COSTO HORARIO DE POSESION

COSTO HORARIO MAQUINARIA

DATOS r=
Vi 166,762,097 CLP netos
Vr 16,676,210 CLP netos 10% de Vi
n 10
hrs vida útil 20,000 hrs
hrs anuales trabajo 2,000 hrs

Método Depreciación Lineal Método de Depreciación L


Dlanual (Vi - Vr) / n ´DLanual = (Vi – Vr)

Dlanual 15,008,589 CLP


Aplicar criterio más cons
DLH 7504.294365 CLP/hr (1)

IAM Invesión Anual Media

Método de Depreciación lineal


n Vij = Invj Vr Dj Vrj
0 166,762,097
1 166,762,097 16,676,210 15,008,589 151,753,508
2 151,753,508 16,676,210 15,008,589 136,744,920
3 136,744,920 16,676,210 15,008,589 121,736,331
4 121,736,331 16,676,210 15,008,589 106,727,742
5 106,727,742 16,676,210 15,008,589 91,719,153
6 91,719,153 16,676,210 15,008,589 76,710,565
7 76,710,565 16,676,210 15,008,589 61,701,976
8 61,701,976 16,676,210 15,008,589 46,693,387
9 46,693,387 16,676,210 15,008,589 31,684,798
10 31,684,798 16,676,210 15,008,589 16,676,210

SUMA Vij 992,234,477 CLP 150,085,887 SUMA Dij

Prom Vij = IAM 99,223,448 CLP/año 15,008,589 Prom Dij

IAM
IAM 99,223,448 CLP/año

Interés de Capital Interés alternativo

Ianual IAM x r

Ianual 14,883,517.2 CLP/año

IH 7441.76 CLP/hr (2)

Seguros

Sanual 5,457,289.62 CLP/año

SH 2,728.64 CLP/hr (3)

impuestos

ianual 1,984,468.95 CLP/año

iH 992.23 CLP/hr (4)

Almacenaje

Aanual 1,488,351.72 CLP/año

AH 744.18 CLP/hr (5)

CPH DH + IH + SH

CHP 19,411.11 CLP/hr


Método de Depreciación lineal

COSTO HORARIO DE OPERACIÓN

MANTENIMIENTO Y REPARACION (6)

CM = CMO+CMR
CMO Costo de Mano de Obras
CMR Coste de Repuestos

CM = 50% a 100% Vi Condiciones Severas -Criterio conservador, CM = 95% Vi


CM = 158,423,992.15 CM= 7921.19961

COMBUSTIBLE (7)

CC= CE (lt/hr) x PC ($/lt) CC = 50,459.20 CLP /hr

CE Consumo del Equipo Consumo Alto 45 a 49 (lt/hr) CE= 47 (lt/hr)


PC Precio Combustible Precio combustible PC = 1,073.60 ($/lt)

LUBRICANTES (8)

CL = 10% a 15 % CC Criterio conservador CL= 15% CC

CL = 7,568.88 CLP/hr

GRASAS (9)

CG = Cg * PG CG= 0,5 kg/hr CG= 2,837.01

Cg Consumo de grasas Cg = 0.568 (lt/hr)


Precio Grasas Precio Grasas 89,990.00 en 15.86 (kg)
Kg grasa= 5,674.02

FILTROS (10)

CF=(0,2 a 0,3) *(CC+CL) CF= 17,408.42

CC Costo Combustible
CL Costo Lubricante

TREN DE AVANCE (NEUMATICOS U ORUGAS) (11)

CN = Cn / Vida util CN= 1/4 Vi CN= 41,690,524.25


CN= 20845.262125
Cn Costo Neumatico
Vida util den horas, condiciones severas 2000 hrs

Pierzas de desgaste (12)

CPD = Cpd / Vida util CPD= 1/5 Vi CPD= 33,352,419.40


CPD= 16676.2097
Cpd Costo Piezas de Desgaste
Vida util den horas, condiciones severas 2000 hrs

Costo de Operador (13)

COP= Leyes Sociales + S Bruto COP= 15,000.00 hr

COP 135,879.18 CLP/hr


Tasa anual de descuento ( r ) 15% dado que no hay otra información

Seguros 5.5% IAM dado que no hay otra información

impuestos 1 a 2% IAM 2% IAM criterio conservador y no hay más datos

Almacenaje 1 a 1,5% IAM 1.50% IAM criterio conservador y no hay más datos
Método de Depreciación Lineal
´DLanual = (Vi – Vr)/n, K´= (DLanual / (Vi-Vr))

K´ = 1/n
plicar criterio más conservador
K´ = 0.1
K´ = 0.1

Se conoce como método de depreciación acelerada


´Dp= K * (Vij – Vr), K = 2K´
K= 0.2
Método de Depreciación Porcentaje Constante
n Vij = Invj Vr Dj Vrj
0 166,762,097
1 166,762,097 16,676,210 30,017,177 136,744,920
2 136,744,920 16,676,210 24,013,742 112,731,178
3 112,731,178 16,676,210 19,210,994 93,520,184
4 93,520,184 16,676,210 15,368,795 78,151,389
5 78,151,389 16,676,210 12,295,036 65,856,353
6 65,856,353 16,676,210 9,836,029 56,020,325
7 56,020,325 16,676,210 7,868,823 48,151,502
8 48,151,502 16,676,210 6,295,058 41,856,443
9 41,856,443 16,676,210 5,036,047 36,820,396
10 36,820,396 16,676,210 4,028,837 32,791,559

SUMA Vij 836,614,786 SUMA Dij 133,970,538 CLP

Prom Vij = IAM 83,661,479 Prom Dij 13,397,054 CLP/año

Depreciación

DH 6698.53 CLP/hr (1)


IAM 83,661,479 CLP/año

Interés de CapitaInterés alternativo

Ianual IAM x r

Ianual 12,549,221.79 CLP/año

IH 6,274.61 CLP/hr (2)

Seguros

Sanual 4,601,381.32 CLP/año

SH 2,300.69 CLP/hr (3)

impuestos

ianual 1,673,229.57 CLP/año

iH 836.61 CLP/hr (4)

Almacenaje

Aanual 1,254,922.18 CLP/año

AH 627.46 CLP/hr (5)

+ CPH + AH

CHP 16,737.90 CLP/hr


Método de Depreciación Porcentaje Constante
hr

Estimacion al no tener el valor se esta estimando en 1/4 del precio de la maquina

Estimacion al no tener el valor se esta estimando en 1/5 del precio de la maquina


De acuerdo a una cotizacion de una integrante se obtiene el valor
y más datos

y más datos

Se conoce como método de depreciación acelerada


n
Método de Depreciación por Suma de Años Dígito
n Vij = Invj Vr Dj Vrj Suma de años dígito
0 166,762,097
1 166,762,097 16,676,210 27,288,343 139,473,754 1
2 139,473,754 16,676,210 24,559,509 114,914,245 2
3 114,914,245 16,676,210 21,830,675 93,083,571 3
4 93,083,571 16,676,210 19,101,840 73,981,730 4
5 73,981,730 16,676,210 16,373,006 57,608,724 5
6 57,608,724 16,676,210 13,644,172 43,964,553 6
7 43,964,553 16,676,210 10,915,337 33,049,216 7
8 33,049,216 16,676,210 8,186,503 24,862,713 8
9 24,862,713 16,676,210 5,457,669 19,405,044 9
10 19,405,044 16,676,210 2,728,834 16,676,210 10
Suma 55
SUMA Vij 767,105,646 SUMA Dij 150,085,887 CLP

Prom Vij = IAM 76,710,565 Prom Dij 15,008,589 CLP/año

Depreciación

DH 7,504.29 CLP/hr (1)


IAM 76,710,565 CLP/año

Interés de Capital Interés alternativo

Ianual IAM x r

Ianual 11,506,584.69 CLP/año

IH 5,753.29 CLP/hr (2)

Seguros

Sanual 4,219,081.05 CLP/año

SH 2,109.54 CLP/hr (3)

impuestos

ianual 1,534,211.29 CLP/año

iH 767.11 CLP/hr (4)

Almacenaje

Aanual 1,150,658.47 CLP/año

AH 575.33 CLP/hr (5)

CHP 16,709.56 CLP/hr


Método de Depreciación por Suma de Años Dígito

CAMBIO DE PIEZAS DESGASTADAS OPERADOR


Dj = fj x (Vi -Vr)

10
Año aplicación
a de años dígito
factor (fj)
0.01818182 10
0.03636364 9
0.05454545 8
0.07272727 7
0.09090909 6
0.10909091 5
0.12727273 4
0.14545455 3
0.16363636 2
0.18181818 1
COSTO HORARIO DE POSESION
COSTO HORARIO MAQUINARIA

DATOS r=
Vi 34,000,000 CLP netos
Vr 3,400,000 CLP netos 10% de Vi
n 4
hrs vida útil 8,000 hrs
hrs anuales trabajo 2,000 hrs

Método Depreciación Lineal Método de Depreciación L


Dlanual (Vi - Vr) / n ´DLanual = (Vi – Vr)

Dlanual 7,650,000 CLP


Aplicar criterio más cons
DLH 3825 CLP/hr (1)

IAM Invesión Anual Media

Método de Depreciación lineal


n Vij = Invj Vr Dj Vrj
0 34,000,000
1 34,000,000 3,400,000 7,650,000 26,350,000
2 26,350,000 3,400,000 7,650,000 18,700,000
3 18,700,000 3,400,000 7,650,000 11,050,000
4 11,050,000 3,400,000 7,650,000 3,400,000

SUMA Vij 90,100,000 CLP 30,600,000 SUMA Dij

Prom Vij = IAM 22,525,000 CLP/año 7,650,000 Prom Dij

IAM
IAM 22,525,000 CLP/año

Interés de Capital Interés alternativo

Ianual IAM x r

Ianual 3,378,750.0 CLP/año

IH 1689.38 CLP/hr (2)

Seguros

Sanual 1,238,875.00 CLP/año

SH 619.44 CLP/hr (3)

impuestos

ianual 450,500.00 CLP/año

iH 225.25 CLP/hr (4)

Almacenaje

Aanual 337,875.00 CLP/año

AH 168.94 CLP/hr (5)

CPH DH + IH + SH

CHP 6,528.00 CLP/hr


Método de Depreciación lineal

COSTO HORARIO DE OPERACIÓN

MANTENIMIENTO Y REPARACION (6)

CM = CMO+CMR
CMO Costo de Mano de Obras
CMR Coste de Repuestos

CM = 50% a 100% Vi Condiciones Severas -Criterio conservador, CM = 95% Vi


CM = 32,300,000.00 CM= 4037.5

COMBUSTIBLE (7)

CC= CE (lt/hr) x PC ($/lt) CC = 50,459.20 CLP /hr

CE Consumo del Equipo Consumo Alto 45 a 49 (lt/hr) CE= 47 (lt/hr)


PC Precio Combustible Precio combustible PC = 1,073.60 ($/lt)

LUBRICANTES (8)

CL = 10% a 15 % CC Criterio conservador CL= 15% CC

CL = 7,568.88 CLP/hr

GRASAS (9)

CG = Cg * PG CG= 0,5 kg/hr CG= 2,837.01

Cg Consumo de grasas Cg = 0.568 (lt/hr)


Precio Grasas Precio Grasas 89,990.00 en 15.86 (kg)
Kg grasa= 5,674.02

FILTROS (10)

CF=(0,2 a 0,3) *(CC+CL) CF= 17,408.42

CC Costo Combustible
CL Costo Lubricante

TREN DE AVANCE (NEUMATICOS U ORUGAS) (11)

CN = Cn / Vida util CN= 1/10 Vi CN= 3,400,000.00


CN= 1700 CLP/hr
Cn Costo Neumatico
Vida util den horas, condiciones severas 2000 hrs

Pierzas de desgaste (12)

CPD = Cpd / Vida util CPD= 1/10 Vi CPD= 3,400,000.00


CPD= 1700 CLP/hr
Cpd Costo Piezas de Desgaste
Vida util den horas, condiciones severas 2000 hrs

Costo de Operador (13)

COP= Leyes Sociales + S Bruto COP= 10,000.00 hr

COP 92,874.00 CLP/hr


Tasa anual de descuento ( r ) 15% dado que no hay otra información

Seguros 5.5% IAM dado que no hay otra información

impuestos 1 a 2% IAM 2% IAM criterio conservador y no hay más datos

Almacenaje 1 a 1,5% IAM 1.50% IAM criterio conservador y no hay más datos
Método de Depreciación Lineal
´DLanual = (Vi – Vr)/n, K´= (DLanual / (Vi-Vr))

K´ = 1/n
plicar criterio más conservador
K´ = 0.25
K´ = 0.25

Se conoce como método de depreciación acelerada


´Dp= K * (Vij – Vr), K = 2K´
K= 0.5
Método de Depreciación Porcentaje Constante
n Vij = Invj Vr Dj Vrj
0 34,000,000
1 34,000,000 3,400,000 15,300,000 18,700,000
2 18,700,000 3,400,000 7,650,000 11,050,000
3 11,050,000 3,400,000 3,825,000 7,225,000
4 7,225,000 3,400,000 1,912,500 5,312,500

SUMA Vij 70,975,000 SUMA Dij 28,687,500 CLP

Prom Vij = IAM 17,743,750 Prom Dij 7,171,875 CLP/año

Depreciación

DH 3585.94 CLP/hr (1)


IAM 17,743,750 CLP/año

Interés de CapitaInterés alternativo

Ianual IAM x r

Ianual 2,661,562.50 CLP/año

IH 1,330.78 CLP/hr (2)

Seguros

Sanual 975,906.25 CLP/año

SH 487.95 CLP/hr (3)

impuestos

ianual 354,875.00 CLP/año

iH 177.44 CLP/hr (4)

Almacenaje

Aanual 266,156.25 CLP/año

AH 133.08 CLP/hr (5)

+ CPH + AH

CHP 5,715.19 CLP/hr


Método de Depreciación Porcentaje Constante
clp/hr

Estimacion al no tener el valor se esta estimando en 1/4 del precio de la maquina

Estimacion al no tener el valor se esta estimando en 1/5 del precio de la maquina


De acuerdo a una cotizacion de una integrante se obtiene el valor
y más datos

y más datos

Se conoce como método de depreciación acelerada


n
Método de Depreciación por Suma de Años Dígito
n Vij = Invj Vr Dj Vrj Suma de años dígito
0 34,000,000
1 34,000,000 3,400,000 5,563,636 28,436,364 1
2 28,436,364 3,400,000 5,007,273 23,429,091 2
3 23,429,091 3,400,000 4,450,909 18,978,182 3
4 18,978,182 3,400,000 3,894,545 15,083,636 4
5
6
7
8
9
10
Suma 55
SUMA Vij 104,843,636 SUMA Dij 18,916,364 CLP

Prom Vij = IAM 26,210,909 Prom Dij 4,729,091 CLP/año

Depreciación

DH 2,364.55 CLP/hr (1)


IAM 26,210,909 CLP/año

Interés de Capital Interés alternativo

Ianual IAM x r

Ianual 3,931,636.36 CLP/año

IH 1,965.82 CLP/hr (2)

Seguros

Sanual 1,441,600.00 CLP/año

SH 720.80 CLP/hr (3)

impuestos

ianual 524,218.18 CLP/año

iH 262.11 CLP/hr (4)

Almacenaje

Aanual 393,163.64 CLP/año

AH 196.58 CLP/hr (5)

CHP 5,509.85 CLP/hr


Método de Depreciación por Suma de Años Dígito

CAMBIO DE PIEZAS DESGASTADAS OPERADOR


Dj = fj x (Vi -Vr)

4
Año aplicación
a de años dígito
factor (fj)
0.01818182 10
0.03636364 9
0.05454545 8
0.07272727 7
0.09090909 6
0.10909091 5
0.12727273 4
0.14545455 3
0.16363636 2
0.18181818 1
COSTO HORARIO DE POSESION
COSTO HORARIO MAQUINARIA

DATOS r=
Vi 113,050,000 CLP netos
Vr 11,305,000 CLP netos 10% de Vi
n 10
hrs vida útil 16,000 hrs
hrs anuales trabajo 1,600 hrs

Método Depreciación Lineal Método de Depreciación L


Dlanual (Vi - Vr) / n ´DLanual = (Vi – Vr)

Dlanual 10,174,500 CLP


Aplicar criterio más cons
DLH 6359.0625 CLP/hr (1)

IAM Invesión Anual Media

Método de Depreciación lineal


n Vij = Invj Vr Dj Vrj
0 113,050,000
1 113,050,000 11,305,000 10,174,500 102,875,500
2 102,875,500 11,305,000 10,174,500 92,701,000
3 92,701,000 11,305,000 10,174,500 82,526,500
4 82,526,500 11,305,000 10,174,500 72,352,000
5 72,352,000 11,305,000 10,174,500 62,177,500
6 62,177,500 11,305,000 10,174,500 52,003,000
7 52,003,000 11,305,000 10,174,500 41,828,500
8 41,828,500 11,305,000 10,174,500 31,654,000

SUMA Vij 619,514,000 CLP 81,396,000 SUMA Dij

Prom Vij = IAM 61,951,400 CLP/año 8,139,600 Prom Dij

IAM
IAM 67,264,750 CLP/año

Interés de Capital Interés alternativo

Ianual IAM x r

Ianual 10,089,712.5 CLP/año

IH 6306.07 CLP/hr (2)

Seguros

Sanual 3,699,561.25 CLP/año

SH 2,312.23 CLP/hr (3)

impuestos

ianual 1,345,295.00 CLP/año

iH 840.81 CLP/hr (4)

Almacenaje

Aanual 1,008,971.25 CLP/año

AH 630.61 CLP/hr (5)

CPH DH + IH + SH

CHP 16,448.78 CLP/hr


Método de Depreciación lineal

COSTO HORARIO DE OPERACIÓN

MANTENIMIENTO Y REPARACION (6)

CM = CMO+CMR
CMO Costo de Mano de Obras
CMR Coste de Repuestos

CM = 50% a 100% Vi Condiciones Severas -Criterio conservador, CM = 95% Vi


CM = 107,397,500.00 CM= 6712.34375

COMBUSTIBLE (7)

CC= CE (lt/hr) x PC ($/lt) CC = 50,459.20 CLP /hr

CE Consumo del Equipo Consumo Alto 45 a 49 (lt/hr) CE= 47 (lt/hr)


PC Precio Combustible Precio combustible PC = 1,073.60 ($/lt)

LUBRICANTES (8)

CL = 10% a 15 % CC Criterio conservador CL= 15% CC

CL = 7,568.88 CLP/hr

GRASAS (9)

CG = Cg * PG CG= 0,5 kg/hr CG= 2,837.01

Cg Consumo de grasas Cg = 0.568 (lt/hr)


Precio Grasas Precio Grasas 89,990.00 en 15.86 (kg)
Kg grasa= 5,674.02

FILTROS (10)

CF=(0,2 a 0,3) *(CC+CL) CF= 17,408.42

CC Costo Combustible
CL Costo Lubricante

TREN DE AVANCE (NEUMATICOS U ORUGAS) (11)

CN = Cn / Vida util CN= 1/4 Vi CN= 28,262,500.00


CN= 17664.0625
Cn Costo Neumatico
Vida util den horas, condiciones severas 2000 hrs

Pierzas de desgaste (12)

CPD = Cpd / Vida util CPD= 1/5 Vi CPD= 22,610,000.00


CPD= 14131.25
Cpd Costo Piezas de Desgaste
Vida util den horas, condiciones severas 2000 hrs

Costo de Operador (13)

COP= Leyes Sociales + S Bruto COP= 100,000.00 hr

COP 170,232.58 CLP/hr


Tasa anual de descuento ( r ) 15% dado que no hay otra información

Seguros 5.5% IAM dado que no hay otra información

impuestos 1 a 2% IAM 2% IAM criterio conservador y no hay más datos

Almacenaje 1 a 1,5% IAM 1.50% IAM criterio conservador y no hay más datos
Método de Depreciación Lineal
´DLanual = (Vi – Vr)/n, K´= (DLanual / (Vi-Vr))

K´ = 1/n
plicar criterio más conservador
K´ = 0.1
K´ = 0.1

Se conoce como método de depreciación acelerada


´Dp= K * (Vij – Vr), K = 2K´
K= 0.2
Método de Depreciación Porcentaje Constante
n Vij = Invj Vr Dj Vrj
0 113,050,000
1 113,050,000 11,305,000 20,349,000 92,701,000
2 92,701,000 11,305,000 16,279,200 76,421,800
3 76,421,800 11,305,000 13,023,360 63,398,440
4 63,398,440 11,305,000 10,418,688 52,979,752
5 52,979,752 11,305,000 8,334,950 44,644,802
6 44,644,802 11,305,000 6,667,960 37,976,841
7 37,976,841 11,305,000 5,334,368 32,642,473
8 32,642,473 11,305,000 4,267,495 28,374,978

SUMA Vij 513,815,108 SUMA Dij 84,675,022 CLP

Prom Vij = IAM 51,381,511 Prom Dij 8,467,502 CLP/año

Depreciación

DH 5292.19 CLP/hr (1)


IAM 51,381,511 CLP/año

Interés de CapitaInterés alternativo

Ianual IAM x r

Ianual 7,707,226.62 CLP/año

IH 4,817.02 CLP/hr (2)

Seguros

Sanual 2,825,983.09 CLP/año

SH 1,766.24 CLP/hr (3)

impuestos

ianual 1,027,630.22 CLP/año

iH 642.27 CLP/hr (4)

Almacenaje

Aanual 770,722.66 CLP/año

AH 481.70 CLP/hr (5)

+ CPH + AH

CHP 12,999.42 CLP/hr


Método de Depreciación Porcentaje Constante
hr

Estimacion al no tener el valor se esta estimando en 1/4 del precio de la maquina

Estimacion al no tener el valor se esta estimando en 1/5 del precio de la maquina


De acuerdo a una cotizacion de una integrante se obtiene el valor
y más datos

y más datos

Se conoce como método de depreciación acelerada


n
Método de Depreciación por Suma de Años Dígito
n Vij = Invj Vr Dj Vrj Suma de años dígito
0 113,050,000
1 113,050,000 11,305,000 18,499,091 94,550,909 1
2 94,550,909 11,305,000 16,649,182 77,901,727 2
3 77,901,727 11,305,000 14,799,273 63,102,455 3
4 63,102,455 11,305,000 12,949,364 50,153,091 4
5 50,153,091 11,305,000 11,099,455 39,053,636 5
6 39,053,636 11,305,000 9,249,545 29,804,091 6
7 29,804,091 11,305,000 7,399,636 22,404,455 7
8 22,404,455 11,305,000 5,549,727 16,854,727 8
9
10
Suma 55
SUMA Vij 490,020,364 SUMA Dij 96,195,273 CLP

Prom Vij = IAM 49,002,036 Prom Dij 9,619,527 CLP/año

Depreciación

DH 6,012.20 CLP/hr (1)


IAM 49,002,036 CLP/año

Interés de Capital Interés alternativo

Ianual IAM x r

Ianual 7,350,305.45 CLP/año

IH 4,593.94 CLP/hr (2)

Seguros

Sanual 2,695,112.00 CLP/año

SH 1,684.45 CLP/hr (3)

impuestos

ianual 980,040.73 CLP/año

iH 612.53 CLP/hr (4)

Almacenaje

Aanual 735,030.55 CLP/año

AH 459.39 CLP/hr (5)

CHP 13,362.51 CLP/hr


Método de Depreciación por Suma de Años Dígito

CAMBIO DE PIEZAS DESGASTADAS OPERADOR


Dj = fj x (Vi -Vr)

10
Año aplicación
a de años dígito
factor (fj)
0.01818182 10
0.03636364 9
0.05454545 8
0.07272727 7
0.09090909 6
0.10909091 5
0.12727273 4
0.14545455 3
0.16363636 2
0.18181818 1
LOGO

PRESUPUESTO "EXCAVACION"

COMUNA

ADMINISTRADOR OBRA

JEFE TERRENO

OFICINA TECNICA

ITEM DESGLOSE UNI TIEMPO CANT. P.U.


$
GASTOS GENERALES
1 GARANTÍAS Y SEGUROS
1.1 Boleta por Anticipo y Fiel Cumplimiento (*) 1% anual Gl 1.00 1 $ 540,245
1.2 Seguros de obra (*) ( 0,25% anual) Gl 1.00 1 $ 1,929,451
1.3 Cargos Notariales Mes 1.00 1 $ 300,000

2 MANO DE OBRA SUPERVISIÓN Y ADMINISTRACIÓN


2.2 Profesional Administrador de la Obra Mes 5.00 1 $ 2,350,000
2.3 Profesional(es) de Terreno Mes 5.00 1 $ 1,500,000
2.4 Prevencionista de Riesgos Mes 5.00 1 $ 750,000
2.5 Jefe(s) de Obra Mes 5.00 1 $ 1,500,000
2.6 Capataces Mes 5.00 2 $ 550,000
2.7 Jefe de Oficina Técnica Mes 5.00 1 $ 1,500,000
2.8 Topográfo Mes 5.00 1 $ 550,000
Leyes Sociales % 1.00 40 $ 46,250,000
Premios por cumplimiento de metas Gl 1.00 1 $ 28,840,000

3 MANO DE OBRA DE APOYO


3.1 Bodeguero Mes 5.00 1 $ 650,000
3.2 Portero,Nochero,Rondin Mes 5.00 3.5 $ 550,000
3.3 Guardias de Seguridad Mes 5.00 1 $ 550,000
3.4 Chofer Mes 5.00 2 $ 500,000
3.5 Administrativos Mes 5.00 1 $ 650,000
Leyes Sociales % 1.00 30 $ 23,875,000

4 HERRAMIENTAS
4.10 Nivel laser Uni 1.00 1 $ 150,000
4.11 Herramientas menores Gl

5 ELEMENTOS DE SEGURIDAD
5.1 Cascos Mes 1.00 30 $ 3,000
5.2 Antiparras Mes 1.00 30 $ 420
5.3 Guantes Mes 1.00 30 $ 1,428
5.4 Zapatos Mes 1.00 30 $ 13,000
5.5 Botas Mes 1.00 30 $ 9,090
5.6 Traje de agua Mes 1.00 30 $ 5,530
5.7 Reflectantes Mes 1.00 30 $ 2,242
5.8 Tapón de Oído Mes 1.00 30 $ 174
5.9 Bloqueador Solar Mes 1.00 3 $ 8,995
5.10 Cintas de Peligro Mes 1.00 15 $ 6,054
5.11 Extintores Mes 1.00 10 $ 24,848

7 TRANSPORTE INTERNO
7.1 Vehículos de Obra (Camioneta) Mes 5.00 2 $ 300,000

10 CAJA CHICA Y VARIOS


10.1 Gastos varios de oficina de obra Mes 5.00 1 $ 150,000
10.2 Aseo diario de Obra Mes Incluido en PPO
10.3 Limpieza y Aseo Final Gl Incluido en PPO

11 COMUNICACIÓN
11.1 Equipo de Radio Mes 1.00 6 $ 120,000
11.2 Telefono / Internet Uni 5.00 6 $ 70,000
11.3 Otros Equipos Gl

12 MAQUINARIA
12.1 Excavadora Uni 1.00 6 $ 166,762,097
12.1 Camion Tolva Uni 1.00 5 $ 34,000,000
12.2 Camion Aljibe Uni 1.00 8 $ 113,050,000

15 INSTALACIÓN PROVISORIA Y CONSUMOS 1.00


15.1 Agua Potable Uni 5.00 1 $ 180,000
15.2 Electricidad Uni 5.00 1 $ 700,000
15.3 Baños Quimicos Uni Incluido en PPO

16 INSTALACIÓN DE FAENAS 1.00


16.1 Oficinas Gl 1.00 1 Incluido
16.2 Desarme Instalación de Faenas Gl 1.00 1 Incluido
16.3 Bodegas Gl 1.00 1 Incluido
16.4 Equipamiento Oficinas de Obra GL 1.00 1 $ 300,000
16.5 Equipamiento Oficinas de ITO y Reuniones GL 1.00 1 $ 350,000
16.6 Consumos Baños, Comedores y Vestidores Mes 1.00 1 $ 300,000
16.7 Mantención de Equipamientos Oficina GL 1.00 1 $ 85,000

17 TRAZADOS Y NIVELES 1.00


17.1 Trazador(es) Mes 5.00 1 $ 350,000
17.2 Ayudante de Trazador Mes 5.00 1 $ 220,000
Leyes Sociales % 0.30 1 $ 2,850,000

18 GASTOS DE ADMINISTRACION CENTRAL 1.00


18.1 Gastos oficina y administración (*) % 0.03 1 $ 771,778,000

TOTAL GASTOS GENERALES


47936 m3 de excavacion con 15% de esponjamiento

55126,4 m3 de trabajo
actualizar
FECHA: 08.06.2023
Valor UF $ 36,064.24
Valor U$ $ 786.99
Plazo de Construcción meses 8
Valor Costo Directo $ 771,778,000.00
M2 construcción 47936

TOTAL TOTAL
$ UF

$ 540,245 UF 14.98
$ 1,929,451 UF 53.50
$ 300,000 UF 8.32

$ 11,750,000 UF 325.81
$ 7,500,000 UF 207.96
$ 3,750,000 UF 103.98
$ 7,500,000 UF 207.96
$ 5,500,000 UF 152.51
$ 7,500,000 UF 207.96
$ 2,750,000 UF 76.25
$ 18,500,000 UF 512.97

$ 3,250,000 UF 90.12
$ 9,625,000 UF 266.88
$ 2,750,000 UF 76.25
$ 5,000,000 UF 138.64
$ 3,250,000 UF 90.12
$ 7,162,500 UF 198.60

$ 150,000 UF 4.16

$ 90,000 UF 2.50
$ 12,600 UF 0.35
$ 42,840 UF 1.19
$ 390,000 UF 10.81
$ 272,700 UF 7.56
$ 165,900 UF 4.60
$ 67,260 UF 1.87
$ 5,220 UF 0.14
$ 26,985 UF 0.75
$ 90,810 UF 2.52
$ 248,480 UF 6.89

$ 3,000,000 UF 83.18

$ 750,000 UF 20.80

$ 720,000 UF 19.96
$ 2,100,000 UF 58.23

$ 1,000,572,582 UF 27744.17
$ 170,000,000 UF 4713.81
$ 904,400,000 UF 25077.47

$ 900,000 UF 24.96
$ 3,500,000 UF 97.05

$ 300,000 UF 8.32
$ 350,000 UF 9.70
$ 300,000 UF 8.32
$ 85,000 UF 2.36

$ 1,750,000 UF 48.52
$ 1,100,000 UF 30.50
$ 855,000 UF 23.71

$ 23,153,340 UF 642.00

$ 2,213,955,913 UF 61389.23
EXCAVADORA
CÁLCULOS
horas días 11
Dólar $ 803 CLP $
año maquinaria 2013
valor inicial $ 124,809 CLP $
valor inicial + iva $ 148,523 CLP $
valor residual $ 31,202 CLP $
horas al mes 307 HORAS
DL anual $ 7,801 CLP $
N 12 AÑOS
vida útil 20,000 HRS
h. total arriendo x HRS
sueldo operador $ 900,000 CLP $
leyes sociales % 30% PPORCENTAJE
consumo litros por hora 20 LT/HR

RENDIMIENTO
CONCEPTOS DESCRIPCIÓN VALOR
Q pala 1.5
F suelos 1
E eficiencia 80
K cucharon 80
CM trabajo en segundos 60
RENDIMIENTO rendimiento en horas 90
MODELO Excavadoras marca Caterpillar modelo 336 D.

CÁLCULO DE RENDIMIENTO
N 7
VALOR INICIAL 124,809
VALOR RESIDUAL 31,202
93,607

OPERADOR
FERIADOS IRRENUNCIABLES DÍAS
15 de agosto 1
18 y 19 de septiembre 2
27 de octubre 1
01 de noviembre 1
08 - 17 y 25 de diciembre 3
TOTAL DÍAS FERIADOS 8

HORARIOS DE TRABAJO
DESCRIPCIÓN HORARIO UNIDAD
Ingreso 8:00
Salida 19:00
Horario sábados 08:00 a 14:00
Salida - Ingreso días de semana 11 hrs/días
Salida - Ingreso días sábados 6 hrs/días
Descuento operación 1 hrs/días
Descuento mantenimiento mensual 5 hrs/mes
Horas finales operador 307
25%

UNIDAD
m3
m3
%
%
seg
m3/hora

25% de vi
COSTO HORARIO MAQUINARIA EXCAVADORA
DEPRECIACIÓN LINEAL
AÑOS Vij Vr Dij Vfj
0 $ 124,809
1 $ 124,809 $ 32,202 $ 7,801 $ 117,008
2 $ 117,008 $ 32,202 $ 7,801 $ 109,208
3 $ 109,208 $ 32,202 $ 7,801 $ 101,407
4 $ 101,407 $ 32,202 $ 7,801 $ 93,607
5 $ 93,607 $ 32,202 $ 7,801 $ 85,806
6 $ 85,806 $ 32,202 $ 7,801 $ 78,006
7 $ 78,006 $ 32,202 $ 7,801 $ 70,205

1 SUMA IA 709,851 K´
2 IAM 101,407
3 SUMA DL 54,604
4 DL 7,801
5 DL ANUAL 7,801
6 HORAS AÑO 1,667

DEPRECIACIÓN PORCENTAJE CONSTANTE


AÑOS Vij Vr Dij Vfj
0 $ 124,809
1 $ 124,809 $ 32,202 $ 13,230 $ 111,579
2 $ 111,579 $ 32,202 $ 11,340 $ 100,240
3 $ 100,240 $ 32,202 $ 9,720 $ 90,520
4 $ 90,520 $ 32,202 $ 8,331 $ 82,189
5 $ 82,189 $ 32,202 $ 7,141 $ 75,048
6 $ 75,048 $ 32,202 $ 6,121 $ 68,927
7 $ 68,927 $ 32,202 $ 5,246 $ 63,681

1 SUMA IA 653,312 266,644,771


2 IAM DPC 93,330
3 SUMA DPC 61,128 1.50%
4 DPC 1,400
5 HORAS AÑO 1667

DEPRECIACIÓN SUMA DE AÑOS DÍGITOS


AÑOS Vij Vr Dij Vfj
0 $ 124,809
1 $ 124,809 $ 32,202 $ 23,402 $ 101,407
2 $ 101,407 $ 32,202 $ 20,059 $ 81,349
3 $ 81,349 $ 32,202 $ 16,715 $ 64,633
4 $ 64,633 $ 32,202 $ 13,372 $ 51,261
5 $ 51,261 $ 32,202 $ 10,029 $ 41,232
6 $ 41,232 $ 32,202 $ 6,686 $ 34,545
7 $ 34,545 $ 32,202 $ 3,343 $ 31,202

1 SUMA IA 499,236
2 IAM SAD 71,319
3 SUMA DPC 93,607
4 SAD 90,770
5 HORAS AÑO 1,667

CÁLCULO COSTOS DE POSESIÓN

CALCULAR DHL
ÍTEM DESCRIPCIÓN
1.1 DL $ 13,372 PESOS
1.2 HORAS AL AÑO 1,667 HORAS
1.3 DHL 8.02 US/HORA

CALCULAR K´
1.3 DLANUAL $ 13,372
1.4 VALOR INICIAL $ 124,809
1.5 VALOR RESIDUAL $ 32,202
K´ 0.14

INTERESES HORARIO
2.1 VALOR INICIAL $ 124,809
2.2 N 7
2.3 VALOR RESIDUAL $ 32,202
2.4 IAM $ 101,407 US/HORA
2.5 R 15%
2.6 IAM*R $ 15,211 ANUAL
2.7 HORAS AL AÑO 1,667 HORAS/AÑO
2.8 INTERESES HORARIO 9.12 US/HORA

SEGUROS HORARIOS
3.1 IAM $ 101,407
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 3,042
3.4 HORAS AL AÑO 2,857 HORAS/AÑO
3.5 SEGUROS HORARIOS 1.06 US/HORA

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM $ 101,407
4.3 IAM*PORCENTAJES 1014.07
4.4 HORAS AL AÑO 1,667
4.5 IMPUESTO HORARIO 0.61 US/HORA

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM $ 101,407
5.3 IAM*PORCENTAJES 1014.07
5.4 HORAS AL AÑO 1,667
5.5 ALMACENAJE HORARIO 0.61 US/HORA

COSTO DE POSESIÓN
1.3 DHL 8.02 US/HORA
2.8 IAM*HORA 9.12 US/HORA
3.5 SEGUROS HORARIO 1.06 US/HORA
4.5 IMPUESTOS HORARIO 0.61 US/HORA
5.5 ALMACENAJE HORARIO 0.61 US/HORA
COSTO DE POSESIÓN 19.4278681 US/HORA

CÁLCULO DPCH
1.1 DPC $ 1,400 PESOS
1.2 HORAS AL AÑO 1,667 HORAS
1.3 DPCH 0.84 US/HORA

CALCULAR K´
2K $ 0.28

INTERESES HORARIO
2.1 VALOR INICIAL $ 124,809
2.2 N 7
2.3 VALOR RESIDUAL $ 32,202
2.4 IAM DPC 93,330 US/HORA
2.5 R 15%
2.6 IAM*R 14,000 ANUAL
2.7 HORAS AL AÑO 1,667 HORAS/AÑO
2.8 INTERESES HORARIO 8.40 US/HORA

SEGUROS HORARIOS
3.1 IAM DPC 93,330
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 2800
3.4 HORAS AL AÑO 1,667 HORAS
3.5 SEGUROS HORARIOS 1.68 US/HORAS

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM DPC 93,330
4.3 IAM*PORCENTAJES 933.3
4.4 HORAS AL AÑO 1,667
4.5 IMPUESTO HORARIO 0.56 US/HORAS

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM DPC 93,330
5.3 IAM*PORCENTAJES 933.3
5.4 HORAS AL AÑO 1,667
5.5 ALMACENAJE HORARIO 0.56 US/HORAS

COSTO DE POSESIÓN
1.3 DPC 0.84 US/HORA
2.8 IAM*HORA 8.40 US/HORA
3.5 SEGUROS HORARIO 1.68 US/HORA
4.5 IMPUESTOS HORARIO 0.56 US/HORA
5.5 ALMACENAJE HORARIO 0.56 US/HORA
COSTO DE POSESIÓN 12.04 US/HORA

CÁLCULO SADH
1.1 SAD $ 90,770 PESOS
1.2 HORAS AL AÑO 1,667 HORAS
1.3 SADH 54.45 US/HORA

INTERESES HORARIO
2.1 VALOR INICIAL $ 124,809
2.2 N 7
2.3 VALOR RESIDUAL $ 32,202
2.4 IAM SAD 71,319 US/HORA
2.5 R 15%
2.6 IAM*R 10,698 ANUAL
2.7 HORAS AL AÑO 1,667 HORAS/AÑO
2.8 INTERESES HORARIO 6.42 US/HORA

SEGUROS HORARIOS
3.1 IAM SAD 71,319
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 2140
3.4 HORAS AL AÑO 1,667 HORAS
3.5 SEGUROS HORARIOS 1.28 US/HORAS

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM SAD 71,319
4.3 IAM*PORCENTAJES 713.19
4.4 HORAS AL AÑO 1,667
4.5 IMPUESTO HORARIO 0.43 US/HORAS

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM SAD 71,319
5.3 IAM*PORCENTAJES 713.19
5.4 HORAS AL AÑO 1,667
5.5 ALMACENAJE HORARIO 0.43 US/HORAS

COSTO DE POSESIÓN
1.3 SADH 54.45 US/HORA
2.8 IAM*HORA 6.42 US/HORA
3.5 SEGUROS HORARIO 1.28 US/HORA
4.5 IMPUESTOS HORARIO 0.43 US/HORA
5.5 ALMACENAJE HORARIO 0.43 US/HORA
COSTO DE POSESIÓN 63.01 US/HORA
CÁLCULO COSTOS DE OPERACIÓN

COSTO DE MANTENIMIENTO
1.1 COSTO MANTENCIÓN 70%
1.2 VALOR INICIAL $ 124,809 US $
1.3 % MANTENIMIENTO 87,366 US $
1.4 VIDA ÚTIL 20,000 HORAS
1.5 COSTO MANTENIMIENTO 4.37 US/HORAS

COSTOS DE COMBUSTIBLES
2.1 CONSUMO 20 KM/L
2.2 VALOR COMBUSTIBLE $ 1,200 US/LT
2.3 VALOR DÓLAR 803 US $/CLP
2.4 COSTOS DE COMBUSTIBLES 29.89 US/HORA

COSTOS DE LUBRICANTE
3.1 CONSUMO LUBRICANTE 0.4 LITRO/HORA
3.2 VALOR LUBRICANTE $ 30 US/LT
3.3 VALOR DÓLAR 803 US $/CLP
3.4 COSTOS DE LUBRICANTE 0.015 US/HORA

COSTOS DE GRASAS
4.1 CONSUMO DE GRASAS 1 KILO/HORA
4.2 VALOR GRASAS 14 US/KILO
4.3 VALOR DÓLAR 803 US $/CLP
4.4 COSTO DE GRASAS 0.017 US/HORA

COSTOS DE FILTROS
5.1 COSTOS DE COMBUSTIBLES 29.89 US/HORA
5.2 COSTOS DE LUBRICANTE 15 US/HORA
5.3 FACTOR 0.2 US $/CLP
5.4 COSTOS DE FILTROS 8 US/HORA

COSTOS DE TREN DE AVANCE


6.1 CONJUNTO DE ORUGAS 80000 US $
6.2 VIDA ÚTIL MAQUINARIA 20000 HORAS
6.3 VIDA ÚTIL TREN DE AVANCE 13000 HORAS
6.4 N° DE CAMBIO ORUGA 2 UNIDAD
6.5 COSTOS TREN DE AVANCE 6.15 US/HORA

COSTOS PIEZAS DE DESGASTE


7.1 PIEZA DE DESGASTE 40%
7.2 COSTOS TREN DE AVANCE 6.15 US/HORA
7.3 COSTOS PIEZAS DE DESGASTE 2.46 US/HORA

COSTO OPERADOR
8.1 HORAS MENSUALES 307
8.2 VALOR DÓLAR 803 US $/CLP
8.3 COSTO OPERADOR 0.38 US/HORA

COSTOS TOTALES
1.5 COSTO MANTENIMIENTO 4.37 US/HORA
2.4 COSTO COMBUSTIBLES 29.89 US/HORA
3.4 COSTO DE LUBRICANTE 0.015 US/HORA
4.4 COSTO GRASAS 0.017 US/HORA
5.4 COSTO DE FILTROS 8 US/HORA
6.5 COSTOS TREN DE AVANCE 6.15 US/HORA
7.3 COSTO PIEZAS DE DESGASTE 2.46 US/HORA
8.3 COSTO OPERADOR 0.38 US/HORA
TOTAL COSTO OPERACIÓN 51.2847763 US/HORA

COSTO HORARIO TOTAL EXCAVADORA


COSTO OPERACIÓN 51.28 US $
CPH DPC 19.42 US $
COSTO HORARIO TOTAL EXCAVADORA 70.7 US $
1/N
0.1

almacenaje

SUMA AÑOS DÍGITO


1 0.0357142857
2 0.0714285714
3 0.1071428571
4 0.1428571429
5 0.1785714286
6 0.2142857143
7 0.250000000
TOTAL AÑOS 28
CAMIÓN TOLVA
CÁLCULOS
horas días
Dólar
año maquinaria
valor inicial
valor inicial + iva
valor residual
horas al mes
DL anual
N
vida útil
h. total arriendo
sueldo operador
leyes sociales %
consumo litros por hora

RENDIMIENTO
CONCEPTOS
EQUIPO
FACTOR DE EFICIENCIA
CAPACIDAD
DISTANCIA DE TRANSPORTE
FACTOR DE ESPONJAMIENTO
VELOCIDAD DE RECORRIDO CARGADO
DESCARGADO
CICLO DE TRABAJO
CARGA + T DESCARGA
C(AD*L6C0U)/LVOC ADREGL ARDEON)D+I(M(DIE*6N0T)O/V D"RE"
((Q*E*60)/CM*F)

CÁLCULO DE RENDIMIENTO
N
VALOR INICIAL
VALOR RESIDUAL

OPERADOR
FERIADOS IRRENUNCIABLES
15 de agosto
18 y 19 de septiembre
27 de octubre
01 de noviembre
08 - 17 y 25 de diciembre
TOTAL DÍAS FERIADOS

HORARIOS DE TRABAJO
DESCRIPCIÓN
Ingreso
Salida
Horario sábados
Salida - Ingreso días de semana
Salida - Ingreso días sábados
Descuento operación
Descuento mantenimiento mensual
Para 1 mes promedio 30 días
Horas en el mes
Mantenimiento horas
Horas efectivas de trabajo de la máquina
Horas finales operador
AMIÓN TOLVA
CÁLCULOS
11
$ 803 CLP $
2013
$ 33,354 CLP $
$ 39,691 CLP $
$ 8,339 CLP $ 25%
355 HRS
$ 2,780 CLP $
9 AÑOS
51,120 HRS
x HRS
$ 900,000 CLP $
30% PORCENTAJE
5 LT/HR

RENDIMIENTO DESCRIPCIÓN
DESCRIPCIÓN UNIDAD CARGA 1 CAMIÓN
ACTROS 4144K CAPACIDAD EN 1 HR POR M3
0.83% %
13 M3
35 KM
1.1
60 KM/HRS
60 KM/HRS
34
4 MIN
30 MIN
20.95 M3/HRS

CÁLCULO DE RENDIMIENTO
7
33,354
8,339 25% de vi
25,016

ADOR
DÍAS
1
2
1
1
3
8

ARIOS DE TRABAJO
HORARIO UNIDAD
8:00
19:00
08:00 a 14:00
11 hrs/días
6 hrs/días
1 hrs/días
5 hrs/mes
30
330
5
325
355 HR/MES
CANTIDAD UNIDAD
10 MIN
M3
COSTO HORARIO CAMIÓ TOLVA
DEPRECIACIÓN LINEAL
AÑOS Vij Vr Dij Vfj
0 $ 33,354
1 $ 33,354 $ 8,339 $ 2,780 $ 30,574
2 $ 30,574 $ 8,339 $ 2,780 $ 27,794
3 $ 27,794 $ 8,339 $ 2,780 $ 25,014
4 $ 25,014 $ 8,339 $ 2,780 $ 22,234
5 $ 22,234 $ 8,339 $ 2,780 $ 19,454
6 $ 19,454 $ 8,339 $ 2,780 $ 16,674
7 $ 16,674 $ 8,339 $ 2,780 $ 13,894
8 $ 13,894 $ 8,339 $ 2,780 $ 11,114
9 $ 11,114 $ 8,339 $ 2,780 $ 8,334

1 SUMA IA 200,106 K´ 1/N


2 IAM 22,234 0.1
3 SUMA DL 25,020
4 DL 2,780
5 DL ANUAL 2,780
6 HORAS AÑO 5,680

DEPRECIACIÓN PORCENTAJE CONSTANTE


AÑOS Vij Vr Dij Vfj
0 $ 33,354
1 $ 33,354 $ 8,339 $ 2,780 $ 30,574
2 $ 30,574 $ 8,339 $ 3,176 $ 27,398
3 $ 27,398 $ 8,339 $ 2,723 $ 24,675
4 $ 24,675 $ 8,339 $ 2,334 $ 22,341
5 $ 22,341 $ 8,339 $ 2,000 $ 20,341
6 $ 20,341 $ 8,339 $ 1,715 $ 18,626
7 $ 18,626 $ 8,339 $ 1,470 $ 17,157
8 $ 17,157 $ 8,339 $ 1,260 $ 15,897
9 $ 15,897 $ 8,339 $ 1,080 $ 14,817

1 SUMA IA 210,363 132,762,248


2 IAM DPC 23,374
3 SUMA DPC 18,537 1.50% almacenaje
4 DPC 351
5 HORAS AÑO 5680

DEPRECIACIÓN SUMA DE AÑOS DÍGITOS


AÑOS Vij Vr Dij Vfj
0 $ 124,809
1 $ 124,809 $ 32,202 $ 5,003 $ 119,806
2 $ 119,806 $ 32,202 $ 4,447 $ 115,359
3 $ 115,359 $ 32,202 $ 3,891 $ 111,467
4 $ 111,467 $ 32,202 $ 3,335 $ 108,132
5 $ 108,132 $ 32,202 $ 2,780 $ 105,353
6 $ 105,353 $ 32,202 $ 2,224 $ 103,129
7 $ 103,129 $ 32,202 $ 1,668 $ 101,461
8 $ 101,461 $ 32,202 $ 1,112 $ 100,349 TOTAL AÑOS
9 $ 100,349 $ 32,202 $ 556 $ 99,794

1 SUMA IA 989,865
2 IAM SAD 109,985
3 SUMA DPC 25,016
4 SAD 179,975
5 HORAS AÑO 5,680

CÁLCULO COSTOS DE POSESIÓN

CALCULAR DHL
ÍTEM DESCRIPCIÓN
1.1 DL $ 2,780 PESOS
1.2 HORAS AL AÑO 5,680 HORAS
1.3 DHL 0.49 US/HORA

CALCULAR K´
1.3 DLANUAL $ 2,780
1.4 VALOR INICIAL $ 33,354
1.5 VALOR RESIDUAL $ 8,339
K´ 0.11

INTERESES HORARIO
2.1 VALOR INICIAL $ 33,354
2.2 N 9
2.3 VALOR RESIDUAL $ 8,339
2.4 IAM $ 22,234 US/HORA
2.5 R 15%
2.6 IAM*R $ 3,335 ANUAL
2.7 HORAS AL AÑO 5,680 HORAS/AÑO
2.8 INTERESES HORARIO 0.59 US/HORA

SEGUROS HORARIOS
3.1 IAM $ 22,234
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 667
3.4 HORAS AL AÑO 5,680 HORAS/AÑO
3.5 SEGUROS HORARIOS 0.12 US/HORA

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM $ 22,234
4.3 IAM*PORCENTAJES 222.34
4.4 HORAS AL AÑO 5,680
4.5 IMPUESTO HORARIO 0.04 US/HORA

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM $ 22,234
5.3 IAM*PORCENTAJES 222.34
5.4 HORAS AL AÑO 5,680
5.5 ALMACENAJE HORARIO 0.04 US/HORA

COSTO DE POSESIÓN
1.3 DHL 0.49 US/HORA
2.8 IAM*HORA 0.59 US/HORA
3.5 SEGUROS HORARIO 0.12 US/HORA
4.5 IMPUESTOS HORARIO 0.04 US/HORA
5.5 ALMACENAJE HORARIO 0.04 US/HORA
COSTO DE POSESIÓN 1.27232394 US/HORA

CÁLCULO DPCH
1.1 DPC $ 451 PESOS
1.2 HORAS AL AÑO 5,680 HORAS
1.3 DPCH 0.08 US/HORA

CALCULAR K´
2K $ 0.22

INTERESES HORARIO
2.1 VALOR INICIAL $ 33,354
2.2 N 9
2.3 VALOR RESIDUAL $ 8,339
2.4 IAM DPC 23,374 US/HORA
2.5 R 15%
2.6 IAM*R 3,506 ANUAL
2.7 HORAS AL AÑO 5,680 HORAS/AÑO
2.8 INTERESES HORARIO 0.62 US/HORA

SEGUROS HORARIOS
3.1 IAM DPC 23,374
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 701
3.4 HORAS AL AÑO 5,680 HORAS
3.5 SEGUROS HORARIOS 0.12 US/HORAS

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM DPC 23,374
4.3 IAM*PORCENTAJES 233.736351
4.4 HORAS AL AÑO 5,680
4.5 IMPUESTO HORARIO 0.04 US/HORAS

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM DPC 23,374
5.3 IAM*PORCENTAJES 233.736351
5.4 HORAS AL AÑO 5,680
5.5 ALMACENAJE HORARIO 0.04 US/HORAS

COSTO DE POSESIÓN
1.3 DPC 0.08 US/HORA
2.8 IAM*HORA 0.62 US/HORA
3.5 SEGUROS HORARIO 0.12 US/HORA
4.5 IMPUESTOS HORARIO 0.04 US/HORA
5.5 ALMACENAJE HORARIO 0.04 US/HORA
COSTO DE POSESIÓN 0.90 US/HORA

CÁLCULO SADH
1.1 SAD $ 179,975 PESOS
1.2 HORAS AL AÑO 5,680 HORAS
1.3 SADH 31.69 US/HORA

INTERESES HORARIO
2.1 VALOR INICIAL $ 33,354
2.2 N 9
2.3 VALOR RESIDUAL $ 8,339
2.4 IAM SAD 109,985 US/HORA
2.5 R 15%
2.6 IAM*R 16,498 ANUAL
2.7 HORAS AL AÑO 5,680 HORAS/AÑO
2.8 INTERESES HORARIO 2.90 US/HORA

SEGUROS HORARIOS
3.1 IAM SAD 109,985
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 3300
3.4 HORAS AL AÑO 5,680 HORAS
3.5 SEGUROS HORARIOS 0.58 US/HORAS

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM SAD 109,985
4.3 IAM*PORCENTAJES 1099.85
4.4 HORAS AL AÑO 5,680
4.5 IMPUESTO HORARIO 0.19 US/HORAS

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM SAD 109,985
5.3 IAM*PORCENTAJES 1099.85
5.4 HORAS AL AÑO 5,680
5.5 ALMACENAJE HORARIO 0.19 US/HORAS

COSTO DE POSESIÓN
1.3 SADH 31.69 US/HORA
2.8 IAM*HORA 2.90 US/HORA
3.5 SEGUROS HORARIO 0.58 US/HORA
4.5 IMPUESTOS HORARIO 0.19 US/HORA
5.5 ALMACENAJE HORARIO 0.19 US/HORA
COSTO DE POSESIÓN 35.56 US/HORA

CÁLCULO COSTOS DE OPERACIÓN

COSTO DE MANTENIMIENTO
1.1 COSTO MANTENCIÓN 70%
1.2 VALOR INICIAL $ 33,354 US $
1.3 % MANTENIMIENTO 23,348 US $
1.4 VIDA ÚTIL 51,120 HORAS
1.5 COSTO MANTENIMIENTO 0.46 US/HORAS

COSTOS DE COMBUSTIBLES
2.1 CONSUMO 5 KM/L
2.2 VALOR COMBUSTIBLE $ 1,200 US/LT
2.3 VALOR DÓLAR 803 US $/CLP
2.4 COSTOS DE COMBUSTIBLES 7.47 US/HORA

COSTOS DE LUBRICANTE
3.1 CONSUMO LUBRICANTE 0.4 LITRO/HORA
3.2 VALOR LUBRICANTE $ 30 US/LT
3.3 VALOR DÓLAR 803 US $/CLP
3.4 COSTOS DE LUBRICANTE 0.015 US/HORA

COSTOS DE GRASAS
4.1 CONSUMO DE GRASAS 1 KILO/HORA
4.2 VALOR GRASAS 14 US/KILO
4.3 VALOR DÓLAR 803 US $/CLP
4.4 COSTO DE GRASAS 0.017 US/HORA

COSTOS DE FILTROS
5.1 COSTOS DE COMBUSTIBLES 7.47 US/HORA
5.2 COSTOS DE LUBRICANTE 15 US/HORA
5.3 FACTOR 0.2 US $/CLP
5.4 COSTOS DE FILTROS 8 US/HORA

COSTOS DE TREN DE AVANCE


6.1 CONJUNTO DE ORUGAS 1860 US $
6.2 VIDA ÚTIL MAQUINARIA 51120 HORAS
6.3 VIDA ÚTIL TREN DE AVANCE 10224 HORAS
6.4 N° DE CAMBIO ORUGA 5 UNIDAD
6.5 COSTOS TREN DE AVANCE 0.18 US/HORA

COSTOS PIEZAS DE DESGASTE


7.1 PIEZA DE DESGASTE 40%
7.2 COSTOS TREN DE AVANCE 0.18 US/HORA
7.3 COSTOS PIEZAS DE DESGASTE 0.07 US/HORA

COSTO OPERADOR
8.1 HORAS MENSUALES 355
8.2 VALOR DÓLAR 803 US $/CLP
8.3 COSTO OPERADOR 0.44 US/HORA

COSTOS TOTALES
1.5 COSTO MANTENIMIENTO 0.46 US/HORA
2.4 COSTO COMBUSTIBLES 7.47 US/HORA
3.4 COSTO DE LUBRICANTE 0.015 US/HORA
4.4 COSTO GRASAS 0.017 US/HORA
5.4 COSTO DE FILTROS 8 US/HORA
6.5 COSTOS TREN DE AVANCE 0.18 US/HORA
7.3 COSTO PIEZAS DE DESGASTE 0.073 US/HORA
8.3 COSTO OPERADOR 0.44 US/HORA
TOTAL COSTO OPERACIÓN 16.657871 US/HORA

COSTO HORARIO TOTAL CAMIÓN TOLVA


COSTO OPERACIÓN 16.65 US $
CPH DPC 1.27 US $
COSTO HORARIO TOTAL EXCAVADORA 17.92 US $
SUMA AÑOS DÍGITO
1 0.02222222
2 0.04444444
3 0.06666667
4 0.08888889
5 0.11111111
6 0.13333333
7 ###
8 0.17777778
9 0.20000000
45
CAMIÓN TOLVA
CÁLCULOS
horas días 11
Dólar $ 803 CLP $
año maquinaria 2016
valor inicial $ 108,630 CLP $
valor inicial + iva $ 129,270 CLP $
valor residual $ 27,158 CLP $
horas al mes 355 HRS
DL anual $ 11,639 CLP $
N 7 AÑOS
vida útil 28,230 HRS
h. total arriendo x HRS
sueldo operador $ 700,000 CLP $
leyes sociales % 30% PORCENTAJE
consumo litros por hora 40 LT/HR

CÁLCULO DE RENDIMIENTO
N 7
VALOR INICIAL 108,630
VALOR RESIDUAL 27,158 25%
81,473

OPERADOR
FERIADOS IRRENUNCIABLES DÍAS
15 de agosto 1
18 y 19 de septiembre 2
27 de octubre 1
01 de noviembre 1
08 - 17 y 25 de diciembre 3
TOTAL DÍAS FERIADOS 8

HORARIOS DE TRABAJO
DESCRIPCIÓN HORARIO UNIDAD
Ingreso 8:00
Salida 19:00
Horario sábados 08:00 a 14:00
Salida - Ingreso días de semana 11 hrs/días
Salida - Ingreso días sábados 6 hrs/días
Descuento operación 1 hrs/días
Descuento mantenimiento mensual 5 hrs/mes
Para 1 mes promedio 30 días 30
Horas en el mes 330
Mantenimiento horas 5
Horas efectivas de trabajo de la máquina 325
Horas finales operador 355 HR/MES
25%

de vi
COSTO HORARIO CAMIÓ ALJIBE
DEPRECIACIÓN LINEAL
AÑOS Vij Vr Dij Vfj
0 $ 108,630
1 $ 108,630 $ 27,158 $ 9,053 $ 99,577
2 $ 99,577 $ 27,158 $ 9,053 $ 90,524
3 $ 90,524 $ 27,158 $ 9,053 $ 81,471
4 $ 81,471 $ 27,158 $ 9,053 $ 72,418
5 $ 72,418 $ 27,158 $ 9,053 $ 63,365
6 $ 63,365 $ 27,158 $ 9,053 $ 54,312
7 $ 54,312 $ 27,158 $ 9,053 $ 45,259

1 SUMA IA 570,297 K´ 1/N


2 IAM 81,471 0.1
3 SUMA DL 63,371
4 DL 11,639
5 DL ANUAL 11,639
6 HORAS AÑO 4,033

DEPRECIACIÓN PORCENTAJE CONSTANTE


AÑOS Vij Vr Dij Vfj
0 $ 108,630
1 $ 108,630 $ 27,158 $ 2,780 $ 105,850
2 $ 105,850 $ 27,158 $ 11,242 $ 94,608
3 $ 94,608 $ 27,158 $ 9,636 $ 84,973
4 $ 84,973 $ 27,158 $ 8,259 $ 76,713
5 $ 76,713 $ 27,158 $ 7,079 $ 69,634
6 $ 69,634 $ 27,158 $ 6,068 $ 63,566
7 $ 63,566 $ 27,158 $ 5,201 $ 58,365

1 SUMA IA 603,974 490,081,836


2 IAM DPC 86,282
3 SUMA DPC 50,265 1.50% almacenaje
4 DPC 1,294
5 HORAS AÑO 4,033

DEPRECIACIÓN SUMA DE AÑOS DÍGITOS SUMA AÑOS DÍGITO


AÑOS Vij Vr Dij Vfj
0 $ 108,630
1 $ 108,630 $ 27,158 $ 20,368 $ 88,262
2 $ 88,262 $ 27,158 $ 17,458 $ 70,803
3 $ 70,803 $ 27,158 $ 14,549 $ 56,255
4 $ 56,255 $ 27,158 $ 11,639 $ 44,616
5 $ 44,616 $ 27,158 $ 8,729 $ 35,887
6 $ 35,887 $ 27,158 $ 5,819 $ 30,067 TOTAL AÑOS
7 $ 30,067 $ 27,158 $ 2,910 $ 27,158
1 SUMA IA 434,520
2 IAM SAD 62,074
3 SUMA DPC 81,473
4 SAD 79,004
5 HORAS AÑO 4,033

CÁLCULO COSTOS DE POSESIÓN

CALCULAR DHL
ÍTEM DESCRIPCIÓN
1.1 DL $ 11,639 PESOS
1.2 HORAS AL AÑO 4,033 HORAS
1.3 DHL 2.89 US/HORA

CALCULAR K´
1.3 DLANUAL $ 11,639
1.4 VALOR INICIAL $ 108,630
1.5 VALOR RESIDUAL $ 27,158
K´ 0.14

INTERESES HORARIO
2.1 VALOR INICIAL $ 108,630
2.2 N 7
2.3 VALOR RESIDUAL $ 27,158
2.4 IAM $ 81,471 US/HORA
2.5 R 15%
2.6 IAM*R $ 12,221 ANUAL
2.7 HORAS AL AÑO 4,033 HORAS/AÑO
2.8 INTERESES HORARIO 3.03 US/HORA

SEGUROS HORARIOS
3.1 IAM $ 81,471
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 2,444
3.4 HORAS AL AÑO 4,033 HORAS/AÑO
3.5 SEGUROS HORARIOS 0.61 US/HORA

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM $ 81,471
4.3 IAM*PORCENTAJES 814.71
4.4 HORAS AL AÑO 4,033
4.5 IMPUESTO HORARIO 0.20 US/HORA

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM $ 81,471
5.3 IAM*PORCENTAJES 814.71
5.4 HORAS AL AÑO 4,033
5.5 ALMACENAJE HORARIO 0.20 US/HORA

COSTO DE POSESIÓN
1.3 DHL 2.89 US/HORA
2.8 IAM*HORA 3.03 US/HORA
3.5 SEGUROS HORARIO 0.61 US/HORA
4.5 IMPUESTOS HORARIO 0.20 US/HORA
5.5 ALMACENAJE HORARIO 0.20 US/HORA
COSTO DE POSESIÓN 6.92615919 US/HORA

CÁLCULO DPCH
1.1 DPC $ 1,294 PESOS
1.2 HORAS AL AÑO 4,033 HORAS
1.3 DPCH 0.32 US/HORA

CALCULAR K´
2K $ 0.29

INTERESES HORARIO
2.1 VALOR INICIAL $ 108,630
2.2 N 7
2.3 VALOR RESIDUAL $ 27,158
2.4 IAM DPC 86,282 US/HORA
2.5 R 15%
2.6 IAM*R 12,942 ANUAL
2.7 HORAS AL AÑO 4,033 HORAS/AÑO
2.8 INTERESES HORARIO 3.21 US/HORA

SEGUROS HORARIOS
3.1 IAM DPC 86,282
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 2588
3.4 HORAS AL AÑO 4,033 HORAS
3.5 SEGUROS HORARIOS 0.64 US/HORAS

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM DPC 86,282
4.3 IAM*PORCENTAJES 862.82
4.4 HORAS AL AÑO 4,033
4.5 IMPUESTO HORARIO 0.21 US/HORAS

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM DPC 86,282
5.3 IAM*PORCENTAJES 862.82
5.4 HORAS AL AÑO 4,033
5.5 ALMACENAJE HORARIO 0.21 US/HORAS

COSTO DE POSESIÓN
1.3 DPC 0.32 US/HORA
2.8 IAM*HORA 3.21 US/HORA
3.5 SEGUROS HORARIO 0.64 US/HORA
4.5 IMPUESTOS HORARIO 0.21 US/HORA
5.5 ALMACENAJE HORARIO 0.21 US/HORA
COSTO DE POSESIÓN 4.60 US/HORA

CÁLCULO SADH
1.1 SAD $ 79,004 PESOS
1.2 HORAS AL AÑO 4,033 HORAS
1.3 SADH 19.59 US/HORA

INTERESES HORARIO
2.1 VALOR INICIAL $ 108,630
2.2 N 7
2.3 VALOR RESIDUAL $ 27,158
2.4 IAM SAD 62,074 US/HORA
2.5 R 15%
2.6 IAM*R 9,311 ANUAL
2.7 HORAS AL AÑO 4,033 HORAS/AÑO
2.8 INTERESES HORARIO 2.31 US/HORA

SEGUROS HORARIOS
3.1 IAM SAD 62,074
3.2 PRIMA SEGURO ANUAL 3%
3.3 IAM*PSA 1862
3.4 HORAS AL AÑO 4,033 HORAS
3.5 SEGUROS HORARIOS 0.46 US/HORAS

IMPUESTO HORARIO
4.1 PORCENTAJES 1%
4.2 IAM SAD 62,074
4.3 IAM*PORCENTAJES 620.742857
4.4 HORAS AL AÑO 4,033
4.5 IMPUESTO HORARIO 0.15 US/HORAS

ALMACENAJE HORARIO
5.1 PORCENTAJES 1%
5.2 IAM SAD 62,074
5.3 IAM*PORCENTAJES 620.742857
5.4 HORAS AL AÑO 4,033
5.5 ALMACENAJE HORARIO 0.15 US/HORAS

COSTO DE POSESIÓN
1.3 SADH 19.59 US/HORA
2.8 IAM*HORA 2.31 US/HORA
3.5 SEGUROS HORARIO 0.46 US/HORA
4.5 IMPUESTOS HORARIO 0.15 US/HORA
5.5 ALMACENAJE HORARIO 0.15 US/HORA
COSTO DE POSESIÓN 22.67 US/HORA

CÁLCULO COSTOS DE OPERACIÓN

COSTO DE MANTENIMIENTO
1.1 COSTO MANTENCIÓN 70%
1.2 VALOR INICIAL $ 108,630 US $
1.3 % MANTENIMIENTO 76,041 US $
1.4 VIDA ÚTIL 28,230 HORAS
1.5 COSTO MANTENIMIENTO 2.69 US/HORAS

COSTOS DE COMBUSTIBLES
2.1 CONSUMO 10 KM/L
2.2 VALOR COMBUSTIBLE $ 1,200 US/LT
2.3 VALOR DÓLAR 803 US $/CLP
2.4 COSTOS DE COMBUSTIBLES 14.94 US/HORA

COSTOS DE LUBRICANTE
3.1 CONSUMO LUBRICANTE 0.4 LITRO/HORA
3.2 VALOR LUBRICANTE $ 30 US/LT
3.3 VALOR DÓLAR 803 US $/CLP
3.4 COSTOS DE LUBRICANTE 0.015 US/HORA

COSTOS DE GRASAS
4.1 CONSUMO DE GRASAS 1 KILO/HORA
4.2 VALOR GRASAS 12 US/KILO
4.3 VALOR DÓLAR 803 US $/CLP
4.4 COSTO DE GRASAS 0.015 US/HORA

COSTOS DE FILTROS
5.1 COSTOS DE COMBUSTIBLES 14.94 US/HORA
5.2 COSTOS DE LUBRICANTE 15 US/HORA
5.3 FACTOR 0.2 US $/CLP
5.4 COSTOS DE FILTROS 8 US/HORA

COSTOS DE TREN DE AVANCE


6.1 COSTO NEUMÁTICO 370 US $
6.2 VIDA ÚTIL MAQUINARIA 28230 HORAS
6.3 VIDA ÚTIL TREN DE AVANCE 50000 HORAS
6.4 N° DE CAMBIO ORUGA 10 UNIDAD
6.5 COSTOS TREN DE AVANCE 0.01 US/HORA

COSTOS PIEZAS DE DESGASTE


7.1 PIEZA DE DESGASTE 60%
7.2 COSTOS TREN DE AVANCE 0.50 US/HORA
7.3 COSTOS PIEZAS DE DESGASTE 0.30 US/HORA

COSTO OPERADOR
8.1 HORAS MENSUALES 355
8.2 VALOR DÓLAR 803 US $/CLP
8.3 COSTO OPERADOR 0.44 US/HORA

COSTOS TOTALES
1.5 COSTO MANTENIMIENTO 2.69 US/HORA
2.4 COSTO COMBUSTIBLES 14.94 US/HORA
3.4 COSTO DE LUBRICANTE 0.015 US/HORA
4.4 COSTO GRASAS 0.015 US/HORA
5.4 COSTO DE FILTROS 8 US/HORA
6.5 COSTOS TREN DE AVANCE 0.01 US/HORA
7.3 COSTO PIEZAS DE DESGASTE 0.300 US/HORA
8.3 COSTO OPERADOR 0.44 US/HORA
TOTAL COSTO OPERACIÓN 26.416964 US/HORA

COSTO HORARIO TOTAL CAMIÓN ALJIBE


COSTO OPERACIÓN 26.42 US $
CPH DPC 6.93 US $
COSTO HORARIO TOTAL EXCAVADORA 33.35 US $
SUMA AÑOS DÍGITO
1 0.03571429
2 0.07142857
3 0.10714286
4 0.14285714
5 0.17857143
6 0.21428571
7 ###
28
DESCRIPCIÓN TOTAL UNI
Volumen del trabajo 48020 m³
Plazo por conteo 12 Meses
12 Total jornada
Cantidad de trabajo en horas 1 Descuento por detención operativa
11 Horas efectivas de trabajo
Días de trabajo mensual (Lunes a Sábado) 26 Días/mes
Horas de trabajo 3432 Horas

Rendimiento requerido 14 m³/hrs

RENDIMIENTO DE LA FLOTA
MAQUINARIA RENDIMIENTO (m³/hrs) CANTIDAD (N°)
Excavadora 90 6
Camión tolva 21 5
Aljibe 81,473 8

EXCAVADORA
DESCRIPCIÓN CANTIDAD
Ancho base 35
Ancho corona 30
Largo 25000
m² totales 1715
m³ totales 12005
día/m³ 90
Días totales 312
Horas totales 3432
H/m³ 3
H/m² 0.50

CAMIÓN TOLVA
DESCRIPCIÓN CANTIDAD
Ancho base 35
Ancho corona 30
Largo 25000
m² totales 1715
m³ totales 12005
día/m³ 90
Días totales 312
Horas totales 3432
H/m³ 3
H/m² 0.50

CAMIÓN ALJIBE
DESCRIPCIÓN CANTIDAD
Ancho base 35
Ancho corona 30
Largo 25000
m² totales 1715
m³ totales 12005
día/m³ 90
Días totales 312
Horas totales 3432
H/m³ 3
H/m² 0.50
OTA
RENDIMIENTO REAL (m³/hrs)
540
105
651,784
PRIMERA FLOTA
COSTO HORARIO COMPRA
PRESUPUESTO
Descripción US$ CL$
COSTOS DIRECTO EXCAVADORA 70.70 55,746.95
SUB TOTAL COSTO DIRECTO (NETO) 57.27 45,155.03
GASTOS GENERALES (30%) 17.18 13,546.51
SUB TOTAL GASTOS GENERALES (NETO) 74.45 58,701.54
UTILIDAD (30%) 5.15 4,063.95
SUB TOTAL CON UTILIDAD (NETO) 136.87 107,920.52
IVA (19%) 26.00 20,504.90
TOTAL VALOR 162.87 128,425.42

PRIMERA FLOTA
COSTO HORARIO COMPRA
PRESUPUESTO
Descripción US$ CL$
COSTO DIRECTO CAMIONES ALJIBE 33.35 26,296.48
SUB TOTAL COSTO DIRECTO (NETO) 27.01 21,300.14
GASTOS GENERALES (30%) 8.10 6,390.04
SUB TOTAL GASTOS GENERALES (NETO) 35.12 27,690.19
UTILIDAD (30%) 2.43 1,917.01
SUB TOTAL CON UTILIDAD (NETO) 64.56 50,907.35
IVA (19%) 12.27 9,672.40
TOTAL VALOR 76.83 60,579.74

SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO
Descripción US$ CL$
COSTOS DIRECTO EXCAVADORA 90.13 71,067.51
SUB TOTAL COSTO DIRECTO (NETO) 73.01 57,564.68
GASTOS GENERALES (30%) 21.90 17,269.40
SUB TOTAL GASTOS GENERALES (NETO) 94.91 74,834.08
UTILIDAD (30%) 6.57 5,180.82
SUB TOTAL CON UTILIDAD (NETO) 174.48 137,579.58
IVA (19%) 33.15 26,140.12
TOTAL VALOR 207.63 163,719.70

SEGUNDA FLOTA
COSTO HORARIO ARRIENDO
PRESUPUESTO
Descripción US$ CL$
COSTO DIRECTO CAMIONES ALJIBE 56.02 44,171.77
SUB TOTAL COSTO DIRECTO (NETO) 45.38 35,779.13
GASTOS GENERALES (30%) 13.61 10,733.74
SUB TOTAL GASTOS GENERALES (NETO) 58.99 46,512.87
UTILIDAD (30%) 4.08 3,220.12
SUB TOTAL CON UTILIDAD (NETO) 108.45 85,512.13
IVA (19%) 20.61 16,247.30
TOTAL VALOR 129.05 101,759.43

PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO UTILIDAD 20% COMPRA MAQUINARIA
Descripción US$ CL$
COSTOS DIRECTO EXCAVADORA 70.70 55,746.95
SUB TOTAL COSTO DIRECTO (NETO) 57.27 45,155.03
GASTOS GENERALES (30%) 17.18 13,546.51
SUB TOTAL GASTOS GENERALES (NETO) 74.45 58,701.54
UTILIDAD (20%) 3.44 2,709.30
SUB TOTAL CON UTILIDAD (NETO) 135.15 106,565.87
IVA (19%) 25.68 20,247.52
TOTAL VALOR 160.83 126,813.38

PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO UTILIDAD 20% COMPRA MAQUINARIA
Descripción US$ CL$
COSTO DIRECTO CAMIONES ALJIBE 33.35 26,296.48
SUB TOTAL COSTO DIRECTO (NETO) 27.01 21,300.14
GASTOS GENERALES (30%) 8.10 6,390.04
SUB TOTAL GASTOS GENERALES (NETO) 35.12 27,690.19
UTILIDAD (20%) 1.62 1,278.01
SUB TOTAL CON UTILIDAD (NETO) 63.75 50,268.34
IVA (19%) 12.11 9,550.98
TOTAL VALOR 75.86 59,819.33

SEGUNDAA FLOTA
COSTO ARRIENDO
PRESUPUESTO UTILIDAD 20% ARRIENDO MAQUINARIA
Descripción US$ CL$
COSTOS DIRECTO EXCAVADORA 90.13 71,067.51
SUB TOTAL COSTO DIRECTO (NETO) 73.01 57,564.68
GASTOS GENERALES (30%) 21.90 17,269.40
SUB TOTAL GASTOS GENERALES (NETO) 94.91 74,834.08
UTILIDAD (20%) 4.38 3,453.88
SUB TOTAL CON UTILIDAD (NETO) 172.29 135,852.64
IVA (19%) 32.74 25,812.00
TOTAL VALOR 205.03 161,664.64
SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO UTILIDAD 20% ARRIENDO MAQUINARIA
Descripción US$ CL$
COSTO DIRECTO CAMIONES ALJIBE 56.02 44,171.77
SUB TOTAL COSTO DIRECTO (NETO) 45.38 35,779.13
GASTOS GENERALES (30%) 13.61 10,733.74
SUB TOTAL GASTOS GENERALES (NETO) 58.99 46,512.87
UTILIDAD (20%) 2.72 2,146.75
SUB TOTAL CON UTILIDAD (NETO) 107.09 84,438.76
IVA (19%) 20.35 16,043.36
TOTAL VALOR 127.43 100,482.12

PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO UTILIDAD 40% COMPRA MAQUINARIA
Descripción US$ CL$
COSTOS DIRECTO EXCAVADORA 33.35 26,296.48
SUB TOTAL COSTO DIRECTO (NETO) 27.01 21,300.14
GASTOS GENERALES (30%) 8.10 6,390.04
SUB TOTAL GASTOS GENERALES (NETO) 35.12 27,690.19
UTILIDAD (40%) 3.24 2,556.02
SUB TOTAL CON UTILIDAD (NETO) 65.37 51,546.35
IVA (19%) 12.42 9,793.81
TOTAL VALOR 77.79 61,340.16

PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO UTILIDAD 40% COMPRA MAQUINARIA
Descripción US$ CL$
COSTO DIRECTO CAMIONES ALJIBE 33.35 26,296.48
SUB TOTAL COSTO DIRECTO (NETO) 27.01 21,300.14
GASTOS GENERALES (30%) 8.10 6,390.04
SUB TOTAL GASTOS GENERALES (NETO) 35.12 27,690.19
UTILIDAD (40%) 3.24 2,556.02
SUB TOTAL CON UTILIDAD (NETO) 65.37 51,546.35
IVA (19%) 12.42 9,793.81
TOTAL VALOR 77.79 61,340.16

SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO UTILIDAD 40% ARRIENDO MAQUINARIA
Descripción US$ CL$
COSTOS DIRECTO EXCAVADORA 90.13 71,067.51
SUB TOTAL COSTO DIRECTO (NETO) 73.01 57,564.68
GASTOS GENERALES (30%) 21.90 17,269.40
SUB TOTAL GASTOS GENERALES (NETO) 94.91 74,834.08
UTILIDAD (40%) 8.76 6,907.76
SUB TOTAL CON UTILIDAD (NETO) 176.67 139,306.52
IVA (19%) 33.57 26,468.24
TOTAL VALOR 210.24 165,774.76

SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO UTILIDAD 40% ARRIENDO MAQUINARIA
Descripción US$ CL$
COSTO DIRECTO CAMIONES ALJIBE 56.02 44,171.77
SUB TOTAL COSTO DIRECTO (NETO) 45.38 35,779.13
GASTOS GENERALES (30%) 13.61 10,733.74
SUB TOTAL GASTOS GENERALES (NETO) 58.99 46,512.87
UTILIDAD (40%) 5.45 4,293.50
SUB TOTAL CON UTILIDAD (NETO) 109.81 86,585.50
IVA (19%) 20.86 16,451.25
TOTAL VALOR 130.67 103,036.75
PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO
UF Descripción
1.55 COSTO DIRECTO CAMIONES ALJIBE
1.25 SUB TOTAL COSTO DIRECTO (NETO)
0.38 GASTOS GENERALES (30%)
1.63 SUB TOTAL GASTOS GENERALES (NETO)
0.11 UTILIDAD (30%)
2.99 SUB TOTAL CON UTILIDAD (NETO)
0.57 IVA (19%)
3.56 TOTAL VALOR

Valor dólar (09/06/2023) 788.5


Valor UF (09/06/2023) 36064.24
UF
0.73
0.59
0.18
0.77
0.05
1.41
0.27
1.68

SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO
UF Descripción
1.97 COSTOS DIRECTO CAMIONES TOLVA
1.60 SUB TOTAL COSTO DIRECTO (NETO)
0.48 GASTOS GENERALES (30%)
2.08 SUB TOTAL GASTOS GENERALES (NETO)
0.14 UTILIDAD (30%)
3.81 SUB TOTAL CON UTILIDAD (NETO)
0.72 IVA (19%)
4.54 TOTAL VALOR

Valor dólar (09/06/2023) 788.5


Valor UF (09/06/2023) 36064.24

UF
1.22
0.99
0.30
1.29
0.09
2.37
0.45
2.82

PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO UTILIDAD 20% COMPRA MAQUINARIA
UF Descripción
1.55 COSTO DIRECTO CAMIONES TOLVA
1.25 SUB TOTAL COSTO DIRECTO (NETO)
0.38 GASTOS GENERALES (30%)
1.63 SUB TOTAL GASTOS GENERALES (NETO)
0.08 UTILIDAD (20%)
2.95 SUB TOTAL CON UTILIDAD (NETO)
0.56 IVA (19%)
3.52 TOTAL VALOR

Valor dólar (09/06/2023) 788.5


Valor UF (09/06/2023) 36064.24

UF
0.73
0.59
0.18
0.77
0.04
1.39
0.26
1.66

SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO UTILIDAD 20% ARRIENDO MAQUINARIA
UF Descripción
1.97 COSTO DIRECTO CAMIONES TOLVA
1.60 SUB TOTAL COSTO DIRECTO (NETO)
0.48 GASTOS GENERALES (30%)
2.08 SUB TOTAL GASTOS GENERALES (NETO)
0.10 UTILIDAD (20%)
3.77 SUB TOTAL CON UTILIDAD (NETO)
0.72 IVA (19%)
4.48 TOTAL VALOR
Valor dólar (09/06/2023) 788.5
Valor UF (09/06/2023) 36064.24

UF
1.22
0.99
0.30
1.29
0.06
2.34
0.44
2.79

PRIMERA FLOTA
COSTO HORARIO
PRESUPUESTO UTILIDAD 40% COMPRA MAQUINARIA
UF Descripción
0.73 COSTO DIRECTO CAMIONES ALJIBE
0.59 SUB TOTAL COSTO DIRECTO (NETO)
0.18 GASTOS GENERALES (30%)
0.77 SUB TOTAL GASTOS GENERALES (NETO)
0.07 UTILIDAD (40%)
1.43 SUB TOTAL CON UTILIDAD (NETO)
0.27 IVA (19%)
1.70 TOTAL VALOR

Valor dólar (09/06/2023) 788.5


Valor UF (09/06/2023) 36064.24

UF
0.73
0.59
0.18
0.77
0.07
1.43
0.27
1.70

SEGUNDA FLOTA
COSTO ARRIENDO
PRESUPUESTO UTILIDAD 40% ARRIENDO MAQUINARIA
UF Descripción
1.97 COSTO DIRECTO CAMIONES TOLVA
1.60 SUB TOTAL COSTO DIRECTO (NETO)
0.48 GASTOS GENERALES (30%)
2.08 SUB TOTAL GASTOS GENERALES (NETO)
0.19 UTILIDAD (40%)
3.86 SUB TOTAL CON UTILIDAD (NETO)
0.73 IVA (19%)
4.60 TOTAL VALOR

Valor dólar (09/06/2023) 788.5


Valor UF (09/06/2023) 36064.24

UF
1.22
0.99
0.30
1.29
0.12
2.40
0.46
2.86
US$ CL$ UF
17.92 14,129.92 0.39
14.52 11,445.24 0.32
4.35 3,433.57 0.10
18.87 14,878.81 0.41
1.31 1,030.07 0.03
34.69 27,354.11 0.76
6.59 5,197.28 0.14
41.28 32,551.39 0.90

US$ CL$ UF
56.48 44,534.48 1.23
45.75 36,072.93 1.00
13.72 10,821.88 0.30
59.47 46,894.81 1.30
4.12 3,246.56 0.09
109.34 86,214.30 2.39
20.77 16,380.72 0.45
130.11 102,595.02 2.84
PRA MAQUINARIA
US$ CL$ UF
17.92 14,129.92 0.39
14.52 11,445.24 0.32
4.35 3,433.57 0.10
18.87 14,878.81 0.41
0.87 686.71 0.02
34.26 27,010.76 0.75
6.51 5,132.04 0.14
40.76 32,142.80 0.89

NDO MAQUINARIA
US$ CL$ UF
56.48 44,534.48 1.23
45.75 36,072.93 1.00
13.72 10,821.88 0.30
59.47 46,894.81 1.30
2.74 2,164.38 0.06
107.97 85,132.11 2.36
20.51 16,175.10 0.45
128.48 101,307.21 2.81
PRA MAQUINARIA
US$ CL$ UF
17.92 14,129.92 0.39
14.52 11,445.24 0.32
4.35 3,433.57 0.10
18.87 14,878.81 0.41
1.74 1,373.43 0.04
35.13 27,697.47 0.77
6.67 5,262.52 0.15
41.80 32,959.99 0.91

NDO MAQUINARIA
US$ CL$ UF
56.48 44,534.48 1.23
45.75 36,072.93 1.00
13.72 10,821.88 0.30
59.47 46,894.81 1.30
5.49 4,328.75 0.12
110.71 87,296.49 2.42
21.04 16,586.33 0.46
131.75 103,882.82 2.88

También podría gustarte