"MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA N° 32741 DE LA LOCALIDAD DE ANDAHUAYLLA,

DISTRITO DE AMBO -PROVINCIA DE AMBO - REGION HUANUCO"

Parcial PROGRAMACION
Item Descripción Und.
(S/.) MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
01 ESTRUCTURAS 1,405,326.78 5,791.55 10,121.33 13,841.30 6,793.99 1,282.53 386.00

TOTALES
02 ARQUITECTURA 574,352.66 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

03 INSTALACIONES SANITARIAS 43,711.92 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

04 INSTALACIONES ELECTRICAS Y COMUNICACIONES 128,186.15 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

05 MODULO 11: PLAN DE MANEJO AMBIENTAL 11,640.51 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

COSTO DIRECTO S/. 2,163,218.02 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
GASTOS GENERALES (8%) S/. 173,057.44 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
UTILIDAD (7%) S/. 151,425.26 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
SUB TOTAL S/. 2,487,700.72 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?

IMPUESTO GENERAL A LAS VENTAS (18%) S/. 447,786.13 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
COSTO TOTAL DE LA OBRA S/. 2,935,486.85 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
S/. 0.00
PORCENTAJE DE AVANCE 100.00% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
"CONSTRUCCION DEL MURO DE CONTENCION EN LA PARTE POSTERIOR DEL LOCAL MULTIUSOS EN LA LOCALIDAD DE VILLA RETAMA,
DISTRITO DE SHUNQUI - DOS DE MAYO - HUANUCO"

Precio PROGRAMACION
Item Descripción Und. Metrado Parcial (S/.)
(S/.) SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6
01 ESTRUCTURAS: MURO DE CONTENCION 38,147.70
01.01. OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 5,551.84
01.01.01 OBRAS PROVISIONALES 2,305.88
01.01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA 2.40 X 3.60 M und 1.00 785.96 785.96 500.00 285.96
01.01.01.02 ACONDICIONAMIENTO DE ALMACEN Y GUARDIANIA m2 20.00 59.28 1,185.60 1,185.60
01.01.01.03 CERCO PERIMETRICO PROVISIONAL m 12.00 27.86 334.32 334.32
01.01.02 TRABAJOS PRELIMINARES 2,671.60
01.01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 24.00 0.78 18.72 87.72
01.01.02.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 24.00 3.78 90.72 50.00 40.72
01.01.02.03 REPLANTEO DURANTE EL PROCESO m2 24.00 2.59 62.16 10.00 10.00 10.00 10.00 10.00 12.16
01.01.02.04 FLETE TRANSPORTE DE MATERIALES A OBRA glb 1.00 2,500.00 2,500.00 1,500.00 1,000.00
01.01.03 SEGURIDAD Y SALUD 574.36
01.01.03.01 EQUIPOS DE PROTECCION INDIVIDUAL und 10.00 34.50 345.00 100.00 50.00 50.00 50.00 50.00 45.00
01.01.03.02 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 174.76 174.76 100.00 50.00 20.00 4.76
01.01.03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 54.60 54.60 10.00 10.00 10.00 10.00 10.00 4.60
01.02. MOVIMIENTO DE TIERRAS 8792.54
01.02.01 CORTE Y NIVELACION DE TERRENO CON MAQUINARIA m3 14.40 85.28 1,228.03 614.02 614.02
EXCAVACION MANUAL PARA MUROS DE CONTENCION EN
01.02.02 m3 51.30 42.64 2,187.43 1,093.72 1,093.72
TERRENO NORMAL
RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO
01.02.03 m3 82.95 24.40 2,023.98 1,011.99 1,011.99
(MATERIAL PROPIO)
01.02.04 FLITRO CON GRAVA DE 3/4" A 1" m3 10.44 99.22 1,035.86 500.00 535.86
01.02.05 ELIMINACION DE MATERIAL EXCEDENTE D/PROM = 30m m3 65.70 35.27 2,317.24 1,000.00 1,317.24
01.03. OBRAS DE CONCRETO SIMPLE 706.18
01.03.01 SOLADOS 706.18
01.03.01.01 SOLADO PARA ZAPATAS DE 4" , F´C=100 KG/CM2 m2 28.80 24.52 706.18 206.18 500.00
01.04. OBRAS DE CONCRETO ARMADO 22512.50
01.04.01 ZAPATAS DE MUROS DE CONCRETO ARMADO 7,517.95
01.04.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 14.40 331.85 4,778.64 778.64 4,000.00
01.04.01.02 ACERO EN ZAPATAS F'Y=4,200 Kg/cm2 GRADO 60 kg 537.12 5.10 2,739.31 2,000.00 739.31
01.04.02 PANTALLAS DE MUROS DE CONCRETO ARMADO 14,994.55
01.04.02.01 CONCRETO EN PANTALLA f'c=210 kg/cm2 m3 13.80 388.85 5,366.13 2,500.00 2,866.13
01.04.02.02 ACERO EN PANTALLAS F'Y=4200 Kg/cm2 GRADO 60 kg 916.92 5.10 4,676.29 2,676.29 2,000.00
01.04.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN PANTALLA m2 103.32 47.93 4,952.13 2,000.00 2,000.00 952.13
01.05. DRENAJE 10.40
01.05.01 TUBERIA PVC SAL D=2", PARA DRENAJE m 2.00 5.20 10.40 10.40
01.06. REVOQUES ENLUCIDOS Y MOLDADURAS 549.94
01.06.01 PANTALLAS DE MUROS DE CONCRETO ARMADO 549.94
01.06.01.01 SOLAQUEADO CON CEMENTO - ARENA - CAL EN PANTALLA m2 45.60 12.06 549.94 250.00 299.94
01.07. VARIOS 24.30
"CONSTRUCCION DEL MURO DE CONTENCION EN LA PARTE POSTERIOR DEL LOCAL MULTIUSOS EN LA LOCALIDAD DE VILLA RETAMA,
DISTRITO DE SHUNQUI - DOS DE MAYO - HUANUCO"

Precio PROGRAMACION
Item Descripción Und. Metrado Parcial (S/.)
(S/.) SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6
01.07.01 JUNTAS DE DILATACION CON TEKNOPOR E=2" m2 8.74 2.78 24.30 24.30

COSTO DIRECTO S/. 38,147.70 S/. 5,791.55 S/. 10,121.33 S/. 13,841.30 S/. 6,793.99 S/. 1,282.53 S/. 386.00
GASTOS GENERALES (10 %) S/. 3,814.77 S/. 579.16 S/. 1,012.13 S/. 1,384.13 S/. 679.40 S/. 128.25 S/. 38.60
SUB TOTAL S/. 41,962.47 S/. 6,370.71 S/. 11,133.46 S/. 15,225.43 S/. 7,473.39 S/. 1,410.78 S/. 424.60
IMPUESTO GENERAL A LAS VENTAS (18%) S/. 7,553.24 S/. 1,146.73 S/. 2,004.02 S/. 2,740.58 S/. 1,345.21 S/. 253.94 S/. 76.43
COSTO TOTAL DE LA OBRA S/. 49,515.71 S/. 7,517.44 S/. 13,137.48 S/. 17,966.01 S/. 8,818.60 S/. 1,664.72 S/. 501.03

PORCENTAJE DE AVANCE 100.00% 15.18% 26.53% 36.28% 17.81% 3.36% 1.01%