Está en la página 1de 5

SISTEMA DE GESTIÓN INTEGRADO

PROTOCOLO DE CONTROL DE CALIDAD

PROTOCOLO DE RELLENO Y COMPACTACION Disciplina: Civil


Página: 1 de 3
DEPARTAMENTO DE CALIDAD / FIRENO - PROYECTOS Revisión: 1
PROYECTO: Ferrobamba fase 5 Infra
CLIENTE: MINERA LAS BAMBAS .S.A
UBICACIÓN: Apurimac - PERU
LP13692B-0132-0460-DWG-00539_Rev5
PLANO DE REFERENCIA: N° PROTOCOLO: LP13692S-0132-0410-PTC-CRE-000
LP13692B-0132-0460-DWG-00538_Rev2
AREA DE TRABAJO: PLATAFORMA 1 FECHA: 9/13/2023
DESCRIPCIÓN: INSTALACION DE CAMA DE ARENA PARA TUBERIA DE HDP DE 10" ELABORADO POR: Percy Flores Huañap
ACTIVIDAD: LIBERACION DE COLOCACION CAMA DE ARENA PARA TUBERIA DEL SCI 10"-0132-WF-00203-M3F0H-NI
DESCRIPCIÓN ESPECÍFICA:
SEGÚN PLANO (TEÓRICO) EJECUTADO (REAL) DIFERENCIA
DESCRIP. PUNTO RESULTADO
ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z)
1 791346.9487 8440224.1220 3918.201 791346.9417 8440224.1170 3918.207 0.007 0.005 0.006 CONFORME
2 791347.2030 8440222.9506 3918.201 791347.1960 8440222.9476 3918.208 0.007 0.003 0.007 CONFORME
3 791355.2510 8440226.3167 3918.252 791355.2480 8440226.3237 3918.252 0.003 -0.007 0.000 CONFORME
4 791356.0149 8440225.2815 3918.252 791356.0099 8440225.2745 3918.259 0.005 0.007 0.007 CONFORME
5 791361.0810 8440228.3230 3918.362 791361.0780 8440228.3210 3918.368 0.003 0.002 0.006 CONFORME
6 791361.4850 8440227.0800 3918.362 791361.4910 8440227.0760 3918.369 -0.006 0.004 0.007 CONFORME
7 791368.4283 8440230.1012 3918.246 791368.4243 8440230.1082 3918.254 0.004 -0.007 0.008 CONFORME
8 791368.7474 8440228.7747 3918.246 791368.7534 8440228.7707 3918.252 -0.006 0.004 0.006 CONFORME
9 791378.1100 8440232.4300 3918.110 791378.1040 8440232.4270 3918.118 0.006 0.003 0.008 CONFORME
CAMA DE 10 791378.4180 8440231.0340 3918.110 791378.4110 8440231.0310 3918.115 0.007 0.003 0.005 CONFORME
ARENA 11 791388.3990 8440235.0070 3917.945 791388.3950 8440235.0010 3917.951 0.004 0.006 0.006 CONFORME
12 791388.8820 8440233.7570 3917.945 791388.8880 8440233.7610 3917.948 -0.006 -0.004 0.003 CONFORME
13 791399.4864 8440238.0055 3917.778 791399.4794 8440237.9985 3917.785 0.007 0.007 0.007 CONFORME
14 791399.8540 8440236.6460 3917.778 791399.8610 8440236.6430 3917.784 -0.007 0.003 0.006 CONFORME
15 791409.8940 8440240.8200 3917.610 791409.8880 8440240.8230 3917.618 0.006 -0.003 0.008 CONFORME
16 791410.1500 8440239.3900 3917.610 791410.1470 8440239.3950 3917.617 0.003 -0.005 0.007 CONFORME
17 791412.7950 8440241.3400 3917.577 791412.7880 8440241.3460 3917.585 0.007 -0.006 0.008 CONFORME
18 791413.4520 8440239.9410 3917.577 791413.4510 8440239.9440 3917.583 0.001 -0.003 0.006 CONFORME
19 791414.9270 8440231.8230 3917.577 791414.9230 8440231.8210 3917.584 0.004 0.002 0.007 CONFORME
20 791413.6020 8440231.3750 3917.577 791413.6090 8440231.3770 3917.582 -0.007 -0.002 0.005 CONFORME

3819.401

0.30 m.

3819.101

0.30 m.

3818.801

0.30 m.

3818.501
0.30 m.

3818.201

Topógrafo - FIRENO Topógrafo - SUPERVISIÓN


FIRMA: FIRMA:

NOMBRE: NOMBRE:

FECHA: FECHA:

Croquis / Planos / Otros:


El area liberada es de 87.998 m2

Inspeccionado por Supervisor de Campo Supervisor de Construcción Consorcio


QC - FIRENO FIRENO Bisa-R&Q
FIRMA: FIRMA: FIRMA:

NOMBRE: NOMBRE: NOMBRE:

FECHA: FECHA: FECHA:


SISTEMA DE GESTIÓN INTEGRADO
PROTOCOLO DE CONTROL DE CALIDAD

PROTOCOLO DE RELLENO Y COMPACTACION Disciplina: Civil


Página: 1 de 3
DEPARTAMENTO DE CALIDAD / FIRENO - PROYECTOS Revisión: 1

PROYECTO: Ferrobamba fase 5 Infra


CLIENTE: MINERA LAS BAMBAS .S.A
UBICACIÓN: Apurimac - PERU
LP13692B-0132-0460-DWG-00539_Rev5
PLANO DE REFERENCIA: N° PROTOCOLO: LP13692S-0132-0410-PTC-CRE-000
LP13692B-0132-0460-DWG-00538_Rev2
AREA DE TRABAJO: PLATAFORMA 1 FECHA:
DESCRIPCIÓN: INSTALACION DE CAMA DE ARENA PARA TUBERIA DE HDP DE 10" ELABORADO POR: Percy Flores Huañap
ACTIVIDAD: LIBERACION DE COLOCACION 1RA CAPA DE ARENA PARA TUBERIA DEL SCI 10"-0132-WF-00203-M3F0H-NI
DESCRIPCIÓN ESPECÍFICA:
SEGÚN PLANO (TEÓRICO) EJECUTADO (REAL) DIFERENCIA
DESCRIP. PUNTO RESULTADO
ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z)
1 791346.9487 8440224.1220 3918.501 791346.9437 8440224.1160 3918.508 0.005 0.006 0.007 CONFORME
2 791347.2030 8440222.9506 3918.501 791347.2010 8440222.9436 3918.509 0.002 0.007 0.008 CONFORME
3 791355.2510 8440226.3167 3918.552 791355.2480 8440226.3227 3918.558 0.003 -0.006 0.006 CONFORME
4 791356.0149 8440225.2815 3918.552 791356.0099 8440225.2755 3918.559 0.005 0.006 0.007 CONFORME
5 791361.0810 8440228.3230 3918.662 791361.0730 8440228.3160 3918.667 0.008 0.007 0.005 CONFORME
6 791361.4850 8440227.0800 3918.662 791361.4910 8440227.0750 3918.668 -0.006 0.005 0.006 CONFORME
7 791368.4283 8440230.1012 3918.546 791368.4213 8440230.1082 3918.553 0.007 -0.007 0.007 CONFORME
8 791368.7474 8440228.7747 3918.546 791368.7534 8440228.7707 3918.550 -0.006 0.004 0.004 CONFORME
9 791378.1100 8440232.4300 3918.410 791378.1080 8440232.4240 3918.416 0.002 0.006 0.006 CONFORME
RELLENO DE 10 791378.4180 8440231.0340 3918.410 791378.4120 8440231.0270 3918.417 0.006 0.007 0.007 CONFORME
ARENA 11 791388.3990 8440235.0070 3918.245 791388.3950 8440235.0030 3918.253 0.004 0.004 0.008 CONFORME
12 791388.8820 8440233.7570 3918.245 791388.8880 8440233.7610 3918.249 -0.006 -0.004 0.004 CONFORME
13 791399.4864 8440238.0055 3918.078 791399.4814 8440237.9985 3918.084 0.005 0.007 0.006 CONFORME
14 791399.8540 8440236.6460 3918.078 791399.8610 8440236.6400 3918.085 -0.007 0.006 0.007 CONFORME
15 791409.8940 8440240.8200 3917.910 791409.8880 8440240.8250 3917.916 0.006 -0.005 0.006 CONFORME
16 791410.1500 8440239.3900 3917.910 791410.1470 8440239.3950 3917.914 0.003 -0.005 0.004 CONFORME
17 791412.7950 8440241.3400 3917.877 791412.7930 8440241.3460 3917.883 0.002 -0.006 0.006 CONFORME
18 791413.4520 8440239.9410 3917.877 791413.4510 8440239.9460 3917.885 0.001 -0.005 0.008 CONFORME
19 791414.9270 8440231.8230 3917.877 791414.9230 8440231.8190 3917.884 0.004 0.004 0.007 CONFORME
20 791413.6020 8440231.3750 3917.877 791413.6090 8440231.3770 3917.885 -0.007 -0.002 0.008 CONFORME

3818.501
0.30 m.

3818.201

Topógrafo - FIRENO Topógrafo - SUPERVISIÓN


FIRMA: FIRMA:

NOMBRE: NOMBRE:

FECHA: FECHA:

Croquis / Planos / Otros:


El area liberada es de 87.998 m2

Inspeccionado por Supervisor de Campo Supervisor de Construcción Consorcio


QC - FIRENO FIRENO Bisa-R&Q
FIRMA: FIRMA: FIRMA:

NOMBRE: NOMBRE: NOMBRE:

FECHA: FECHA: FECHA:


SISTEMA DE GESTIÓN INTEGRADO
PROTOCOLO DE CONTROL DE CALIDAD

PROTOCOLO DE RELLENO Y COMPACTACION Disciplina: Civil


Página: 1 de 3
DEPARTAMENTO DE CALIDAD / FIRENO - PROYECTOS Revisión: 1

PROYECTO: Ferrobamba fase 5 Infra


CLIENTE: MINERA LAS BAMBAS .S.A
UBICACIÓN: Apurimac - PERU
LP13692B-0132-0460-DWG-00539_Rev5
PLANO DE REFERENCIA: N° PROTOCOLO: LP13692S-0132-0410-PTC-CRE-000
LP13692B-0132-0460-DWG-00538_Rev2
AREA DE TRABAJO: PLATAFORMA 1 FECHA:
DESCRIPCIÓN: INSTALACION DE CAMA DE ARENA PARA TUBERIA DE HDP DE 10" ELABORADO POR: Percy Flores Huañap
ACTIVIDAD: LIBERACION DE COLOCACION 2DA CAPA DE ARENA PARA TUBERIA DEL SCI 10"-0132-WF-00203-M3F0H-NI
DESCRIPCIÓN ESPECÍFICA:
SEGÚN PLANO (TEÓRICO) EJECUTADO (REAL) DIFERENCIA
DESCRIP. PUNTO RESULTADO
ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z)
1 791346.9487 8440224.1220 3918.801 791346.9467 8440224.1190 3918.807 0.002 0.003 0.006 CONFORME
2 791347.2030 8440222.9506 3918.801 791347.1980 8440222.9466 3918.808 0.005 0.004 0.007 CONFORME
3 791355.2510 8440226.3167 3918.852 791355.2450 8440226.3207 3918.857 0.006 -0.004 0.005 CONFORME
4 791356.0149 8440225.2815 3918.852 791356.0199 8440225.2745 3918.859 -0.005 0.007 0.007 CONFORME
5 791361.0810 8440228.3230 3918.962 791361.0760 8440228.3290 3918.968 0.005 -0.006 0.006 CONFORME
6 791361.4850 8440227.0800 3918.962 791361.4820 8440227.0850 3918.970 0.003 -0.005 0.008 CONFORME
7 791368.4283 8440230.1012 3918.846 791368.4313 8440230.0992 3918.852 -0.003 0.002 0.006 CONFORME
8 791368.7474 8440228.7747 3918.846 791368.7434 8440228.7737 3918.851 0.004 0.001 0.005 CONFORME
9 791378.1100 8440232.4300 3918.710 791378.1040 8440232.4340 3918.717 0.006 -0.004 0.007 CONFORME
RELLENO DE 10 791378.4180 8440231.0340 3918.710 791378.4140 8440231.0310 3918.716 0.004 0.003 0.006 CONFORME
ARENA 11 791388.3990 8440235.0070 3918.545 791388.4020 8440235.0110 3918.549 -0.003 -0.004 0.004 CONFORME
12 791388.8820 8440233.7570 3918.545 791388.8840 8440233.7510 3918.551 -0.002 0.006 0.006 CONFORME
13 791399.4864 8440238.0055 3918.378 791399.4834 8440238.0015 3918.385 0.003 0.004 0.007 CONFORME
14 791399.8540 8440236.6460 3918.378 791399.8590 8440236.6420 3918.383 -0.005 0.004 0.005 CONFORME
15 791409.8940 8440240.8200 3918.210 791409.8920 8440240.8250 3918.217 0.002 -0.005 0.007 CONFORME
16 791410.1500 8440239.3900 3918.210 791410.1470 8440239.3950 3918.214 0.003 -0.005 0.004 CONFORME
17 791412.7950 8440241.3400 3918.177 791412.7910 8440241.3460 3918.183 0.004 -0.006 0.006 CONFORME
18 791413.4520 8440239.9410 3918.177 791413.4470 8440239.9460 3918.182 0.005 -0.005 0.005 CONFORME
19 791414.9270 8440231.8230 3918.177 791414.9230 8440231.8210 3918.184 0.004 0.002 0.007 CONFORME
20 791413.6020 8440231.3750 3918.177 791413.6080 8440231.3770 3918.183 -0.006 -0.002 0.006 CONFORME

3818.801

0.30 m.

3818.501
0.30 m.

3818.201

Topógrafo - FIRENO Topógrafo - SUPERVISIÓN


FIRMA: FIRMA:

NOMBRE: NOMBRE:

FECHA: FECHA:

Croquis / Planos / Otros:

Inspeccionado por Supervisor de Campo Supervisor de Construcción Consorcio


QC - FIRENO FIRENO Bisa-R&Q
FIRMA: FIRMA: FIRMA:

NOMBRE: NOMBRE: NOMBRE:

FECHA: FECHA: FECHA:


SISTEMA DE GESTIÓN INTEGRADO
PROTOCOLO DE CONTROL DE CALIDAD

PROTOCOLO DE RELLENO Y COMPACTACION Disciplina: Civil


Página: 1 de 3
DEPARTAMENTO DE CALIDAD / FIRENO - PROYECTOS Revisión: 1

PROYECTO: Ferrobamba fase 5 Infra


CLIENTE: MINERA LAS BAMBAS .S.A
UBICACIÓN: Apurimac - PERU
LP13692B-0132-0460-DWG-00539_Rev5
PLANO DE REFERENCIA: N° PROTOCOLO: LP13692S-0132-0410-PTC-CRE-000
LP13692B-0132-0460-DWG-00538_Rev2
AREA DE TRABAJO: PLATAFORMA 1 FECHA:
DESCRIPCIÓN: INSTALACION DE CAMA DE AGREGADO PARA TUBERIA DE HDP DE 10" ELABORADO POR: Percy Flores Huañap
ACTIVIDAD: LIBERACION DE COLOCACION 1 CAPA DE AGREGADO B-1 PARA TUBERIA DEL SCI 10"-0132-WF-00203-M3F0H-NI
DESCRIPCIÓN ESPECÍFICA:
SEGÚN PLANO (TEÓRICO) EJECUTADO (REAL) DIFERENCIA
DESCRIP. PUNTO RESULTADO
ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z)
1 791346.9487 8440224.1220 3919.101 791346.9417 8440224.1180 3919.107 0.007 0.004 0.006 CONFORME
2 791347.2030 8440222.9506 3919.101 791347.1990 8440222.9446 3919.104 0.004 0.006 0.003 CONFORME
3 791355.2510 8440226.3167 3919.151 791355.2480 8440226.3097 3919.155 0.003 0.007 0.004 CONFORME
4 791356.0149 8440225.2815 3919.151 791356.0199 8440225.2795 3919.157 -0.005 0.002 0.006 CONFORME
5 791361.0810 8440228.3230 3919.262 791361.0780 8440228.3290 3919.270 0.003 -0.006 0.008 CONFORME
6 791361.4850 8440227.0800 3919.262 791361.4790 8440227.0840 3919.269 0.006 -0.004 0.007 CONFORME
7 791368.4283 8440230.1012 3919.146 791368.4343 8440230.0972 3919.150 -0.006 0.004 0.004 CONFORME
8 791368.7474 8440228.7747 3919.146 791368.7424 8440228.7687 3919.152 0.005 0.006 0.006 CONFORME
9 791378.1100 8440232.4300 3919.010 791378.1050 8440232.4340 3919.017 0.005 -0.004 0.007 CONFORME
AGREGADO 10 791378.4180 8440231.0340 3919.010 791378.4120 8440231.0290 3919.015 0.006 0.005 0.005 CONFORME
1-B 11 791388.3990 8440235.0070 3918.845 791388.4020 8440235.0110 3918.851 -0.003 -0.004 0.006 CONFORME
12 791388.8820 8440233.7570 3918.845 791388.8840 8440233.7510 3918.849 -0.002 0.006 0.004 CONFORME
13 791399.4864 8440238.0055 3918.678 791399.4814 8440238.0015 3918.681 0.005 0.004 0.003 CONFORME
14 791399.8540 8440236.6460 3918.678 791399.8590 8440236.6410 3918.685 -0.005 0.005 0.007 CONFORME
15 791409.8940 8440240.8200 3918.510 791409.8880 8440240.8250 3918.516 0.006 -0.005 0.006 CONFORME
16 791410.1500 8440239.3900 3918.510 791410.1450 8440239.3940 3918.517 0.005 -0.004 0.007 CONFORME
17 791412.7950 8440241.3400 3918.477 791412.7920 8440241.3460 3918.481 0.003 -0.006 0.004 CONFORME
18 791413.4520 8440239.9410 3918.477 791413.4460 8440239.9460 3918.480 0.006 -0.005 0.003 CONFORME
19 791414.9270 8440231.8230 3918.477 791414.9250 8440231.8160 3918.482 0.002 0.007 0.005 CONFORME
20 791413.6020 8440231.3750 3918.477 791413.6080 8440231.3800 3918.484 -0.006 -0.005 0.007 CONFORME

3819.101
0.30 m.
3818.801

0.30 m.

3818.501
0.30 m.

3818.201

Topógrafo - FIRENO Topógrafo - SUPERVISIÓN


FIRMA: FIRMA:

NOMBRE: NOMBRE:

FECHA: FECHA:

Croquis / Planos / Otros:

Inspeccionado por Supervisor de Campo Supervisor de Construcción Consorcio


QC - FIRENO FIRENO Bisa-R&Q
FIRMA: FIRMA: FIRMA:

NOMBRE: NOMBRE: NOMBRE:

FECHA: FECHA: FECHA:


SISTEMA DE GESTIÓN INTEGRADO
PROTOCOLO DE CONTROL DE CALIDAD

PROTOCOLO DE RELLENO Y COMPACTACION Disciplina: Civil


Página: 1 de 3
DEPARTAMENTO DE CALIDAD / FIRENO - PROYECTOS Revisión: 1

PROYECTO: Ferrobamba fase 5 Infra


CLIENTE: MINERA LAS BAMBAS .S.A
UBICACIÓN: Apurimac - PERU
LP13692B-0132-0460-DWG-00539_Rev5
PLANO DE REFERENCIA: N° PROTOCOLO: LP13692S-0132-0410-PTC-CRE-000
LP13692B-0132-0460-DWG-00538_Rev2
AREA DE TRABAJO: PLATAFORMA 1 FECHA:
DESCRIPCIÓN: INSTALACION DE CAMA DE AGREGADO PARA TUBERIA DE HDP DE 10" ELABORADO POR: Percy Flores Huañap
ACTIVIDAD: LIBERACION DE COLOCACION 2 CAPA DE AGREGADO 1B PARA TUBERIA DEL SCI 10"-0132-WF-00203-M3F0H-NI
DESCRIPCIÓN ESPECÍFICA:
SEGÚN PLANO (TEÓRICO) EJECUTADO (REAL) DIFERENCIA
DESCRIP. PUNTO RESULTADO
ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z) ESTE (x) NORTE (y) COTA (z)
1 791346.9487 8440224.1220 3919.401 791346.9417 8440224.1180 3919.407 0.007 0.004 0.006 CONFORME
2 791347.2030 8440222.9506 3919.401 791347.1990 8440222.9446 3919.408 0.004 0.006 0.007 CONFORME
3 791355.2510 8440226.3167 3919.451 791355.2480 8440226.3097 3919.459 0.003 0.007 0.008 CONFORME
4 791356.0149 8440225.2815 3919.451 791356.0199 8440225.2795 3919.458 -0.005 0.002 0.007 CONFORME
5 791361.0810 8440228.3230 3919.562 791361.0780 8440228.3290 3919.569 0.003 -0.006 0.007 CONFORME
6 791361.4850 8440227.0800 3919.562 791361.4790 8440227.0840 3919.570 0.006 -0.004 0.008 CONFORME
7 791368.4283 8440230.1012 3919.446 791368.4343 8440230.0972 3919.453 -0.006 0.004 0.007 CONFORME
8 791368.7474 8440228.7747 3919.446 791368.7424 8440228.7687 3919.451 0.005 0.006 0.005 CONFORME
9 791378.1100 8440232.4300 3919.310 791378.1050 8440232.4340 3919.318 0.005 -0.004 0.008 CONFORME
AGREGADO 10 791378.4180 8440231.0340 3919.310 791378.4120 8440231.0290 3919.317 0.006 0.005 0.007 CONFORME
1-B 11 791388.3990 8440235.0070 3919.145 791388.4020 8440235.0110 3919.150 -0.003 -0.004 0.005 CONFORME
12 791388.8820 8440233.7570 3919.145 791388.8840 8440233.7510 3919.151 -0.002 0.006 0.006 CONFORME
13 791399.4864 8440238.0055 3918.978 791399.4814 8440238.0015 3918.985 0.005 0.004 0.007 CONFORME
14 791399.8540 8440236.6460 3918.978 791399.8590 8440236.6410 3918.986 -0.005 0.005 0.008 CONFORME
15 791409.8940 8440240.8200 3918.810 791409.8880 8440240.8250 3918.818 0.006 -0.005 0.008 CONFORME
16 791410.1500 8440239.3900 3918.810 791410.1450 8440239.3940 3918.817 0.005 -0.004 0.007 CONFORME
17 791412.7950 8440241.3400 3918.777 791412.7920 8440241.3460 3918.784 0.003 -0.006 0.007 CONFORME
18 791413.4520 8440239.9410 3918.777 791413.4460 8440239.9460 3918.783 0.006 -0.005 0.006 CONFORME
19 791414.9270 8440231.8230 3918.777 791414.9250 8440231.8160 3918.785 0.002 0.007 0.008 CONFORME
20 791413.6020 8440231.3750 3918.777 791413.6080 8440231.3800 3918.783 -0.006 -0.005 0.006 CONFORME

3819.401

0.30 m.

3819.101
0.30 m.
3818.801

0.30 m.

3818.501
0.30 m.

3818.201

Topógrafo - FIRENO Topógrafo - SUPERVISIÓN


FIRMA: FIRMA:

NOMBRE: NOMBRE:

FECHA: FECHA:

Croquis / Planos / Otros:

Inspeccionado por Supervisor de Campo Supervisor de Construcción Consorcio


QC - FIRENO FIRENO Bisa-R&Q
FIRMA: FIRMA: FIRMA:

NOMBRE: NOMBRE: NOMBRE:

FECHA: FECHA: FECHA: