CÁLCULO DE ADELANTO DE MATERIALES

Obra: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL NIVEL INICIAL, PRIMARIA Y SECUNDARIA, EN LA IE N° 11601 OJO DE TORO EN EL
CASERIO EL PROGRESO ALTO, DISTRITO DE JAYANCA-LAMBAYEQUE”
Valor Referencial: 4,302,306.30 Proceso: LP-05-2018-GR.LAMB
Valor Contratado: 4,095,795.60 Contrato de Obra 008-2018-GR.LAMB/ORAD
Factor de Relación: 0.9520 Residente: Ing. Domingo Jorge Luis Dávila Vidarte

ADELANTO SOLICITADO - MATERIALES FIANZA CF N° E1375-00-2018 SECREX CESCE


Monto Solicitado: 819,159.12 C/IGV
694,202.64 S/IGV 10087.5%

Costo Directo: 3,101,623.38 S/IGV IU39 473.17 -0.8749%


4095795.6 3471013.2203 477.31 -4.14

K= 0.316*(Mr/Mo)+0.153*(Car/Cao)+0.069*(Bar/Bao)+0.142*(Mr/Mo)+0.320*(Ir/Io)
IU03 767.7
MONOMIO FACTOR PORCENTAJE SIMBOLO INDICE DESCRIPCION 679.83
1 0.316 100.000% M 47 MANO DE OBRA
2 0.153 32.680% 03 ACERO DE CONTRUCCION
67.320% CA 21 CEMENTO PORTLAND TIPO I
3 0.069 23.188% 07 ALAMBRE Y CABLE TIPO TW Y THW
76.812% BA 17 BLOQUE Y LADRILLO
4 0.142 100.000% M 48 MAQUINARIA Y EQUIPO NACIONAL
5 0.320 100.000% I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR
1.000
Monto Maximo Para Solicitar Asfalto:

Monto Maximo = C.I. x % INCIDENCIA x SALDO BRUTO A VALORIZAR x F.R. x Ima / Imo

DESCRIPCION CI % INCIDENCIA SALDO F.R. Ima Imo MONTO MAXIMO


CEMENTO PORTLAND 0.153 67.320% 3,101,623.38 0.9520 476.04 465.71 310,877.60
ACERO DE CONSRTUCCION 0.153 32.680% 3,101,623.38 0.9520 512.37 460.39 164,307.47
BLOQUE Y LADRILLO 0.069 76.812% 3,101,623.38 0.9520 622.77 628.23 155,136.21
ALAMBRE Y CABLE TIPO TW 0.069 23.188% 3,101,623.38 0.9520 685.35 620.15 52,210.04
MADERA 0.142 9.010% 3,101,623.38 0.9520 369.08 366.02 38,093.85
720,625.17
MONTOS MAXIMOS A SOLICITAR
ACERO DE CONTRUCCION
IU: 03 Ima(JULIO '18): 512.37 Imo(AGOSTO '17): 460.39
Monto Maximo: 164,307.47
Monto Solicitado: 164,307.47 (S/IGV)

CEMENTO PORTLAND TIPO I


IU: 21 Ima(JULIO '18): 476.04 Imo(AGOSTO '17): 465.71
Monto Maximo: 310,877.60
Monto Solicitado: 310,877.60 (S/IGV)

BLOQUE Y LADRILLO
IU: 17 Ima(JULIO '18): 622.77 Imo(AGOSTO '17): 628.23
Monto Maximo: 155,136.21
Monto Solicitado: 155,136.21 (S/IGV)

ALAMBRE
IU: 17 Ima(JULIO '18): 685.35 Imo(AGOSTO '17): 620.15
Monto Maximo: 52,210.04
Monto Solicitado: 52,210.04 (S/IGV)

MADERA
IU: 17 Ima(JULIO '18): 369.08 Imo(AGOSTO '17): 366.02
Monto Maximo: 38,093.85
Monto Solicitado: 11,671.31 (S/IGV)

Total Solicitado: 694,202.64 (S/IGV)


819,159.12 (C/IGV)
-87.87
-12.93%
ADELANTO DE MATERIALES
Obra: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL NIVEL INICIAL, PRIMARIA Y SECUNDARIA
CASERIO EL PROGRESO ALTO, DISTRITO DE JAYANCA-LAMBA
Valor Referencial: 4,302,306.30 Proceso:
Valor Contratado: 4,095,795.60 Contrato de Obra 008-2018-GR.LAMB/ORAD
Factor de Relación: 0.9520 Residente:

ADELANTO SOLICITADO - MATERIALES FIANZA CF N° E1375-00-2018 SECREX CESCE


Monto Solicitado: 819,159.12 C/IGV
694,202.64 S/IGV

Costo Directo: 3,101,623.38 S/IGV


4095795.6 3471013.2203

K= 0.316*(Mr/Mo)+0.153*(Car/Cao)+0.069*(Bar/Bao)+0.142*(Mr/Mo)+0.320*(I

MONOMIO FACTOR PORCENTAJE SIMBOLO INDICE


1 0.316 100.000% M 47
2 0.153 32.680% 03
67.320% CA 21
3 0.069 23.188% 07
76.812% BA 17
4 0.142 100.000% M 48
5 0.320 100.000% I 39
1.000
Monto Maximo Para Solicitar Asfalto:

Monto Maximo = C.I. x % INCIDENCIA x SALDO BRUTO A VALORIZAR x F.R. x Ima / Imo

DESCRIPCION CI % INCIDENCIA SALDO F.R.


CEMENTO PORTLAND 0.153 67.320% 3,101,623.38 0.9520
ACERO DE CONSRTUCCION 0.153 32.680% 3,101,623.38 0.9520
BLOQUE Y LADRILLO 0.069 76.812% 3,101,623.38 0.9520
ALAMBRE Y CABLE TIPO TW 0.069 23.188% 3,101,623.38 0.9520
MADERA 0.142 9.010% 3,101,623.38 0.9520

MONTOS MAXIMOS A SOLICITAR


ACERO DE CONTRUCCION
IU: 03 Ima(JULIO '18): 512.37 Imo(AGOSTO '17):
Monto Maximo: 164,307.47
Monto Solicitado: 164,307.47 (S/IGV)

CEMENTO PORTLAND TIPO I


IU: 21 Ima(JULIO '18): 476.04 Imo(AGOSTO '17):
Monto Maximo: 310,877.60
Monto Solicitado: 310,877.60 (S/IGV)

BLOQUE Y LADRILLO
IU: 17 Ima(JULIO '18): 622.77 Imo(AGOSTO '17):
Monto Maximo: 155,136.21
Monto Solicitado: 155,136.21 (S/IGV)

ALAMBRE
IU: 17 Ima(JULIO '18): 685.35 Imo(AGOSTO '17):
Monto Maximo: 52,210.04
Monto Solicitado: 52,210.04 (S/IGV)

MADERA
IU: 17 Ima(JULIO '18): 369.08 Imo(AGOSTO '17):
Monto Maximo: 38,093.85
Monto Solicitado: 11,671.31 (S/IGV)

Total Solicitado: 694,202.64 (S/IGV)


819,159.12 (C/IGV)
MATERIALES

EL INICIAL, PRIMARIA Y SECUNDARIA, EN LA IE N° 11601 OJO DE TORO EN EL


ALTO, DISTRITO DE JAYANCA-LAMBAYEQUE”
LP-05-2018-GR.LAMB
de Obra 008-2018-GR.LAMB/ORAD
Ing. Domingo Jorge Luis Dávila Vidarte VP 4,095,795.60
SUB TOTAL 3,471,013.22
2018 SECREX CESCE

9*(Bar/Bao)+0.142*(Mr/Mo)+0.320*(Ir/Io)

DESCRIPCION
MANO DE OBRA
ACERO DE CONTRUCCION
CEMENTO PORTLAND TIPO I
ALAMBRE Y CABLE TIPO TW Y THW
BLOQUE Y LADRILLO
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 3,101,623.38

IZAR x F.R. x Ima / Imo

Ima Imo MONTO MAXIMO


476.04 465.71 310,877.60
512.37 460.39 164,307.47
622.77 628.23 155,136.21 CEMENTO PORTLAND TIPO Ic
685.35 620.15 52,210.04 CEMENTO PORTLAND TIPO M
369.08 366.02 38,093.85
720,625.17
ACERO CORRUGADO fy=4200

460.39
LADRILLO PARA TECHO 15 X 3
LADRILLO PASTELERO 24 X 24
LADRILLO CORRIENTE 6 X 12
LADRILLO CARAVISTA 9 X 13 X
465.71 LADRILLO KK TIPO IV 23X

628.23 MADERA DE CEDRO (p2)


MELAMINE 18MM (1.50x2.50)

620.15

366.02
1,096,840.18 MANO DE OBRA
531,065.02 ACERO DE CONTRUCCION
239,499.91 BLOQUE Y LADRILLO
492,883.88 MAQUINARIA Y EQUIPO NACIONAL
1,110,724.23 INDICE GENERAL DE PRECIOS AL CONSUMIDOR

bls 10,418.1084 19.75 205,757.64 195,881.27


bls 5,405.3490 19.75 106,755.64 101,631.37
-
-
kg 88,772.6477 2.34 207,728.00 197,757.06
70,216.87 -
-
u 14,144.3295 1.80 25,459.79 24,237.72
u 17,120.8700 0.51 8,731.64 8,312.52
u 271.4400 0.60 162.86 155.04
u 19,428.3600 0.60 11,657.02 11,097.48
u 89,545.9500 0.65 58,204.87 55,411.04
-

-
p2 6,117.94 6.80 41,601.99 39,605.09
u 74.55 28.00 2,087.40 1,987.20
636,075.80

Descripción Und. Cantidad Precio S/. Parcial S/.


ACERO CORRU kg 88,772.65 2.34 207,728.00
CEMENTO POR bls 10,418.11 19.75 205,757.64
CEMENTO PO bls 5,405.35 19.75 106,755.64
LADRILLO PA u 14,144.33 1.80 25,459.79
LADRILLO PA u 17,120.87 0.51 8,731.64
LADRILLO COR u 271.44 0.60 162.86
LADRILLO CA u 19,428.36 0.60 11,657.02
LADRILLO KK u 89,545.95 0.65 58,204.87
CALCULO DE ADELANTO DE MATERIALES
Obra: “MEJORAMIENTO DEL SERVICIO EDUCATIVO EN EL NIVEL INICIAL, PRIMARIA Y SECUNDARIA
CASERIO EL PROGRESO ALTO, DISTRITO DE JAYANCA-LAMBA
Valor Referencial: 4,302,306.30 Proceso:
Valor Contratado: 4,095,795.60 Contrato de Obra 008-2018-GR.LAMB/ORAD
Factor de Relación: 1.0000 Residente:

ADELANTO SOLICITADO - MATERIALES FIANZA CF N° E1375-00-2018 SECREX CESCE


Monto Solicitado: 819,159.12 C/IGV
694,202.64 S/IGV

Costo Directo: 3,101,623.38 S/IGV


4,095,795.60 3471013.2203

K= 0.316*(Mr/Mo)+0.153*(Car/Cao)+0.069*(Bar/Bao)+0.142*(Mr/Mo)+0.320*(I

MONOMIO FACTOR PORCENTAJE SIMBOLO INDICE


1 0.316 100.000% M 47
2 0.153 32.680% 03
67.320% CA 21
3 0.069 23.188% 07
76.812% BA 17
4 0.142 100.000% M 48
5 0.320 100.000% I 39
1.000
Monto Maximo Para Solicitar Asfalto:

Monto Maximo = C.I. x % INCIDENCIA x SALDO BRUTO A VALORIZAR x F.R. x Ima / Imo

DESCRIPCION CI % INCIDENCIA SALDO F.R.


CEMENTO PORTLAND 0.153 67.320% 3,101,623.38 1.0000
ACERO DE CONSRTUCCION 0.153 32.680% 3,101,623.38 1.0000
BLOQUE Y LADRILLO 0.069 76.812% 3,101,623.38 1.0000
ALAMBRE Y CABLE TIPO TW 0.069 23.188% 3,101,623.38 1.0000
MADERA 0.142 9.010% 3,101,623.38 1.0000

MONTOS MAXIMOS A SOLICITAR


ACERO DE CONTRUCCION
IU: 03 Ima(JULIO '18): 512.37 Imo(AGOSTO '17):
Monto Maximo: 172,591.88
Monto Solicitado: 172,591.88 (S/IGV)

CEMENTO PORTLAND TIPO I


IU: 21 Ima(JULIO '18): 476.04 Imo(AGOSTO '17):
Monto Maximo: 326,552.10
Monto Solicitado: 326,552.10 (S/IGV)

BLOQUE Y LADRILLO
IU: 17 Ima(JULIO '18): 622.77 Imo(AGOSTO '17):
Monto Maximo: 162,958.21
Monto Solicitado: 162,958.21 (S/IGV)

ALAMBRE
IU: 17 Ima(JULIO '18): 685.35 Imo(AGOSTO '17):
Monto Maximo: 54,842.48
Monto Solicitado: 32,100.45 (S/IGV)

MADERA
IU: 17 Ima(JULIO '18): 369.08 Imo(AGOSTO '17):
Monto Maximo: 40,014.55
Monto Solicitado: 0.00 (S/IGV)

Total Solicitado: 694,202.64 (S/IGV)


819,159.12 (C/IGV)
O DE MATERIALES

EL INICIAL, PRIMARIA Y SECUNDARIA, EN LA IE N° 11601 OJO DE TORO EN EL


ALTO, DISTRITO DE JAYANCA-LAMBAYEQUE”
LP-05-2018-GR.LAMB
de Obra 008-2018-GR.LAMB/ORAD
Ing. Domingo Jorge Luis Dávila Vidarte VP 4,095,795.60
SUB TOTAL 3,471,013.22
2018 SECREX CESCE

9*(Bar/Bao)+0.142*(Mr/Mo)+0.320*(Ir/Io)

DESCRIPCION
MANO DE OBRA
ACERO DE CONTRUCCION
CEMENTO PORTLAND TIPO I
ALAMBRE Y CABLE TIPO TW Y THW
BLOQUE Y LADRILLO
MAQUINARIA Y EQUIPO NACIONAL
INDICE GENERAL DE PRECIOS AL CONSUMIDOR 3,101,623.38

IZAR x F.R. x Ima / Imo

Ima Imo MONTO MAXIMO


476.04 465.71 326,552.10
512.37 460.39 172,591.88
622.77 628.23 162,958.21 CEMENTO PORTLAND TIPO Ic
685.35 620.15 54,842.48 CEMENTO PORTLAND TIPO M
369.08 366.02 40,014.55
756,959.21
62,199.91 ACERO CORRUGADO fy=4200

460.39
LADRILLO PARA TECHO 15 X 3
LADRILLO PASTELERO 24 X 24
LADRILLO CORRIENTE 6 X 12
LADRILLO CARAVISTA 9 X 13 X
465.71 LADRILLO KK TIPO IV 23X

628.23 MADERA DE CEDRO (p2)


MELAMINE 18MM (1.50x2.50)

620.15
-22742.029
9358.4255

366.02
1,096,840.18 MANO DE OBRA
531,065.02 ACERO DE CONTRUCCION
239,499.91 BLOQUE Y LADRILLO
492,883.88 MAQUINARIA Y EQUIPO NACIONAL
1,110,724.23 INDICE GENERAL DE PRECIOS AL CONSUMIDOR

bls 10,418.1084 19.75 205,757.64 195,881.27


bls 5,405.3490 19.75 106,755.64 101,631.37 297,512.64
-
-
kg 88,772.6477 2.34 207,728.00 197,757.06
73,757.21 -
-
u 14,144.3295 1.80 25,459.79 24,237.72
u 17,120.8700 0.51 8,731.64 8,312.52
u 271.4400 0.60 162.86 155.04
u 19,428.3600 0.60 11,657.02 11,097.48
u 89,545.9500 0.65 58,204.87 55,411.04 99,213.80
-

-
p2 6,117.94 6.80 41,601.99 39,605.09
u 74.55 28.00 2,087.40 1,987.20 41,592.30
636,075.80

Descripción Und. Cantidad Precio S/. Parcial S/.


ACERO CORRU kg 88,772.65 2.34 207,728.00
CEMENTO POR bls 10,418.11 19.75 205,757.64
CEMENTO PO bls 5,405.35 19.75 106,755.64
LADRILLO PA u 14,144.33 1.80 25,459.79
LADRILLO PA u 17,120.87 0.51 8,731.64
LADRILLO COR u 271.44 0.60 162.86
LADRILLO CA u 19,428.36 0.60 11,657.02
LADRILLO KK u 89,545.95 0.65 58,204.87
IU MAT Y EQUI CD 100 83.33%
IU 39 GG 10 16.67%
IU 39 UTIL 10
SUB TOTAL 120
IGV 18% 21.6
TOTAL 141.6

OFERTA OFERTA 134.8032


IGV 18% 20.5632
SUB TOTAL 114.24
GG UTI 14.24
CD 100
K= 83.30% CDr/Cdo + 16.70% GGUUr/GGUo

k= 87.54% CDr/Cdo+ 12.46% GGUUr/GGUUo