Está en la página 1de 2

OFFICE OF THE EXECUTIVE ENGINEER WATER RESOURCE DIVISION,REODAR(SEROHI)

Name of Work :- REHABILITATION WORK OF EARTHEN DAM,SPILLWAY ARANGEMENTS AND BASIC


FACILITIES AT SUKLI SELWADA DEM,Dist.-SIROHI UNDER DRIP 2
LOA. NO. :- S.NO./Acct./DRIP/SUKLI SELWADA/2021/5364 Dated:- 12.08.2021
CONTRACTOR :- M/S RAM NARAYAN CONTRACTOR
NAME of CLIENT :- WATER RESOURCE DEPARTMENT SIROHI

FLAKINESS & ELONGATION INDEX


(I.S 2386-1963 PART I)
Sample No : Date of Sampling :
ELEVATION : RD : Date of Testing:
Site Decription : SUKLI SELWADA DEM VILLAGE RAMP Weight of Sample
Flakiness Index Elongation Index

Passing I.S Sieve Retained I.S Wt. of Wt. of Non flaky Weight of
Sr.No Wt. of
(mm) Sieve (mm) Aggregate Aggregate Aggregate
Aggregate in
passing retained on retained on
each fraction
Thickness Gauge thickness gauge Length Gauge
(gm)
(gm) (gm) (gm)

1 63 50
2 50 40
3 40 31.5
4 31.5 25
5 25 20
6 20 16
7 16 12.5
8 12.5 10
9 10 6.3
A1 A2 A3 A4
Total
lakiness Index (A2/A1)x100
ongation Index (A4/A3)x100
Combined F.I+E.I

REMARKS :-

SITE ENGINEER AEN/JEN XEN


SIGNATURE SIGNATURE SIGNATURE