Pulgadas Rendimiento
1 21.3 1 21.3
1.5 14.2 1.5 14.2
2 10.65 2 10.65
3 7.1 3 7.1
| PRODUCCION DE SHOCRETE POR CUENTAS (m3)
CECO (Todas)
VETA (Todas) Prog. Mes
LABOR (Todas)
CECO (Todas)
VETA (Todas)
LABOR (Todas)
Suma de m2 METODO
FECHA BF CRM2 CRM3 TOTAL
1/1/2015 32 75 63 171
1/2/2015 59 59
TOTAL 32 75 122 229
CECO (Todas)
VETA (Todas)
LABOR (Todas)
Suma de m3 METODO
FECHA BF CRM2 CRM3 TOTAL
1/1/2015 3 5 6 14
1/2/2015 6 6
TOTAL 3 5 11 20
CECO (Todas)
VETA (Todas)
LABOR (Todas)
EJECUT. (Varios elementos)
Suma de m3 TIPO
FECHA Explotación TOTAL
1/1/2015 -0.0220657277 -0.0220657277
1/2/2015 0.02338028169 0.02338028169
TOTAL 0.00131455399 0.00131455399
VETA (Todas)
LABOR (Todas)
CECO (Todas)
EJECUT. Iesa
Suma de m3 TIPO
FECHA Inf. Operación Rehabilitación Inf.Operación TOTAL
1/1/2015 0.05427230047 -0.02957746479 -0.05633802817 -0.03164319249
1/2/2015 0.37183098592 -0.02450704225 0.34732394366
1/3/2015 0.1665258216 -0.05661971831 0.10990610329
1/4/2015 2.67727699531 0.02741784038 2.70469483568
TOTAL 3.26990610329 -0.08328638498 -0.05633802817 3.13028169014
765 m3
M3 % CUMPL.
TOTAL CIA 311 41%
Rehabilitación Preparacion IESA 307.5 40%
3 23 618.5 81%
9 17.5
9 15
24 31.5
21 30
5 20
13.5
1.5 21.5
18
25.5
21.5
25.5
28
3 27
7 33.5
11 30
7.5 28.5
27.5
5.5 30.5
25
4 36
13.5
4 30
19
27.5
78 36.5 618.5
UENTAS (m2)
M3 % CUMPL.
Iesa TOTAL CIA
Inf. Operac. RehabilitaciónPreparacion IESA
63.9 31.6 266.2
35.9 63.7 158.5
65.7 95.2 160.9
82.2 255.9 338.1
64.9 224.1 320.4
84.9 52.0 211.2
100.1 127.5
89.8 8.0 215.2
32.5 160.7
26.2 249.1
42.2 228.5
62.5 268.3
140.4 303.8
157.1 32.1 284.2
83.6 74.5 354.3
137.9 115.4 316.5
81.6 77.0 295.4
126.5 285.1
103.5 54.2 316.2
116.6 268.5
107.3 30.2 358.6
60.9 109.4
36.5 39.4 214.9
77.6 146.7
65.5 290.6
2,045.9 784.8 368.5 6,248.7
SHOT
10
EJECUTADO (m3)
9
SCHOT
10
tado (m3)
9
SCHOT
10
Ejecutado (m3)
9
0
SHOTCRETE EJECUTADO
SCHOTCRETE EJECUTADO
SCHOTCRETE EJECUTADO
Geotecnia
Unidad Operativa Pallancata
PRODUCCION DE SHOTCRETE - MES: ENERO 2015
Total 602.50
SUB - TOTAL
IGV
TOTAL A VALORIZAR
TCRETE
14
607.5
Costo Parcial
S/. 163,836.52
S/. 109,711.98 34.2383025
S/. 0.00 37.1484276
S/. 0.00
S/. 0.00
S/. 479,186.40
S/. 752,734.90
S/. 163,836.52
S/. 109,711.98
S/. 0.00
S/. 0.00
S/. 0.00
S/. 479,186.40
S/. 752,734.90
S/. 752,734.90
S/. 135,492.28
S/. 888,227.18