS AS AS

OS

OS
- El espesor de garganta efectiva de las soldaduras de penetración parcial se determina según la
Tipo 8 tabla J2.1. Donde:

Tipo 6 3) En soldaduras en ángulo se cumple que: OS(Other Side): es el otro lado de la flecha

B
- El tamaño mínimo del lado de una soldadura en ángulo cumple con los valores de la siguiente AS(Arrow Side): es el lado de la flecha
tabla:
100

Referencia 3
C
100

100

Tabla J2.4 ANSI/AISC 360-10


Viga secundaria Designación Ilustración Símbolo
Bisel 15 x 15
85 230 85 3 55 E70XX Viga principal Viga principal 3 55 E70XX Menor espesor de las piezas a Tamaño mínimo del lado de una
3 55 SMAW IPE 550 3 55 SMAW IPE 140 unir soldadura en ángulo(*)
IPE 550
70.5 70.5 400 (mm) (mm) Soldadura en ángulo
Rigidizadores x - x (e = 6.4 mm) Rigidizadores y - y (e = 9.5 mm) Menor o igual que 6 3
Pilar Pilar
Menor o igual que 13 5
A A A A Menor o igual que 19 6
HE 240 A HE 240 A
Soldadura a tope en 'V' simple (con chaflán)
Mayor que 19 8
A A A A Viga secundaria Ejecutada en una sola pasada
(*)

IPE 140
- El tamaño máximo del lado de una soldadura en ángulo a lo largo de los bordes de piezas Soldadura a tope en bisel simple
soldadas cumple con el artículo J2.2b, el cual exige que:

410
E70XX 6 6 E70XX
SMAW 6 6 E70XX E70XX 6 SMAW
- debe ser menor o igual que el espesor de la pieza si dicho espesor es menor que 6 mm,
6 SMAW SMAW 10 - debe ser menor o igual que el espesor de la pieza menos 2 mm si dicho espesor es mayor o Soldadura a tope en bisel doble
Placa base Placa base igual que 6 mm
400x400x15.9 400x400x15.9 - La longitud efectiva de un cordón de soldadura en ángulo cumple que es mayor o igual que 4
veces el tamaño de su lado, o bien que el lado no se considera mayor que el 25 % de la longitud Soldadura a tope en bisel simple con talón de raíz amplio
Alzado Vista lateral efectiva de la soldadura. Adicionalmente, la longitud efectiva de una soldadura en ángulo sujeta
a cualquier solicitación de cálculo no es inferior a 40 mm (J2.2b).
E90XX
Pernos de anclaje SMAW 8 Placa base: 15.9 mm 4) En el detalle de las soldaduras se indica la longitud efectiva del cordón (longitud sobre la cual el
E70XX 4 Ø 19.1 cordón tiene su tamaño completo). Para alcanzar dicha longitud, puede ser necesario prolongar el Soldadura combinada a tope en bisel simple y en ángulo
C

B
SMAW 10 cordón rodeando las esquinas, con el mismo tamaño de cordón.
Mortero de nivelación: 20 mm
40

Sección B - B Sección C - C 5) Las soldaduras en ángulo de uniones en 'T' con ángulos menores que 30° no se consideran como
efectivas para la transmisión de las cargas aplicadas (artículo 2.3.3.4 AWS D1.1/D1.1M:2002).
E70XX
500

SMAW 8 Viga principal


6) En los procesos de fabricación y montaje se deberá cumplir con los requisitos indicados en el Soldadura a tope en bisel simple con lado curvo
320

400

IPE 550
capítulo 5 de AWS D1.1/D1.1M:2002 y capítulo M de ANSI/AISC 360-10. En lo que respecta a la
preparación del metal base, se exige que las superficies sobre las cuales se depositará el metal de
Placa base aportación sean suaves, uniformes, y libres de desgarramientos, fisuras y otras discontinuidades que
Hormigón: f'c=250
40

400x400x15.9 afectarían a la calidad o resistencia de la soldadura. Las superficies a soldar y las superficies
adyacentes a una soldadura, deberán estar también libres de laminillas, escamas, óxido suelto o
Orientar anclaje al centro de la placa adherido, escoria, herrumbre, humedad, aceite, grasa y otros materiales extraños que impidan una
40 320 40
soldadura apropiada o produzcan emisiones perjudiciales.
400

B
Anclaje de los pernos Ø 19.1, COMPROBACIONES:
Sección A - A 109
- La resistencia de cálculo de los cordones de soldadura se determina conforme al artículo J.2.4
A-325 (liso)
ANSI/AISC 360-10.
41

Escala 1:15 - El método utilizado para la comprobación de la resistencia de los cordones de soldadura es aquel
en el que las tensiones calculadas en los cordones (resultante vectorial), se consideran como
tensiones de corte aplicadas sobre el área efectiva (artículo J.2.4 ANSI/AISC 360-10).
Viga secundaria - El área efectiva de un cordón de soldadura es igual al producto de la longitud efectiva del cordón
IPE 140 por el espesor de garganta efectiva (artículo J2.2a ANSI/AISC 360-10).
Detalle del extremo de la viga - Los esfuerzos provenientes de combinaciones sísmicas se han mayorado por un factor igual a
B

secundaria IPE 140 1.375.

C C

Sección A - A

Escala 1:10

PROYECTO: UBICACION : DISEÑÒ: CONTIENE: OBSERVACIONES: PLANO N°:

ING. ELKIN LOZANO ESTR-TITI-CAR-V1


MAT. 13202251194BLV UNIONES ESCALA: FECHA:
INDICADA OCT-2023
MR TITI. CARTAGENA, BOLÍVAR. DISEÑÒ:

ING. ELKIN LOZANO


DIGITALIZÓ:

ING. ELKIN LOZANO


PLANO: TIPO: Civil REV:

MAT. 13202251194BLV MAT. 13202251194BLV


05 05 05 DE RV-1

También podría gustarte