Está en la página 1de 16

COMPUTOS MÉTRICOS

COMUNIDAD: JURUNA
PROYECTO: CONSTRUCCION PUESTO DE SALUD JURUNA GOBIERNO AUTONOMO MUNICIPAL DE TACOBAMBA
MODULO: OBRA GRUESA
DIMENSIONES [m] CANTIDADES

UNID N° ESQUEMA
ÍTEM
a b l h PARCIAL TOTAL
1 REPLANTEO DE OBRA M²
28.20 18.40 1 518.88
518.88
2 EXCAVACIÓN PARA FUNDACIONES M³
EXCAVACION ZAPATAS TIPO 2 0.80 0.80 1.50 11 10.56
EXCAVACION ZAPATAS TIPO 1 0.70 0.70 0.80 42 16.46
EJE A, TRAMO 1-12 0.40 14.80 0.50 1 2.96
EJE B 0.40 2.12 0.50 1 0.42
EJE C, TRAMO 10-12 0.40 3.29 0.50 1 0.66
EJE D TRAMO 1-5 0.40 4.90 0.50 1 0.98
EJE F 0.40 8.95 0.50 1 1.79
EJE H 0.40 2.01 0.50 1 0.40
EJE I , TRAMO 1-4 0.40 6.01 0.50 1 1.20
EJE J, TRAMO 5-12 0.40 7.84 0.50 1 1.57
EJE L 0.40 5.84 0.50 1 1.17
EJE N 0.40 13.16 0.50 2 5.26
EJE M 0.40 2.69 0.50 2 1.08
EJE O 0.40 12.05 0.50 1 2.41
EJE P, TRAMO 1-12 0.40 14.88 0.50 1 2.98
EJE 1 0.40 21.89 1.30 1 11.38
EJE 3 0.40 6.43 0.50 1 1.29
EJE 4 0.40 14.70 0.50 1 2.94
EJE 5 0.40 17.47 0.50 1 3.49
EJE 7 0.40 4.59 0.50 1 0.92
EJE 8 0.40 12.49 0.50 1 2.50
EJE 9 0.40 3.76 0.50 1 0.75
EJE 10 0.40 10.44 0.50 1 2.09
EJE 11 0.40 3.00 0.50 1 0.60
EJE 12 0.40 17.56 0.50 1 3.51
79.37
3 CIMIENTOS DE HºCº M³
EJE A 0.40 18.01 0.50 1 3.60
EJE B 0.40 2.12 0.50 1 0.42
EJE C 0.40 3.69 0.50 1 0.74
EJE D 0.40 6.30 0.50 1 1.26
EJE F 0.40 10.50 1.40 1 5.88
EJE H 0.40 2.31 0.50 1 0.46
EJE I 0.40 6.01 0.50 1 1.20
EJE J 0.40 9.49 0.50 1 1.90
EJE L 0.40 6.34 0.50 1 1.27
EJE M 0.40 2.69 0.50 1 0.54
EJE N 0.40 15.42 0.50 1 3.08
EJE O 0.40 13.70 0.50 1 2.74
EJE P 0.40 18.06 0.50 1 3.61
EJE 1 0.40 27.87 1.40 1 15.61
EJE 3 0.40 6.45 0.50 1 1.29
EJE 4 0.40 18.20 0.50 1 3.64
EJE 5 0.40 21.23 0.50 1 4.25
EJE 7 0.40 4.59 0.50 1 0.92
EJE 8 0.40 14.52 0.50 1 2.90
EJE 9 0.40 3.76 0.50 1 0.75
EJE 10 0.40 12.19 0.50 1 2.44
EJE 11 0.40 3.00 0.50 1 0.60
EJE 12 0.40 23.28 0.50 1 4.66
COLUMNAS 0.20 0.20 0.50 -52 -1.04
62.72
4 SOBRECIMIENTOS DE HºCº M³
1 EJE A 0.15 17.40 0.30 1 0.78
2 EJE B 0.15 2.36 0.30 1 0.11
3 EJE C 0.15 3.89 0.30 1 0.18
4 EJE D 0.15 5.05 0.30 1 0.23
5 EJE F 0.15 7.94 0.30 1 0.36
6 EJE H 0.15 2.51 0.30 1 0.11
7 EJE I 0.15 6.54 0.30 1 0.29
8 EJE J 0.15 7.07 0.30 1 0.32
9 EJE L 0.15 6.52 0.30 1 0.29
10 EJE M 0.15 2.94 0.30 1 0.13
11 EJE N 0.15 14.40 0.30 1 0.65
12 EJE O 0.15 13.50 0.30 1 0.61
13 EJE P 0.15 16.76 0.30 1 0.75
14 EJE 1 0.15 25.89 0.50 1 1.94
15 EJE 3 0.15 5.49 0.30 1 0.25
16 EJE 4 0.15 13.10 0.30 1 0.59
17 EJE 5 0.15 19.33 0.30 1 0.87
18 EJE 7 0.15 3.49 0.30 1 0.16
19 EJE 8 0.15 12.84 0.30 1 0.58
20 EJE 9 0.15 4.27 0.30 1 0.19
21 EJE 10 0.15 11.09 0.30 1 0.50
22 EJE 11 0.15 2.40 0.30 1 0.11
23 EJE 12 0.15 20.33 0.30 1 0.91
10.91
5 IMPERMEABILIZACIÓN DE SOBRECIMIENTOS M²
1 EJE A 0.15 17.40 1 2.61
2 EJE B 0.15 2.36 1 0.35
3 EJE C 0.15 3.89 1 0.58
4 EJE D 0.15 5.05 1 0.76
5 EJE F 0.15 7.94 1 1.19
6 EJE H 0.15 2.51 1 0.38
7 EJE I 0.15 6.54 1 0.98
8 EJE J 0.15 7.07 1 1.06
9 EJE L 0.15 6.52 1 0.98
10 EJE M 0.15 2.94 1 0.44
11 EJE N 0.15 14.40 1 2.16
12 EJE O 0.15 13.50 1 2.03
13 EJE P 0.15 16.76 1 2.51
14 EJE 1 0.15 25.89 1 3.88
15 EJE 3 0.15 5.49 1 0.82
16 EJE 4 0.15 13.10 1 1.97
17 EJE 5 0.15 19.33 1 2.90
18 EJE 7 0.15 3.49 1 0.52
19 EJE 8 0.15 12.84 1 1.93
20 EJE 9 0.15 4.27 1 0.64
21 EJE 10 0.15 11.09 1 1.66
22 EJE 11 0.15 2.40 1 0.36
23 EJE 12 0.15 20.33 1 3.05
33.76
6 MURO DE LADRILLO DE 6H (e = 16 CM) M²
1 EJE A 17.40 2.40 1 41.76
2 EJE B 2.36 2.40 1 5.66
3 EJE C 3.89 2.40 1 9.34
4 EJE D 5.05 2.40 1 12.12
5 EJE F 7.94 2.40 1 19.06
6 EJE H 2.51 2.40 1 6.02
7 EJE I 6.54 2.40 1 15.70
8 EJE J 7.07 2.40 1 16.97
9 EJE L 6.52 2.40 1 15.65
10 EJE M 2.94 2.40 1 7.06
11 EJE N 14.40 2.40 1 34.56
12 EJE O 13.50 2.40 1 32.40
13 EJE P 16.76 2.40 1 40.22
14 EJE 1 25.89 2.20 1 56.96
15 EJE 3 5.49 2.40 1 13.18
16 EJE 4 13.10 2.40 1 31.44
17 EJE 5 19.33 2.40 1 46.39
18 EJE 7 3.49 2.40 1 8.38
19 EJE 8 12.84 2.40 1 30.82
20 EJE 9 4.27 2.40 1 10.25
21 EJE 10 11.09 2.40 1 26.62
22 EJE 11 2.40 2.40 1 5.76
23 EJE 12 20.33 2.40 1 48.79
EJE B (SIN VIGA) 2.36 0.30 1 0.71
EJE I (SIN VIGA) 2.56 0.30 1 0.77
EJE M (SIN VIGA) 2.94 0.30 1 0.88
EJE O (SIN VIGA) 2.05 0.30 1 0.62
EJE 3 (SIN VIGA) 6.89 0.30 1 2.07
EJE 7 (SIN VIGA) 4.34 0.30 1 1.30
EJE 9 (SIN VIGA) 4.27 0.30 1 1.28
EJE 11 (SIN VIGA) 3.25 0.30 1 0.98
MOJINETE 1 3.50 1.65 2 11.55
MOJINETE 2 3.00 1.65 2 9.90
VENTANA TIPO 1(60X100) 0.60 1.00 -10 -6.00
VENTANA TIPO 2(60X60) 0.60 0.60 -5 -1.80
VENTANA TIPO 3(100X100) 1.00 1.00 -1 -1.00
VENTANA TIPO 4(120X100) 1.20 1.00 -5 -6.00
VENTANA TIPO 5(180X100) 1.80 1.00 -4 -7.20
543.13
7 REVOQUE EXTERIOR CAL CEMENTO M²
EJE 12 21.93 2.50 1 54.83
VENTANA T-5(180x100) 1.80 1.00 -4 -7.20
PUERTA PRINCIPAL 1.14 2.50 2 5.70
VENTANA TIPO 1(60x100) 0.60 1.00 -1 -0.60
EJE A 18.60 2.50 1 46.50
EJE 1 27.69 2.50 1 69.23
VENTANA TIPO 1(60x100) 0.60 1.00 -1 -0.60
VENTANA TIPO 2(60x60) 0.60 0.60 -2 -0.72
VENTANA TIPO 4(120x100) 1.20 1.00 -5 -6.00
EJE P 17.96 2.50 1 44.90
VENTANA T-1(60x100) 0.60 1.00 -5 -3.00
INTERIOR GARAJE - PATIO 61.49 2.50 1 153.73
PUERTA T-1 0.70 2.50 -3 -5.25
GARAJE 3.00 2.50 -1 -7.50
PUERTA T-2 0.85 2.20 -3 -5.61
VENTANA T-1 0.60 1.00 -1 -0.60
VENTANA T-2 0.60 0.60 -2 -0.72
VENTANA T-3 1.00 1.00 -1 -1.00
PUERTA T-3 2.00 2.20 -2 -8.80
JARDIN 27.97 2.50 1 69.93
PUERTA T-2 0.85 2.20 -2 -3.74
VENTANA T-2 0.60 0.60 -1 -0.36
393.10
8 ZAPATAS DE HºAº M³
ZAPATA TIPO 2 0.80 0.80 0.25 11 1.76
ZAPATA TIPO 1 0.70 0.70 0.25 42 5.15 6.91

8 COLUMNAS DE HºAº M³
COLUMNAS 36 ,37 , 45, 46 0.20 0.20 5.45 4 0.87
COLUMNAS 1 AL 9 0.20 0.20 3.95 9 1.42
COLUMNAS 10 AL 53 0.20 0.20 3.25 40 5.20 7.49

9 VIGA DE ENCADENADO DE HºAº M³


EJE 1 0.20 24.34 0.30 1 1.46
EJE1 BASE LOSA 0.20 2.90 0.30 1 0.17
EJE 4 0.20 24.64 0.30 1 1.48
EJE 4 BASE LOSA 0.20 2.90 0.30 1 0.17
EJE 5 0.20 24.81 0.30 1 1.49
EJE 8 0.20 22.32 0.30 1 1.34
EJE 10 0.20 24.68 0.30 1 1.48
EJE 12 0.20 26.11 0.30 1 1.57
EJE A 0.20 9.79 0.30 1 0.59
EJE A BASE LOSA 0.20 5.90 0.30 1 0.35
EJE C 0.20 3.89 0.30 1 0.23
EJE D 0.20 5.90 0.30 1 0.35
EJE D BASE LOSA 0.20 5.90 0.30 1 0.35
EJE F 0.20 12.30 0.30 1 0.74
EJE H 0.20 12.30 0.30 1 0.74
EJE J 0.20 17.40 0.30 1 1.04
EJE L 0.20 17.40 0.30 1 1.04
EJE N 0.20 17.40 0.30 1 1.04
EJE O 0.20 12.30 0.30 1 0.74
EJE P 0.20 12.34 0.30 1 0.74
17.13
10 LOSA ALIVIANADA CON PLASTAFORMO M²
Depósito de agua 6.50 2.90 2 37.70 37.70

11 CUBIERTA CAL. OND. Nº 28 + EST. DE MAD. M²


Porteria 1 382.38
Bloques 1 12.73

395.11

12 CUMBRERA DE CALAMINA PLANA Nº 28 ML


23.00 1 23.00
22.07 1 22.07
11.85 1 11.85
56.92

13 LIMAHOYAS DE CALAMINA PLANA Nº 28 ML


Bloque 1 5.89 2 11.78
Bloque 3 5.72 2 11.44 23.22
GOBIERNO AUTONOMO MUNICIPAL DE TACOBAMBA
P.O.C.

ORDEN DE CAMBIO Nº 2 Fecha: 12-Jun-18

Proyecto: CONSTRUCCION PUESTO DE SALUD JURUNA

Empresa Constructora : CONSTRUCTORA UNIPERONAL LIBGE

Deparatmento : POTOSI Plazo Contractual: 238 Días Calendario

Provincia : CORNELIO SAAVEDRA

Municipio : TACOBAMBA Orden de Proceder: 2-Jan-18

Beneficiario : COMUNIDAD DE JURUNA

Precio Contrato Inicial Orden de Cambio Nº1 Contrato Modificatorio Nº1 Contrato Actualizado % de Incremento
Item Descripción Unid.
Unitario Cantidad Precio Cantidad Precio Cantidad P. Unit. Precio Cantidad Precio y/o decremento
M01 - MODULO I: TRABAJOS PRELIMINARES 6,196.56
1 Instalacion de faenas glb 1470.42 1.00 1470.42 1.00 1,470.42 0.00 0.00 0.00 1,470.42 0.00%
2 Letre.muro lad gamb.2.50x2.0x0.25(cimi/ladr) pza 3694.64 1.00 3694.64 1.00 3,694.64 0.00 0.00 0.00 3,694.64 0.00%
3 Placa entrega de obras fis(segun diseno) pza 1031.50 1.00 1031.50 1.00 1,031.50 0.00 0.00 0.00 1,031.50 0.00%
M02 - MODULO II: OBRA GRUESA 322,548.08
4 Replanteo (estructuras y edificaciones) m² 8.92 373.97 3,335.81 518.88 4,628.41 0.00 0.00 144.91 4,628.41 38.75%
5 Excavacion para fundaciones m³ 65.41 55.95 3,659.69 79.37 5,191.59 0.00 0.00 23.42 5,191.59 41.86%
6 Cimientos hºcº (1:2:4) 50 % piedra m³ 542.57 55.95 30,356.79 62.72 34,029.99 0.00 0.00 6.77 34,029.99 12.10%
7 Sobrecimientos hºcº (1:2:3) 50 % piedra m³ 1029.39 24.17 24,880.36 10.91 11,230.64 0.00 0.00 -13.26 11,230.64 -54.86%
8 Impermeabilizacion de sobrecimientos m² 33.39 48.35 1,614.41 33.76 1,127.25 0.00 0.00 -14.59 1,127.25 -30.18%
9 Muro ladrillo 16cm (6h) m² 170.06 498.64 84,798.72 543.13 92,364.69 0.00 0.00 44.49 92,364.69 8.92%
10 Revoque exterior (cal-cemento) m² 149.04 362.92 54,089.60 393.10 58,587.62 0.00 0.00 30.18 58,587.62 8.32%
11 Zapatas de h°a° (dos.1:2:3) m³ 2875.31 0.77 2,213.99 6.91 19,868.39 0.00 0.00 6.14 19,868.39 797.40%
12 Columnas de hº aº (Dos. 1:2:3) m³ 3800.99 1.01 3,839.00 7.49 28,469.42 0.00 0.00 6.48 28,469.42 641.58%
13 Viga de encadenado de hº aº (Dos. 1:2:3) m³ 3004.13 9.32 27,998.49 17.13 51,460.75 0.00 0.00 7.81 51,460.75 83.80%
14 Losa alivianada de hºaº c/plastoform m² 248.82 18.25 4,540.97 37.70 9,380.51 0.00 0.00 19.45 9,380.51 106.58%
15 Cubierta calamina galv. nº 28 m² 171.92 421.97 72,545.08 392.92 67,550.81 0.00 0.00 -29.05 67,550.81 -6.88%
16 Cumbreras No 28 m 92.60 63.61 5,890.29 56.72 5,252.27 0.00 0.00 -6.89 5,252.27 -10.83%
17 Limahoya de calamina No 28 galvanizada m 125.94 21.96 2,765.64 22.26 2,803.42 0.00 0.00 0.30 2,803.42 1.37%
18 Limpieza general glb 19.24 1.00 19.24 1.00 19.24 0.00 0.00 0.00 19.24 0.00%
M03 - MODULO III: OBRA FINA 455,182.64
19 Cielo falso de yeso mas maderamen m² 132.47 229.22 30,364.77 322.42 42,710.98 0.00 0.00 93.20 42,710.98 40.66%
20 Aleros m² 258.02 78.58 20,275.21 51.08 13,179.66 0.00 0.00 -27.50 13,179.66 -35.00%
21 Botaguas de hº aº m 122.05 25.90 3,161.10 25.70 3,136.69 0.00 0.00 -0.20 3,136.69 -0.77%
22 Revoque interior de yeso m² 81.39 783.51 63,769.88 775.24 63,096.78 0.00 0.00 -8.27 63,096.78 -1.06%
23 Revoque exterior (cal-cemento) m² 149.04 304.97 45,452.73 122.46 18,251.44 0.00 0.00 -182.51 18,251.44 -59.85%
24 Contrapiso de cemento + empedrado m² 137.69 412.30 56,769.59 322.42 44,394.01 0.00 0.00 -89.88 44,394.01 -21.80%
25 Revestimiento de azulejos blancos m² 151.14 89.08 13,463.55 151.65 22,920.38 0.00 0.00 62.57 22,920.38 70.24%
26 Piso de ceramica nacional Esmaltado m² 222.55 315.15 70,136.63 334.89 74,529.77 0.00 0.00 19.74 74,529.77 6.26%
27 Meson de h°a° con revest. azulejo blanco m² 524.49 19.51 10,232.80 4.70 2,465.10 0.00 0.00 -14.81 2,465.10 -75.91%
28 Cordon para acera de hormigon 20*40 cm. m 137.23 29.46 4,042.80 116.38 15,970.83 0.00 0.00 86.92 15,970.83 295.04%
29 Aceras de cemento + solado de piedra m² 215.52 31.92 6,879.40 238.74 51,453.24 0.00 0.00 206.82 51,453.24 647.93%
30 Zocalo de ceramica h=10cm m 40.07 280.63 11,244.84 301.77 12,091.92 0.00 0.00 21.14 12,091.92 7.53%
31 Zocalo exterior de cemento enlucido m² 47.74 69.08 3,297.88 0.00 0.00 0.00 0.00 -69.08 0.00 -100.00%
32 Canaleta de calamina No 28 m 117.74 96.62 11,376.04 84.37 9,933.72 0.00 0.00 -12.25 9,933.72 -12.68%
33 Bajante calamina No 28 m 77.76 52.60 4,090.18 38.50 2,993.76 0.00 0.00 -14.10 2,993.76 -26.81%
34 Puerta de madera Cedro 0.70 x 2.10 mts Con visor m² 1088.63 61.83 67,309.99 69.19 75,322.31 0.00 0.00 7.36 75,322.31 11.90%
35 Ventana de alum. con vidrio 4mm m² 826.82 26.22 21,679.22 22.00 18,190.04 0.00 0.00 -4.22 18,190.04 -16.09%
36 Chapa exterior (2 golpes) pza 347.49 10.00 3,474.90 4.00 1,389.96 0.00 0.00 -6.00 1,389.96 -60.00%
37 Chapa papaiz interior pza 307.30 17.00 5,224.10 28.00 8,604.40 0.00 0.00 11.00 8,604.40 64.71%
38 Bisagras dobles de 4" pza 29.23 12.00 350.76 96.00 2,806.08 0.00 0.00 84.00 2,806.08 700.00%
39 Bisagras dobles de 3" pza 27.52 75.00 2,064.00 0.00 0.00 0.00 0.00 -75.00 0.00 -100.00%
40 Jaladores de bronce de 5" pza 32.29 12.00 387.48 37.00 1,194.73 0.00 0.00 25.00 1,194.73 208.33%
41 Picaporte de 3" p/ventana (solo mat.) pza 13.48 10.00 134.80 20.00 269.60 0.00 0.00 10.00 269.60 100.00%
M04 - MODULO IV:INSTALACIONES SANITARIAS 61,839.40
42 Excavacion (0-2 m.) suelo duro m³ 57.71 45.40 2,620.03 45.40 2,620.03 0.00 0.00 0.00 2,620.03 0.00%
43 Prov.e inst.tanque agua fibrocemen.1000l pza 2863.46 1.00 2,863.46 2.00 5,726.92 0.00 0.00 1.00 5,726.92 100.00%
44 Prov. y Coloc de Tanque Electrico de 240 LT pza 2364.65 1.00 2,364.65 0.00 0.00 0.00 0.00 -1.00 0.00 -100.00%
45 Regadera plastica de Ducha pza 300.75 2.00 601.50 5.00 1,503.75 0.00 0.00 3.00 1,503.75 150.00%
46 Base de ducha pza 387.47 2.00 774.94 5.00 1,937.35 0.00 0.00 3.00 1,937.35 150.00%
47 Inodoro tanque bajo blanco pza 1329.72 4.00 5,318.88 7.00 9,308.04 0.00 0.00 3.00 9,308.04 75.00%
48 Lavamanos mas accesorios pza 531.72 4.00 2,126.88 11.00 5,848.92 0.00 0.00 7.00 5,848.92 175.00%
49 Lavaplatos 2 depositos pza 861.53 6.00 5,169.18 1.00 861.53 0.00 0.00 -5.00 861.53 -83.33%
50 Sumidero de piso (rejilla cromada 4x 4) pza 130.25 11.00 1,432.75 7.00 911.75 0.00 0.00 -4.00 911.75 -36.36%
51 Prov. y tend. tuberia pvc 1" esq. 40 ec m 20.94 15.07 315.57 106.30 2,225.92 0.00 0.00 91.23 2,225.92 605.37%
52 Prov. y tend. tuberia pvc 3/4" esq 40 ec m 22.59 23.35 527.48 0.00 0.00 0.00 0.00 -23.35 0.00 -100.00%
53 Prov. y tend. tuberia pvc 1½" esq. 40 ec m 41.49 60.48 2,509.32 0.00 0.00 0.00 0.00 -60.48 0.00 -100.00%
54 Provision y colocado tuberia de f.g. d=1" m 41.77 5.67 236.84 6.00 250.62 0.00 0.00 0.33 250.62 5.82%
55 Provision y colocado tuberia de f.g. d=3/4" m 40.15 19.28 774.09 0.00 0.00 0.00 0.00 -19.28 0.00 -100.00%
56 Provision y colocado tuberia de f.g. d=1/2" m 24.09 30.27 729.20 12.00 289.08 0.00 0.00 -18.27 289.08 -60.36%
57 Provision y colocado tubo plasmar d=4" m 72.53 99.05 7,184.10 150.00 10,879.50 0.00 0.00 50.95 10,879.50 51.44%
58 Prov.tendi.tube.pvc1/2"clase 15-esp.camp m 26.45 9.12 241.22 200.00 5,290.00 0.00 0.00 190.88 5,290.00 2092.98%
59 Prov.tendi.tube.pvc1 1/2"clase15(espicam m 29.22 32.55 951.11 0.00 0.00 0.00 0.00 -32.55 0.00 -100.00%
60 Camara de recoleccion 0.60x0.60 (care) pza 855.00 16.00 13,680.00 12.00 10,260.00 0.00 0.00 -4.00 10,260.00 -25.00%
61 Camara septica(2.50x1.20x2.00) pza 6559.45 1.00 6,559.45 1.00 6,559.45 0.00 0.00 0.00 6,559.45 0.00%
62 Pozo absorv.di=1.2m-manpost.piedra-c/exc m 1339.87 1.00 1,339.87 1.00 1,339.87 0.00 0.00 0.00 1,339.87 0.00%
63 Caja interceptora de pvc pza 218.17 11.00 2,399.87 7.00 1,527.19 0.00 0.00 -4.00 1,527.19 -36.36%
64 Rejilla de piso pza 46.17 5.00 230.85 5.00 230.85 0.00 0.00 0.00 230.85 0.00%
65 Lavarropa de cemento pza 444.08 2.00 888.16 2.00 888.16 0.00 0.00 0.00 888.16 0.00%
M05 - MODULO V: INSTALACION ELECTRICA 44,614.93
66 Acometida electricidad glb 1253.86 1.00 1,253.86 1.00 1,253.86 0.00 0.00 0.00 1,253.86 0.00%
67 Tablero de distribucion glb 2169.42 1.00 2,169.42 1.00 2,169.42 0.00 0.00 0.00 2,169.42 0.00%
68 Medidor de luz y caja electrica pza 2587.84 2.00 5,175.68 1.00 2,587.84 0.00 0.00 -1.00 2,587.84 -50.00%
69 Prov/coloca.panel solar 48w;12v-acc-bat glb 7112.46 2.00 14,224.92 1.00 7,112.46 0.00 0.00 -1.00 7,112.46 -50.00%
70 Prov/coloc. disyuntor-termomag. 30 amp pza 102.60 12.00 1,231.20 4.00 410.40 0.00 0.00 -8.00 410.40 -66.67%
71 Iluminacion fluorescente (2x40 w) pto 255.54 33.00 8,432.82 42.00 10,732.68 0.00 0.00 9.00 10,732.68 27.27%
72 Interruptores pto 87.65 31.00 2,717.15 31.00 2,717.15 0.00 0.00 0.00 2,717.15 0.00%
73 Toma corriente doble pza 131.10 48.00 6,292.80 48.00 6,292.80 0.00 0.00 0.00 6,292.80 0.00%
74 Iluminacion incandescente pto 87.88 33.00 2,900.04 21.00 1,845.48 0.00 0.00 -12.00 1,845.48 -36.36%
75 Conmutador simple pto 27.13 8.00 217.04 8.00 217.04 0.00 0.00 0.00 217.04 0.00%
M06 - MODULO VI: ACABADOS 59,986.84
76 Pintura interior latex m² 27.41 1092.71 29,951.18 1097.66 30,086.86 0.00 0.00 4.95 30,086.86 0.45%
77 Pintura latex exterior m² 31.65 449.62 14,230.47 448.18 14,184.90 0.00 0.00 -1.44 14,184.90 -0.32%
78 Pintura anticorrosiva para cubiertas m² 21.03 421.97 8,874.03 0.00 0.00 0.00 0.00 -421.97 0.00 -100.00%
79 Barnizado de madera m² 34.29 61.83 2,120.15 138.38 4,745.05 0.00 0.00 76.55 4,745.05 123.81%
80 Pintura al aceite s/carp. de madera m² 32.52 61.83 2,010.71 0.00 0.00 0.00 0.00 -61.83 0.00 -100.00%
81 Prov. y coloc de vidrios dobles m² 106.47 26.22 2,791.64 0.00 0.00 0.00 0.00 -26.22 0.00 -100.00%
82 Limpieza general de la obra m² 8.66 1.00 8.66 0.00 0.00 0.00 0.00 -1.00 0.00 -100.00%
M07 - MODULO VII: ACCESOS Y MURO PERIMETRAL 47,764.72
83 Replanteo de eje m 1.03 19.50 20.09 0.00 0.00 0.00 0.00 -19.50 0.00 -100.00%
84 Excavacion (0-2 m.) s. duro m³ 67.33 2.93 197.28 0.00 0.00 0.00 0.00 -2.93 0.00 -100.00%
85 Cimientos de ho.c.fc=180kg/cm2(1:2:4)60% m³ 584.73 2.93 1,713.26 0.00 0.00 0.00 0.00 -2.93 0.00 -100.00%
86 Sobrecimientos hocofc=210 kg/cm2(1:2:3)5 m³ 1138.35 1.46 1,661.99 0.00 0.00 0.00 0.00 -1.46 0.00 -100.00%
87 Impermeabilizacion sobrecimientos m² 74.52 25.71 1,915.91 0.00 0.00 0.00 0.00 -25.71 0.00 -100.00%
88 Muro ladrillo 6 H(16 cm.) m² 297.34 31.20 9,277.01 0.00 0.00 0.00 0.00 -31.20 0.00 -100.00%
89 Revoque exterior (cal-cemento) m² 149.04 62.40 9,300.10 0.00 0.00 0.00 0.00 -62.40 0.00 -100.00%
90 Columnas de hºaº m³ 4061.91 0.34 1,381.05 0.00 0.00 0.00 0.00 -0.34 0.00 -100.00%
91 Cubertina ho.ao.(0.30x0.05)esp.mur 16cm. m 133.96 19.50 2,612.22 16.28 2,180.87 0.00 0.00 -3.22 2,180.87 -16.51%
92 Puerta metalica para garaje m² 728.71 8.19 5,968.13 9.97 7,265.24 0.00 0.00 1.78 7,265.24 21.73%
93 Pintura al aceite s/carp. de madera m² 32.52 8.19 266.34 0.00 0.00 0.00 0.00 -8.19 0.00 -100.00%
94 Zampeado de piedra-c/emboquillado juntas m² 145.53 92.43 13,451.34 0.00 0.00 0.00 0.00 -92.43 0.00 -100.00%

Total Parcial : 998,133.17 1,045,327.94 0.00 1,045,327.94 4.73%

Monto Contrato Inicial 998,133.17 Bs.


Monto Orden de Nº1 47,194.77
Monto Cont. Modificatorio Nº1 0.00
Monto Con Orden de Cambio y Cont Modif. 1,045,327.94 Bs.
Monto Contrato Actualizado 1,045,327.94 Bs.
% Orden de Trabajo 4.73% %

Nombre (Sello): Firmas : Fecha :

Elavorado por :
Director de Obra

Presentado por :
Empresa Contratista

Revisado por :
Supervisor de Obra

Validado por :
Fiscal de Obra

Aprobado por :
ALCALDE MUNICIPAL
COMPUTOS MÉTRICOS
ACTIVIDAD: AMPL. RED DE ALCANTARILLADO Y AGUA POTABLE ZONA VIRGEN DE GUADALUPE

SERVICIO: AMPL. RED DE ALCANTARILLADO Y AGUA POTABLE ZONA VIRGEN DE GUADALUPE

Nº DIMENSIONES [m] CANTIDADES


UNID N°
ÍTEM a b l h PARCIAL TOTAL
MOD 01.- REPOSICION DE CAMARAS DE ALCANTARILLADO SANITARIO
1 DEMOLICION DE CAMARAS DE ALCANT. SANITARIO Pza 3.00
Sector Plaza Agua Castilla 3.00 3.00

2 PROV. Y COLOC. TAPA DE FIERRO FUNDIDO ALCANT. SANITARIO Pza 3.00


Sector Plaza Agua Castilla 3.00 3.00

3 HORMIGON ARMADO (DOSIF 1:2:3) M3 0.00

4 REPOSICION/AMPLIACION CAMARAS DE HoCo (ALCANTARILLADO SANITARIO) Pza 3.00


Sector Plaza Agua Castilla 3.00 3.00

MOD 02.- CONEXIÓN DRENAJE A BOVEDA


5 REPLANTEO Y TRAZADO Ml 112.00
100.00 1.00 100.00
12.00 1.00 12.00

6 EXCAVACION 0- 2 M SUELO DURO M³ 6.60


0.50 12.00 1.10 1.00 6.60

7 CAMARA COLECTORA DE Ho Ao Pza 1.00


1.00 1.00

8 PROV Y TEND TUBERIA PVC C-9 D=6" ESP. CAMP. (CRIVADA) Ml 100.00
100.00 1.00 100.00

9 PROV. Y COLOC. GRAVA PARA PREFILTRO D=1.5" M³ 15.00


0.50 100.00 0.30 1.00 15.00

10 PROV. Y COLOC. GRAVA PARA PREFILTRO D=1.0" M³ 15.00


0.50 100.00 0.30 1.00 15.00

11 PROV. Y COLOC. GRAVA PARA PREFILTRO D=3/4" M³ 13.00


0.50 100.00 0.30 1.00 15.00
TUBERIA 0.02 100.00 -1.00 -2.00

12 PROV. Y COLOC. SUPERTUBO HDPE SDR23 PN6 D=6" M³ 12.00


12.00 12.00

13 EXCAVACION 0-2 M SUELO DURO CON AGOTAMIENTO M³ 45.00


0.50 100.00 0.90 45.00

14 RELLENO Y COMPACTADO MANUAL CON TIERRA CERNIDA M³ 1.80


0.50 12.00 0.34 2.04
TUBERIA 0.02 12.00 -1.00 -0.24

15 RELLENO Y COMPACTADO CON COMPACTADOR MANUAL (SALTARIN) M³ 4.20


0.50 12.00 0.70 4.20
16 DEMOLICION DE HoCo (BOVEDA) Glb 1.00
1.00

17 CONEXIÓN DE TUBERIA DE CEMENTO A CAMARA DE ALCANT. SANITARI Glb 1.00


1.00

18 LIMPIEZA GENERAL DE LA OBRA Glb 1.00


1.00

Representante Legal: ____________________ Spervisor de Obra: ________________________


GOBIERNO AUTONOMO MUNICIPAL DE PORCO
UNIDAD TECNICA

BALANCE ECONOMICO 1 Fecha: 31-Jan-20


Servicio: AMPL. RED DE ALCANTARILLADO Y AGUA POTABLE ZONA VIRGEN DE GUADALUPE

Empresa Constructora : CONSULTORA Y CONSTRUCTORA "CEYSA S.R.L."

Deparatmento : POTOSI

Provincia : ANTONIO QUIJARRO

Municipio : PORCO

Beneficiario : PORCO

Precio Contrato Inicial Orden de Trabajo Nº1 Contrato Actualizado % de Incremento


Item Descripción Unid.
Unitario Cantidad Precio Cantidad P. Unit. Precio Cantidad Precio y/o decremento
M01 - M01 - OBRAS PRELIMINARES 3,678.71 3,678.71
1 INSTALACION DE FAENAS GBL. 1090.15 1.00 1,090.15 0.00 1,090.15 0.00 1.00 1,090.15 0.00%
2 LETRERO DE OBRAS MURO DE LADRILLO Pza 2588.56 1.00 2,588.56 0.00 2,588.56 0.00 1.00 2,588.56 0.00%
M02 - M02 - RED DE ALCANTARILLADO SANITARIO 216,807.83 238,911.83
3 REPLANTEO Y CONTROL TOPOGRAFICO M 7.22 512.66 3,701.41 -12.35 7.22 -89.17 500.31 3,612.24 -2.41%
4 REPLANTEO DE ESTRUCTURAS M2 13.23 31.78 420.45 4.54 13.23 60.06 36.32 480.51 14.28%
5 EXCAVACION DE ZANJA C/EQUIPO 0-2M SUELO SEMIDURO M3 29.27 29.92 875.76 -29.92 29.27 -875.76 0.00 0.00 -100.00%
EXCAVACION DE ZANJA C/EQUIPO 0-4,5M SUELO SEMIDURO M3 36.43 62.04 2,260.12 -62.04 36.43 -2,260.12 0.00 0.00 -100.00%
5 EXCAVACION EN ROCA DE (0-2M) M3 147.36 336.51 49,588.11 162.15 147.36 23,894.42 498.66 73,482.54 48.19%
6 CAMA DE TIERRA CERNIDA S/PROV. MATERIAL M3 79.67 20.51 1,634.03 4.51 79.67 359.31 25.02 1,993.34 21.99%
6 PROV.Y TENDIDO DE TUBERIA PVC SDR 26 D=6" DN=150MM M 146.48 512.66 75,094.44 -12.35 146.48 -1,809.03 500.31 73,285.41 -2.41%
7 PRUEBA HIDRAULICA (HASTA 4") M 2.23 512.66 1,143.23 -12.35 2.23 -27.54 500.31 1,115.69 -2.41%
7 RELLENO Y COMPACTO DE ZANJA CON TIERRA CERNIDA S/MAT M3 76.61 51.27 3,927.79 11.27 76.61 863.39 62.54 4,791.19 21.98%
8 RELLENO Y COMPACTO CON TIERRA COMUN S/PROV.MAT. M3 54.03 422.34 22,819.03 0.46 54.03 24.85 422.80 22,843.88 0.11%
8 CAMARA DE INSPECCION SIN CAIDA 1,4<=H<=1,5 M C/TAPA PZA 3581.69 2.00 7,163.38 14.00 3,581.69 50,143.66 16.00 57,307.04 700.00%
9 CAMARA DE INSPECCION SIN CAIDA 1,6<=H<=1,7 M C/TAPA PZA 3845.33 3.00 11,535.99 -3.00 3,845.33 -11,535.99 0.00 0.00 -100.00%
9 CAMARA DE INSPECCION SIN CAIDA 1,9<=H<=2,0 M C/TAPA PZA 3893.18 3.00 11,679.54 -3.00 3,893.18 -11,679.54 0.00 0.00 -100.00%
10 CAMARA DE INSPECCION SIN CAIDA 2,1<=H<=2,2 M C/TAPA PZA 3957.85 1.00 3,957.85 -1.00 3,957.85 -3,957.85 0.00 0.00 -100.00%
10 CAMARA DE INSPECCION SIN CAIDA 2,3<=H<=2,4 M C/TAPA PZA 4169.36 2.00 8,338.72 -2.00 4,169.36 -8,338.72 0.00 0.00 -100.00%
11 CAMARA DE INSPECCION SIN CAIDA 2,4<=H<=2,5 M C/TAPA PZA 4169.36 2.00 8,338.72 -2.00 4,169.36 -8,338.72 0.00 0.00 -100.00%
11 CAMARA DE INSPECCION SIN CAIDA 2,7<=H<=2,8 M C/TAPA PZA 4329.26 1.00 4,329.26 -1.00 4,329.26 -4,329.26 0.00 0.00 -100.00%
M03 - M03 - RED DE AGUA POTABLE 42,873.35 48,299.10 12.66%
13 REPLANTEO Y CONTROL TOPOGRAFICO M 7.22 596.07 4,303.63 -62.23 7.22 -449.30 533.84 3,854.32 -10.44%
EXCAVACION DE ZANJA C/EQUIPO 0-2M SUELO SEMIDURO M3 29.27 26.94 788.53 -26.94 29.27 -788.53 0.00 0.00 -100.00%
14 EXCAVACION EN ROCA DE (0-2M) M3 147.36 72.36 10,662.97 64.43 147.36 9,494.40 136.79 20,157.37 89.04%
15 CAMA DE TIERRA CERNIDA S/PROV. MATERIAL M3 79.67 35.76 2,849.00 -3.73 79.67 -297.17 32.03 2,551.83 -10.43%
16 PROV.Y TENDIDO DE TUBERIA PVC SDR 26 D=6" DN=150MM M 31.59 596.07 18,829.85 -62.23 31.59 -1,965.85 533.84 16,864.01 -10.44%
17 PRUEBA HIDRAULICA (HASTA 4") M 2.23 596.07 1,329.24 -62.23 2.23 -138.77 533.84 1,190.46 -10.44%
18 RELLENO Y COMPACTO DE ZANJA CON TIERRA CERNIDA S/MAT M3 76.61 53.65 4,110.13 -5.60 76.61 -429.02 48.05 3,681.11 -10.44%
M03 - M03 - RED DE AGUA POTABLE 20,029.65 0.00 20,367.15 1.69%
19 LIMPIEZA GRAL. RETIRO MATERIAL EXCAVADO C/CARGUIO M3 46.81 389.92 18,252.16 7.21 46.81 337.50 397.13 18,589.66 1.85%
20 PLACA ENTREGA DE OBRAS PZA 1777.49 1.00 1,777.49 0.00 1,777.49 0.00 1.00 1,777.49 0.00%
Total Parcial : 283,389.54 27,867.28 311,256.79 9.83%
GOBIERNO AUTONOMO MUNICIPAL DE PORCO
UNIDAD TECNICA

BALANCE ECONOMICO 1 Fecha: 31-Jan-20


Servicio: AMPL. RED DE ALCANTARILLADO Y AGUA POTABLE ZONA VIRGEN DE GUADALUPE

Empresa Constructora : CONSULTORA Y CONSTRUCTORA "CEYSA S.R.L."

Deparatmento : POTOSI

Provincia : ANTONIO QUIJARRO

Municipio : PORCO

Beneficiario : PORCO

Monto Contrato Inicial 283,389.54 Bs.


Monto Orden de Trabajo Nº1 27,867.28 Bs.
Monto Contrato Actualizado 311,256.79 Bs.
% Orden de Trabajo 9.83 %

Nombre (Sello): Fecha :

Presentado por :
Empresa Contratista

Revisado por :
Supervisor de Obra

Validado por :
Fiscal de Obra
GOBIERNO AUTONOMO MUNICIPAL DE PORCO
UNIDAD TECNICA

F. O. T. - 01

ORDEN DE TRABAJO Nº 1 Fecha: 1-Oct-19

Proyecto:
AMPL. RED DE ALCANTARILLADO Y AGUA POTABLE ZONA VIRGEN DE GUADALUPE

Empresa Contratista: CONSULTORA Y CONSTRUCTORA MONSEXI

Plazo Segun Contrato: 30 Días calendario Fecha de Inicio: 12-Sep-19

Fecha de Conclusión Segun Contrato: 12-Oct-19

Monto de Contrato (Bs.) 283,389.54

Monto Orden de Trabajo N°1 27,867.28

Nuevo Monto Aprobado (Bs.) 311,256.81

Porcentaje de Incremento o Disminución 9.83%

Monto Contrato Actualizado 311,256.81

Resumen Justificativo:
Los cambios que se realizaron son los siguientes:

1-Demolicion de camaras de Alcant. Sanitario: Este item tuvo un decremento debido a que se redujo una camara a demoler, ya que no
fue necesariio solo se acomodo las tapa de HoAo que no inscrustaba.

3 -Hormigon Armado (Dosif 1:2:3): Este item tuvo no se ejecuto debido a que solo se acomodo la tapa de Ho Ao, para que incruste en la
camara de alcantarillado sanitario.
5 -Replanteo y Trazado: Este item tubo un decremento, debido a que la longitud de entubado disminuyo
5 -Excavacion 0-2m Suelo Duro: Este item tubo un incremento debido a que la profundidad del embovedado donde se conectara la tuberia
era mayor a lo dispuesto inicialmente.
8 -Prov y tend. Tuberia PVC C-9 D=6"Esp. Camp. (Crivada): Este item tubo un decremento, debido a que la longitud de entubado
disminuyo

9 -Prov. Y Coloc. Grava Para Prefiltro D=1.5": Este item tubo un decremento, debido a que la longitud de entubado disminuyo

10 -Prov. Y Coloc. Grava Para Prefiltro D=1.0": Este item tubo un decremento, debido a que la longitud de entubado disminuyo

11 -Prov. Y Coloc. Supertubo HDPE SDR 23 PN6 D=6": Este item tubo un incremento debido a que el embovedado estaba mas alejado
de la camara de drenaje.

12 -Prov. Y Coloc. Grava Para Prefiltro D=3/4": Este item tubo un decremento, debido a que la longitud de entubado disminuyo

13.- Excavacion 0-2 m Suelo Duro con Agotamiento: Este item tubo un incremento debido a que lel nivel freatico se encontraba mas
debajo de lo previsto inicialmente.

Nombre (Sello): Firmas: Fecha :

Presentado por :
Empresa Contratista
GOBIERNO AUTONOMO MUNICIPAL DE PORCO
UNIDAD TECNICA

F. O. T. - 01

ORDEN DE TRABAJO Nº 1 Fecha: 1-Oct-19

Revisado por :
Supervisor de Obra

Validado por :
Fisc. de Obras

Autorizado por :
Alcalde G.A.M de Porco