PRESUPUESTO
PRECIO UNITARIO
N° CLAVE CONCEPTO UNIDAD CANTIDAD PRECIO IMPORTE
( CON UNITARIO
LETRA)
PRELIMINARES
TOTAL= $1,214.71
ESTRUCTURA
TOTAL= $264,733.66
ALBAÑILERIA
LEVANTAMIENTO DE MURO DE
BLOCK. INCLUYE: MATERIAL, CIENTO VEINTI
EQUIPO, HERRAMIENTA,
5 ALBA-01 M2 54.6 CINCO PESOS $125.89 $6,873.59
NIVELACION, SUPERVICION, MANO
89/100 M.N
DE OBRA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION.
SOLDADURA,COLOCACION Y
ANCLAJE DE PTR 10" X 4" JUNTO A
ANGULO DE 2" X 1/4".
INCLUYE:
NOVECIENTOS SIETE
6 ALBA-02 MATERIAL, SUPERVISION, DETALLE, ML 147.91 $1,226.36 $181,390.91
MANO DE OBRA, EQUIPO, PESOS 81/100 M.N
HERRAMIENTA, PINTURA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCUCION.
TOTAL= $188,264.50
ACABADOS
TOTAL= $72,218.37
SUBTOTAL $526,431.25
IVA $84,229.00
TOTAL $610,660.25
SEICIENTOS DIEZ MIL SEISCIENTOS SESENTA PESOS 25/100 M.N