Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN –
PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO AL 09 DE DICIEMBRE 2018 DICIEMBRE 2018 ENERO 2019 FEBRERO 2019 MARZO 2019
EJECUCION DE OBRA S/. 3,124,772.22 S/. 457,578.27 S/. 449,793.08 S/. 857,385.28 S/. 864,902.61 S/. 495,052.54
INICIO DE OBRA
01 TRABAJOS GENERALES S/. 114,563.43
01.01 OBRAS PROVISIONALES S/. 6,950.00
01.01.01 CARTEL PARA LA OBRA 2.40 X 3.60 S/. 950.00 S/. 950.00
01.01.02 ALMACEN DE OBRA S/. 6,000.00 S/. 6,000.00
01.02 OBRAS PRELIMINARES S/. 107,613.43
01.02.01 TRANSPORTE DE MATERIALES A OBRA S/. 58,980.01 S/. 9,133.71 S/. 10,157.67 S/. 9,830.00 S/. 10,157.67 S/. 19,700.96
01.02.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS PARA LA OBRA S/. 22,199.02 S/. 11,099.51 S/. 11,099.51
01.02.03 IMPLEMENTOS DE SEGURIDAD PARA LOS TRABAJADORES S/. 10,000.00 S/. 3,000.00 S/. 7,000.00
01.02.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO S/. 15,166.40 S/. 15,166.40
01.02.05 ELIMINACION DE MATERIAL DEMOLIDO CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,268.00 S/. 1,268.00
02 SECTOR INICIAL S/. 225,861.54
02.01 ESTRUCTURAS S/. 84,768.77
02.01.01 OBRAS PRELIMINARES S/. 372.30
02.01.01.01 LIMPIEZA DE TERRENO S/. 131.48 S/. 131.48
02.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 240.82 S/. 240.82
02.01.02 MOVIMIENTO DE TIERRAS S/. 7,902.25
02.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 1,455.98 S/. 1,455.98
02.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 2,087.06 S/. 2,087.06
02.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 278.01 S/. 278.01
02.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 890.02 S/. 890.02
02.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 2,208.48 S/. 2,208.48
02.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 982.70 S/. 982.70
02.01.03 OBRAS DE CONCRETO SIMPLE S/. 15,500.07
02.01.03.01 SOLADO PARA ZAPATAS S/. 1,264.68 S/. 1,264.68
02.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 4,357.86 S/. 4,357.86
02.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 2,089.54 S/. 2,089.54
02.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 3,336.50 S/. 3,336.50
02.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 4,451.49 S/. 1,780.60 S/. 2,670.89
02.01.04 OBRAS DE CONCRETO ARMADO S/. 60,994.15
02.01.04.01 ZAPATAS S/. 10,006.67
02.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 8,096.58 S/. 8,096.58
02.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 1,910.09 S/. 1,910.09
02.01.04.02 VIGA DE CIMENTACION S/. 13,214.46
02.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 4,273.20 S/. 4,273.20
02.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 3,907.16 S/. 3,907.16
02.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 5,034.10 S/. 5,034.10
02.01.04.03 COLUMNAS S/. 19,610.14
02.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 5,186.31 S/. 5,186.31
02.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 6,741.16 S/. 6,741.16
02.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 7,682.67 S/. 7,682.67
02.01.04.04 VIGAS S/. 15,656.91
02.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 4,583.56 S/. 4,583.56
02.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 6,097.44 S/. 6,097.44
02.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 4,975.91 S/. 4,975.91
02.01.04.05 COLUMNETAS S/. 2,505.97
02.01.04.05.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 558.23 S/. 558.23
02.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 942.70 S/. 942.70
02.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 1,005.04 S/. 1,005.04
02.02 ARQUITECTURA S/. 119,572.63
02.02.01 ALBAÑILERIA S/. 6,173.76
02.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 6,173.76 S/. 5,247.70 S/. 926.06
02.02.02 REVOQUES S/. 16,085.43
02.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 3,737.98 S/. 3,737.98
02.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 2,496.96 S/. 2,496.96
02.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 4,003.20 S/. 4,003.20
02.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 845.94 S/. 845.94
02.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 3,080.61 S/. 3,080.61
02.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 343.07 S/. 343.07
02.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 881.28 S/. 881.28
02.02.02.08 BRUÑAS DE 1.0 cm S/. 696.39 S/. 696.39
02.02.03 PISOS Y PAVIMENTOS S/. 10,893.71
02.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 4,192.53 S/. 4,192.53
02.02.03.02 PISO DE CERAMICO 45 X 45 CM S/. 6,701.18 S/. 6,701.18
02.02.04 CONTRAZOCALOS S/. 5,499.22
02.02.04.01 CONTRAZOCALO CERAMICO H=0.10 m. S/. 1,485.72 S/. 1,485.72
02.02.04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 1,490.72 S/. 1,490.72
02.02.04.03 ZOCALO DE CERAMICA 20 X 30 CM S/. 2,522.78 S/. 2,522.78
02.02.05 CARPINTERIA MADERA S/. 3,658.71
02.02.05.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 2,838.38 S/. 2,838.38
02.02.05.02 PUERTA CONTRAPLACADA SEGUN DISEÑO S/. 820.33 S/. 820.33
02.02.06 CARPINTERIA METALICA S/. 7,302.36
02.02.06.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 7,302.36 S/. 7,302.36
02.02.07 CERRAJERIA S/. 245.96
02.02.07.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 155.86 S/. 155.86
02.02.07.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 90.10 S/. 90.10
02.02.08 VIDRIOS, CRISTALES Y SIMILARES S/. 5,262.45
02.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 5,262.45 S/. 5,262.45
02.02.09 PINTURAS S/. 4,843.26
02.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 2,356.69 S/. 2,356.69
02.02.09.02 PINTURA EN CONTRAZOCALO S/. 77.05 S/. 77.05
02.02.09.03 PINTURA EN VIGAS S/. 1,347.46 S/. 1,347.46
02.02.09.04 PINTURA EN COLUMNAS S/. 1,062.06 S/. 1,062.06
02.02.10 CUBIERTA METALICA Y CIELO RASO S/. 59,607.77
02.02.10.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 23,216.60 S/. 23,216.60
02.02.10.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 13,757.94 S/. 13,757.94
02.02.10.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 22,633.23 S/. 22,633.23
02.03 INSTALACIONES ELECTRICAS S/. 14,806.77
02.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 3,649.75 S/. 3,649.75
02.03.02 SALIDA TOMACORRIENTE S/. 1,721.36 S/. 1,721.36
02.03.03 SALIDA TOMACORRIENTE A PRUEBA DE AGUA S/. 438.76 S/. 438.76
02.03.04 SALIDA PARA INTERRUPTOR SIMPLE S/. 541.15 S/. 541.15
02.03.05 SALIDA PARA INTERRUPTOR TRIPLE S/. 228.76 S/. 228.76
02.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 4,525.62 S/. 4,525.62
02.03.07 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIRCULAR 22W S/. 205.77 S/. 180.05 S/. 25.72
02.03.08 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 1,476.21 S/. 1,476.21
02.03.09 ALAMBRE THHN 2.5 mm2 S/. 442.02 S/. 442.02
02.03.10 ALAMBRE THHN 4 mm2 S/. 232.14 S/. 232.14
02.03.11 TABLERO DE DISTRIBUCION S/. 439.49 S/. 439.49
02.03.12 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
02.03.13 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
02.04 INSTALACIONES SANITARIAS S/. 6,713.37
02.04.01 APARATOS Y ACCESORIOS SANITARIOS S/. 1,193.88
02.04.01.01 INODORO TANQUE BAJO S/. 723.58 S/. 723.58
02.04.01.02 LAVATORIO DE LOZA BLANCA S/. 391.76 S/. 391.76
02.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" S/. 78.54 S/. 78.54
02.04.02 SISTEMA DE DESAGUE S/. 2,066.22
02.04.02.01 SALIDA DE DESAGUE PVC D=2" S/. 186.30 S/. 186.30
02.04.02.02 SALIDA DE DESAGUE PVC D=4" S/. 291.08 S/. 291.08
02.04.02.03 SALIDA VENTILACION DE 2" S/. 116.16 S/. 116.16
02.04.02.04 REGISTRO DE BRONCE 4" S/. 285.99 S/. 285.99
02.04.02.05 SUMIDERO DE 2" S/. 77.41 S/. 77.41
02.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" S/. 339.50 S/. 339.50
02.04.02.07 YEE PVC SAL 4"X2" S/. 185.91 S/. 185.91
02.04.02.08 CODO PVC SAL P/DESAGUE D=2" S/. 51.62 S/. 51.62
02.04.02.09 EXCAVACION MANUAL PARA TUBERIA S/. 148.90 S/. 148.90
02.04.02.10 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 38.60 S/. 38.60
02.04.02.11 CAMA DE APOYO S/. 94.40 S/. 94.40
02.04.02.12 RELLENO COMPACTADO DE ZANJAS S/. 120.00 S/. 120.00
02.04.02.13 CAJA DE REGISTRO CON REJILLA METALICA S/. 130.35 S/. 130.35
02.04.03 SISTEMA DE AGUA FRIA S/. 955.73
02.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" S/. 291.36 S/. 291.36
02.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" S/. 136.93 S/. 136.93
02.04.03.03 CODO PVC 1/2" S/. 9.94 S/. 9.94
02.04.03.04 TEE PVC 1/2" S/. 33.12 S/. 33.12
02.04.03.05 EXCAVACION MANUAL PARA TUBERIA S/. 104.97 S/. 104.97
02.04.03.06 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 27.21 S/. 27.21
02.04.03.07 CAMA DE APOYO S/. 66.55 S/. 66.55
02.04.03.08 RELLENO COMPACTADO DE ZANJAS S/. 84.60 S/. 84.60
02.04.03.09 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" S/. 70.70 S/. 70.70
02.04.03.10 CAJA PARA VALVULAS S/. 130.35 S/. 130.35
02.04.04 SISTEMA DE AGUA PLUVIAL S/. 2,497.54
02.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 2,150.98 S/. 2,150.98
02.04.04.02 TUBERIA PVC SAL D=4" S/. 272.40 S/. 238.35 S/. 34.05
02.04.04.03 CODO PVC SAL D=4" S/. 74.16 S/. 74.16
03 SECTOR SECUNDARIA S/. 373,415.79
03.01 ESTRUCTURAS S/. 157,033.01
03.01.01 OBRAS PRELIMINARES S/. 311.88
03.01.01.01 LIMPIEZA DE TERRENO S/. 110.14 S/. 110.14
03.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 201.74 S/. 201.74
03.01.02 MOVIMIENTO DE TIERRAS S/. 11,127.55
03.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 866.30 S/. 866.30
03.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 3,548.01 S/. 3,548.01
03.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 260.40 S/. 260.40
03.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 1,528.88 S/. 1,528.88
03.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 3,879.13 S/. 3,879.13
03.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,044.83 S/. 1,044.83
03.01.03 OBRAS DE CONCRETO SIMPLE S/. 12,111.33
03.01.03.01 SOLADO PARA ZAPATAS S/. 2,312.61 S/. 2,312.61
03.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,905.73 S/. 1,905.73
03.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 1,434.38 S/. 1,434.38
03.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 2,289.06 S/. 2,289.06
03.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 4,169.55 S/. 4,169.55
03.01.04 OBRAS DE CONCRETO ARMADO S/. 133,482.25
03.01.04.01 ZAPATAS S/. 20,484.56
03.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 15,972.75 S/. 15,972.75
03.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 4,511.81 S/. 4,511.81
03.01.04.02 VIGA DE CIMENTACION S/. 12,509.61
03.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 3,863.87 S/. 3,863.87
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 3,534.44 S/. 3,534.44
03.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 5,111.30 S/. 5,111.30
03.01.04.03 COLUMNAS S/. 47,206.14
03.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 12,333.79 S/. 12,333.79
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 14,950.51 S/. 14,950.51
03.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 19,921.84 S/. 19,921.84
03.01.04.04 VIGAS S/. 27,967.41
03.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 7,642.27 S/. 7,642.27
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 10,166.95 S/. 10,166.95
03.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 10,158.19 S/. 10,158.19
03.01.04.05 LOSAS ALIGERADAS S/. 16,968.05
03.01.04.05.01 CONCRETO LOSA ALIGERADA f'c= 210 kg/cm2 S/. 5,217.80 S/. 5,217.80
03.01.04.05.02 LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO S/. 6,775.44 S/. 6,775.44
03.01.04.05.03 LOSAS ALIGERADAS ACERO fy=4,200 kg/cm2 S/. 1,948.59 S/. 1,948.59
03.01.04.05.04 LOSA ALIGERADA LADRILLO HUECO 15X30X30 S/. 3,026.22 S/. 3,026.22
03.01.04.06 COLUMNETAS S/. 7,805.24
03.01.04.06.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 1,842.57 S/. 1,842.57
03.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 3,108.36 S/. 3,108.36
03.01.04.06.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 2,854.31 S/. 2,854.31
03.01.04.07 VIGAS COLLARIN S/. 541.24
03.01.04.07.01 CONCRETO VIGAS COLLARIN f'c=175 kg/cm2 S/. 159.49 S/. 159.49
03.01.04.07.02 ENCOFRADO Y DESENCOFRADO EN VIGAS COLLARIN S/. 271.77 S/. 271.77
03.01.04.07.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN VIGAS COLLARIN S/. 109.98 S/. 109.98
03.02 ARQUITECTURA S/. 161,830.49
03.02.01 ALBAÑILERIA S/. 8,900.12
03.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 8,900.12 S/. 4,450.06 S/. 4,450.06
03.02.02 REVOQUES S/. 27,991.70
03.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 5,600.58 S/. 2,800.29 S/. 2,800.29
03.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 2,955.62 S/. 1,477.81 S/. 1,477.81
03.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 8,111.81 S/. 4,055.91 S/. 4,055.91
03.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 1,516.62 S/. 758.31 S/. 758.31
03.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 5,136.66 S/. 2,568.33 S/. 2,568.33
03.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 1,375.86 S/. 687.93 S/. 687.93
03.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 1,566.72 S/. 783.36 S/. 783.36
03.02.02.08 BRUÑAS DE 1.0 cm S/. 1,727.83 S/. 863.92 S/. 863.92
03.02.03 CIELO RASO S/. 5,746.93
03.02.03.01 TARRAJEO DE CIELO RASO - SUPERFICIE CON CEMENTO-ARENA S/. 5,746.93 S/. 5,746.93
03.02.04 PISOS Y PAVIMENTOS S/. 20,912.44
03.02.04.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 7,429.80 S/. 3,714.90 S/. 3,714.90
03.02.04.02 PISO DE CERAMICO 45 X 45 CM S/. 11,875.50 S/. 5,937.75 S/. 5,937.75
03.02.04.03 PISO CEMENTO PULIDO E=2" S/. 1,607.14 S/. 803.57 S/. 803.57
03.02.05 CONTRAZOCALOS S/. 3,920.57
03.02.05.01 CONTRAZOCALO CERAMICO H=0.10 m. S/. 2,705.51 S/. 1,352.76 S/. 1,352.76
03.02.05.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 1,215.06 S/. 607.53 S/. 607.53
03.02.06 CARPINTERIA MADERA S/. 7,443.30
03.02.06.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 7,443.30 S/. 7,443.30
03.02.07 CARPINTERIA METALICA S/. 10,768.28
03.02.07.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 10,768.28 S/. 10,768.28
03.02.08 CERRAJERIA S/. 629.76
03.02.08.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 467.58 S/. 467.58
03.02.08.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 162.18 S/. 162.18
03.02.09 VIDRIOS, CRISTALES Y SIMILARES S/. 7,760.14
03.02.09.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 7,760.14 S/. 7,760.14
03.02.10 PINTURAS S/. 9,374.13
03.02.10.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 3,505.86 S/. 3,505.86
03.02.10.02 PINTURA EN CONTRAZOCALO S/. 354.06 S/. 354.06
03.02.10.03 PINTURA EN VIGAS S/. 1,715.98 S/. 1,715.98
03.02.10.04 PINTURA EN COLUMNAS S/. 2,397.28 S/. 2,397.28
03.02.10.05 PINTURA EN CIELO RASO S/. 1,400.95 S/. 1,400.95
03.02.11 CUBIERTA METALICA Y CIELO RASO S/. 58,383.12
03.02.11.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 21,678.27 S/. 20,323.38 S/. 1,354.89
03.02.11.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 13,569.99 S/. 13,569.99
03.02.11.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 23,134.86 S/. 23,134.86
03.03 INSTALACIONES ELECTRICAS S/. 26,845.81
03.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 7,007.52 S/. 7,007.52
03.03.02 SALIDA TOMACORRIENTE S/. 3,873.06 S/. 3,873.06
03.03.03 SALIDA TOMACORRIENTE A PRUEBA DE AGUA S/. 108.23 S/. 108.23
03.03.04 SALIDA PARA INTERRUPTOR SIMPLE S/. 677.34 S/. 677.34
03.03.05 SALIDA PARA INTERRUPTOR TRIPLE S/. 228.76 S/. 228.76
03.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 9,874.08 S/. 9,874.08
03.03.07 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIRCULAR 22W S/. 68.59 S/. 68.59
03.03.08 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 2,363.28 S/. 2,363.28
03.03.09 ALAMBRE THHN 2.5 mm2 S/. 542.22 S/. 542.22
03.03.10 ALAMBRE THHN 4 mm2 S/. 287.59 S/. 287.59
03.03.11 TABLERO DE DISTRIBUCION S/. 469.91 S/. 469.91
03.03.12 SUBTABLERO DE DISTRIBUCION S/. 439.49 S/. 439.49
03.03.13 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
03.03.14 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
03.04 INSTALACIONES SANITARIAS S/. 2,809.47
03.04.01 SISTEMA DE AGUA PLUVIAL S/. 2,809.47
03.04.01.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 2,145.11 S/. 2,145.11
03.04.01.02 TUBERIA PVC SAL D=4" S/. 590.20 S/. 590.20
03.04.01.03 CODO PVC SAL D=4" S/. 74.16 S/. 74.16
03.05 CONSTRUCCION DE ESCALERAS S/. 24,897.01
03.05.01 OBRAS PRELIMINARES S/. 48.31
03.05.01.01 LIMPIEZA DE TERRENO S/. 17.06 S/. 17.06
03.05.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 31.25 S/. 31.25
03.05.02 MOVIMIENTO DE TIERRAS S/. 1,179.42
03.05.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 573.53 S/. 573.53
03.05.02.02 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 35.04 S/. 35.04
03.05.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 96.85 S/. 96.85
03.05.02.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 277.78 S/. 243.06 S/. 34.72
03.05.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 196.22 S/. 196.22
03.05.03 OBRAS DE CONCRETO SIMPLE S/. 3,851.27
03.05.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,775.80 S/. 1,775.80
03.05.03.02 SOBRECIMIENTO 1:8 + 25% P.M S/. 674.55 S/. 674.55
03.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 839.82 S/. 839.82
03.05.03.04 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 561.10 S/. 561.10
03.05.04 OBRAS DE CONCRETO ARMADO S/. 11,546.69
03.05.04.01 VIGA DE CIMENTACION S/. 2,645.43
03.05.04.01.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 899.62 S/. 899.62
03.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 1,029.23 S/. 1,029.23
03.05.04.01.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 716.58 S/. 716.58
03.05.04.02 COLUMNAS S/. 2,896.60
03.05.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 751.18 S/. 751.18
03.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 799.92 S/. 799.92
03.05.04.02.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 1,345.50 S/. 1,345.50
03.05.04.03 VIGAS S/. 2,222.94
03.05.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 746.68 S/. 746.68
03.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 801.48 S/. 801.48
03.05.04.03.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 674.78 S/. 674.78
03.05.04.04 ESCALERAS S/. 2,484.68
03.05.04.04.01 ESCALERAS CONCRETO FC=210 KG/CM2 S/. 850.14 S/. 850.14
03.05.04.04.02 ESCALERA ENCOFRADO Y DESENCOFRADO S/. 682.25 S/. 682.25
03.05.04.04.03 ESCALERA ACERO fy=4,200 kg/cm2 S/. 952.29 S/. 952.29
03.05.04.05 LOSA MACIZA S/. 1,297.04
03.05.04.05.01 LOSA MACIZA CONCRETO FC=210 KG/CM2 S/. 346.35 S/. 346.35
03.05.04.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA S/. 279.59 S/. 279.59
03.05.04.05.03 LOSA MACIZA ACERO fy=4,200 kg/cm2 S/. 671.10 S/. 671.10
03.05.05 ALBAÑILERIA S/. 1,616.54
03.05.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 1,616.54 S/. 1,616.54
03.05.06 REVOQUES S/. 4,512.97
03.05.06.01 TARRAJEO EN EXTERIORES C:A-1:4 S/. 1,554.08 S/. 1,554.08
03.05.06.02 TARRAJEO DE COLUMNAS C:A-1:4 S/. 434.02 S/. 434.02
03.05.06.03 VESTIDURA DE ARISTAS EN COLUMNAS S/. 223.28 S/. 223.28
03.05.06.04 TARRAJEO DE VIGAS C:A-1:4 S/. 404.93 S/. 404.93
03.05.06.05 VESTIDURA DE ARISTAS EN VIGAS S/. 178.47 S/. 178.47
03.05.06.06 BRUÑAS DE 1.0 cm S/. 771.51 S/. 771.51
03.05.06.07 REVESTIMIENTO DE GRADAS Y ESCALERA S/. 567.12 S/. 567.12
03.05.06.08 REVESTIMIENTO DE FONDO DE ESCALERAS CON CEMENTO-ARENA S/. 379.56 S/. 379.56
03.05.07 PISOS S/. 732.78
03.05.07.01 PISO CEMENTO PULIDO E=2" S/. 732.78 S/. 732.78
03.05.08 CONTRAZOCALOS S/. 262.11
03.05.08.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 262.11 S/. 262.11
03.05.09 PINTURAS S/. 1,146.92
03.05.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 617.08 S/. 617.08
03.05.09.02 PINTURA EN COLUMNAS S/. 198.77 S/. 198.77
03.05.09.03 PINTURA EN VIGAS S/. 177.12 S/. 177.12
03.05.09.04 PINTURA EN FONDO DE ESCALERA S/. 95.39 S/. 95.39
03.05.09.05 PINTURA EN LOSA MACIZA S/. 58.56 S/. 58.56
04 ADMINISTRACION, SALA DE COMPUTO Y SALON DE USOS MULTIPLES S/. 379,732.21
04.01 ESTRUCTURAS S/. 139,933.65
04.01.01 OBRAS PRELIMINARES S/. 350.61
04.01.01.01 LIMPIEZA DE TERRENO S/. 123.82 S/. 123.82
04.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 226.79 S/. 226.79
04.01.02 MOVIMIENTO DE TIERRAS S/. 8,554.41
04.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 683.68 S/. 683.68
04.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 3,437.44 S/. 3,437.44
04.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 261.84 S/. 261.84
04.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 717.93 S/. 717.93
04.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 2,080.43 S/. 2,080.43
04.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,373.09 S/. 1,373.09
04.01.03 OBRAS DE CONCRETO SIMPLE S/. 12,520.73
04.01.03.01 SOLADO PARA ZAPATAS S/. 2,243.40 S/. 2,243.40
04.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 2,115.63 S/. 2,115.63
04.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 2,027.51 S/. 2,027.51
04.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 1,941.61 S/. 1,941.61
04.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 4,192.58 S/. 4,192.58
04.01.04 OBRAS DE CONCRETO ARMADO S/. 118,507.90
04.01.04.01 ZAPATAS S/. 20,173.23
04.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 15,675.88 S/. 15,675.88
04.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 4,497.35 S/. 4,497.35
04.01.04.02 VIGA DE CIMENTACION S/. 11,190.06
04.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 3,589.48 S/. 3,589.48
04.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 3,279.96 S/. 3,279.96
04.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 4,320.62 S/. 4,320.62
04.01.04.03 COLUMNAS S/. 35,879.80
04.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 9,643.93 S/. 9,643.93
04.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 11,482.27 S/. 11,482.27
04.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 14,753.60 S/. 10,327.52 S/. 4,426.08
04.01.04.04 VIGAS S/. 23,771.80
04.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 7,318.41 S/. 2,927.36 S/. 4,391.05
04.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 8,247.76 S/. 3,299.10 S/. 4,948.66
04.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 8,205.63 S/. 3,282.25 S/. 4,923.38
04.01.04.05 LOSAS ALIGERADAS S/. 19,154.31
04.01.04.05.01 CONCRETO LOSA ALIGERADA f'c= 210 kg/cm2 S/. 5,600.13 S/. 2,240.05 S/. 3,360.08
04.01.04.05.02 LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO S/. 7,274.89 S/. 2,909.96 S/. 4,364.93
1 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN –
PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO AL 09 DE DICIEMBRE 2018 DICIEMBRE 2018 ENERO 2019 FEBRERO 2019 MARZO 2019
04.01.04.05.03 LOSAS ALIGERADAS ACERO fy=4,200 kg/cm2 S/. 3,030.12 S/. 1,212.05 S/. 1,818.07
04.01.04.05.04 LOSA ALIGERADA LADRILLO HUECO 15X30X30 S/. 3,249.17 S/. 1,299.67 S/. 1,949.50
04.01.04.06 COLUMNETAS S/. 7,823.00
04.01.04.06.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 1,443.84 S/. 577.54 S/. 866.30
04.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 4,112.64 S/. 1,645.06 S/. 2,467.58
04.01.04.06.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 2,266.52 S/. 906.61 S/. 1,359.91
04.01.04.07 VIGAS COLLARIN S/. 515.70
04.01.04.07.01 CONCRETO VIGAS COLLARIN f'c=175 kg/cm2 S/. 151.10 S/. 151.10
04.01.04.07.02 ENCOFRADO Y DESENCOFRADO EN VIGAS COLLARIN S/. 254.25 S/. 254.25
04.01.04.07.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN VIGAS COLLARIN S/. 110.35 S/. 110.35
04.02 ARQUITECTURA S/. 174,570.71
04.02.01 ALBAÑILERIA S/. 8,721.24
04.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 8,721.24 S/. 3,488.50 S/. 5,232.74
04.02.02 REVOQUES S/. 24,798.60
04.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 5,551.33 S/. 5,551.33
04.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 4,293.27 S/. 4,293.27
04.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 6,230.02 S/. 6,230.02
04.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 660.33 S/. 660.33
04.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 4,167.02 S/. 4,167.02
04.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 748.58 S/. 748.58
04.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 1,876.80 S/. 1,876.80
04.02.02.08 BRUÑAS DE 1.0 cm S/. 1,271.25 S/. 1,271.25
04.02.03 CIELO RASO S/. 6,170.56
04.02.03.01 TARRAJEO DE CIELO RASO - SUPERFICIE CON CEMENTO-ARENA S/. 6,170.56 S/. 6,170.56
04.02.04 PISOS Y PAVIMENTOS S/. 23,179.67
04.02.04.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 8,239.29 S/. 2,471.79 S/. 5,767.50
04.02.04.02 PISO DE CERAMICO 45 X 45 CM S/. 13,169.36 S/. 3,950.81 S/. 9,218.55
04.02.04.03 PISO CEMENTO PULIDO E=2" S/. 1,771.02 S/. 531.31 S/. 1,239.71
04.02.05 CONTRAZOCALOS S/. 5,606.04
04.02.05.01 CONTRAZOCALO CERAMICO H=0.10 m. S/. 2,662.73 S/. 798.82 S/. 1,863.91
04.02.05.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 1,170.40 S/. 351.12 S/. 819.28
04.02.05.03 ZOCALO DE CERAMICA 20 X 30 CM S/. 1,772.91 S/. 531.87 S/. 1,241.04
04.02.06 CARPINTERIA MADERA S/. 9,607.44
04.02.06.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 8,187.63 S/. 2,456.29 S/. 5,731.34
04.02.06.02 PUERTA CONTRAPLACADA SEGÚN DISEÑO S/. 1,419.81 S/. 425.94 S/. 993.87
04.02.07 CARPINTERIA METALICA S/. 13,514.39
04.02.07.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 13,514.39 S/. 13,514.39
04.02.08 CERRAJERIA S/. 839.68
04.02.08.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 623.44 S/. 623.44
04.02.08.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 216.24 S/. 216.24
04.02.09 VIDRIOS, CRISTALES Y SIMILARES S/. 9,738.32
04.02.09.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 9,738.32 S/. 9,738.32
04.02.10 PINTURAS S/. 10,210.13
04.02.10.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 3,909.00 S/. 3,909.00
04.02.10.02 PINTURA EN CONTRAZOCALO S/. 120.99 S/. 120.99
04.02.10.03 PINTURA EN VIGAS S/. 1,822.66 S/. 1,822.66
04.02.10.04 PINTURA EN COLUMNAS S/. 2,853.26 S/. 2,853.26
04.02.10.05 PINTURA EN CIELO RASO S/. 1,504.22 S/. 1,504.22
04.02.11 CUBIERTA METALICA Y CIELO RASO S/. 62,184.64
04.02.11.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 24,579.34 S/. 23,043.13 S/. 1,536.21
04.02.11.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 13,645.17 S/. 13,645.17
04.02.11.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 23,960.13 S/. 23,960.13
04.03 INSTALACIONES ELECTRICAS S/. 33,036.01
04.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 5,985.59 S/. 5,985.59
04.03.02 SALIDA TOMACORRIENTE S/. 11,619.18 S/. 11,619.18
04.03.03 SALIDA PARA INTERRUPTOR SIMPLE S/. 865.84 S/. 865.84
04.03.04 SALIDA PARA INTERRUPTOR TRIPLE S/. 228.76 S/. 228.76
04.03.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 7,816.98 S/. 7,816.98
04.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIRCULAR 22W S/. 137.18 S/. 137.18
04.03.07 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 3,082.04 S/. 3,082.04
04.03.08 ALAMBRE THHN 2.5 mm2 S/. 575.42 S/. 575.42
04.03.09 ALAMBRE THHN 4 mm2 S/. 909.88 S/. 909.88
04.03.10 TABLERO DE DISTRIBUCION S/. 469.91 S/. 469.91
04.03.11 SUBTABLERO DE DISTRIBUCION S/. 439.49 S/. 439.49
04.03.12 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
04.03.13 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
04.04 INSTALACIONES SANITARIAS S/. 7,294.83
04.04.01 APARATOS Y ACCESORIOS SANITARIOS S/. 1,193.88
04.04.01.01 INODORO TANQUE BAJO S/. 723.58 S/. 723.58
04.04.01.02 LAVATORIO DE LOZA BLANCA S/. 391.76 S/. 391.76
04.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" S/. 78.54 S/. 78.54
04.04.02 SISTEMA DE DESAGUE S/. 2,175.09
04.04.02.01 SALIDA DE DESAGUE PVC D=2" S/. 186.30 S/. 186.30
04.04.02.02 SALIDA DE DESAGUE PVC D=4" S/. 291.08 S/. 291.08
04.04.02.03 SALIDA VENTILACION DE 2" S/. 58.08 S/. 58.08
04.04.02.04 REGISTRO DE BRONCE 4" S/. 285.99 S/. 285.99
04.04.02.05 SUMIDERO DE 2" S/. 154.82 S/. 154.82
04.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" S/. 355.46 S/. 355.46
04.04.02.07 YEE PVC SAL 4"X2" S/. 123.94 S/. 123.94
04.04.02.08 YEE PVC SAL 2"X2" S/. 116.66 S/. 116.66
04.04.02.09 CODO PVC SAL P/DESAGUE D=2" S/. 51.62 S/. 51.62
04.04.02.10 EXCAVACION MANUAL PARA TUBERIA S/. 155.90 S/. 155.90
04.04.02.11 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 40.41 S/. 40.41
04.04.02.12 CAMA DE APOYO S/. 98.84 S/. 98.84
04.04.02.13 RELLENO COMPACTADO DE ZANJAS S/. 125.64 S/. 125.64
04.04.02.14 CAJA DE REGISTRO CON REJILLA METALICA S/. 130.35 S/. 130.35
04.04.03 SISTEMA DE AGUA FRIA S/. 1,193.38
04.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" S/. 291.36 S/. 291.36
04.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" S/. 68.21 S/. 68.21
04.04.03.03 TUBERIA PVC SAP CLASE 10-3/4" S/. 126.49 S/. 126.49
04.04.03.04 CODO PVC 1/2" S/. 19.88 S/. 19.88
04.04.03.05 TEE PVC 1/2" S/. 33.12 S/. 33.12
04.04.03.06 CODO PVC 3/4" S/. 10.78 S/. 10.78
04.04.03.07 EXCAVACION MANUAL PARA TUBERIA S/. 163.94 S/. 163.94
04.04.03.08 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 42.50 S/. 42.50
04.04.03.09 CAMA DE APOYO S/. 103.93 S/. 103.93
04.04.03.10 RELLENO COMPACTADO DE ZANJAS S/. 132.12 S/. 132.12
04.04.03.11 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" S/. 70.70 S/. 70.70
04.04.03.12 CAJA PARA VALVULAS S/. 130.35 S/. 130.35
04.04.04 SISTEMA DE AGUA PLUVIAL S/. 2,732.48
04.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 1,886.52 S/. 1,886.52
04.04.04.02 TUBERIA PVC SAL D=4" S/. 771.80 S/. 771.80
04.04.04.03 CODO PVC SAL D=4" S/. 74.16 S/. 74.16
04.05 CONSTRUCCION DE ESCALERAS S/. 24,897.01
04.05.01 OBRAS PRELIMINARES S/. 48.31
04.05.01.01 LIMPIEZA DE TERRENO S/. 17.06 S/. 17.06
04.05.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 31.25 S/. 31.25
04.05.02 MOVIMIENTO DE TIERRAS S/. 1,179.42
04.05.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 573.53 S/. 573.53
04.05.02.02 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 35.04 S/. 35.04
04.05.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 96.85 S/. 84.74 S/. 12.11
04.05.02.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 277.78 S/. 277.78
04.05.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 196.22 S/. 196.22
04.05.03 OBRAS DE CONCRETO SIMPLE S/. 3,851.27
04.05.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,775.80 S/. 1,775.80
04.05.03.02 SOBRECIMIENTO 1:8 + 25% P.M S/. 674.55 S/. 674.55
04.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 839.82 S/. 839.82
04.05.03.04 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 561.10 S/. 561.10
04.05.04 OBRAS DE CONCRETO ARMADO S/. 11,546.69
04.05.04.01 VIGA DE CIMENTACION S/. 2,645.43
04.05.04.01.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 899.62 S/. 899.62
04.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 1,029.23 S/. 1,029.23
04.05.04.01.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 716.58 S/. 716.58
04.05.04.02 COLUMNAS S/. 2,896.60
04.05.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 751.18 S/. 751.18
04.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 799.92 S/. 799.92
04.05.04.02.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 1,345.50 S/. 1,345.50
04.05.04.03 VIGAS S/. 2,222.94
04.05.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 746.68 S/. 746.68
04.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 801.48 S/. 801.48
04.05.04.03.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 674.78 S/. 674.78
04.05.04.04 ESCALERAS S/. 2,484.68
04.05.04.04.01 ESCALERAS CONCRETO FC=210 KG/CM2 S/. 850.14 S/. 850.14
04.05.04.04.02 ESCALERA ENCOFRADO Y DESENCOFRADO S/. 682.25 S/. 682.25
04.05.04.04.03 ESCALERA ACERO fy=4,200 kg/cm2 S/. 952.29 S/. 952.29
04.05.04.05 LOSA MACIZA S/. 1,297.04
04.05.04.05.01 LOSA MACIZA CONCRETO FC=210 KG/CM2 S/. 346.35 S/. 346.35
04.05.04.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA S/. 279.59 S/. 279.59
04.05.04.05.03 LOSA MACIZA ACERO fy=4,200 kg/cm2 S/. 671.10 S/. 671.10
04.05.05 ALBAÑILERIA S/. 1,616.54
04.05.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 1,616.54 S/. 1,616.54
04.05.06 REVOQUES S/. 4,512.97
04.05.06.01 TARRAJEO EN EXTERIORES C:A-1:4 S/. 1,554.08 S/. 1,554.08
04.05.06.02 TARRAJEO DE COLUMNAS C:A-1:4 S/. 434.02 S/. 434.02
04.05.06.03 VESTIDURA DE ARISTAS EN COLUMNAS S/. 223.28 S/. 223.28
04.05.06.04 TARRAJEO DE VIGAS C:A-1:4 S/. 404.93 S/. 404.93
04.05.06.05 VESTIDURA DE ARISTAS EN VIGAS S/. 178.47 S/. 178.47
04.05.06.06 BRUÑAS DE 1.0 cm S/. 771.51 S/. 771.51
04.05.06.07 REVESTIMIENTO DE GRADAS Y ESCALERA S/. 567.12 S/. 567.12
04.05.06.08 REVESTIMIENTO DE FONDO DE ESCALERAS CON CEMENTO-ARENA S/. 379.56 S/. 379.56
04.05.07 PISOS S/. 732.78
04.05.07.01 PISO CEMENTO PULIDO E=2" S/. 732.78 S/. 732.78
04.05.08 CONTRAZOCALOS S/. 262.11
04.05.08.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 262.11 S/. 262.11
04.05.09 PINTURAS S/. 1,146.92
04.05.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 617.08 S/. 617.08
04.05.09.02 PINTURA EN COLUMNAS S/. 198.77 S/. 198.77
04.05.09.03 PINTURA EN VIGAS S/. 177.12 S/. 177.12
04.05.09.04 PINTURA EN FONDO DE ESCALERA S/. 95.39 S/. 95.39
04.05.09.05 PINTURA EN LOSA MACIZA S/. 58.56 S/. 58.56
05 CONSTRUCCION DE COMEDOR S/. 144,917.87
05.01 ESTRUCTURAS S/. 52,611.09
05.01.01 OBRAS PRELIMINARES S/. 188.04
05.01.01.01 LIMPIEZA DE TERRENO S/. 66.41 S/. 66.41
05.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 121.63 S/. 121.63
05.01.02 MOVIMIENTO DE TIERRAS S/. 4,303.76
05.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 756.56 S/. 756.56
05.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 1,072.93 S/. 1,072.93
05.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 157.63 S/. 157.63
05.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 809.58 S/. 809.58
05.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 1,252.98 S/. 1,252.98
05.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 254.08 S/. 254.08
05.01.03 OBRAS DE CONCRETO SIMPLE S/. 7,695.11
05.01.03.01 SOLADO PARA ZAPATAS S/. 700.14 S/. 700.14
05.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,762.47 S/. 1,762.47
05.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 1,042.83 S/. 1,042.83
05.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 1,665.70 S/. 1,665.70
05.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 2,523.97 S/. 2,523.97
05.01.04 OBRAS DE CONCRETO ARMADO S/. 40,424.18
05.01.04.01 ZAPATAS S/. 5,545.41
05.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 4,484.61 S/. 4,484.61
05.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 1,060.80 S/. 1,060.80
05.01.04.02 VIGA DE CIMENTACION S/. 8,818.36
05.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 2,856.29 S/. 2,856.29
05.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 2,611.63 S/. 2,611.63
05.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 3,350.44 S/. 3,350.44
05.01.04.03 COLUMNAS S/. 13,991.50
05.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 3,692.94 S/. 3,692.94
05.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 4,840.90 S/. 4,840.90
05.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 5,457.66 S/. 5,457.66
05.01.04.04 VIGAS S/. 10,012.03
05.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 2,977.74 S/. 2,977.74
05.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 3,934.07 S/. 3,934.07
05.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 3,100.22 S/. 3,100.22
05.01.04.05 COLUMNETAS S/. 2,056.88
05.01.04.05.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 474.28 S/. 474.28
05.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 802.57 S/. 802.57
05.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 780.03 S/. 780.03
05.02 ARQUITECTURA S/. 78,614.27
05.02.01 ALBAÑILERIA S/. 3,063.62
05.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 3,063.62 S/. 2,297.72 S/. 765.91
05.02.02 REVOQUES S/. 11,385.22
05.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 2,249.66 S/. 2,249.66
05.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 1,411.13 S/. 1,411.13
05.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 2,035.58 S/. 2,035.58
05.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 317.40 S/. 317.40
05.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 1,987.61 S/. 1,987.61
05.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 212.52 S/. 212.52
05.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 2,708.12 S/. 2,708.12
05.02.02.08 BRUÑAS DE 1.0 cm S/. 463.20 S/. 463.20
05.02.03 PISOS Y PAVIMENTOS S/. 5,843.07
05.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 2,248.75 S/. 2,248.75
05.02.03.02 PISO DE CERAMICO 45 X 45 CM S/. 3,594.32 S/. 3,594.32
05.02.04 CONTRAZOCALOS S/. 1,272.03
05.02.04.01 CONTRAZOCALO CERAMICO H=0.10 m. S/. 728.41 S/. 728.41
05.02.04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 543.62 S/. 543.62
05.02.05 CARPINTERIA MADERA S/. 6,321.84
05.02.05.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 6,321.84 S/. 6,321.84
05.02.06 CARPINTERIA METALICA S/. 5,773.96
05.02.06.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 5,773.96 S/. 5,773.96
05.02.07 CERRAJERIA S/. 524.80
05.02.07.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 389.65 S/. 389.65
05.02.07.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 135.15 S/. 135.15
05.02.08 VIDRIOS, CRISTALES Y SIMILARES S/. 4,182.85
05.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 4,182.85 S/. 4,182.85
05.02.09 PINTURAS S/. 3,306.15
05.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 1,448.30 S/. 1,448.30
05.02.09.02 PINTURA EN CONTRAZOCALO S/. 56.20 S/. 56.20
05.02.09.03 PINTURA EN VIGAS S/. 869.38 S/. 869.38
05.02.09.04 PINTURA EN COLUMNAS S/. 932.27 S/. 932.27
05.02.10 CUBIERTA METALICA Y CIELO RASO S/. 36,940.73
05.02.10.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 13,889.70 S/. 13,889.70
05.02.10.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 9,510.27 S/. 9,510.27
05.02.10.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 13,540.76 S/. 13,540.76
05.03 INSTALACIONES ELECTRICAS S/. 8,742.62
05.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 1,459.90 S/. 1,459.90
05.03.02 SALIDA TOMACORRIENTE S/. 1,936.53 S/. 1,936.53
05.03.03 SALIDA PARA INTERRUPTOR SIMPLE S/. 432.92 S/. 432.92
05.03.04 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 2,057.10 S/. 2,057.10
05.03.05 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 1,081.00 S/. 1,081.00
05.03.06 ALAMBRE THHN 2.5 mm2 S/. 208.75 S/. 208.75
05.03.07 ALAMBRE THHN 4 mm2 S/. 221.19 S/. 221.19
05.03.08 TABLERO DE DISTRIBUCION S/. 439.49 S/. 439.49
05.03.09 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
05.03.10 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
05.04 INSTALACIONES SANITARIAS S/. 4,949.89
05.04.01 APARATOS Y ACCESORIOS SANITARIOS S/. 1,433.36
05.04.01.01 LAVADERO DE ACERO INOXIDABLE DOS POZAS CON ESCURRIDERO S/. 895.52 S/. 895.52
05.04.01.02 GRIFO TIPO CUELLO DE CISNE CROMADO 1/2" S/. 537.84 S/. 537.84
05.04.02 SISTEMA DE DESAGUE S/. 1,071.20
05.04.02.01 SALIDA DE DESAGUE PVC D=2" S/. 372.60 S/. 372.60
05.04.02.02 SUMIDERO DE 2" S/. 77.41 S/. 77.41
05.04.02.03 TUBERIA PVC SAL P/DESAGUE D=4" S/. 186.25 S/. 186.25
05.04.02.04 YEE PVC SAL P/DESAGUE D=2" S/. 27.59 S/. 27.59
05.04.02.05 CODO PVC SAL P/DESAGUE D=2" S/. 25.81 S/. 25.81
05.04.02.06 EXCAVACION MANUAL PARA TUBERIA S/. 93.06 S/. 93.06
05.04.02.07 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 24.13 S/. 24.13
05.04.02.08 CAMA DE APOYO S/. 59.00 S/. 59.00
05.04.02.09 RELLENO COMPACTADO DE ZANJAS S/. 75.00 S/. 75.00
05.04.02.10 CAJA DE REGISTRO CON REJILLA METALICA S/. 130.35 S/. 130.35
05.04.03 SISTEMA DE AGUA FRIA S/. 729.43
05.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" S/. 145.68 S/. 145.68
05.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" S/. 104.61 S/. 104.61
05.04.03.03 CODO PVC 1/2" S/. 19.88 S/. 19.88
05.04.03.04 TEE PVC 1/2" S/. 11.04 S/. 11.04
05.04.03.05 EXCAVACION MANUAL PARA TUBERIA S/. 91.57 S/. 91.57
05.04.03.06 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 23.74 S/. 23.74
05.04.03.07 CAMA DE APOYO S/. 58.06 S/. 58.06
05.04.03.08 RELLENO COMPACTADO DE ZANJAS S/. 73.80 S/. 73.80
05.04.03.09 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" S/. 70.70 S/. 70.70
05.04.03.10 CAJA PARA VALVULAS S/. 130.35 S/. 130.35
05.04.04 SISTEMA DE AGUA PLUVIAL S/. 1,715.90
05.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 1,369.34 S/. 1,369.34
05.04.04.02 TUBERIA PVC SAL D=4" S/. 272.40 S/. 272.40
05.04.04.03 CODO PVC SAL D=4" S/. 74.16 S/. 74.16
06 CONSTRUCCIÓN DE SERVICIOS HIGIENICOS S/. 232,892.65
06.01 ESTRUCTURAS S/. 64,827.86
06.01.01 OBRAS PRELIMINARES S/. 228.00
06.01.01.01 LIMPIEZA DE TERRENO S/. 80.52 S/. 80.52
06.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 147.48 S/. 147.48
06.01.02 MOVIMIENTO DE TIERRAS S/. 5,317.64
06.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 1,274.60 S/. 1,274.60
06.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 1,104.82 S/. 1,104.82
06.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 189.70 S/. 189.70
06.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 538.44 S/. 538.44
06.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 1,507.13 S/. 1,507.13
06.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 702.95 S/. 702.95
06.01.03 OBRAS DE CONCRETO SIMPLE S/. 12,987.55
06.01.03.01 SOLADO PARA ZAPATAS S/. 720.87 S/. 720.87
06.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 4,244.59 S/. 4,244.59
06.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 1,918.97 S/. 1,918.97
06.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 3,065.70 S/. 3,065.70
06.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 3,037.42 S/. 3,037.42
06.01.04 OBRAS DE CONCRETO ARMADO S/. 46,294.67
06.01.04.01 ZAPATAS S/. 5,692.90
06.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 4,615.05 S/. 4,615.05
06.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 1,077.85 S/. 1,077.85
06.01.04.02 VIGA DE CIMENTACION S/. 8,838.96
06.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 2,802.32 S/. 2,802.32
06.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 2,560.22 S/. 2,560.22
06.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 3,476.42 S/. 3,476.42
06.01.04.03 COLUMNAS S/. 13,863.72
06.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 3,616.47 S/. 3,616.47
06.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 4,751.72 S/. 4,751.72
06.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 5,495.53 S/. 5,495.53
06.01.04.04 VIGAS S/. 13,462.21
06.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 3,962.83 S/. 3,962.83
06.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 5,231.35 S/. 5,231.35
06.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 4,268.03 S/. 4,268.03
06.01.04.05 COLUMNETAS S/. 4,436.88
06.01.04.05.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 1,057.69 S/. 1,057.69
06.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 1,785.61 S/. 1,785.61
06.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 1,593.58 S/. 1,593.58
06.02 ARQUITECTURA S/. 122,519.44
06.02.01 ALBAÑILERIA S/. 6,205.88
06.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 6,205.88 S/. 6,205.88
06.02.02 REVOQUES S/. 15,227.74
06.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 3,661.85 S/. 3,661.85
06.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 2,304.23 S/. 2,304.23
06.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 2,578.18 S/. 2,578.18
06.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 585.12 S/. 585.12
06.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 2,643.04 S/. 2,643.04
06.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 379.09 S/. 379.09
06.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 2,571.46 S/. 2,571.46
06.02.02.08 BRUÑAS DE 1.0 cm S/. 504.77 S/. 504.77
06.02.03 PISOS S/. 7,031.73
06.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 2,706.22 S/. 2,706.22
06.02.03.02 PISO DE CERAMICO 45 X 45 CM S/. 4,325.51 S/. 4,325.51
06.02.04 ZOCALOS S/. 16,988.89
06.02.04.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 492.80 S/. 492.80
06.02.04.02 ZOCALO DE CERAMICA 20 X 30 CM S/. 16,496.09 S/. 16,496.09
06.02.05 CARPINTERIA MADERA S/. 24,845.08
06.02.05.01 PUERTAS S/. 14,785.70
06.02.05.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 8,475.44 S/. 8,475.44
06.02.05.01.02 PUERTA CONTRAPLACADA SEGUN DISEÑO S/. 6,310.26 S/. 6,310.26
06.02.05.02 TABIQUES DIVISORIOS S/. 10,059.38
06.02.05.02.01 DIVISIONES CONTRAPLACADAS DE MADERA (SSHH) S/. 10,059.38 S/. 10,059.38
2 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN –
PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO AL 09 DE DICIEMBRE 2018 DICIEMBRE 2018 ENERO 2019 FEBRERO 2019 MARZO 2019
3 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN –
PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO AL 09 DE DICIEMBRE 2018 DICIEMBRE 2018 ENERO 2019 FEBRERO 2019 MARZO 2019
12.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 2,580.34 S/. 2,580.34
12.02 CARPINTERIA METALICA S/. 3,189.96
12.02.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 3,189.96 S/. 3,189.96
12.03 CERRAJERIA S/. 209.92
12.03.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 155.86 S/. 155.86
12.03.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 54.06 S/. 54.06
12.04 VIDRIOS, CRISTALES Y SIMILARES S/. 2,298.86
12.04.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 2,298.86 S/. 2,298.86
12.05 PINTURAS S/. 3,174.34
12.05.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 1,741.94 S/. 1,741.94
12.05.02 PINTURA EN VIGAS S/. 1,065.45 S/. 1,065.45
12.05.03 PINTURA EN COLUMNAS S/. 366.95 S/. 366.95
12.06 CUBIERTA METALICA Y CIELO RASO S/. 44,352.34
12.06.01 DESMONTAJE DE COBERTURA EXISTENTE S/. 607.27 S/. 607.27
12.06.02 RESANE PRODUCTO DE DESMONTAJE S/. 1,582.15 S/. 1,582.15
12.06.03 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 16,154.02 S/. 16,154.02
12.06.04 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 10,262.07 S/. 10,262.07
12.06.05 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 15,746.83 S/. 15,746.83
12.07 INSTALACIONES ELECTRICAS S/. 8,783.50
12.07.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 2,189.85 S/. 2,189.85
12.07.02 SALIDA TOMACORRIENTE S/. 1,075.85 S/. 1,075.85
12.07.03 SALIDA PARA INTERRUPTOR SIMPLE S/. 108.23 S/. 108.23
12.07.04 SALIDA PARA INTERRUPTOR DOBLE S/. 225.78 S/. 225.78
12.07.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 3,085.65 S/. 3,085.65
12.07.06 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 789.35 S/. 789.35
12.07.07 ALAMBRE THHN 2.5 mm2 S/. 246.22 S/. 246.22
12.07.08 ALAMBRE THHN 4 mm2 S/. 156.83 S/. 156.83
12.07.09 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
12.07.10 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
12.08 SISTEMA DE AGUA PLUVIAL S/. 843.30
12.08.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 843.30 S/. 843.30
13 REMODELACION Y CAMBIO DE CUBIERTA SECTOR PRIMARIA AULAS 5 Y 6 S/. 65,432.56
13.01 CARPINTERIA MADERA S/. 2,580.34
13.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 2,580.34 S/. 2,580.34
13.02 CARPINTERIA METALICA S/. 3,189.96
13.02.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 3,189.96 S/. 3,189.96
13.03 CERRAJERIA S/. 209.92
13.03.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 155.86 S/. 155.86
13.03.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 54.06 S/. 54.06
13.04 VIDRIOS, CRISTALES Y SIMILARES S/. 2,298.86
13.04.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 2,298.86 S/. 2,298.86
13.05 PINTURAS S/. 3,174.34
13.05.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 1,741.94 S/. 1,741.94
13.05.02 PINTURA EN VIGAS S/. 1,065.45 S/. 1,065.45
13.05.03 PINTURA EN COLUMNAS S/. 366.95 S/. 366.95
13.06 CUBIERTA METALICA Y CIELO RASO S/. 44,352.34
13.06.01 DESMONTAJE DE COBERTURA EXISTENTE S/. 607.27 S/. 265.68 S/. 341.59
13.06.02 RESANE PRODUCTO DE DESMONTAJE S/. 1,582.15 S/. 1,582.15
13.06.03 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 16,154.02 S/. 16,154.02
13.06.04 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 10,262.07 S/. 10,262.07
13.06.05 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 15,746.83 S/. 15,746.83
13.07 INSTALACIONES ELECTRICAS S/. 8,783.50
13.07.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 2,189.85 S/. 2,189.85
13.07.02 SALIDA TOMACORRIENTE S/. 1,075.85 S/. 1,075.85
13.07.03 SALIDA PARA INTERRUPTOR SIMPLE S/. 108.23 S/. 108.23
13.07.04 SALIDA PARA INTERRUPTOR DOBLE S/. 225.78 S/. 225.78
13.07.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 3,085.65 S/. 3,085.65
13.07.06 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 789.35 S/. 789.35
13.07.07 ALAMBRE THHN 2.5 mm2 S/. 246.22 S/. 246.22
13.07.08 ALAMBRE THHN 4 mm2 S/. 156.83 S/. 156.83
13.07.09 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
13.07.10 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
13.08 SISTEMA DE AGUA PLUVIAL S/. 843.30
13.08.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 843.30 S/. 843.30
14 CONSTRUCCION DE VEREDAS S/. 124,773.80
14.01 OBRAS PRELIMINARES S/. 2,711.41
14.01.01 LIMPIEZA DE TERRENO S/. 1,003.84 S/. 1,003.84
14.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 1,707.57 S/. 1,707.57
14.02 MOVIMIENTO DE TIERRAS S/. 43,860.65
14.02.01 CORTE DE TERRENO CON MAQUINARIA S/. 1,105.27 S/. 1,105.27
14.02.02 BASE PARA VEREDAS DE 0.15 M S/. 38,818.72 S/. 38,818.72
14.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 3,936.66 S/. 3,936.66
14.03 CONCRETO SIMPLE S/. 78,201.74
14.03.01 VEREDA CONC. FC=175 KG/CM2 E=4" S/. 45,090.16 S/. 45,090.16
14.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS S/. 11,541.07 S/. 11,541.07
14.03.03 JUNTA ASFALTICA PARA VEREDAS S/. 19,014.33 S/. 19,014.33
14.03.04 CURADO CON AGUA EN VEREDA S/. 2,556.18 S/. 2,556.18
15 RAMPAS S/. 8,542.76
15.01 OBRAS PRELIMINARES S/. 104.64
15.01.01 LIMPIEZA DE TERRENO S/. 38.74 S/. 0.00
15.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 65.90 S/. 65.90
15.02 MOVIMIENTO DE TIERRAS S/. 255.14
15.02.01 CORTE DE TERRENO CON MAQUINARIA S/. 6.68 S/. 6.68
15.02.02 BASE PARA RAMPAS DE 0.15 M S/. 224.68 S/. 224.68
15.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 23.78 S/. 23.78
15.03 CONCRETO SIMPLE S/. 3,159.80
15.03.01 CONCRETO FROTACHADO EN LOSA FC=175 KG/CM2 E=4" S/. 2,035.53 S/. 2,035.53
15.03.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS S/. 801.69 S/. 801.69
15.03.03 JUNTA DE DILATACION S/. 223.93 S/. 223.93
15.03.04 CURADO CON AGUA EN RAMPAS S/. 98.65 S/. 98.65
15.04 CARPINTERIA METALICA S/. 5,023.18
15.04.01 BARANDAS METALICAS DE TUBO 2" S/. 5,023.18 S/. 5,023.18
16 GRADAS Y ESCALERAS S/. 15,269.04
16.01 OBRAS PRELIMINARES S/. 60.34
16.01.01 LIMPIEZA DE TERRENO S/. 21.31 S/. 21.31
16.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 39.03 S/. 39.03
16.02 MOVIMIENTO DE TIERRAS S/. 1,247.62
16.02.01 EXCAVACION DE ZANJAS MANUAL S/. 217.40 S/. 217.40
16.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 368.27 S/. 368.27
16.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 661.95 S/. 661.95
16.03 OBRAS DE CONCRETO S/. 6,737.15
16.03.01 CIMIENTOS S/. 1,749.14
16.03.01.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,749.14 S/. 1,749.14
16.03.02 ESCALERAS S/. 4,988.01
16.03.02.01 ESCALERAS CONCRETO FC=210 KG/CM2 S/. 3,589.48 S/. 3,589.48
16.03.02.02 ESCALERA ENCOFRADO Y DESENCOFRADO S/. 896.26 S/. 896.26
16.03.02.03 ESCALERA ACERO fy=4,200 kg/cm2 S/. 502.27 S/. 502.27
16.04 REVOQUES S/. 1,470.32
16.04.01 REVESTIMIENTO DE GRADAS Y ESCALERA S/. 1,470.32 S/. 1,470.32
16.05 CARPINTERIA METALICA S/. 4,997.34
16.05.01 BARANDAS METALICAS DE TUBO 2" S/. 3,525.66 S/. 3,525.66
16.05.02 CANTONERA DE ALUMINIO EN PASOS DE ESCALERA S/. 1,471.68 S/. 1,471.68
16.06 PINTURAS S/. 466.89
16.06.01 PINTURA ANTICORROSIVA EN BARANDAS S/. 466.89 S/. 466.89
16.07 VARIOS S/. 289.38
16.07.01 JUNTA DE DILATACION S/. 289.38 S/. 289.38
17 PATIO DE HONOR S/. 28,317.10
17.01 OBRAS PRELIMINARES S/. 709.26
17.01.01 LIMPIEZA DE TERRENO S/. 262.59 S/. 262.59
17.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 446.67 S/. 446.67
17.02 MOVIMIENTO DE TIERRAS S/. 11,012.28
17.02.01 CORTE DE TERRENO CON MAQUINARIA S/. 144.55 S/. 144.55
17.02.02 BASE GRANULAR DE 0.15 M S/. 10,352.76 S/. 10,352.76
17.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 514.97 S/. 514.97
17.03 CONCRETO SIMPLE S/. 16,595.56
17.03.01 CONCRETO SEMIPULIDO EN LOSA FC=175 KG/CM2 S/. 11,901.05 S/. 11,901.05
17.03.02 ENCOFRADO Y DESENCOFRADO EN PATIO S/. 1,538.98 S/. 1,538.98
17.03.03 JUNTA ASFALTICA S/. 2,486.88 S/. 2,176.02 S/. 310.86
17.03.04 CURADO CON AGUA S/. 668.65 S/. 668.65
18 LOSA DEPORTIVA S/. 60,745.47
18.01 OBRAS PRELIMINARES S/. 1,092.02
18.01.01 LIMPIEZA DE TERRENO S/. 404.30 S/. 404.30
18.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 687.72 S/. 687.72
18.02 MOVIMIENTO DE TIERRAS S/. 17,157.10
18.02.01 CORTE DE TERRENO CON MAQUINARIA S/. 333.86 S/. 333.86
18.02.02 BASE GRANULAR DE 0.15 M S/. 15,634.17 S/. 15,634.17
18.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,189.07 S/. 1,189.07
18.03 CONCRETO SIMPLE S/. 31,783.50
18.03.01 CONCRETO SEMIPULIDO EN LOSA FC=175 KG/CM2 S/. 27,486.29 S/. 27,486.29
18.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA S/. 4,297.21 S/. 4,297.21
18.04 PINTURA S/. 1,837.47
18.04.01 PINTURA DE MARCA EN LOSA DEPORTIVA S/. 1,837.47 S/. 1,837.47
18.05 VARIOS S/. 8,875.38
18.05.01 JUNTA ASFALTICA S/. 3,829.05 S/. 3,829.05
18.05.02 CURADO CON ADITIVO ANTISOL S/. 1,546.33 S/. 1,546.33
18.05.03 ARCOS DE FUTBOL CON TABLERO DE BASQUET S/. 3,000.00 S/. 3,000.00
18.05.04 POSTE DE TUBO PARA VOLEY S/. 500.00 S/. 500.00
19 CONSTRUCCION DE MURO DE CONTENCION S/. 647,548.41
19.01 OBRAS PRELIMINARES S/. 2,466.94
19.01.01 LIMPIEZA DE TERRENO S/. 913.33 S/. 137.00 S/. 456.67 S/. 319.67
19.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 1,553.61 S/. 233.04 S/. 776.81 S/. 543.76
19.02 MOVIMIENTO DE TIERRAS S/. 123,308.74
19.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 28,384.07 S/. 4,257.61 S/. 8,515.22 S/. 8,515.22 S/. 7,096.02
19.02.02 NIVELACION Y APISONADO MANUAL S/. 1,893.16 S/. 283.97 S/. 567.95 S/. 567.95 S/. 473.29
19.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (AFIRMADO) S/. 75,184.93 S/. 11,277.74 S/. 22,555.48 S/. 22,555.48 S/. 18,796.23
19.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 17,435.43 S/. 2,615.31 S/. 5,230.63 S/. 5,230.63 S/. 4,358.86
19.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 411.15 S/. 61.67 S/. 123.35 S/. 123.35 S/. 102.79
19.03 OBRAS DE CONCRETO ARMADO S/. 520,704.96
19.03.01 CONCRETO CICLOPEO MURO DE CONTENCION FC=140 KG/CM2 + 30% PG S/. 412,427.88 S/. 61,864.18 S/. 123,728.36 S/. 123,728.36 S/. 103,106.97
19.03.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION S/. 108,277.08 S/. 16,241.56 S/. 32,483.12 S/. 32,483.12 S/. 27,069.27
19.04 VARIOS S/. 1,067.77
19.04.01 TUBERIA PVC SAL D=3" DRENAJE MUROS S/. 1,067.77 S/. 160.17 S/. 320.33 S/. 320.33 S/. 266.94
20 CONSTRUCCION DE CERCO S/. 53,726.28
20.01 OBRAS PRELIMINARES S/. 127.62
20.01.01 LIMPIEZA DE TERRENO S/. 47.25 S/. 47.25
20.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 80.37 S/. 80.37
20.02 MOVIMIENTO DE TIERRAS S/. 49.07
20.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 33.54 S/. 33.54
20.02.02 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 15.53 S/. 15.53
20.03 OBRAS DE CONCRETO SIMPLE S/. 269.87
20.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 269.87 S/. 269.87
20.04 CARPINTERIA METALICA S/. 53,279.72
20.04.01 CERCO MALLA METALICA COCADA DE 2" S/. 53,279.72 S/. 26,306.86 S/. 26,972.86
21 ADQUISICION E INSTALACION DE POSTES ORNAMENTALES S/. 30,322.97
21.01 ADQUISICION DE POSTES ORNAMENTALES S/. 9,100.00 S/. 9,100.00
21.02 TRAZO NIVELADO Y REPLANTEO S/. 21.71 S/. 21.71
21.03 CIMENTACION PARA POSTES S/. 2,165.61 S/. 2,165.61
21.04 EXCAVACION DE ZANJAS PARA CABLE SUBTERRANEO S/. 3,169.11 S/. 3,169.11
21.05 INSTALACION DE POSTES ORNAMENTALES S/. 164.84 S/. 164.84
21.06 INSTALACION DE FAROLAS ORNAMENTALES S/. 5,443.62 S/. 5,443.62
21.07 INSTALACION DE CABLE SUBTERRANEO NYY 3X10MM2 S/. 10,258.08 S/. 10,258.08
22 CORTES GENERALES S/. 145,915.73
22.01 EXCAVACION CON MAQUINARIA S/. 38,392.75 S/. 32,633.84 S/. 5,758.91
22.02 RELLENO CON MATERIAL PROPIO, COMPACTADO S/. 9,455.07 S/. 8,036.81 S/. 1,418.26
22.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 98,067.91 S/. 83,357.72 S/. 14,710.19
23 INSTALACION DE SISTEMA DE AGUA Y DESAGUE S/. 28,190.61
23.01 SISTEMA DE DESAGUE S/. 8,307.53
23.01.01 TRAZO NIVELADO Y REPLANTEO S/. 150.66 S/. 22.60 S/. 52.73 S/. 75.33
23.01.02 EXCAVACION MANUAL PARA TUBERIA S/. 1,359.61 S/. 203.94 S/. 475.86 S/. 679.81
23.01.03 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 352.46 S/. 52.87 S/. 123.36 S/. 176.23
23.01.04 CAMA DE APOYO S/. 861.97 S/. 129.30 S/. 301.69 S/. 430.99
23.01.05 RELLENO COMPACTADO DE ZANJAS S/. 1,095.72 S/. 164.36 S/. 383.50 S/. 547.86
23.01.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 57.85 S/. 8.68 S/. 20.25 S/. 28.93
23.01.07 SUMINISTRO E INSTALACION DE TUBERIA 4" DE DESAGUE S/. 302.49 S/. 45.37 S/. 105.87 S/. 151.25
23.01.08 SUMINISTRO E INSTALACION DE TUBERIA 6" DE DESAGUE S/. 3,207.89 S/. 481.18 S/. 1,122.76 S/. 1,603.95
23.01.09 CAJAS DE REGISTRO DE DESAGUE 60 x 60 cm S/. 577.38 S/. 86.61 S/. 202.08 S/. 288.69
23.01.10 PRUEBA HIDRAULICA S/. 341.50 S/. 51.23 S/. 119.53 S/. 170.75
23.02 SISTEMA DE AGUA S/. 6,827.77
23.02.01 TRAZO NIVELADO Y REPLANTEO S/. 184.85 S/. 27.73 S/. 64.70 S/. 92.43
23.02.02 EXCAVACION MANUAL PARA TUBERIA S/. 1,668.13 S/. 250.22 S/. 583.85 S/. 834.07
23.02.03 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 432.44 S/. 64.87 S/. 151.35 S/. 216.22
23.02.04 CAMA DE APOYO S/. 1,057.56 S/. 158.63 S/. 370.15 S/. 528.78
23.02.05 RELLENO COMPACTADO DE ZANJAS S/. 1,344.36 S/. 201.65 S/. 470.53 S/. 672.18
23.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 85.27 S/. 12.79 S/. 29.84 S/. 42.64
23.02.07 SUMINISTRO E INSTALACION DE TUBERIA 1 1/2" AGUA S/. 1,181.26 S/. 177.19 S/. 413.44 S/. 590.63
23.02.08 SUMINISTRO E INSTALACION DE TUBERIA 3/4" AGUA S/. 368.06 S/. 55.21 S/. 128.82 S/. 184.03
23.02.09 CAJAS DE REGISTRO DE DESAGUE 60 x 60 cm S/. 86.85 S/. 13.03 S/. 30.40 S/. 43.43
23.02.10 PRUEBA HIDRAULICA S/. 418.99 S/. 62.85 S/. 146.65 S/. 209.50
23.03 SISTEMA DE DESAGUE S/. 13,055.31
23.03.01 TRAZO NIVELADO Y REPLANTEO S/. 221.02 S/. 33.15 S/. 77.36 S/. 110.51
23.03.02 EXCAVACION MANUAL PARA TUBERIA S/. 1,994.52 S/. 299.18 S/. 698.08 S/. 997.26
23.03.03 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 517.05 S/. 77.56 S/. 180.97 S/. 258.53
23.03.04 CAMA DE APOYO S/. 1,264.49 S/. 189.67 S/. 442.57 S/. 632.25
23.03.05 RELLENO COMPACTADO DE ZANJAS S/. 1,607.40 S/. 241.11 S/. 562.59 S/. 803.70
23.03.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 84.96 S/. 12.74 S/. 29.74 S/. 42.48
23.03.07 SUMINISTRO E INSTALACION DE TUBERIA 4" DE DESAGUE S/. 1,186.23 S/. 177.93 S/. 415.18 S/. 593.12
23.03.08 SUMINISTRO E INSTALACION DE TUBERIA 6" DE DESAGUE S/. 1,701.91 S/. 255.29 S/. 595.67 S/. 850.96
23.03.09 SUMINISTRO E INSTALACION DE TUBERIA 8" DE DESAGUE S/. 1,965.53 S/. 294.83 S/. 687.94 S/. 982.77
23.03.10 CAJA DE REGISTRO 30X60 CM CON REJILLA METALICA S/. 1,433.85 S/. 215.08 S/. 501.85 S/. 716.93
23.03.11 CAJAS DE REGISTRO DE DESAGUE 60 x 60 cm S/. 577.38 S/. 86.61 S/. 202.08 S/. 288.69
23.03.12 PRUEBA HIDRAULICA S/. 500.97 S/. 75.15 S/. 175.34 S/. 250.49
24 INSTALACIONES ELECTRICAS GENERALES S/. 22,569.52
24.01 TRAZO NIVELADO Y REPLANTEO S/. 231.00 S/. 34.65 S/. 80.85 S/. 115.50
24.02 EXCAVACION MANUAL PARA TUBERIA S/. 2,084.60 S/. 312.69 S/. 729.61 S/. 1,042.30
24.03 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 540.40 S/. 81.06 S/. 189.14 S/. 270.20
24.04 CAMA DE APOYO S/. 1,321.60 S/. 198.24 S/. 462.56 S/. 660.80
24.05 RELLENO COMPACTADO DE ZANJAS S/. 1,680.00 S/. 252.00 S/. 588.00 S/. 840.00
24.06 CABLE NYY 6MM2 S/. 4,631.83 S/. 2,315.92 S/. 2,315.92
24.07 CABLE NYY 10MM2 S/. 3,668.21 S/. 1,834.11 S/. 1,834.11
24.08 CABLE NYY 16MM2 S/. 3,870.90 S/. 1,935.45 S/. 1,935.45
24.09 SUMINISTRO E INSTALACION DE TUBERIA ELECTRICA 25mm S/. 3,691.71 S/. 1,845.86 S/. 1,845.86
24.10 TABLERO DE DISTRIBUCION S/. 543.57 S/. 271.79 S/. 271.79
24.11 CAJA DE REGISTRO 40X40 CM S/. 305.70 S/. 152.85 S/. 152.85
25 AREAS VERDES S/. 42,366.85
25.01 OBRAS PRELIMINARES S/. 1,990.31
25.01.01 LIMPIEZA DE TERRENO S/. 736.87 S/. 736.87
25.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 1,253.44 S/. 1,253.44
25.02 MOVIMIENTO DE TIERRAS S/. 15,402.98
25.02.01 CORTE MANUAL DE TERRENO S/. 1,833.92 S/. 1,833.92
25.02.02 PREPARACION DE TIERRA DE CHACRA S/. 4,960.58 S/. 4,960.58
25.02.03 EXT. Y NIV. DE TIERRA DE CHACRA PARA SEMBRADO DE GRASS S/. 7,163.59 S/. 7,163.59
25.02.04 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,444.89 S/. 1,444.89
25.03 SEMBRADO DE GRASS S/. 17,973.56
25.03.01 SEMBRADO DE GRASS S/. 17,973.56 S/. 17,973.56
25.04 VARIOS S/. 7,000.00
25.04.01 ADQUISICION E INSTALACION DE JUEGO RECREATIVOS S/. 7,000.00 S/. 7,000.00
26 ADQUISICION DE EQUIPAMIENTO S/. 63,256.00
26.01 ADQUISICION DE EQUIPAMIENTO COCINA S/. 4,980.00 S/. 4,980.00
26.02 ADQUISICION DE EQUIPAMIENTO SALA DE COMPUTO S/. 58,276.00 S/. 33,508.70 S/. 24,767.30
27 ADQUISICION DE MOBILIARIO ESCOLAR S/. 64,465.00
27.01 ADQUISICION DE MOBILIARIO ESCOLAR INICIAL S/. 960.00 S/. 960.00
27.02 ADQUISICION DE MOBILIARIO ESCOLAR PRIMARIO S/. 19,980.00 S/. 19,980.00
27.03 ADQUISICION DE MOBILIARIO ESCOLAR SECUNDARIO S/. 14,310.00 S/. 14,310.00
27.04 ADQUISICION DE MOBILIARIO PARA AULAS S/. 10,380.00 S/. 10,380.00
27.05 ADQUISICION DE MOBILIARIO PARA SALA DE USOS MULTIPLES S/. 3,615.00 S/. 3,615.00
27.06 ADQUISICION DE MOBILIARIO PARA SALA DE COMPUTO S/. 6,865.00 S/. 6,865.00
27.07 ADQUISICION DE MOBILIARIO PARA DIRECCION S/. 715.00 S/. 715.00
27.08 ADQUISICION DE MOBILIARIO PARA SECRETARIA Y ESPERA S/. 970.00 S/. 970.00
27.09 ADQUISICION DE MOBILIARIO PARA SALA DE PROFESORES S/. 2,295.00 S/. 2,295.00
27.10 ADQUISICION DE MOBILIARIO PARA CENTRO DE RECURSOS EDUCATIVOS S/. 2,855.00 S/. 2,855.00
27.11 ADQUISICION DE MOBILIARIO PARA COCINA S/. 1,520.00 S/. 1,520.00
28 FLETE TERRESTRE S/. 4,000.00
28.01 TRANSPORTE DE EQUIPAMIENTO Y MOBILIARIO A OBRA S/. 4,000.00 S/. 4,000.00
FIN DE OBRA
TOTAL COSTO DIRECTO DE OBRA (CD) S/. 3,124,772.22 S/. 457,578.27 S/. 449,793.08 S/. 857,385.28 S/. 864,902.61 S/. 495,052.54
GASTOS GENERALES 9.205655% S/. 42,123.08 S/. 41,406.40 S/. 78,927.93 S/. 79,619.95 S/. 45,572.83
UTILIDAD 9.00% S/. 41,182.04 S/. 40,481.38 S/. 77,164.68 S/. 77,841.23 S/. 44,554.73
SUBTOTAL S/. 3,693,657.46 S/. 540,883.39 S/. 531,680.86 S/. 1,013,477.89 S/. 1,022,363.79 S/. 585,180.09
IGV (18%) 18.00% S/. 97,359.01 S/. 95,702.55 S/. 182,426.02 S/. 184,025.48 S/. 105,332.42
TOTAL MENSUAL S/. 4,358,515.80 S/. 638,242.40 S/. 627,383.41 S/. 1,195,903.90 S/. 1,206,389.27 S/. 690,512.51
4 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
EJECUCION DE OBRA S/. 3,124,772.22 S/. 193,664.96 S/. 223,071.95 S/. 681,697.50 S/. 807,362.22 S/. 731,821.79 S/. 487,153.80
INICIO DE OBRA
01 TRABAJOS GENERALES S/. 114,563.43 S/. 64,717.13 S/. 10,157.67 S/. 9,830.00 S/. 10,157.67 S/. 9,830.00 S/. 9,870.96
01.01 OBRAS PROVISIONALES S/. 6,950.00 S/. 6,950.00
01.01.01 CARTEL PARA LA OBRA 2.40 X 3.60 S/. 950.00 S/. 950.00
01.01.02 ALMACEN DE OBRA S/. 6,000.00 S/. 6,000.00
01.02 OBRAS PRELIMINARES S/. 107,613.43 S/. 57,767.13 S/. 10,157.67 S/. 9,830.00 S/. 10,157.67 S/. 9,830.00 S/. 9,870.96
01.02.01 TRANSPORTE DE MATERIALES A OBRA S/. 58,980.01 S/. 9,133.71 S/. 10,157.67 S/. 9,830.00 S/. 10,157.67 S/. 9,830.00 S/. 9,870.96
01.02.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS PARA LA OBRA S/. 22,199.02 S/. 22,199.02
01.02.03 IMPLEMENTOS DE SEGURIDAD PARA LOS TRABAJADORES S/. 10,000.00 S/. 10,000.00
01.02.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO S/. 15,166.40 S/. 15,166.40
01.02.05 ELIMINACION DE MATERIAL DEMOLIDO CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,268.00 S/. 1,268.00
02 SECTOR INICIAL S/. 225,861.54 S/. 32,502.87 S/. 128,534.31 S/. 49,546.14 S/. 15,278.22
02.01 ESTRUCTURAS S/. 84,768.77 S/. 32,502.87 S/. 52,265.90
02.01.01 OBRAS PRELIMINARES S/. 372.30 S/. 372.30
02.01.01.01 LIMPIEZA DE TERRENO S/. 131.48 S/. 131.48
02.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 240.82 S/. 240.82
02.01.02 MOVIMIENTO DE TIERRAS S/. 7,902.25 S/. 3,821.05 S/. 4,081.20
02.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 1,455.98 S/. 1,455.98
02.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 2,087.06 S/. 2,087.06
02.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 278.01 S/. 278.01
02.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 890.02 S/. 890.02
02.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 2,208.48 S/. 2,208.48
02.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 982.70 S/. 982.70
02.01.03 OBRAS DE CONCRETO SIMPLE S/. 15,500.07 S/. 5,622.54 S/. 9,877.53
02.01.03.01 SOLADO PARA ZAPATAS S/. 1,264.68 S/. 1,264.68
02.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 4,357.86 S/. 4,357.86
02.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 2,089.54 S/. 2,089.54
02.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 3,336.50 S/. 3,336.50
02.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 4,451.49 S/. 4,451.49
02.01.04 OBRAS DE CONCRETO ARMADO S/. 60,994.15 S/. 22,686.98 S/. 38,307.17
02.01.04.01 ZAPATAS S/. 10,006.67 S/. 10,006.67
02.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 8,096.58 S/. 8,096.58
02.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 1,910.09 S/. 1,910.09
02.01.04.02 VIGA DE CIMENTACION S/. 13,214.46 S/. 12,680.31 S/. 534.15
02.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 4,273.20 S/. 3,739.05 S/. 534.15
02.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 3,907.16 S/. 3,907.16
02.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 5,034.10 S/. 5,034.10
02.01.04.03 COLUMNAS S/. 19,610.14 S/. 19,610.14
02.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 5,186.31 S/. 5,186.31
02.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 6,741.16 S/. 6,741.16
02.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 7,682.67 S/. 7,682.67
02.01.04.04 VIGAS S/. 15,656.91 S/. 15,656.91
02.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 4,583.56 S/. 4,583.56
02.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 6,097.44 S/. 6,097.44
02.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 4,975.91 S/. 4,975.91
02.01.04.05 COLUMNETAS S/. 2,505.97 S/. 2,505.97
02.01.04.05.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 558.23 S/. 558.23
02.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 942.70 S/. 942.70
02.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 1,005.04 S/. 1,005.04
02.02 ARQUITECTURA S/. 119,572.63 S/. 62,501.71 S/. 41,792.70 S/. 15,278.22
02.02.01 ALBAÑILERIA S/. 6,173.76 S/. 2,893.95 S/. 3,279.81
02.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 6,173.76 S/. 2,893.95 S/. 3,279.81
02.02.02 REVOQUES S/. 16,085.43 S/. 16,085.43
02.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 3,737.98 S/. 3,737.98
02.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 2,496.96 S/. 2,496.96
02.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 4,003.20 S/. 4,003.20
02.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 845.94 S/. 845.94
02.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 3,080.61 S/. 3,080.61
02.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 343.07 S/. 343.07
02.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 881.28 S/. 881.28
02.02.02.08 BRUÑAS DE 1.0 cm S/. 696.39 S/. 696.39
02.02.03 PISOS Y PAVIMENTOS S/. 10,893.71 S/. 10,893.71
02.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 4,192.53 S/. 4,192.53
02.02.03.02 PISO DE CERAMICO 45 X 45 CM S/. 6,701.18 S/. 6,701.18
02.02.04 CONTRAZOCALOS S/. 5,499.22 S/. 5,499.22
02.02.04.01 CONTRAZOCALO CERAMICO H=0.10 m. S/. 1,485.72 S/. 1,485.72
02.02.04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 1,490.72 S/. 1,490.72
02.02.04.03 ZOCALO DE CERAMICA 20 X 30 CM S/. 2,522.78 S/. 2,522.78
02.02.05 CARPINTERIA MADERA S/. 3,658.71 S/. 3,658.71
02.02.05.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 2,838.38 S/. 2,838.38
02.02.05.02 PUERTA CONTRAPLACADA SEGUN DISEÑO S/. 820.33 S/. 820.33
02.02.06 CARPINTERIA METALICA S/. 7,302.36 S/. 2,129.86 S/. 5,172.50
02.02.06.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 7,302.36 S/. 2,129.86 S/. 5,172.50
02.02.07 CERRAJERIA S/. 245.96 S/. 245.96
02.02.07.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 155.86 S/. 155.86
02.02.07.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 90.10 S/. 90.10
02.02.08 VIDRIOS, CRISTALES Y SIMILARES S/. 5,262.45 S/. 5,262.45
02.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 5,262.45 S/. 5,262.45
02.02.09 PINTURAS S/. 4,843.26 S/. 4,843.26
02.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 2,356.69 S/. 2,356.69
02.02.09.02 PINTURA EN CONTRAZOCALO S/. 77.05 S/. 77.05
02.02.09.03 PINTURA EN VIGAS S/. 1,347.46 S/. 1,347.46
02.02.09.04 PINTURA EN COLUMNAS S/. 1,062.06 S/. 1,062.06
02.02.10 CUBIERTA METALICA Y CIELO RASO S/. 59,607.77 S/. 59,607.77
02.02.10.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 23,216.60 S/. 23,216.60
02.02.10.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 13,757.94 S/. 13,757.94
02.02.10.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 22,633.23 S/. 22,633.23
02.03 INSTALACIONES ELECTRICAS S/. 14,806.77 S/. 8,355.42 S/. 6,451.35
02.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 3,649.75 S/. 3,649.75
02.03.02 SALIDA TOMACORRIENTE S/. 1,721.36 S/. 1,721.36
02.03.03 SALIDA TOMACORRIENTE A PRUEBA DE AGUA S/. 438.76 S/. 438.76
02.03.04 SALIDA PARA INTERRUPTOR SIMPLE S/. 541.15 S/. 541.15
02.03.05 SALIDA PARA INTERRUPTOR TRIPLE S/. 228.76 S/. 228.76
02.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 4,525.62 S/. 4,525.62
02.03.07 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIRCULAR 22W S/. 205.77 S/. 180.05 S/. 25.72
02.03.08 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 1,476.21 S/. 1,476.21
02.03.09 ALAMBRE THHN 2.5 mm2 S/. 442.02 S/. 442.02
02.03.10 ALAMBRE THHN 4 mm2 S/. 232.14 S/. 232.14
02.03.11 TABLERO DE DISTRIBUCION S/. 439.49 S/. 439.49
02.03.12 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
02.03.13 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
02.04 INSTALACIONES SANITARIAS S/. 6,713.37 S/. 5,411.28 S/. 1,302.09
02.04.01 APARATOS Y ACCESORIOS SANITARIOS S/. 1,193.88 S/. 1,193.88
02.04.01.01 INODORO TANQUE BAJO S/. 723.58 S/. 723.58
02.04.01.02 LAVATORIO DE LOZA BLANCA S/. 391.76 S/. 391.76
02.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" S/. 78.54 S/. 78.54
02.04.02 SISTEMA DE DESAGUE S/. 2,066.22 S/. 2,066.22
02.04.02.01 SALIDA DE DESAGUE PVC D=2" S/. 186.30 S/. 186.30
02.04.02.02 SALIDA DE DESAGUE PVC D=4" S/. 291.08 S/. 291.08
02.04.02.03 SALIDA VENTILACION DE 2" S/. 116.16 S/. 116.16
02.04.02.04 REGISTRO DE BRONCE 4" S/. 285.99 S/. 285.99
02.04.02.05 SUMIDERO DE 2" S/. 77.41 S/. 77.41
02.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" S/. 339.50 S/. 339.50
02.04.02.07 YEE PVC SAL 4"X2" S/. 185.91 S/. 185.91
02.04.02.08 CODO PVC SAL P/DESAGUE D=2" S/. 51.62 S/. 51.62
02.04.02.09 EXCAVACION MANUAL PARA TUBERIA S/. 148.90 S/. 148.90
02.04.02.10 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 38.60 S/. 38.60
02.04.02.11 CAMA DE APOYO S/. 94.40 S/. 94.40
02.04.02.12 RELLENO COMPACTADO DE ZANJAS S/. 120.00 S/. 120.00
02.04.02.13 CAJA DE REGISTRO CON REJILLA METALICA S/. 130.35 S/. 130.35
02.04.03 SISTEMA DE AGUA FRIA S/. 955.73 S/. 955.73
02.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" S/. 291.36 S/. 291.36
02.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" S/. 136.93 S/. 136.93
02.04.03.03 CODO PVC 1/2" S/. 9.94 S/. 9.94
02.04.03.04 TEE PVC 1/2" S/. 33.12 S/. 33.12
02.04.03.05 EXCAVACION MANUAL PARA TUBERIA S/. 104.97 S/. 104.97
02.04.03.06 REFINE NIVELACION Y COMPACTACION DE ZANJA S/. 27.21 S/. 27.21
02.04.03.07 CAMA DE APOYO S/. 66.55 S/. 66.55
02.04.03.08 RELLENO COMPACTADO DE ZANJAS S/. 84.60 S/. 84.60
02.04.03.09 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/2" S/. 70.70 S/. 70.70
02.04.03.10 CAJA PARA VALVULAS S/. 130.35 S/. 130.35
02.04.04 SISTEMA DE AGUA PLUVIAL S/. 2,497.54 S/. 2,389.33 S/. 108.21
02.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 2,150.98 S/. 2,150.98
02.04.04.02 TUBERIA PVC SAL D=4" S/. 272.40 S/. 238.35 S/. 34.05
02.04.04.03 CODO PVC SAL D=4" S/. 74.16 S/. 74.16
03 SECTOR SECUNDARIA S/. 373,415.79 S/. 38,114.33 S/. 152,270.81 S/. 108,779.28 S/. 74,251.37
03.01 ESTRUCTURAS S/. 157,033.01 S/. 38,114.33 S/. 118,377.44 S/. 541.24
03.01.01 OBRAS PRELIMINARES S/. 311.88 S/. 311.88
03.01.01.01 LIMPIEZA DE TERRENO S/. 110.14 S/. 110.14
03.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 201.74 S/. 201.74
03.01.02 MOVIMIENTO DE TIERRAS S/. 11,127.55 S/. 4,674.71 S/. 6,452.84
03.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 866.30 S/. 866.30
03.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 3,548.01 S/. 3,548.01
03.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 260.40 S/. 260.40
03.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 1,528.88 S/. 1,528.88
03.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 3,879.13 S/. 3,879.13
03.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,044.83 S/. 1,044.83
03.01.03 OBRAS DE CONCRETO SIMPLE S/. 12,111.33 S/. 4,218.34 S/. 7,892.99
03.01.03.01 SOLADO PARA ZAPATAS S/. 2,312.61 S/. 2,312.61
03.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,905.73 S/. 1,905.73
03.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 1,434.38 S/. 1,434.38
03.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 2,289.06 S/. 2,289.06
03.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 4,169.55 S/. 4,169.55
03.01.04 OBRAS DE CONCRETO ARMADO S/. 133,482.25 S/. 28,909.40 S/. 104,031.61 S/. 541.24
03.01.04.01 ZAPATAS S/. 20,484.56 S/. 20,484.56
03.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 15,972.75 S/. 15,972.75
03.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 4,511.81 S/. 4,511.81
03.01.04.02 VIGA DE CIMENTACION S/. 12,509.61 S/. 8,424.84 S/. 4,084.77
03.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 3,863.87 S/. 3,863.87
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 3,534.44 S/. 3,313.54 S/. 220.90
03.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 5,111.30 S/. 5,111.30
03.01.04.03 COLUMNAS S/. 47,206.14 S/. 47,206.14
03.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 12,333.79 S/. 12,333.79
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 14,950.51 S/. 14,950.51
03.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 19,921.84 S/. 19,921.84
03.01.04.04 VIGAS S/. 27,967.41 S/. 27,967.41
03.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 7,642.27 S/. 7,642.27
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 10,166.95 S/. 10,166.95
03.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 10,158.19 S/. 10,158.19
03.01.04.05 LOSAS ALIGERADAS S/. 16,968.05 S/. 16,968.05
03.01.04.05.01 CONCRETO LOSA ALIGERADA f'c= 210 kg/cm2 S/. 5,217.80 S/. 5,217.80
03.01.04.05.02 LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO S/. 6,775.44 S/. 6,775.44
03.01.04.05.03 LOSAS ALIGERADAS ACERO fy=4,200 kg/cm2 S/. 1,948.59 S/. 1,948.59
03.01.04.05.04 LOSA ALIGERADA LADRILLO HUECO 15X30X30 S/. 3,026.22 S/. 3,026.22
03.01.04.06 COLUMNETAS S/. 7,805.24 S/. 7,805.24
03.01.04.06.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 S/. 1,842.57 S/. 1,842.57
03.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS S/. 3,108.36 S/. 3,108.36
03.01.04.06.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS S/. 2,854.31 S/. 2,854.31
03.01.04.07 VIGAS COLLARIN S/. 541.24 S/. 541.24
03.01.04.07.01 CONCRETO VIGAS COLLARIN f'c=175 kg/cm2 S/. 159.49 S/. 159.49
03.01.04.07.02 ENCOFRADO Y DESENCOFRADO EN VIGAS COLLARIN S/. 271.77 S/. 271.77
03.01.04.07.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN VIGAS COLLARIN S/. 109.98 S/. 109.98
03.02 ARQUITECTURA S/. 161,830.49 S/. 33,893.37 S/. 68,753.77 S/. 59,183.35
03.02.01 ALBAÑILERIA S/. 8,900.12 S/. 8,900.12
03.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 8,900.12 S/. 8,900.12
03.02.02 REVOQUES S/. 27,991.70 S/. 27,991.70
03.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 S/. 5,600.58 S/. 5,600.58
03.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 S/. 2,955.62 S/. 2,955.62
03.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 S/. 8,111.81 S/. 8,111.81
03.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS S/. 1,516.62 S/. 1,516.62
03.02.02.05 TARRAJEO DE VIGAS C:A-1:4 S/. 5,136.66 S/. 5,136.66
03.02.02.06 VESTIDURA DE ARISTAS EN VIGAS S/. 1,375.86 S/. 1,375.86
03.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) S/. 1,566.72 S/. 1,566.72
03.02.02.08 BRUÑAS DE 1.0 cm S/. 1,727.83 S/. 1,727.83
03.02.03 CIELO RASO S/. 5,746.93 S/. 5,746.93
03.02.03.01 TARRAJEO DE CIELO RASO - SUPERFICIE CON CEMENTO-ARENA S/. 5,746.93 S/. 5,746.93
03.02.04 PISOS Y PAVIMENTOS S/. 20,912.44 S/. 1,625.27 S/. 19,287.17
03.02.04.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 S/. 7,429.80 S/. 1,625.27 S/. 5,804.53
03.02.04.02 PISO DE CERAMICO 45 X 45 CM S/. 11,875.50 S/. 11,875.50
03.02.04.03 PISO CEMENTO PULIDO E=2" S/. 1,607.14 S/. 1,607.14
03.02.05 CONTRAZOCALOS S/. 3,920.57 S/. 3,920.57
03.02.05.01 CONTRAZOCALO CERAMICO H=0.10 m. S/. 2,705.51 S/. 2,705.51
03.02.05.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 1,215.06 S/. 1,215.06
03.02.06 CARPINTERIA MADERA S/. 7,443.30 S/. 7,443.30
03.02.06.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO S/. 7,443.30 S/. 7,443.30
03.02.07 CARPINTERIA METALICA S/. 10,768.28 S/. 10,768.28
03.02.07.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO S/. 10,768.28 S/. 10,768.28
03.02.08 CERRAJERIA S/. 629.76 S/. 629.76
03.02.08.01 CERRADURA DE TRES GOLPES TIPO PESADO S/. 467.58 S/. 467.58
03.02.08.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" S/. 162.18 S/. 162.18
03.02.09 VIDRIOS, CRISTALES Y SIMILARES S/. 7,760.14 S/. 7,760.14
03.02.09.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE S/. 7,760.14 S/. 7,760.14
03.02.10 PINTURAS S/. 9,374.13 S/. 9,374.13
03.02.10.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 3,505.86 S/. 3,505.86
03.02.10.02 PINTURA EN CONTRAZOCALO S/. 354.06 S/. 354.06
03.02.10.03 PINTURA EN VIGAS S/. 1,715.98 S/. 1,715.98
03.02.10.04 PINTURA EN COLUMNAS S/. 2,397.28 S/. 2,397.28
03.02.10.05 PINTURA EN CIELO RASO S/. 1,400.95 S/. 1,400.95
03.02.11 CUBIERTA METALICA Y CIELO RASO S/. 58,383.12 S/. 33,893.37 S/. 24,489.75
03.02.11.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPERBOARD S/. 21,678.27 S/. 20,323.38 S/. 1,354.89
03.02.11.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTURA EPOXICA S/. 13,569.99 S/. 13,569.99
03.02.11.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA S/. 23,134.86 S/. 23,134.86
03.03 INSTALACIONES ELECTRICAS S/. 26,845.81 S/. 26,845.81
03.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ S/. 7,007.52 S/. 7,007.52
03.03.02 SALIDA TOMACORRIENTE S/. 3,873.06 S/. 3,873.06
03.03.03 SALIDA TOMACORRIENTE A PRUEBA DE AGUA S/. 108.23 S/. 108.23
03.03.04 SALIDA PARA INTERRUPTOR SIMPLE S/. 677.34 S/. 677.34
03.03.05 SALIDA PARA INTERRUPTOR TRIPLE S/. 228.76 S/. 228.76
03.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/EMPOTRAR 4x18W S/. 9,874.08 S/. 9,874.08
03.03.07 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIRCULAR 22W S/. 68.59 S/. 68.59
03.03.08 TUBERIA PVC-SAP ELECTRICA DE 20 mm S/. 2,363.28 S/. 2,363.28
03.03.09 ALAMBRE THHN 2.5 mm2 S/. 542.22 S/. 542.22
03.03.10 ALAMBRE THHN 4 mm2 S/. 287.59 S/. 287.59
03.03.11 TABLERO DE DISTRIBUCION S/. 469.91 S/. 469.91
03.03.12 SUBTABLERO DE DISTRIBUCION S/. 439.49 S/. 439.49
03.03.13 PRUEBA ELECTRICA S/. 50.00 S/. 50.00
03.03.14 POZO DE CONEXION A TIERRA S/. 855.74 S/. 855.74
03.04 INSTALACIONES SANITARIAS S/. 2,809.47 S/. 2,809.47
03.04.01 SISTEMA DE AGUA PLUVIAL S/. 2,809.47 S/. 2,809.47
03.04.01.01 CANALETA PARA AGUA FLUVIAL DE 4" S/. 2,145.11 S/. 2,145.11
03.04.01.02 TUBERIA PVC SAL D=4" S/. 590.20 S/. 590.20
03.04.01.03 CODO PVC SAL D=4" S/. 74.16 S/. 74.16
03.05 CONSTRUCCION DE ESCALERAS S/. 24,897.01 S/. 9,828.99 S/. 15,068.02
03.05.01 OBRAS PRELIMINARES S/. 48.31 S/. 48.31
03.05.01.01 LIMPIEZA DE TERRENO S/. 17.06 S/. 17.06
03.05.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 31.25 S/. 31.25
03.05.02 MOVIMIENTO DE TIERRAS S/. 1,179.42 S/. 948.48 S/. 230.94
03.05.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 573.53 S/. 573.53
03.05.02.02 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 35.04 S/. 35.04
03.05.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 96.85 S/. 96.85
03.05.02.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 277.78 S/. 243.06 S/. 34.72
03.05.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 196.22 S/. 196.22
03.05.03 OBRAS DE CONCRETO SIMPLE S/. 3,851.27 S/. 3,290.17 S/. 561.10
03.05.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 1,775.80 S/. 1,775.80
03.05.03.02 SOBRECIMIENTO 1:8 + 25% P.M S/. 674.55 S/. 674.55
03.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 839.82 S/. 839.82
03.05.03.04 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 561.10 S/. 561.10
03.05.04 OBRAS DE CONCRETO ARMADO S/. 11,546.69 S/. 5,542.03 S/. 6,004.66
03.05.04.01 VIGA DE CIMENTACION S/. 2,645.43 S/. 2,645.43
03.05.04.01.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 899.62 S/. 899.62
03.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 1,029.23 S/. 1,029.23
03.05.04.01.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 716.58 S/. 716.58
03.05.04.02 COLUMNAS S/. 2,896.60 S/. 2,896.60
03.05.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 751.18 S/. 751.18
03.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 799.92 S/. 799.92
03.05.04.02.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 1,345.50 S/. 1,345.50
03.05.04.03 VIGAS S/. 2,222.94 S/. 2,222.94
03.05.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 746.68 S/. 746.68
03.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 801.48 S/. 801.48
03.05.04.03.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 674.78 S/. 674.78
03.05.04.04 ESCALERAS S/. 2,484.68 S/. 2,484.68
03.05.04.04.01 ESCALERAS CONCRETO FC=210 KG/CM2 S/. 850.14 S/. 850.14
03.05.04.04.02 ESCALERA ENCOFRADO Y DESENCOFRADO S/. 682.25 S/. 682.25
03.05.04.04.03 ESCALERA ACERO fy=4,200 kg/cm2 S/. 952.29 S/. 952.29
03.05.04.05 LOSA MACIZA S/. 1,297.04 S/. 1,297.04
03.05.04.05.01 LOSA MACIZA CONCRETO FC=210 KG/CM2 S/. 346.35 S/. 346.35
03.05.04.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA S/. 279.59 S/. 279.59
03.05.04.05.03 LOSA MACIZA ACERO fy=4,200 kg/cm2 S/. 671.10 S/. 671.10
03.05.05 ALBAÑILERIA S/. 1,616.54 S/. 1,616.54
03.05.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA S/. 1,616.54 S/. 1,616.54
03.05.06 REVOQUES S/. 4,512.97 S/. 4,512.97
03.05.06.01 TARRAJEO EN EXTERIORES C:A-1:4 S/. 1,554.08 S/. 1,554.08
03.05.06.02 TARRAJEO DE COLUMNAS C:A-1:4 S/. 434.02 S/. 434.02
03.05.06.03 VESTIDURA DE ARISTAS EN COLUMNAS S/. 223.28 S/. 223.28
03.05.06.04 TARRAJEO DE VIGAS C:A-1:4 S/. 404.93 S/. 404.93
03.05.06.05 VESTIDURA DE ARISTAS EN VIGAS S/. 178.47 S/. 178.47
03.05.06.06 BRUÑAS DE 1.0 cm S/. 771.51 S/. 771.51
03.05.06.07 REVESTIMIENTO DE GRADAS Y ESCALERA S/. 567.12 S/. 567.12
03.05.06.08 REVESTIMIENTO DE FONDO DE ESCALERAS CON CEMENTO-ARENA S/. 379.56 S/. 379.56
03.05.07 PISOS S/. 732.78 S/. 732.78
03.05.07.01 PISO CEMENTO PULIDO E=2" S/. 732.78 S/. 732.78
03.05.08 CONTRAZOCALOS S/. 262.11 S/. 262.11
03.05.08.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m S/. 262.11 S/. 262.11
03.05.09 PINTURAS S/. 1,146.92 S/. 1,146.92
03.05.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS S/. 617.08 S/. 617.08
03.05.09.02 PINTURA EN COLUMNAS S/. 198.77 S/. 198.77
03.05.09.03 PINTURA EN VIGAS S/. 177.12 S/. 177.12
03.05.09.04 PINTURA EN FONDO DE ESCALERA S/. 95.39 S/. 95.39
03.05.09.05 PINTURA EN LOSA MACIZA S/. 58.56 S/. 58.56
04 ADMINISTRACION, SALA DE COMPUTO Y SALON DE USOS MULTIPLES S/. 379,732.21 S/. 36,661.41 S/. 142,813.31 S/. 112,847.09 S/. 87,410.40
04.01 ESTRUCTURAS S/. 139,933.65 S/. 36,661.41 S/. 102,756.54 S/. 515.70
04.01.01 OBRAS PRELIMINARES S/. 350.61 S/. 350.61
04.01.01.01 LIMPIEZA DE TERRENO S/. 123.82 S/. 123.82
04.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL S/. 226.79 S/. 226.79
04.01.02 MOVIMIENTO DE TIERRAS S/. 8,554.41 S/. 4,382.96 S/. 4,171.45
04.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS S/. 683.68 S/. 683.68
04.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS S/. 3,437.44 S/. 3,437.44
04.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS S/. 261.84 S/. 261.84
04.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO S/. 717.93 S/. 717.93
04.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO S/. 2,080.43 S/. 2,080.43
04.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15M3 D=2KM S/. 1,373.09 S/. 1,373.09
04.01.03 OBRAS DE CONCRETO SIMPLE S/. 12,520.73 S/. 4,359.03 S/. 8,161.70
04.01.03.01 SOLADO PARA ZAPATAS S/. 2,243.40 S/. 2,243.40
04.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" MAX) S/. 2,115.63 S/. 2,115.63
04.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M S/. 2,027.51 S/. 2,027.51
04.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO S/. 1,941.61 S/. 1,941.61
04.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM S/. 4,192.58 S/. 4,192.58
04.01.04 OBRAS DE CONCRETO ARMADO S/. 118,507.90 S/. 27,568.81 S/. 90,423.39 S/. 515.70
04.01.04.01 ZAPATAS S/. 20,173.23 S/. 20,173.23
04.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 S/. 15,675.88 S/. 15,675.88
04.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 S/. 4,497.35 S/. 4,497.35
04.01.04.02 VIGA DE CIMENTACION S/. 11,190.06 S/. 7,395.58 S/. 3,794.48
04.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 S/. 3,589.48 S/. 3,589.48
04.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION S/. 3,279.96 S/. 3,074.96 S/. 205.00
04.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION S/. 4,320.62 S/. 4,320.62
04.01.04.03 COLUMNAS S/. 35,879.80 S/. 35,879.80
04.01.04.03.01 CONCRETO COLUMNAS f'c=210 kg/cm2 S/. 9,643.93 S/. 9,643.93
04.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS S/. 11,482.27 S/. 11,482.27
04.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS S/. 14,753.60 S/. 14,753.60
04.01.04.04 VIGAS S/. 23,771.80 S/. 23,771.80
04.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 S/. 7,318.41 S/. 7,318.41
04.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS S/. 8,247.76 S/. 8,247.76
04.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 S/. 8,205.63 S/. 8,205.63
04.01.04.05 LOSAS ALIGERADAS S/. 19,154.31 S/. 19,154.31
04.01.04.05.01 CONCRETO LOSA ALIGERADA f'c= 210 kg/cm2 S/. 5,600.13 S/. 5,600.13
04.01.04.05.02 LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO S/. 7,274.89 S/. 7,274.89
04.01.04.05.03 LOSAS ALIGERADAS ACERO fy=4,200 kg/cm2 S/. 3,030.12 S/. 3,030.12
04.01.04.05.04 LOSA ALIGERADA LADRILLO HUECO 15X30X30 S/. 3,249.17 S/. 3,249.17
5 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
6 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
7 de 10
CRONOGRAMA GENERAL VALORIZADO DE AVANCE DE OBRA
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
DESCRIPCION PRESUPUESTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
TOTAL COSTO DIRECTO DE OBRA (CD) S/. 3,124,772.22 S/. 193,664.96 S/. 223,071.95 S/. 681,697.50 S/. 807,362.22 S/. 731,821.79 S/. 487,153.80
GASTOS GENERALES 9.205655% S/. 17,828.13 S/. 20,535.23 S/. 62,754.72 S/. 74,322.98 S/. 67,368.99 S/. 44,845.70
UTILIDAD 9.00% S/. 17,429.85 S/. 20,076.48 S/. 61,352.78 S/. 72,662.60 S/. 65,863.96 S/. 43,843.84
SUBTOTAL S/. 3,693,657.46 S/. 228,922.93 S/. 263,683.66 S/. 805,804.99 S/. 954,347.80 S/. 865,054.74 S/. 575,843.34
IGV (18%) 18.00% S/. 41,206.13 S/. 47,463.06 S/. 145,044.90 S/. 171,782.60 S/. 155,709.85 S/. 103,651.80
TOTAL MENSUAL S/. 4,358,515.80 S/. 270,129.06 S/. 311,146.71 S/. 950,849.89 S/. 1,126,130.40 S/. 1,020,764.59 S/. 679,495.14
8 de 10
DESEMBOLSO VALORIZACION N°04
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN –
PROVINCIA CHINCHA – ICA"
MAYO 2019 JUNIO 2019 JULIO 2019 AGOSTO 2019 SETIEMBRE 2019
DESCRIPCIÓN TOTAL
15 31 01 30 01 31 01 31 01 11
TOTAL COSTO DIRECTO DE OBRA (CD) S/. 2,926,192.51 S/. 173,167.51 S/. 386,239.87 S/. 885,123.75 S/. 589,378.57 ###
% AVANCE DE MES 100.00% 5.92% 13.20% 30.25% 20.14% ###
% AVANCE ACUMULADO MENSUAL 100.00% 5.92% 19.12% 49.37% 69.51%
GASTOS GENERALES 25.13% S/. 735,386.96 S/. 43,519.05 S/. 97,066.67 S/. 222,442.12 S/. 148,117.84
UTILIDAD 9% S/. 263,357.33 S/. 15,585.08 S/. 34,761.59 S/. 79,661.14 S/. 53,044.07
SUBTOTAL S/. 3,924,936.80 S/. 232,271.64 S/. 518,068.13 S/. 1,187,227.01 S/. 790,540.48
IGV (18%) S/. 706,488.62 S/. 41,808.90 S/. 93,252.26 S/. 213,700.86 S/. 142,297.29 ###
TOTAL MENSUAL S/. 4,631,425.42 S/. 274,080.54 S/. 611,320.39 S/. 1,400,927.87 S/. 932,837.77
TOTAL MENSUAL S/. 4,631,425.42 S/. 274,080.54 S/. 611,320.39 S/. 1,400,927.87 S/. 932,837.77
DESCRIPCIÓN MAYO 2019 JUNIO 2019 JULIO 2019 AGOSTO 2019 SETIEMBRE 2019 OCTUBRE 2019
SUBTOTAL SIN IGV S/. 3,924,936.80 S/. 232,271.64 S/. 518,068.13 S/. 1,187,227.01 S/. 790,540.48 S/. 800,000.00 S/. 396,829.53
IGV (18%) S/. 706,488.62 S/. 41,808.90 S/. 93,252.26 S/. 213,700.86 S/. 142,297.29 S/. 144,000.00 S/. 71,429.32
TOTAL MENSUAL S/. 4,631,425.42 S/. 274,080.54 S/. 611,320.39 S/. 1,400,927.87 S/. 932,837.77 S/. 944,000.00 S/. 468,258.85
DESCRIPCIÓN MAYO 2019 JUNIO 2019 JULIO 2019 AGOSTO 2019 SETIEMBRE 2019 OCTUBRE 2019
RESUMEN DE PAGO
TOTAL MENSUAL S/. 4,631,425.42 S/. 274,080.54 S/. 611,320.39 S/. 1,400,927.87 S/. 932,837.77 S/. 944,000.00 S/. 468,258.85
AMORTIZACION ADELANTO 20.00% 24.73% S/. 926,285.08 S/. 0.00 S/. 0.00 S/. 346,409.53 S/. 230,664.19 S/. 233,424.29 S/. 93,651.77