CONTROL DE INDICADORES
PLANEAMIENTO_PRODUCTIVIDAD
ENERO
ZONA I
TIPO DE ACTIVIDAD
ZONA EQUIPO MTS PROG. PROG. FECHA Ejecutado Fecha CUMPL.% NRO DISP. MTS/DISP
II MUKI Nº 03 115.00 103.87 109.45 105.37% 43 2.55
195
MUKI Nº 04 117.00 105.68 51.02 48.28% 21 2.43
Total general 232.00 209.55 160.48 76.58% 64 2.51 53
ACTIVIDAD OPERATIVA MUKI Nº 03 137
Horas
T. Hrs. % ACUM. 80%-20%
40.00 37.50 100.00%
35.00 DEMORA NO OPERATIVA ACTIVIDAD OPERATIVA
80.00%
30.00 DEMORA OPERATIVA 1 DEMORA OPERATIVA 2
25.00
ACTIVIDAD OPERATIVA MUKI Nº 04
60.00%
20.00 Horas
15.00 40.00% T. Hrs. % ACUM. 80%-20%
11.23 45.00 100.00%
10.00 8.50 39.15
5.35 20.00% 40.00
4.45 3.30
5.00 2.45 1.70 35.00 80.00%
0.00 0.00% 30.00
60.00%
OTROS TRABAJOS EN LABOR
PERF.TAL.SOSTENIMIENTO
DESATADO DE ROCAS
PERF.TAL.SERV. ENERGIA
PERF. FRENTE
TRASLADO DE EQUIPO A
PERF. CANCAMO
CARGUIO FRENTE
25.00 22.45
20.00 18.25 16.60 40.00%
15.00 11.10 10.45
LABOR
10.00 20.00%
5.00 1.60
0.00 0.00%
DESATADO DE ROCAS
OTROS TRABAJOS EN LABOR
PERF.TAL.SOSTENIMIENTO
CARGUIO FRENTE
TRASLADO DE EQUIPO A
PERF. FRENTE
PERF.TAL.SERV. DRENAJE
LABOR
DEMORA NO OPERATIVA MUKI Nº 03
Horas
T. Hrs. % ACUM. 80%-20%
6.00 100.00%
5.00
5.00 80.00%
DEMORA NO OPERATIVA MUKI Nº 04
4.00 3.55
60.00% Horas
3.00 T. Hrs. % ACUM. 80%-20%
40.00% 3.50 100.00%
2.00 3.00
1.45 3.00
20.00% 80.00%
1.00 2.50 2.20
0.00 0.00% 2.00 60.00%
CORRECTIVO X FALLA
Total general
OTRAS DEMORAS NO
1.50
MANTENIMIENTO
40.00%
OPERATIVAS
1.00 0.80
20.00%
0.50
0.00 0.00%
CORRECTIVO X FALLA
Total general
OTRAS DEMORAS NO
MANTENIMIENTO
OPERATIVAS
Movimiento de carga
ZONA EQUIPO CAPAC EQUIPO Prom. de TON/Hr % del Dia % Prom. Acumulado % del Dia % Prom. Acumulado
(M+D)
1.7 SD-05 3,270.48 35.65 84.00% 85.00% 60.00% 60.11%
I SCOOP
Total S-1.7 Ydas3 3,270.48 35.65 84.00% 85.00% 60.00% 60.11%
10 DM-04 2,490.00 16.55 76.80% 78.00% 69.00% 70.71%
DUMPER
Total DM 10 Tn 2,490.00 16.55 76.80% 78.00% 69.00% 70.71%
SD-06 1,174.23 31.16 85.10% 86.30% 72.00% 73.31%
II
2 SD-07 2,919.56 42.44 84.00% 85.00% 70.00% 71.70%
SCOOP
SD-09 4,325.19 33.82 84.00% 85.00% 55.00% 56.33%
Total S-2.0 Ydas3 8,418.98 35.81 84.37% 85.43% 65.67% 67.11%
Total general 14,179.46
RESUMEN POR EL TIPO DE EQUIPO: Disp. Mec. % (objetivo 85%) Util. Efectiva % (objetivo 65%)
Movimiento de
Equipo Tipo de Equipo Cap. Teorica Prom. de TON/Hr % del Dia % Prom. Acumulado % del Dia % Prom. Acumulado
carga (M+D)
Dumper NORMET 10 TN 2,490.00 16.55 76.80% 78.00% 69.00% 70.71%
SANDVIK 1.7 Ydas3 3,270.48 35.65 84.00% 85.00% 60.00% 60.11%
Scoop
SANDVIK 2.0 Ydas3 8,418.98 35.81 84.37% 85.43% 65.67% 67.11%