Está en la página 1de 45

MES 1 MES 2 MES 3

Nombre de tarea
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, S/79,895.96 S/67,003.75 S/12,093.16
Obras Provisionales y Trabajos Preliminares S/79,895.96 S/67,003.75 S/12,093.16
Construcciones Provisionales S/15,592.91 S/787.48
ALMACEN Y CASETA DE GUARDIANIA S/3,547.80
CARTEL DE OBRA 4.80mX3.60m S/2,172.73
CONSTRUCCION DE CERCO PROVISIONAL S/9,084.90
CONSTRUCCION DE PUERTAS PROVISIONALES S/787.48 S/787.48
Instalaciones Provisionales S/446.84
ENERGIA ELECTRICA PROVISIONAL S/446.84
Flete Terrestre S/1,075.74 S/8,337.00 S/8,068.06
FLETE TERRESTRE S/1,075.74 S/8,337.00 S/8,068.06
Remociones S/3,153.72 S/28,309.66
DESMONTAJE DE PUERTAS S/440.97
DESMONTAJE DE VENTANAS S/38.28
DESMONTAJE DE REJILLA METALICA EN CANALE S/168.66
DESMONTAJE DE TECHO DE ETERNIT DE FIBR S/2,505.81 S/20,046.50
DESMONTAJE DE ESTRUCTURA METALICA S/5,285.24
DESMONTAJE DE COLUMNAS METALICAS S/2,977.92
Demoliciones S/4,081.30 S/20,570.92
DEMOLICION DE MUROS DE LADRILLO S/2,951.62
DEMOLICION DE ESTRUCTURAS DE CONCRETO S/1,129.68 S/9,037.46
ACARREO INTERNO, MATERIAL PROCEDENTE DE DEMOLICIO S/5,459.42
ELIMINACION DE MATERIAL PROVENIENTE DE DEMOLICIONE S/6,074.04
Trazo, Niveles y Replanteo S/1,555.61
TRAZO Y REPLANTEO PRELIMINAR S/1,555.61
Seguridad y Salud en la Construcción S/42,549.84
ELABORACION, IMPLEMENTACION Y ADMINIST S/3,920.00
EQUIPOS DE PROTECCION INDIVIDUAL S/30,182.25
EQUIPO DE PROTECCION COLECTIVA S/3,972.46
SEÑALIZACION TEMPORAL DE SEGURIDAD S/1,914.75
RECURSOS PARA RESPUESTA ANTE EMERGENC S/2,560.38
Plan para la Vigilancia, Prevencion y Control de Covid- S/12,995.61 S/7,443.08 S/4,025.10
IMPLEMENTACION DE ZONA DE CONTROL S/1,027.90
TOMA DE TEMPERATURA Y PULSIOXIMETRIA S/976.82
DESINFECCION DE PERSONAL S/49.00 S/379.75 S/367.50
ZONA DE LAVADO DE MANOS S/444.19
ZONA DE ENTREGA DE MATERIALES S/586.14
IMPLEMENTACION DE AREA PARA ENFERMERIA S/544.77
IMPLEMENTACION DE ENFERMERIA S/1,145.16
CONTENEDORES PARA DESECHOS S/123.81
DESINFECCION DE AMBIENTES DE TRABAJO S/208.00 S/1,612.00 S/1,560.00
DESINFECCION DE MATERIALES, EQUIPOS Y H S/1,580.00 S/3,160.00
EQUIPOS DE PROTECCIÓN INDIVIUAL CONTRA EL S/342.12
IMPLEMENTACION DE COMEDOR S/5,730.50
DESINFECCION DE COMEDOR S/81.44 S/631.16 S/610.80
SEÑAL INFORMATIVA EN INGRESO A OBRA S/26.60
SEÑAL INFORMATIVA DENTRO DE LA OBRA S/26.60
SEÑALIZACION DE RUTAS PARA VACIADO S/28.13
MOVILIZACION DE PERSONAL S/198.24 S/1,536.36 S/1,486.80
ESTRUCTURAS S/14,286.13 ###
Movimiento de Tierras S/8,720.27 S/58,558.29
Excavaciones S/7,128.52 S/710.45
EXCAVACION DE ZANJAS Y ZAPATAS Rt<2 Kg/cm² h=1.20m S/2,865.84
EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS S/4,262.68 S/710.45
Rellenos S/22,379.13
RELLENO CON ARENA FINA E=4" S/19,971.40
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO S/2,407.73
Nivelación Interior y Apisonado S/1,591.75 S/24,239.01
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PATIO Y VERED S/4,519.14
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES S/19,719.87
BASE DE AFIRMADO COMPACTADO DE 8" S/1,591.75
Eliminación de Material Excedente S/11,229.70
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES S/5,027.04
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA S/6,202.66
Obras de Concreto Simple S/2,440.07 S/69,582.37
Cimientos S/22,716.88
CIMIENTOS CORRIDOS 1:10 + 30 % P.G. f'c >=100 Kg/cm². S/22,716.88
Sobrecimiento S/2,337.74
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c >=100 Kg/cm² S/820.29
SOBRECIMIENTO ENCONFRADO Y DESENCOFRADO S/1,517.45
Solado S/2,440.07 S/4,880.14
SOLADO PARA ZAPATAS e = 4" f'c=175 kg/cm2 S/2,440.07 S/4,880.14
Falso Piso S/37,121.46
FALSO PISO f´c = 100 Kg/cm², e=4" S/37,121.46
Pediluvio/Rodaluvio S/874.25
PEDILUVIO/RODALUVIO - CONCRETO F'c = 175 kg/cm2, E=4" S/570.11
PEDILUVIO/RODALUVIO - ENCOFRADO Y DESENCOFRADO S/304.14
Bebederos S/1,651.90
BEBEDEROS - CONCRETO F'c = 175 kg/cm2, E=4" S/763.87
BEBEDEROS - ENCOFRADO Y DESENCOFRADO S/888.03
Obras de Concreto Armado S/3,125.79 ###
Zapatas S/3,125.79 S/20,054.96
ZAPATAS.- CONCRETO f´c = 210 Kg/cm² S/13,803.39
ZAPATAS.- ACERO fy = 4,200 Kg/cm² S/3,125.79 S/6,251.57
Sobrecimiento Reforzado S/49,729.89
SOBRECIMIENTO REFORZADO.- CONCRETO F'c=175 kg/cm2 S/15,058.58
SOBRECIMIENTO REFORZADO.- ENCOFRADO Y DESENCOFRADO S/25,088.41
SOBRECIMIENTO REFORZADO.- ACERO fy = 4,200 Kg/cm² S/9,582.90
Columnas S/74,914.24
COLUMNAS - CONCRETO 210 KG/CM² - 1er PISO S/15,414.84
COLUMNAS.- ENCOFRADO Y DESENCOFRADO S/20,229.43
COLUMNAS.- ACERO fy = 4,200 Kg/cm² S/39,269.97
Vigas S/34,279.01
VIGAS.- CONCRETO 210 kg/cm2 - 1er PISO S/3,104.18
VIGAS.- ENCOFRADO Y DESENCOFRADO S/13,698.40
VIGAS.- ACERO fy = 4,200 Kg/cm² S/17,476.43
Losas
LOSA ALIGERADA.- CONCRETO f´c = 210 Kg/cm²
LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA.- ACERO fy = 4,200 Kg/cm²
LOSA ALIGERADA.- LADRILLO HUECO 15X30X30cm
LOSAS MACIZAS.- CONCRETO f´c = 210 Kg/cm² - 01 PISO
LOSAS MACIZAS.- ENCOFRADO Y DESENCOFRADO
LOSAS MACIZAS.- ACERO fy = 4,200 Kg/cm²
Escaleras
ESCALERAS.- CONCRETO f´c =175 Kg/cm²
ESCALERAS.- ENCOFRADO Y DESENCOFRADO
ESCALERAS.- ACERO fy = 4,200 Kg/cm²
Cisternas S/16,803.06
CISTERNA.- CONCRETO f´c = 280 Kg/cm² S/5,039.96
CISTERNA.- ENCOFRADO Y DESENCOFRADO S/3,363.84
CISTERNA.- ACERO fy = 4,200 Kg/cm² S/8,399.26
Tanque Elevado S/11,395.84
TANQUE ELEVADO.- CONCRETO 210 kg/cm2 S/2,861.54
TANQUE ELEVADO.- ENCOFRADO Y DESENCOFRADO S/4,279.92
TANQUE ELEVADO, ACERO fy=4200 kg/cm2 S/4,254.38
Trampas de Grasa S/1,398.12
TRAMPA DE GRASAS.- CONCRETO f´c = 210 Kg/cm²
TRAMPA DE GRASAS.- ENCOFRADO Y DESENCOFRADO
TRAMPA DE GRASAS.- ACERO fy = 4,200 Kg/cm² S/1,398.12
Camara de rejas
CAMARA DE REJAS - CONCRETO f´c = 210 Kg/cm²
CAMARA DE REJAS.- ENCOFRADO Y DESENCOFRADO
CAMARA DE REJAS.- ACERO fy = 4,200 Kg/cm²
Pozo de Sedimentacion
POZO DE SEDIMENTACION.- CONCRETO f´c = 210 Kg/cm²
POZO DE SEDIMENTACION.- ENCOFRADO Y DESENCOFRADO
POZO DE SEDIMENTACION.- ACERO fy = 4,200 Kg/cm²
Rampas S/497.36
RAMPAS - CONCRETO f´c = 175 Kg/cm² S/44.47
RAMPAS - ENCOFRADO Y DESENCOFRADO S/81.25
RAMPAS - ACERO fy = 4200 Kg/cm² S/371.64
Mesa de Concreto S/1,726.38
MESAS DE CONCRETO - CONCRETO F'c = 210 kg/cm2
MESA DE CONCRETO - ENCOFRADO Y DESENCOFRADO S/1,726.38
MESA DE CONCRETO - ACERO DE REFUERZO FY=4200 kg/cm2
Estructuras Metálicas S/44,484.23
Tijerales Metalicos S/7,590.35
CERCHA TIPO I SEGÚN DISEÑO.INCL. SUMINISTRO E INSTALACION S/7,590.35
Columnas Metálicas S/11,702.29
COLUMNAS METALICAS DE TUBO CUADRADO DE 4"x4"x2.5mm (INC.ANCLA S/11,702.29
ESTRUCTURA METALICA PARA ZONA DE OREO DE BOVINOS
ESTRUCTURA METALICA PARA ZONA DE OREO DE PORCINO/OVINO
ESTRUCTURA METALICA PARA BENEFICIO/BOVINO
Vigas Metalicas S/25,191.59
VIGUETAS METALICAS C/TUBO DE FIERRO NEGRO ESTRUCTURAL DE 75m S/2,065.65
ESTRUCTURA VIGA DE 100mm x 100mm, e=2.50 mm METÁLICA PARA CO S/20,397.12
ESTRUCTURA TUBO DE 100mm x50mm, e=2.5mm METÁLICA PARA COBER S/2,728.82
CORREA DE 25mm x 50mm, e=2.5mm METÁLICA PARA COBERTURA INC BASE ANTICO
Cobertura
COBERTURA DE PLANCHA DE CALAMINON TI, E=0.40MM
Varios S/500.29
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1" S/298.40
TAPA JUNTA DE DILATACION CON ESPUNA+JEBE MICROPOROSO S/201.89
ARQUITECTURA S/86,589.55
Muros y Tabiques de Albañilería S/60,062.21
MURO DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:4 (e=1.5cm) S/57,553.84
ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS S/2,508.37
Muros con Sistema de Construccion en Seco
MURO TABIQUE SIMPLE C/PLACA DE YESO ESTANDARD 1/2'', PERFIL 89
Revoques y Revestimientos S/1,856.27
TARRAJEO EN MURO: TARRAJEO PRIMARIO
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
TARRAJEO CON IMPERMEABILIZANTE S/1,856.27
VESTIDURA DE DERRAMES, MORTERO C:A 1:5
Pisos y Pavimentos S/24,189.28
Contrapisos S/2,464.18
CONTRAPISO DE 40 mm S/1,691.92
CONTRAPISO DE 4" ACABADO PULIDO, ZONA MUEBLES BAJOS S/772.26
Pisos
PISO CERAMICO ANTIDESLIZANTE 0.45 x 0.45 m SERIE COLOR - NACIONAL
PISO DE CANTO RODADO ASENTADO FRAGUADO
Acabado de Concreto en Pisos S/17,258.66
PISO DE CEMENTO PULIDO e = 4" C/F. PISO S/17,258.66
PISO DE CEMENTO SEMI PULIDO e = 4" C/F. PISO
Patios y Veredas S/4,466.44
PATIO Y VEREDA CONCRETO f´c = 175 Kg/cm², e=4" FROTACHADO Y BRU S/4,331.87
RAMPA CEMENTO FROTACHADO Y BRUÑADO S/134.57
Zócalos y Contrazócalos
Zócalos
ZOCALO DE CERAMICA ANTIDESLIZANTE DE 45X45cm, COLOR BLANCO
Contrazócalos
CONTRAZOCALO DE CERAMICA 10X45cm
CONTRAZOCALO SANITARIO DE CERAMICO H=10CM
Ceramica en Mesa de Concreto
CERAMICA 45x45CM EN MESAS DE CONCRETO
Carpintería de Madera S/481.79
Puertas S/481.79
PUERTA CONTRAPLACADA 50 mm CON TRIPLAY 6 mm INCLUYE MARCO CE S/481.79
PUERTA DE MELAMINE PLANCHA DE 18 mm INCLUYE PERFILES DE ALUMINIO
Carpintería Metálica y Herrería
Ventanas de Fierro
VENTANA MARCO Y MALLA METALICA ACERADA
VENTANA SOBRE MARCO DE ALUMINIO
Puertas de Fierro
PUERTA DE UNA HOJA DE 1.00x2.30m, MATERIAL METALICO
PUERTA DE UNA HOJA DE 0.90x2.30m MATERIAL METALICO
PUERTA DE UNA HOJA DE 0.90x2.10m, MATERIAL METALICO
PUERTA DE DOS HOJAS DE 4.00x3.00 m BATIENTE, MATERIAL METALICO
PUERTA ENRROLLABLE DE METAL DE UNA HOJA DE 2.00x2.80m
PUERTA DE UNA HOJA MATERIAL METALICO CON MALLA DE ACERADA
PUERTA UNA HOJA VAIVEN MATERIAL METALICO CON MALLA ACERADA
Pasamanos
PASAMANO DE TUBO F°G° DE 2" EN RAMPA
Cerrajería
Bisagras
BISAGRA DE ACERO ALUMINIZADO DE 4"X4" PESADA EN PUERTAS METALICAS
BISAGRA DE ACERO ALUMINIZADO DE 4"X3" PESADA EN PUERTAS CONTRAPLACADAS
BISAGRA TIPO PISTON DE 4" EN PUERTAS CON MALLAS METALICA
Cerradura
CERRADURA TIPO PARCHE DE 03 GOLPES P/PUERTAS METALICAS
CERRADURA TIPO PESADA DE 2 GOLPES PARA PUERTA
CERRADURA DE POMO P/PUERTAS CONTRAPLACADAS
CERROJO PICAPORTE EN PUERTAS DE MALLA
Accesorios Cierre
MANIJA DE BRONCE 4" PARA PUERTAS
Vidrios, Cristales y Similares
SUMINSTRO E INSTALACION DE VIDRIO TEMPLADO E=6 mm
Cercos
CERCO DE MALLA GALVANIZADA TIPO CICLON 2" x 2" x 4mm, COLUM. TUBO NEGRO ESTR
Pintura
Pintura de Cielos Rasos, Vigas, Columnas y Paredes
PINTURA LATEX 2 MANOS EN VIGAS
PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA
Pintura de Puertas y Ventanas
PINTURA BARNIZ EN CARPINTERIA DE MADERA
Pintura de Estructuras Metalicas
PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS PTA. Y VENT.
Varios
LIMPIEZA FINAL DE LA OBRA
MEJORAMIENTO DE VENTANAS Y PUERTA EN FACHADA PRINCIPAL
COLOCACION DE CORTINAS DE PVC,SEGÚN DISEÑO
TAPA DE CISTERNA Y TANQUE ELEVADO
INSTALACIONES SANITARIAS
Aparatos Sanitarios y Accesorios
SUMINISTRO E INSTALACION DE INODORO ONEPIECE MEDITERRAANEO BLANCO
SUMINISTRO E INSTALACION DE URINARIO CADET
SUMINISTRO E INSTALACION DE LAVATORIO AVANTE COLOR BLANCO
DUCHA SIMPLE CON GRIFERIA
ACCESORIOS DE BAÑOS
LLAVE ESFERICA DE 1/2"
Sistema de Agua Fría
EMPALME A RED EXISTENTE AGUA
SALIDA DE AGUA FRIA - PVC
TUBERIA PVC CLASE 10-1/2" ROSCADA
TUBERIA PVC CLASE 10-3/4" ROSCADA
TUBERIA PVC CLASE 10-1" ROSCADA
TUBERIA PVC CLASE 10 1 1/2" ROSCADA
TUBERIA PVC CLASE 10 2" ROSCADA
VALVULA COMPUERTA DE BRONCE 3/4"
VALVULA COMPUERTA DE BRONCE 2"
UNION UNIVERSAL DE 2"
VALVULA CHECK DE BRONCE DE 2"
REBOSE DE TANQUE ELEVADO F°G° 2"
CAJA Y TAPA METALICA PARA VALVULAS EN PARED
GRIFO DE RIEGO INCL. CAJUELA DE CONCRETO
EQUIPO DE BOMBEO 02 ELECTROBOMBAS 1.50 HP
Sistema de Desagüe y Ventilación
EMPALME A RED EXISTENTE, DESAGUE
SALIDA DE PVC-SAL PARA DESAGUE DE 2"
SALIDA DE PVC-SAL PARA DESAGUE DE 4"
SALIDA VENTILACION PVC-SAP Ø2"
SOMBRERO DE VENTILACION PVC-SAL Ø2"
EXCAVACION DE ZANJAS PARA RED EXT. SANIT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. SANIT.)
TUBERIA PVC SAL 2"
TUBERIA PVC SAL 3"
TUBERIA PVC-SAL 4"
REGISTRO DE BRONCE 4"
REGISTRO DE BRONCE 3"
SUMIDERO DE BRONCE 4"
SUMIDERO DE BRONCE 3"
SUMIDERO DE BRONCE 2"
CAJA DE REGISTRO PREFABRIC. 12"X24" C/TAPA CONCRETO
Sistema de Drenaje Pluvial
TUBERIA DE BAJADA PVC-SAP 2" P/LLUVIAS
TUBERIA PVC SAL 3" RED EXTERIOR
CANALETA DE FIERRO GALVANIZADO e=0.90mm, P/EVAC. PLUVIAL
CANAL RECT. DE CONCRETO f’c’=175 Kg/cm2 CON REJILLA METALICA-PISOS
INSTALACIONES ELECTRICAS
Conexion a Red Existente
CONEXION A RED EXISTENTE
Salida para Alumbrado, Tomacorrientes, Fuerza
SALIDA DE TECHO (CENTRO DE LUZ)
SALIDA PARA BRAQUETE (PARED)
SALIDA PARA INTERRUPTOR DE 01 GOLPE
SALIDA PARA INTERRUPTOR DE 02 GOLPES
SALIDA PARA INTERRUPTOR DE CONMUTACION
SALIDA TOMACORRIENTE DOBLE CON PUESTA A TIERRA
SALIDA TOMACORRIENTE DOBLE APRUEBA DE AGUA CON LINEA DE TIERRA
SALIDA PARA LUZ DE EMERGENCIA
SALIDA DE FUERZA P/BALANZA ELECTRONICA
SALIDA DE FUERZA P/ ESTERILIZADOR DE CUCHILLOS
SALIDA DE FUERZA P/ CREMATORIO
Canalización para Tuberías
EXCAVACIÓN DE ZANJA PARA REDES ELÉCTRICAS Y COMUNICACIONES
RELLENO MANUAL CON MATERIAL PROPIO (REDES ELÉCTRICAS Y COMUNICACIONES)
ELIMINACION DE MATERIAL EXCEDENTE
Tuberias
TUBERÍA PVC-P 20mm
TUBERÍA PVC-P 35mm
Cajas de Distribucion
CAJA DE PASE F°G° 8x8x4" (200x200x100mm)
Tableros Electricos
TAB.GEN.3x60A;5-2x10A;4-3x10A;4-2x16A;1-3x25A;12-IDF 25AMP
Alimentadores
ALIM. 3-1x25mm2+1-1x25mm2+1-10mm2 N2XOH
CABLE DE COBRE DESNUDO 1x50mm2, TEMPLE BLANDO
Sistema Puesta a Tierra
POZO PUESTA A TIERRA PT-1 (R<15 OHM)
Artefactos Electricos
ARTEFACTO FLUORESCENTE 2 x 36 W (SIM. JOSFEL) COLGANTES INCL. ACCESORIOS
ARTEFACTO DE ILUMINACIÓN DE EMERGENCIA CON DOS LÁMPARAS DE 20W, CON DOS HORAS DE
ARTEFACTO DE ILUMINACIÓN TIPO SPOT LIGHT
MOBILIARIO
ESCRITORIO 1.30x0.60
SILLA METALICA
SILLA GIRATORIA
ESTANTE DE ANGULO RANURADO
SILLA DE ESPERA - 3 ASIENTOS
EQUIPAMIENTO
CAJÓN DE ATURDIMIENTO
ESTERILIZADOR DE CUCHILLO ELECTRICO
PISTOLA DE ATURDIMIENTO BOVINO
PARRILLA METÁLICA MÓVIL BOVINOS
PARRILLA METÁLICA MÓVIL PORCINOS
PLATAFORMA METÁLICA 1.20X0.70 CON ESCALONES
MANILUVIO DE ACERO A PEDAL
POZA DE LAVADO DE BOTAS
BALANZA ELECTRONICA
MESA DE INSPECCION DE ACERO INOXIDABLE
ESTANTE CON GANCHOS PARA VISCERAS
COLGADORES EMPOTRADO DE VISCERAS C/10 GANCHOS
CARRO TRANSPORTADOR TIPO BUGGY (CABEZAS Y PATAS)
CARRETILLA DE MANO ACERO GALVANIZADO
GANCHOS DE ACERO PARA OREO
BANDEJA DE ACERO INOXIDABLE
RECIPIENTE PARA DESANGRADO MOVIL
COCINA INDUSTRIAL 03 HORNILLAS
BALÓN DE GAS DE 45KG
OLLA #50 DE 80LTS 4mm DE ESPESOR
CONTENEDORES PARA BASURA DE 240 LTS
LOCKERS 2 CUERPOS/6 PUERTAS
MES 4 MES 5

### S/9,674.53
### S/9,674.53

S/8,337.00 S/6,454.45
S/8,337.00 S/6,454.45

S/4,159.27 S/3,220.08

S/379.75 S/294.00

S/1,612.00 S/1,248.00

S/631.16 S/488.64

S/1,536.36 S/1,189.44
###
###

S/3,104.18
S/3,104.18

S/2,158.31
S/197.51
S/361.14
S/318.86
S/142.40
S/244.86
S/176.62
S/716.92
S/1,287.83
S/249.18
S/931.34
S/107.31

S/3,001.22
S/1,442.96
S/1,558.26

S/3,908.39
S/1,183.97
S/1,530.24
S/1,194.18
S/5,038.88
S/1,611.51
S/1,869.60
S/1,557.77

S/5,038.88
S/2,339.16
S/1,726.38
S/973.34
###

S/7,843.21

S/4,268.46
S/1,833.95
S/1,740.80
###

###
S/7,933.85
###
###

### S/77,040.67
###
###

S/2,716.17
S/2,716.17
###
###
###
S/5,072.59
S/8,464.12

S/2,899.80
### S/3,374.00

S/5,232.78 S/3,374.00
S/3,374.00
S/5,232.78
###
###
###

S/2,764.32 S/58,147.10
S/36,664.14
S/36,664.14
S/21,482.96
S/3,267.41
S/18,215.55
S/2,764.32
S/2,764.32
S/6,993.51
S/6,993.51
S/963.57
S/6,029.94
###
S/8,429.20
S/7,970.59
S/458.61
###
S/1,323.00
S/935.90
S/2,558.40
S/3,430.00
S/2,156.00
S/5,675.02
S/721.70
S/1,406.11
S/1,406.11
S/4,354.76
S/2,596.92
S/558.60
S/675.22
S/1,363.10
S/1,573.59
S/305.90
S/268.12
S/645.15
S/354.42
S/184.25
S/184.25
S/272.18
S/272.18
###
###
### S/15,519.57
S/3,584.55 S/11,357.13
S/1,962.10
S/1,622.45 S/11,357.13
S/581.50
S/581.50
S/1,650.66
S/46.17
S/1,604.49
### S/4,162.44
S/2,382.34
S/1,780.10
###
S/1,764.00
### S/27,597.80
S/6,683.03
S/1,827.30
S/844.14
S/1,167.44
S/632.20
S/417.98
S/1,793.97
S/6,870.78 S/8,097.57
S/94.35
S/6,870.78
S/528.29
S/703.03
S/854.13
S/268.42
S/2,100.01
S/277.70
S/606.56
S/199.98
S/337.67
S/157.28
S/265.12
S/620.32
S/1,084.71
S/7,715.20 S/12,817.20
S/201.74
S/6,351.90
S/416.76
S/238.26
S/24.66
S/449.43
S/395.54
S/1,208.94
S/1,520.36
S/4,536.47
S/659.28
S/149.88
S/906.68
S/929.28
S/1,624.98
S/918.24
###
S/539.24
S/166.93
S/3,854.28
###
### S/26,857.90
S/183.43
S/183.43
S/6,213.48 S/5,256.98
S/3,409.04
S/1,000.23
S/976.31
S/117.14
S/710.76
S/1,152.12
S/2,448.64
S/1,212.97
S/143.18
S/136.92
S/163.15
S/58.12
S/24.62
S/23.65
S/9.85
S/2,734.25
S/2,447.37
S/286.88
S/405.78
S/405.78
S/2,709.70
S/2,709.70
S/765.23
S/748.41
S/16.82
S/959.11
S/959.11
S/18,707.79
S/14,224.83
, CON DOS HORAS DE S/3,386.90
S/1,096.06
S/24,825.20
S/10,231.20
S/4,586.40
S/2,657.60
S/6,615.00
S/735.00
###
S/18,210.59
S/21,168.00
S/31,773.77
S/4,152.55
S/3,322.03
S/13,815.51
S/7,497.00
S/2,000.00
S/1,677.97
S/2,300.00
S/1,930.00
S/9,016.00
S/10,800.00
S/1,911.00
S/8,820.00
S/5,979.64
S/1,600.00
S/2,711.84
S/1,481.76
S/2,156.00
S/966.12
S/1,862.00
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

OBRAS PROVISIONALES, TRABAJOS


01 PRELIMINARES, SEGURIDAD Y SALUD EN 181,163.67 58,789.61 61,009.79 25,752.91 26,311.54 9,299.81
LA CONSTRUCCION
Obras Provisionales y Trabajos
01.01 181,163.67 58,789.61 61,009.79 25,752.91 26,311.54 9,299.81
Preliminares
Construcciones Provisionales
01.01.01 16,380.39 15,592.91 787.48 0.00 0.00 0.00
01.01.01.01 ALMACEN Y CASETA DE GUARDIANIA Glb 1.00 3,547.80 3,547.80 1.00 3,547.80 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.01.02 CARTEL DE OBRA 4.80mX3.60m Und 1.00 2,172.73 2,172.73 1.00 2,172.73 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
CONSTRUCCION DE CERCO
01.01.01.03 m 165.00 55.06 9,084.90
PROVISIONAL 165.00 9,084.90 100.00% 100.00%
CONSTRUCCION DE PUERTAS
01.01.01.04 und 2.00 787.48 1,574.96
PROVISIONALES 1.00 787.48 50.00% 787.48 50.00%
01.01.02 Instalaciones Provisionales 446.84 89.37 89.37 89.37 89.37 89.37
01.01.02.01 ENERGIA ELECTRICA PROVISIONAL Mes 4.00 111.71 446.84 0.80 89.37 20.00% 0.80 89.37 20.00% 0.80 89.37 20.00% 0.80 89.37 20.00% 357.47 89.37 20.00% 100.00%
01.01.03 Flete Terrestre 32,272.25 1,075.74 6,454.45 8,068.06 8,337.00 8,337.00
FLETE TERRESTRE 0.03 1,075.74 3.33% 0.20 6,454.45 20.00% 0.25 8,068.06 25.00% 0.26 8,337.00 25.83% 0.26 8,337.00 25.84% 100.00%
01.01.03.01 Glb 1.00 32,272.25 32,272.25
01.01.04 Remociones
DESMONTAJE DE PUERTAS 31,463.38 3,153.72 28,309.66 0.00 0.00 0.00
01.01.04.01 DESMONTAJE DE VENTANAS m2 41.64 10.59 440.97 41.64 440.97 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.04.02 m2 6.00 6.38 38.28 6.00 38.28 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DESMONTAJE DE REJILLA METALICA
01.01.04.03 m2 26.56 6.35 168.66 26.56 168.66 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
EN CANALETAS DE PISOS
DESMONTAJE DE TECHO DE ETERNIT
01.01.04.04 m2 557.26 40.47 22,552.31
DE FIBROCEMENTO 61.92 2,505.81 11.11% 495.34 20,046.50 88.89% - 0.00% - 0.00% - 0.00% 100.00%
DESMONTAJE DE ESTRUCTURA
01.01.04.05 m 13.62 388.05 5,285.24
METALICA 0.00 0.00% 13.62 5,285.24 100.00% - 0.00% - 0.00% 0.00% 100.00%
DESMONTAJE DE COLUMNAS
01.01.04.06 und 32.00 93.06 2,977.92
METALICAS 0.00 0.00% 32.00 2,977.92 100.00% - 0.00% - 0.00% 0.00% 100.00%
01.01.05 Demoliciones 24,652.22 11,879.67 8,928.06 3,844.49 0.00 0.00
01.01.05.01 DEMOLICION DE MUROS DE LADRILLO m3 95.46 30.92 2,951.62 95.46 2,951.62 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DEMOLICION DE ESTRUCTURAS DE
01.01.05.02 m3 82.97 122.54 10,167.14
CONCRETO 41.49 5,083.57 50.00% 41.49 5,083.57 50.00% - 0.00% - 0.00% - 0.00% 100.00%
ACARREO INTERNO, MATERIAL
01.01.05.03 m3 171.68 31.80 5,459.42 57.23 1,819.80 33.33% 57.23 1,819.81 33.33% 57.23 1,819.81 33.33% - 0.00% - 0.00% 99.99%
PROCEDENTE DE DEMOLICION
ELIMINACION DE MATERIAL
01.01.05.04 PROVENIENTE DE DEMOLICIONES m3 171.68 35.38 6,074.04
57.23 2,024.68 33.33% 57.23 2,024.68 33.33% 57.23 2,024.68 33.33% - 0.00% - 0.00% 99.99%
01.01.06 Trazo, Niveles y Replanteo 1,555.61 1,555.61 0.00 0.00 0.00
01.01.06.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,087.84 1.43 1,555.61 0.00 0.00% 1,087.84 1,555.61 100.00% - 0.00% - 0.00% - 0.00% 100.00%
Seguridad y Salud en la Construcción
01.01.07 42,549.84 11,577.42 9,657.47 8,657.47 12,657.48 0.00
ELABORACION, IMPLEMENTACION Y
01.01.07.01 ADMINISTRACION DEL PLAN DE Glb 1.00 3,920.00 3,920.00
SEGURIDAD Y SALUD EN EL TRABAJO 1.00 3,920.00 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
EQUIPOS DE PROTECCION 13.78 5,545.56 18.37% 18.75 7,545.56 25.00% 16.27 6,545.56 21.69% 26.20 10,545.57 34.94% - 0.00% 100.00%
01.01.07.02 Und 75.00 402.43 30,182.25
INDIVIDUAL
01.01.07.03 EQUIPO DE PROTECCION COLECTIVA Glb 1.00 3,972.46 3,972.46 0.25 993.10 25.00% 0.25 993.12 25.00% 0.25 993.12 25.00% 0.25 993.12 25.00% - 0.00% 100.00%
SEÑALIZACION TEMPORAL DE
01.01.07.04 Glb 1.00 1,914.75 1,914.75
SEGURIDAD 0.25 478.68 25.00% 0.25 478.69 25.00% 0.25 478.69 25.00% 0.25 478.69 25.00% - 0.00% 100.00%
RECURSOS PARA RESPUESTA ANTE
01.01.07.05 EMERGENCIAS EN SEGURIDAD Y SALUD Glb 1.00 2,560.38 2,560.38
EN EL TRABAJO 0.25 640.08 25.00% 0.25 640.10 25.00% 0.25 640.10 25.00% 0.25 640.10 25.00% - 0.00% 100.00%
Plan para la Vigilancia, Prevencion y
01.01.08 31,843.14 15,420.78 5,227.69 5,093.52 5,227.69 873.44
Control de Covid-19 en Obra
IMPLEMENTACION DE ZONA DE
01.01.08.01 glb 1.00 1,027.90 1,027.90
CONTROL 1.00 1,027.90 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
TOMA DE TEMPERATURA Y
01.01.08.02 glb 1.00 976.82 976.82
PULSIOXIMETRIA 1.00 976.82 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.03 DESINFECCION DE PERSONAL Día 120.00 12.25 1,470.00 22.00 269.50 18.33% 31.00 379.75 25.83% 30.00 367.5 25.00% 31.00 379.75 25.83% 720.00 73.5 5.01% 100.00%
01.01.08.04 ZONA DE LAVADO DE MANOS und 1.00 444.19 444.19 1.00 444.19 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.05 ZONA DE ENTREGA DE MATERIALES glb 1.00 586.14 586.14 1.00 586.14 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
IMPLEMENTACION DE AREA PARA
01.01.08.06 glb 1.00 544.77 544.77
ENFERMERIA 1.00 544.77 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.07 IMPLEMENTACION DE ENFERMERIA glb 1.00 1,145.16 1,145.16 1.00 1,145.16 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.08 CONTENEDORES PARA DESECHOS und 1.00 123.81 123.81 1.00 123.81 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

DESINFECCION DE AMBIENTES DE
01.01.08.09 Día 120.00 52.00 6,240.00
TRABAJO 22.00 1,144.00 18.33% 31.00 1,612.00 25.83% 30.00 1,560.00 25.00% 31.00 1,612.00 25.83% 720.00 312 5.01% 100.00%
DESINFECCION DE MATERIALES,
01.01.08.10 Día 120.00 39.50 4,740.00
EQUIPOS Y HERRAMIENTAS 44.05 1,740.00 36.71% 25.32 1,000.00 21.10% 25.32 1,000.00 21.10% 25.32 1,000.00 21.10% - 0.00% 100.01%
EQUIPOS DE PROTECCIÓN INDIVIUAL
01.01.08.11 und 1.00 342.12 342.12
CONTRA EL COVID - 19 0.20 68.42 20.00% 0.20 68.42 20.00% 0.20 68.42 20.00% 0.20 68.42 20.00% 0.20 68.42 20.00% 100.00%
01.01.08.12 IMPLEMENTACION DE COMEDOR glb 1.00 5,730.50 5,730.50 1.00 5,730.50 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.13 DESINFECCION DE COMEDOR Día 120.00 20.36 2,443.20 22.00 447.92 18.33% 31.00 631.16 25.83% 30.00 610.8 25.00% 31.00 631.16 25.83% 720.00 122.16 5.00% 100.09%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

SEÑAL INFORMATIVA EN INGRESO A


01.01.08.14 und 1.00 26.60 26.60
OBRA 1.00 26.60 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
SEÑAL INFORMATIVA DENTRO DE LA
01.01.08.15 und 1.00 26.60 26.60
OBRA 1.00 26.60 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
SEÑALIZACION DE RUTAS PARA 1.00 28.13 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.16 glb 1.00 28.13 28.13
VACIADO
01.01.08.17 MOVILIZACION DE PERSONAL Día 120.00 49.56 5,947.20 22.00 1,090.32 18.33% 31.00 1,536.36 25.83% 30.00 1,486.80 25.00% 31.00 1536.36 25.83% 720.00 297.36 5.00% 99.99%
02 ESTRUCTURAS 547,190.67 0.00 181,747.91 282,143.08 83,299.68 0.00
02.01 Movimiento de Tierras 67,278.56 0.00 61,663.71 2,614.85 3,000.00 0.00
02.01.01 Excavaciones 7,838.97 0.00 7,838.97 0.00 0.00 0.00
EXCAVACION DE ZANJAS Y ZAPATAS
02.01.01.01 m3 82.21 34.86 2,865.84
Rt<2 Kg/cm² h=1.20m 0.00 0.00% 82.21 2,865.84 100.00% - 0.00% - 0.00% - 0.00% 100.00%
EXCAVACION MANUAL DE ZANJAS
02.01.01.02 m3 142.66 34.86 4,973.13
PARA CIMIENTOS 0.00 0.00% 142.66 4,973.13 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.01.02 Rellenos 24,169.93 0.00 22,379.13 0.00 0.00 0.00
02.01.02.01 RELLENO CON ARENA FINA E=4" m2 838.43 23.82 19,971.40 0.00 0.00% 838.43 19,971.40 100.00% - 0.00% - 0.00% - 0.00% 100.00%
RELLENO COMPACTADO C/EQUIPO
02.01.02.02 m3 89.54 46.89 4,198.53
MAT/PROPIO 0.00 0.00% 51.35 2,407.73 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.01.03 Nivelación Interior y Apisonado 25,830.76 0.00 25,830.76 0.00 0.00 0.00
NIVELACION INTERIOR Y APISONADO
02.01.03.01 m2 838.43 5.39 4,519.14
PARA FALSO PISO, PATIO Y VEREDAS 0.00 0.00% 838.43 4,519.14 100.00% - 0.00% - 0.00% - 0.00% 100.00%
AFIRMADO DE 6" PARA PISOS
02.01.03.02 m2 838.43 23.52 19,719.87
INTERIORES Y EXTERIORES 0.00 0.00% 838.43 19,719.87 100.00% - 0.00% - 0.00% - 0.00% 100.00%
BASE DE AFIRMADO COMPACTADO 0.00 0.00% 63.24 1,591.75 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.01.03.03 m2 63.24 25.17 1,591.75
DE 8"
02.01.04 Eliminación de Material Excedente 11,229.70 0.00 5,614.85 2,614.85 3,000.00 0.00
ACARREO INTERNO, MATERIAL
02.01.04.01 m3 180.31 27.88 5,027.04 0.00 0.00% 90.16 2,513.52 50.00% 36.35 1,013.52 20.16% 53.80 1,500.00 29.84% - 0.00% 100.00%
PROCEDENTE DE EXCAVACIONES
ELIMINACION MATERIAL EXCEDENTE
02.01.04.02 m3 180.31 34.40 6,202.66
C/MAQUINA 0.00 0.00% 90.16 3,101.33 50.00% 46.55 1,601.33 25.82% 43.60 1,500.00 24.18% - 0.00% 100.00%
02.02 Obras de Concreto Simple 72,022.44 0.00 29,934.76 17,263.71 24,823.97 0.00
02.02.01 Cimientos 22,716.88 0.00 22,716.88 0.00 0.00 0.00
CIMIENTOS CORRIDOS 1:10 + 30 %
02.02.01.01 m3 79.84 284.53 22,716.88
P.G. f'c >=100 Kg/cm². 0.00 0.00% 79.84 22,716.88 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.02.02 Sobrecimiento 2,337.74 0.00 2,337.74 0.00 0.00 0.00
SOBRECIMIENTO, CONCRETO 1:8 +
02.02.02.01 m3 2.47 332.10 820.29 0.00 0.00% 2.47 820.29 100.00% - 0.00% - 0.00% - 0.00% 100.00%
25% P.M. f'c >=100 Kg/cm²
SOBRECIMIENTO ENCONFRADO Y
02.02.02.02 m2 27.59 55.00 1,517.45
DESENCOFRADO 0.00 0.00% 27.59 1,517.45 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.02.03 Solado 7,320.21 0.00 4,880.14 2,440.07 0.00 0.00
SOLADO PARA ZAPATAS e = 4" f'c=175
02.02.03.01 m2 195.78 37.39 7,320.21
kg/cm2 0.00 0.00% 130.52 4,880.14 66.67% 65.26 2,440.07 33.33% - 0.00% - 0.00% 100.00%
02.02.04 Falso Piso 37,121.46 0.00 0.00 13,560.73 23,560.73 0.00
FALSO PISO f´c = 100 Kg/cm², e=4" 0.00 0.00% - 0.00% 276.07 13,560.73 36.53% 479.66 23,560.73 63.47% - 0.00% 100.00%
02.02.04.01 m2 755.73 49.12 37,121.46
02.02.05 Pediluvio/Rodaluvio 874.25 0.00 0.00 437.07 437.18 0.00
PEDILUVIO/RODALUVIO - CONCRETO
02.02.05.01 m2 1.53 372.62 570.11
F'c = 175 kg/cm2, E=4" 0.00 0.00% - 0.00% 0.76 285 49.99% 0.77 285.11 50.01% - 0.00% 100.00%
PEDILUVIO/RODALUVIO - ENCOFRADO
02.02.05.02 m2 6.85 44.40 304.14
Y DESENCOFRADO 0.00 0.00% - 0.00% 3.43 152.07 50.00% 3.43 152.07 50.00% - 0.00% 100.00%
02.02.06 Bebederos 1,651.90 0.00 0.00 825.84 826.06 0.00
BEBEDEROS - CONCRETO F'c = 175
02.02.06.01 m3 2.05 372.62 763.87
kg/cm2, E=4" 0.00 0.00% - 0.00% 1.02 381.83 49.99% 1.03 382.04 50.01% - 0.00% 100.00%
BEBEDEROS - ENCOFRADO Y
02.02.06.02 m2 31.67 28.04 888.03
DESENCOFRADO 0.00 0.00% - 0.00% 15.83 444.01 50.00% 15.84 444.02 50.00% - 0.00% 100.00%
02.03 Obras de Concreto Armado 237,462.33 0.00 90,149.44 111,243.75 36,069.14 0.00
02.03.01 Zapatas 23,180.75 0.00 11,590.37 11,590.38 0.00 0.00
02.03.01.01 ZAPATAS.- CONCRETO f´c = 210 Kg/cm² m3 31.62 436.54 13,803.39 0.00 0.00% 15.81 6,901.69 50.00% 15.81 6,901.70 50.00% - 0.00% - 0.00% 100.00%
02.03.01.02 ZAPATAS.- ACERO fy = 4,200 Kg/cm² Kg 1,281.06 7.32 9,377.36 0.00 0.00% 640.53 4,688.68 50.00% 640.53 4,688.68 50.00% - 0.00% - 0.00% 100.00%
02.03.02 Sobrecimiento Reforzado 49,729.89 0.00 18,729.89 26,500.00 4,500.00 0.00
SOBRECIMIENTO REFORZADO.-
02.03.02.01 m3 37.72 399.22 15,058.58 8,000.00 2,000.00
CONCRETO F'c=175 kg/cm2 0.00 0.00% 12.67 5,058.58 33.59% 20.04 53.13% 5.01 13.28% - 0.00% 100.00%
SOBRECIMIENTO REFORZADO.-
02.03.02.02 m2 503.48 49.83 25,088.41 0.00 0.00% 122.18 6,088.41 24.27% 341.16 17,000.00 67.76% 40.14 2,000.00 7.97% - 0.00% 100.00%
ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO.-
02.03.02.03 Kg 1,309.14 7.32 9,582.90 1,500.00 500.00
ACERO fy = 4,200 Kg/cm² 0.00 0.00% 1,035.92 7,582.90 79.13% 204.92 15.65% 68.31 5.22% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

02.03.03 Columnas 74,914.24 0.00 37,345.10 21,000.00 16,569.14 0.00


COLUMNAS - CONCRETO 210 KG/CM² -
02.03.03.01 1er PISO m3 27.74 555.69 15,414.84 4,000.00
0.00 0.00% 12.32 6,845.70 44.41% 7.20 25.95% 8.22 4,569.14 29.64% - 0.00% 100.00%
COLUMNAS.- ENCOFRADO Y
02.03.03.02 DESENCOFRADO m2 263.61 76.74 20,229.43 7,000.00
0.00 0.00% 146.33 11,229.43 55.51% 91.22 34.60% 26.06 2,000.00 9.89% - 0.00% 100.00%
02.03.03.03 COLUMNAS.- ACERO fy = 4,200 Kg/cm² Kg 5,364.75 7.32 39,269.97 0.00 0.00% 2,632.51 19,269.97 49.07% 1,366.12 10,000.00 25.46% 1,366.12 10,000.00 25.46% - 0.00% 99.99%
02.03.04 Vigas 37,383.18 0.00 0.00 22,383.18 15,000.00 0.00
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

VIGAS.- CONCRETO 210 kg/cm2 - 1er


02.03.04.01 PISO m3 14.21 436.90 6,208.35
VIGAS.- ENCOFRADO Y 0.00 0.00% - 0.00% 9.63 4,208.35 67.79% 4.58 2,000.00 32.21% - 0.00% 100.00%
02.03.04.02 DESENCOFRADO m2 151.28 90.55 13,698.40 0.00 0.00% - 0.00% 96.06 8,698.40 63.50% 55.22 5,000.00 36.50% - 0.00% 100.00%
02.03.04.03 VIGAS.- ACERO fy = 4,200 Kg/cm² Kg 2,387.49 7.32 17,476.43 0.00 0.00% - 0.00% 1,294.59 9,476.43 54.22% 1,092.90 8,000.00 45.78% - 0.00% 100.00%
02.03.05 Losas 2,158.31 0.00 0.00 2,158.31 0.00 0.00
LOSA ALIGERADA.- CONCRETO f´c =
02.03.05.01 m3 0.45 438.92 197.51
210 Kg/cm² 0.00 0.00% - 0.00% 0.45 197.51 100.00% - 0.00% - 0.00% 100.00%
LOSA ALIGERADA.- ENCOFRADO Y
02.03.05.02 m2 5.09 70.95 361.14
DESENCOFRADO 0.00 0.00% - 0.00% 5.09 361.14 100.00% - 0.00% - 0.00% 100.00%
LOSA ALIGERADA.- ACERO fy = 4,200
02.03.05.03 Kg 43.56 7.32 318.86
Kg/cm² 0.00 0.00% - 0.00% 43.56 318.86 100.00% - 0.00% - 0.00% 100.00%
LOSA ALIGERADA.- LADRILLO HUECO
02.03.05.04 Und 42.38 3.36 142.40
15X30X30cm 0.00 0.00% - 0.00% 42.38 142.4 100.00% - 0.00% - 0.00% 100.00%
LOSAS MACIZAS.- CONCRETO f´c = 210
02.03.05.05 m3 0.58 422.17 244.86
Kg/cm² - 01 PISO 0.00 0.00% - 0.00% 0.58 244.86 100.00% - 0.00% - 0.00% 100.00%
LOSAS MACIZAS.- ENCOFRADO Y
02.03.05.06 DESENCOFRADO m2 2.38 74.21 176.62
0.00 0.00% - 0.00% 2.38 176.62 100.00% - 0.00% - 0.00% 100.00%
LOSAS MACIZAS.- ACERO fy = 4,200
02.03.05.07 Kg 97.94 7.32 716.92
Kg/cm² 0.00 0.00% - 0.00% 97.94 716.92 100.00% - 0.00% - 0.00% 100.00%
02.03.06 Escaleras 1,287.83 0.00 0.00 1,287.83 0.00 0.00
ESCALERAS.- CONCRETO f´c =175
02.03.06.01 m3 0.47 530.17 249.18
Kg/cm² 0.00 0.00% - 0.00% 0.47 249.18 100.00% - 0.00% - 0.00% 100.00%
ESCALERAS.- ENCOFRADO Y
02.03.06.02 DESENCOFRADO m2 9.52 97.83 931.34
0.00 0.00% - 0.00% 9.52 931.34 100.00% - 0.00% - 0.00% 100.00%
02.03.06.03 ESCALERAS.- ACERO fy = 4,200 Kg/cm² Kg 14.66 7.32 107.31 0.00 0.00% - 0.00% 14.66 107.31 100.00% - 0.00% - 0.00% 100.00%
02.03.07 Cisternas 16,803.06 0.00 16,803.06 0.00 0.00 0.00
CISTERNA.- CONCRETO f´c = 280 0.00 0.00% 8.07 5,039.96 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.07.01 m3 8.07 624.53 5,039.96
Kg/cm²
CISTERNA.- ENCOFRADO Y
02.03.07.02 m2 49.10 68.51 3,363.84
DESENCOFRADO 0.00 0.00% 49.10 3,363.84 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.07.03 CISTERNA.- ACERO fy = 4,200 Kg/cm² Kg 1,147.44 7.32 8,399.26 0.00 0.00% 1,147.44 8,399.26 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.08 Tanque Elevado 11,395.84 0.00 5,681.02 5,714.82 0.00 0.00
TANQUE ELEVADO.- CONCRETO 210
02.03.08.01 kg/cm2 m3 5.23 547.14 2,861.54
0.00 0.00% - 0.00% 5.23 2861.54 100.00% - 0.00% - 0.00% 100.00%
TANQUE ELEVADO.- ENCOFRADO Y
02.03.08.02 DESENCOFRADO m2 47.65 89.82 4,279.92
0.00 0.00% 15.88 1,426.64 33.33% 31.77 2853.28 66.67% - 0.00% - 0.00% 100.00%
TANQUE ELEVADO, ACERO fy=4200
02.03.08.03 kg/cm2 Kg 581.20 7.32 4,254.38
0.00 0.00% 581.20 4,254.38 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.09 Trampas de Grasa 4,399.34 0.00 0.00 4,399.34 0.00 0.00
TRAMPA DE GRASAS.- CONCRETO f´c
02.03.09.01 m3 3.51 411.10 1,442.96
= 210 Kg/cm² 0.00 0.00% - 0.00% 3.51 1442.96 100.00% - 0.00% - 0.00% 100.00%
TRAMPA DE GRASAS.- ENCOFRADO Y
02.03.09.02 m2 30.03 51.89 1,558.26
DESENCOFRADO 0.00 0.00% - 0.00% 30.03 1558.26 100.00% - 0.00% - 0.00% 100.00%
TRAMPA DE GRASAS.- ACERO fy =
02.03.09.03 kg 191.00 7.32 1,398.12
4,200 Kg/cm² 0.00 0.00% - 0.00% 191.00 1398.12 100.00% - 0.00% - 0.00% 100.00%
02.03.10 Camara de rejas 3,908.39 0.00 0.00 3,908.39 0.00 0.00
CAMARA DE REJAS - CONCRETO f´c =
02.03.10.01 m3 2.88 411.10 1,183.97
210 Kg/cm² 0.00 0.00% - 0.00% 2.88 1183.97 100.00% - 0.00% - 0.00% 100.00%
CAMARA DE REJAS.- ENCOFRADO Y
02.03.10.02 m2 29.49 51.89 1,530.24
DESENCOFRADO 0.00 0.00% - 0.00% 29.49 1530.24 100.00% - 0.00% - 0.00% 100.00%
CAMARA DE REJAS.- ACERO fy = 4,200
02.03.10.03 kg 163.14 7.32 1,194.18
Kg/cm² 0.00 0.00% - 0.00% 163.14 1194.18 100.00% - 0.00% - 0.00% 100.00%
02.03.11 Pozo de Sedimentacion 5,038.88 0.00 0.00 5,038.88 0.00 0.00
POZO DE SEDIMENTACION.-
02.03.11.01 m3 3.92 411.10 1,611.51
CONCRETO f´c = 210 Kg/cm² 0.00 0.00% - 0.00% 3.92 1611.51 100.00% - 0.00% - 0.00% 100.00%
POZO DE SEDIMENTACION.-
02.03.11.02 m2 36.03 51.89 1,869.60 0.00 0.00% - 0.00% 36.03 1869.6 100.00% - 0.00% - 0.00% 100.00%
ENCOFRADO Y DESENCOFRADO
POZO DE SEDIMENTACION.- ACERO fy
02.03.11.03 kg 212.81 7.32 1,557.77
= 4,200 Kg/cm² 0.00 0.00% - 0.00% 212.81 1557.77 100.00% - 0.00% - 0.00% 100.00%
02.03.12 Rampas 497.36 0.00 0.00 497.36 0.00 0.00
02.03.12.01 RAMPAS - CONCRETO f´c = 175 Kg/cm² m2 0.96 46.32 44.47 0.00 0.00% - 0.00% 0.96 44.47 100.00% - 0.00% - 0.00% 100.00%
RAMPAS - ENCOFRADO Y
02.03.12.02 m2 1.83 44.40 81.25
DESENCOFRADO 0.00 0.00% - 0.00% 1.83 81.25 100.00% - 0.00% - 0.00% 100.00%
02.03.12.03 RAMPAS - ACERO fy = 4200 Kg/cm² m2 50.77 7.32 371.64 0.00 0.00% - 0.00% 50.77 371.64 100.00% - 0.00% - 0.00% 100.00%
02.03.13 Mesa de Concreto 6,765.26 0.00 0.00 6,765.26 0.00 0.00
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

MESAS DE CONCRETO - CONCRETO


02.03.13.01 m3 5.69 411.10 2,339.16 2,339.16
F'c = 210 kg/cm2 0.00 0.00% - 0.00% 5.69 100.00% - 0.00% - 0.00% 100.00%
MESA DE CONCRETO - ENCOFRADO Y
02.03.13.02 m2 66.54 51.89 3,452.76 3,452.76
DESENCOFRADO 0.00 0.00% - 0.00% 66.54 100.00% - 0.00% - 0.00% 100.00%
MESA DE CONCRETO - ACERO DE
02.03.13.03 kg 132.97 7.32 973.34 973.34
REFUERZO FY=4200 kg/cm2 0.00 0.00% - 0.00% 132.97 100.00% - 0.00% - 0.00% 100.00%
02.04 Estructuras Metálicas 79,363.06 0.00 0.00 79,363.06 0.00 0.00
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

02.04.01 Tijerales Metalicos 7,590.35 0.00 0.00 7,590.35 0.00 0.00


CERCHA TIPO I SEGÚN DISEÑO.INCL.
02.04.01.01 und 5.00 1,518.07 7,590.35 0.00 0.00% - 0.00% 5.00 7,590.35 100.00% - 0.00% - 0.00% 100.00%
SUMINISTRO E INSTALACION
02.04.02 Columnas Metálicas 19,545.50 0.00 0.00 19,545.50 0.00 0.00
COLUMNAS METALICAS DE TUBO
02.04.02.01 CUADRADO DE 4"x4"x2.5mm (INC.ANCLAJES und 19.00 615.91 11,702.29 11,702.29
+ PINT. ANTICORR. + ESMALTE) 0.00 0.00% - 0.00% 19.00 100.00% - 0.00% - 0.00% 100.00%
ESTRUCTURA METALICA PARA ZONA
02.04.02.02 und 6.00 711.41 4,268.46 4,268.46
DE OREO DE BOVINOS 0.00% 0.00% 100.00% 0.00% - 0.00% 100.00%
ESTRUCTURA METALICA PARA ZONA
02.04.02.03 und 5.00 366.79 1,833.95 1,833.95
DE OREO DE PORCINO/OVINO 0.00% 0.00% 100.00% 0.00% - 0.00% 100.00%
ESTRUCTURA METALICA PARA
02.04.02.04 und 8.00 217.60 1,740.80 1,740.80
BENEFICIO/BOVINO 0.00 0.00% - 0.00% 8.00 100.00% - 0.00% - 0.00% 100.00%
02.04.03 Vigas Metalicas 52,227.21 0.00 0.00 52,227.21 0.00 0.00
VIGUETAS METALICAS C/TUBO DE
02.04.03.01 FIERRO NEGRO ESTRUCTURAL DE 75mm x m 117.50 17.58 2,065.65 2,065.65
75mm x 2.5mm 0.00 0.00% - 0.00% 117.50 100.00% - 0.00% - 0.00% 100.00%
ESTRUCTURA VIGA DE 100mm x
100mm, e=2.50 mm METÁLICA PARA
02.04.03.02 m 213.56 95.51 20,397.12 20,397.12
COBERTURA INC BASE ANTICORROSIVA Y
PINTADO 0.00 0.00% - 0.00% 213.56 100.00% - 0.00% - 0.00% 100.00%
ESTRUCTURA TUBO DE 100mm
x50mm, e=2.5mm METÁLICA PARA
02.04.03.03 m 323.56 67.47 21,830.59 21,830.59
COBERTURA INC BASE ANTICORROSIVA Y
PINTADO 0.00 0.00% - 0.00% 323.56 100.00% - 0.00% - 0.00% 100.00%
CORREA DE 25mm x 50mm, e=2.5mm
02.04.03.04 METÁLICA PARA COBERTURA INC BASE m 180.11 44.05 7,933.85 7,933.85
ANTICORROSIVA Y PINTADO 0.00 0.00% - 0.00% 180.11 100.00% - 0.00% - 0.00% 100.00%
02.05 Cobertura 90,563.99 0.00 0.00 71,157.42 19,406.57 0.00
COBERTURA DE PLANCHA DE
02.05.01 m2 467.21 193.84 90,563.99 71,157.42 19,406.57
CALMINON TI, E=0.40MM 0.00 0.00% - 0.00% 367.09 78.57% 100.12 21.43% - 0.00% 100.00%
02.06 Varios 500.29 0.00 0.00 500.29 0.00 0.00
JUNTA DE DILATACION RELLENO CON
02.06.01 MORTERO ASFALTICO E=1" m 32.40 9.21 298.40
0.00 0.00% - 0.00% 32.40 298.4 100.00% - 0.00% - 0.00% 100.00%
TAPA JUNTA DE DILATACION CON
02.06.02 m 9.60 21.03 201.89 0.00 0.00% - 0.00% 9.60 201.89 100.00% - 0.00% - 0.00% 100.00%
ESPUNA+JEBE MICROPOROSO
03 ARQUITECTURA 345,358.51 0.00 19,435.97 167,613.62 111,955.68 46,353.24
03.01 Muros y Tabiques de Albañilería 76,989.81 0.00 19,435.97 57,553.84 0.00 0.00
MURO DE LADRILLO KK TIPO IV SOGA;
03.01.01 m2 604.95 123.12 74,481.44
MEZCLA 1:4 (e=1.5cm) 0.00 0.00% 137.49 16,927.60 22.73% 467.46 57,553.84 77.27% - 0.00% - 0.00% 100.00%
ALAMBRE # 8 REFUERZO HORIZONTAL
03.01.02 Kg 446.33 5.62 2,508.37
EN MUROS 0.00 0.00% 446.33 2,508.37 100.00% - 0.00% - 0.00% - 0.00% 100.00%
Muros con Sistema de Construccion en
03.02 2,716.17 0.00 0.00 0.00 2,716.17 0.00
Seco
MURO TABIQUE SIMPLE C/PLACA DE
03.02.01 m2 25.38 107.02 2,716.17
YESO ESTANDARD 1/2'', PERFIL 89 0.00% 0.00% 0.00% 2,716.17 100.00% 0.00% 100.00%
03.03 Revoques y Revestimientos 55,717.00 0.00 0.00 34,736.28 20,980.72 0.00
TARRAJEO EN MURO: TARRAJEO
03.03.01 m2 514.44 26.38 13,570.93
PRIMARIO 0.00 0.00% - 0.00% 514.44 13570.93 100.00% - 0.00% - 0.00% 100.00%
TARRAJEO EN MURO: INTERIOR Y
03.03.02 m2 895.73 26.63 23,853.29
EXTERIOR 0.00 0.00% - 0.00% 582.22 15504.64 65.00% 313.51 8348.65 35.00% - 0.00% 100.00%
03.03.03 TARRAJEO DE COLUMNAS m2 125.28 40.49 5,072.59 0.00 0.00% - 0.00% 93.96 3804.44 75.00% 31.32 1268.15 25.00% - 0.00% 100.00%
TARRAJEO DE VIGAS 0.00 0.00% - 0.00% - 0.00% 151.28 8464.12 100.00% - 0.00% 100.00%
03.03.04 m2 151.28 55.95 8,464.12
03.03.05 TARRAJEO CON IMPERMEABILIZANTE m2 52.78 35.17 1,856.27 0.00 0.00% - 0.00% 52.78 1856.27 100.00% - 0.00% - 0.00% 100.00%
VESTIDURA DE DERRAMES, MORTERO
03.03.06 m 169.48 17.11 2,899.80
C:A 1:5 0.00 0.00% - 0.00% - 0.00% 169.48 2899.8 100.00% - 0.00% 100.00%
03.04 Pisos y Pavimentos 59,681.60 0.00 0.00 54,812.52 4,869.08 0.00
03.04.01 Contrapisos 2,464.18 0.00 0.00 2,464.18 0.00 0.00
03.04.01.01 CONTRAPISO DE 40 mm m2 51.82 32.65 1,691.92 0.00 0.00% - 0.00% 51.82 1,691.92 100.00% - 0.00% - 0.00% 100.00%
CONTRAPISO DE 4" ACABADO PULIDO,
03.04.01.02 m2 27.94 27.64 772.26 0.00 0.00% - 0.00% 27.94 772.26 100.00% - 0.00% - 0.00% 100.00%
ZONA MUEBLES BAJOS
03.04.02 Pisos 8,606.78 0.00 0.00 3,737.70 4,869.08 0.00
PISO CERAMICO ANTIDESLIZANTE
03.04.02.01 m2 51.82 65.11 3,374.00 3,374.00
0.45 x 0.45 m SERIE COLOR - NACIONAL 0.00 0.00% - 0.00% - 0.00% 51.82 100.00% - 0.00% 100.00%
PISO DE CANTO RODADO ASENTADO
03.04.02.02 m2 67.87 77.10 5,232.78 3,737.70 1,495.08
FRAGUADO 0.00 0.00% - 0.00% 48.48 71.43% 19.39 28.57% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

03.04.03 Acabado de Concreto en Pisos 44,144.20 0.00 0.00 44,144.20 0.00 0.00
PISO DE CEMENTO PULIDO e = 4" C/F.
03.04.03.01 m2 384.86 74.74 28,764.44 28,764.44
PISO 0.00 0.00% - 0.00% 384.86 100.00% - 0.00% - 0.00% 100.00%
PISO DE CEMENTO SEMI PULIDO e = 4"
03.04.03.02 m2 226.04 68.04 15,379.76 15,379.76
C/F. PISO 0.00 0.00% - 0.00% 226.04 100.00% - 0.00% - 0.00% 100.00%
03.04.04 Patios y Veredas 4,466.44 0.00 0.00 4,466.44 0.00 0.00
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

PATIO Y VEREDA CONCRETO f´c = 175


03.04.04.01 Kg/cm², e=4" FROTACHADO Y BRUÑADO m2 71.33 60.73 4,331.87 4,331.87
S/DISEÑO 0.00 0.00% - 0.00% 71.33 100.00% - 0.00% - 0.00% 100.00%
RAMPA CEMENTO FROTACHADO Y
03.04.04.02 m2 8.49 15.85 134.57 134.57
BRUÑADO 0.00 0.00% - 0.00% 8.49 100.00% - 0.00% - 0.00% 100.00%
Zócalos y Contrazócalos
03.05 60,911.42 0.00 0.00 2,764.32 32,350.71 25,796.39
03.05.01 Zócalos 36,664.14 0.00 0.00 0.00 32,350.71 4,313.43
ZOCALO DE CERAMICA
03.05.01.01 ANTIDESLIZANTE DE 45X45cm, COLOR m2 514.44 71.27 36,664.14 32,350.71 4,313.43
0.00 0.00% - 0.00% - 0.00% 453.92 88.24% 31,135.13 11.76% 100.00%
BLANCO
03.05.02 Contrazócalos 21,482.96 0.00 0.00 0.00 0.00 21,482.96
CONTRAZOCALO DE CERAMICA 0.00 0.00% - 0.00% - 0.00% - 0.00% 2,932.22 100.00% 100.00%
03.05.02.01 m 54.15 60.34 3,267.41 3,267.41
10X45cm
CONTRAZOCALO SANITARIO DE
03.05.02.02 m 283.29 64.30 18,215.55 18,215.55
CERAMICO H=10CM 0.00 0.00% - 0.00% - 0.00% - 0.00% 80,253.24 100.00% 100.00%
03.05.03 Ceramica en Mesa de Concreto 2,764.32 0.00 0.00 2,764.32 0.00 0.00
CERAMICA 45x45CM EN MESAS DE
03.05.03.01 m2 34.14 80.97 2,764.32
CONCRETO 0.00 0.00% - 0.00% 34.14 2764.32 100.00% - 0.00% - 0.00% 100.00%
03.06 Carpintería de Madera 7,475.30 0.00 0.00 0.00 7,475.30 0.00
03.06.01 Puertas 7,475.30 0.00 0.00 0.00 7,475.30 0.00
PUERTA CONTRAPLACADA 50 mm
03.06.01.01 CON TRIPLAY 6 mm INCLUYE MARCO m2 3.78 382.37 1,445.36 1,445.36
CEDRO 2"X4" 0.00 0.00% - 0.00% - 0.00% 3.78 100.00% - 0.00% 100.00%
PUERTA DE MELAMINE PLANCHA DE
03.06.01.02 m2 20.51 294.00 6,029.94 6,029.94
18 mm INCLUYE PERFILES DE ALUMINIO 0.00 0.00% - 0.00% - 0.00% 20.51 100.00% - 0.00% 100.00%
Carpintería Metálica y Herrería
03.07 26,635.33 0.00 0.00 9,835.31 16,800.02 0.00
03.07.01 Ventanas de Fierro 8,429.20 0.00 0.00 8,429.20 0.00 0.00
VENTANA MARCO Y MALLA METALICA
03.07.01.01 m2 63.78 124.97 7,970.59 7,970.59
ACERADA 0.00 0.00% - 0.00% 63.78 100.00% - 0.00% - 0.00% 100.00%
VENTANA SOBRE MARCO DE 0.00 0.00% - 0.00% 2.88 100.00% - 0.00% - 0.00% 100.00%
03.07.01.02 m2 2.88 159.24 458.61 458.61
ALUMINIO
03.07.02 Puertas de Fierro 16,800.02 0.00 0.00 0.00 16,800.02 0.00
PUERTA DE UNA HOJA DE 1.00x2.30m,
03.07.02.01 und 1.00 1,323.00 1,323.00 1,323.00
MATERIAL METALICO 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
PUERTA DE UNA HOJA DE 0.90x2.30m
03.07.02.02 und 1.00 935.90 935.90 935.90
MATERIAL METALICO 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
PUERTA DE UNA HOJA DE 0.90x2.10m,
03.07.02.03 und 3.00 852.80 2,558.40 2,558.40
MATERIAL METALICO 0.00 0.00% - 0.00% - 0.00% 3.00 100.00% - 0.00% 100.00%
PUERTA DE DOS HOJAS DE 4.00x3.00
03.07.02.04 und 1.00 3,430.00 3,430.00 3,430.00
m BATIENTE, MATERIAL METALICO 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
PUERTA ENRROLLABLE DE METAL DE
03.07.02.05 und 1.00 2,156.00 2,156.00 0.00 0.00% - 0.00% - 0.00% 1.00 2,156.00 100.00% - 0.00% 100.00%
UNA HOJA DE 2.00x2.80m
PUERTA DE UNA HOJA MATERIAL
03.07.02.06 m2 26.00 218.27 5,675.02 5,675.02
METALICO CON MALLA DE ACERADA 0.00 0.00% - 0.00% - 0.00% 26.00 100.00% - 0.00% 100.00%
PUERTA UNA HOJA VAIVEN MATERIAL
03.07.02.07 m2 3.20 225.53 721.70 721.70
METALICO CON MALLA ACERADA 0.00 0.00% - 0.00% - 0.00% 3.20 100.00% - 0.00% 100.00%
03.07.03 Pasamanos 1,406.11 0.00 0.00 1,406.11 0.00 0.00
PASAMANO DE TUBO F°G° DE 2" EN
03.07.03.01 m 12.95 108.58 1,406.11 1,406.11
RAMPA 0.00 0.00% - 0.00% 12.95 100.00% - 0.00% - 0.00% 100.00%
03.08 Cerrajería 4,354.76 0.00 0.00 3,816.09 538.67 0.00
03.08.01 Bisagras 2,596.92 0.00 0.00 2,596.92 0.00 0.00
BISAGRA DE ACERO ALUMINIZADO DE
03.08.01.01 pza 20.00 27.93 558.60 558.60
4"X4" PESADA EN PUERTAS METALICAS 0.00 0.00% - 0.00% 20.00 100.00% - 0.00% - 0.00% 100.00%
BISAGRA DE ACERO ALUMINIZADO DE
03.08.01.02 4"X3" PESADA EN PUERTAS Pza 26.00 25.97 675.22 675.22
CONTRAPLACADAS 0.00 0.00% - 0.00% 26.00 100.00% - 0.00% - 0.00% 100.00%
BISAGRA TIPO PISTON DE 4" EN
03.08.01.03 pza 43.00 31.70 1,363.10 1,363.10
PUERTAS CON MALLAS METALICA 0.00 0.00% - 0.00% 43.00 100.00% - 0.00% - 0.00% 100.00%
03.08.02 Cerradura 1,573.59 0.00 0.00 1,219.17 354.42 0.00
CERRADURA TIPO PARCHE DE 03
03.08.02.01 pza 5.00 61.18 305.90
GOLPES P/PUERTAS METALICAS 0.00 0.00% - 0.00% 5.00 305.9 100.00% - 0.00% - 0.00% 100.00%
CERRADURA TIPO PESADA DE 2
03.08.02.02 pza 4.00 67.03 268.12
GOLPES PARA PUERTA 0.00 0.00% - 0.00% 4.00 268.12 100.00% - 0.00% - 0.00% 100.00%
CERRADURA DE POMO P/PUERTAS
03.08.02.03 pza 11.00 58.65 645.15
CONTRAPLACADAS 0.00 0.00% - 0.00% 11.00 645.15 100.00% - 0.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

CERROJO PICAPORTE EN PUERTAS


03.08.02.04 pza 11.00 32.22 354.42
DE MALLA 0.00 0.00% - 0.00% - 0.00% 11.00 354.42 100.00% - 0.00% 100.00%
03.08.03 Accesorios
MANIJA DE Cierre
BRONCE 4" PARA 184.25 0.00 0.00 0.00 184.25 0.00
03.08.03.01 PUERTAS Pza 11.00 16.75 184.25 0.00 0.00% - 0.00% - 0.00% 11.00 184.25 100.00% - 0.00% 100.00%
Vidrios, Cristales y Similares
03.09 272.18 0.00 0.00 0.00 272.18 0.00
SUMINSTRO E INSTALACION DE VIDRIO
03.09.01 p2 31.00 8.78 272.18
TEMPLADO E=6 mm 0.00 0.00% - 0.00% - 0.00% 31.00 272.18 100.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

03.10 Cercos 16,819.26 0.00 0.00 3,513.76 13,305.50 0.00


CERCO DE MALLA GALVANIZADA TIPO
03.10.01 CICLON 2" x 2" x 4mm, COLUM. TUBO m2 63.01 266.93 16,819.26 0.00% 13.16 3,513.76 20.89% 49.85 13,305.50 79.11% - 0.00%
NEGRO ESTR. CUAD. 3"x3"x3mm 0.00 0.00% - 100.00%
03.11 Pintura 33,785.68 0.00 0.00 581.50 12,647.33 20,556.85
Pintura de Cielos Rasos, Vigas,
03.11.01 Columnas y Paredes 14,941.68 0.00 0.00 0.00 9,441.68 5,500.00

03.11.01.01 PINTURA LATEX 2 MANOS EN VIGAS m2 151.28 12.97 1,962.10 0.00 0.00% - 0.00% - 0.00% 151.28 1962.1 100.00% - 0.00% 100.00%
PINTURA LATEX 2 MANOS EN MUROS
03.11.01.02 Y COLUMNA m2 1,021.21 12.71 12,979.58 7,479.58
0.00 0.00% - 0.00% - 0.00% 588.48 57.63% 432.73 5500 42.37% 100.00%
Pintura de Puertas y Ventanas
03.11.02 581.50 0.00 0.00 581.50 0.00 0.00
PINTURA BARNIZ EN CARPINTERIA DE
03.11.02.01 m2 24.29 23.94 581.50
MADERA 0.00 0.00% - 0.00% 24.29 581.5 100.00% - 0.00% - 0.00% 100.00%
03.11.03 Pintura de Estructuras Metalicas 1,650.66 0.00 0.00 0.00 823.31 827.35
PINTURA ANTICORROSIVA Y
03.11.03.01 ESMALTE 2 MANOS EN BARRAS DE m 9.50 4.86 46.17
0.00 0.00% - 0.00% - 0.00% 4.33 21.06 45.61% 5.16 25.1 54.36% 99.97%
SEGURIDAD
PINTURA ANTICORROSIVA Y ESMALTE
03.11.03.02 m2 111.50 14.39 1,604.49 802.25
2 MANOS PTA. Y VENT. 0.00 0.00% - 0.00% - 0.00% 55.75 50.00% 55.75 802.25 50.00% 100.00%
03.11.04 Varios 16,611.84 0.00 0.00 0.00 2,382.34 14,229.50
03.11.04.01 LIMPIEZA FINAL DE LA OBRA glb 1.00 2,382.34 2,382.34 2,382.34 0.00%
MEJORAMIENTO DE VENTANAS Y
03.11.04.02 glb 1.00 1,780.10 1,780.10 1,780.10
PUERTA EN FACHADA PRINCIPAL 0.00%
COLOCACION DE CORTINAS DE
03.11.04.03 m2 30.29 352.77 10,685.40 0.00 0.00% - 0.00% - 0.00% - 0.00% 917.48 10,685.40 100.00% 100.00%
PVC,SEGÚN DISEÑO
TAPA DE CISTERNA Y TANQUE
03.11.04.04 glb 1.00 1,764.00 1,764.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 1,764.00 100.00% 100.00%
ELEVADO
INSTALACIONES SANITARIAS
04 72,566.55 0.00 0.00 0.00 40,061.20 32,505.35
04.01 Aparatos Sanitarios y Accesorios 6,683.03 0.00 0.00 0.00 0.00 6,683.03
SUMINISTRO E INSTALACION DE
04.01.01 INODORO ONEPIECE MEDITERRAANEO und 3.00 609.10 1,827.30
0.00 0.00% - 0.00% - 0.00% - 0.00% 9.00 1827.3 100.00% 100.00%
BLANCO
SUMINISTRO E INSTALACION DE
04.01.02 und 2.00 422.07 844.14
URINARIO CADET 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 844.14 100.00% 100.00%
SUMINISTRO E INSTALACION DE
04.01.03 und 4.00 291.86 1,167.44
LAVATORIO AVANTE COLOR BLANCO 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 1167.44 100.00% 100.00%
DUCHA SIMPLE CON GRIFERIA
04.01.04 Pto 4.00 158.05 632.20 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 632.2 100.00% 100.00%
04.01.05 ACCESORIOS DE BAÑOS glb 1.00 417.98 417.98 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 417.98 100.00% 100.00%
04.01.06 LLAVE ESFERICA DE 1/2" und 31.00 57.87 1,793.97 0.00 0.00% - 0.00% - 0.00% - 0.00% 961.00 1793.97 100.00% 100.00%
04.02 Sistema de Agua Fría 14,968.35 0.00 0.00 0.00 14,968.35 0.00
04.02.01 EMPALME A RED EXISTENTE AGUA und 1.00 94.35 94.35 0.00 0.00% - 0.00% - 0.00% 1.00 94.35 100.00% - 0.00% 100.00%
04.02.02 SALIDA DE AGUA FRIA - PVC Pto 49.00 140.22 6,870.78 0.00 0.00% - 0.00% - 0.00% 49.00 6,870.78 100.00% - 0.00% 100.00%
04.02.03 TUBERIA PVC CLASE 10-1/2" ROSCADA m 30.75 17.18 528.29 0.00 0.00% - 0.00% - 0.00% 30.75 528.29 100.00% - 0.00% 100.00%
04.02.04 TUBERIA PVC CLASE 10-3/4" ROSCADA m 36.54 19.24 703.03 0.00 0.00% - 0.00% - 0.00% 36.54 703.03 100.00% - 0.00% 100.00%
04.02.05 TUBERIA PVC CLASE 10-1" ROSCADA m 36.47 23.42 854.13 0.00 0.00% - 0.00% - 0.00% 36.47 854.13 100.00% - 0.00% 100.00%
04.02.06 TUBERIA PVC CLASE 10 1 1/2" ROSCADA m 16.60 16.17 268.42 0.00 0.00% - 0.00% - 0.00% 16.60 268.42 100.00% - 0.00% 100.00%
04.02.07 TUBERIA PVC CLASE 10 2" ROSCADA m 54.56 38.49 2,100.01 0.00 0.00% - 0.00% - 0.00% 54.56 2,100.01 100.00% - 0.00% 100.00%
04.02.08 VALVULA COMPUERTA DE BRONCE 3/4" und 2.00 138.85 277.70 0.00 0.00% - 0.00% - 0.00% 2.00 277.70 100.00% - 0.00% 100.00%
04.02.09 VALVULA COMPUERTA DE BRONCE 2" und 2.00 303.28 606.56 0.00 0.00% - 0.00% - 0.00% 2.00 606.56 100.00% - 0.00% 100.00%
04.02.10 UNION UNIVERSAL DE 2" und 2.00 99.99 199.98 0.00 0.00% - 0.00% - 0.00% 2.00 199.98 100.00% - 0.00% 100.00%
04.02.11 VALVULA CHECK DE BRONCE DE 2" und 1.00 337.67 337.67 0.00 0.00% - 0.00% - 0.00% 1.00 337.67 100.00% - 0.00% 100.00%
04.02.12 REBOSE DE TANQUE ELEVADO F°G° 2" und 2.00 78.64 157.28 0.00 0.00% - 0.00% - 0.00% 2.00 157.28 100.00% - 0.00% 100.00%
CAJA Y TAPA METALICA PARA
04.02.13 und 4.00 66.28 265.12 265.12
VALVULAS EN PARED 0.00 0.00% - 0.00% - 0.00% 4.00 100.00% - 0.00% 100.00%
GRIFO DE RIEGO INCL. CAJUELA DE
04.02.14 und 1.00 620.32 620.32 620.32
CONCRETO 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
EQUIPO DE BOMBEO 02
04.02.15 und 1.00 1,084.71 1,084.71 1,084.71
ELECTROBOMBAS 1.50 HP 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
Sistema de Desagüe y Ventilación
04.03 20,532.40 0.00 0.00 0.00 20,532.40 0.00
04.03.01 EMPALME A RED EXISTENTE, DESAGUE und 2.00 100.87 201.74 0.00 0.00% - 0.00% - 0.00% 2.00 201.74 100.00% - 0.00% 100.00%
SALIDA DE PVC-SAL PARA DESAGUE DE
04.03.02 PTO 31.00 204.90 6,351.90 0.00 0.00% - 0.00% - 0.00% 31.00 6,351.90 100.00% - 0.00% 100.00%
2" SALIDA DE PVC-SAL PARA DESAGUE DE
04.03.03 PTO 3.00 138.92 416.76 0.00 0.00% - 0.00% - 0.00% 3.00 416.76 100.00% - 0.00% 100.00%
4" SALIDA VENTILACION PVC-SAP Ø2"
04.03.04 SOMBRERO DE VENTILACION PVC-SAL PTO 3.00 79.42 238.26 0.00 0.00% - 0.00% - 0.00% 3.00 238.26 100.00% - 0.00% 100.00%
04.03.05 Ø2" Und 2.00 12.33 24.66 0.00 0.00% - 0.00% - 0.00% 2.00 24.66 100.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

EXCAVACION DE ZANJAS PARA RED


04.03.06 m3 16.12 27.88 449.43 449.43
EXT. SANIT. 0.00 0.00% - 0.00% - 0.00% 16.12 100.00% - 0.00% 100.00%
RELLENO MANUAL CON MATERIAL
04.03.07 m3 17.02 23.24 395.54 395.54
PROPIO (REDES EXT. SANIT.) 0.00 0.00% - 0.00% - 0.00% 17.02 100.00% - 0.00% 100.00%
04.03.08 TUBERIA PVC SAL 2" m 40.46 29.88 1,208.94 0.00 0.00% - 0.00% - 0.00% 40.46 1,208.94 100.00% - 0.00% 100.00%
04.03.09 TUBERIA PVC SAL 3" m 41.54 36.60 1,520.36 0.00 0.00% - 0.00% - 0.00% 41.54 1,520.36 100.00% - 0.00% 100.00%
04.03.10 TUBERIA PVC-SAL 4" m 113.44 39.99 4,536.47 0.00 0.00% - 0.00% - 0.00% 113.44 4,536.47 100.00% - 0.00% 100.00%
04.03.11 REGISTRO DE BRONCE 4" und 8.00 82.41 659.28 0.00 0.00% - 0.00% - 0.00% 8.00 659.28 100.00% - 0.00% 100.00%
04.03.12 REGISTRO DE BRONCE 3" und 3.00 49.96 149.88 0.00 0.00% - 0.00% - 0.00% 3.00 149.88 100.00% - 0.00% 100.00%
04.03.13 SUMIDERO DE BRONCE 4" und 4.00 226.67 906.68 0.00 0.00% - 0.00% - 0.00% 4.00 906.68 100.00% - 0.00% 100.00%
04.03.14 SUMIDERO DE BRONCE 3" und 8.00 116.16 929.28 0.00 0.00% - 0.00% - 0.00% 8.00 929.28 100.00% - 0.00% 100.00%
04.03.15 SUMIDERO DE BRONCE 2" und 14.00 116.07 1,624.98 0.00 0.00% - 0.00% - 0.00% 14.00 1,624.98 100.00% - 0.00% 100.00%
CAJA DE REGISTRO PREFABRIC.
04.03.16 und 8.00 114.78 918.24 918.24
12"X24" C/TAPA CONCRETO 0.00 0.00% - 0.00% - 0.00% 8.00 100.00% - 0.00% 100.00%
04.04 Sistema de Drenaje Pluvial 30,382.77 0.00 0.00 0.00 4,560.45 25,822.32
TUBERIA DE BAJADA PVC-SAP 2"
04.04.01 m 13.60 39.65 539.24 539.24
P/LLUVIAS 0.00 0.00% - 0.00% - 0.00% 13.60 100.00% - 0.00% 100.00%
04.04.02 TUBERIA PVC SAL 3" RED EXTERIOR m 10.16 16.43 166.93 0.00 0.00% - 0.00% - 0.00% 10.16 166.93 100.00% - 0.00% 100.00%
CANALETA DE FIERRO GALVANIZADO
04.04.03 m 66.66 57.82 3,854.28 3,854.28
e=0.90mm, P/EVAC. PLUVIAL 0.00 0.00% - 0.00% - 0.00% 66.66 100.00% - 0.00% 100.00%
CANAL RECT. DE CONCRETO f’c’=175
04.04.04 m 114.96 224.62 25,822.32 25,822.32
Kg/cm2 CON REJILLA METALICA-PISOS 0.00 0.00% - 0.00% - 0.00% - 0.00% 13,215.80 100.00% 100.00%
05 INSTALACIONES ELECTRICAS 37,993.87 0.00 0.00 0.00 19,286.08 18,707.79
05.01 Conexion a Red Existente 183.43 0.00 0.00 0.00 183.43 0.00
05.01.01 CONEXION A RED EXISTENTE und 1.00 183.43 183.43 0.00 0.00% - 0.00% - 0.00% 1.00 183.43 100.00% - 0.00% 100.00%
Salida para Alumbrado, Tomacorrientes,
05.02 11,470.46 0.00 0.00 0.00 11,470.46 0.00
Fuerza
05.02.01 SALIDA DE TECHO (CENTRO DE LUZ) Pto 43.00 79.28 3,409.04 0.00 0.00% - 0.00% - 0.00% 43.00 3,409.04 100.00% - 0.00% 100.00%
05.02.02 SALIDA PARA BRAQUETE (PARED) pto 7.00 142.89 1,000.23 0.00 0.00% - 0.00% - 0.00% 7.00 1,000.23 100.00% - 0.00% 100.00%
SALIDA PARA INTERRUPTOR DE 01 0.00 0.00% - 0.00% - 0.00% 17.00 100.00% - 0.00% 100.00%
05.02.03 Pto 17.00 57.43 976.31 976.31
GOLPE
SALIDA PARA INTERRUPTOR DE 02
05.02.04 Pto 2.00 58.57 117.14 117.14
GOLPES 0.00 0.00% - 0.00% - 0.00% 2.00 100.00% - 0.00% 100.00%
SALIDA PARA INTERRUPTOR DE
05.02.05 pto 12.00 59.23 710.76 710.76
CONMUTACION 0.00 0.00% - 0.00% - 0.00% 12.00 100.00% - 0.00% 100.00%
SALIDA TOMACORRIENTE DOBLE CON
05.02.06 Pto 12.00 96.01 1,152.12 1,152.12
PUESTA A TIERRA 0.00 0.00% - 0.00% - 0.00% 12.00 100.00% - 0.00% 100.00%
SALIDA TOMACORRIENTE DOBLE
05.02.07 APRUEBA DE AGUA CON LINEA DE TIERRA Pto 16.00 153.04 2,448.64 2,448.64
0.00 0.00% - 0.00% - 0.00% 16.00 100.00% - 0.00% 100.00%
05.02.08 SALIDA PARA LUZ DE EMERGENCIA pto 11.00 110.27 1,212.97 0.00 0.00% - 0.00% - 0.00% 11.00 1,212.97 100.00% - 0.00% 100.00%
SALIDA DE FUERZA P/BALANZA
05.02.09 pto 1.00 143.18 143.18 143.18
ELECTRONICA 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
SALIDA DE FUERZA P/ ESTERILIZADOR
05.02.10 pto 1.00 136.92 136.92 136.92
DE CUCHILLOS 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
05.02.11 SALIDA DE FUERZA P/ CREMATORIO pto 1.00 163.15 163.15 0.00 0.00% - 0.00% - 0.00% 1.00 163.15 100.00% - 0.00% 100.00%
Canalización para Tuberías
05.03 58.12 0.00 0.00 0.00 58.12 0.00
EXCAVACIÓN DE ZANJA PARA REDES
05.03.01 m3 2.60 9.47 24.62
ELÉCTRICAS Y COMUNICACIONES 0.00 0.00% - 0.00% - 0.00% 2.60 24.62 100.00% - 0.00% 100.00%
RELLENO MANUAL CON MATERIAL
05.03.02 PROPIO (REDES ELÉCTRICAS Y m3 2.08 11.37 23.65
COMUNICACIONES) 0.00 0.00% - 0.00% - 0.00% 2.08 23.65 100.00% - 0.00% 100.00%
ELIMINACION DE MATERIAL 0.00 0.00% - 0.00% - 0.00% 0.52 9.85 100.00% - 0.00% 100.00%
05.03.03 m3 0.52 18.95 9.85
EXCEDENTE
05.04 Tuberias 2,734.25 0.00 0.00 0.00 2,734.25 0.00
05.04.01 TUBERÍA PVC-P 20mm m 178.12 13.74 2,447.37 0.00 0.00% - 0.00% - 0.00% 178.12 2,447.37 100.00% - 0.00% 100.00%
05.04.02 TUBERÍA PVC-P 35mm m 13.50 21.25 286.88 0.00 0.00% - 0.00% - 0.00% 13.50 286.88 100.00% - 0.00% 100.00%
05.05 Cajas de Distribucion 405.78 0.00 0.00 0.00 405.78 0.00
CAJA DE PASE F°G° 8x8x4"
05.05.01 und 6.00 67.63 405.78
(200x200x100mm) 0.00 0.00% - 0.00% - 0.00% 6.00 405.78 100.00% - 0.00% 100.00%
05.06 Tableros Electricos 2,709.70 0.00 0.00 0.00 2,709.70 0.00

TAB.GEN.3x60A;5-2x10A;4-3x10A;4-
05.06.01 und 1.00 2,709.70 2,709.70 2,709.70
2x16A;1-3x25A;12-IDF 25AMP
0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
05.07 Alimentadores 765.23 0.00 0.00 0.00 765.23 0.00
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 2 ((01/10/22 - 04/10/22) y


MES 1 (28/09/22 AL 30/09/22) MES 3 (01/11/22 AL 30/11/22) MES 4 (01/12/22 AL 31/12/22) MES 5 (01/01/23 AL 28/01/23) TOTAL
(08/10/22- 31/10/22)
Costo
ITEM PARTIDAS Und. Metrado Costo Parcial
Unitario Valorizació Valorizació Valorización Valorización Valorizació
Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

ALIM. 3-1x25mm2+1-1x25mm2+1-10mm2
05.07.01 m 7.95 94.14 748.41 748.41
N2XOH 0.00 0.00% - 0.00% - 0.00% 7.95 100.00% - 0.00% 100.00%
CABLE DE COBRE DESNUDO 1x50mm2,
05.07.02 m 2.95 5.70 16.82 16.82
TEMPLE BLANDO 0.00 0.00% - 0.00% - 0.00% 2.95 100.03% - 0.00% 100.03%
05.08 Sistema Puesta a Tierra 959.11 0.00 0.00 0.00 959.11 0.00
POZO PUESTA A TIERRA PT-1 (R<15
05.08.01 und 1.00 959.11 959.11 0.00 0.00% - 0.00% - 0.00% 1.00 959.11 100.00% - 0.00% 100.00%
OHM)
05.09 Artefactos Electricos 18,707.79 0.00 0.00 0.00 0.00 18,707.79
ARTEFACTO FLUORESCENTE 2 x 36 W
05.09.01 (SIM. JOSFEL) COLGANTES INCL. und 43.00 330.81 14,224.83 14,224.83
ACCESORIOS 0.00 0.00% - 0.00% - 0.00% - 0.00% 1,849.00 100.00% 100.00%
ARTEFACTO DE ILUMINACIÓN DE
05.09.02 EMERGENCIA CON DOS LÁMPARAS DE und 11.00 307.90 3,386.90 3,386.90
20W, CON DOS HORAS DE AUTONOMÍA 0.00 0.00% - 0.00% - 0.00% - 0.00% 121.00 100.00% 100.00%
ARTEFACTO DE ILUMINACIÓN TIPO
05.09.03 und 7.00 156.58 1,096.06 1,096.06
SPOT LIGHT 0.00 0.00% - 0.00% - 0.00% - 0.00% 49.00 100.00% 100.00%
06 Mobiliario 24,825.20 0.00 0.00 0.00 0.00 24,825.20
06.01 ESCRITORIO 1.30x0.60 und 6.00 1,705.20 10,231.20 0.00 0.00% - 0.00% - 0.00% - 0.00% 36.00 10,231.20 100.00% 100.00%
06.02 SILLA METALICA und 6.00 764.40 4,586.40 0.00 0.00% - 0.00% - 0.00% - 0.00% 36.00 4,586.40 100.00% 100.00%
06.03 SILLA GIRATORIA und 4.00 664.40 2,657.60 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 2,657.60 100.00% 100.00%
06.04 ESTANTE DE ANGULO RANURADO und 3.00 2,205.00 6,615.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 9.00 6,615.00 100.00% 100.00%
06.05 SILLA DE ESPERA - 3 ASIENTOS und 1.00 735.00 735.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 735.00 100.00% 100.00%
07 Equipamiento 155,151.78 0.00 0.00 0.00 0.00 155,151.78
07.01 CAJÓN DE ATURDIMIENTO und 1.00 18,210.59 18,210.59 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 18210.59 100.00% 100.00%
ESTERILIZADOR DE CUCHILLO 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 21168 100.00% 100.00%
07.02 und 2.00 10,584.00 21,168.00
ELECTRICO
07.03 PISTOLA DE ATURDIMIENTO BOVINO und 1.00 31,773.77 31,773.77 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 31773.77 100.00% 100.00%
07.04 PARRILLA METÁLICA MÓVIL BOVINOS und 1.00 4,152.55 4,152.55 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 4152.55 100.00% 100.00%
07.05 PARRILLA METÁLICA MÓVIL PORCINOS und 1.00 3,322.03 3,322.03 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 3322.03 100.00% 100.00%
PLATAFORMA METÁLICA 1.20X0.70 CON 1.00
07.06 und 13,815.51 13,815.51
ESCALONES 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 13815.51 100.00% 100.00%
07.07 MANILUVIO DE ACERO A PEDAL und 3.00 2,499.00 7,497.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 9.00 7497 100.00% 100.00%
07.08 POZA DE LAVADO DE BOTAS und 2.00 1,000.00 2,000.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 2000 100.00% 100.00%
07.09 BALANZA ELECTRONICA und 1.00 1,677.97 1,677.97 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 1677.97 100.00% 100.00%
MESA DE INSPECCION DE ACERO 1.00
07.10 und 2,300.00 2,300.00
INOXIDABLE 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 2300 100.00% 100.00%
07.11 ESTANTE CON GANCHOS PARA VISCERAS und 1.00 1,930.00 1,930.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 1930 100.00% 100.00%
COLGADORES EMPOTRADO DE 2.00
07.12 und 4,508.00 9,016.00
VISCERAS C/10 GANCHOS 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 9016 100.00% 100.00%
CARRO TRANSPORTADOR TIPO BUGGY 2.00
07.13 und 5,400.00 10,800.00
(CABEZAS Y PATAS) 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 10800 100.00% 100.00%
CARRETILLA DE MANO ACERO 3.00
07.14 und 637.00 1,911.00
GALVANIZADO 0.00 0.00% - 0.00% - 0.00% - 0.00% 9.00 1911 100.00% 100.00%
07.15 GANCHOS DE ACERO PARA OREO und 60.00 147.00 8,820.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 3,600.00 8820 100.00% 100.00%
07.16 BANDEJA DE ACERO INOXIDABLE und 4.00 1,494.91 5,979.64 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 5979.64 100.00% 100.00%
07.17 RECIPIENTE PARA DESANGRADO MOVIL glb 2.00 800.00 1,600.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 1600 100.00% 100.00%
07.18 COCINA INDUSTRIAL 03 HORNILLAS und 2.00 1,355.92 2,711.84 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 2711.84 100.00% 100.00%
07.19 BALÓN DE GAS DE 45KG und 2.00 740.88 1,481.76 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 1481.76 100.00% 100.00%
07.20 OLLA #50 DE 80LTS 4mm DE ESPESOR und 4.00 539.00 2,156.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 2156 100.00% 100.00%
CONTENEDORES PARA BASURA DE 240 2.00
07.21 und 483.06 966.12
LTS 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 966.12 100.00% 100.00%
07.22 LOCKERS 2 CUERPOS/6 PUERTAS und 2.00 931.00 1,862.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 1862 100.00% 100.00%

Costo Directo Total 1,364,250.25 58,789.61 4.31% 262,193.67 19.22% 475,509.61 34.86% 280,914.18 20.59% 286,843.17 21.03% 100.00%
Costo Gastos Generales 9.10% 124,146.77 5,349.85 23,859.62 43,271.37 25,563.19 26,102.72
Costo Utilidad 6.50% 88,676.27 3,821.32 17,042.59 30,908.13 18,259.42 18,644.82
I.G.V. 18% 283,873.19 12,232.94 54,557.26 98,944.04 58,452.62 59,686.33
Valor Referencial 1,860,946.48 80,193.72 357,653.14 648,633.15 383,189.41 391,277.04

% Avance Fisico Programado 100.00% 4.31% 19.22% 34.86% 20.59% 21.03% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL


Costo
ITEM PARTIDAS Und. Metrado Costo Parcial Valorizació Valorizació Valorización Valorización Valorizació
Unitario Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual

OBRAS PROVISIONALES, TRABAJOS


01 PRELIMINARES, SEGURIDAD Y SALUD EN 181,163.67 140,103.73 14,051.88 12,093.16 12,496.27 2,418.63
LA CONSTRUCCION
Obras Provisionales y Trabajos
01.01 181,163.67 140,103.73 14,051.88 12,093.16 12,496.27 2,418.63
Preliminares
Construcciones Provisionales
01.01.01 16,380.39 16,380.39 0.00 0.00 0.00 0.00
01.01.01.01 ALMACEN Y CASETA DE GUARDIANIA Glb 1.00 3,547.80 3,547.80 1.00 3,547.80 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.01.02 CARTEL DE OBRA 4.80mX3.60m Und 1.00 2,172.73 2,172.73 1.00 2,172.73 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
CONSTRUCCION DE CERCO
01.01.01.03 m 165.00 55.06 9,084.90
PROVISIONAL 165.00 9,084.90 100.00% 100.00%
CONSTRUCCION DE PUERTAS
01.01.01.04 und 2.00 787.48 1,574.96
PROVISIONALES 2.00 1,574.96 100.00% 100.00%
01.01.02 Instalaciones Provisionales 446.84 446.84 0.00 0.00 0.00 0.00
01.01.02.01 ENERGIA ELECTRICA PROVISIONAL Mes 4.00 111.71 446.84 4.00 446.84 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.03 Flete Terrestre 32,272.25 5,916.58 8,337.00 8,068.06 8,337.00 1,613.61
FLETE TERRESTRE 0.18 5,916.58 18.33% 0.26 8,337.00 25.83% 0.25 S/8,068.06 25.00% 0.26 8337 25.83% 0.05 1613.61 5.01% 100.00%
01.01.03.01 Glb 1.00 32,272.25 32,272.25
01.01.04 Remociones
DESMONTAJE DE PUERTAS 31,463.38 31,463.38 0.00 0.00 0.00 0.00
01.01.04.01 DESMONTAJE DE VENTANAS m2 41.64 10.59 440.97 41.64 440.97 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.04.02 m2 6.00 6.38 38.28 6.00 38.28 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DESMONTAJE DE REJILLA METALICA
01.01.04.03 m2 26.56 6.35 168.66 26.56 168.66 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
EN CANALETAS DE PISOS
DESMONTAJE DE TECHO DE ETERNIT
01.01.04.04 m2 557.26 40.47 22,552.31
DE FIBROCEMENTO 557.26 22,552.31 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DESMONTAJE DE ESTRUCTURA
01.01.04.05 m 13.62 388.05 5,285.24
METALICA 13.62 5,285.24 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DESMONTAJE DE COLUMNAS
01.01.04.06 und 32.00 93.06 2,977.92
METALICAS 32.00 2,977.92 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.05 Demoliciones 24,652.22 24,652.22 0.00 0.00 0.00 0.00
01.01.05.01 DEMOLICION DE MUROS DE LADRILLO m3 95.46 30.92 2,951.62 95.46 2,951.62 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DEMOLICION DE ESTRUCTURAS DE
01.01.05.02 m3 82.97 122.54 10,167.14
CONCRETO 82.97 10,167.14 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
ACARREO INTERNO, MATERIAL
01.01.05.03 m3 171.68 31.80 5,459.42 171.68 5,459.42 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
ELIMINACION
PROCEDENTE DE MATERIAL
DE DEMOLICION
01.01.05.04 PROVENIENTE DE DEMOLICIONES m3 171.68 35.38 6,074.04 171.68 6,074.04 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.06 Trazo, Niveles y Replanteo 1,555.61 0.00 1,555.61 0.00 0.00 0.00
01.01.06.01 TRAZO Y REPLANTEO PRELIMINAR m2 1,087.84 1.43 1,555.61 0.00 0.00% 1,087.84 1,555.61 100.00% - 0.00% - 0.00% - 0.00% 100.00%
Seguridad y Salud en la Construcción
01.01.07 42,549.84 42,549.84 0.00 0.00 0.00 0.00
ELABORACION, IMPLEMENTACION Y
01.01.07.01 ADMINISTRACION DEL PLAN DE Glb 1.00 3,920.00 3,920.00
SEGURIDAD Y SALUD EN EL TRABAJO 1.00 3,920.00 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
EQUIPOS DE PROTECCION 75.00 30,182.25 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.07.02 Und 75.00 402.43 30,182.25
INDIVIDUAL
01.01.07.03 EQUIPO DE PROTECCION COLECTIVA Glb 1.00 3,972.46 3,972.46 1.00 3,972.46 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
SEÑALIZACION TEMPORAL DE
01.01.07.04 Glb 1.00 1,914.75 1,914.75
SEGURIDAD 1.00 1,914.75 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
RECURSOS PARA RESPUESTA ANTE
01.01.07.05 EMERGENCIAS EN SEGURIDAD Y SALUD Glb 1.00 2,560.38 2,560.38
EN EL TRABAJO 1.00 2,560.38 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
Plan para la Vigilancia, Prevencion y
01.01.08 31,843.14 18,694.48 4,159.27 4,025.10 4,159.27 805.02
Control de Covid-19 en Obra
IMPLEMENTACION DE ZONA DE
01.01.08.01 glb 1.00 1,027.90 1,027.90
CONTROL 1.00 1,027.90 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
TOMA DE TEMPERATURA Y
01.01.08.02 glb 1.00 976.82 976.82
PULSIOXIMETRIA 1.00 976.82 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.03 DESINFECCION DE PERSONAL Día 120.00 12.25 1,470.00 22.00 269.50 18.33% 31.00 379.75 25.83% 30.00 367.5 25.00% 31.00 379.75 25.83% 720.00 73.5 5.01% 100.00%
01.01.08.04 ZONA DE LAVADO DE MANOS und 1.00 444.19 444.19 1.00 444.19 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.05 ZONA DE ENTREGA DE MATERIALES glb 1.00 586.14 586.14 1.00 586.14 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
IMPLEMENTACION DE AREA PARA
01.01.08.06 glb 1.00 544.77 544.77
ENFERMERIA 1.00 544.77 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.07 IMPLEMENTACION DE ENFERMERIA glb 1.00 1,145.16 1,145.16 1.00 1,145.16 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.08 CONTENEDORES PARA DESECHOS und 1.00 123.81 123.81 1.00 123.81 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
DESINFECCION DE AMBIENTES DE
01.01.08.09 Día 120.00 52.00 6,240.00
TRABAJO 22.00 1,144.00 18.33% 31.00 1,612.00 25.83% 30.00 1560 25.00% 31.00 1612 25.83% 720.00 312 5.01% 100.00%
DESINFECCION DE MATERIALES,
01.01.08.10 Día 120.00 39.50 4,740.00
EQUIPOS Y HERRAMIENTAS 120.00 4,740.00 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
EQUIPOS DE PROTECCIÓN INDIVIUAL
01.01.08.11 und 1.00 342.12 342.12
CONTRA EL COVID - 19 1.00 342.12 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.12 IMPLEMENTACION DE COMEDOR glb 1.00 5,730.50 5,730.50 1.00 5,730.50 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.13 DESINFECCION DE COMEDOR Día 120.00 20.36 2,443.20 22.00 447.92 18.33% 31.00 631.16 25.83% 30.00 610.8 25.00% 31.00 631.16 25.83% 720.00 122.16 5.00% 100.09%
SEÑAL INFORMATIVA EN INGRESO A
01.01.08.14 und 1.00 26.60 26.60
OBRA 1.00 26.60 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
SEÑAL INFORMATIVA DENTRO DE LA
01.01.08.15 und 1.00 26.60 26.60
OBRA 1.00 26.60 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
SEÑALIZACION DE RUTAS PARA 1.00 28.13 100.00% - 0.00% - 0.00% - 0.00% - 0.00% 100.00%
01.01.08.16 glb 1.00 28.13 28.13
VACIADO
01.01.08.17 MOVILIZACION DE PERSONAL Día 120.00 49.56 5,947.20 22.00 1,090.32 18.33% 31.00 1,536.36 25.83% 30.00 1486.8 25.00% 31.00 1536.36 25.83% 720.00 297.36 5.00% 99.99%
02 ESTRUCTURAS 547,190.67 0.00 263,878.32 263,905.78 19,406.57 0.00
02.01 Movimiento de Tierras 67,278.56 0.00 63,763.67 3,514.89 0.00 0.00
02.01.01 Excavaciones 7,838.97 0.00 7,838.97 0.00 0.00 0.00
EXCAVACION DE ZANJAS Y ZAPATAS
02.01.01.01 m3 82.21 34.86 2,865.84
Rt<2 Kg/cm² h=1.20m 0.00 0.00% 82.21 2,865.84 100.00% - 0.00% - 0.00% - 0.00% 100.00%
EXCAVACION MANUAL DE ZANJAS
02.01.01.02 m3 142.66 34.86 4,973.13
PARA CIMIENTOS 0.00 0.00% 142.66 4,973.13 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.01.02 Rellenos 24,169.93 0.00 22,379.13 0.00 0.00 0.00
02.01.02.01 RELLENO CON ARENA FINA E=4" m2 838.43 23.82 19,971.40 0.00 0.00% 838.43 19,971.40 100.00% - 0.00% - 0.00% - 0.00% 100.00%
RELLENO COMPACTADO C/EQUIPO
02.01.02.02 m3 89.54 46.89 4,198.53
MAT/PROPIO 0.00 0.00% 51.35 2,407.73 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.01.03 Nivelación Interior y Apisonado 25,830.76 0.00 22,315.87 3,514.89 0.00 0.00
NIVELACION INTERIOR Y APISONADO
02.01.03.01 m2 838.43 5.39 4,519.14
PARA FALSO PISO, PATIO Y VEREDAS 0.00 0.00% 186.32 1,004.25 22.22% 652.11 3514.89 77.78% - 0.00% - 0.00% 100.00%
AFIRMADO DE 6" PARA PISOS
02.01.03.02 m2 838.43 23.52 19,719.87
INTERIORES Y EXTERIORES 0.00 0.00% 838.43 19,719.87 100.00% - 0.00% - 0.00% - 0.00% 100.00%
BASE DE AFIRMADO COMPACTADO 0.00 0.00% 63.24 1,591.75 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.01.03.03 m2 63.24 25.17 1,591.75
DE 8"
02.01.04 Eliminación de Material Excedente 11,229.70 0.00 11,229.70 0.00 0.00 0.00
ACARREO INTERNO, MATERIAL
02.01.04.01 m3 180.31 27.88 5,027.04 0.00 0.00% 180.31 5,027.04 100.00% - 0.00% - 0.00% - 0.00% 100.00%
PROCEDENTE DE EXCAVACIONES
ELIMINACION MATERIAL EXCEDENTE
02.01.04.02 m3 180.31 34.40 6,202.66
C/MAQUINA 0.00 0.00% 180.31 6,202.66 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.02 Obras de Concreto Simple 72,022.44 0.00 32,374.83 39,647.61 0.00 0.00
02.02.01 Cimientos 22,716.88 0.00 22,716.88 0.00 0.00 0.00
CIMIENTOS CORRIDOS 1:10 + 30 %
02.02.01.01 m3 79.84 284.53 22,716.88
P.G. f'c >=100 Kg/cm². 0.00 0.00% 79.84 22,716.88 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.02.02 Sobrecimiento 2,337.74 0.00 2,337.74 0.00 0.00 0.00
SOBRECIMIENTO, CONCRETO 1:8 +
02.02.02.01 m3 2.47 332.10 820.29 0.00 0.00% 2.47 820.29 100.00% - 0.00% - 0.00% - 0.00% 100.00%
25% P.M. f'c >=100 Kg/cm²
SOBRECIMIENTO ENCONFRADO Y
02.02.02.02 m2 27.59 55.00 1,517.45
DESENCOFRADO 0.00 0.00% 27.59 1,517.45 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.02.03 Solado 7,320.21 0.00 7,320.21 0.00 0.00 0.00
SOLADO PARA ZAPATAS e = 4" f'c=175
02.02.03.01 m2 195.78 37.39 7,320.21
kg/cm2 0.00 0.00% 195.78 S/7,320.21 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.02.04 Falso Piso 37,121.46 0.00 0.00 37,121.46 0.00 0.00
FALSO PISO f´c = 100 Kg/cm², e=4"
02.02.04.01 m2 755.73 49.12 37,121.46 0.00 0.00% - 0.00% 755.73 37121.46 100.00% - 0.00% - 0.00% 100.00%
02.02.05 Pediluvio/Rodaluvio 874.25 0.00 0.00 874.25 0.00 0.00
PEDILUVIO/RODALUVIO - CONCRETO
02.02.05.01 m2 1.53 372.62 570.11
F'c = 175 kg/cm2, E=4" 0.00 0.00% - 0.00% 1.53 570.11 100.00% - 0.00% - 0.00% 100.00%
PEDILUVIO/RODALUVIO - ENCOFRADO
02.02.05.02 m2 6.85 44.40 304.14
Y DESENCOFRADO 0.00 0.00% - 0.00% 6.85 304.14 100.00% - 0.00% - 0.00% 100.00%
02.02.06 Bebederos 1,651.90 0.00 0.00 1,651.90 0.00 0.00
BEBEDEROS - CONCRETO F'c = 175
02.02.06.01 m3 2.05 372.62 763.87
kg/cm2, E=4" 0.00 0.00% - 0.00% 2.05 763.87 100.00% - 0.00% - 0.00% 100.00%
BEBEDEROS - ENCOFRADO Y
02.02.06.02 m2 31.67 28.04 888.03
DESENCOFRADO 0.00 0.00% - 0.00% 31.67 888.03 100.00% - 0.00% - 0.00% 100.00%
02.03 Obras de Concreto Armado 237,462.33 0.00 167,739.82 69,722.51 0.00 0.00
02.03.01 Zapatas 23,180.75 0.00 23,180.75 0.00 0.00 0.00
02.03.01.01 ZAPATAS.- CONCRETO f´c = 210 Kg/cm² m3 31.62 436.54 13,803.39 0.00 0.00% 31.62 13,803.39 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.01.02 ZAPATAS.- ACERO fy = 4,200 Kg/cm² Kg 1,281.06 7.32 9,377.36 0.00 0.00% 1,281.06 9,377.36 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.02 Sobrecimiento Reforzado 49,729.89 0.00 49,729.89 0.00 0.00 0.00
SOBRECIMIENTO REFORZADO.-
02.03.02.01 m3 37.72 399.22 15,058.58
CONCRETO F'c=175 kg/cm2 0.00 0.00% 37.72 15,058.58 100.00% - 0.00% - 0.00% - 0.00% 100.00%
SOBRECIMIENTO REFORZADO.-
02.03.02.02 m2 503.48 49.83 25,088.41 0.00 0.00% 503.48 25,088.41 100.00% - 0.00% - 0.00% - 0.00% 100.00%
ENCOFRADO Y DESENCOFRADO
SOBRECIMIENTO REFORZADO.-
02.03.02.03 Kg 1,309.14 7.32 9,582.90
ACERO fy = 4,200 Kg/cm² 0.00 0.00% 1,309.14 9,582.90 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.03 Columnas 74,914.24 0.00 72,345.10 2,569.14 0.00 0.00
COLUMNAS - CONCRETO 210 KG/CM² -
02.03.03.01 1er PISO m3 27.74 555.69 15,414.84
0.00 0.00% 23.12 12,845.70 83.33% 4.62 2569.14 16.67% - 0.00% - 0.00% 100.00%
COLUMNAS.- ENCOFRADO Y
02.03.03.02 DESENCOFRADO m2 263.61 76.74 20,229.43
0.00 0.00% 263.61 20,229.43 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.03.03 COLUMNAS.- ACERO fy = 4,200 Kg/cm² Kg 5,364.75 7.32 39,269.97 0.00 0.00% 5,364.75 39,269.97 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.04 Vigas 37,383.18 0.00 0.00 37,383.18 0.00 0.00
VIGAS.- CONCRETO 210 kg/cm2 - 1er
02.03.04.01 PISO m3 14.21 436.90 6,208.35
VIGAS.- ENCOFRADO Y 0.00 0.00% - 0.00% 14.21 6,208.35 100.00% - 0.00% - 0.00% 100.00%
02.03.04.02 DESENCOFRADO m2 151.28 90.55 13,698.40 0.00 0.00% - 0.00% 151.28 13,698.40 100.00% - 0.00% - 0.00% 100.00%
02.03.04.03 VIGAS.- ACERO fy = 4,200 Kg/cm² Kg 2,387.49 7.32 17,476.43 0.00 0.00% - 0.00% 2,387.49 17,476.43 100.00% - 0.00% - 0.00% 100.00%
02.03.05 Losas 2,158.31 0.00 0.00 2,158.31 0.00 0.00
LOSA ALIGERADA.- CONCRETO f´c =
02.03.05.01 m3 0.45 438.92 197.51
210 Kg/cm² 0.00 0.00% - 0.00% 0.45 197.51 100.00% - 0.00% - 0.00% 100.00%
LOSA ALIGERADA.- ENCOFRADO Y
02.03.05.02 m2 5.09 70.95 361.14
DESENCOFRADO 0.00 0.00% - 0.00% 5.09 361.14 100.00% - 0.00% - 0.00% 100.00%
LOSA ALIGERADA.- ACERO fy = 4,200
02.03.05.03 Kg 43.56 7.32 318.86
Kg/cm² 0.00 0.00% - 0.00% 43.56 318.86 100.00% - 0.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL


Costo
ITEM PARTIDAS Und. Metrado Costo Parcial Valorizació Valorizació Valorización Valorización Valorizació
Unitario Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual
LOSA ALIGERADA.- LADRILLO HUECO
02.03.05.04 Und 42.38 3.36 142.40
15X30X30cm 0.00 0.00% - 0.00% 42.38 142.4 100.00% - 0.00% - 0.00% 100.00%
LOSAS MACIZAS.- CONCRETO f´c = 210
02.03.05.05 m3 0.58 422.17 244.86
Kg/cm² - 01 PISO 0.00 0.00% - 0.00% 0.58 244.86 100.00% - 0.00% - 0.00% 100.00%
LOSAS MACIZAS.- ENCOFRADO Y
02.03.05.06 DESENCOFRADO m2 2.38 74.21 176.62
0.00 0.00% - 0.00% 2.38 176.62 100.00% - 0.00% - 0.00% 100.00%
LOSAS MACIZAS.- ACERO fy = 4,200
02.03.05.07 Kg 97.94 7.32 716.92
Kg/cm² 0.00 0.00% - 0.00% 97.94 716.92 100.00% - 0.00% - 0.00% 100.00%
02.03.06 Escaleras 1,287.83 0.00 0.00 1,287.83 0.00 0.00
ESCALERAS.- CONCRETO f´c =175
02.03.06.01 m3 0.47 530.17 249.18
Kg/cm² 0.00 0.00% - 0.00% 0.47 249.18 100.00% - 0.00% - 0.00% 100.00%
ESCALERAS.- ENCOFRADO Y
02.03.06.02 DESENCOFRADO m2 9.52 97.83 931.34
0.00 0.00% - 0.00% 9.52 931.34 100.00% - 0.00% - 0.00% 100.00%
02.03.06.03 ESCALERAS.- ACERO fy = 4,200 Kg/cm² Kg 14.66 7.32 107.31 0.00 0.00% - 0.00% 14.66 107.31 100.00% - 0.00% - 0.00% 100.00%
02.03.07 Cisternas 16,803.06 0.00 16,803.06 0.00 0.00 0.00
CISTERNA.- CONCRETO f´c = 280 0.00 0.00% 8.07 5,039.96 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.07.01 m3 8.07 624.53 5,039.96
Kg/cm²
CISTERNA.- ENCOFRADO Y
02.03.07.02 m2 49.10 68.51 3,363.84
DESENCOFRADO 0.00 0.00% 49.10 3,363.84 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.07.03 CISTERNA.- ACERO fy = 4,200 Kg/cm² Kg 1,147.44 7.32 8,399.26 0.00 0.00% 1,147.44 8,399.26 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.08 Tanque Elevado 11,395.84 0.00 5,681.02 5,714.82 0.00 0.00
TANQUE ELEVADO.- CONCRETO 210
02.03.08.01 kg/cm2 m3 5.23 547.14 2,861.54
0.00 0.00% - 0.00% 5.23 2861.54 100.00% - 0.00% - 0.00% 100.00%
TANQUE ELEVADO.- ENCOFRADO Y
02.03.08.02 DESENCOFRADO m2 47.65 89.82 4,279.92
0.00 0.00% 15.88 1,426.64 33.33% 31.77 2853.28 66.67% - 0.00% - 0.00% 100.00%
TANQUE ELEVADO, ACERO fy=4200
02.03.08.03 kg/cm2 Kg 581.20 7.32 4,254.38
0.00 0.00% 581.20 4,254.38 100.00% - 0.00% - 0.00% - 0.00% 100.00%
02.03.09 Trampas de Grasa 4,399.34 0.00 0.00 4,399.34 0.00 0.00
TRAMPA DE GRASAS.- CONCRETO f´c
02.03.09.01 m3 3.51 411.10 1,442.96
= 210 Kg/cm² 0.00 0.00% - 0.00% 3.51 1442.96 100.00% - 0.00% - 0.00% 100.00%
TRAMPA DE GRASAS.- ENCOFRADO Y
02.03.09.02 m2 30.03 51.89 1,558.26
DESENCOFRADO 0.00 0.00% - 0.00% 30.03 1558.26 100.00% - 0.00% - 0.00% 100.00%
TRAMPA DE GRASAS.- ACERO fy =
02.03.09.03 kg 191.00 7.32 1,398.12
4,200 Kg/cm² 0.00 0.00% - 0.00% 191.00 1398.12 100.00% - 0.00% - 0.00% 100.00%
02.03.10 Camara de rejas 3,908.39 0.00 0.00 3,908.39 0.00 0.00
CAMARA DE REJAS - CONCRETO f´c =
02.03.10.01 m3 2.88 411.10 1,183.97
210 Kg/cm² 0.00 0.00% - 0.00% 2.88 1183.97 100.00% - 0.00% - 0.00% 100.00%
CAMARA DE REJAS.- ENCOFRADO Y
02.03.10.02 m2 29.49 51.89 1,530.24
DESENCOFRADO 0.00 0.00% - 0.00% 29.49 1530.24 100.00% - 0.00% - 0.00% 100.00%
CAMARA DE REJAS.- ACERO fy = 4,200
02.03.10.03 kg 163.14 7.32 1,194.18
Kg/cm² 0.00 0.00% - 0.00% 163.14 1194.18 100.00% - 0.00% - 0.00% 100.00%
02.03.11 Pozo de Sedimentacion 5,038.88 0.00 0.00 5,038.88 0.00 0.00
POZO DE SEDIMENTACION.-
02.03.11.01 m3 3.92 411.10 1,611.51
CONCRETO f´c = 210 Kg/cm² 0.00 0.00% - 0.00% 3.92 1611.51 100.00% - 0.00% - 0.00% 100.00%
POZO DE SEDIMENTACION.-
02.03.11.02 m2 36.03 51.89 1,869.60 0.00 0.00% - 0.00% 36.03 1869.6 100.00% - 0.00% - 0.00% 100.00%
ENCOFRADO Y DESENCOFRADO
POZO DE SEDIMENTACION.- ACERO fy
02.03.11.03 kg 212.81 7.32 1,557.77
= 4,200 Kg/cm² 0.00 0.00% - 0.00% 212.81 1557.77 100.00% - 0.00% - 0.00% 100.00%
02.03.12 Rampas 497.36 0.00 0.00 497.36 0.00 0.00
02.03.12.01 RAMPAS - CONCRETO f´c = 175 Kg/cm² m2 0.96 46.32 44.47 0.00 0.00% - 0.00% 0.96 44.47 100.00% - 0.00% - 0.00% 100.00%
RAMPAS - ENCOFRADO Y
02.03.12.02 m2 1.83 44.40 81.25
DESENCOFRADO 0.00 0.00% - 0.00% 1.83 81.25 100.00% - 0.00% - 0.00% 100.00%
02.03.12.03 RAMPAS - ACERO fy = 4200 Kg/cm² m2 50.77 7.32 371.64 0.00 0.00% - 0.00% 50.77 371.64 100.00% - 0.00% - 0.00% 100.00%
02.03.13 Mesa de Concreto 6,765.26 0.00 0.00 6,765.26 0.00 0.00
MESAS DE CONCRETO - CONCRETO
02.03.13.01 m3 5.69 411.10 2,339.16 2,339.16
F'c = 210 kg/cm2 0.00 0.00% - 0.00% 5.69 100.00% - 0.00% - 0.00% 100.00%
MESA DE CONCRETO - ENCOFRADO Y
02.03.13.02 m2 66.54 51.89 3,452.76 3,452.76
DESENCOFRADO 0.00 0.00% - 0.00% 66.54 100.00% - 0.00% - 0.00% 100.00%
MESA DE CONCRETO - ACERO DE
02.03.13.03 kg 132.97 7.32 973.34 973.34
REFUERZO FY=4200 kg/cm2 0.00 0.00% - 0.00% 132.97 100.00% - 0.00% - 0.00% 100.00%
02.04 Estructuras Metálicas 79,363.06 0.00 0.00 79,363.06 0.00 0.00
02.04.01 Tijerales Metalicos 7,590.35 0.00 0.00 7,590.35 0.00 0.00
CERCHA TIPO I SEGÚN DISEÑO.INCL.
02.04.01.01 und 5.00 1,518.07 7,590.35 0.00 0.00% - 0.00% 5.00 7,590.35 100.00% - 0.00% - 0.00% 100.00%
SUMINISTRO E INSTALACION
02.04.02 Columnas Metálicas 19,545.50 0.00 0.00 19,545.50 0.00 0.00
COLUMNAS METALICAS DE TUBO
02.04.02.01 CUADRADO DE 4"x4"x2.5mm (INC.ANCLAJES und 19.00 615.91 11,702.29 11,702.29
+ PINT. ANTICORR. + ESMALTE) 0.00 0.00% - 0.00% 19.00 100.00% - 0.00% - 0.00% 100.00%
ESTRUCTURA METALICA PARA ZONA
02.04.02.02 und 6.00 711.41 4,268.46 4,268.46
DE OREO DE BOVINOS 0.00% 0.00% 100.00% 0.00% - 0.00% 100.00%
ESTRUCTURA METALICA PARA ZONA
02.04.02.03 und 5.00 366.79 1,833.95 1,833.95
DE OREO DE PORCINO/OVINO 0.00% 0.00% 100.00% 0.00% - 0.00% 100.00%
ESTRUCTURA METALICA PARA
02.04.02.04 und 8.00 217.60 1,740.80 1,740.80
BENEFICIO/BOVINO 0.00 0.00% - 0.00% 8.00 100.00% - 0.00% - 0.00% 100.00%
02.04.03 Vigas Metalicas 52,227.21 0.00 0.00 52,227.21 0.00 0.00
VIGUETAS METALICAS C/TUBO DE
02.04.03.01 FIERRO NEGRO ESTRUCTURAL DE 75mm x m 117.50 17.58 2,065.65 2,065.65
75mm x 2.5mm 0.00 0.00% - 0.00% 117.50 100.00% - 0.00% - 0.00% 100.00%
ESTRUCTURA VIGA DE 100mm x
100mm, e=2.50 mm METÁLICA PARA
02.04.03.02 m 213.56 95.51 20,397.12 20,397.12
COBERTURA INC BASE ANTICORROSIVA Y
PINTADO 0.00 0.00% - 0.00% 213.56 100.00% - 0.00% - 0.00% 100.00%
ESTRUCTURA TUBO DE 100mm
x50mm, e=2.5mm METÁLICA PARA
02.04.03.03 m 323.56 67.47 21,830.59 21,830.59
COBERTURA INC BASE ANTICORROSIVA Y
PINTADO 0.00 0.00% - 0.00% 323.56 100.00% - 0.00% - 0.00% 100.00%
CORREA DE 25mm x 50mm, e=2.5mm
02.04.03.04 METÁLICA PARA COBERTURA INC BASE m 180.11 44.05 7,933.85 7,933.85
ANTICORROSIVA Y PINTADO 0.00 0.00% - 0.00% 180.11 100.00% - 0.00% - 0.00% 100.00%
02.05 Cobertura 90,563.99 0.00 0.00 71,157.42 19,406.57 0.00
COBERTURA DE PLANCHA DE
02.05.01 m2 467.21 193.84 90,563.99 71,157.42 19,406.57
CALMINON TI, E=0.40MM 0.00 0.00% - 0.00% 367.09 78.57% 100.12 21.43% - 0.00% 100.00%
02.06 Varios
JUNTA DE DILATACION RELLENO CON 500.29 0.00 0.00 500.29 0.00 0.00
02.06.01 MORTERO ASFALTICO E=1" m 32.40 9.21 298.40 0.00 0.00% - 0.00% 32.40 298.4 100.00% - 0.00% - 0.00% 100.00%
TAPA JUNTA DE DILATACION CON
02.06.02 m 9.60 21.03 201.89 0.00 0.00% - 0.00% 9.60 201.89 100.00% - 0.00% - 0.00% 100.00%
ESPUNA+JEBE MICROPOROSO
03 ARQUITECTURA 345,358.51 0.00 19,435.97 213,958.94 86,167.21 25,796.39
03.01 Muros y Tabiques de Albañilería 76,989.81 0.00 19,435.97 57,553.84 0.00 0.00
MURO DE LADRILLO KK TIPO IV SOGA;
03.01.01 m2 604.95 123.12 74,481.44 0.00 0.00% 137.49 16,927.60 22.73% 467.46 57,553.84 77.27% - 0.00% - 0.00% 100.00%
MEZCLA 1:4 (e=1.5cm)
ALAMBRE # 8 REFUERZO HORIZONTAL
03.01.02 Kg 446.33 5.62 2,508.37
EN MUROS 0.00 0.00% 446.33 2,508.37 100.00% - 0.00% - 0.00% - 0.00% 100.00%
Muros con Sistema de Construccion en
03.02 2,716.17 0.00 0.00 0.00 2,716.17 0.00
Seco
MURO TABIQUE SIMPLE C/PLACA DE
03.02.01 m2 25.38 107.02 2,716.17
YESO ESTANDARD 1/2'', PERFIL 89 0.00% 0.00% 0.00% 2,716.17 100.00% 0.00% 100.00%
03.03 Revoques y Revestimientos 55,717.00 0.00 0.00 34,736.28 20,980.72 0.00
TARRAJEO EN MURO: TARRAJEO
03.03.01 m2 514.44 26.38 13,570.93
PRIMARIO 0.00 0.00% - 0.00% 514.44 13570.93 100.00% - 0.00% - 0.00% 100.00%
TARRAJEO EN MURO: INTERIOR Y
03.03.02 m2 895.73 26.63 23,853.29
EXTERIOR 0.00 0.00% - 0.00% 582.22 15504.64 65.00% 313.51 8348.65 35.00% - 0.00% 100.00%
03.03.03 TARRAJEO DE COLUMNAS m2 125.28 40.49 5,072.59 0.00 0.00% - 0.00% 93.96 3804.44 75.00% 31.32 1268.15 25.00% - 0.00% 100.00%
TARRAJEO DE VIGAS 0.00 0.00% - 0.00% - 0.00% 151.28 8464.12 100.00% - 0.00% 100.00%
03.03.04 m2 151.28 55.95 8,464.12
03.03.05 TARRAJEO CON IMPERMEABILIZANTE m2 52.78 35.17 1,856.27 0.00 0.00% - 0.00% 52.78 1856.27 100.00% - 0.00% - 0.00% 100.00%
VESTIDURA DE DERRAMES, MORTERO
03.03.06 m 169.48 17.11 2,899.80
C:A 1:5 0.00 0.00% - 0.00% - 0.00% 169.48 2899.8 100.00% - 0.00% 100.00%
03.04 Pisos y Pavimentos 59,681.60 0.00 0.00 54,812.52 4,869.08 0.00
03.04.01 Contrapisos 2,464.18 0.00 0.00 2,464.18 0.00 0.00
03.04.01.01 CONTRAPISO DE 40 mm m2 51.82 32.65 1,691.92 0.00 0.00% - 0.00% 51.82 1,691.92 100.00% - 0.00% - 0.00% 100.00%
CONTRAPISO DE 4" ACABADO PULIDO,
03.04.01.02 m2 27.94 27.64 772.26 0.00 0.00% - 0.00% 27.94 772.26 100.00% - 0.00% - 0.00% 100.00%
ZONA MUEBLES BAJOS
03.04.02 Pisos 8,606.78 0.00 0.00 3,737.70 4,869.08 0.00
PISO CERAMICO ANTIDESLIZANTE
03.04.02.01 m2 51.82 65.11 3,374.00 3,374.00
0.45 x 0.45 m SERIE COLOR - NACIONAL 0.00 0.00% - 0.00% - 0.00% 51.82 100.00% - 0.00% 100.00%
PISO DE CANTO RODADO ASENTADO
03.04.02.02 m2 67.87 77.10 5,232.78 3,737.70 1,495.08
FRAGUADO 0.00 0.00% - 0.00% 48.48 71.43% 19.39 28.57% - 0.00% 100.00%
03.04.03 Acabado de Concreto en Pisos 44,144.20 0.00 0.00 44,144.20 0.00 0.00
PISO DE CEMENTO PULIDO e = 4" C/F.
03.04.03.01 m2 384.86 74.74 28,764.44 28,764.44
PISO 0.00 0.00% - 0.00% 384.86 100.00% - 0.00% - 0.00% 100.00%
PISO DE CEMENTO SEMI PULIDO e = 4"
03.04.03.02 m2 226.04 68.04 15,379.76 15,379.76
C/F. PISO 0.00 0.00% - 0.00% 226.04 100.00% - 0.00% - 0.00% 100.00%
03.04.04 Patios y Veredas 4,466.44 0.00 0.00 4,466.44 0.00 0.00
PATIO Y VEREDA CONCRETO f´c = 175
03.04.04.01 Kg/cm², e=4" FROTACHADO Y BRUÑADO m2 71.33 60.73 4,331.87 4,331.87
S/DISEÑO 0.00 0.00% - 0.00% 71.33 100.00% - 0.00% - 0.00% 100.00%
RAMPA CEMENTO FROTACHADO Y
03.04.04.02 m2 8.49 15.85 134.57 134.57
BRUÑADO 0.00 0.00% - 0.00% 8.49 100.00% - 0.00% - 0.00% 100.00%
Zócalos y Contrazócalos
03.05 60,911.42 0.00 0.00 2,764.32 32,350.71 25,796.39
03.05.01 Zócalos 36,664.14 0.00 0.00 0.00 32,350.71 4,313.43
ZOCALO DE CERAMICA
03.05.01.01 ANTIDESLIZANTE DE 45X45cm, COLOR m2 514.44 71.27 36,664.14 32,350.71 4,313.43
0.00 0.00% - 0.00% - 0.00% 453.92 88.24% 31,135.13 11.76% 100.00%
BLANCO
03.05.02 Contrazócalos 21,482.96 0.00 0.00 0.00 0.00 21,482.96
CONTRAZOCALO DE CERAMICA
03.05.02.01 m 54.15 60.34 3,267.41 3,267.41
10X45cm 0.00 0.00% - 0.00% - 0.00% - 0.00% 2,932.22 100.00% 100.00%
CONTRAZOCALO SANITARIO DE
03.05.02.02 m 283.29 64.30 18,215.55 18,215.55
CERAMICO H=10CM 0.00 0.00% - 0.00% - 0.00% - 0.00% 80,253.24 100.00% 100.00%
03.05.03 Ceramica en Mesa de Concreto 2,764.32 0.00 0.00 2,764.32 0.00 0.00
CERAMICA 45x45CM EN MESAS DE
03.05.03.01 m2 34.14 80.97 2,764.32
CONCRETO 0.00 0.00% - 0.00% 34.14 2764.32 100.00% - 0.00% - 0.00% 100.00%
03.06 Carpintería de Madera 7,475.30 0.00 0.00 7,475.30 0.00 0.00
03.06.01 Puertas 7,475.30 0.00 0.00 7,475.30 0.00 0.00
PUERTA CONTRAPLACADA 50 mm
03.06.01.01 CON TRIPLAY 6 mm INCLUYE MARCO m2 3.78 382.37 1,445.36 1,445.36
CEDRO 2"X4" 0.00 0.00% - 0.00% 3.78 100.00% - 0.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL


Costo
ITEM PARTIDAS Und. Metrado Costo Parcial Valorizació Valorizació Valorización Valorización Valorizació
Unitario Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual
PUERTA DE MELAMINE PLANCHA DE
03.06.01.02 m2 20.51 294.00 6,029.94 6,029.94
18 mm INCLUYE PERFILES DE ALUMINIO 0.00 0.00% - 0.00% 20.51 100.00% - 0.00% - 0.00% 100.00%
Carpintería Metálica y Herrería
03.07 26,635.33 0.00 0.00 26,635.33 0.00 0.00
03.07.01 Ventanas de Fierro 8,429.20 0.00 0.00 8,429.20 0.00 0.00
VENTANA MARCO Y MALLA METALICA
03.07.01.01 m2 63.78 124.97 7,970.59 7,970.59
ACERADA 0.00 0.00% - 0.00% 63.78 100.00% - 0.00% - 0.00% 100.00%
VENTANA SOBRE MARCO DE 0.00 0.00% - 0.00% 2.88 100.00% - 0.00% - 0.00% 100.00%
03.07.01.02 m2 2.88 159.24 458.61 458.61
ALUMINIO
03.07.02 Puertas de Fierro 16,800.02 0.00 0.00 16,800.02 0.00 0.00
PUERTA DE UNA HOJA DE 1.00x2.30m,
03.07.02.01 und 1.00 1,323.00 1,323.00 0.00 0.00% - 0.00% 1.00 1,323.00 100.00% - 0.00% - 0.00% 100.00%
MATERIAL METALICO
PUERTA DE UNA HOJA DE 0.90x2.30m
03.07.02.02 und 1.00 935.90 935.90 0.00 0.00% - 0.00% 1.00 935.90 100.00% - 0.00% - 0.00% 100.00%
MATERIAL
PUERTAMETALICO
DE UNA HOJA DE 0.90x2.10m,
03.07.02.03 und 3.00 852.80 2,558.40 0.00 0.00% - 0.00% 3.00 2,558.40 100.00% - 0.00% - 0.00% 100.00%
MATERIAL METALICO
PUERTA DE DOS HOJAS DE 4.00x3.00
03.07.02.04 und 1.00 3,430.00 3,430.00 3,430.00
m BATIENTE, MATERIAL METALICO 0.00 0.00% - 0.00% 1.00 100.00% - 0.00% - 0.00% 100.00%
PUERTA ENRROLLABLE DE METAL DE
03.07.02.05 und 1.00 2,156.00 2,156.00 0.00 0.00% - 0.00% 1.00 2,156.00 100.00% - 0.00% - 0.00% 100.00%
UNA HOJA DE 2.00x2.80m
PUERTA DE UNA HOJA MATERIAL
03.07.02.06 m2 26.00 218.27 5,675.02 5,675.02
METALICO CON MALLA DE ACERADA 0.00 0.00% - 0.00% 26.00 100.00% - 0.00% - 0.00% 100.00%
PUERTA UNA HOJA VAIVEN MATERIAL
03.07.02.07 m2 3.20 225.53 721.70 721.70
METALICO CON MALLA ACERADA 0.00 0.00% - 0.00% 3.20 100.00% - 0.00% - 0.00% 100.00%
03.07.03 Pasamanos 1,406.11 0.00 0.00 1,406.11 0.00 0.00
PASAMANO DE TUBO F°G° DE 2" EN
03.07.03.01 m 12.95 108.58 1,406.11 1,406.11
RAMPA 0.00 0.00% - 0.00% 12.95 100.00% - 0.00% - 0.00% 100.00%
03.08 Cerrajería 4,354.76 0.00 0.00 3,816.09 538.67 0.00
03.08.01 Bisagras 2,596.92 0.00 0.00 2,596.92 0.00 0.00
BISAGRA DE ACERO ALUMINIZADO DE
03.08.01.01 pza 20.00 27.93 558.60 558.60
4"X4" PESADA EN PUERTAS METALICAS 0.00 0.00% - 0.00% 20.00 100.00% - 0.00% - 0.00% 100.00%
BISAGRA DE ACERO ALUMINIZADO DE
03.08.01.02 4"X3" PESADA EN PUERTAS Pza 26.00 25.97 675.22 675.22
CONTRAPLACADAS 0.00 0.00% - 0.00% 26.00 100.00% - 0.00% - 0.00% 100.00%
BISAGRA TIPO PISTON DE 4" EN
03.08.01.03 pza 43.00 31.70 1,363.10 1,363.10
PUERTAS CON MALLAS METALICA 0.00 0.00% - 0.00% 43.00 100.00% - 0.00% - 0.00% 100.00%
03.08.02 Cerradura 1,573.59 0.00 0.00 1,219.17 354.42 0.00
CERRADURA TIPO PARCHE DE 03
03.08.02.01 pza 5.00 61.18 305.90
GOLPES P/PUERTAS METALICAS 0.00 0.00% - 0.00% 5.00 305.9 100.00% - 0.00% - 0.00% 100.00%
CERRADURA TIPO PESADA DE 2
03.08.02.02 pza 4.00 67.03 268.12
GOLPES PARA PUERTA 0.00 0.00% - 0.00% 4.00 268.12 100.00% - 0.00% - 0.00% 100.00%
CERRADURA DE POMO P/PUERTAS
03.08.02.03 pza 11.00 58.65 645.15
CONTRAPLACADAS 0.00 0.00% - 0.00% 11.00 645.15 100.00% - 0.00% - 0.00% 100.00%
CERROJO PICAPORTE EN PUERTAS
03.08.02.04 pza 11.00 32.22 354.42
DE MALLA 0.00 0.00% - 0.00% - 0.00% 11.00 354.42 100.00% - 0.00% 100.00%
03.08.03 Accesorios
MANIJA DECierre
BRONCE 4" PARA 184.25 0.00 0.00 0.00 184.25 0.00
03.08.03.01 PUERTAS Pza 11.00 16.75 184.25 0.00 0.00% - 0.00% - 0.00% 11.00 184.25 100.00% - 0.00% 100.00%
Vidrios, Cristales y Similares
03.09 272.18 0.00 0.00 272.18 0.00 0.00
SUMINSTRO E INSTALACION DE VIDRIO
03.09.01 p2 31.00 8.78 272.18
TEMPLADO E=6 mm 0.00 0.00% - 0.00% 31.00 272.18 100.00% - 0.00% - 0.00% 100.00%
03.10 Cercos 16,819.26 0.00 0.00 12,013.76 4,805.50 0.00
CERCO DE MALLA GALVANIZADA TIPO
03.10.01 CICLON 2" x 2" x 4mm, COLUM. TUBO m2 63.01 266.93 16,819.26 12,013.76 4,805.50
NEGRO ESTR. CUAD. 3"x3"x3mm 0.00 0.00% - 0.00% 45.01 71.43% 18.00 28.57% - 0.00% 100.00%
03.11 Pintura 33,785.68 0.00 0.00 13,879.32 19,906.36 0.00
Pintura de Cielos Rasos, Vigas,
03.11.01 Columnas y Paredes 14,941.68 0.00 0.00 0.00 14,941.68 0.00
03.11.01.01 PINTURA LATEX 2 MANOS EN VIGAS m2 151.28 12.97 1,962.10 0.00 0.00% - 0.00% - 0.00% 151.28 1962.1 100.00% - 0.00% 100.00%
PINTURA LATEX 2 MANOS EN MUROS
03.11.01.02 Y COLUMNA m2 1,021.21 12.71 12,979.58
0.00 0.00% - 0.00% - 0.00% 1,021.21 12979.58 100.00% - 0.00% 100.00%
Pintura de Puertas y Ventanas
03.11.02 581.50 0.00 0.00 581.50 0.00 0.00
PINTURA BARNIZ EN CARPINTERIA DE
03.11.02.01 m2 24.29 23.94 581.50
MADERA 0.00 0.00% - 0.00% 24.29 581.5 100.00% - 0.00% - 0.00% 100.00%
03.11.03 Pintura de Estructuras Metalicas 1,650.66 0.00 0.00 848.42 802.24 0.00
PINTURA ANTICORROSIVA Y
03.11.03.01 ESMALTE 2 MANOS EN BARRAS DE m 9.50 4.86 46.17
0.00 0.00% - 0.00% 9.50 46.17 100.00% - 0.00% - 0.00% 100.00%
SEGURIDAD
PINTURA ANTICORROSIVA Y ESMALTE
03.11.03.02 m2 111.50 14.39 1,604.49
2 MANOS PTA. Y VENT. 0.00 0.00% - 0.00% 55.75 802.25 50.00% 55.75 802.24 50.00% - 0.00% 100.00%
03.11.04 Varios 16,611.84 0.00 0.00 12,449.40 4,162.44 0.00
03.11.04.01 LIMPIEZA FINAL DE LA OBRA glb 1.00 2,382.34 2,382.34 2,382.34 0.00%
MEJORAMIENTO DE VENTANAS Y
03.11.04.02 glb 1.00 1,780.10 1,780.10 1,780.10
PUERTA EN FACHADA PRINCIPAL 0.00%
COLOCACION DE CORTINAS DE
03.11.04.03 m2 30.29 352.77 10,685.40 0.00 0.00% - 0.00% 30.29 10,685.40 100.00% - 0.00% - 0.00% 100.00%
PVC,SEGÚN DISEÑO
TAPA DE CISTERNA Y TANQUE
03.11.04.04 glb 1.00 1,764.00 1,764.00 0.00 0.00% - 0.00% 1.00 1,764.00 100.00% - 0.00% - 0.00% 100.00%
ELEVADO
INSTALACIONES SANITARIAS
04 72,566.55 0.00 0.00 4,560.45 68,006.10 0.00
04.01 Aparatos Sanitarios y Accesorios 6,683.03 0.00 0.00 0.00 6,683.03 0.00
SUMINISTRO E INSTALACION DE
04.01.01 INODORO ONEPIECE MEDITERRAANEO und 3.00 609.10 1,827.30
BLANCO 0.00 0.00% - 0.00% - 0.00% 3.00 1827.3 100.00% - 0.00% 100.00%
SUMINISTRO E INSTALACION DE
04.01.02 und 2.00 422.07 844.14
URINARIO CADET 0.00 0.00% - 0.00% - 0.00% 2.00 844.14 100.00% - 0.00% 100.00%
SUMINISTRO E INSTALACION DE
04.01.03 und 4.00 291.86 1,167.44
LAVATORIO AVANTE COLOR BLANCO 0.00 0.00% - 0.00% - 0.00% 4.00 1167.44 100.00% - 0.00% 100.00%
DUCHA SIMPLE CON GRIFERIA 0.00 0.00% - 0.00% - 0.00% 4.00 632.2 100.00% - 0.00% 100.00%
04.01.04 Pto 4.00 158.05 632.20
04.01.05 ACCESORIOS DE BAÑOS glb 1.00 417.98 417.98 0.00 0.00% - 0.00% - 0.00% 1.00 417.98 100.00% - 0.00% 100.00%
04.01.06 LLAVE ESFERICA DE 1/2" und 31.00 57.87 1,793.97 0.00 0.00% - 0.00% - 0.00% 31.00 1,793.97 100.00% - 0.00% 100.00%
04.02 Sistema de Agua Fría 14,968.35 0.00 0.00 0.00 14,968.35 0.00
04.02.01 EMPALME A RED EXISTENTE AGUA und 1.00 94.35 94.35 0.00 0.00% - 0.00% - 0.00% 1.00 94.35 100.00% - 0.00% 100.00%
04.02.02 SALIDA DE AGUA FRIA - PVC Pto 49.00 140.22 6,870.78 0.00 0.00% - 0.00% - 0.00% 49.00 6,870.78 100.00% - 0.00% 100.00%
04.02.03 TUBERIA PVC CLASE 10-1/2" ROSCADA m 30.75 17.18 528.29 0.00 0.00% - 0.00% - 0.00% 30.75 528.29 100.00% - 0.00% 100.00%
CRONOGRAMA VALORIZADO EJECUCION DE OBRA
Proyecto: “MEJORAMIENTO DEL SERVICIO DE FAENADO EN EL CAMAL MUNICIPAL CATEGORIA 1 DEL DISTRITO DE MOTUPE, PROVINCIA DE LAMBAYEQUE, DEPARTAMENTO DE LAMBAYEQUE”

MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL


Costo
ITEM PARTIDAS Und. Metrado Costo Parcial Valorizació Valorizació Valorización Valorización Valorizació
Unitario Metrado % Metrado % Metrado % Metrado % Metrado % %
n Mensual n Mensual Mensual Mensual n Mensual
04.02.04 TUBERIA PVC CLASE 10-3/4" ROSCADA m 36.54 19.24 703.03 0.00 0.00% - 0.00% - 0.00% 36.54 703.03 100.00% - 0.00% 100.00%
04.02.05 TUBERIA PVC CLASE 10-1" ROSCADA m 36.47 23.42 854.13 0.00 0.00% - 0.00% - 0.00% 36.47 854.13 100.00% - 0.00% 100.00%
04.02.06 TUBERIA PVC CLASE 10 1 1/2" ROSCADA m 16.60 16.17 268.42 0.00 0.00% - 0.00% - 0.00% 16.60 268.42 100.00% - 0.00% 100.00%
04.02.07 TUBERIA PVC CLASE 10 2" ROSCADA m 54.56 38.49 2,100.01 0.00 0.00% - 0.00% - 0.00% 54.56 2,100.01 100.00% - 0.00% 100.00%
04.02.08 VALVULA COMPUERTA DE BRONCE 3/4" und 2.00 138.85 277.70 0.00 0.00% - 0.00% - 0.00% 2.00 277.70 100.00% - 0.00% 100.00%
04.02.09 VALVULA COMPUERTA DE BRONCE 2" und 2.00 303.28 606.56 0.00 0.00% - 0.00% - 0.00% 2.00 606.56 100.00% - 0.00% 100.00%
04.02.10 UNION UNIVERSAL DE 2" und 2.00 99.99 199.98 0.00 0.00% - 0.00% - 0.00% 2.00 199.98 100.00% - 0.00% 100.00%
04.02.11 VALVULA CHECK DE BRONCE DE 2" und 1.00 337.67 337.67 0.00 0.00% - 0.00% - 0.00% 1.00 337.67 100.00% - 0.00% 100.00%
04.02.12 REBOSE DE TANQUE ELEVADO F°G° 2" und 2.00 78.64 157.28 0.00 0.00% - 0.00% - 0.00% 2.00 157.28 100.00% - 0.00% 100.00%
CAJA Y TAPA METALICA PARA
04.02.13 und 4.00 66.28 265.12 265.12
VALVULAS EN PARED 0.00 0.00% - 0.00% - 0.00% 4.00 100.00% - 0.00% 100.00%
GRIFO DE RIEGO INCL. CAJUELA DE
04.02.14 und 1.00 620.32 620.32 620.32
CONCRETO 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
EQUIPO DE BOMBEO 02
04.02.15 und 1.00 1,084.71 1,084.71 1,084.71
ELECTROBOMBAS 1.50 HP 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
Sistema de Desagüe y Ventilación
04.03 20,532.40 0.00 0.00 0.00 20,532.40 0.00
04.03.01 EMPALME A RED EXISTENTE, DESAGUE und 2.00 100.87 201.74 0.00 0.00% - 0.00% - 0.00% 2.00 201.74 100.00% - 0.00% 100.00%
SALIDA DE PVC-SAL PARA DESAGUE DE 0.00 0.00% - 0.00% - 0.00% 31.00 100.00% - 0.00% 100.00%
04.03.02 PTO 31.00 204.90 6,351.90 6,351.90
2" SALIDA DE PVC-SAL PARA DESAGUE DE
04.03.03 PTO 3.00 138.92 416.76 0.00 0.00% - 0.00% - 0.00% 3.00 416.76 100.00% - 0.00% 100.00%
4" SALIDA VENTILACION PVC-SAP Ø2"
04.03.04 SOMBRERO DE VENTILACION PVC-SAL PTO 3.00 79.42 238.26 0.00 0.00% - 0.00% - 0.00% 3.00 238.26 100.00% - 0.00% 100.00%
04.03.05 Ø2" Und 2.00 12.33 24.66 0.00 0.00% - 0.00% - 0.00% 2.00 24.66 100.00% - 0.00% 100.00%
EXCAVACION DE ZANJAS PARA RED
04.03.06 m3 16.12 27.88 449.43 449.43
EXT. SANIT. 0.00 0.00% - 0.00% - 0.00% 16.12 100.00% - 0.00% 100.00%
RELLENO MANUAL CON MATERIAL
04.03.07 m3 17.02 23.24 395.54 395.54
PROPIO (REDES EXT. SANIT.) 0.00 0.00% - 0.00% - 0.00% 17.02 100.00% - 0.00% 100.00%
04.03.08 TUBERIA PVC SAL 2" m 40.46 29.88 1,208.94 0.00 0.00% - 0.00% - 0.00% 40.46 1,208.94 100.00% - 0.00% 100.00%
04.03.09 TUBERIA PVC SAL 3" m 41.54 36.60 1,520.36 0.00 0.00% - 0.00% - 0.00% 41.54 1,520.36 100.00% - 0.00% 100.00%
04.03.10 TUBERIA PVC-SAL 4" m 113.44 39.99 4,536.47 0.00 0.00% - 0.00% - 0.00% 113.44 4,536.47 100.00% - 0.00% 100.00%
04.03.11 REGISTRO DE BRONCE 4" und 8.00 82.41 659.28 0.00 0.00% - 0.00% - 0.00% 8.00 659.28 100.00% - 0.00% 100.00%
04.03.12 REGISTRO DE BRONCE 3" und 3.00 49.96 149.88 0.00 0.00% - 0.00% - 0.00% 3.00 149.88 100.00% - 0.00% 100.00%
04.03.13 SUMIDERO DE BRONCE 4" und 4.00 226.67 906.68 0.00 0.00% - 0.00% - 0.00% 4.00 906.68 100.00% - 0.00% 100.00%
04.03.14 SUMIDERO DE BRONCE 3" und 8.00 116.16 929.28 0.00 0.00% - 0.00% - 0.00% 8.00 929.28 100.00% - 0.00% 100.00%
04.03.15 SUMIDERO DE BRONCE 2" und 14.00 116.07 1,624.98 0.00 0.00% - 0.00% - 0.00% 14.00 1,624.98 100.00% - 0.00% 100.00%
CAJA DE REGISTRO PREFABRIC.
04.03.16 und 8.00 114.78 918.24 918.24
12"X24" C/TAPA CONCRETO 0.00 0.00% - 0.00% - 0.00% 8.00 100.00% - 0.00% 100.00%
04.04 Sistema de Drenaje Pluvial 30,382.77 0.00 0.00 4,560.45 25,822.32 0.00
TUBERIA DE BAJADA PVC-SAP 2"
04.04.01 m 13.60 39.65 539.24 539.24
P/LLUVIAS 0.00 0.00% - 0.00% 13.60 100.00% - 0.00% - 0.00% 100.00%
04.04.02 TUBERIA PVC SAL 3" RED EXTERIOR m 10.16 16.43 166.93 0.00 0.00% - 0.00% 10.16 166.93 100.00% - 0.00% - 0.00% 100.00%
CANALETA DE FIERRO GALVANIZADO
04.04.03 m 66.66 57.82 3,854.28 3,854.28
e=0.90mm, P/EVAC. PLUVIAL 0.00 0.00% - 0.00% 66.66 100.00% - 0.00% - 0.00% 100.00%
CANAL RECT. DE CONCRETO f’c’=175
04.04.04 m 114.96 224.62 25,822.32 25,822.32
Kg/cm2 CON REJILLA METALICA-PISOS 0.00 0.00% - 0.00% - 0.00% 114.96 100.00% - 0.00% 100.00%
05 INSTALACIONES ELECTRICAS 37,993.87 0.00 0.00 0.00 37,993.87 0.00
05.01 Conexion a Red Existente 183.43 0.00 0.00 0.00 183.43 0.00
05.01.01 CONEXION A RED EXISTENTE und 1.00 183.43 183.43 0.00 0.00% - 0.00% - 0.00% 1.00 183.43 100.00% - 0.00% 100.00%
Salida para Alumbrado, Tomacorrientes,
05.02 11,470.46 0.00 0.00 0.00 11,470.46 0.00
Fuerza
05.02.01 SALIDA DE TECHO (CENTRO DE LUZ) Pto 43.00 79.28 3,409.04 0.00 0.00% - 0.00% - 0.00% 43.00 3,409.04 100.00% - 0.00% 100.00%
05.02.02 SALIDA PARA BRAQUETE (PARED) pto 7.00 142.89 1,000.23 0.00 0.00% - 0.00% - 0.00% 7.00 1,000.23 100.00% - 0.00% 100.00%
SALIDA PARA INTERRUPTOR DE 01 0.00 0.00% - 0.00% - 0.00% 17.00 100.00% - 0.00% 100.00%
05.02.03 Pto 17.00 57.43 976.31 976.31
GOLPE
SALIDA PARA INTERRUPTOR DE 02
05.02.04 Pto 2.00 58.57 117.14 117.14
GOLPES 0.00 0.00% - 0.00% - 0.00% 2.00 100.00% - 0.00% 100.00%
SALIDA PARA INTERRUPTOR DE
05.02.05 pto 12.00 59.23 710.76 710.76
CONMUTACION 0.00 0.00% - 0.00% - 0.00% 12.00 100.00% - 0.00% 100.00%
SALIDA TOMACORRIENTE DOBLE CON
05.02.06 Pto 12.00 96.01 1,152.12 1,152.12
PUESTA A TIERRA 0.00 0.00% - 0.00% - 0.00% 12.00 100.00% - 0.00% 100.00%
SALIDA TOMACORRIENTE DOBLE
05.02.07 APRUEBA DE AGUA CON LINEA DE TIERRA Pto 16.00 153.04 2,448.64 2,448.64
0.00 0.00% - 0.00% - 0.00% 16.00 100.00% - 0.00% 100.00%
05.02.08 SALIDA PARA LUZ DE EMERGENCIA pto 11.00 110.27 1,212.97 0.00 0.00% - 0.00% - 0.00% 11.00 1,212.97 100.00% - 0.00% 100.00%
SALIDA DE FUERZA P/BALANZA
05.02.09 pto 1.00 143.18 143.18 143.18
ELECTRONICA 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
SALIDA DE FUERZA P/ ESTERILIZADOR
05.02.10 pto 1.00 136.92 136.92 136.92
DE CUCHILLOS 0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
05.02.11 SALIDA DE FUERZA P/ CREMATORIO pto 1.00 163.15 163.15 0.00 0.00% - 0.00% - 0.00% 1.00 163.15 100.00% - 0.00% 100.00%
Canalización para Tuberías
05.03 58.12 0.00 0.00 0.00 58.12 0.00
EXCAVACIÓN DE ZANJA PARA REDES
05.03.01 m3 2.60 9.47 24.62
ELÉCTRICAS Y COMUNICACIONES 0.00 0.00% - 0.00% - 0.00% 2.60 24.62 100.00% - 0.00% 100.00%
RELLENO MANUAL CON MATERIAL
05.03.02 PROPIO (REDES ELÉCTRICAS Y m3 2.08 11.37 23.65
COMUNICACIONES) 0.00 0.00% - 0.00% - 0.00% 2.08 23.65 100.00% - 0.00% 100.00%
ELIMINACION DE MATERIAL 0.00 0.00% - 0.00% - 0.00% 0.52 9.85 100.00% - 0.00% 100.00%
05.03.03 m3 0.52 18.95 9.85
EXCEDENTE
05.04 Tuberias 2,734.25 0.00 0.00 0.00 2,734.25 0.00
05.04.01 TUBERÍA PVC-P 20mm m 178.12 13.74 2,447.37 0.00 0.00% - 0.00% - 0.00% 178.12 2,447.37 100.00% - 0.00% 100.00%
05.04.02 TUBERÍA PVC-P 35mm m 13.50 21.25 286.88 0.00 0.00% - 0.00% - 0.00% 13.50 286.88 100.00% - 0.00% 100.00%
05.05 Cajas de Distribucion 405.78 0.00 0.00 0.00 405.78 0.00
CAJA DE PASE F°G° 8x8x4"
05.05.01 und 6.00 67.63 405.78
(200x200x100mm) 0.00 0.00% - 0.00% - 0.00% 6.00 405.78 100.00% - 0.00% 100.00%
05.06 Tableros Electricos 2,709.70 0.00 0.00 0.00 2,709.70 0.00

TAB.GEN.3x60A;5-2x10A;4-3x10A;4-
05.06.01 und 1.00 2,709.70 2,709.70 2,709.70
2x16A;1-3x25A;12-IDF 25AMP
0.00 0.00% - 0.00% - 0.00% 1.00 100.00% - 0.00% 100.00%
05.07 Alimentadores 765.23 0.00 0.00 0.00 765.23 0.00
ALIM. 3-1x25mm2+1-1x25mm2+1-10mm2
05.07.01 m 7.95 94.14 748.41 748.41
N2XOH 0.00 0.00% - 0.00% - 0.00% 7.95 100.00% - 0.00% 100.00%
CABLE DE COBRE DESNUDO 1x50mm2,
05.07.02 m 2.95 5.70 16.82 16.82
TEMPLE BLANDO 0.00 0.00% - 0.00% - 0.00% 2.95 100.03% - 0.00% 100.03%
05.08 Sistema Puesta a Tierra 959.11 0.00 0.00 0.00 959.11 0.00
POZO PUESTA A TIERRA PT-1 (R<15 0.00 0.00% - 0.00% - 0.00% 1.00 959.11 100.00% - 0.00% 100.00%
05.08.01 und 1.00 959.11 959.11
OHM)
05.09 Artefactos Electricos 18,707.79 0.00 0.00 0.00 18,707.79 0.00
ARTEFACTO FLUORESCENTE 2 x 36 W
05.09.01 (SIM. JOSFEL) COLGANTES INCL. und 43.00 330.81 14,224.83 14,224.83
ACCESORIOS 0.00 0.00% - 0.00% - 0.00% 43.00 100.00% - 0.00% 100.00%
ARTEFACTO DE ILUMINACIÓN DE
05.09.02 EMERGENCIA CON DOS LÁMPARAS DE und 11.00 307.90 3,386.90 3,386.90
20W, CON DOS HORAS DE AUTONOMÍA 0.00 0.00% - 0.00% - 0.00% 11.00 100.00% - 0.00% 100.00%
ARTEFACTO DE ILUMINACIÓN TIPO
05.09.03 und 7.00 156.58 1,096.06 1,096.06
SPOT LIGHT 0.00 0.00% - 0.00% - 0.00% 7.00 100.00% - 0.00% 100.00%
06 Mobiliario 24,825.20 0.00 0.00 0.00 24,825.20 0.00
06.01 ESCRITORIO 1.30x0.60 und 6.00 1,705.20 10,231.20 0.00 0.00% - 0.00% - 0.00% 6.00 10,231.20 100.00% - 0.00% 100.00%
06.02 SILLA METALICA und 6.00 764.40 4,586.40 0.00 0.00% - 0.00% - 0.00% 6.00 4,586.40 100.00% - 0.00% 100.00%
06.03 SILLA GIRATORIA und 4.00 664.40 2,657.60 0.00 0.00% - 0.00% - 0.00% 4.00 2,657.60 100.00% - 0.00% 100.00%
06.04 ESTANTE DE ANGULO RANURADO und 3.00 2,205.00 6,615.00 0.00 0.00% - 0.00% - 0.00% 3.00 6,615.00 100.00% - 0.00% 100.00%
06.05 SILLA DE ESPERA - 3 ASIENTOS und 1.00 735.00 735.00 0.00 0.00% - 0.00% - 0.00% 1.00 735.00 100.00% - 0.00% 100.00%
07 Equipamiento 155,151.78 0.00 0.00 0.00 39,378.59 115,773.19
07.01 CAJÓN DE ATURDIMIENTO und 1.00 18,210.59 18,210.59 0.00 0.00% - 0.00% - 0.00% 1.00 18210.59 100.00% - 0.00% 100.00%
ESTERILIZADOR DE CUCHILLO
07.02 und 2.00 10,584.00 21,168.00 0.00 0.00% - 0.00% - 0.00% 2.00 21168 100.00% - 0.00% 100.00%
ELECTRICO
07.03 PISTOLA DE ATURDIMIENTO BOVINO und 1.00 31,773.77 31,773.77 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 31773.77 100.00% 100.00%
07.04 PARRILLA METÁLICA MÓVIL BOVINOS und 1.00 4,152.55 4,152.55 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 4152.55 100.00% 100.00%
07.05 PARRILLA METÁLICA MÓVIL PORCINOS und 1.00 3,322.03 3,322.03 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 3322.03 100.00% 100.00%
PLATAFORMA METÁLICA 1.20X0.70 CON 1.00
07.06 und 13,815.51 13,815.51
ESCALONES 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 13815.51 100.00% 100.00%
07.07 MANILUVIO DE ACERO A PEDAL und 3.00 2,499.00 7,497.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 9.00 7497 100.00% 100.00%
07.08 POZA DE LAVADO DE BOTAS und 2.00 1,000.00 2,000.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 2000 100.00% 100.00%
07.09 BALANZA ELECTRONICA und 1.00 1,677.97 1,677.97 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 1677.97 100.00% 100.00%
MESA DE INSPECCION DE ACERO 1.00
07.10 und 2,300.00 2,300.00
INOXIDABLE 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 2300 100.00% 100.00%
ESTANTE CON GANCHOS PARA 0.00 0.00% - 0.00% - 0.00% - 0.00% 1.00 1930 100.00% 100.00%
07.11 und 1.00 1,930.00 1,930.00
VISCERAS
COLGADORES EMPOTRADO DE 2.00
07.12 und 4,508.00 9,016.00
VISCERAS C/10 GANCHOS 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 9016 100.00% 100.00%
CARRO TRANSPORTADOR TIPO BUGGY 2.00
07.13 und 5,400.00 10,800.00
(CABEZAS Y PATAS) 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 10800 100.00% 100.00%
CARRETILLA DE MANO ACERO 3.00
07.14 und 637.00 1,911.00
GALVANIZADO 0.00 0.00% - 0.00% - 0.00% - 0.00% 9.00 1911 100.00% 100.00%
07.15 GANCHOS DE ACERO PARA OREO und 60.00 147.00 8,820.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 3,600.00 8820 100.00% 100.00%
07.16 BANDEJA DE ACERO INOXIDABLE und 4.00 1,494.91 5,979.64 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 5979.64 100.00% 100.00%
07.17 RECIPIENTE PARA DESANGRADO MOVIL glb 2.00 800.00 1,600.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 1600 100.00% 100.00%
07.18 COCINA INDUSTRIAL 03 HORNILLAS und 2.00 1,355.92 2,711.84 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 2711.84 100.00% 100.00%
07.19 BALÓN DE GAS DE 45KG und 2.00 740.88 1,481.76 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 1481.76 100.00% 100.00%
07.20 OLLA #50 DE 80LTS 4mm DE ESPESOR und 4.00 539.00 2,156.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 16.00 2156 100.00% 100.00%
CONTENEDORES PARA BASURA DE 240 2.00
07.21 und 483.06 966.12
LTS 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 966.12 100.00% 100.00%
07.22 LOCKERS 2 CUERPOS/6 PUERTAS und 2.00 931.00 1,862.00 0.00 0.00% - 0.00% - 0.00% - 0.00% 4.00 1862 100.00% 100.00%

Costo Directo Total 1,364,250.25 140,103.73 10.27% 297,366.17 21.80% 494,518.33 36.25% 288,273.81 21.13% 143,988.21 10.55% 100.00%
Costo Gastos Generales 9.10% 124,146.77 12,749.44 27,060.32 45,001.17 26,232.92 13,102.92
Costo Utilidad 6.50% 88,676.27 9,106.74 19,328.80 32,143.69 18,737.80 9,359.24
I.G.V. 18% 283,873.19 29,152.78 61,875.95 102,899.37 59,984.02 29,961.07
Valor Referencial 1,860,946.48 191,112.69 405,631.24 674,562.56 393,228.55 196,411.44

% Avance Fisico Programado 100.00% 10.27% 21.80% 36.25% 21.13% 10.55% 100.00%
OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD EN LA CONSTRUCCION
Obras Provisionales y Trabajos Preliminares
Construcciones Provisionales
ALMACEN Y CASETA DE GUARDIANIA Glb 1.00 197.39
CARTEL DE OBRA 4.80mX3.60m Und 1.00 1,201.42
Instalaciones Provisionales
ENERGIA ELECTRICA PROVISIONAL Mes 4.00 113.99
Flete Terrestre
FLETE TERRESTRE Glb 1.00 12,208.54
Remociones
DESMONTAJE DE PUERTAS m2 41.64 5.53
DESMONTAJE DE VENTANAS m2 6.00 3.32
DESMONTAJE DE REJILLA METALICA EN CANALETAS DE PISOS
m2 26.56 3.32
DESMONTAJE DE TECHO DE ETERNIT DE FIBROCEMENTO m2 557.26 20.27
DESMONTAJE DE ESTRUCTURA METALICA m 13.62 285.52
DESMONTAJE DE COLUMNAS METALICAS und 32.00 70.48
Demoliciones
DEMOLICION DE MUROS DE LADRILLO m3 95.46 11.09
DEMOLICION DE ESTRUCTURAS DE CONCRETO m3 76.22 61.51
ACARREO INTERNO, MATERIAL PROCEDENTE DE DEMOLICION m3 171.68 19.77
ELIMINACION DE MATERIAL PROVENIENTE DE DEMOLICIONES m3 171.68 25.91
Trazo, Niveles y Replanteo
TRAZO Y REPLANTEO PRELIMINAR m2 1,087.84 1.44
Seguridad y Salud en la Construcción
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLA Glb 1.00 2,000.00
EQUIPOS DE PROTECCION INDIVIDUAL Und 25.00 373.87
EQUIPO DE PROTECCION COLECTIVA Glb 1.00 2,076.65
SEÑALIZACION TEMPORAL DE SEGURIDAD Glb 1.00 1,745.34
RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURI Glb 1.00 2,553.22
Plan para la Vigilancia, Prevencion y Control de Covid-19 en Obra
IMPLEMENTACION DE ZONA DE CONTROL glb 1.00 1,048.75
TOMA DE TEMPERATURA Y PULSIOXIMETRIA glb 1.00 996.76
DESINFECCION DE PERSONAL Día 120.00 3.60
ZONA DE LAVADO DE MANOS und 1.00 432.40
ZONA DE ENTREGA DE MATERIALES glb 1.00 598.00
IMPLEMENTACION DE AREA PARA ENFERMERIA glb 1.00 555.81
IMPLEMENTACION DE ENFERMERIA glb 1.00 1,168.32
CONTENEDORES PARA DESECHOS und 1.00 92.25
DESINFECCION DE AMBIENTES DE TRABAJO Día 120.00 19.10
DESINFECCION DE MATERIALES, EQUIPOS Y HERRAMIENTAS Día 120.00 38.81
EQUIPOS DE PROTECCIÓN INDIVIUAL CONTRA EL COVID - 19 und 1.00 349.34
IMPLEMENTACION DE COMEDOR glb 1.00 2,273.96
DESINFECCION DE COMEDOR Día 120.00 7.48
SEÑAL INFORMATIVA EN INGRESO A OBRA und 1.00 27.10
SEÑAL INFORMATIVA DENTRO DE LA OBRA und 1.00 27.10
SEÑALIZACION DE RUTAS PARA VACIADO glb 1.00 28.56
MOVILIZACION DE PERSONAL Día 120.00 50.57
ESTRUCTURAS
Movimiento de Tierras
Excavaciones
EXCAVACION DE ZANJAS Y ZAPATAS Rt<2 Kg/cm² h=1.20m m3 82.21 34.57
EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS m3 142.66 34.57
Rellenos
RELLENO CON ARENA FINA E=4" m2 838.43 11.41
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 89.54 26.33
Nivelación Interior y Apisonado
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO, PAT m2 838.43 4.84
AFIRMADO DE 6" PARA PISOS INTERIORES Y EXTERIORES m2 838.43 19.54
BASE DE AFIRMADO COMPACTADO DE 8" m2 63.24 23.96
Eliminación de Material Excedente
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIO m3 180.31 17.28
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA m3 180.31 25.22
Obras de Concreto Simple
Cimientos
CIMIENTOS CORRIDOS 1:10 + 30 % P.G. f'c >=100 Kg/cm². m3 79.84 284.40
Sobrecimiento
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c >=100 Kg/cm² m3 2.47 323.74
SOBRECIMIENTO ENCONFRADO Y DESENCOFRADO m2 27.59 54.13
Solado
SOLADO PARA ZAPATAS e = 4" f'c=175 kg/cm2 m2 195.78 27.34
Falso Piso
FALSO PISO f´c = 100 Kg/cm², e=4" m2 755.73 38.37
Pediluvio/Rodaluvio
PEDILUVIO/RODALUVIO - CONCRETO F'c = 175 kg/cm2, E=4" m2 1.53 49.39
PEDILUVIO/RODALUVIO - ENCOFRADO Y DESENCOFRADO m2 6.85 44.87
Bebederos
BEBEDEROS - CONCRETO F'c = 175 kg/cm2, E=4" m3 2.05 356.61
BEBEDEROS - ENCOFRADO Y DESENCOFRADO m2 31.67 28.50
Obras de Concreto Armado
Zapatas
ZAPATAS.- CONCRETO f´c = 210 Kg/cm² m3 31.62 439.78
ZAPATAS.- ACERO fy = 4,200 Kg/cm² Kg 813.78 6.42
Sobrecimiento Reforzado
SOBRECIMIENTO REFORZADO.- CONCRETO F'c=175 kg/cm2 m3 37.72 403.04
SOBRECIMIENTO REFORZADO.- ENCOFRADO Y DESENCOFRA m2 503.48 50.33
SOBRECIMIENTO REFORZADO.- ACERO fy = 4,200 Kg/cm² Kg 1,309.14 6.42
Columnas
COLUMNAS - CONCRETO 210 KG/CM² - 1er PISO m3 27.74 536.12
COLUMNAS.- ENCOFRADO Y DESENCOFRADO m2 263.61 77.21
COLUMNAS.- ACERO fy = 4,200 Kg/cm² Kg 4,980.89 6.42
Vigas
VIGAS.- CONCRETO 210 kg/cm2 - 1er PISO m3 14.21 417.89
VIGAS.- ENCOFRADO Y DESENCOFRADO m2 151.28 91.11
VIGAS.- ACERO fy = 4,200 Kg/cm² Kg 2,387.49 6.42
Losas
LOSA ALIGERADA.- CONCRETO f´c = 210 Kg/cm² m3 0.45 417.14
LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO m2 5.09 71.64
LOSA ALIGERADA.- ACERO fy = 4,200 Kg/cm² Kg 43.56 6.42
LOSA ALIGERADA.- LADRILLO HUECO 15X30X30cm Und 42.38 4.70
LOSAS MACIZAS.- CONCRETO f´c = 210 Kg/cm² - 01 PISO m3 0.58 403.06
LOSAS MACIZAS.- ENCOFRADO Y DESENCOFRADO m2 2.38 74.73
LOSAS MACIZAS.- ACERO fy = 4,200 Kg/cm² Kg 97.94 6.42
Escaleras
ESCALERAS.- CONCRETO f´c =175 Kg/cm² m3 0.47 513.58
ESCALERAS.- ENCOFRADO Y DESENCOFRADO m2 9.52 98.29
ESCALERAS.- ACERO fy = 4,200 Kg/cm² Kg 14.66 6.42
Cisternas
CISTERNA.- CONCRETO f´c = 280 Kg/cm² m3 8.07 637.84
CISTERNA.- ENCOFRADO Y DESENCOFRADO m2 49.10 68.79
CISTERNA.- ACERO fy = 4,200 Kg/cm² Kg 1,147.44 6.42
Tanque Elevado
TANQUE ELEVADO.- CONCRETO 210 kg/cm2 m3 5.04 527.49
TANQUE ELEVADO.- ENCOFRADO Y DESENCOFRADO m2 45.47 90.48
TANQUE ELEVADO, ACERO fy=4200 kg/cm2 Kg 573.80 6.32
Trampas de Grasa
TRAMPA DE GRASAS.- CONCRETO f´c = 210 Kg/cm² m3 3.51 391.88
TRAMPA DE GRASAS.- ENCOFRADO Y DESENCOFRADO m2 30.03 52.31
TRAMPA DE GRASAS.- ACERO fy = 4,200 Kg/cm² kg 191.00 5.50
Camara de rejas
CAMARA DE REJAS - CONCRETO f´c = 210 Kg/cm² m3 2.88 391.88
CAMARA DE REJAS.- ENCOFRADO Y DESENCOFRADO m2 29.49 52.31
CAMARA DE REJAS.- ACERO fy = 4,200 Kg/cm² kg 163.14 5.50
Pozo de Sedimentacion
POZO DE SEDIMENTACION.- CONCRETO f´c = 210 Kg/cm² m3 3.92 391.88
POZO DE SEDIMENTACION.- ENCOFRADO Y DESENCOFRADO m2 36.03 52.31
POZO DE SEDIMENTACION.- ACERO fy = 4,200 Kg/cm² kg 212.81 5.50
Rampas
RAMPAS - CONCRETO f´c = 175 Kg/cm² m2 0.96 44.69
RAMPAS - ENCOFRADO Y DESENCOFRADO m2 1.83 44.87
RAMPAS - ACERO fy = 4200 Kg/cm² m2 50.77 6.32
Mesa de Concreto
MESAS DE CONCRETO - CONCRETO F'c = 210 kg/cm2 m3 5.69 391.88
MESA DE CONCRETO - ENCOFRADO Y DESENCOFRADO m2 66.54 52.31
MESA DE CONCRETO - ACERO DE REFUERZO FY=4200 kg/cm2 kg 132.97 5.50
Estructuras Metálicas
Tijerales Metalicos
CERCHA TIPO I SEGÚN DISEÑO.INCL. SUMINISTRO E INSTALA und 5.00 1,227.04
Columnas Metálicas
COLUMNAS METALICAS DE TUBO CUADRADO DE 4"x4"x2.5mm und 12.00 56.10
PORTICO METALICO DE TUBO REDONDO DE 4"x 3mm (INC.ANC und 19.00 59.80
Vigas Metalicas
VIGUETAS METALICAS C/TUBO DE FIERRO NEGRO ESTRUCTU m 117.50 16.94
ESTRUCTURA VIGA DE 100mm x 100mm, e=2.50 mm METÁL m 187.39 56.10
ESTRUCTURA TUBO DE 100mm x50mm, e=2.5mm METÁLICA m 289.96 39.45
CORREA DE 25mm x 50mm, e=2.5mm METÁLICA PARA COBER m 180.11 31.33
Cobertura
COBERTURA DE PLANCHA DE CALMINON TI, E=0.40MM m2 811.49 99.22
Varios
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
m 32.40 8.90
TAPA JUNTA DE DILATACION CON ESPUNA+JEBE MICROPOROS m 9.60 21.12
ARQUITECTURA
Muros y Tabiques de Albañilería
MURO DE LADRILLO KK TIPO IV SOGA; MEZCLA 1:4 (e=1.5cm) m2 604.95 81.68
ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS Kg 446.33 6.32
Revoques y Revestimientos
TARRAJEO EN MURO: TARRAJEO PRIMARIO m2 514.44 25.27
TARRAJEO EN MURO: INTERIOR Y EXTERIOR m2 828.63 25.47
TARRAJEO DE COLUMNAS m2 125.28 39.16
TARRAJEO DE VIGAS m2 151.28 54.81
TARRAJEO CON IMPERMEABILIZANTE m2 52.78 33.03
VESTIDURA DE DERRAMES, MORTERO C:A 1:5 m 169.48 16.70
Pisos y Pavimentos
Contrapisos
CONTRAPISO DE 40 mm m2 51.82 29.17
CONTRAPISO DE 4" ACABADO PULIDO, ZONA MUEBLES BAJOS m2 27.94 27.42
Pisos
PISO CERAMICO ANTIDESLIZANTE 0.45 x 0.45 m SERIE COLOR m2 51.82 62.83
PISO DE CANTO RODADO ASENTADO FRAGUADO m2 67.87 77.65
Acabado de Concreto en Pisos
PISO DE CEMENTO PULIDO e = 4" C/F. PISO m2 384.86 70.85
PISO DE CEMENTO SEMI PULIDO e = 4" C/F. PISO m2 226.04 64.18
Patios y Veredas
PATIO Y VEREDA CONCRETO f´c = 175 Kg/cm², e=4" FROTAC m2 71.33 58.47
RAMPA CEMENTO FROTACHADO Y BRUÑADO m2 8.49 13.64
Zócalos y Contrazócalos
Zócalos
ZOCALO DE CERAMICA ANTIDESLIZANTE DE 45X45cm, COLOR m2 514.44 66.40
Contrazócalos
CONTRAZOCALO DE CERAMICA 10X45cm m 54.15 40.90
CONTRAZOCALO SANITARIO DE CERAMICO H=10CM m 283.29 44.81
Ceramica en Mesa de Concreto
CERAMICA 45x45CM EN MESAS DE CONCRETO m2 34.14 56.57
Carpintería de Madera
Puertas
PUERTA CONTRAPLACADA 50 mm CON TRIPLAY 6 mm INCLUY m2 3.78 351.57
PUERTA DE MELAMINE PLANCHA DE 18 mm INCLUYE PERFILE m2 20.51 254.23
Carpintería Metálica y Herrería
Ventanas de Fierro
VENTANA MARCO Y MALLA METALICA ACERADA m2 63.78 125.33
VENTANA SOBRE MARCO DE ALUMINIO m2 2.88 160.41
Puertas de Fierro
PUERTA DE UNA HOJA DE 1.00x2.30m, MATERIAL METALICO und 1.00 650.00
PUERTA DE UNA HOJA DE 0.90x2.30m MATERIAL METALICO und 1.00 550.00
PUERTA DE UNA HOJA DE 0.90x2.10m, MATERIAL METALICO und 3.00 700.00
PUERTA DE DOS HOJAS DE 4.00x3.00 m BATIENTE, MATERIAL und 1.00 2,000.00
PUERTA ENRROLLABLE DE METAL DE UNA HOJA DE 2.00x2.80 und 1.00 1,500.00
PUERTA DE UNA HOJA MATERIAL METALICO CON MALLA DE m2 26.00 213.17
PUERTA UNA HOJA VAIVEN MATERIAL METALICO CON MALLA m2 3.20 215.25
Pasamanos
PASAMANO DE TUBO F°G° DE 2" EN RAMPA m 12.95 102.04
Cerrajería
Bisagras
BISAGRA DE ACERO ALUMINIZADO DE 4"X4" PESADA EN PUE pza 20.00 27.97
BISAGRA DE ACERO ALUMINIZADO DE 4"X3" PESADA EN PU Pza 26.00 25.97
BISAGRA TIPO PISTON DE 4" EN PUERTAS CON MALLAS METALpza 43.00 31.82
Cerradura
CERRADURA TIPO PARCHE DE 03 GOLPES P/PUERTAS METAL pza 5.00 61.66
CERRADURA TIPO PESADA DE 2 GOLPES PARA PUERTA pza 4.00 67.63
CERRADURA DE POMO P/PUERTAS CONTRAPLACADAS pza 11.00 59.23
CERROJO PICAPORTE EN PUERTAS DE MALLA pza 11.00 32.73
Accesorios Cierre
MANIJA DE BRONCE 4" PARA PUERTAS Pza 11.00 16.98
Vidrios, Cristales y Similares
SUMINSTRO E INSTALACION DE VIDRIO TEMPLADO E=6 mm p2 31.00 8.82
Cercos
CERCO DE MALLA GALVANIZADA TIPO CICLON 2" x 2" x 4mm, m2 63.01 269.66
Pintura
Pintura de Cielos Rasos, Vigas, Columnas y Paredes
PINTURA LATEX 2 MANOS EN VIGAS m2 151.28 12.98
PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA m2 953.91 12.75
Pintura de Puertas y Ventanas
PINTURA BARNIZ EN CARPINTERIA DE MADERA m2 24.29 23.91
Pintura de Estructuras Metalicas
PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS EN BARRAS m 9.50 4.89
PINTURA ANTICORROSIVA Y ESMALTE 2 MANOS PTA. Y VENT. m2 111.50 14.41
Varios
LIMPIEZA FINAL DE LA OBRA glb 1.00 2,362.62
COLOCACION DE CORTINAS DE PVC,SEGÚN DISEÑO
m2 30.29 359.66
INSTALACIONES SANITARIAS
Aparatos Sanitarios y Accesorios
SUMINISTRO E INSTALACION DE INODORO ONEPIECE MEDITE und 3.00 618.16
SUMINISTRO E INSTALACION DE URINARIO CADET und 2.00 427.31
SUMINISTRO E INSTALACION DE LAVATORIO AVANTE COLOR B und 4.00 250.38
DUCHA SIMPLE CON GRIFERIA Pto 4.00 160.01
ACCESORIOS DE BAÑOS glb 1.00 348.92
LLAVE ESFERICA DE 1/2" und 31.00 38.98
Sistema de Agua Fría
EMPALME A RED EXISTENTE AGUA und 1.00 93.74
SALIDA DE AGUA FRIA - PVC Pto 49.00 132.39
TUBERIA PVC CLASE 10-1/2" ROSCADA m 30.75 15.42
TUBERIA PVC CLASE 10-3/4" ROSCADA m 36.54 16.55
TUBERIA PVC CLASE 10-1" ROSCADA m 36.47 19.26
TUBERIA PVC CLASE 10 1 1/2" ROSCADA m 16.60 16.17
TUBERIA PVC CLASE 10 2" ROSCADA m 54.56 33.41
VALVULA COMPUERTA DE BRONCE 3/4" und 2.00 123.78
VALVULA COMPUERTA DE BRONCE 2" und 2.00 267.86
UNION UNIVERSAL DE 2" und 2.00 60.09
VALVULA CHECK DE BRONCE DE 2" und 1.00 184.46
REBOSE DE TANQUE ELEVADO F°G° 2" und 1.00 69.13
CAJA Y TAPA METALICA PARA VALVULAS EN PARED und 4.00 66.43
GRIFO DE RIEGO INCL. CAJUELA DE CONCRETO und 1.00 628.30
EQUIPO DE BOMBEO 02 ELECTROBOMBAS 1.50 HP und 1.00 1,096.24
Sistema de Desagüe y Ventilación
EMPALME A RED EXISTENTE, DESAGUE und 1.00 91.95
SALIDA DE PVC-SAL PARA DESAGUE DE 2" PTO 31.00 101.48
SALIDA DE PVC-SAL PARA DESAGUE DE 4" PTO 3.00 119.82
SALIDA VENTILACION PVC-SAP Ø2" PTO 3.00 70.10
SOMBRERO DE VENTILACION PVC-SAL Ø2" Und 2.00 8.57
EXCAVACION DE ZANJAS PARA RED EXT. SANIT. m3 16.12 27.66
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. SANIT.) m3 17.02 23.04
TUBERIA PVC SAL 2" m 40.46 26.83
TUBERIA PVC SAL 3" m 41.54 28.90
TUBERIA PVC-SAL 4" m 113.44 31.23
REGISTRO DE BRONCE 4" und 8.00 58.67
REGISTRO DE BRONCE 3" und 3.00 46.09
SUMIDERO DE BRONCE 4" und 4.00 215.66
SUMIDERO DE BRONCE 3" und 8.00 96.58
SUMIDERO DE BRONCE 2" und 14.00 93.48
CAJA DE REGISTRO PREFABRIC. 12"X24" C/TAPA CONCRETO und 8.00 114.27
Sistema de Drenaje Pluvial
TUBERIA DE BAJADA PVC-SAP 2" P/LLUVIAS m 13.60 39.73
TUBERIA PVC SAL 3" RED EXTERIOR m 10.16 8.94
CANALETA DE FIERRO GALVANIZADO e=0.90mm, P/EVAC. PLUVIAm 66.66 58.48
CANAL RECT. DE CONCRETO f’c’=175 Kg/cm2 CON REJILLA META m 114.96 222.63
INSTALACIONES ELECTRICAS
Conexion a Red Existente
CONEXION A RED EXISTENTE und 1.00 186.69
Salida para Alumbrado, Tomacorrientes, Fuerza
SALIDA DE TECHO (CENTRO DE LUZ) Pto 43.00 77.20
SALIDA PARA BRAQUETE (PARED) pto 7.00 124.46
SALIDA PARA INTERRUPTOR DE 01 GOLPE Pto 17.00 54.90
SALIDA PARA INTERRUPTOR DE 02 GOLPES Pto 2.00 56.07
SALIDA PARA INTERRUPTOR DE CONMUTACION pto 12.00 56.74
SALIDA TOMACORRIENTE DOBLE CON PUESTA A TIERRA Pto 12.00 94.28
SALIDA TOMACORRIENTE DOBLE APRUEBA DE AGUA CON LINEAPto 16.00 152.47
SALIDA PARA LUZ DE EMERGENCIA pto 11.00 108.83
SALIDA DE FUERZA P/BALANZA ELECTRONICA pto 1.00 129.31
SALIDA DE FUERZA P/ ESTERILIZADOR DE CUCHILLOS pto 1.00 123.13
SALIDA DE FUERZA P/ CREMATORIO pto 1.00 149.11
Canalización para Tuberías
EXCAVACIÓN DE ZANJA PARA REDES ELÉCTRICAS Y COMUNIC m3 2.60 9.40
RELLENO MANUAL CON MATERIAL PROPIO (REDES ELÉCTRICA m3 2.08 11.28
ELIMINACION DE MATERIAL EXCEDENTE m3 0.52 18.80
Tuberias
TUBERÍA PVC-P 20mm m 178.12 10.83
TUBERÍA PVC-P 35mm m 13.50 21.36
Cajas de Distribucion
CAJA DE PASE F°G° 8x8x4" (200x200x100mm) und 6.00 67.82
Tableros Electricos
TAB.GEN.3x60A;5-2x10A;4-3x10A;4-2x16A;1-3x25A;12-IDF 25AMP und 1.00 2,301.07
Alimentadores
ALIM. 3-1x25mm2+1-1x25mm2+1-10mm2 N2XOH m 7.95 70.12
CABLE DE COBRE DESNUDO 1x50mm2, TEMPLE BLANDO m 2.95 4.26
Sistema Puesta a Tierra
POZO PUESTA A TIERRA PT-1 (R<15 OHM) und 1.00 968.86
Artefactos Electricos
ARTEFACTO FLUORESCENTE 2 x 36 W (SIM. JOSFEL) COLGANT und 43.00 211.43
ARTEFACTO DE ILUMINACIÓN DE EMERGENCIA CON DOS LÁM und 11.00 313.16
ARTEFACTO DE ILUMINACIÓN TIPO SPOT LIGHT und 7.00 153.59
Mobiliario
ESCRITORIO 1.30x0.60 und 6.00 1,740.00
SILLA METALICA und 6.00 780.00
SILLA GIRATORIA und 4.00 677.96
ESTANTE DE ANGULO RANURADO und 3.00 2,250.00
SILLA DE ESPERA - 3 ASIENTOS und 1.00 320.00
Equipamiento
CAJÓN DE ATURDIMIENTO und 1.00 18,582.23
ESTERILIZADOR DE CUCHILLO ELECTRICO und 2.00 10,800.00
PISTOLA DE ATURDIMIENTO BOVINO und 1.00 31,773.77
PLATAFORMA METÁLICA CON ESCALONES und 1.00 14,097.46
MANILUVIO DE ACERO A PEDAL und 3.00 2,550.00
POZA DE LAVADO DE BOTAS und 2.00 1,000.00
BALANZA ELECTRONICA und 1.00 1,677.97
MESA DE INSPECCION DE ACERO INOXIDABLE und 1.00 2,300.00
ESTANTE CON GANCHOS PARA VISCERAS und 1.00 1,930.00
COLGADORES EMPOTRADO DE VISCERAS C/10 GANCHOS und 2.00 4,600.00
COCINA INDUSTRIAL 03 HORNILLAS und 2.00 1,355.92
BALÓN DE GAS DE 45KG und 2.00 1,271.18
OLLA #50 DE 80LTS 4mm DE ESPESOR und 4.00 1,520.00
CARRO TRANSPORTADOR TIPO BUGGY (CABEZAS Y PATAS) und 2.00 5,400.00
CARRETILLA DE MANO ACERO GALVANIZADO und 3.00 7,950.00
GANCHOS DE ACERO PARA OREO und 60.00 4,200.00
BANDEJA DE ACERO INOXIDABLE glb 4.00 4,800.00
CONTENEDORES PARA BASURA DE 240 LTS und 2.00 483.06
LOCKERS 2 CUERPOS/6 PUERTAS und 2.00 2,400.00
RECIPIENTE PARA DESANGRADO MOVIL und 2.00 800.00
86,664.76
46,997.25
1,398.81
197.39 197.39
1,201.42 1201.42
455.96
455.96 455.96
12,208.54
12,208.54 4615.94 2552.14 2637.21 2403.26
17,778.17
230.27 230.27
19.92 19.92
88.18 88.18
11,295.66 11295.66
3,888.78 3888.78
2,255.36 2255.36
13,589.28
1,058.65 1058.65
4,688.29 4688.29
3,394.11 3394.11
4,448.23 4448.23
1,566.49
1,566.49 1566.49
17,721.96
2,000.00 2000.00
9,346.75 9346.75
2,076.65 2076.65
1,745.34 1745.34
2,553.22 2553.22
21,945.55
1,048.75 1048.75
996.76 996.76
432.00 108.00 108.00 108.00 108.00
432.40 432.40
598.00 598.00
555.81 555.81
1,168.32 1168.32
92.25 92.25
2,292.00 573.00 573.00 573.00 573.00
4,657.20 4657.20
349.34 349.34
2,273.96 2273.96
897.60 224.40 224.40 224.40 224.40
27.10 27.10
27.10 27.10
28.56 28.56
6,068.40 1517.10 1517.10 1517.10 1517.10
448,227.24
49,317.17
7,773.76
2,842.00 2842.00
4,931.76 4931.76
11,924.08
9,566.49 9566.49
2,357.59 2357.59
21,956.15
4,058.00 4058.00
16,382.92 16382.92
1,515.23 1515.23
7,663.18
3,115.76 3115.76
4,547.42 4547.42
61,366.16
22,706.50
22,706.50 22706.50
2,293.09
799.64 799.64
1,493.45 2785.38 -1291.93
5,352.63
5,352.63 5352.63
28,997.36
28,997.36 28997.36
382.93
75.57 75.57
307.36 307.36
1,633.65
731.05 731.05
902.60 902.60
219,007.36
19,130.31
13,905.84 13905.84
5,224.47 5224.47
48,947.50
15,202.67 15202.67
25,340.15 25340.15
8,404.68 8404.68
67,202.61
14,871.97 14871.97
20,353.33 13405.50 6947.83
31,977.31 31977.31
35,049.03
5,938.22 5938.22
13,783.12 10514.50 3268.62
15,327.69 15327.69
2,071.61
187.71 187.71
364.65 364.65
279.66 279.66
199.19 199.19
233.77 233.77
177.86 177.86
628.77 628.77
1,271.22
241.38 241.38
935.72 935.72
94.12 94.12
15,891.52
5,147.37 5147.37
3,377.59 3096.12 281.47
7,366.56 7366.56
10,399.10
2,658.55 2658.55
4,114.13 4114.13
3,626.42 3626.42
3,996.87
1,375.50 1031.63 343.88
1,570.87 1570.87
1,050.50 1050.50
3,568.50
1,128.61 1128.61
1,542.62 578.48 964.14
897.27 897.27
4,591.36
1,536.17 1536.17
1,884.73 1884.73
1,170.46 1170.46
445.88
42.90 42.90
82.11 82.11
320.87 320.87
6,441.85
2,229.80 2229.80
3,480.71 3480.71
731.34 731.34
37,529.40
6,135.20
6,135.20 6135.20
1,809.40
673.20 673.20
1,136.20 3128.89 -1992.69
29,584.80
1,990.45 1990.45
10,512.58 10512.58
11,438.92 11438.92
5,642.85 5642.85
80,516.04
80,516.04 80516.04
491.11
288.36 288.36
202.75 202.75
292,586.02
52,233.13
49,412.32 49412.32
2,820.81 2820.81
51,876.37
12,999.90 7474.94 5524.96
21,105.21 7138.53 13966.68
4,905.96 4905.96
8,291.66 8291.66
1,743.32 1743.32
2,830.32 2830.32
56,864.71
2,277.70
1,511.59 1511.59
766.11 766.11
8,525.96
3,255.85 3255.85
5,270.11 5270.11
41,774.58
27,267.33 21586.64 5680.69
14,507.25 14507.25
4,286.47
4,170.67 4170.67
115.80 115.80
50,999.08
34,158.82
34,158.82 8539.71 25619.12
14,908.96
2,214.74 2214.74
12,694.22 12694.22
1,931.30
1,931.30 482.83 1448.48
6,543.19
6,543.19
1,328.93 830.58 498.35
5,214.26 5214.26
22,808.17
8,455.53
7,993.55 6566.13 1427.42
461.98 461.98
13,031.22
650.00 121.88 528.13
550.00 550.00
2,100.00 2100.00
2,000.00 2000.00
1,500.00 1500.00
5,542.42 5542.42
688.80 688.80
1,321.42
1,321.42 1321.42
4,380.04
2,602.88
559.40 559.40
675.22 675.22
1,368.26 1368.26
1,590.38
308.30 308.30
270.52 270.52
651.53 651.53
360.03 360.03
186.78
186.78 186.78
273.42
273.42 273.42
16,991.28
16,991.28 16991.28
16,359.91
14,125.96
1,963.61 1963.61
12,162.35 11858.29 304.06
580.77
580.77 580.77
1,653.18
46.46 46.46
1,606.72 1606.72
13,256.72
2,362.62 2362.62
10,894.10 10894.10
64,589.01
5,907.96
1,854.48 1854.48
854.62 854.62
1,001.52 1001.52
640.04 640.04
348.92 348.92
1,208.38 906.29 302.10
13,600.75
93.74 93.74
6,487.11 6487.11
474.17 474.17
604.74 604.74
702.41 702.41
268.42 268.42
1,822.85 1822.85
247.56 247.56
535.72 535.72
120.18 120.18
184.46 184.46
69.13 69.13
265.72 265.72
628.30 628.30
1,096.24 1096.24
14,957.32
91.95 91.95
3,145.88 3145.88
359.46 359.46
210.30 210.30
17.14 17.14
445.88 445.88
392.14 392.14
1,085.54 1085.54
1,200.51 1200.51
3,542.73 3542.73
469.36 469.36
138.27 138.27
862.64 862.64
772.64 772.64
1,308.72 1308.72
914.16 914.16
30,122.98
540.33 540.33
90.83 68.12 22.71
3,898.28 3898.28
25,593.54 25593.54
31,406.72
186.69
186.69 186.69
11,086.70
3,319.60 3319.60
871.22 871.22
933.30 933.30
112.14 112.14
680.88 680.88
1,131.36 1131.36
2,439.52 2439.52
1,197.13 1197.13
129.31 129.31
123.13 123.13
149.11 149.11
57.68
24.44 24.44
23.46 23.46
9.78 9.78
2,217.40
1,929.04 1929.04
288.36 288.36
406.92
406.92 406.92
2,301.07
2,301.07 2301.07
570.02
557.45 557.45
12.57 12.57
968.86
968.86 968.86
13,611.38
9,091.49 9091.49
3,444.76 3444.76
1,075.13 1075.13
24,901.84
10,440.00 10440.00
4,680.00 4680.00
2,711.84 2711.84
6,750.00 6750.00
320.00 320.00
435,361.75
18,582.23 18582.23
21,600.00 21600.00
31,773.77 31773.77
14,097.46 14097.46
7,650.00 7650.00
2,000.00 2000.00
1,677.97 1677.97
2,300.00 2300.00
1,930.00 1930.00
9,200.00 9200.00
2,711.84 2711.84
2,542.36 2542.36
6,080.00 6080.00
10,800.00 10800.00
23,850.00 23850.00
252,000.00 252000.00
19,200.00 19200.00
966.12 966.12
4,800.00 4800.00
1,600.00 1600.00

También podría gustarte