HOJA DE METRADOS

CLIENTE SR. JHONY

01.00.00 OBRAS DE CONCRETO SIMPLE


01.01.00 SOLADOS
DESCRIPCION UND A B Nº REPET. M2
EJE 1-1 M2 1.50 1.50 1.00 2.25
EJE 1-1 M2 2.05 2.05 1.00 4.20
EJE 3-3 M2 1.50 1.50 2.00 4.50
EJE 4-4 M2 1.50 1.50 2.00 4.50
EJE 5-5 M2 1.50 1.50 2.00 4.50
EJE 6-6 M2 1.50 1.50 2.00 4.50
EJE 7-7 M2 1.50 1.50 2.00 4.50
EJE 8-8 M2 1.20 1.20 2.00 2.88
EJE 9-9 M2 1.20 1.20 2.00 2.88
EJE 10-10 M2 1.00 1.00 1.00 1.00
EJE 11-11 M2 1.20 1.20 2.00 2.88
01.02.00 CIMIENTOS CORRIDOS 38.59
DESCRIPCION UND A B H Nº REPET.
EJE 1-1 M3 0.50 1.53 0.40 1.00
EJE 1-1 M3 0.50 1.37 0.40 1.00
EJE 3-3 M3 0.50 2.00 0.40 1.00
EJE 4-4 M3 0.50 1.89 0.40 1.00
EJE 5-5 M3 0.50 1.79 0.40 1.00
EJE 6-6 M3 0.50 1.68 0.40 1.00
EJE 7-7 M3 0.50 1.57 0.40 1.00
EJE 8-8 M3 0.50 2.07 0.40 1.00
EJE 9-9 M3 0.50 1.21 0.40 1.00
EJE 9-9 M3 0.50 0.25 0.40 1.00
EJE 10-10 M3 0.40 1.22 0.60 1.00
EJE 11-11 M3 0.50 1.85 0.40 1.00
EJE A-A M3 0.50 0.55 0.40 1.00
EJE A-A M3 0.50 2.00 0.40 3.00
EJE A-A M3 0.50 2.03 0.40 1.00
EJE A-A 0.50 2.15 0.40 1.00
EJE A-A M3 0.50 2.30 0.40 1.00
EJE A-A M3 0.50 1.00 0.40 1.00
EJE C-C M3 0.40 1.13 0.60 1.00
EJE C-C M3 0.40 3.06 0.60 1.00
EJE D-D M3 0.50 1.08 0.40 1.00
EJE D-D M3 0.50 2.00 0.40 3.00
EJE D-D M3 0.50 2.03 0.40 1.00
EJE D-D M3 0.50 2.15 0.40 1.00
EJE D-D M3 0.50 2.75 0.40 1.00
EJE D-D M3 0.50 2.20 0.40 1.00
01.03.00 SOBRE CIMIENTOS
DESCRIPCION UND A B H Nº REPET.
EJE 1-1 M3 0.15 3.34 0.30 1.00
EJE 1-1 M3 0.15 1.37 0.30 1.00
EJE 3-3 M3 0.15 4.19 0.30 1.00
EJE 4-4 M3 0.15 4.09 0.30 1.00
EJE 5-5 M3 0.15 3.98 0.30 1.00
EJE 6-6 M3 0.15 4.08 0.30 1.00
EJE 7-7 M3 0.15 3.97 0.30 1.00
EJE 8-8 M3 0.15 3.86 0.30 1.00
EJE 9-9 M3 0.15 2.56 0.30 1.00
EJE 9-9 M3 0.15 1.06 0.30 1.00
EJE 10-10 M3 0.15 2.55 0.30 1.00
EJE 11-11 M3 0.15 3.45 0.30 1.00
EJE A-A M3 0.15 1.73 0.30 1.00
EJE A-A M3 0.15 3.20 0.30 4.00
EJE A-A M3 0.15 3.23 0.30 1.00
EJE A-A M3 0.15 3.25 0.30 1.00
EJE A-A M3 0.15 1.97 0.30 1.00
EJE A-A M3 0.15 1.00 0.30 1.00
EJE C-C M3 0.15 1.97 0.30 1.00
EJE C-C M3 0.15 3.53 0.30 1.00
EJE D-D M3 0.15 2.88 0.30 1.00
EJE D-D M3 0.15 3.20 0.30 4.00
EJE D-D M3 0.15 3.23 0.30 1.00
EJE D-D M3 0.15 3.15 0.30 1.00
EJE D-D M3 0.15 3.16 0.30 1.00

02.00.00 OBRAS DE CONCRETO ARMADO


02.01.00 ZAPATAS
DESCRIPCION UND A B H Nº REPET.
EJE 1-1 M3 1.50 1.50 0.60 1.00
EJE 1-1 M3 2.05 2.05 0.60 1.00
EJE 3-3 M3 1.50 1.50 0.60 2.00
EJE 4-4 M3 1.50 1.50 0.60 2.00
EJE 5-5 M3 1.50 1.50 0.60 2.00
EJE 6-6 M3 1.50 1.50 0.60 2.00
EJE 7-7 M3 1.50 1.50 0.60 2.00
EJE 8-8 M3 1.20 1.20 0.60 2.00
EJE 9-9 M3 1.20 1.20 0.60 2.00
EJE 10-10 M3 1.00 1.00 0.60 1.00
EJE 11-11 M3 1.20 1.20 0.60 2.00

02.03.00 VIGAS DE CIMENTACION


DESCRIPCION UND A B H Nº REPET.
EJE 1-1 M3 0.30 3.34 0.40 1.00
EJE 1-1 M3 0.30 1.37 0.40 1.00
EJE 3-3 M3 0.30 4.19 0.40 1.00
EJE 4-4 M3 0.30 4.09 0.40 1.00
EJE 5-5 M3 0.30 3.98 0.40 1.00
EJE 6-6 M3 0.30 4.08 0.40 1.00
EJE 7-7 M3 0.30 3.97 0.40 1.00
EJE 8-8 M3 0.30 3.86 0.40 1.00
EJE 9-9 M3 0.30 2.56 0.40 1.00
EJE 9-9 M3 0.30 1.06 0.40 1.00
EJE 10-10 M3 0.30 2.55 0.40 1.00
EJE 11-11 M3 0.30 3.45 0.40 1.00
EJE A-A M3 0.30 1.73 0.40 1.00
EJE A-A M3 0.30 3.20 0.40 4.00
EJE A-A M3 0.30 3.23 0.40 1.00
EJE A-A M3 0.30 3.25 0.40 1.00
EJE A-A M3 0.30 1.97 0.40 1.00
EJE A-A M3 0.30 1.00 0.40 1.00
EJE C-C M3 0.30 1.97 0.40 1.00
EJE C-C M3 0.30 3.53 0.40 1.00
EJE D-D M3 0.30 2.88 0.40 1.00
EJE D-D M3 0.30 3.20 0.40 4.00
EJE D-D M3 0.30 3.23 0.40 1.00
EJE D-D M3 0.30 3.15 0.40 1.00
EJE D-D M3 0.30 3.16 0.40 1.00

02.04.00 COLUMNAS
DESCRIPCION UND A B H Nº REPET.
EJE 1-1 M3 0.30 0.30 5.00 1.00
EJE 1-1 M3 0.08 5.00 1.00
EJE 2-2 M3 0.08 5.00 1.00
EJE 3-3 M3 0.30 0.40 5.00 2.00
EJE 4-4 M3 0.30 0.40 5.00 2.00
EJE 5-5 M3 0.30 0.40 5.00 2.00
EJE 6-6 M3 0.30 0.30 5.00 2.00
EJE 7-7 M3 0.30 0.30 5.00 2.00
EJE 8-8 M3 0.30 0.30 5.00 2.00
EJE 9-9 M3 0.30 0.30 5.00 2.00
EJE 9-9 M3 0.15 0.40 5.00 1.00
EJE 10-10 M3 0.30 0.30 5.00 2.00
EJE 11-11 M3 0.30 0.40 5.00 2.00

02.05.00 VIGAS DE ALIGERADO


DESCRIPCION UND A B H Nº REPET.
EJE 1-1 M3 0.30 5.35 0.50 1.00
EJE 3-3 M3 0.30 5.50 0.50 1.00
EJE 4-4 M3 0.30 5.40 0.50 1.00
EJE 5-5 M3 0.30 5.29 0.50 1.00
EJE 6-6 M3 0.30 5.18 0.50 1.00
EJE 7-7 M3 0.30 5.08 0.50 1.00
EJE 8-8 M3 0.30 4.97 0.50 1.00
EJE 9-9 M3 0.25 3.66 0.40 1.00
EJE 10-10 M3 0.25 3.55 0.40 1.00
EJE 11-11 M3 0.30 4.76 0.50 1.00
EJE A-A M3 0.25 1.00 0.20 1.00
EJE A-A M3 0.25 1.97 0.20 1.00
EJE A-A M3 0.25 3.25 0.20 1.00
EJE A-A M3 0.25 3.20 0.20 4.00
EJE A-A M3 0.25 3.23 0.20 1.00
EJE A-A M3 0.25 1.73 0.20 1.00
EJE A-A M3 0.25 1.37 0.20 1.00
EJE C-C M3 0.25 1.97 0.20 1.00
EJE C-C M3 0.25 3.23 0.20 1.00
EJE D-D M3 0.25 3.15 0.20 2.00
EJE D-D M3 0.25 3.20 0.20 4.00
EJE D-D M3 0.25 3.23 0.20 1.00
EJE D-D M3 0.25 3.38 0.20 1.00
VIGA PERIMETRAL M3 0.15 3.67 0.20 1.00
VIGA PERIMETRAL M3 0.15 2.45 0.20 1.00
VIGA PERIMETRAL M3 0.15 1.97 0.20 1.00
VIGA PERIMETRAL M3 0.15 3.20 0.20 4.00
VIGA PERIMETRAL M3 0.15 3.23 0.20 1.00
VIGA PERIMETRAL M3 0.15 3.25 0.20 1.00
VIGA PERIMETRAL M3 0.15 1.97 0.20 1.00
VIGA PERIMETRAL M3 0.15 1.00 0.20 1.00
VIGA PERIMETRAL M3 0.15 3.33 0.20 1.00
VIGA PERIMETRAL M3 0.15 3.97 0.20 1.00

02.06.00 VIGUETAS
DESCRIPCION UND A B H Nº VIGUETAS
EJE 1-3 M3 0.10 2.88 0.15 12.00
EJE 3-4 M3 0.10 3.20 0.15 11.00
EJE 4-5 M3 0.10 3.20 0.15 11.00
EJE 5-6 M3 0.10 3.20 0.15 11.00
EJE 6-7 M3 0.10 3.23 0.15 11.00
EJE 7-8 M3 0.10 3.20 0.15 10.00
EJE 8-9 M3 0.10 3.25 0.15 7.00
EJE 9-10 M3 0.10 2.12 0.15 7.00

02.07.00 LOSA
DESCRIPCION UND A H Nº REPET M3
EJE 1-3 M3 15.22 0.05 1.00 0.76
EJE 3-4 M3 15.35 0.05 1.00 0.77
EJE4-5 M3 13.15 0.05 1.00 0.66
EJE 5-6 M3 14.67 0.05 1.00 0.73
EJE 6-7 M3 14.44 0.05 1.00 0.72
EJE 7-8 M3 13.98 0.05 1.00 0.70
EJE 8-9 M3 9.72 0.05 1.00 0.49
EJE 9-10 M3 5.78 0.05 1.00 0.29
EJE 10-11 M3 0.35 0.05 1.00 0.02
M3
0.31
0.27
0.40
0.38
0.36
0.34
0.31
0.41
0.24
0.05
0.29
0.37
0.11
1.20
0.41
0.43
0.46
0.20
0.27
0.73
0.22
1.20
0.41
0.43
0.55
0.44
10.79

M3
0.15
0.06
0.19
0.18
0.18
0.18
0.18
0.17
0.12
0.05
0.11
0.16
0.08
0.58
0.15
0.15
0.09
0.05
0.09
0.16
0.13
0.58
0.15
0.14
0.14
4.19

M3
1.35
2.52
2.70
2.70
2.70
2.70
2.70
1.73
1.73
0.60
1.73
23.16

M3
0.40
0.16
0.50
0.49
0.48
0.49
0.48
0.46
0.31
0.13
0.31
0.41
0.21
1.54
0.39
0.39
0.24
0.12
0.24
0.42
0.35
1.54
0.39
0.38
0.38

M3
0.45
0.40
0.40
1.20
1.20
1.20
0.90
0.90
0.90
0.90
0.30
0.90
1.20

M3
0.80
0.83
0.81
0.79
0.78
0.76
0.75
0.37
0.36
0.71
0.05
0.10
0.16
0.64
0.16
0.09
0.07
0.10
0.16
0.32
0.64
0.16
0.17
0.11
0.07
0.06
0.38
0.10
0.10
0.06
0.03
0.10
0.12

M3
0.52
0.53
0.53
0.53
0.53
0.48
0.34
0.22
01.00.00 MOVIMIENTO DE TIERRA
01.01.01 EXCAVACION DE ZAPATAS
DESCRIPCION A L H
EJE 1-1 1.50 1.50 0.60
EJE 1-1 2.05 2.05 0.60
EJE 3-3 1.50 1.50 0.60
EJE 4-4 1.50 1.50 0.60
EJE 5-5 1.50 1.50 0.60
EJE 6-6 1.50 1.50 0.60
EJE 7-7 1.50 1.50 0.60
EJE 8-8 1.20 1.20 0.60
EJE 9-9 1.20 1.20 0.60
EJE 10-10 1.00 1.00 0.60
EJE 11-11 1.20 1.20 0.60

01.01.02 VIGA DE CIMENTACION


DESCRIPCION A L H
EJE 1-1 0.30 3.34 0.40
EJE 3-3 0.30 4.19 0.40
EJE 4-4 0.30 4.09 0.40
EJE 5-5 0.30 3.98 0.40
EJE 6-6 0.30 4.08 0.40
EJE 7-7 0.30 3.97 0.40
EJE 8-8 0.30 3.86 0.40
EJE 9-9 0.30 2.56 0.40
EJE 10-10 0.30 1.22 0.40
EJE 11-11 0.30 1.85 0.40
EJE A-A 0.30 1.37 0.40
EJE A-A 0.30 1.73 0.40
EJE A-A 0.30 3.20 0.40
EJE A-A 0.30 3.23 0.40
EJE A-A 0.30 3.25 0.40
EJE A-A 0.30 1.97 0.40
EJE A-A 0.30 1.00 0.40
EJE C-C 0.30 1.97 0.40
EJE C-C 0.30 3.53 0.40
EJE D-D 0.30 2.88 0.40
EJE D-D 0.30 3.20 0.40
EJE D-D 0.30 3.23 0.40
EJE D-D 0.30 3.15 0.40
EJE D-D 0.30 3.16 0.40

01.01.03 CIMIENTO CORRRIDO


DESCRIPCION A L H
EJE 1-1 0.50 1.53 0.40
EJE 1-1 0.50 1.37 0.40
EJE 3-3 0.50 2.00 0.40
EJE 4-4 0.50 1.89 0.40
EJE 5-5 0.50 1.79 0.40
EJE 6-6 0.50 1.68 0.40
EJE 7-7 0.50 1.57 0.40
EJE 8-8 0.50 2.07 0.40
EJE 9-9 0.50 1.21 0.40
EJE 9-9 0.50 0.25 0.40
EJE 10-10 0.40 1.22 0.60
EJE 11-11 0.50 1.85 0.40
EJE A-A 0.50 0.55 0.40
EJE A-A 0.50 2.00 0.40
EJE A-A 0.50 2.03 0.40
EJE A-A 0.50 2.15 0.40
EJE A-A 0.50 2.30 0.40
EJE A-A 0.50 1.00 0.40
EJE C-C 0.40 1.13 0.60
EJE C-C 0.40 3.06 0.60
EJE D-D 0.50 1.08 0.40
EJE D-D 0.50 2.00 0.40
EJE D-D 0.50 2.03 0.40
EJE D-D 0.50 2.15 0.40
EJE D-D 0.50 2.75 0.40
EJE D-D 0.50 2.20 0.40

01.02.00 RELLENO CON MATERIAL SELECCIONADO


01.02.01 ZAPATAS
DESCRIPCION A L H
EJE 1-1 1.20 1.20 0.40
EJE 1-1 1.75 1.75 0.40
EJE 3-3 1.20 1.20 0.40
EJE 4-4 1.20 1.20 0.40
EJE 5-5 1.20 1.20 0.40
EJE 6-6 1.20 1.20 0.40
EJE 7-7 1.20 1.20 0.40
EJE 8-8 0.90 0.90 0.40
EJE 9-9 0.90 0.90 0.40
EJE 10-10 0.70 0.70 0.40
EJE 11-11 0.90 0.90 0.40

01.02.02 CIMIENTO CORRRIDO


DESCRIPCION A L H
EJE 1-1 0.20 1.53 0.40
EJE 1-1 0.20 1.37 0.40
EJE 3-3 0.20 2.00 0.40
EJE 4-4 0.20 1.89 0.40
EJE 5-5 0.20 1.79 0.40
EJE 6-6 0.20 1.68 0.40
EJE 7-7 0.20 1.57 0.40
EJE 8-8 0.20 2.07 0.40
EJE 9-9 0.20 1.21 0.40
EJE 9-9 0.20 0.25 0.40
EJE 10-10 0.25 1.22 0.30
EJE 11-11 0.20 1.85 0.40
EJE A-A 0.20 0.55 0.40
EJE A-A 0.20 2.00 0.40
EJE A-A 0.20 2.03 0.40
EJE A-A 0.20 2.15 0.40
EJE A-A 0.20 2.30 0.40
EJE A-A 0.20 1.00 0.40
EJE C-C 0.25 1.13 0.30
EJE C-C 0.25 3.06 0.30
EJE D-D 0.20 1.08 0.40
EJE D-D 0.20 2.00 0.40
EJE D-D 0.20 2.03 0.40
EJE D-D 0.20 2.15 0.40
EJE D-D 0.20 2.75 0.40
EJE D-D 0.20 2.20 0.40

01.02.03 VIGA DE CIMENTACION


DESCRIPCION A L H
EJE 1-1 0.05 3.34 0.10
EJE 3-3 0.05 4.19 0.10
EJE 4-4 0.05 4.09 0.10
EJE 5-5 0.05 3.98 0.10
EJE 6-6 0.05 4.08 0.10
EJE 7-7 0.05 3.97 0.10
EJE 8-8 0.05 3.86 0.10
EJE 9-9 0.05 2.56 0.10
EJE 10-10 0.15 1.22 0.10
EJE 11-11 0.05 1.85 0.10
EJE A-A 0.05 1.37 0.10
EJE A-A 0.05 1.73 0.10
EJE A-A 0.05 3.20 0.10
EJE A-A 0.05 3.23 0.10
EJE A-A 0.05 3.25 0.10
EJE A-A 0.05 1.97 0.10
EJE A-A 0.05 1.00 0.10
EJE C-C 0.15 1.97 0.10
EJE C-C 0.15 3.53 0.10
EJE D-D 0.05 2.88 0.10
EJE D-D 0.05 3.20 0.10
EJE D-D 0.05 3.23 0.10
EJE D-D 0.05 3.15 0.10
EJE D-D 0.05 3.16 0.10

01.03.00 ELIMINACION DE MATERIALES EXCEDENTES


01.03.01 ZAPATAS
DESCRIPCION A L H
EJE 1-1 1.50 1.50 0.60
EJE 1-1 2.05 2.05 0.60
EJE 3-3 1.50 1.50 0.60
EJE 4-4 1.50 1.50 0.60
EJE 5-5 1.50 1.50 0.60
EJE 6-6 1.50 1.50 0.60
EJE 7-7 1.50 1.50 0.60
EJE 8-8 1.20 1.20 0.60
EJE 9-9 1.20 1.20 0.60
EJE 10-10 1.00 1.00 0.60
EJE 11-11 1.20 1.20 0.60

01.03.02 VIGA DE CIMENTACION


DESCRIPCION A L H
EJE 1-1 0.30 3.34 0.40
EJE 3-3 0.30 4.19 0.40
EJE 4-4 0.30 4.09 0.40
EJE 5-5 0.30 3.98 0.40
EJE 6-6 0.30 4.08 0.40
EJE 7-7 0.30 3.97 0.40
EJE 8-8 0.30 3.86 0.40
EJE 9-9 0.30 2.56 0.40
EJE 10-10 0.30 1.22 0.40
EJE 11-11 0.30 1.85 0.40
EJE A-A 0.30 1.37 0.40
EJE A-A 0.30 1.73 0.40
EJE A-A 0.30 3.20 0.40
EJE A-A 0.30 3.23 0.40
EJE A-A 0.30 3.25 0.40
EJE A-A 0.30 1.97 0.40
EJE A-A 0.30 1.00 0.40
EJE C-C 0.30 1.97 0.40
EJE C-C 0.30 3.53 0.40
EJE D-D 0.30 2.88 0.40
EJE D-D 0.30 3.20 0.40
EJE D-D 0.30 3.23 0.40
EJE D-D 0.30 3.15 0.40
EJE D-D 0.30 3.16 0.40
01.03.03 CIMIENTO CORRRIDO
DESCRIPCION A L H
EJE 1-1 0.50 1.53 0.40
EJE 1-1 0.50 1.37 0.40
EJE 3-3 0.50 2.00 0.40
EJE 4-4 0.50 1.89 0.40
EJE 5-5 0.50 1.79 0.40
EJE 6-6 0.50 1.68 0.40
EJE 7-7 0.50 1.57 0.40
EJE 8-8 0.50 2.07 0.40
EJE 9-9 0.50 1.21 0.40
EJE 9-9 0.50 0.25 0.40
EJE 10-10 0.50 1.22 0.40
EJE 11-11 0.50 1.85 0.40
EJE A-A 0.50 0.55 0.40
EJE A-A 0.50 2.00 0.40
EJE A-A 0.50 2.03 0.40
EJE A-A 0.50 2.15 0.40
EJE A-A 0.50 2.30 0.40
EJE A-A 0.50 1.00 0.40
EJE C-C 0.50 1.13 0.40
EJE C-C 0.50 3.06 0.40
EJE D-D 0.50 1.08 0.40
EJE D-D 0.50 2.00 0.40
EJE D-D 0.50 2.03 0.40
EJE D-D 0.50 2.15 0.40
EJE D-D 0.50 2.75 0.40
EJE D-D 0.50 2.20 0.40
Nº REPET M3
1.00 1.35
1.00 2.52
2.00 2.70
2.00 2.70
2.00 2.70
2.00 2.70
2.00 2.70
2.00 1.73
2.00 1.73
1.00 0.60
2.00 1.73
23.16

Nº REPET M3
1.00 0.40
1.00 0.50
1.00 0.49
1.00 0.48
1.00 0.49
1.00 0.48
1.00 0.46
1.00 0.31
1.00 0.15
1.00 0.22
1.00 0.16
1.00 0.21
4.00 1.54
1.00 0.39
1.00 0.39
1.00 0.24
1.00 0.12
1.00 0.24
1.00 0.42
1.00 0.35
4.00 1.54
1.00 0.39
1.00 0.38
1.00 0.38
10.71
Nº REPET M3
1.00 0.31
1.00 0.27
1.00 0.40
1.00 0.38
1.00 0.36
1.00 0.34
1.00 0.31
1.00 0.41
1.00 0.24
1.00 0.05
1.00 0.29
1.00 0.37
1.00 0.11
3.00 1.20
1.00 0.41
1.00 0.43
1.00 0.46
1.00 0.20
1.00 0.27
1.00 0.73
1.00 0.22
3.00 1.20
1.00 0.41
1.00 0.43
1.00 0.55
1.00 0.44
10.79

Nº REPET M3
1.00 0.58
1.00 1.23
2.00 1.15
2.00 1.15
2.00 1.15
2.00 1.15
2.00 1.15
2.00 0.65
2.00 0.65
1.00 0.20
2.00 0.65
9.70

Nº REPET M3
1.00 0.12
1.00 0.11
1.00 0.16
1.00 0.15
1.00 0.14
1.00 0.13
1.00 0.13
1.00 0.17
1.00 0.10
1.00 0.02
1.00 0.09
1.00 0.15
1.00 0.04
3.00 0.48
1.00 0.16
1.00 0.17
1.00 0.18
1.00 0.08
1.00 0.08
1.00 0.23
1.00 0.09
3.00 0.48
1.00 0.16
1.00 0.17
1.00 0.22
1.00 0.18
4.20

Nº REPET M3
1.00 0.02
1.00 0.02
1.00 0.02
1.00 0.02
1.00 0.02
1.00 0.02
1.00 0.02
1.00 0.01
1.00 0.02
1.00 0.01
1.00 0.01
1.00 0.01
4.00 0.06
1.00 0.02
1.00 0.02
1.00 0.01
1.00 0.01
1.00 0.03
1.00 0.05
1.00 0.01
4.00 0.06
1.00 0.02
1.00 0.02
1.00 0.02
0.51

Nº REPET F.E M3
1.00 1.75 2.36
1.00 1.75 4.41
2.00 1.75 4.73
2.00 1.75 4.73
2.00 1.75 4.73
2.00 1.75 4.73
2.00 1.75 4.73
2.00 1.75 3.02
2.00 1.75 3.02
1.00 1.75 1.05
2.00 1.73 2.99
40.48

Nº REPET F.E M3
1.00 1.75 0.70
1.00 1.75 0.88
1.00 1.75 0.86
1.00 1.75 0.84
1.00 1.75 0.86
1.00 1.75 0.83
1.00 1.75 0.81
1.00 1.75 0.54
1.00 1.75 0.26
1.00 1.75 0.39
1.00 1.75 0.29
1.00 1.75 0.36
4.00 1.75 2.69
1.00 1.75 0.68
1.00 1.75 0.68
1.00 1.75 0.41
1.00 1.75 0.21
1.00 1.75 0.41
1.00 1.75 0.74
1.00 1.75 0.60
4.00 1.75 2.69
1.00 1.75 0.68
1.00 1.75 0.66
1.00 1.75 0.66
18.73
Nº REPET F.E M3
1.00 1.75 0.54
1.00 1.75 0.48
1.00 1.75 0.70
1.00 1.75 0.66
1.00 1.75 0.63
1.00 1.75 0.59
1.00 1.75 0.55
1.00 1.75 0.72
1.00 1.75 0.42
1.00 1.75 0.09
1.00 1.75 0.43
1.00 1.75 0.65
1.00 1.75 0.19
3.00 1.75 2.10
1.00 1.75 0.71
1.00 1.75 0.75
1.00 1.75 0.81
1.00 1.75 0.35
1.00 1.75 0.40
1.00 1.75 1.07
1.00 1.75 0.38
3.00 1.75 2.10
1.00 1.75 0.71
1.00 1.75 0.75
1.00 1.75 0.96
1.00 1.75 0.77
18.50

total
136.78
01.00.00 ENCOFRADO Y DESENCOFRADO
01.01.00 VIGA DE CIMENTACION
DESCRIPCION A L Nº ELEM. Nº REPET
EJE 1-1 0.40 3.34 2.00 1.00
EJE 3-3 0.40 4.19 2.00 1.00
EJE 4-4 0.40 4.09 2.00 1.00
EJE 5-5 0.40 3.98 2.00 1.00
EJE 6-6 0.40 4.08 2.00 1.00
EJE 7-7 0.40 3.97 2.00 1.00
EJE 8-8 0.40 3.86 2.00 1.00
EJE 9-9 0.40 2.56 2.00 1.00
EJE 10-10 0.40 1.22 2.00 1.00
EJE 11-11 0.40 1.85 2.00 1.00
EJE A-A 0.40 1.37 2.00 1.00
EJE A-A 0.40 1.73 2.00 1.00
EJE A-A 0.40 3.20 2.00 4.00
EJE A-A 0.40 3.23 2.00 1.00
EJE A-A 0.40 3.25 2.00 1.00
EJE A-A 0.40 1.97 2.00 1.00
EJE A-A 0.40 1.00 2.00 1.00
EJE C-C 0.40 1.97 2.00 1.00
EJE C-C 0.40 3.53 2.00 1.00
EJE D-D 0.40 2.88 2.00 1.00
EJE D-D 0.40 3.20 2.00 4.00
EJE D-D 0.40 3.23 2.00 1.00
EJE D-D 0.40 3.15 2.00 1.00
EJE D-D 0.40 3.16 2.00 1.00

01.02.00 SOBRE CIMENTO


DESCRIPCION A L Nº ELEM. Nº REPET
EJE 1-1 0.30 3.34 2.00 1.00
EJE 1-1 0.30 1.37 2.00 1.00
EJE 3-3 0.30 4.19 2.00 1.00
EJE 4-4 0.30 4.09 2.00 1.00
EJE 5-5 0.30 3.98 2.00 1.00
EJE 6-6 0.30 4.08 2.00 1.00
EJE 7-7 0.30 3.97 2.00 1.00
EJE 8-8 0.30 3.86 2.00 1.00
EJE 9-9 0.30 2.56 2.00 1.00
EJE 9-9 0.30 1.06 2.00 1.00
EJE 10-10 0.30 2.55 2.00 1.00
EJE 11-11 0.30 3.45 2.00 1.00
EJE A-A 0.30 1.73 2.00 1.00
EJE A-A 0.30 3.20 2.00 4.00
EJE A-A 0.30 3.23 2.00 1.00
EJE A-A 0.30 3.25 2.00 1.00
EJE A-A 0.30 1.97 2.00 1.00
EJE A-A 0.30 1.00 2.00 1.00
EJE C-C 0.30 1.97 2.00 1.00
EJE C-C 0.30 3.53 2.00 1.00
EJE D-D 0.30 2.88 2.00 1.00
EJE D-D 0.30 3.20 2.00 4.00
EJE D-D 0.30 3.23 2.00 1.00
EJE D-D 0.30 3.15 2.00 1.00
EJE D-D 0.30 3.16 2.00 1.00
M2
2.67
3.35
3.27
3.18
3.26
3.18
3.09
2.05
0.98
1.48
1.10
1.38
10.24
2.58
2.60
1.58
0.80
1.58
2.82
2.30
10.24
2.58
2.52
2.53
71.37

M2
2.00
0.82
2.51
2.45
2.39
2.45
2.38
2.32
1.54
0.64
1.53
2.07
1.04
7.68
1.94
1.95
1.18
0.60
1.18
2.12
1.73
7.68
1.94
1.89
1.90
55.92

total
127.29