MUNICIPALIDAD DISTRITAL DE POROY

POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
01 ESCALINATAS PARCELA 24 ASOCIACION NUEVO HORIZONTE S/ 621,658.38 S/ 621,658.38 S/ 29,900.36 S/ 0.00 S/ 124,663.31 S/ 526,895.47
01.01 OBRAS PROVISIONALES S/ 17,227.26 S/ 17,227.26 S/ 0.00 S/ 0.00 S/ 0.00 S/ 17,227.26
01.01.01 CARTEL DE OBRA 3.60m x 2.40m und 1.00 S/ 579.76 S/ 579.76 1.00 S/ 579.76 S/ 579.76 1.00 S/ 579.76 S/ 579.76
01.01.02 ALQUILER DE LOCAL PARA RESIDENCIA Y mes 16.00 S/ 400.00 S/ 6,400.00 16.00 S/ 400.00 S/ 6,400.00 16.00 S/ 400.00 S/ 6,400.00
01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQU glb 1.00 S/ 2,000.00 S/ 2,000.00 1.00 S/ 2,000.00 S/ 2,000.00 1.00 S/ 2,000.00 S/ 2,000.00
01.01.04 ACARREO DE MATERIAL A ZONA DE TRABAJ m3 250.00 S/ 32.99 S/ 8,247.50 250.00 S/ 32.99 S/ 8,247.50 250.00 S/ 32.99 S/ 8,247.50
01.02 SEGURIDAD Y SALUD EN OBRA S/ 23,101.50 S/ 23,101.50 S/ 0.00 S/ 0.00 S/ 0.00 S/ 23,101.50
01.02.01 CAPACITACION EN SEGURIDAD Y SALUD EN glb 1.00 S/ 6,600.00 S/ 6,600.00 1.00 S/ 6,600.00 S/ 6,600.00 1.00 S/ 6,600.00 S/ 6,600.00
01.02.02 EQUIPOS DE SEGURIDAD INDIVIDUAL und 90.00 S/ 181.07 S/ 16,296.30 90.00 S/ 181.07 S/ 16,296.30 90.00 S/ 181.07 S/ 16,296.30
01.02.03 SEÑALIZACION PREVENTIVA DE SEGURIDAD glb 1.00 S/ 205.20 S/ 205.20 1.00 S/ 205.20 S/ 205.20 1.00 S/ 205.20 S/ 205.20
01.03 SARDINELES, VEREDAS Y ESCALINATAS S/ 103,068.11 S/ 103,068.11 S/ 0.00 S/ 0.00 S/ 37,354.57 S/ 65,713.54
01.03.01 SARDINELES DE CONCRETO S/ 42,027.39 S/ 42,027.39 S/ 0.00 S/ 0.00 S/ 0.00 S/ 42,027.39
01.03.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 80.40 S/ 0.96 S/ 77.18 80.40 S/ 0.96 S/ 77.18 80.40 S/ 0.96 S/ 77.18
01.03.01.02 EXCAVACION MANUAL m3 28.14 S/ 33.63 S/ 946.35 28.14 S/ 33.63 S/ 946.35 28.14 S/ 33.63 S/ 946.35
01.03.01.03 ENCOFRADO Y DESENCOFRADO EN SARDI m2 428.80 S/ 53.14 S/ 22,786.43 428.80 S/ 53.14 S/ 22,786.43 428.80 S/ 53.14 S/ 22,786.43
01.03.01.04 CONCRETO f'c=175 kg/cm2 m3 40.20 S/ 440.05 S/ 17,690.01 40.20 S/ 440.05 S/ 17,690.01 40.20 S/ 440.05 S/ 17,690.01
01.03.01.05 CURADO CON AGUA m2 80.40 S/ 0.55 S/ 44.22 80.40 S/ 0.55 S/ 44.22 80.40 S/ 0.55 S/ 44.22
01.03.01.06 JUNTAS ASFALTICAS m 26.80 S/ 18.03 S/ 483.20 26.80 S/ 18.03 S/ 483.20 26.80 S/ 18.03 S/ 483.20
01.03.02 VEREDAS DE CONCRETO S/ 61,040.72 S/ 61,040.72 S/ 0.00 S/ 0.00 S/ 37,354.57 S/ 23,686.15
01.03.02.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 455.60 S/ 0.96 S/ 437.38 455.60 S/ 0.96 S/ 437.38 272.00 0.96 S/ 261.12 183.60 S/ 0.96 S/ 176.26
01.03.02.02 EXCAVACION MANUAL m3 136.68 S/ 33.63 S/ 4,596.55 136.68 S/ 33.63 S/ 4,596.55 81.60 33.63 S/ 2,744.21 55.08 S/ 33.63 S/ 1,852.34
01.03.02.03 NIVELACION Y COMPACTADO MANUAL m2 455.60 S/ 3.00 S/ 1,366.80 455.60 S/ 3.00 S/ 1,366.80 272.00 3.00 S/ 816.00 183.60 S/ 3.00 S/ 550.80
01.03.02.04 ENCOFRADO Y DESENCOFRADO EN VERE m2 107.20 S/ 53.14 S/ 5,696.61 107.20 S/ 53.14 S/ 5,696.61 64.00 53.14 S/ 3,400.96 43.20 S/ 53.14 S/ 2,295.65
01.03.02.05 EMPEDRADO C/ PM (E=0.15) m2 469.27 S/ 35.53 S/ 16,673.16 469.27 S/ 35.53 S/ 16,673.16 280.16 35.53 S/ 9,954.08 189.11 S/ 35.53 S/ 6,719.08
01.03.02.06 CONCRETO f'c=175 kg/cm2 m3 23.35 S/ 440.05 S/ 10,275.17 23.35 S/ 440.05 S/ 10,275.17 13.94 440.05 S/ 6,134.30 9.41 S/ 440.05 S/ 4,140.87
01.03.02.07 BRUÑADO DE VEREDAS m 687.86 S/ 5.36 S/ 3,686.93 687.86 S/ 5.36 S/ 3,686.93 410.66 5.36 S/ 2,201.14 277.20 S/ 5.36 S/ 1,485.79
01.03.02.08 PULIDO DE PISO m2 455.60 S/ 18.95 S/ 8,633.62 455.60 S/ 18.95 S/ 8,633.62 272.00 18.95 S/ 5,154.40 183.60 S/ 18.95 S/ 3,479.22
01.03.02.09 JUNTAS ASFALTICAS m 522.68 S/ 18.03 S/ 9,423.92 522.68 S/ 18.03 S/ 9,423.92 362.66 18.03 S/ 6,538.76 160.02 S/ 18.03 S/ 2,885.16
01.03.02.10 CURADO CON AGUA m2 455.60 S/ 0.55 S/ 250.58 455.60 S/ 0.55 S/ 250.58 272.00 0.55 S/ 149.60 183.60 S/ 0.55 S/ 100.98
01.04 MUROS DE CONTENCION S/ 35,828.62 S/ 35,828.62 S/ 0.00 S/ 0.00 S/ 0.00 S/ 35,828.62
01.04.01 OBRAS PRELIMINARES S/ 96.96 S/ 96.96 S/ 0.00 S/ 0.00 S/ 0.00 S/ 96.96
01.04.01.01 LIMPIEZA DEL TERRENO MANUAL m2 48.00 S/ 1.06 S/ 50.88 48.00 S/ 1.06 S/ 50.88 48.00 S/ 1.06 S/ 50.88
01.04.01.02 TRAZO, NIVELACION Y REPLANTEO DU m2 48.00 S/ 0.96 S/ 46.08 48.00 S/ 0.96 S/ 46.08 48.00 S/ 0.96 S/ 46.08
01.04.02 MOVIMIENTO DE TIERRAS S/ 6,646.93 S/ 6,646.93 S/ 0.00 S/ 0.00 S/ 0.00 S/ 6,646.93
01.04.02.01 EXCAVACION MANUAL m3 98.88 S/ 33.63 S/ 3,325.33 98.88 S/ 33.63 S/ 3,325.33 98.88 S/ 33.63 S/ 3,325.33
01.04.02.02 NIVELACION INTERIOR Y APISONADO m2 48.00 S/ 1.94 S/ 93.12 48.00 S/ 1.94 S/ 93.12 48.00 S/ 1.94 S/ 93.12
01.04.02.03 ELIMINACION DE EXCAVACION m3 96.00 S/ 33.63 S/ 3,228.48 96.00 S/ 33.63 S/ 3,228.48 96.00 S/ 33.63 S/ 3,228.48
01.04.03 CONCRETO SIMPLE S/ 83.01 S/ 83.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 83.01
01.04.03.01 SOLDADO PARA ZAPATAS 4" CONCRETO m3 4.88 S/ 17.01 S/ 83.01 4.88 S/ 17.01 S/ 83.01 4.88 S/ 17.01 S/ 83.01
01.04.04 CONCRETO CICLOPEO S/ 29,001.72 S/ 29,001.72 S/ 0.00 S/ 0.00 S/ 0.00 S/ 29,001.72
01.04.04.01 ZAPATAS S/ 8,829.24 S/ 8,829.24 S/ 0.00 S/ 0.00 S/ 0.00 S/ 8,829.24
01.04.04.01.01 CONCRETO CICLOPEO f'c=175 kg/cm2 m3 19.68 S/ 448.64 S/ 8,829.24 19.68 S/ 448.64 S/ 8,829.24 19.68 S/ 448.64 S/ 8,829.24
01.04.04.02 MURO DE CONTENCION TIPO CICLOPEO S/ 20,172.48 S/ 20,172.48 S/ 0.00 S/ 0.00 S/ 0.00 S/ 20,172.48
01.04.04.02.01 CONCRETO CICLOPEO f'c=175 kg/cm2 m3 30.75 S/ 448.64 S/ 13,795.68 30.75 S/ 448.64 S/ 13,795.68 30.75 S/ 448.64 S/ 13,795.68
01.04.04.02.02 ENCOFRADO DE MURO m2 120.00 S/ 53.14 S/ 6,376.80 120.00 S/ 53.14 S/ 6,376.80 120.00 S/ 53.14 S/ 6,376.80
01.05 ESCALINATA S/ 38,329.76 S/ 38,329.76 S/ 7,320.88 S/ 0.00 S/ 0.00 S/ 45,650.65
01.05.01 OBRAS PRELIMINARES S/ 202.92 S/ 202.92 S/ 37.44 S/ 0.00 S/ 0.00 S/ 240.36
01.05.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 211.38 S/ 0.96 S/ 202.92 211.38 S/ 0.96 S/ 202.92 39.00 0.96 S/ 37.44 250.38 S/ 0.96 S/ 240.36
01.05.02 MOVIMIENTO DE TIERRAS S/ 14,166.04 S/ 14,166.04 S/ 901.33 S/ 0.00 S/ 0.00 S/ 15,067.38
01.05.02.01 EXCAVACION MANUAL DE ZANJAS m3 318.55 S/ 33.63 S/ 10,712.84 318.55 S/ 33.63 S/ 10,712.84 11.70 33.63 S/ 393.47 330.25 S/ 33.63 S/ 11,106.31
01.05.02.02 RELLENO Y COMPACTADO CON MATERIAL m3 5.62 S/ 77.33 S/ 434.59 5.62 S/ 77.33 S/ 434.59 5.85 77.33 S/ 452.38 11.47 S/ 77.33 S/ 886.98
01.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 328.11 S/ 9.20 S/ 3,018.61 328.11 S/ 9.20 S/ 3,018.61 6.03 9.20 S/ 55.48 334.14 S/ 9.20 S/ 3,074.09
01.05.03 ESCALINATA S/ 21,950.39 S/ 21,950.39 S/ 6,382.11 S/ 0.00 S/ 0.00 S/ 28,332.50
01.05.03.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 211.38 S/ 0.96 S/ 202.92 211.38 S/ 0.96 S/ 202.92 39.00 0.96 S/ 37.44 250.38 S/ 0.96 S/ 240.36
01.05.03.02 PERFILADO Y COMPACTADO SUPERFICIE m2 211.38 S/ 2.95 S/ 623.57 211.38 S/ 2.95 S/ 623.57 39.00 2.95 S/ 115.05 250.38 S/ 2.95 S/ 738.62
01.05.03.03 EMPEDRADO C/ PM (E=0.15) m2 217.72 S/ 35.53 S/ 7,735.59 217.72 S/ 35.53 S/ 7,735.59 40.17 35.53 S/ 1,427.24 257.89 S/ 35.53 S/ 9,162.83
01.05.03.04 ENCOFRADO Y DESENCOFRADO m2 36.00 S/ 60.56 S/ 2,180.16 36.00 S/ 60.56 S/ 2,180.16 6.00 60.56 S/ 363.36 42.00 S/ 60.56 S/ 2,543.52
01.05.03.05 ENCOFRADO Y DESENCOFRADO DE CON m2 94.07 S/ 60.56 S/ 5,696.88 94.07 S/ 60.56 S/ 5,696.88 56.16 60.56 S/ 3,401.05 150.23 S/ 60.56 S/ 9,097.93
01.05.03.06 CONCRETO f'c=175 kg/cm2 m3 12.26 S/ 440.05 S/ 5,395.01 12.26 S/ 440.05 S/ 5,395.01 2.31 440.05 S/ 1,016.52 14.57 S/ 440.05 S/ 6,411.53
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
01.05.03.07 CURADO CON AGUA m2 211.38 S/ 0.55 S/ 116.26 211.38 S/ 0.55 S/ 116.26 39.00 0.55 S/ 21.45 250.38 S/ 0.55 S/ 137.71
01.05.04 ACCESOS PEATONALES S/ 2,010.41 S/ 2,010.41 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,010.41
01.05.04.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 30.00 S/ 0.96 S/ 28.80 30.00 S/ 0.96 S/ 28.80 30.00 S/ 0.96 S/ 28.80
01.05.04.02 ENCOFRADO Y DESENCOFRADO EN ACCE m2 4.50 S/ 53.14 S/ 239.13 4.50 S/ 53.14 S/ 239.13 4.50 S/ 53.14 S/ 239.13
01.05.04.03 EMPEDRADO C/ PM (E=0.15) m2 30.00 S/ 35.53 S/ 1,065.90 30.00 S/ 35.53 S/ 1,065.90 30.00 S/ 35.53 S/ 1,065.90
01.05.04.04 CONCRETO f'c=175 kg/cm2 m3 1.50 S/ 440.05 S/ 660.08 1.50 S/ 440.05 S/ 660.08 1.50 S/ 440.05 S/ 660.08
01.05.04.05 CURADO CON AGUA m2 30.00 S/ 0.55 S/ 16.50 30.00 S/ 0.55 S/ 16.50 30.00 S/ 0.55 S/ 16.50
01.06 SUMIDEROS TRANSVERSALES S/ 10,657.79 S/ 10,657.79 S/ 0.00 S/ 0.00 S/ 0.00 S/ 10,657.79
01.06.01 SISTEMA DE EVACUACION DE AGUAS PLUVIALES Y DRENAJE S/ 10,657.79 S/ 10,657.79 S/ 0.00 S/ 0.00 S/ 0.00 S/ 10,657.79
01.06.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 9.20 S/ 0.96 S/ 8.83 9.20 S/ 0.96 S/ 8.83 9.20 S/ 0.96 S/ 8.83
01.06.01.02 EXCAVACION MANUAL DE ZANJAS m3 7.82 S/ 33.63 S/ 262.99 7.82 S/ 33.63 S/ 262.99 7.82 S/ 33.63 S/ 262.99
01.06.01.03 NIVELACION Y COMPACTADO MANUAL m2 9.20 S/ 3.00 S/ 27.60 9.20 S/ 3.00 S/ 27.60 9.20 S/ 3.00 S/ 27.60
01.06.01.04 ENCOFRADO Y DESENCOFRADO EN SUMI m2 11.96 S/ 53.14 S/ 635.55 11.96 S/ 53.14 S/ 635.55 11.96 S/ 53.14 S/ 635.55
01.06.01.05 CONCRETO F'C=210 KG/CM2 m3 4.23 S/ 466.49 S/ 1,973.25 4.23 S/ 466.49 S/ 1,973.25 4.23 S/ 466.49 S/ 1,973.25
01.06.01.06 ACERO DE REFUERZO fy=4200 kg/cm2 kg 81.00 S/ 7.72 S/ 625.32 81.00 S/ 7.72 S/ 625.32 81.00 S/ 7.72 S/ 625.32
01.06.01.07 REJILLA DE SUMIDERO PLATINA 2 1/2" X 1 m 9.20 S/ 657.57 S/ 6,049.64 9.20 S/ 657.57 S/ 6,049.64 9.20 S/ 657.57 S/ 6,049.64
01.06.01.08 TARRAJEO IMPERMEABILIZADO MEZCLA 1: m2 18.72 S/ 36.96 S/ 691.89 18.72 S/ 36.96 S/ 691.89 18.72 S/ 36.96 S/ 691.89
01.06.01.09 CURADO CON AGUA m2 18.72 S/ 0.55 S/ 10.30 18.72 S/ 0.55 S/ 10.30 18.72 S/ 0.55 S/ 10.30
01.06.01.10 SUMINISTRO EN INSTALACIONES DE TUBER m 9.00 S/ 41.38 S/ 372.42 9.00 S/ 41.38 S/ 372.42 9.00 S/ 41.38 S/ 372.42
01.07 CANALES LATERALES S/ 49,432.48 S/ 49,432.48 S/ 0.00 S/ 0.00 S/ 0.00 S/ 49,432.48
01.07.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 126.00 S/ 0.96 S/ 120.96 126.00 S/ 0.96 S/ 120.96 126.00 S/ 0.96 S/ 120.96
01.07.02 EXCAVACION MANUAL m3 99.93 S/ 33.63 S/ 3,360.65 99.93 S/ 33.63 S/ 3,360.65 99.93 S/ 33.63 S/ 3,360.65
01.07.03 NIVELACION Y COMPACTADO MANUAL m2 126.00 S/ 3.00 S/ 378.00 126.00 S/ 3.00 S/ 378.00 126.00 S/ 3.00 S/ 378.00
01.07.04 ENCOFRADO Y DESENCOFRADO EN CUNETA m2 223.20 S/ 53.14 S/ 11,860.85 223.20 S/ 53.14 S/ 11,860.85 223.20 S/ 53.14 S/ 11,860.85
01.07.05 CONCRETO F'C=210 KG/CM2 m3 52.38 S/ 466.49 S/ 24,434.75 52.38 S/ 466.49 S/ 24,434.75 52.38 S/ 466.49 S/ 24,434.75
01.07.06 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 223.20 S/ 36.96 S/ 8,249.47 223.20 S/ 36.96 S/ 8,249.47 223.20 S/ 36.96 S/ 8,249.47
01.07.07 CURADO CON AGUA m2 295.20 S/ 0.55 S/ 162.36 295.20 S/ 0.55 S/ 162.36 295.20 S/ 0.55 S/ 162.36
01.07.08 JUNTAS ASFALTICAS m 48.00 S/ 18.03 S/ 865.44 48.00 S/ 18.03 S/ 865.44 48.00 S/ 18.03 S/ 865.44
01.08 DISIPADORES DE ENERGIA S/ 3,663.05 S/ 3,663.05 S/ 0.00 S/ 0.00 S/ 0.00 S/ 3,663.05
01.08.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 6.72 S/ 0.96 S/ 6.45 6.72 S/ 0.96 S/ 6.45 6.72 S/ 0.96 S/ 6.45
01.08.02 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 18.00 S/ 36.96 S/ 665.28 18.00 S/ 36.96 S/ 665.28 18.00 S/ 36.96 S/ 665.28
01.08.03 ENCOFRADO Y DESENCOFRADO EN DISIPA m2 23.40 S/ 53.14 S/ 1,243.48 23.40 S/ 53.14 S/ 1,243.48 23.40 S/ 53.14 S/ 1,243.48
01.08.04 CONCRETO F'C=210 KG/CM2 m3 3.71 S/ 466.49 S/ 1,730.68 3.71 S/ 466.49 S/ 1,730.68 3.71 S/ 466.49 S/ 1,730.68
01.08.05 CURADO CON AGUA m2 31.20 S/ 0.55 S/ 17.16 31.20 S/ 0.55 S/ 17.16 31.20 S/ 0.55 S/ 17.16
01.09 OBRAS COMPLEMENTARIAS S/ 104,194.96 S/ 104,194.96 S/ 17,179.48 S/ 0.00 S/ 0.00 S/ 121,374.46
01.09.01 INSTALACION DE TUBERIAS DE AGUA Y DESAGUE S/ 104,194.96 S/ 104,194.96 S/ 17,179.48 S/ 0.00 S/ 0.00 S/ 121,374.46
01.09.01.01 DESAGUE S/ 52,810.75 S/ 52,810.75 S/ 0.00 S/ 0.00 S/ 0.00 S/ 52,810.75
01.09.01.01.01 TRAZO, NIVELACION Y REPLANTEO DU m2 160.80 S/ 0.96 S/ 154.37 160.80 S/ 0.96 S/ 154.37 160.80 S/ 0.96 S/ 154.37
01.09.01.01.02 EXCAVACION MANUAL m3 241.20 S/ 33.63 S/ 8,111.56 241.20 S/ 33.63 S/ 8,111.56 241.20 S/ 33.63 S/ 8,111.56
01.09.01.01.03 REFINE DEL TERRENO EXCAVADO m2 402.00 S/ 6.74 S/ 2,709.48 402.00 S/ 6.74 S/ 2,709.48 402.00 S/ 6.74 S/ 2,709.48
01.09.01.01.04 CAMA DE ARENA E=0.20M m 268.00 S/ 1.59 S/ 426.12 268.00 S/ 1.59 S/ 426.12 268.00 S/ 1.59 S/ 426.12
01.09.01.01.05 SUMINISTRO Y COLOCACION DE TUBERIA m 268.00 S/ 57.77 S/ 15,482.36 268.00 S/ 57.77 S/ 15,482.36 268.00 S/ 57.77 S/ 15,482.36
01.09.01.01.06 RELLENO COMPACTADO CON MATERIAL m3 482.40 S/ 42.57 S/ 20,535.77 482.40 S/ 42.57 S/ 20,535.77 482.40 S/ 42.57 S/ 20,535.77
01.09.01.01.07 ELIMINACION DE MATERIAL EXCEDE m3 120.60 S/ 41.88 S/ 5,050.73 120.60 S/ 41.88 S/ 5,050.73 120.60 S/ 41.88 S/ 5,050.73
01.09.01.01.08 PRUEBA HIDRAULICA DE DESAGUE m 268.00 S/ 1.27 S/ 340.36 268.00 S/ 1.27 S/ 340.36 268.00 S/ 1.27 S/ 340.36
01.09.01.02 INSTALACIONES DOMICILIARIAS S/ 17,820.47 S/ 17,820.47 S/ 12,072.16 S/ 0.00 S/ 0.00 S/ 29,892.64
01.09.01.02.01 TRAZO, NIVELACION Y REPLANTEO DU m2 74.40 S/ 0.96 S/ 71.42 74.40 S/ 0.96 S/ 71.42 50.400 S/ 0.96 S/ 48.38 124.80 S/ 0.96 S/ 119.81
01.09.01.02.02 EXCAVACION MANUAL m3 61.31 S/ 33.63 S/ 2,061.86 61.31 S/ 33.63 S/ 2,061.86 41.540 S/ 33.63 S/ 1,396.98 102.85 S/ 33.63 S/ 3,458.83
01.09.01.02.03 REFINE DEL TERRENO EXCAVADO m2 297.60 S/ 6.74 S/ 2,005.82 297.60 S/ 6.74 S/ 2,005.82 201.600 S/ 6.74 S/ 1,358.78 499.20 S/ 6.74 S/ 3,364.61
01.09.01.02.04 CAMA DE ARENA E=0.20M m 124.00 S/ 1.59 S/ 197.16 124.00 S/ 1.59 S/ 197.16 84.000 S/ 1.59 S/ 133.56 208.00 S/ 1.59 S/ 330.72
01.09.01.02.05 SUMINISTRO Y COLOCACION DE TUBERIA m 124.00 S/ 30.55 S/ 3,788.20 124.00 S/ 30.55 S/ 3,788.20 84.000 S/ 30.55 S/ 2,566.20 208.00 S/ 30.55 S/ 6,354.40
01.09.01.02.06 RELLENO COMPACTADO CON MATERIAL m3 59.52 S/ 42.57 S/ 2,533.77 59.52 S/ 42.57 S/ 2,533.77 40.320 S/ 42.57 S/ 1,716.42 99.84 S/ 42.57 S/ 4,250.19
01.09.01.02.07 CONEXION DOMICILIARIAS DE DESAGUE und 31.00 S/ 231.04 S/ 7,162.24 31.00 S/ 231.04 S/ 7,162.24 21.000 S/ 231.04 S/ 4,851.84 52.00 S/ 231.04 S/ 12,014.08
01.09.01.03 BUZONES S/ 10,197.52 S/ 10,197.52 S/ 0.00 S/ 0.00 S/ 0.00 S/ 10,197.52
01.09.01.03.01 TRAZO, NIVELACION Y REPLANTEO DU m2 8.85 S/ 0.96 S/ 8.50 8.85 S/ 0.96 S/ 8.50 8.85 S/ 0.96 S/ 8.50
01.09.01.03.02 EXCAVACION DE BUZON EN TERRENO m3 13.28 S/ 32.99 S/ 438.11 13.28 S/ 32.99 S/ 438.11 13.28 S/ 32.99 S/ 438.11
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
01.09.01.03.03 ENCOFRADO Y DESENCOFRADO m 48.60 S/ 60.56 S/ 2,943.22 48.60 S/ 60.56 S/ 2,943.22 48.60 S/ 60.56 S/ 2,943.22
01.09.01.03.04 ACERO CORRUGADO FY=4200 kg/cm2 G kg 240.75 S/ 8.95 S/ 2,154.71 240.75 S/ 8.95 S/ 2,154.71 240.75 S/ 8.95 S/ 2,154.71
01.09.01.03.05 CONCRETO BUZONES f'c=210kg/cm2 m3 5.03 S/ 331.95 S/ 1,669.71 5.03 S/ 331.95 S/ 1,669.71 5.03 S/ 331.95 S/ 1,669.71
01.09.01.03.06 ELIMINACION DE MATERIAL EXCEDE m3 20.81 S/ 41.88 S/ 871.52 20.81 S/ 41.88 S/ 871.52 20.81 S/ 41.88 S/ 871.52
01.09.01.03.07 ENCIMADO DE BUZONES und 5.00 S/ 422.35 S/ 2,111.75 5.00 S/ 422.35 S/ 2,111.75 5.00 S/ 422.35 S/ 2,111.75
01.09.01.04 INSTALACIONES DE AGUA S/ 15,846.94 S/ 15,846.94 S/ 0.00 S/ 0.00 S/ 0.00 S/ 15,846.94
01.09.01.04.01 TRAZO, NIVELACION Y REPLANTEO DU m2 160.80 S/ 0.96 S/ 154.37 160.80 S/ 0.96 S/ 154.37 160.80 S/ 0.96 S/ 154.37
01.09.01.04.02 EXCAVACION MANUAL m3 132.50 S/ 33.63 S/ 4,455.98 132.50 S/ 33.63 S/ 4,455.98 132.50 S/ 33.63 S/ 4,455.98
01.09.01.04.03 REFINE DEL TERRENO EXCAVADO m2 160.80 S/ 6.74 S/ 1,083.79 160.80 S/ 6.74 S/ 1,083.79 160.80 S/ 6.74 S/ 1,083.79
01.09.01.04.04 CAMA DE ARENA E=0.20M m 268.00 S/ 1.59 S/ 426.12 268.00 S/ 1.59 S/ 426.12 268.00 S/ 1.59 S/ 426.12
01.09.01.04.05 SUMINISTRO E INSTALACION DE TUBER m 268.00 S/ 14.59 S/ 3,910.12 268.00 S/ 14.59 S/ 3,910.12 268.00 S/ 14.59 S/ 3,910.12
01.09.01.04.06 RELLENO COMPACTADO CON MATERIAL m3 128.64 S/ 42.57 S/ 5,476.20 128.64 S/ 42.57 S/ 5,476.20 128.64 S/ 42.57 S/ 5,476.20
01.09.01.04.07 PRUEBA HIDRAULICA m 268.00 S/ 1.27 S/ 340.36 268.00 S/ 1.27 S/ 340.36 268.00 S/ 1.27 S/ 340.36
01.09.01.05 CONEXIONES DOMICILIARIAS S/ 7,519.28 S/ 7,519.28 S/ 5,107.32 S/ 0.00 S/ 0.00 S/ 12,626.61
01.09.01.05.01 TRAZO, NIVELACION Y REPLANTEO DU m2 49.60 S/ 0.96 S/ 47.62 49.60 S/ 0.96 S/ 47.62 33.67 S/ 0.96 S/ 32.32 83.27 S/ 0.96 S/ 79.94
01.09.01.05.02 EXCAVACION MANUAL m3 40.87 S/ 33.63 S/ 1,374.46 40.87 S/ 33.63 S/ 1,374.46 27.76 S/ 33.63 S/ 933.57 68.63 S/ 33.63 S/ 2,308.03
01.09.01.05.03 REFINE DEL TERRENO EXCAVADO m2 49.60 S/ 6.74 S/ 334.30 49.60 S/ 6.74 S/ 334.30 33.67 S/ 6.74 S/ 226.94 83.27 S/ 6.74 S/ 561.25
01.09.01.05.04 CAMA DE ARENA E=0.20M m 124.00 S/ 1.59 S/ 197.16 124.00 S/ 1.59 S/ 197.16 84.07 S/ 1.59 S/ 133.67 208.07 S/ 1.59 S/ 330.83
01.09.01.05.05 SUMINISTRO Y COLOCACION DE TUBERIA m 124.00 S/ 9.97 S/ 1,236.28 124.00 S/ 9.97 S/ 1,236.28 84.07 S/ 9.97 S/ 838.18 208.07 S/ 9.97 S/ 2,074.46
01.09.01.05.06 CONEXIONES DOMICILIARIAS DE AGUA und 31.00 S/ 139.66 S/ 4,329.46 31.00 S/ 139.66 S/ 4,329.46 21.07 S/ 139.66 S/ 2,942.64 52.07 S/ 139.66 S/ 7,272.10
01.10 CARPINTERIA METALICA S/ 32,400.00 S/ 32,400.00 S/ 5,400.00 S/ 0.00 S/ 0.00 S/ 37,800.00
01.10.01 INSTALACION DE BARANDAS METALICAS m 180.00 S/ 180.00 S/ 32,400.00 180.00 S/ 180.00 S/ 32,400.00 30.000 S/ 180.00 S/ 5,400.00 210.00 S/ 180.00 S/ 37,800.00
01.11 ESTRUCTURA VIAL S/ 203,754.85 S/ 203,754.85 S/ 0.00 S/ 0.00 S/ 87,308.74 S/ 116,446.12
01.11.01 MOVIMIENTO DE TIERRAS S/ 30,370.33 S/ 30,370.33 S/ 0.00 S/ 0.00 S/ 30,370.33 S/ 0.00
01.11.01.01 EXCAVACION MANUAL m3 621.98 S/ 33.63 S/ 20,917.19 621.98 S/ 33.63 S/ 20,917.19 621.98 33.63 S/ 20,917.19 0.00 S/ 33.63 S/ 0.00
01.11.01.02 RELLENO Y COMPACTADO C/MATERIAL P m3 82.42 S/ 52.66 S/ 4,340.24 82.42 S/ 52.66 S/ 4,340.24 82.42 52.66 S/ 4,340.24 0.00 S/ 52.66 S/ 0.00
01.11.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3 555.75 S/ 9.20 S/ 5,112.90 555.75 S/ 9.20 S/ 5,112.90 555.75 9.20 S/ 5,112.90 0.00 S/ 9.20 S/ 0.00
01.11.02 SUB-RASANTE S/ 1,772.88 S/ 1,772.88 S/ 0.00 S/ 0.00 S/ 697.20 S/ 1,075.68
01.11.02.01 PERFILADO Y COMPACTADO DE SUB-RASA m2 712.00 S/ 2.49 S/ 1,772.88 712.00 S/ 2.49 S/ 1,772.88 280.00 2.49 S/ 697.20 432.00 S/ 2.49 S/ 1,075.68
01.11.03 BASE E= 0.30 S/ 34,998.36 S/ 34,998.36 S/ 0.00 S/ 0.00 S/ 22,011.09 S/ 12,987.27
01.11.03.01 EXTRACCION Y APILAMIENTO DE MATERIA m3 356.00 S/ 43.82 S/ 15,599.92 356.00 S/ 43.82 S/ 15,599.92 239.00 43.82 S/ 10,472.98 117.00 S/ 43.82 S/ 5,126.94
01.11.03.02 ZARANDEO DE MATERIAL EN CANTERA m3 356.00 S/ 10.75 S/ 3,827.00 356.00 S/ 10.75 S/ 3,827.00 239.00 10.75 S/ 2,569.25 117.00 S/ 10.75 S/ 1,257.75
01.11.03.03 TRANSPORTE DE MATERIAL CON CARGUIO m3 356.00 S/ 28.74 S/ 10,231.44 356.00 S/ 28.74 S/ 10,231.44 239.00 28.74 S/ 6,868.86 117.00 S/ 28.74 S/ 3,362.58
01.11.03.04 EXTENDIDO, RIEGO Y COMPACTACION DE m2 712.00 S/ 7.50 S/ 5,340.00 712.00 S/ 7.50 S/ 5,340.00 280.00 7.50 S/ 2,100.00 432.00 S/ 7.50 S/ 3,240.00
01.11.04 PAVIMENTO DE CONCRETO S/ 86,207.03 S/ 86,207.03 S/ 0.00 S/ 0.00 S/ 34,230.12 S/ 51,976.92
01.11.04.01 ENCOFRADO DE LOSA DE PAVIMENTO m2 83.60 S/ 60.56 S/ 5,062.82 83.60 S/ 60.56 S/ 5,062.82 33.20 60.56 S/ 2,010.59 50.40 S/ 60.56 S/ 3,052.22
01.11.04.02 CONCRETO f'c=210 kg/cm2 C/MEZCLADORA m3 142.40 S/ 463.87 S/ 66,055.09 142.40 S/ 463.87 S/ 66,055.09 56.00 463.87 S/ 25,976.72 86.40 S/ 463.87 S/ 40,078.37
01.11.04.03 ACERO LISO DE 1" EN JUNTAS TRANSVER kg 154.22 S/ 7.56 S/ 1,165.90 154.22 S/ 7.56 S/ 1,165.90 61.69 7.56 S/ 466.38 92.53 S/ 7.56 S/ 699.53
01.11.04.04 ACERO CORRUGADO 1/4" GRADO 60 EN kg 1130.85 S/ 6.84 S/ 7,735.01 1130.85 S/ 6.84 S/ 7,735.01 452.34 6.84 S/ 3,094.01 678.51 S/ 6.84 S/ 4,641.01
01.11.04.05 ACERO CORRUGADO 1/2" EN JUNTAS LO kg 294.05 S/ 6.86 S/ 2,017.18 294.05 S/ 6.86 S/ 2,017.18 117.62 6.86 S/ 806.87 176.43 S/ 6.86 S/ 1,210.31
01.11.04.06 ACERO EN JUNTAS TRANVERSALES DE CO kg 337.18 S/ 7.55 S/ 2,545.71 337.18 S/ 7.55 S/ 2,545.71 134.87 7.55 S/ 1,018.27 202.31 S/ 7.55 S/ 1,527.44
01.11.04.07 CURADO CON AGUA m2 712.00 S/ 0.55 S/ 391.60 712.00 S/ 0.55 S/ 391.60 280.00 0.55 S/ 154.00 432.00 S/ 0.55 S/ 237.60
01.11.04.08 SELLO CON MEZCLA ASFALTICA E=5 mm. m 414.00 S/ 2.98 S/ 1,233.72 414.00 S/ 2.98 S/ 1,233.72 236.00 2.98 S/ 703.28 178.00 S/ 2.98 S/ 530.44
01.11.05 PRUEBAS DE CALIDAD S/ 2,770.00 S/ 2,770.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,770.00
01.11.05.01 DISEÑO DE MEZCLAS DE CONCRETO und 3.00 S/ 350.00 S/ 1,050.00 3.00 S/ 350.00 S/ 1,050.00 3.00 S/ 350.00 S/ 1,050.00
01.11.05.02 PRUEBAS DE CONTROL CALIDAD DEL CO und 15.00 S/ 20.00 S/ 300.00 15.00 S/ 20.00 S/ 300.00 15.00 S/ 20.00 S/ 300.00
01.11.05.03 PRUEBA DE DENSIDAD DE CAMPO (CONO und 4.00 S/ 80.00 S/ 320.00 4.00 S/ 80.00 S/ 320.00 4.00 S/ 80.00 S/ 320.00
01.11.05.04 ESTUDIO DE CANTERAS glb 1.00 S/ 250.00 S/ 250.00 1.00 S/ 250.00 S/ 250.00 1.00 S/ 250.00 S/ 250.00
01.11.05.05 PLACA RECORDATORIA DE BRONCE und 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00
01.11.06 IMPACTO AMBIENTAL S/ 45,136.25 S/ 45,136.25 S/ 0.00 S/ 0.00 S/ 0.00 S/ 45,136.25
01.11.06.01 LIMPIEZA Y ELIMINACION DE DESECHOS m3 250.00 S/ 40.52 S/ 10,130.00 250.00 S/ 40.52 S/ 10,130.00 250.00 S/ 40.52 S/ 10,130.00
01.11.06.02 RESTAURACION DE CANTERAS m2 500.00 S/ 47.67 S/ 23,835.00 500.00 S/ 47.67 S/ 23,835.00 500.00 S/ 47.67 S/ 23,835.00
01.11.06.03 ACONDICIONAMIENTO DE MATERIAL EXC m3 250.00 S/ 11.32 S/ 2,830.00 250.00 S/ 11.32 S/ 2,830.00 250.00 S/ 11.32 S/ 2,830.00
01.11.06.04 REVEGETACION EN BOTADEROS ha 0.10 S/ 50,991.80 S/ 5,099.18 0.10 S/ 50,991.80 S/ 5,099.18 0.10 S/ 50,991.80 S/ 5,099.18
01.11.06.05 SEMBRIO DE GRASS NATURAL m2 153.00 S/ 21.19 S/ 3,242.07 153.00 S/ 21.19 S/ 3,242.07 153.00 S/ 21.19 S/ 3,242.07
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
01.11.07 FLETE TERRESTRE S/ 2,500.00 S/ 2,500.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,500.00
01.11.07.01 FLETE TERRESTRE DE MATERIALES PA glb 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00
02 ESCALINATAS PARCELA 23 ASOCIACION NUEVO HORIZONTE S/ 633,370.94 S/ 633,370.94 S/ 41,693.86 S/ 0.00 S/ 220,020.96 S/ 455,043.84
02.01 OBRAS PROVISIONALES S/ 4,474.00 S/ 4,474.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 4,474.00
02.01.02 ACARREO DE MATERIAL A ZONA DE TRABAJ glb 1.00 S/ 2,474.00 S/ 2,474.00 1.00 S/ 2,474.00 S/ 2,474.00 1.00 S/ 2,474.00 S/ 2,474.00
02.01.03 MOVILIZACION Y DESMOVILIZACION DE EQU glb 200.00 S/ 10.00 S/ 2,000.00 200.00 S/ 10.00 S/ 2,000.00 200.00 S/ 10.00 S/ 2,000.00
02.02 SEGURIDAD Y SALUD EN OBRA S/ 19,713.72 S/ 19,713.72 S/ 0.00 S/ 0.00 S/ 0.00 S/ 19,713.72
02.02.01 CAPACITACION EN SEGURIDAD Y SALUD EN glb 1.00 S/ 6,600.00 S/ 6,600.00 1.00 S/ 6,600.00 S/ 6,600.00 1.00 S/ 6,600.00 S/ 6,600.00
02.02.02 EQUIPOS DE SEGURIDAD INDIVIDUAL und 60.00 S/ 181.07 S/ 10,864.20 60.00 S/ 181.07 S/ 10,864.20 60.00 S/ 181.07 S/ 10,864.20
02.02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 S/ 2,249.52 S/ 2,249.52 1.00 S/ 2,249.52 S/ 2,249.52 1.00 S/ 2,249.52 S/ 2,249.52
02.03 SARDINELES, VEREDAS Y ESCALINATAS S/ 136,120.73 S/ 91,212.64 S/ 0.00 S/ 0.00 S/ 106,068.19 S/ 30,052.54
02.03.01 SARDINELES DE CONCRETO S/ 30,052.54 S/ 30,052.54 S/ 0.00 S/ 0.00 S/ 0.00 S/ 30,052.54
02.03.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 79.50 S/ 0.96 S/ 76.32 79.50 S/ 0.96 S/ 76.32 79.50 S/ 0.96 S/ 76.32
02.03.01.02 EXCAVACION MANUAL m3 27.83 S/ 33.63 S/ 935.92 27.83 S/ 33.63 S/ 935.92 27.83 S/ 33.63 S/ 935.92
02.03.01.03 ENCOFRADO Y DESENCOFRADO EN SARDI m2 212.00 S/ 53.14 S/ 11,265.68 212.00 S/ 53.14 S/ 11,265.68 212.00 S/ 53.14 S/ 11,265.68
02.03.01.04 CONCRETO f'c=175 kg/cm2 m3 39.75 S/ 440.05 S/ 17,491.99 39.75 S/ 440.05 S/ 17,491.99 39.75 S/ 440.05 S/ 17,491.99
02.03.01.05 CURADO CON AGUA m2 79.50 S/ 0.55 S/ 43.73 79.50 S/ 0.55 S/ 43.73 79.50 S/ 0.55 S/ 43.73
02.03.01.06 JUNTAS ASFALTICAS m 13.25 S/ 18.03 S/ 238.90 13.25 S/ 18.03 S/ 238.90 13.25 S/ 18.03 S/ 238.90
02.03.02 VEREDAS DE CONCRETO S/ 61,160.10 S/ 61,160.10 S/ 0.00 S/ 0.00 S/ 61,160.10 S/ 0.00
02.03.02.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 450.50 S/ 0.96 S/ 432.48 450.50 S/ 0.96 S/ 432.48 450.50 0.96 S/ 432.48 0.00 S/ 0.96 S/ 0.00
02.03.02.02 EXCAVACION MANUAL m3 135.15 S/ 33.63 S/ 4,545.09 135.15 S/ 33.63 S/ 4,545.09 135.15 33.63 S/ 4,545.09 0.00 S/ 33.63 S/ 0.00
02.03.02.03 NIVELACION Y COMPACTADO MANUAL m2 450.50 S/ 3.00 S/ 1,351.50 450.50 S/ 3.00 S/ 1,351.50 450.50 3.00 S/ 1,351.50 0.00 S/ 3.00 S/ 0.00
02.03.02.04 ENCOFRADO Y DESENCOFRADO EN VERE m2 106.00 S/ 53.14 S/ 5,632.84 106.00 S/ 53.14 S/ 5,632.84 106.00 53.14 S/ 5,632.84 0.00 S/ 53.14 S/ 0.00
02.03.02.05 EMPEDRADO C/ PM (E=0.15) m2 464.02 S/ 35.53 S/ 16,486.63 464.02 S/ 35.53 S/ 16,486.63 464.02 35.53 S/ 16,486.63 0.00 S/ 35.53 S/ 0.00
02.03.02.06 CONCRETO f'c=175 kg/cm2 m3 23.09 S/ 440.05 S/ 10,160.75 23.09 S/ 440.05 S/ 10,160.75 23.09 440.05 S/ 10,160.75 0.00 S/ 440.05 S/ 0.00
02.03.02.07 BRUÑADO DE VEREDAS m 680.16 S/ 5.36 S/ 3,645.66 680.16 S/ 5.36 S/ 3,645.66 680.16 5.36 S/ 3,645.66 0.00 S/ 5.36 S/ 0.00
02.03.02.08 PULIDO DE PISO m2 450.50 S/ 18.95 S/ 8,536.98 450.50 S/ 18.95 S/ 8,536.98 450.50 18.95 S/ 8,536.98 0.00 S/ 18.95 S/ 0.00
02.03.02.09 JUNTAS ASFALTICAS m 560.50 S/ 18.03 S/ 10,105.82 560.50 S/ 18.03 S/ 10,105.82 560.50 18.03 S/ 10,105.82 0.00 S/ 18.03 S/ 0.00
02.03.02.10 CURADO CON AGUA m2 477.00 S/ 0.55 S/ 262.35 477.00 S/ 0.55 S/ 262.35 477.00 0.55 S/ 262.35 0.00 S/ 0.55 S/ 0.00
02.03.03 MUROS DE CONTENCION S/ 44,908.09 S/ 44,908.09 S/ 0.00 S/ 0.00 S/ 44,908.09 S/ 0.00
02.03.03.01 OBRAS PRELIMINARES S/ 242.40 S/ 242.40 S/ 0.00 S/ 0.00 S/ 242.40 S/ 0.00
02.03.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 120.00 S/ 1.06 S/ 127.20 120.00 S/ 1.06 S/ 127.20 120.00 1.06 S/ 127.20 0.00 S/ 1.06 S/ 0.00
02.03.03.01.02 TRAZO, NIVELACION Y REPLANTEO m2 120.00 S/ 0.96 S/ 115.20 120.00 S/ 0.96 S/ 115.20 120.00 0.96 S/ 115.20 0.00 S/ 0.96 S/ 0.00
02.03.03.02 MOVIMIENTO DE TIERRAS S/ 8,308.67 S/ 8,308.67 S/ 0.00 S/ 0.00 S/ 8,308.67 S/ 0.00
02.03.03.02.01 EXCAVACION MANUAL m3 123.60 S/ 33.63 S/ 4,156.67 123.60 S/ 33.63 S/ 4,156.67 123.60 33.63 S/ 4,156.67 0.00 S/ 33.63 S/ 0.00
02.03.03.02.02 NIVELACION INTERIOR Y APISONADO m2 60.00 S/ 1.94 S/ 116.40 60.00 S/ 1.94 S/ 116.40 60.00 1.94 S/ 116.40 0.00 S/ 1.94 S/ 0.00
02.03.03.02.03 ELIMINACION DE EXCAVACION m3 120.00 S/ 33.63 S/ 4,035.60 120.00 S/ 33.63 S/ 4,035.60 120.00 33.63 S/ 4,035.60 0.00 S/ 33.63 S/ 0.00
02.03.03.03 CONCRETO SIMPLE S/ 103.76 S/ 103.76 S/ 0.00 S/ 0.00 S/ 103.76 S/ 0.00
02.03.03.03.01 SOLDADO PARA ZAPATAS 4" CONCRE m3 6.10 S/ 17.01 S/ 103.76 6.10 S/ 17.01 S/ 103.76 6.10 17.01 S/ 103.76 0.00 S/ 17.01 S/ 0.00
02.03.03.04 CONCRETO CICLOPEO S/ 36,253.26 S/ 36,253.26 S/ 0.00 S/ 0.00 S/ 36,253.26 S/ 0.00
02.03.03.04.01 ZAPATAS S/ 11,036.54 S/ 11,036.54 S/ 0.00 S/ 0.00 S/ 11,036.54 S/ 0.00
02.03.03.04.01.01 CONCRETO CICLOPEO f'c=175 kg/c m3 24.60 S/ 448.64 S/ 11,036.54 24.60 S/ 448.64 S/ 11,036.54 24.60 448.64 S/ 11,036.54 0.00 S/ 448.64 S/ 0.00
02.03.03.04.02 MURO DE CONTENCION TIPO CICLOPEO S/ 25,216.72 S/ 25,216.72 S/ 0.00 S/ 0.00 S/ 25,216.72 S/ 0.00
02.03.03.04.02.01 CONCRETO CICLOPEO f'c=175 kg/c m3 38.44 S/ 448.64 S/ 17,245.72 38.44 S/ 448.64 S/ 17,245.72 38.44 448.64 S/ 17,245.72 0.00 S/ 448.64 S/ 0.00
02.03.03.04.02.02 ENCOFRADO DE MURO m2 150.00 S/ 53.14 S/ 7,971.00 150.00 S/ 53.14 S/ 7,971.00 150 53.14 S/ 7,971.00 0.00 S/ 53.14 S/ 0.00
02.04 ESCALINATA S/ 98,973.97 S/ 98,973.97 S/ 7,702.52 S/ 0.00 S/ 0.00 S/ 106,676.49
02.04.01 OBRAS PRELIMINARES S/ 467.25 S/ 467.25 S/ 0.00 S/ 0.00 S/ 0.00 S/ 467.25
02.04.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 486.72 S/ 0.96 S/ 467.25 486.72 S/ 0.96 S/ 467.25 486.72 S/ 0.96 S/ 467.25
02.04.02 MOVIMIENTO DE TIERRAS S/ 47,532.54 S/ 47,532.54 S/ 0.00 S/ 0.00 S/ 0.00 S/ 47,532.54
02.04.02.01 EXCAVACION MANUAL m3 1028.24 S/ 33.63 S/ 34,579.71 1028.24 S/ 33.63 S/ 34,579.71 1028.24 S/ 33.63 S/ 34,579.71
02.04.02.02 RELLENO Y COMPACTADO CON MATERIAL m3 51.27 S/ 77.33 S/ 3,964.71 51.27 S/ 77.33 S/ 3,964.71 51.27 S/ 77.33 S/ 3,964.71
02.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 976.97 S/ 9.20 S/ 8,988.12 976.97 S/ 9.20 S/ 8,988.12 976.97 S/ 9.20 S/ 8,988.12
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
02.04.03 ESCALINATA S/ 48,931.79 S/ 48,931.79 S/ 6,412.12 S/ 0.00 S/ 0.00 S/ 55,343.92
02.04.03.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 486.72 S/ 0.96 S/ 467.25 486.72 S/ 0.96 S/ 467.25 29.64 0.96 S/ 28.45 516.36 S/ 0.96 S/ 495.71
02.04.03.02 PERFILADO Y COMPACTADO SUPERFICIE m2 486.72 S/ 2.95 S/ 1,435.82 486.72 S/ 2.95 S/ 1,435.82 29.64 2.95 S/ 87.44 516.36 S/ 2.95 S/ 1,523.26
02.04.03.03 EMPEDRADO C/ PM (E=0.15) m2 498.89 S/ 35.53 S/ 17,725.56 498.89 S/ 35.53 S/ 17,725.56 30.38 35.53 S/ 1,079.40 529.27 S/ 35.53 S/ 18,804.96
02.04.03.04 ENCOFRADO Y DESENCOFRADO m2 82.00 S/ 60.56 S/ 4,965.92 82.00 S/ 60.56 S/ 4,965.92 23.60 60.56 S/ 1,429.22 105.60 S/ 60.56 S/ 6,395.14
02.04.03.05 ENCOFRADO Y DESENCOFRADO DE CON m2 205.45 S/ 60.56 S/ 12,442.05 205.45 S/ 60.56 S/ 12,442.05 5.62 60.56 S/ 340.35 211.07 S/ 60.56 S/ 12,782.40
02.04.03.06 CONCRETO f'c=175 kg/cm2 m3 26.48 S/ 440.05 S/ 11,652.52 26.48 S/ 440.05 S/ 11,652.52 7.80 440.05 S/ 3,432.39 34.28 S/ 440.05 S/ 15,084.91
02.04.03.07 CURADO CON AGUA m2 441.22 S/ 0.55 S/ 242.67 441.22 S/ 0.55 S/ 242.67 27.04 0.55 S/ 14.87 468.26 S/ 0.55 S/ 257.54
02.04.04 ACCESOS PEATONALES S/ 2,042.39 S/ 2,042.39 S/ 1,290.40 S/ 0.00 S/ 0.00 S/ 3,332.78
02.04.04.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 30.00 S/ 0.96 S/ 28.80 30.00 S/ 0.96 S/ 28.80 13.50 0.96 S/ 12.96 43.50 S/ 0.96 S/ 41.76
02.04.04.02 ENCOFRADO Y DESENCOFRADO EN ACCE m2 4.50 S/ 53.14 S/ 239.13 4.50 S/ 53.14 S/ 239.13 4.20 53.14 S/ 223.19 8.70 S/ 53.14 S/ 462.32
02.04.04.03 EMPEDRADO C/ PM (E=0.15) m2 30.90 S/ 35.53 S/ 1,097.88 30.90 S/ 35.53 S/ 1,097.88 4.94 35.53 S/ 175.52 35.84 S/ 35.53 S/ 1,273.40
02.04.04.04 CONCRETO f'c=175 kg/cm2 m3 1.50 S/ 440.05 S/ 660.08 1.50 S/ 440.05 S/ 660.08 1.98 440.05 S/ 871.30 3.48 S/ 440.05 S/ 1,531.37
02.04.04.05 CURADO CON AGUA m2 30.00 S/ 0.55 S/ 16.50 30.00 S/ 0.55 S/ 16.50 13.50 0.55 S/ 7.43 43.50 S/ 0.55 S/ 23.93
02.05 SISTEMA DE EVACUACION DE AGUAS PLUVIALES Y DRENAJE S/ 10,613.24 S/ 10,613.24 S/ 0.00 S/ 0.00 S/ 5,569.87 S/ 5,043.37
02.05.01 SUMIDEROS TRANSVERSALES S/ 10,613.24 S/ 10,613.24 S/ 0.00 S/ 0.00 S/ 5,569.87 S/ 5,043.37
02.05.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 9.20 S/ 0.96 S/ 8.83 9.20 S/ 0.96 S/ 8.83 5.20 0.96 S/ 4.99 4.00 S/ 0.96 S/ 3.84
02.05.01.02 EXCAVACION MANUAL m3 7.82 S/ 33.63 S/ 262.99 7.82 S/ 33.63 S/ 262.99 4.42 33.63 S/ 148.64 3.40 S/ 33.63 S/ 114.34
02.05.01.03 NIVELACION Y COMPACTADO MANUAL m2 9.20 S/ 3.00 S/ 27.60 9.20 S/ 3.00 S/ 27.60 5.20 3.00 S/ 15.60 4.00 S/ 3.00 S/ 12.00
02.05.01.04 ENCOFRADO Y DESENCOFRADO EN SUMI m2 11.96 S/ 53.14 S/ 635.55 11.96 S/ 53.14 S/ 635.55 6.76 53.14 S/ 359.23 5.20 S/ 53.14 S/ 276.33
02.05.01.05 CONCRETO F'C=210 KG/CM2 m3 4.23 S/ 466.49 S/ 1,973.25 4.23 S/ 466.49 S/ 1,973.25 2.39 466.49 S/ 1,114.91 1.84 S/ 466.49 S/ 858.34
02.05.01.06 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 81.00 S/ 7.17 S/ 580.77 81.00 S/ 7.17 S/ 580.77 81.00 S/ 7.17 S/ 580.77
02.05.01.07 REJILLA DE SUMIDERO PLATINA 2 1/2" X 1 m 9.20 S/ 657.57 S/ 6,049.64 9.20 S/ 657.57 S/ 6,049.64 5.20 657.57 S/ 3,419.36 4.00 S/ 657.57 S/ 2,630.28
02.05.01.08 TARRAJEO IMPERMEABILIZADO MEZCLA 1: m2 18.72 S/ 36.96 S/ 691.89 18.72 S/ 36.96 S/ 691.89 13.52 36.96 S/ 499.70 5.20 S/ 36.96 S/ 192.19
02.05.01.09 CURADO CON AGUA m2 18.72 S/ 0.55 S/ 10.30 18.72 S/ 0.55 S/ 10.30 13.52 0.55 S/ 7.44 5.20 S/ 0.55 S/ 2.86
02.05.01.10 SUMINISTRO EN INSTALACIONES DE TUBER m 9.00 S/ 41.38 S/ 372.42 9.00 S/ 41.38 S/ 372.42 9.00 S/ 41.38 S/ 372.42
02.06 CANALES LATERALES S/ 97,900.49 S/ 97,900.49 S/ 0.00 S/ 0.00 S/ 11,276.62 S/ 86,623.87
02.06.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 322.00 S/ 0.96 S/ 309.12 322.00 S/ 0.96 S/ 309.12 35.00 0.96 S/ 33.60 287.00 S/ 0.96 S/ 275.52
02.06.02 EXCAVACION MANUAL m3 255.38 S/ 33.63 S/ 8,588.43 255.38 S/ 33.63 S/ 8,588.43 27.76 33.63 S/ 933.57 227.62 S/ 33.63 S/ 7,654.86
02.06.03 NIVELACION Y COMPACTADO MANUAL m2 322.00 S/ 3.00 S/ 966.00 322.00 S/ 3.00 S/ 966.00 35.00 3.00 S/ 105.00 287.00 S/ 3.00 S/ 861.00
02.06.04 ENCOFRADO Y DESENCOFRADO EN CUNETA m2 570.40 S/ 53.14 S/ 30,311.06 570.40 S/ 53.14 S/ 30,311.06 62.00 53.14 S/ 3,294.68 508.40 S/ 53.14 S/ 27,016.38
02.06.05 CONCRETO F'C=210 KG/CM2 m3 69.56 S/ 466.49 S/ 32,449.04 69.56 S/ 466.49 S/ 32,449.04 9.90 466.49 S/ 4,618.25 59.66 S/ 466.49 S/ 27,830.79
02.06.06 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 570.40 S/ 36.96 S/ 21,081.98 570.40 S/ 36.96 S/ 21,081.98 62.00 36.96 S/ 2,291.52 508.40 S/ 36.96 S/ 18,790.46
02.06.07 CURADO CON AGUA m2 590.40 S/ 0.55 S/ 324.72 590.40 S/ 0.55 S/ 324.72 590.40 S/ 0.55 S/ 324.72
02.06.08 JUNTAS ASFALTICAS m 214.65 S/ 18.03 S/ 3,870.14 214.65 S/ 18.03 S/ 3,870.14 214.65 S/ 18.03 S/ 3,870.14
02.07 DISIPADORES DE ENERGIA S/ 12,818.33 S/ 12,818.33 S/ 0.00 S/ 0.00 S/ 0.00 S/ 12,818.33
02.07.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 23.52 S/ 0.96 S/ 22.58 23.52 S/ 0.96 S/ 22.58 23.52 S/ 0.96 S/ 22.58
02.07.02 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 63.00 S/ 36.96 S/ 2,328.48 63.00 S/ 36.96 S/ 2,328.48 63.00 S/ 36.96 S/ 2,328.48
02.07.03 ENCOFRADO Y DESENCOFRADO EN DISIPA m2 81.90 S/ 53.14 S/ 4,352.17 81.90 S/ 53.14 S/ 4,352.17 81.90 S/ 53.14 S/ 4,352.17
02.07.04 CONCRETO F'C=210 KG/CM2 m3 12.98 S/ 466.49 S/ 6,055.04 12.98 S/ 466.49 S/ 6,055.04 12.98 S/ 466.49 S/ 6,055.04
02.07.05 CURADO CON AGUA m2 109.20 S/ 0.55 S/ 60.06 109.20 S/ 0.55 S/ 60.06 109.20 S/ 0.55 S/ 60.06
02.08 OBRAS COMPLEMENTARIAS S/ 99,850.18 S/ 99,850.18 S/ 21,824.11 S/ 0.00 S/ 0.00 S/ 121,674.29
02.08.01 INSTALACION DE TUBERIAS DE AGUA Y DESAGUE S/ 99,850.18 S/ 99,850.18 S/ 21,824.11 S/ 0.00 S/ 0.00 S/ 121,674.29
02.08.01.01 DESAGUE S/ 49,173.38 S/ 49,173.38 S/ 0.00 S/ 0.00 S/ 0.00 S/ 49,173.38
02.08.01.01.01 TRAZO, NIVELACION Y REPLANTEO DU m2 265.00 S/ 0.96 S/ 254.40 265.00 S/ 0.96 S/ 254.40 265.00 S/ 0.96 S/ 254.40
02.08.01.01.02 EXCAVACION MANUAL DE ZANJAS m3 409.43 S/ 33.63 S/ 13,769.13 409.43 S/ 33.63 S/ 13,769.13 409.43 S/ 33.63 S/ 13,769.13
02.08.01.01.03 REFINE DEL TERRENO EXCAVADO m2 265.00 S/ 6.74 S/ 1,786.10 265.00 S/ 6.74 S/ 1,786.10 265.00 S/ 6.74 S/ 1,786.10
02.08.01.01.04 CAMA DE ARENA E=0.20M m 265.00 S/ 1.59 S/ 421.35 265.00 S/ 1.59 S/ 421.35 265.00 S/ 1.59 S/ 421.35
02.08.01.01.05 SUMINISTRO Y COLOCACION DE TUBERIA m 265.00 S/ 57.77 S/ 15,309.05 265.00 S/ 57.77 S/ 15,309.05 265.00 S/ 57.77 S/ 15,309.05
02.08.01.01.06 RELLENO COMPACTADO CON MATERIAL m3 318.00 S/ 51.93 S/ 16,513.74 318.00 S/ 51.93 S/ 16,513.74 318.00 S/ 51.93 S/ 16,513.74
02.08.01.01.07 ELIMINACION DE MATERIAL EXCEDE m3 92.56 S/ 8.46 S/ 783.06 92.56 S/ 8.46 S/ 783.06 92.56 S/ 8.46 S/ 783.06
02.08.01.01.08 PRUEBA HIDRAULICA DE DESAGUE m 265.00 S/ 1.27 S/ 336.55 265.00 S/ 1.27 S/ 336.55 265.00 S/ 1.27 S/ 336.55
02.08.01.02 INSTALACIONES DOMICILIARIAS S/ 19,276.67 S/ 19,276.67 S/ 12,880.60 S/ 0.00 S/ 0.00 S/ 32,157.26
02.08.01.02.01 TRAZO, NIVELACION Y REPLANTEO DU m2 100.80 S/ 0.96 S/ 96.77 100.80 S/ 0.96 S/ 96.77 16.800 S/ 0.96 S/ 16.13 117.60 S/ 0.96 S/ 112.90
02.08.01.02.02 EXCAVACION MANUAL m3 72.68 S/ 33.63 S/ 2,444.23 72.68 S/ 33.63 S/ 2,444.23 12.110 S/ 33.63 S/ 407.26 84.79 S/ 33.63 S/ 2,851.49
02.08.01.02.03 REFINE DEL TERRENO EXCAVADO m2 100.80 S/ 6.74 S/ 679.39 100.80 S/ 6.74 S/ 679.39 16.800 S/ 6.74 S/ 113.23 117.60 S/ 6.74 S/ 792.62
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
02.08.01.02.04 CAMA DE ARENA E=0.20M m 168.00 S/ 1.59 S/ 267.12 168.00 S/ 1.59 S/ 267.12 28.000 S/ 1.59 S/ 44.52 196.00 S/ 1.59 S/ 311.64
02.08.01.02.05 SUMINISTRO Y COLOCACION DE TUBERIA m 168.00 S/ 30.55 S/ 5,132.40 168.00 S/ 30.55 S/ 5,132.40 168.000 S/ 30.55 S/ 5,132.40 336.00 S/ 30.55 S/ 10,264.80
02.08.01.02.06 RELLENO COMPACTADO CON MATERIAL m3 80.64 S/ 51.93 S/ 4,187.64 80.64 S/ 51.93 S/ 4,187.64 13.440 S/ 51.93 S/ 697.94 94.08 S/ 51.93 S/ 4,885.57
02.08.01.02.07 CONEXION DOMICILIARIAS DE DESAGUE und 28.00 S/ 231.04 S/ 6,469.12 28.00 S/ 231.04 S/ 6,469.12 28.000 S/ 231.04 S/ 6,469.12 56.00 S/ 231.04 S/ 12,938.24
02.08.01.03 BUZONES S/ 9,700.04 S/ 9,700.04 S/ 0.00 S/ 0.00 S/ 0.00 S/ 9,700.04
02.08.01.03.01 TRAZO, NIVELACION Y REPLANTEO DU m2 10.60 S/ 0.96 S/ 10.18 10.60 S/ 0.96 S/ 10.18 10.60 S/ 0.96 S/ 10.18
02.08.01.03.02 EXCAVACION DE BUZON EN TERRENO m3 15.89 S/ 32.99 S/ 524.21 15.89 S/ 32.99 S/ 524.21 15.89 S/ 32.99 S/ 524.21
02.08.01.03.03 ENCOFRADO Y DESENCOFRADO m 58.28 S/ 60.56 S/ 3,529.44 58.28 S/ 60.56 S/ 3,529.44 58.28 S/ 60.56 S/ 3,529.44
02.08.01.03.04 ACERO CORRUGADO FY=4200 kg/cm2 G kg 248.68 S/ 8.95 S/ 2,225.69 248.68 S/ 8.95 S/ 2,225.69 248.68 S/ 8.95 S/ 2,225.69
02.08.01.03.05 CONCRETO BUZONES f'c=210kg/cm2 m3 6.04 S/ 331.95 S/ 2,004.98 6.04 S/ 331.95 S/ 2,004.98 6.04 S/ 331.95 S/ 2,004.98
02.08.01.03.06 ELIMINACION DE MATERIAL EXCEDE m3 16.37 S/ 8.46 S/ 138.49 16.37 S/ 8.46 S/ 138.49 16.37 S/ 8.46 S/ 138.49
02.08.01.03.07 ENCIMADO DE BUZONES und 3.00 S/ 422.35 S/ 1,267.05 3.00 S/ 422.35 S/ 1,267.05 3.00 S/ 422.35 S/ 1,267.05
02.08.01.04 INSTALACIONES DE AGUA S/ 12,756.58 S/ 12,756.58 S/ 0.00 S/ 0.00 S/ 0.00 S/ 12,756.58
02.08.01.04.01 TRAZO, NIVELACION Y REPLANTEO DU m2 132.50 S/ 0.96 S/ 127.20 132.50 S/ 0.96 S/ 127.20 132.50 S/ 0.96 S/ 127.20
02.08.01.04.02 EXCAVACION MANUAL m3 109.18 S/ 33.63 S/ 3,671.72 109.18 S/ 33.63 S/ 3,671.72 109.18 S/ 33.63 S/ 3,671.72
02.08.01.04.03 REFINE DEL TERRENO EXCAVADO m2 132.50 S/ 6.74 S/ 893.05 132.50 S/ 6.74 S/ 893.05 132.50 S/ 6.74 S/ 893.05
02.08.01.04.04 CAMA DE ARENA E=0.20M m 265.00 S/ 1.59 S/ 421.35 265.00 S/ 1.59 S/ 421.35 265.00 S/ 1.59 S/ 421.35
02.08.01.04.05 SUMINISTRO E INSTALACION DE TUBER m 265.00 S/ 14.59 S/ 3,866.35 265.00 S/ 14.59 S/ 3,866.35 265.00 S/ 14.59 S/ 3,866.35
02.08.01.04.06 RELLENO COMPACTADO CON MATERIAL m3 66.25 S/ 51.93 S/ 3,440.36 66.25 S/ 51.93 S/ 3,440.36 66.25 S/ 51.93 S/ 3,440.36
02.08.01.04.07 PRUEBA HIDRAULICA m 265.00 S/ 1.27 S/ 336.55 265.00 S/ 1.27 S/ 336.55 265.00 S/ 1.27 S/ 336.55
02.08.01.05 CONEXIONES DOMICILIARIAS S/ 8,943.51 S/ 8,943.51 S/ 8,943.51 S/ 0.00 S/ 0.00 S/ 17,887.03
02.08.01.05.01 TRAZO, NIVELACION Y REPLANTEO DU m2 67.20 S/ 0.96 S/ 64.51 67.20 S/ 0.96 S/ 64.51 67.200 S/ 0.96 S/ 64.51 134.40 S/ 0.96 S/ 129.02
02.08.01.05.02 EXCAVACION MANUAL m3 55.37 S/ 33.63 S/ 1,862.09 55.37 S/ 33.63 S/ 1,862.09 55.370 S/ 33.63 S/ 1,862.09 110.74 S/ 33.63 S/ 3,724.19
02.08.01.05.03 REFINE DEL TERRENO EXCAVADO m2 268.80 S/ 6.74 S/ 1,811.71 268.80 S/ 6.74 S/ 1,811.71 268.800 S/ 6.74 S/ 1,811.71 537.60 S/ 6.74 S/ 3,623.42
02.08.01.05.04 CAMA DE ARENA E=0.2 M m 112.00 S/ 1.59 S/ 178.08 112.00 S/ 1.59 S/ 178.08 112.000 S/ 1.59 S/ 178.08 224.00 S/ 1.59 S/ 356.16
02.08.01.05.05 SUMINISTRO Y COLOCACION DE TUBERIA m 112.00 S/ 9.97 S/ 1,116.64 112.00 S/ 9.97 S/ 1,116.64 112.000 S/ 9.97 S/ 1,116.64 224.00 S/ 9.97 S/ 2,233.28
02.08.01.05.06 CONEXIONES DOMICILIARIAS DE AGUA und 28.00 S/ 139.66 S/ 3,910.48 28.00 S/ 139.66 S/ 3,910.48 28.000 S/ 139.66 S/ 3,910.48 56.00 S/ 139.66 S/ 7,820.96
02.09 CARPINTERIA METALICA S/ 55,800.00 S/ 55,800.00 S/ 12,167.23 S/ 0.00 S/ 0.00 S/ 67,967.23
02.09.01 INSTALACION DE BARANDAS METALICAS m 310.00 S/ 180.00 S/ 55,800.00 310.00 S/ 180.00 S/ 55,800.00 67.60 180.00 S/ 12,167.23 377.60 S/ 180.00 S/ 67,967.23
02.10 ESTRUCTURA VIAL S/ 97,106.28 S/ 97,106.28 S/ 0.00 S/ 0.00 S/ 97,106.28 S/ 0.00
02.10.01 MOVIMIENTO DE TIERRAS S/ 6,753.24 S/ 6,753.24 S/ 0.00 S/ 0.00 S/ 6,753.24 S/ 0.00
02.10.01.01 EXCAVACION MANUAL m3 128.62 S/ 33.63 S/ 4,325.49 128.62 S/ 33.63 S/ 4,325.49 128.62 33.63 S/ 4,325.49 0.00 S/ 33.63 S/ 0.00
02.10.01.02 RELLENO Y COMPACTADO C/MATERIAL P m3 19.85 S/ 52.66 S/ 1,045.30 19.85 S/ 52.66 S/ 1,045.30 19.85 52.66 S/ 1,045.30 0.00 S/ 52.66 S/ 0.00
02.10.01.03 ELIMINACION DE MAERIAL EXCEDENTE m3 112.03 S/ 12.34 S/ 1,382.45 112.03 S/ 12.34 S/ 1,382.45 112.03 12.34 S/ 1,382.45 0.00 S/ 12.34 S/ 0.00
02.10.02 SUB-RASANTE S/ 597.60 S/ 597.60 S/ 0.00 S/ 0.00 S/ 597.60 S/ 0.00
02.10.02.01 PERFILADO Y COMPACTADO DE SUB-RASA m2 240.00 S/ 2.49 S/ 597.60 240.00 S/ 2.49 S/ 597.60 240.00 2.49 S/ 597.60 0.00 S/ 2.49 S/ 0.00
02.10.03 BASE E= 0.30 S/ 6,661.07 S/ 6,661.07 S/ 0.00 S/ 0.00 S/ 6,661.07 S/ 0.00
02.10.03.01 EXTRACCION Y APILAMIENTO DE MATERIA m3 61.50 S/ 43.82 S/ 2,694.93 61.50 S/ 43.82 S/ 2,694.93 61.50 43.82 S/ 2,694.93 0.00 S/ 43.82 S/ 0.00
02.10.03.02 ZARANDEO DE MATERIAL EN CANTERA m3 61.50 S/ 10.75 S/ 661.13 61.50 S/ 10.75 S/ 661.13 61.50 10.75 S/ 661.13 0.00 S/ 10.75 S/ 0.00
02.10.03.03 TRANSPORTE DE MATERIAL CON CARGUIO m3 61.50 S/ 28.74 S/ 1,767.51 61.50 S/ 28.74 S/ 1,767.51 61.50 28.74 S/ 1,767.51 0.00 S/ 28.74 S/ 0.00
02.10.03.04 EXTENDIDO, RIEGO Y COMPACTACION DE m2 205.00 S/ 7.50 S/ 1,537.50 205.00 S/ 7.50 S/ 1,537.50 205.00 7.50 S/ 1,537.50 0.00 S/ 7.50 S/ 0.00
02.10.04 PAVIMENTO DE CONCRETO S/ 28,705.47 S/ 28,705.47 S/ 0.00 S/ 0.00 S/ 28,705.47 S/ 0.00
02.10.04.01 ENCOFRADO DE LOSA DE PAVIMENTO m2 20.00 S/ 60.56 S/ 1,211.20 20.00 S/ 60.56 S/ 1,211.20 20.00 60.56 S/ 1,211.20 0.00 S/ 60.56 S/ 0.00
02.10.04.02 CONCRETO f'c=210 kg/cm2 C/MEZCLADORA m3 48.00 S/ 463.87 S/ 22,265.76 48.00 S/ 463.87 S/ 22,265.76 48.00 463.87 S/ 22,265.76 0.00 S/ 463.87 S/ 0.00
02.10.04.03 ACERO LISO DE 1" EN JUNTAS TRANSVER kg 53.98 S/ 7.56 S/ 408.09 53.98 S/ 7.56 S/ 408.09 53.98 7.56 S/ 408.09 0.00 S/ 7.56 S/ 0.00
02.10.04.04 ACERO CORRUGADO 1/4" GRADO 60 EN kg 393.80 S/ 6.84 S/ 2,693.59 393.80 S/ 6.84 S/ 2,693.59 393.80 6.84 S/ 2,693.59 0.00 S/ 6.84 S/ 0.00
02.10.04.05 ACERO CORRUGADO 1/2" EN JUNTAS LO kg 102.91 S/ 6.86 S/ 705.96 102.91 S/ 6.86 S/ 705.96 102.91 6.86 S/ 705.96 0.00 S/ 6.86 S/ 0.00
02.10.04.06 ACERO EN JUNTAS TRANVERSALES DE CO kg 118.01 S/ 7.55 S/ 890.98 118.01 S/ 7.55 S/ 890.98 118.01 7.55 S/ 890.98 0.00 S/ 7.55 S/ 0.00
02.10.04.07 CURADO CON AGUA m2 205.00 S/ 0.55 S/ 112.75 205.00 S/ 0.55 S/ 112.75 205.00 0.55 S/ 112.75 0.00 S/ 0.55 S/ 0.00
02.10.04.08 SELLO CON MEZCLA ASFALTICA E=5 mm. m 139.98 S/ 2.98 S/ 417.14 139.98 S/ 2.98 S/ 417.14 139.98 2.98 S/ 417.14 0.00 S/ 2.98 S/ 0.00
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
02.10.05 PRUEBAS DE CALIDAD S/ 2,610.00 S/ 2,610.00 S/ 0.00 S/ 0.00 S/ 2,610.00 S/ 0.00
02.10.05.01 DISEÑO DE MEZCLAS DE CONCRETO und 3.00 S/ 350.00 S/ 1,050.00 3.00 S/ 350.00 S/ 1,050.00 3.00 350.00 S/ 1,050.00 0.00 S/ 350.00 S/ 0.00
02.10.05.02 PRUEBAS DE CONTROL CALIDAD DEL CO und 15.00 S/ 20.00 S/ 300.00 15.00 S/ 20.00 S/ 300.00 15.00 20.00 S/ 300.00 0.00 S/ 20.00 S/ 0.00
02.10.05.03 PRUEBA DE DENSIDAD DE CAMPO (CONO und 2.00 S/ 80.00 S/ 160.00 2.00 S/ 80.00 S/ 160.00 2.00 80.00 S/ 160.00 0.00 S/ 80.00 S/ 0.00
02.10.05.04 ESTUDIO DE CANTERAS glb 1.00 S/ 250.00 S/ 250.00 1.00 S/ 250.00 S/ 250.00 1.00 250.00 S/ 250.00 0.00 S/ 250.00 S/ 0.00
02.10.05.05 PLACA RECORDATORIA DE BRONCE und 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00 1.00 850.00 S/ 850.00 0.00 S/ 850.00 S/ 0.00
02.10.06 IMPACTO AMBIENTAL S/ 49,278.90 S/ 49,278.90 S/ 0.00 S/ 0.00 S/ 49,278.90 S/ 0.00
02.10.06.01 LIMPIEZA Y ELIMINACION DE DESECHOS m3 250.00 S/ 40.52 S/ 10,130.00 250.00 S/ 40.52 S/ 10,130.00 250.00 40.52 S/ 10,130.00 0.00 S/ 40.52 S/ 0.00
02.10.06.02 RESTAURACION DE CANTERAS m2 500.00 S/ 47.67 S/ 23,835.00 500.00 S/ 47.67 S/ 23,835.00 500.00 47.67 S/ 23,835.00 0.00 S/ 47.67 S/ 0.00
02.10.06.03 ACONDICIONAMIENTO DE MATERIAL EXC m3 250.00 S/ 11.32 S/ 2,830.00 250.00 S/ 11.32 S/ 2,830.00 250.00 11.32 S/ 2,830.00 0.00 S/ 11.32 S/ 0.00
02.10.06.04 REVEGETACION EN BOTADEROS ha 0.10 S/ 50,991.80 S/ 5,099.18 0.10 S/ 50,991.80 S/ 5,099.18 0.10 50991.80 S/ 5,099.18 0.00 S/ 50,991.80 S/ 0.00
02.10.06.05 SEMBRIO DE GRASS NATURAL m2 348.50 S/ 21.19 S/ 7,384.72 348.50 S/ 21.19 S/ 7,384.72 348.50 21.19 S/ 7,384.72 0.00 S/ 21.19 S/ 0.00
02.10.07 FLETE TERRESTRE S/ 2,500.00 S/ 2,500.00 S/ 0.00 S/ 0.00 S/ 2,500.00 S/ 0.00
02.10.07.01 FLETE TERRESTRE DE MATERIALES PA glb 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00 1.00 2500.00 S/ 2,500.00 0.00 S/ 2,500.00 S/ 0.00
03 PAVIMENTACION AV. CHINCHAYSUYO S/ 1,079,510.90 S/ 1,166,405.70 S/ 101,483.30 S/ 0.00 S/ 60,602.50 S/ 1,207,286.51
03.01 OBRAS PROVISIONALES S/ 579.76 S/ 579.76 S/ 0.00 S/ 0.00 S/ 0.00 S/ 579.76
03.01.01 CARTEL DE OBRA 3.60m x 2.40m und 1.00 S/ 579.76 S/ 579.76 1.00 S/ 579.76 S/ 579.76 1.00 S/ 579.76 S/ 579.76
03.02 CALZADA VEHICULAR S/ 893,473.03 S/ 967,240.69 S/ 93,283.30 S/ 0.00 S/ 20,128.95 S/ 1,040,395.05
03.02.01 TRABAJOS PRELIMINARES S/ 6,761.60 S/ 6,761.60 S/ 0.00 S/ 0.00 S/ 0.00 S/ 6,761.60
03.02.01.01 MOVILIZACION Y DESMOVILIZACION DE E glb 1.00 S/ 2,000.00 S/ 2,000.00 1.00 S/ 2,000.00 S/ 2,000.00 1.00 S/ 2,000.00 S/ 2,000.00
03.02.01.02 TRAZO, NIVELES Y REPLANTEO m2 4960.00 S/ 0.96 S/ 4,761.60 4960.00 S/ 0.96 S/ 4,761.60 4960.00 S/ 0.96 S/ 4,761.60
03.02.02 MOVIMIENTO DE TIERRAS S/ 123,139.87 S/ 123,139.87 S/ 0.00 S/ 0.00 S/ 7,157.78 S/ 115,982.09
03.02.02.01 CORTE DE TERRENO A NIVEL DE SUB RAS m3 3461.19 S/ 14.75 S/ 51,052.55 3461.19 S/ 14.75 S/ 51,052.55 185.19 14.75 S/ 2,731.55 3276.00 S/ 14.75 S/ 48,321.00
03.02.02.02 RELLENO COMPACTADO CON MATERIAL m3 57.79 S/ 58.39 S/ 3,374.36 57.79 S/ 58.39 S/ 3,374.36 57.79 58.39 S/ 3,374.36 0.00 S/ 58.39 S/ 0.00
03.02.02.03 ELIMINACION DE DESMONTE PROV. DEL m3 3488.49 S/ 9.21 S/ 32,128.99 3488.49 S/ 9.21 S/ 32,128.99 114.21 9.21 S/ 1,051.87 3374.28 S/ 9.21 S/ 31,077.12
03.02.02.04 PERFILADO Y COMPACTACION SUB-RAS m2 3124.80 S/ 10.46 S/ 32,685.41 3124.80 S/ 10.46 S/ 32,685.41 3124.80 S/ 10.46 S/ 32,685.41
03.02.02.05 RIEGO m2 2976.00 S/ 1.31 S/ 3,898.56 2976.00 S/ 1.31 S/ 3,898.56 2976.00 S/ 1.31 S/ 3,898.56
03.02.03 SUB BASE (E=0.15M) S/ 68,005.99 S/ 124,113.14 S/ 82,515.23 S/ 0.00 S/ 0.00 S/ 206,628.37
03.02.03.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 3124.80 S/ 0.96 S/ 2,999.81 3124.80 S/ 0.96 S/ 2,999.81 3124.80 S/ 0.96 S/ 2,999.81
03.02.03.02 EXTRACCION Y PREPARACION DE MATERI m3 480.44 S/ 42.30 S/ 20,322.61 1281.17 S/ 42.30 S/ 54,193.49 1690.97 42.30 S/ 71,528.03 2972.14 S/ 42.30 S/ 125,721.52
03.02.03.03 CARGUIO Y TRANSPORTE DE MATERIAL DE m3 480.44 S/ 27.77 S/ 13,341.82 1281.17 S/ 27.77 S/ 35,578.09 1281.17 S/ 27.77 S/ 35,578.09
03.02.03.04 EXTENDIDO Y COMPACTACION DE SUB-BA m2 3124.80 S/ 8.72 S/ 27,248.26 3124.80 S/ 8.72 S/ 27,248.26 1260.00 8.72 S/ 10,987.20 4384.80 S/ 8.72 S/ 38,235.46
03.02.03.05 RIEGO m2 3124.80 S/ 1.31 S/ 4,093.49 3124.80 S/ 1.31 S/ 4,093.49 3124.80 S/ 1.31 S/ 4,093.49
03.02.04 BASE (E=0.20M) S/ 79,848.36 S/ 79,848.36 S/ 0.00 S/ 0.00 S/ 0.00 S/ 79,848.36
03.02.04.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 3124.80 S/ 0.96 S/ 2,999.81 3124.80 S/ 0.96 S/ 2,999.81 3124.80 S/ 0.96 S/ 2,999.81
03.02.04.02 EXTRACCION Y PREPARACION DE MATERI m3 640.58 S/ 42.30 S/ 27,096.53 640.58 S/ 42.30 S/ 27,096.53 640.58 S/ 42.30 S/ 27,096.53
03.02.04.03 TRANSPORTE DE MATERIAL CON CARGUIO m3 640.58 S/ 28.74 S/ 18,410.27 640.58 S/ 28.74 S/ 18,410.27 640.58 S/ 28.74 S/ 18,410.27
03.02.04.04 EXTENDIDO Y COMPACTACION DE SUB-BA m2 3124.80 S/ 8.72 S/ 27,248.26 3124.80 S/ 8.72 S/ 27,248.26 3124.80 S/ 8.72 S/ 27,248.26
03.02.04.05 RIEGO m2 3124.80 S/ 1.31 S/ 4,093.49 3124.80 S/ 1.31 S/ 4,093.49 3124.80 S/ 1.31 S/ 4,093.49
03.02.05 LOSA DE RODADURA S/ 395,400.20 S/ 413,060.71 S/ 3,915.14 S/ 0.00 S/ 12,971.17 S/ 404,004.68
03.02.05.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 2976.00 S/ 0.96 S/ 2,856.96 2976.00 S/ 0.96 S/ 2,856.96 30.00 S/ 0.96 S/ 28.80 3006.00 S/ 0.96 S/ 2,885.76
03.02.05.02 ENCOFRADO Y DESENCOFRADO EN LOSA m2 495.99 S/ 60.56 S/ 30,037.15 495.99 S/ 60.56 S/ 30,037.15 10.00 S/ 60.56 S/ 605.60 505.99 S/ 60.56 S/ 30,642.75
03.02.05.03 CONCRETO F'C=210 KG/CM2 m3 595.20 S/ 466.49 S/ 277,654.85 595.20 S/ 466.49 S/ 277,654.85 6.00 S/ 466.49 S/ 2,798.94 601.20 S/ 466.49 S/ 280,453.79
03.02.05.04 ACERO DE TEMPERATURA DE 1/4" kg 3975.97 S/ 7.97 S/ 31,688.48 3975.97 S/ 7.97 S/ 31,688.48 556.29 7.97 S/ 4,433.63 3419.68 S/ 7.97 S/ 27,254.85
03.02.05.05 ACERO CORRUGADO G-60 1/2" EN JUNTA kg 1671.21 S/ 7.97 S/ 13,319.54 1671.21 S/ 7.97 S/ 13,319.54 1071.21 7.97 S/ 8,537.54 600.00 S/ 7.97 S/ 4,782.00
03.02.05.06 ACERO LISO DE 1" EN DILATACION kg 578.34 S/ 8.10 S/ 4,684.55 2321.14 S/ 8.10 S/ 18,801.23 2321.14 S/ 8.10 S/ 18,801.23
03.02.05.07 ACERO LISO DE 3/4" EN JUNTA DE DILATA kg 1348.70 S/ 8.10 S/ 10,924.47 1786.21 S/ 8.10 S/ 14,468.30 1786.21 S/ 8.10 S/ 14,468.30
03.02.05.08 SELLADO DE JUNTAS LONGITUDINALES m 496.00 S/ 9.50 S/ 4,712.00 496.00 S/ 9.50 S/ 4,712.00 30.00 S/ 9.50 S/ 285.00 526.00 S/ 9.50 S/ 4,997.00
03.02.05.09 SELLADO DE JUNTAS DILATACION Y CONTR m 991.98 S/ 18.03 S/ 17,885.40 991.98 S/ 18.03 S/ 17,885.40 10.00 S/ 18.03 S/ 180.30 1001.98 S/ 18.03 S/ 18,065.70
03.02.05.10 CURADO CON AGUA m2 2976.00 S/ 0.55 S/ 1,636.80 2976.00 S/ 0.55 S/ 1,636.80 30.00 S/ 0.55 S/ 16.50 3006.00 S/ 0.55 S/ 1,653.30
03.02.06 SARDINELES DE CONCRETO S/ 72,063.42 S/ 72,063.42 S/ 0.00 S/ 0.00 S/ 0.00 S/ 72,063.42
03.02.06.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 148.80 S/ 0.96 S/ 142.85 148.80 S/ 0.96 S/ 142.85 148.80 S/ 0.96 S/ 142.85
03.02.06.02 EXCAVACION MANUAL m3 52.08 S/ 33.63 S/ 1,751.45 52.08 S/ 33.63 S/ 1,751.45 52.08 S/ 33.63 S/ 1,751.45
03.02.06.03 ENCOFRADO Y DESENCOFRADO EN SARDI m2 694.40 S/ 53.14 S/ 36,900.42 694.40 S/ 53.14 S/ 36,900.42 694.40 S/ 53.14 S/ 36,900.42
03.02.06.04 CONCRETO f'c=175 kg/cm2 m3 74.40 S/ 440.05 S/ 32,739.72 74.40 S/ 440.05 S/ 32,739.72 74.40 S/ 440.05 S/ 32,739.72
03.02.06.05 CURADO CON AGUA m2 148.80 S/ 0.55 S/ 81.84 148.80 S/ 0.55 S/ 81.84 148.80 S/ 0.55 S/ 81.84
03.02.06.06 SELLADO DE JUNTAS EN SARDINELES e= 3 m 24.80 S/ 18.03 S/ 447.14 24.80 S/ 18.03 S/ 447.14 24.80 S/ 18.03 S/ 447.14
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
03.02.07 VEREDAS DE CONCRETO S/ 122,566.87 S/ 122,566.87 S/ 6,852.93 S/ 0.00 S/ 0.00 S/ 129,419.81
03.02.07.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 595.20 S/ 0.96 S/ 571.39 595.20 S/ 0.96 S/ 571.39 595.20 S/ 0.96 S/ 571.39
03.02.07.02 EXCAVACION MANUAL m3 306.53 S/ 33.63 S/ 10,308.60 306.53 S/ 33.63 S/ 10,308.60 306.53 S/ 33.63 S/ 10,308.60
03.02.07.03 NIVELACION Y COMPACTADO MANUAL m2 1190.40 S/ 3.00 S/ 3,571.20 1190.40 S/ 3.00 S/ 3,571.20 1190.40 S/ 3.00 S/ 3,571.20
03.02.07.04 ENCOFRADO Y DESENCOFRADO EN VERE m2 218.24 S/ 53.14 S/ 11,597.27 218.24 S/ 53.14 S/ 11,597.27 128.96 53.14 S/ 6,852.93 S/ 0.00 347.20 S/ 53.14 S/ 18,450.21
03.02.07.05 EMPEDRADO C/ PM (E=0.15) m2 1226.11 S/ 35.53 S/ 43,563.69 1226.11 S/ 35.53 S/ 43,563.69 1226.11 S/ 35.53 S/ 43,563.69
03.02.07.06 CONCRETO f'c=175 kg/cm2 m3 63.98 S/ 440.05 S/ 28,154.40 63.98 S/ 440.05 S/ 28,154.40 63.98 S/ 440.05 S/ 28,154.40
03.02.07.07 SELLADO DE JUNTAS DILATACION Y CONTR m 1339.19 S/ 18.03 S/ 24,145.60 1339.19 S/ 18.03 S/ 24,145.60 1339.19 S/ 18.03 S/ 24,145.60
03.02.07.08 CURADO CON AGUA m2 1190.40 S/ 0.55 S/ 654.72 1190.40 S/ 0.55 S/ 654.72 1190.40 S/ 0.55 S/ 654.72
03.02.08 AREA VERDE S/ 25,686.72 S/ 25,686.72 S/ 0.00 S/ 0.00 S/ 0.00 S/ 25,686.72
03.02.08.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 644.80 S/ 0.96 S/ 619.01 644.80 S/ 0.96 S/ 619.01 644.80 S/ 0.96 S/ 619.01
03.02.08.02 EXCAVACION MANUAL m3 225.68 S/ 33.63 S/ 7,589.62 225.68 S/ 33.63 S/ 7,589.62 225.68 S/ 33.63 S/ 7,589.62
03.02.08.03 NIVELACION Y COMPACTADO MANUAL m2 644.80 S/ 3.00 S/ 1,934.40 644.80 S/ 3.00 S/ 1,934.40 644.80 S/ 3.00 S/ 1,934.40
03.02.08.04 ACARREO DE MATERIAL EXCEDENTE m3 225.68 S/ 39.58 S/ 8,932.41 225.68 S/ 39.58 S/ 8,932.41 225.68 S/ 39.58 S/ 8,932.41
03.02.08.05 SEMBRIO DE GRASS NATURAL m2 312.00 S/ 21.19 S/ 6,611.28 312.00 S/ 21.19 S/ 6,611.28 312.00 S/ 21.19 S/ 6,611.28
03.03 RECONEXION DE INSTALACIONES S/ 36,783.20 S/ 36,783.20 S/ 1,200.00 S/ 0.00 S/ 0.00 S/ 37,983.20
03.03.01 INSTALACIONES DE AGUA Y DESAGUE S/ 36,783.20 S/ 36,783.20 S/ 1,200.00 S/ 0.00 S/ 0.00 S/ 37,983.20
03.03.01.01 RECONEXION DOMICILIARIA DE AGUA und 50.00 S/ 300.00 S/ 15,000.00 50.00 S/ 300.00 S/ 15,000.00 2.00 S/ 300.00 S/ 600.00 S/ 0.00 52.00 S/ 300.00 S/ 15,600.00
03.03.01.02 RECONEXION DOMICILIARIA DE DESAGUE und 50.00 S/ 300.00 S/ 15,000.00 50.00 S/ 300.00 S/ 15,000.00 2.00 S/ 300.00 S/ 600.00 S/ 0.00 52.00 S/ 300.00 S/ 15,600.00
03.03.01.03 ENCIMADO DE BUZONES und 10.00 S/ 486.05 S/ 4,860.50 10.00 S/ 486.05 S/ 4,860.50 10.00 S/ 486.05 S/ 4,860.50
03.03.01.04 ACCESORIOS PARA BUZONES und 10.00 S/ 192.27 S/ 1,922.70 10.00 S/ 192.27 S/ 1,922.70 10.00 S/ 192.27 S/ 1,922.70
03.04 SUMIDEROS TRANSVERSALES (REJILLAS) S/ 21,894.49 S/ 27,701.63 S/ 0.00 S/ 0.00 S/ 5,182.00 S/ 22,519.63
03.04.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 18.00 S/ 0.96 S/ 17.28 30.00 S/ 0.96 S/ 28.80 30.00 S/ 0.96 S/ 28.80
03.04.02 EXCAVACION MANUAL m3 15.30 S/ 33.63 S/ 514.54 25.50 S/ 33.63 S/ 857.57 25.50 S/ 33.63 S/ 857.57
03.04.03 NIVELACION Y COMPACTADO MANUAL m2 18.00 S/ 3.00 S/ 54.00 30.00 S/ 3.00 S/ 90.00 30.00 S/ 3.00 S/ 90.00
03.04.04 ENCOFRADO Y DESENCOFRADO EN SUMIDE m2 30.60 S/ 53.14 S/ 1,626.08 51.00 S/ 53.14 S/ 2,710.14 51.00 S/ 53.14 S/ 2,710.14
03.04.05 CONCRETO f'c=210 kg/cm2 m3 9.72 S/ 463.87 S/ 4,508.82 16.20 S/ 463.87 S/ 7,514.69 16.20 S/ 463.87 S/ 7,514.69
03.04.06 ACERO DE REFUERZO G-60 kg 202.72 S/ 7.97 S/ 1,615.68 272.67 S/ 7.97 S/ 2,173.18 272.67 S/ 7.97 S/ 2,173.18
03.04.07 REJILLA SUMIDERO PLATINA 2 1/2" x 1/2" C/ri m 18.00 S/ 647.75 S/ 11,659.50 18.00 S/ 647.75 S/ 11,659.50 8.00 647.75 S/ 5,182.00 10.00 S/ 647.75 S/ 6,477.50
03.04.08 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 30.60 S/ 36.96 S/ 1,130.98 51.00 S/ 36.96 S/ 1,884.96 51.00 S/ 36.96 S/ 1,884.96
03.04.09 CURADO CON AGUA m2 41.40 S/ 0.55 S/ 22.77 69.00 S/ 0.55 S/ 37.95 69.00 S/ 0.55 S/ 37.95
03.04.10 SUMINISTRO EN INSTALACIONES DE TUBERIA m 18.00 S/ 41.38 S/ 744.84 18.00 S/ 41.38 S/ 744.84 18.00 S/ 41.38 S/ 744.84
03.05 SEÑALIZACION S/ 37,979.52 S/ 37,979.52 S/ 0.00 S/ 0.00 S/ 0.00 S/ 37,979.52
03.05.01 PINTADO DE SARDINELES AL BORDE DE LA V m 992.00 S/ 31.74 S/ 31,486.08 992.00 S/ 31.74 S/ 31,486.08 992.00 S/ 31.74 S/ 31,486.08
03.05.02 PINTADO DE SEÑALES EN PAVIMENTO m2 36.00 S/ 31.74 S/ 1,142.64 36.00 S/ 31.74 S/ 1,142.64 36.00 S/ 31.74 S/ 1,142.64
03.05.03 SEÑALES VERTICALES und 10.00 S/ 535.08 S/ 5,350.80 10.00 S/ 535.08 S/ 5,350.80 10.00 S/ 535.08 S/ 5,350.80
03.06 PRUEBAS DE CALIDAD S/ 3,010.00 S/ 3,330.00 S/ 0.00 S/ 0.00 S/ 500.00 S/ 2,830.00
03.06.01 DISEÑO DE MEZCLAS und 3.00 S/ 400.00 S/ 1,200.00 3.00 S/ 400.00 S/ 1,200.00 3.00 S/ 400.00 S/ 1,200.00
03.06.02 PRUEBAS DE CONTROL CALIDAD DEL CONC und 15.00 S/ 20.00 S/ 300.00 15.00 S/ 20.00 S/ 300.00 15.00 S/ 20.00 S/ 300.00
03.06.03 PRUEBA DE DENSIDAD DE CAMPO (CONO DE und 2.00 S/ 80.00 S/ 160.00 6.00 S/ 80.00 S/ 480.00 6.00 S/ 80.00 S/ 480.00
03.06.04 ESTUDIO DE CANTERAS glb 2.00 S/ 250.00 S/ 500.00 2.00 S/ 250.00 S/ 500.00 2.00 250.00 S/ 500.00 0.00 S/ 250.00 S/ 0.00
03.06.05 PLACA RECORDATORIA DE BRONCE und 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00
03.07 IMPACTO AMBIENTAL S/ 62,290.90 S/ 62,290.90 S/ 0.00 S/ 0.00 S/ 34,791.55 S/ 27,499.35
03.07.01 LIMPIEZA Y ELIMINACION DE DESECHOS DE m3 250.00 S/ 40.52 S/ 10,130.00 250.00 S/ 40.52 S/ 10,130.00 250.00 S/ 40.52 S/ 10,130.00
03.07.02 RESTAURACION DE CANTERAS m2 500.00 S/ 47.67 S/ 23,835.00 500.00 S/ 47.67 S/ 23,835.00 195 47.67 S/ 9,295.65 305.00 S/ 47.67 S/ 14,539.35
03.07.03 ACONDICIONAMIENTO DE MATERIAL EXCED m3 250.00 S/ 11.32 S/ 2,830.00 250.00 S/ 11.32 S/ 2,830.00 250.00 S/ 11.32 S/ 2,830.00
03.07.04 REVEGETACION EN BOTADEROS ha 0.50 S/ 50,991.80 S/ 25,495.90 0.50 S/ 50,991.80 S/ 25,495.90 0.5 50,991.79 S/ 25,495.90 0.00 S/ 50,991.80 S/ 0.00
03.08 FLETE TERRESTRE S/ 2,500.00 S/ 2,500.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,500.00
03.08.01 FLETE TERRESTRE DE MATERIALES PARA glb 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00
03.09 PLAN DE MONITOREO ARQUEOLOGICO S/ 21,000.00 S/ 28,000.00 S/ 7,000.00 S/ 0.00 S/ 0.00 S/ 35,000.00
03.09.01 PLAN DE MONITOREO ARQUEOLOGICO mes 4.00 S/ 3,500.00 S/ 14,000.00 6.00 S/ 3,500.00 S/ 21,000.00 2.00 S/ 3,500.00 S/ 7,000.00 8.00 S/ 3,500.00 S/ 28,000.00
03.09.02 ELABORACION DE EXPEDIENTE PARA EL und 1.00 S/ 7,000.00 S/ 7,000.00 1.00 S/ 7,000.00 S/ 7,000.00 1.00 S/ 7,000.00 S/ 7,000.00
04 PAVIMENTACION APV LOS LIRIOS S/ 389,268.07 S/ 447,935.20 S/ 13,917.82 S/ 0.00 S/ 43,687.90 S/ 418,165.13
04.01 CALZADA VEHICULAR S/ 213,613.66 S/ 251,791.05 S/ 8,539.15 S/ 0.00 S/ 32,277.65 S/ 228,052.56
04.01.01 TRABAJOS PRELIMINARES S/ 2,414.72 S/ 2,449.28 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,449.28
04.01.01.01 MOVILIZACION Y DESMOVILIZACION DE E glb 1.00 S/ 2,000.00 S/ 2,000.00 1.00 S/ 2,000.00 S/ 2,000.00 1.00 S/ 2,000.00 S/ 2,000.00
04.01.01.02 TRAZO, NIVELACION Y REPLANTEO DURA m2 432.00 S/ 0.96 S/ 414.72 468.00 S/ 0.96 S/ 449.28 468.00 S/ 0.96 S/ 449.28
04.01.02 MOVIMIENTO DE TIERRAS S/ 25,840.55 S/ 31,973.73 S/ 0.00 S/ 0.00 S/ 0.00 S/ 31,973.73
04.01.02.01 CORTE DE TERRENO A NIVEL DE SUB RAS m3 653.52 S/ 14.75 S/ 9,639.42 858.72 S/ 14.75 S/ 12,666.12 858.72 S/ 14.75 S/ 12,666.12
04.01.02.02 ELIMINACION MANUAL DE DESMONTE (zonas m3 130.70 S/ 10.82 S/ 1,414.17 130.70 S/ 10.82 S/ 1,414.17 130.70 S/ 10.82 S/ 1,414.17
04.01.02.03 ELIMINACION DE DESMONTE PROV. DEL m3 882.25 S/ 9.21 S/ 8,125.52 1159.27 S/ 9.21 S/ 10,676.88 1159.27 S/ 9.21 S/ 10,676.88
04.01.02.04 PERFILADO Y COMPACTADO DE SUB RAS m2 432.00 S/ 14.11 S/ 6,095.52 468.00 S/ 14.11 S/ 6,603.48 468.00 S/ 14.11 S/ 6,603.48
04.01.02.05 RIEGO m2 432.00 S/ 1.31 S/ 565.92 468.00 S/ 1.31 S/ 613.08 468.00 S/ 1.31 S/ 613.08
04.01.03 SUB BASE e=0.60m S/ 39,550.73 S/ 55,988.42 S/ 0.00 S/ 0.00 S/ 0.00 S/ 55,988.42
04.01.03.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 432.00 S/ 0.96 S/ 414.72 467.00 S/ 0.96 S/ 448.32 467.00 S/ 0.96 S/ 448.32
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
04.01.03.02 EXTRACCION Y PREPARACION DE MATERI m3 349.92 S/ 42.30 S/ 14,801.62 579.02 S/ 42.30 S/ 24,492.55 579.02 S/ 42.30 S/ 24,492.55
04.01.03.03 CARGUIO Y TRANSPORTE DE MATERIAL DE m3 349.92 S/ 27.77 S/ 9,717.28 579.02 S/ 27.77 S/ 16,079.39 579.02 S/ 27.77 S/ 16,079.39
04.01.03.04 CARGUIO MANUAL DE MATERIAL DE SUB B m3 349.92 S/ 29.39 S/ 10,284.15 349.92 S/ 29.39 S/ 10,284.15 349.92 S/ 29.39 S/ 10,284.15
04.01.03.05 EXTENDIDO Y COMPACTACION DE SUB BA m2 432.00 S/ 8.72 S/ 3,767.04 467.00 S/ 8.72 S/ 4,072.24 467.00 S/ 8.72 S/ 4,072.24
04.01.03.06 RIEGO m2 432.00 S/ 1.31 S/ 565.92 467.00 S/ 1.31 S/ 611.77 467.00 S/ 1.31 S/ 611.77
04.01.04 BASE (E=0.20M) S/ 13,430.40 S/ 14,518.52 S/ 0.00 S/ 0.00 S/ 0.00 S/ 14,518.52
04.01.04.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 432.00 S/ 0.96 S/ 414.72 467.00 S/ 0.96 S/ 448.32 467.00 S/ 0.96 S/ 448.32
04.01.04.02 EXTRACCION Y PREPARACION DE MATERI m3 116.64 S/ 42.30 S/ 4,933.87 126.09 S/ 42.30 S/ 5,333.61 126.09 S/ 42.30 S/ 5,333.61
04.01.04.03 CARGUIO Y TRANSPORTE DE MATERIAL DE m3 116.64 S/ 27.77 S/ 3,239.09 126.09 S/ 27.77 S/ 3,501.52 126.09 S/ 27.77 S/ 3,501.52
04.01.04.04 EXTENDIDO Y COMPACTACION DE BASE m2 432.00 S/ 9.90 S/ 4,276.80 467.00 S/ 9.90 S/ 4,623.30 467.00 S/ 9.90 S/ 4,623.30
04.01.04.05 RIEGO m2 432.00 S/ 1.31 S/ 565.92 467.00 S/ 1.31 S/ 611.77 467.00 S/ 1.31 S/ 611.77
04.01.05 LOSA DE RODADURA S/ 58,830.76 S/ 66,198.99 S/ 2,239.15 S/ 0.00 S/ 0.00 S/ 68,438.14
04.01.05.01 TRASLADO DE MATERIALES Y EQUIPOS A glb 1.00 S/ 33.63 S/ 33.63 1.00 S/ 33.63 S/ 33.63 1.00 S/ 33.63 S/ 33.63
04.01.05.02 TRAZO, NIVELACION Y REPLANTEO DURA m2 432.00 S/ 0.96 S/ 414.72 467.00 S/ 0.96 S/ 448.32 467.00 S/ 0.96 S/ 448.32
04.01.05.03 ENCOFRADO Y DESENCOFRADO EN LOSA m2 43.20 S/ 60.56 S/ 2,616.19 81.40 S/ 60.56 S/ 4,929.58 81.40 S/ 60.56 S/ 4,929.58
04.01.05.04 CONCRETO F'C=210 KG/CM2 m3 86.40 S/ 466.49 S/ 40,304.74 93.40 S/ 466.49 S/ 43,570.17 4.80 S/ 466.49 S/ 2,239.15 98.20 S/ 466.49 S/ 45,809.32
04.01.05.05 ACERO DE TEMPERATURA DE 1/4" kg 552.24 S/ 7.97 S/ 4,401.35 621.02 S/ 7.97 S/ 4,949.53 621.02 S/ 7.97 S/ 4,949.53
04.01.05.06 ACERO CORRUGADO G-60 1/2" EN JUNTA kg 95.13 S/ 7.97 S/ 758.19 103.00 S/ 7.97 S/ 820.91 103.00 S/ 7.97 S/ 820.91
04.01.05.07 ACERO LISO DE 3/4" EN JUNTA DE DILATA kg 247.82 S/ 8.10 S/ 2,007.34 318.62 S/ 8.10 S/ 2,580.82 318.62 S/ 8.10 S/ 2,580.82
04.01.05.08 ACERO LISO DE 1" EN JUNTA DE DILATACI kg 567.39 S/ 8.13 S/ 4,612.88 567.39 S/ 8.13 S/ 4,612.88 567.39 S/ 8.13 S/ 4,612.88
04.01.05.09 SELLADO DE JUNTAS LONGITUDINALES m 108.00 S/ 9.50 S/ 1,026.00 117.00 S/ 9.50 S/ 1,111.50 117.00 S/ 9.50 S/ 1,111.50
04.01.05.10 SELLADO DE JUNTAS DILATACION Y CONTR m 144.00 S/ 18.03 S/ 2,596.32 160.00 S/ 18.03 S/ 2,884.80 160.00 S/ 18.03 S/ 2,884.80
04.01.05.11 CURADO CON AGUA m2 108.00 S/ 0.55 S/ 59.40 467.00 S/ 0.55 S/ 256.85 467.00 S/ 0.55 S/ 256.85
04.01.06 SARDINELES DE CONCRETO S/ 13,263.72 S/ 18,002.28 S/ 0.00 S/ 0.00 S/ 0.00 S/ 18,002.28
04.01.06.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 43.20 S/ 0.96 S/ 41.47 46.00 S/ 0.96 S/ 44.16 46.00 S/ 0.96 S/ 44.16
04.01.06.02 EXCAVACION MANUAL m3 23.33 S/ 33.63 S/ 784.59 24.84 S/ 33.63 S/ 835.37 24.84 S/ 33.63 S/ 835.37
04.01.06.03 ACARREO MANUAL DE MATERIAL EXCEDE m3 23.33 S/ 32.99 S/ 769.66 23.33 S/ 32.99 S/ 769.66 23.33 S/ 32.99 S/ 769.66
04.01.06.04 ENCOFRADO Y DESENCOFRADO EN SARDI m2 86.40 S/ 53.14 S/ 4,591.30 138.00 S/ 53.14 S/ 7,333.32 138.00 S/ 53.14 S/ 7,333.32
04.01.06.05 CONCRETO BUZONES f'c=175 kg/cm2 m3 16.20 S/ 421.88 S/ 6,834.46 20.70 S/ 421.88 S/ 8,732.92 20.70 S/ 421.88 S/ 8,732.92
04.01.06.06 CURADO CON AGUA m2 86.40 S/ 0.55 S/ 47.52 138.00 S/ 0.55 S/ 75.90 138.00 S/ 0.55 S/ 75.90
04.01.06.07 SELLADO DE JUNTAS e= 3/4; h=0.05m m 10.80 S/ 18.03 S/ 194.72 11.70 S/ 18.03 S/ 210.95 11.70 S/ 18.03 S/ 210.95
04.01.07 VEREDAS DE CONCRETO S/ 56,613.65 S/ 58,990.70 S/ 0.00 S/ 0.00 S/ 30,649.48 S/ 28,341.22
04.01.07.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 183.60 S/ 0.96 S/ 176.26 195.50 S/ 0.96 S/ 187.68 195.50 S/ 0.96 S/ 187.68
04.01.07.02 EXCAVACION MANUAL m3 54.53 S/ 33.63 S/ 1,833.84 79.18 S/ 33.63 S/ 2,662.82 79.18 S/ 33.63 S/ 2,662.82
04.01.07.03 ACARREO MANUAL DE MATERIAL EXCEDE m3 54.53 S/ 32.99 S/ 1,798.94 54.53 S/ 32.99 S/ 1,798.94 54.53 S/ 32.99 S/ 1,798.94
04.01.07.04 ELIMINACION DE EXCAVACION m3 54.53 S/ 33.63 S/ 1,833.84 79.18 S/ 33.63 S/ 2,662.82 79.18 S/ 33.63 S/ 2,662.82
04.01.07.05 NIVELACION Y COMPACTADO MANUAL m2 183.60 S/ 3.00 S/ 550.80 195.50 S/ 3.00 S/ 586.50 195.50 S/ 3.00 S/ 586.50
04.01.07.06 ENCOFRADO Y DESENCOFRADO EN VERE m2 43.20 S/ 53.14 S/ 2,295.65 46.00 S/ 53.14 S/ 2,444.44 46.00 S/ 53.14 S/ 2,444.44
04.01.07.07 EMPEDRADO DE e= 0.15 m m2 183.60 S/ 35.53 S/ 6,523.31 195.50 S/ 35.53 S/ 6,946.12 195.50 S/ 35.53 S/ 6,946.12
04.01.07.08 CONCRETO f'c=175 kg/cm2 m3 91.80 S/ 440.05 S/ 40,396.59 91.80 S/ 440.05 S/ 40,396.59 69.65 S/ 440.05 S/ 30,649.48 22.15 S/ 440.05 S/ 9,747.11
04.01.07.09 SELLADO DE JUNTAS e= 3/4; h=0.05m m 61.20 S/ 18.03 S/ 1,103.44 66.30 S/ 18.03 S/ 1,195.39 66.30 S/ 18.03 S/ 1,195.39
04.01.07.10 CURADO CON AGUA m2 183.60 S/ 0.55 S/ 100.98 198.90 S/ 0.55 S/ 109.40 198.90 S/ 0.55 S/ 109.40
04.01.08 ESCALINATA S/ 3,669.13 S/ 3,669.13 S/ 6,300.00 S/ 0.00 S/ 1,628.17 S/ 8,340.97
04.01.08.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 23.55 S/ 0.96 S/ 22.61 23.55 S/ 0.96 S/ 22.61 19.95 S/ 0.96 S/ 19.15 3.60 S/ 0.96 S/ 3.46
04.01.08.02 EXCAVACION MANUAL m3 7.07 S/ 33.63 S/ 237.76 7.07 S/ 33.63 S/ 237.76 5.99 S/ 33.63 S/ 201.44 1.08 S/ 33.63 S/ 36.32
04.01.08.03 ACARREO MANUAL DE MATERIAL EXCEDE m3 9.54 S/ 32.99 S/ 314.72 9.54 S/ 32.99 S/ 314.72 8.08 S/ 32.99 S/ 266.56 1.46 S/ 32.99 S/ 48.17
04.01.08.04 ELIMINACION DE EXCAVACION m3 9.54 S/ 33.63 S/ 320.83 9.54 S/ 33.63 S/ 320.83 8.08 S/ 33.63 S/ 271.73 1.46 S/ 33.63 S/ 49.10
04.01.08.05 NIVELACION Y COMPACTADO MANUAL m2 23.55 S/ 3.00 S/ 70.65 23.55 S/ 3.00 S/ 70.65 19.95 S/ 3.00 S/ 59.85 3.60 S/ 3.00 S/ 10.80
04.01.08.06 ENCOFRADO Y DESENCOFRADO DE ESCAL m2 8.24 S/ 43.20 S/ 355.97 8.24 S/ 43.20 S/ 355.97 3.74 S/ 43.20 S/ 161.57 4.50 S/ 43.20 S/ 194.40
04.01.08.07 EMPEDRADO DE e= 0.15 m m2 9.36 S/ 35.53 S/ 332.56 9.36 S/ 35.53 S/ 332.56 5.76 S/ 35.53 S/ 204.65 3.60 S/ 35.53 S/ 127.91
04.01.08.08 CONCRETO f'c=175 kg/cm2 m3 1.62 S/ 440.05 S/ 712.88 1.62 S/ 440.05 S/ 712.88 1.00 S/ 440.05 S/ 440.05 0.62 S/ 440.05 S/ 272.83
04.01.08.09 CURADO CON AGUA m2 9.36 S/ 0.55 S/ 5.15 9.36 S/ 0.55 S/ 5.15 5.76 S/ 0.55 S/ 3.17 3.60 S/ 0.55 S/ 1.98
04.01.08.10 BARANDAS METALICAS m 7.20 S/ 180.00 S/ 1,296.00 7.20 S/ 180.00 S/ 1,296.00 35.00 180.00 S/ 6,300.00 42.20 S/ 180.00 S/ 7,596.00
04.02 RECONEXION DE INSTALACIONES S/ 16,107.76 S/ 17,310.18 S/ 1,500.00 S/ 0.00 S/ 2,700.00 S/ 16,110.18
04.02.01 INSTALACIONES DE AGUA Y DESAGUE S/ 16,107.76 S/ 17,310.18 S/ 1,500.00 S/ 0.00 S/ 2,700.00 S/ 16,110.18
04.02.01.01 TRAZO, NIVELACION Y REPLANTEO DURA m2 64.80 S/ 0.96 S/ 62.21 78.00 S/ 0.96 S/ 74.88 78.00 S/ 0.96 S/ 74.88
04.02.01.02 EXCAVACION MANUAL m3 64.80 S/ 33.63 S/ 2,179.22 99.00 S/ 33.63 S/ 3,329.37 99.00 S/ 33.63 S/ 3,329.37
04.02.01.03 ACARREO MANUAL DE MATERIAL EXCEDE m3 6.48 S/ 32.99 S/ 213.78 6.48 S/ 32.99 S/ 213.78 6.48 S/ 32.99 S/ 213.78
04.02.01.04 NIVELACION Y COMPACTADO MANUAL m2 64.80 S/ 3.00 S/ 194.40 78.00 S/ 3.00 S/ 234.00 78.00 S/ 3.00 S/ 234.00
04.02.01.05 RECONEXION DOMICILIARIA DE AGUA und 20.00 S/ 300.00 S/ 6,000.00 20.00 S/ 300.00 S/ 6,000.00 5.00 300.00 S/ 1,500.00 25.00 S/ 300.00 S/ 7,500.00
04.02.01.06 RECONEXION DOMICILIARIA DE DESAGUE und 20.00 S/ 300.00 S/ 6,000.00 20.00 S/ 300.00 S/ 6,000.00 9 300 S/ 2,700.00 11.00 S/ 300.00 S/ 3,300.00
04.02.01.07 ENCIMADO DE BUZONES und 3.00 S/ 486.05 S/ 1,458.15 3.00 S/ 486.05 S/ 1,458.15 3.00 S/ 486.05 S/ 1,458.15
04.03 CANALETA PLUVIAL S/ 100,785.69 S/ 118,621.69 S/ 3,878.67 S/ 0.00 S/ 8,710.25 S/ 113,790.11
04.03.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 209.76 S/ 0.96 S/ 201.37 234.00 S/ 0.96 S/ 224.64 10.00 S/ 0.96 S/ 9.60 244.00 S/ 0.96 S/ 234.24
04.03.02 EXCAVACION MANUAL m3 67.12 S/ 33.63 S/ 2,257.25 74.88 S/ 33.63 S/ 2,518.21 3.20 S/ 33.63 S/ 107.62 78.08 S/ 33.63 S/ 2,625.83
04.03.03 ACARREO MANUAL DE MATERIAL EXCEDENT m3 90.62 S/ 32.99 S/ 2,989.55 101.09 S/ 32.99 S/ 3,334.96 4.32 S/ 32.99 S/ 142.52 105.41 S/ 32.99 S/ 3,477.48
04.03.04 NIVELACION Y COMPACTADO MANUAL m2 83.90 S/ 3.00 S/ 251.70 93.60 S/ 3.00 S/ 280.80 4.00 S/ 3.00 S/ 12.00 97.60 S/ 3.00 S/ 292.80
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
04.03.05 ENCOFRADO Y DESENCOFRADO m 209.76 S/ 60.56 S/ 12,703.07 234.00 S/ 60.56 S/ 14,171.04 10.00 S/ 60.56 S/ 605.60 244.00 S/ 60.56 S/ 14,776.64
04.03.06 SOLADO m2 209.76 S/ 19.29 S/ 4,046.27 234.00 S/ 19.29 S/ 4,513.86 10.00 S/ 19.29 S/ 192.90 244.00 S/ 19.29 S/ 4,706.76
04.03.07 CONCRETO fc=210kg/cm2 m3 30.94 S/ 463.87 S/ 14,352.14 34.52 S/ 463.87 S/ 16,012.79 1.48 S/ 463.87 S/ 686.53 36.00 S/ 463.87 S/ 16,699.32
04.03.08 ACERO DE REFUERZO G-60 kg 2409.37 S/ 7.97 S/ 19,202.68 3502.25 S/ 7.97 S/ 27,912.93 1092.88 S/ 7.97 S/ 8,710.25 2409.37 S/ 7.97 S/ 19,202.68
04.03.09 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 216.00 S/ 36.96 S/ 7,983.36 234.00 S/ 36.96 S/ 8,648.64 10.00 S/ 36.96 S/ 369.60 244.00 S/ 36.96 S/ 9,018.24
04.03.10 TAPAS DE CANALETAS und 105.00 S/ 350.46 S/ 36,798.30 117.00 S/ 350.46 S/ 41,003.82 5.00 S/ 350.46 S/ 1,752.30 122.00 S/ 350.46 S/ 42,756.12
04.04 SUMIDEROS TRANSVERSALES (REJILLAS) S/ 4,448.95 S/ 4,448.95 S/ 0.00 S/ 0.00 S/ 0.00 S/ 4,448.95
04.04.01 TRAZO, NIVELACION Y REPLANTEO DURAN m2 4.80 S/ 0.96 S/ 4.61 4.80 S/ 0.96 S/ 4.61 4.80 S/ 0.96 S/ 4.61
04.04.02 EXCAVACION MANUAL m3 4.08 S/ 33.63 S/ 137.21 4.08 S/ 33.63 S/ 137.21 4.08 S/ 33.63 S/ 137.21
04.04.03 ACARREO MANUAL DE MATERIAL EXCEDENT m3 5.51 S/ 32.99 S/ 181.77 5.51 S/ 32.99 S/ 181.77 5.51 S/ 32.99 S/ 181.77
04.04.04 NIVELACION Y COMPACTADO MANUAL m2 4.80 S/ 3.00 S/ 14.40 4.80 S/ 3.00 S/ 14.40 4.80 S/ 3.00 S/ 14.40
04.04.05 ENCOFRADO Y DESENCOFRADO EN SUMIDE m2 8.50 S/ 53.14 S/ 451.69 8.50 S/ 53.14 S/ 451.69 8.50 S/ 53.14 S/ 451.69
04.04.06 SOLADO m2 4.80 S/ 19.29 S/ 92.59 4.80 S/ 19.29 S/ 92.59 4.80 S/ 19.29 S/ 92.59
04.04.07 CONCRETO F'C=210 KG/CM2 m3 2.14 S/ 466.49 S/ 998.29 2.14 S/ 466.49 S/ 998.29 2.14 S/ 466.49 S/ 998.29
04.04.08 ACERO DE REFUERZO G-60 FY=4200 kg/cm2 kg 222.99 S/ 7.17 S/ 1,598.84 222.99 S/ 7.17 S/ 1,598.84 222.99 S/ 7.17 S/ 1,598.84
04.04.09 REJILLA DE SUMIDEROS 4.80 x 1.00m und 1.00 S/ 655.39 S/ 655.39 1.00 S/ 655.39 S/ 655.39 1.00 S/ 655.39 S/ 655.39
04.04.10 TARRAJEO IMPERMEABILIZADO MEZCLA 1:5 m2 8.50 S/ 36.96 S/ 314.16 8.50 S/ 36.96 S/ 314.16 8.50 S/ 36.96 S/ 314.16
04.05 SEÑALIZACION S/ 9,513.00 S/ 10,084.32 S/ 0.00 S/ 0.00 S/ 0.00 S/ 10,084.32
04.05.01 PINTADO DE SARDINELES AL BORDE DE LA V m 216.00 S/ 31.74 S/ 6,855.84 234.00 S/ 31.74 S/ 7,427.16 234.00 S/ 31.74 S/ 7,427.16
04.05.02 PINTADO DE SEÑALES EN EL PISO m2 50.00 S/ 31.74 S/ 1,587.00 50.00 S/ 31.74 S/ 1,587.00 50.00 S/ 31.74 S/ 1,587.00
04.05.03 SEÑALES VERTICALES und 2.00 S/ 535.08 S/ 1,070.16 2.00 S/ 535.08 S/ 1,070.16 2.00 S/ 535.08 S/ 1,070.16
04.06 CONTROLES DE CALIDAD S/ 1,710.00 S/ 2,590.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,590.00
04.06.01 PRUEBAS DE CONTROL DE CALIDAD S/ 1,710.00 S/ 2,590.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 2,590.00
04.06.01.01 ESTUDIO DE SUELOS und 1.00 S/ 800.00 S/ 800.00 2.00 S/ 800.00 S/ 1,600.00 2.00 S/ 800.00 S/ 1,600.00
04.06.01.02 ROTURA DE BRIQUETAS und 1.00 S/ 20.00 S/ 20.00 5.00 S/ 20.00 S/ 100.00 5.00 S/ 20.00 S/ 100.00
04.06.01.03 DISEÑO DE MEZCLAS und 1.00 S/ 400.00 S/ 400.00 1.00 S/ 400.00 S/ 400.00 1.00 S/ 400.00 S/ 400.00
04.06.01.04 ESTUDIO DE CANTERAS glb 1.00 S/ 250.00 S/ 250.00 1.00 S/ 250.00 S/ 250.00 1.00 S/ 250.00 S/ 250.00
04.06.01.05 CONTROL DE DENSIDAD glb 3.00 S/ 80.00 S/ 240.00 3.00 S/ 80.00 S/ 240.00 3.00 S/ 80.00 S/ 240.00
04.07 VARIOS S/ 35,850.00 S/ 35,850.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 35,850.00
04.07.01 AFECTACION DE TERCEROS glb 1.00 S/ 20,000.00 S/ 20,000.00 1.00 S/ 20,000.00 S/ 20,000.00 1.00 S/ 20,000.00 S/ 20,000.00
04.07.02 BASUREROS BASCULANTES glb 1.00 S/ 500.00 S/ 500.00 1.00 S/ 500.00 S/ 500.00 1.00 S/ 500.00 S/ 500.00
04.07.03 PLACA DE INAUGURACION POR SECTOR und 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00 1.00 S/ 850.00 S/ 850.00
04.07.04 REUBICACION DE POSTES glb 1.00 S/ 6,000.00 S/ 6,000.00 1.00 S/ 6,000.00 S/ 6,000.00 1.00 S/ 6,000.00 S/ 6,000.00
04.07.05 GESTION DE RIESGOS glb 1.00 S/ 6,000.00 S/ 6,000.00 1.00 S/ 6,000.00 S/ 6,000.00 1.00 S/ 6,000.00 S/ 6,000.00
04.07.06 FLETE TERRESTRE glb 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00 1.00 S/ 2,500.00 S/ 2,500.00
04.08 MITIGACION DE IMPACTOS S/ 7,239.01 S/ 7,239.01 S/ 0.00 S/ 0.00 S/ 0.00 S/ 7,239.01
04.08.01 TRATAMIENTO DE AREAS VERDES Y JARDINERIA S/ 747.39 S/ 747.39 S/ 0.00 S/ 0.00 S/ 0.00 S/ 747.39
04.08.01.01 ACONDICIONAMIENTO DE AREAS VERDE m2 18.95 S/ 39.44 S/ 747.39 18.95 S/ 39.44 S/ 747.39 18.95 S/ 39.44 S/ 747.39
04.08.02 LIMPIEZA DE OBRA S/ 6,491.62 S/ 6,491.62 S/ 0.00 S/ 0.00 S/ 0.00 S/ 6,491.62
04.08.02.01 LIMPIEZA FINAL DE OBRA m2 5694.40 S/ 1.14 S/ 6,491.62 5694.40 S/ 1.14 S/ 6,491.62 5694.40 S/ 1.14 S/ 6,491.62
05 PRESUPUESTO PARA LA IMPLEMENTACION DE PLAN PARA LA VIGILANCIA PREVENC S/ 94,687.60 S/ 94,687.60 S/ 0.00 S/ 0.00 S/ 0.00 S/ 94,687.60
05.01 TRABAJOS PRELIMINARES REINICIO DE OBRA S/ 27,311.60 S/ 27,311.60 S/ 0.00 S/ 0.00 S/ 0.00 S/ 27,311.60
05.01.01 COMEDOR Y VESTUARIO PROVISIONAL m2 8.00 S/ 132.70 S/ 1,061.60 8.00 S/ 132.70 S/ 1,061.60 8.00 S/ 132.70 S/ 1,061.60
05.01.02 IMPLEMENTACION DE COMEDOR Y VESTUAR glb 1.00 S/ 450.00 S/ 450.00 1.00 S/ 450.00 S/ 450.00 1.00 S/ 450.00 S/ 450.00
05.01.03 OFICINA EXTERNA PARA MONITOREO DEL V mes 16.00 S/ 300.00 S/ 4,800.00 16.00 S/ 300.00 S/ 4,800.00 16.00 S/ 300.00 S/ 4,800.00
05.01.04 EVALUACION MEDICA OCUPACIONAL und 1.00 S/ 21,000.00 S/ 21,000.00 1.00 S/ 21,000.00 S/ 21,000.00 1.00 S/ 21,000.00 S/ 21,000.00
05.02 INSUMO DE LIMPIEZA S/ 27,216.00 S/ 27,216.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 27,216.00
05.02.01 MOCHILA FUMIGADORA DE 20 LITROS und 2.00 S/ 165.00 S/ 330.00 2.00 S/ 165.00 S/ 330.00 2.00 S/ 165.00 S/ 330.00
05.02.02 JARRA DE PVC GRADUADA HASTA 1 LITRO und 4.00 S/ 5.00 S/ 20.00 4.00 S/ 5.00 S/ 20.00 4.00 S/ 5.00 S/ 20.00
05.02.03 MODULO DE LAVADO DE MANOS und 4.00 S/ 220.00 S/ 880.00 4.00 S/ 220.00 S/ 880.00 4.00 S/ 220.00 S/ 880.00
05.02.04 PAPEL TOALLA cja 150.00 S/ 25.00 S/ 3,750.00 150.00 S/ 25.00 S/ 3,750.00 150.00 S/ 25.00 S/ 3,750.00
05.02.05 HIPOCLORITO DE SODIO AL 5% pqt 48.00 S/ 15.00 S/ 720.00 48.00 S/ 15.00 S/ 720.00 48.00 S/ 15.00 S/ 720.00
05.02.06 ALCOHOL GEL 70° ENVASE DE 1 LITRO gal 100.00 S/ 25.00 S/ 2,500.00 100.00 S/ 25.00 S/ 2,500.00 100.00 S/ 25.00 S/ 2,500.00
05.02.07 ALCOHOL ETILICO DE 96° und 300.00 S/ 25.00 S/ 7,500.00 300.00 S/ 25.00 S/ 7,500.00 300.00 S/ 25.00 S/ 7,500.00
05.02.08 JABON LIQUIDO l 60.00 S/ 12.00 S/ 720.00 60.00 S/ 12.00 S/ 720.00 60.00 S/ 12.00 S/ 720.00
05.02.09 DETERGENTE DE 5 kg gal 40.00 S/ 30.00 S/ 1,200.00 40.00 S/ 30.00 S/ 1,200.00 40.00 S/ 30.00 S/ 1,200.00
05.02.10 TACHOS DE SEGREGACION DE REIDUOS SO und 16.00 S/ 60.00 S/ 960.00 16.00 S/ 60.00 S/ 960.00 16.00 S/ 60.00 S/ 960.00
05.02.11 BANDEJA METALICA und 8.00 S/ 35.00 S/ 280.00 8.00 S/ 35.00 S/ 280.00 8.00 S/ 35.00 S/ 280.00
05.02.12 TAPETES ABSORVENTES und 50.00 S/ 5.00 S/ 250.00 50.00 S/ 5.00 S/ 250.00 50.00 S/ 5.00 S/ 250.00
05.02.13 BOLSA PARA DESECHOS und 60.00 S/ 60.00 S/ 3,600.00 60.00 S/ 60.00 S/ 3,600.00 60.00 S/ 60.00 S/ 3,600.00
05.02.14 DISPENSADOR DE PAPEL TOALLA pqt 6.00 S/ 70.00 S/ 420.00 6.00 S/ 70.00 S/ 420.00 6.00 S/ 70.00 S/ 420.00
05.02.15 DISPENSADORES DE 250 ML und 300.00 S/ 12.00 S/ 3,600.00 300.00 S/ 12.00 S/ 3,600.00 300.00 S/ 12.00 S/ 3,600.00
05.02.16 BIDON DE POLIETILENO und 6.00 S/ 25.00 S/ 150.00 6.00 S/ 25.00 S/ 150.00 6.00 S/ 25.00 S/ 150.00
05.02.17 TRAPO INDUSTRIAL und 96.00 S/ 3.50 S/ 336.00 96.00 S/ 3.50 S/ 336.00 96.00 S/ 3.50 S/ 336.00
05.03 INSUMO DE PROTECCION PERSONAL S/ 39,560.00 S/ 39,560.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 39,560.00
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
05.03.01 TERMOMETRO INFRAROJO und 2.00 S/ 150.00 S/ 300.00 2.00 S/ 150.00 S/ 300.00 2.00 S/ 150.00 S/ 300.00
05.03.02 OXIMETRO DE PULSO cja 2.00 S/ 350.00 S/ 700.00 2.00 S/ 350.00 S/ 700.00 2.00 S/ 350.00 S/ 700.00
05.03.03 MASCARILLA ANATOMICA QUIRURGICA ANT und 400.00 S/ 20.00 S/ 8,000.00 400.00 S/ 20.00 S/ 8,000.00 400.00 S/ 20.00 S/ 8,000.00
05.03.04 MASCARILLA FACIAL TEXTIL CON LOGOTIPO cja 200.00 S/ 10.00 S/ 2,000.00 200.00 S/ 10.00 S/ 2,000.00 200.00 S/ 10.00 S/ 2,000.00
05.03.05 GUANTES DE NITRILO QUIRURGICO und 52.00 S/ 30.00 S/ 1,560.00 52.00 S/ 30.00 S/ 1,560.00 52.00 S/ 30.00 S/ 1,560.00
05.03.06 PROTECTOR FACIAL CASCO und 150.00 S/ 30.00 S/ 4,500.00 150.00 S/ 30.00 S/ 4,500.00 150.00 S/ 30.00 S/ 4,500.00
05.03.07 TRAJE DE BIOSEGURIDAD Y PROTECCION und 250.00 S/ 90.00 S/ 22,500.00 250.00 S/ 90.00 S/ 22,500.00 250.00 S/ 90.00 S/ 22,500.00
05.04 SEÑALIZACION S/ 600.00 S/ 600.00 S/ 0.00 S/ 0.00 S/ 600.00
05.04.01 LETREROS DE SEÑALIZACION DE SEGURIDAD jgo 4.00 S/ 150.00 S/ 600.00 4.00 S/ 150.00 S/ 600.00 4.00 S/ 150.00 S/ 600.00
6 PAVIMENTACION CALLE LOS LIRIOS - PARTIDAS NUEVAS S/ 174,786.18 S/ 1,467.33 S/ 0.00 S/ 0.00 S/ 176,253.53
6.01 DESAGUE S/ 13,594.25 S/ 0.00 S/ 0.00 S/ 0.00 S/ 13,594.25
06.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL P m2 61.56 S/ 0.96 S/ 59.10 61.56 S/ 0.96 S/ 59.10
06.01.02 EXCAVACION CON MAQUINARIA m3 110.81 S/ 18.79 S/ 2,082.12 110.81 S/ 18.79 S/ 2,082.12
06.01.03 REFINE Y NIVELACION DE ZANJAS m2 61.56 S/ 6.74 S/ 414.91 61.56 S/ 6.74 S/ 414.91
06.01.04 CAMA DE APOYO h=0.20M m 102.60 S/ 1.59 S/ 163.13 102.60 S/ 1.59 S/ 163.13
06.01.05 SUMINISTRO E INSTALACION DE TUBERIA PVC U m 102.60 S/ 59.43 S/ 6,097.52 102.60 S/ 59.43 S/ 6,097.52
06.01.06 RELLENO Y APISONADO CON MATERIAL PROPIO m3 184.68 S/ 24.88 S/ 4,594.84 184.68 S/ 24.88 S/ 4,594.84
06.01.07 PRUEBA HIDRAULICA DE DESAGUE m 102.60 S/ 1.78 S/ 182.63 102.60 S/ 1.78 S/ 182.63
6.02 INSTALACIONES DOMICILIARIAS DESAGUE S/ 10,138.91 S/ 0.00 S/ 0.00 S/ 0.00 S/ 10,138.91
06.02.01 CAMA DE APOYO h=0.20M m 130.00 S/ 1.59 S/ 206.70 130.00 S/ 1.59 S/ 206.70
06.02.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SA m 120.00 S/ 59.63 S/ 7,155.60 120.00 S/ 59.63 S/ 7,155.60
06.02.03 RELLENO Y APISONADO CON MATERIAL PROPIO m3 111.60 S/ 24.88 S/ 2,776.61 111.60 S/ 24.88 S/ 2,776.61
6.03 BUZONES S/ 2,183.81 S/ 1,467.33 S/ 0.00 S/ 0.00 S/ 3,651.16
06.03.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL P m2 2.01 S/ 0.96 S/ 1.93 2.01 S/ 0.96 S/ 1.93
06.03.02 EXCAVACION MANUAL EN TIERRA COMPACTADA ( m3 4.02 S/ 33.63 S/ 135.19 5.88 33.63 S/ 197.74 S/ 0.00 9.90 S/ 33.63 S/ 332.94
06.03.03 ENCOFRADO Y DESENCOFRADO DE BUZONES m2 9.60 S/ 38.23 S/ 367.01 6.87 38.23 S/ 262.64 S/ 0.00 16.47 S/ 38.23 S/ 629.65
06.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 6 kg 22.99 S/ 10.05 S/ 231.05 22.99 S/ 10.05 S/ 231.05
06.03.05 CONCRETO f'c=210 kg/cm2 m3 0.40 S/ 532.97 S/ 213.19 0.40 S/ 532.97 S/ 213.19
06.03.06 CONCRETO PARA BUZONES f'c=175 kg/cm2 m3 2.63 S/ 435.91 S/ 1,146.44 2.31 435.91 S/ 1,006.95 S/ 0.00 4.94 S/ 435.91 S/ 2,153.40
06.03.07 ELIMINACION DE MATERIAL EXCEDENTE m3 5.43 S/ 16.39 S/ 89.00 5.43 S/ 16.39 S/ 89.00
6.04 BUZONETA S/ 692.81 S/ 0.00 S/ 0.00 S/ 0.00 S/ 692.81
06.04.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL P m2 1.28 S/ 0.96 S/ 1.23 1.28 S/ 0.96 S/ 1.23
06.04.02 EXCAVACION MANUAL EN TIERRA COMPACTADA ( m3 1.54 S/ 33.63 S/ 51.79 1.54 S/ 33.63 S/ 51.79
06.04.03 ENCOFRADO Y DESENCOFRADO DE BUZONES m2 1.07 S/ 38.23 S/ 40.91 1.07 S/ 38.23 S/ 40.91
06.04.04 CONCRETO f'c=210 kg/cm2 m3 1.06 S/ 532.97 S/ 564.95 1.06 S/ 532.97 S/ 564.95
06.04.05 ELIMINACION DE MATERIAL EXCEDENTE m3 2.07 S/ 16.39 S/ 33.93 2.07 S/ 16.39 S/ 33.93
6.05 INSTALACIONES DE AGUA S/ 18,716.91 S/ 0.00 S/ 0.00 S/ 0.00 S/ 18,716.91
06.05.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL P m2 124.80 S/ 0.96 S/ 119.81 124.80 S/ 0.96 S/ 119.81
06.05.02 EXCAVACION MANUAL m3 128.54 S/ 33.63 S/ 4,322.80 128.54 S/ 33.63 S/ 4,322.80
06.05.03 REFINE Y NIVELACION DE ZANJAS m2 124.80 S/ 6.74 S/ 841.15 124.80 S/ 6.74 S/ 841.15
06.05.04 CAMA DE APOYO h=0.20M m 208.00 S/ 1.59 S/ 330.72 208.00 S/ 1.59 S/ 330.72
06.05.05 SUMINISTRO E INSTALACION DE TUBERIA PVC SA m 208.00 S/ 48.10 S/ 10,004.80 208.00 S/ 48.10 S/ 10,004.80
06.05.06 RELLENO Y APISONADO CON MATERIAL PROPIO m3 104.94 S/ 24.88 S/ 2,610.91 104.94 S/ 24.88 S/ 2,610.91
06.05.07 PRUEBA HIDRAULICA DE AGUA glb 208.00 S/ 2.34 S/ 486.72 208.00 S/ 2.34 S/ 486.72
6.06 MURO DE CONTENCION S/ 121,036.85 S/ 0.00 S/ 0.00 S/ 0.00 S/ 121,036.85
06.06.01 MUROS DE CONTENCION CONCRETO ARMADO S/ 121,036.85 S/ 0.00 S/ 0.00 S/ 0.00 S/ 121,036.85
06.06.01.01 DEMOLICION DE VEREDAS EXISTENTES m3 5.40 S/ 55.64 S/ 300.46 5.40 S/ 55.64 S/ 300.46
06.06.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE EL P m2 63.00 S/ 0.96 S/ 60.48 63.00 S/ 0.96 S/ 60.48
06.06.01.03 EXCAVACION CON MAQUINARIA m3 227.43 S/ 18.79 S/ 4,273.41 227.43 S/ 18.79 S/ 4,273.41
06.06.01.04 EXCAVACION MANUAL m3 6.00 S/ 33.63 S/ 201.78 6.00 S/ 33.63 S/ 201.78
06.06.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 315.13 S/ 16.39 S/ 5,164.98 315.13 S/ 16.39 S/ 5,164.98
06.06.01.06 NIVELACION Y COMPACTACION DE ZANJAS m2 54.28 S/ 5.98 S/ 324.59 54.28 S/ 5.98 S/ 324.59
06.06.01.07 SOLADO PARA ZAPATAS 4" CONCCRETO F´C=17 m2 5.51 S/ 140.76 S/ 775.59 5.51 S/ 140.76 S/ 775.59
06.06.01.08 CONCRETO f'c=210 kg/cm2 m3 105.10 S/ 532.97 S/ 56,015.15 105.10 S/ 532.97 S/ 56,015.15
06.06.01.09 ENCOFRADO DE MURO m2 108.29 S/ 157.35 S/ 17,039.43 108.29 S/ 157.35 S/ 17,039.43
06.06.01.10 ACERO CORRUGADO DE 3/4 FY= 4200 kg/cm2 G kg 1593.11 S/ 12.81 S/ 20,407.74 1593.11 S/ 12.81 S/ 20,407.74
06.06.01.11 ACERO CORRUGADO DE 1/2 FY= 4200 kg/cm2 G kg 1633.54 S/ 10.05 S/ 16,417.08 1633.54 S/ 10.05 S/ 16,417.08
06.06.01.12 CURADO CON AGUA m2 102.10 S/ 0.55 S/ 56.16 102.10 S/ 0.55 S/ 56.16
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
6.07 SUMIDEROS TRANSVERSALES S/ 7,500.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 7,500.00
06.07.01 SER. DE SUMINISTRO E INSTALACION DE REJIL ser 1.00 S/ 7,500.00 S/ 7,500.00 1.00 S/ 7,500.00 S/ 7,500.00
6.08 REPOSICION DE VEREDADAS EXISTENTES S/ 922.64 S/ 0.00 S/ 0.00 S/ 0.00 S/ 922.64
06.08.01 TRAZO NIVELES Y REPLANTEO DURANTE EL P m2 4.80 S/ 0.96 S/ 4.61 4.80 S/ 0.96 S/ 4.61
06.08.02 EXCAVACION MANUAL m3 0.96 S/ 33.63 S/ 32.28 0.96 S/ 33.63 S/ 32.28
06.08.03 ELIMINACION DE EXCAVACION m3 1.30 S/ 33.63 S/ 43.72 1.30 S/ 33.63 S/ 43.72
06.08.04 NIVELACION Y COMPACTACION MANUAL m2 4.80 S/ 5.98 S/ 28.70 4.80 S/ 5.98 S/ 28.70
06.08.05 ENCOFRADO Y DESENCOFRADO m2 1.60 S/ 60.80 S/ 97.28 1.60 S/ 60.80 S/ 97.28
06.08.06 EMPEDRADO DE e=0.15m m2 9.60 S/ 49.28 S/ 473.09 9.60 S/ 49.28 S/ 473.09
06.08.07 CONCRETO f'c=175 kg/cm2 m3 0.48 S/ 435.91 S/ 209.24 0.48 S/ 435.91 S/ 209.24
06.08.08 SELLADO DE JUNTAS e =3/4 ;h = 0.05 m m 2.40 S/ 11.85 S/ 28.44 2.40 S/ 11.85 S/ 28.44
06.08.09 CURADO DE CONCRETO m2 9.60 S/ 0.55 S/ 5.28 9.60 S/ 0.55 S/ 5.28
7 PARTIDA NUEVAS CHINCHAYSUYO S/ 116,420.50 S/ 0.00 S/ 0.00 S/ 0.00 S/ 116,420.50
7.01 DESAGUE S/ 28,956.00 S/ 0.00 S/ 0.00 S/ 0.00 S/ 28,956.00
07.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL P m2 128.00 S/ 0.96 S/ 122.88 128.00 S/ 0.96 S/ 122.88
07.01.02 EXCAVACION CON MAQUINARIA m3 182.40 S/ 18.79 S/ 3,427.30 182.40 S/ 18.79 S/ 3,427.30
07.01.03 REFINE Y NIVELACION DE ZANJAS m2 104.00 S/ 6.74 S/ 700.96 104.00 S/ 6.74 S/ 700.96
07.01.04 CAMA DE APOYO h=0.20M m3 160.00 S/ 1.59 S/ 254.40 160.00 S/ 1.59 S/ 254.40
07.01.05 SUMINISTRO E INSTALACION DE TUBERIA PVC U m 120.00 S/ 59.43 S/ 7,131.60 120.00 S/ 59.43 S/ 7,131.60
07.01.06 SUMINISTRO E INSTALACION DE TUBERIA PVC U m 40.00 S/ 226.43 S/ 9,057.20 40.00 S/ 226.43 S/ 9,057.20
07.01.07 RELLENO COMPACTADO CON MATERIAL PROPI m3 158.40 S/ 24.88 S/ 3,940.99 158.40 S/ 24.88 S/ 3,940.99
07.01.08 ELIMINACION DE MATERIAL EXCEDENTE m3 246.24 S/ 16.39 S/ 4,035.87 246.24 S/ 16.39 S/ 4,035.87
07.01.09 PRUEBA HIDRAULICA DE DESAGUE m 160.00 S/ 1.78 S/ 284.80 160.00 S/ 1.78 S/ 284.80
7.02 INSTALACIONES DOMICILIARIAS DESAGUE S/ 30,696.24 S/ 0.00 S/ 0.00 S/ 0.00 S/ 30,696.24
07.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL P m2 270.00 S/ 0.96 S/ 259.20 270.00 S/ 0.96 S/ 259.20
07.02.02 EXCAVACION MANUAL EN TIERRA COMPACTADA ( m3 324.00 S/ 33.63 S/ 10,896.12 324.00 S/ 33.63 S/ 10,896.12
07.02.03 REFINE Y NIVELACION DE ZANJAS m2 270.00 S/ 6.74 S/ 1,819.80 270.00 S/ 6.74 S/ 1,819.80
07.02.04 CAMA DE APOYO h=0.20M m 450.00 S/ 1.59 S/ 715.50 450.00 S/ 1.59 S/ 715.50
07.02.05 SUMINISTRO E INSTALACION DE TUBERIA PVC SA m 150.00 S/ 59.63 S/ 8,944.50 150.00 S/ 59.63 S/ 8,944.50
07.02.06 RELLENO COMPACTADO CON MATERIAL PROPI m3 324.00 S/ 24.88 S/ 8,061.12 324.00 S/ 24.88 S/ 8,061.12
7.03 BUZONES S/ 6,902.50 S/ 0.00 S/ 0.00 S/ 0.00 S/ 6,902.50
07.03.01 TRAZO NIVELES Y REPLANTEO DURANTE EL P m2 6.03 S/ 0.96 S/ 5.79 6.03 S/ 0.96 S/ 5.79
07.03.02 EXCAVACION MANUAL EN TIERRA COMPACTADA ( m3 9.05 S/ 33.63 S/ 304.35 9.05 S/ 33.63 S/ 304.35
07.03.03 ENCOFRADO Y DESENCOFRADO DE BUZONES m2 21.60 S/ 38.23 S/ 825.77 21.60 S/ 38.23 S/ 825.77
07.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 6 kg 68.98 S/ 10.05 S/ 693.25 68.98 S/ 10.05 S/ 693.25
07.03.05 CONCRETO f'c=210 kg/cm2 m3 1.21 S/ 532.97 S/ 644.89 1.21 S/ 532.97 S/ 644.89
07.03.06 CONCRETO BUZONES f'c=175kg/cm2 m3 9.70 S/ 435.91 S/ 4,228.33 9.70 S/ 435.91 S/ 4,228.33
07.03.07 ELIMINACION DE MATERIAL EXCEDENTE m3 12.21 S/ 16.39 S/ 200.12 12.21 S/ 16.39 S/ 200.12
7.04 MEJORAMIENTO DE SUB BASE (ENRROCADO) e=0.40 S/ 49,865.76 S/ 0.00 S/ 0.00 S/ 0.00 S/ 49,865.76
07.04.01 EXTRACCION Y TRASLADO DE PIEDRA MEDIANA D m3 403.20 S/ 65.00 S/ 26,208.00 403.20 S/ 65.00 S/ 26,208.00
07.04.02 EXTENDIDO DE PIEDRA MEDIANA 6" A 8" m2 1008.00 S/ 22.51 S/ 22,690.08 1008.00 S/ 22.51 S/ 22,690.08
07.04.03 TRAZO NIVELES Y REPLANTEO DURANTE EL P m2 1008.00 S/ 0.96 S/ 967.68 1008.00 S/ 0.96 S/ 967.68
PARTIDAS NUEVAS-N02 CHINCHAYSUYO S/ 0.00 S/ 75,432.42 S/ 0.00 S/ 75,432.42
07.05 SARDINELES DE VEREDA S/ 0.00 S/ 30,307.88 S/ 0.00 S/ 30,307.88
07.05.01 EXCAVACION MANUAL m3 20.36 33.63 S/ 684.71 20.36 33.63 S/ 684.71
07.05.02 CONCRETO f'c=175 kg/cm2 m3 47.51 440.00 S/ 20,904.40 47.51 440.00 S/ 20,904.40
07.05.03 ENCOFRADO Y DESENOFRADO m2 135.75 60.56 S/ 8,221.02 135.75 60.56 S/ 8,221.02
07.05.04 CURADO DE SARDINELES ml 905.00 0.55 S/ 497.75 905.00 0.55 S/ 497.75
07.06 VEREDAS - OBRAS COMPLEMENTARIAS S/ 0.00 S/ 5,761.18 S/ 0.00 S/ 5,761.18
07.06.01 TRAZO NIVEL Y REPLANTEO DURANTE EL 116.45 0.71 S/ 82.68 116.45 0.71 S/ 82.68
PROCESO
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
07.06.02 MURO DE MAMPOSTERIA DE PIEDRA 22.97 154.07 S/ 3,538.99 22.97 154.07 S/ 3,538.99
07.06.03 RELLENO Y COMPACTADO MANUAL 83.62 21.62 S/ 1,807.86 83.62 21.62 S/ 1,807.86
07.06.04 DEMOLICION DE VEREDAS MANUAL 16.75 19.80 S/ 331.65 16.75 19.80 S/ 331.65
07.07 AREAS VERDES S/ 0.00 S/ 7,042.25 S/ 0.00 S/ 7,042.25
07.07.01 MEJORAMIENTO DE TERRENO CON TIERRA 121.18 43.26 S/ 5,242.25 121.18 43.26 S/ 5,242.25
07.07.02 AGRICOLANATIVAS
PLANTAS 1.00 1,800.00 S/ 1,800.00 1.00 1,800.00 S/ 1,800.00
07.08 RECONEXION DE TUBERIAS DESAGÜE S/ 0.00 S/ 8,833.66 S/ 0.00 S/ 8,833.66
07.08.01 TRAZO NIVEL Y REPLANTEO DURANTE EL m2 80.00 0.71 S/ 56.80 80.00 0.71 S/ 56.80
07.08.02 PROCESO
EXCAVACION DE ZANJAS CON EQUIPO m3 224.00 18.79 S/ 4,208.96 224.00 18.79 S/ 4,208.96
07.08.03 REFINE Y NIVELACION DE ZANJAS m2 160.00 6.74 S/ 1,078.40 160.00 6.74 S/ 1,078.40
07.08.04 CAMA CON MATERIAL PROPIO h=0.15 ml 100.00 1.79 S/ 179.00 100.00 1.79 S/ 179.00
07.08.05 REUBICACION DE TUBERIA PVC UF 300MM ml 100.00 5.86 S/ 586.00 100.00 5.86 S/ 586.00
07.08.06 RELLENO COMPACTADO CON MATERIAL m3 200.00 6.38 S/ 1,276.00 200.00 6.38 S/ 1,276.00
07.08.07 PROPIO
ELIMINACION DE MATERIAL EXCEDENTE m3 39.00 11.50 S/ 448.50 39.00 11.50 S/ 448.50
07.08.08 RECONEXION DE ACOMETIDAS DE DESAGÜE glb 1.00 1,000.00 S/ 1,000.00 1.00 1,000.00 S/ 1,000.00
07.09 DAÑADAS
RECONEXION DE TUBERIAS AGUA S/ 0.00 S/ 18,911.28 S/ 0.00 S/ 18,911.28
07.09.01 TRAZO NIVEL Y REPLANTEO DURANTE EL 561.60 0.71 S/ 398.74 561.60 0.71 S/ 398.74
07.09.02 PROCESO DE ZANJAS CON EQUIPO
EXCAVACION 449.28 18.79 S/ 8,441.97 449.28 18.79 S/ 8,441.97
07.09.03 CAMA CON MATERIAL PROPIO h=0.15 936.00 1.79 S/ 1,675.44 936.00 1.79 S/ 1,675.44
07.09.04 REUBICACION DE TUBERIA PVC 63MM 936.00 3.77 S/ 3,528.72 936.00 3.77 S/ 3,528.72
07.09.05 RELLENO COMPACTADO CON MATERIAL 449.28 6.38 S/ 2,866.41 449.28 6.38 S/ 2,866.41
07.09.06 PROPIO
RECONEXION DOMICILIARIA AGUA JASS 1.00 2,000.00 S/ 2,000.00 1.00 2,000.00 S/ 2,000.00
7.10. VERIFICACION DE TUBERIA DE DESAGUE S/ 0.00 S/ 4,576.17 S/ 0.00 S/ 4,576.17
7.10.01 TRAZO NIVELACION Y REPLANTEO DURANTE 108.00 0.96 S/ 103.68 108.00 0.96 S/ 103.68
7.10.02 EL PROCESO DE ZANJA MANUAL
EXCAVACION 86.40 33.63 S/ 2,905.63 86.40 33.63 S/ 2,905.63
7.10.03 CAMA DE PIEDRA CHANCADO DE H=0.2 90.00 9.09 S/ 818.10 90.00 9.09 S/ 818.10
7.10.04 RELLENO Y COMPACTADO CON MATERIAL 64.80 6.38 S/ 413.42 64.80 6.38 S/ 413.42
7.10.05 PROPIO
ELIMINACION DE MATERIAL EXCEDENTE 29.16 11.50 S/ 335.34 29.16 11.50 S/ 335.34
08 PARCELA 23 PARTIDAS NUEVAS S/ 0.00 S/ 50,277.02 S/ 0.00 S/ 50,277.02
08.01 VEREDAS DE CONCRETO S/ 0.00 S/ 12,871.00 S/ 0.00 S/ 12,871.00
08.01.01 TRAZO NIVEL Y REPLANTEO DURANTE EL 135.20 0.71 S/ 95.99 135.20 0.71 S/ 95.99
08.01.02 PROCESO CON MAQUINARIA
EXCAVACION 27.04 18.79 S/ 508.08 27.04 18.79 S/ 508.08
08.01.03 ELIMINACION DE MATERIAL EXCEDENTE 27.85 11.50 S/ 320.28 27.85 11.50 S/ 320.28
08.01.04 NIVELACION Y COMPACTADO MANUAL 135.20 2.50 S/ 338.00 135.20 2.50 S/ 338.00
08.01.05 ENCOFRADO Y DESENCOFRADO EN VEREDAS 10.40 60.56 S/ 629.82 10.40 60.56 S/ 629.82
08.01.06 EMPEDRADO C/ PM (E=0.15) 139.26 35.53 S/ 4,947.91 139.26 35.53 S/ 4,947.91
08.01.07 CONCRETO f'c=175 kg/cm2 9.33 440.00 S/ 4,105.20 9.33 440.00 S/ 4,105.20
08.01.08 BRUÑADO DE VEREDAS 183.00 5.36 S/ 980.88 183.00 5.36 S/ 980.88
08.01.09 JUNTAS ASFALTICAS 46.80 18.60 S/ 870.48 46.80 18.60 S/ 870.48
08.01.10 CURADO CON AGUA 135.20 0.55 S/ 74.36 135.20 0.55 S/ 74.36
08.02 CUNETAS LATERALES S/ 0.00 S/ 24,953.52 S/ 0.00 S/ 24,953.52
08.02.01 TRAZO NIVEL Y REPLANTEO DURANTE EL 72.80 0.71 S/ 51.69 72.80 0.71 S/ 51.69
08.02.02 PROCESO MANUAL
EXCAVACION 57.74 33.63 S/ 1,941.80 57.74 33.63 S/ 1,941.80
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE 28.87 11.50 S/ 332.01 28.87 11.50 S/ 332.01
08.02.04 NIVELACION Y COMPACTADO MANUAL 72.80 2.50 S/ 182.00 72.80 2.50 S/ 182.00
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
08.02.05 ENCOFRADO Y DESENCOFRADO 128.96 60.56 S/ 7,809.82 128.96 60.56 S/ 7,809.82
08.02.06 CONCRETO f´c = 175 kg/cm2 15.13 440.00 S/ 6,657.20 15.13 440.00 S/ 6,657.20
08.02.07 TARRAJEO CON IMPERMEABILIZANTES 128.96 59.92 S/ 7,727.28 128.96 59.92 S/ 7,727.28
MEZCLA 1:5 e=1.5cm
08.02.08 JUNTAS ASFALTICAS 9.72 18.60 S/ 180.79 9.72 18.60 S/ 180.79
08.02.09 CURADO CON AGUA 128.96 0.55 S/ 70.93 128.96 0.55 S/ 70.93
08.03 PRUEBAS DE CALIDAD S/ 0.00 S/ 200.00 S/ 0.00 S/ 200.00
08.03.01 PRUEBAS DE CONTROL DE CALIDAD DEL 10.00 20.00 S/ 200.00 10.00 20.00 S/ 200.00
CONCRETO
08.04 IMPACTO AMBIENTAL S/ 0.00 S/ 11,402.50 S/ 0.00 S/ 11,402.50
08.04.01 LIMPIEZA Y ELIMINACION , RESTAURACION Y M3 250.00 45.61 45.61
S/ 11,402.50 S/ 11,402.50
ACONDICIONAMIENTO DESECHOS DE OBRA 250.00
08.05 PLACA RECORDATORIA DE BRONCE S/ 0.00 S/ 850.00 S/ 0.00 S/ 850.00
08.06.01 PLACA RECORDATORIA DE BRONCE 1.00 850.00 S/ 850.00 1.00 850.00 S/ 850.00
9 PARTIDAS NUEVAS PARCELA 24 S/ 0.00 S/ 111,380.70 S/ 0.00 S/ 111,380.70
9.01 INFRAESTRUCTURA PEATONAL URBANA S/ 0.00 S/ 14,072.78 S/ 0.00 S/ 14,072.78
09.01.01 VEREDAS DE CONCRETO CENTRALES S/ 0.00 S/ 14,072.78 S/ 14,072.78
09.01.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 91.00 0.71 S/ 64.61 0.71 S/ 64.61
91.00
PROCESO DE CONSTRUCCION
09.01.01.02 EXCAVACION CON MAQUINARIA 27.00 18.79 S/ 507.33 27.00 18.79 S/ 507.33
09.01.01.03 NIVELACION Y COMPACTACION MANUAL 91.00 3.00 S/ 273.00 91.00 3.00 S/ 273.00
09.01.01.04 ENCOFRADO Y DESENCOFRADO P/VEREDAS 7.00 60.56 S/ 423.92 7.00 60.56 S/ 423.92
09.01.01.05 EMPEDRADO DE e=0.15m 93.73 35.53 S/ 3,330.23 93.73 35.53 S/ 3,330.23
09.01.01.06 CONCRETO f'c=175 kg/cm2 4.66 440.00 S/ 2,050.40 4.66 440.00 S/ 2,050.40
09.01.01.07 BRUÑAS DE VEREDAS 105.00 5.36 S/ 562.80 105.00 5.36 S/ 562.80
09.01.01.08 PULIDO DE PISO 182.00 19.24 S/ 3,501.68 182.00 19.24 S/ 3,501.68
09.01.01.09 JUNTA ALFALTICA 182.00 18.18 S/ 3,308.76 182.00 18.18 S/ 3,308.76
09.01.01.10 CURADO DE CONCRETO 91.00 0.55 S/ 50.05 91.00 0.55 S/ 50.05
9.02 SISTEMA DE EVACUACION DE AGUAS S/ 0.00 S/ 34,201.01 S/ 0.00 S/ 34,201.01
PLUVIALES Y DRENAJE
09.02.01 CANALES LATERALES S/ 0.00 S/ 26,293.64 S/ 26,293.64
09.02.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 70.00 0.96 S/ 67.20 70.00 0.96 S/ 67.20
PROCESO DE CONSTRUCCION
09.02.01.02 EXCAVACION MANUAL 5.52 33.63 S/ 185.64 5.52 33.63 S/ 185.64
09.02.01.03 NIVELACION Y COMPACTACION MANUAL 70.00 3.00 S/ 210.00 70.00 3.00 S/ 210.00
09.02.01.04 ENCOFRADO Y DESENCOFRADO DE CANALES 124.00 60.56 S/ 7,509.44 124.00 60.56 S/ 7,509.44
LATERALES
09.02.01.05 CONCRETO f'c=175 kg/cm2 29.10 440.00 S/ 12,804.00 29.10 440.00 S/ 12,804.00
09.02.01.06 TARRAJEO CON IMPERMEABILIZANTES 124.00 36.73 S/ 4,554.52 124.00 36.73 S/ 4,554.52
MEZCLA 1:5 e=1.5 cm
09.02.01.07 CURADO DE CONCRETO 164.00 0.55 S/ 90.20 164.00 0.55 S/ 90.20
09.02.01.08 JUNTAS ASFALTICAS 48.00 18.18 S/ 872.64 48.00 18.18 S/ 872.64
09.02.02 DISCIPADORES DE ENERGIA S/ 0.00 S/ 7,907.37 S/ 7,907.37
09.02.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 3.36 0.96 S/ 3.23 3.36 0.96 S/ 3.23
PROCESO DE CONSTRUCCION
09.02.02.02 TARRAJEO CON IMPERMEABILIZANTES 9.00 36.73 S/ 330.57 9.00 36.73 S/ 330.57
MEZCLA 1:5 e=1.5 cm
09.02.02.03 ENCOFRADO Y DESENCOFRADO DE 11.70 60.56 S/ 708.55 11.70 60.56 S/ 708.55
DISIPADORES
09.02.02.04 CONCRETO f'c=175 kg/cm2 15.60 440.00 S/ 6,864.00 15.60 440.00 S/ 6,864.00
09.02.02.05 CURADO DE CONCRETO 1.85 0.55 S/ 1.02 1.85 0.55 S/ 1.02
9.03 MUROS DE CONTENCION CONCRETO ARMADO S/ 0.00 S/ 18,127.74 S/ 0.00 S/ 18,127.74
09.03.01 OBRAS PRELIMINARES S/ 0.00 S/ 21.42 S/ 21.42
09.03.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 10.60 0.96 S/ 10.18 10.60 0.96 S/ 10.18
PROCESO DE CONSTRUCCION
09.03.01.02 LIMPIEZA DEL TERRENO MANUAL 10.60 1.06 S/ 11.24 10.60 1.06 S/ 11.24
09.03.02 MOVIMIENTO DE TIERRAS S/ 0.00 S/ 2,292.37 S/ 2,292.37
09.03.02.01 EXCAVACION MANUAL 50.09 33.63 S/ 1,684.53 50.09 33.63 S/ 1,684.53
09.03.02.02 NIVELACION Y COMPACTACION 10.60 3.00 S/ 31.80 10.60 3.00 S/ 31.80
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
09.03.02.03 ELIMINACION DE EXCAVACION 50.09 11.50 S/ 576.04 50.09 11.50 S/ 576.04
09.03.03 CONCRETO ARMADO ZAPATAS S/ 0.00 S/ 5,161.01 S/ 5,161.01
09.03.01 SOLADO PARA ZAPATAS 4" CONCCRETO F 0.93 19.68 S/ 18.30 0.93 19.68 S/ 18.30
´C=175KG/CM2
09.03.02 CONCRETO f'c=210 kg/cm2 6.40 510.00 S/ 3,264.00 6.40 510.00 S/ 3,264.00
09.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 185.46 10.13 S/ 1,878.71 185.46 10.13 S/ 1,878.71
60
09.03.05 PANTALLA DE MURO DE CONTENCION S/ 0.00 S/ 10,652.94 S/ 10,652.94
09.03.05.01 CONCRETO f'c=210 kg/cm2 5.81 510.00 S/ 2,963.10 5.81 510.00 S/ 2,963.10
09.03.05.02 ENCOFRADO DE MURO 44.40 60.56 S/ 2,688.86 44.40 60.56 S/ 2,688.86
09.03.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 493.68 10.13 S/ 5,000.98 493.68 10.13 S/ 5,000.98
60
9.04 ESTRUCTURA VIAL S/ 0.00 S/ 44,979.17 S/ 0.00 S/ 44,979.17
09.04.01 MOVIMIENTO DE TIERRAS S/ 0.00 S/ 16,266.96 S/ 0.00 S/ 16,266.96
09.04.01.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 432.00 0.96 432.00 0.96
PROCESO DE CONSTRUCCION S/ 414.72 S/ 414.72

09.04.01.02 CORTE DE TERRENO A NIVEL DE SUB- 432.00 21.17 S/ 9,145.44 432.00 21.17 S/ 9,145.44
RASANTE
09.04.01.03 ELIMINACION DE MATERIAL EXCEDENTE 583.20 11.50 S/ 6,706.80 583.20 11.50 S/ 6,706.80
09.04.02 ENROCADO EN SUB RASANTE e=0.40m S/ 0.00 S/ 6,222.40 S/ 6,222.40
09.04.02.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 160.00 0.96 S/ 153.60 0.96 S/ 153.60
PROCESO DE CONSTRUCCION 160.00
09.04.02.02 EXTRACCION APILAMIENTO TRANSPORTE DE 112.00 42.30 42.30
S/ 4,737.60 S/ 4,737.60
MATERIAL PARA ENROCADO DE SUB RASANTE 112.00
09.04.02.04 EXTENDIDO DE MATERIAL PIEDRA PARA SUB 160.00 8.32 S/ 1,331.20 8.32 S/ 1,331.20
RASANTE " 160.00
09.04.03 SUB BASE e=0.60m S/ 0.00 S/ 22,075.09 S/ 0.00 S/ 22,075.09
09.04.03.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 432.00 0.96 S/ 414.72 432.00 0.96 S/ 414.72
PROCESO DE CONSTRUCCION
09.04.03.02 EXTRACCION APILAMIENTO Y TRANSPORTE 318.84 42.30 318.84 42.30
S/ 13,486.93 S/ 13,486.93
DE MATERIAL DE MATERIAL PARA SUB BASE
09.04.03.05 EXTENDIDO, RIEGO Y COMPACTADO DE SUB 432.00 18.92 S/ 8,173.44 432.00 18.92 S/ 8,173.44
BASE
09.04.04 BASE e=0.30m S/ 0.00 S/ 414.72 S/ 414.72
09.04.04.01 TRAZO NIVELES Y REPLANTEO DURANTE EL 432.00 0.96 S/ 414.72 0.96 S/ 414.72
PROCESO DE CONSTRUCCION 432.00
10 PARTIDAS NUEVAS N°02 LIRIOS S/ 0.00 S/ 23,421.86 S/ 0.00 S/ 23,421.86
10.01 CANALETA PLUVIAL S/ 0.00 S/ 4,122.97 S/ 0.00 S/ 4,122.97
10.01.01 SELLADO DE JUNTAS e =3/4 ;h = 0.05 m 80.00 39.62 S/ 3,169.60 80.00 39.62 S/ 3,169.60
10.01.02 MEJORAMIENTO DE CABECERA DE CANALETA S/ 953.37 S/ 0.00 S/ 953.37
PLUVIAL
10.01.02.01 DEMOLICON DE CANAL EXISTENTE m3 0.84 55.64 S/ 46.74 S/ 46.74
0.84 S/ 55.64
10.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 1.13 11.50 S/ 13.00 S/ 13.00
1.13 S/ 11.50
10.01.02.03 CONCRETO f'c=210 kg/cm2 m3 1.04 510.00 S/ 530.40 S/ 530.40
1.04 S/ 510.00
10.01.02.04 ENCOFRADO DE CANAL Y TAPA m2 3.00 60.56 S/ 181.68 S/ 181.68
3.00 S/ 60.56
10.01.02.06 ACERO CORRUGADO DE 1/2 FY= 4200 kg/cm2 G kg 17.90 10.05 S/ 179.90 S/ 179.90
17.90 S/ 10.05
10.01.02.07 CURADO CON AGUA m2 3.00 0.55 S/ 1.65 S/ 1.65
3.00 S/ 0.55
10.02 CANALETA PLUVIAL DE MAMPOSTRIA DE S/ 0.00 S/ 3,285.65 S/ 0.00 S/ 3,285.65
PIEDRA
10.02.01 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO 10.00 S/ 0.96 S/ 9.60 0.96 S/ 9.60
10.00
10.02.02 EXCAVACION MANUAL 10.40 S/ 33.63 S/ 349.75 33.63 S/ 349.75
10.40
10.02.03 ACARREO MANUAL DE MATERIAL EXCEDENTE 14.04 S/ 32.99 S/ 463.18 32.99 S/ 463.18
14.04
10.02.04 NIVELACION Y COMPACTADO MANUAL 4.00 S/ 3.00 S/ 12.00 3.00 S/ 12.00
4.00
MUNICIPALIDAD DISTRITAL DE POROY
POROY FORJADO SU DESARROLLO

“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS PASAJES SN
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.

CUADRO COMPARATIVO

PRESUPUESTO DE EXPEDIENTE TECNICO PRESUPUESTO DE EXPEDIENTE TECNICO


MAYORES METRADOS PARTIDAS NUEVAS DEDUCTIVOS PRESUPUESTO MODIFICADO N° 03
MODIFICADO N° 01 MODIFICADO N° 02
Item Descripción Und. Metrado Precio S/. Parcial S/. Metrado Precio S/. Parcial S/. Metrado Precio (S/.) Parcial (S/.) Metrado Precio S/. Precio (S/.) Metrado Precio (S/.) Parcial (S/.) Metrado Precio (S/.) Parcial (S/.)
10.02.05 ENCOFRADO Y DESENCOFRADO 13.00 S/ 60.56 S/ 787.28 60.56 S/ 787.28
13.00
10.02.06 SOLADO 13.00 S/ 19.68 S/ 255.84 19.68 S/ 255.84
13.00
10.02.07 CONCRETO CICLOPEO fc=175 kg/cm2 + 30% P.G. DOSIFICADO 3.20 S/ 440.00 S/ 1,408.00 440.00 S/ 1,408.00
3.20
10.03 MURO DE CONTENCIO PARA VEREDAS Y S/ 0.00 S/ 10,688.42 S/ 0.00 S/ 10,688.42
ESCALINATAS
10.03.01 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO 9.75 0.96 S/ 9.36 9.75 0.96 S/ 9.36
10.03.02 EXCAVACION MANUAL 4.88 33.63 S/ 164.11 33.63 S/ 164.11
4.88
10.03.03 NIVELACION INTERIOR Y APISONADO 9.75 3.00 S/ 29.25 3.00 S/ 29.25
9.75
10.03.04 ELIMINACION DE EXCAVACION 4.88 11.50 S/ 56.12 11.50 S/ 56.12
4.88
10.03.05 SOLDADO 4" 29.25 19.68 S/ 575.64 19.68 S/ 575.64
29.25
10.03.06 ENCOFRADO Y DESENCOFRADO DE MURO 78.00 60.56 S/ 4,723.68 60.56 S/ 4,723.68
78.00
10.03.07 CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% P.G. DOSIFICADO 11.55 440.00 S/ 5,082.00 440.00 S/ 5,082.00
11.55
10.03.08 CURADO CON AGUA 87.75 0.55 S/ 48.26 87.75 0.55 S/ 48.26
10.04 OBRAS COMPLEMENTARIAS S/ 0.00 S/ 5,324.82 S/ 0.00 S/ 5,324.82
10.04.01 RELLENO Y COMPACTADO DE VEREDAS CON MATERIAL PROPIO 7.67 77.33 S/ 593.12 7.67 77.33 S/ 593.12
10.04.02 GUARDAVIA DE CONCRETO S/ 3,573.72 S/ 0.00 S/ 3,573.72
10.04.02.01 ACERO DE REFUERZO fy=4200 kg/cm2 60.00 10.05 S/ 603.00 60.00 10.05 S/ 603.00
10.04.02.02 ENCOFRADO Y DESENCOFRADO 12.00 60.56 S/ 726.72 12.00 60.56 S/ 726.72
10.04.02.03 CONCRETO f'c=210 kg/cm2 4.40 510.00 S/ 2,244.00 4.40 510.00 S/ 2,244.00
10.04.03 RAMPA DE ACCESO VEHICULAR S/ 0.00 S/ 1,157.98 S/ 0.00 S/ 1,157.98
10.04.03.01 EXCAVACION MANUAL 3.20 33.63 S/ 107.62 3.20 33.63 S/ 107.62
10.04.03.02 ELIMINACION DE MATERIAL EXCEDENTE 4.32 11.50 S/ 49.68 4.32 11.50 S/ 49.68
10.04.03.03 NIVELACION Y COMPACTADO MANUAL 10.56 3.00 S/ 31.68 10.56 3.00 S/ 31.68
10.04.03.04 CONCRETO f'c=210 kg/cm2 1.90 510.00 S/ 969.00 1.90 510.00 S/ 969.00
COSTO DIRECTO MODIFICADO S/ 2,818,495.89 S/ 3,255,264.49 188,462.67 260,512.00 448,974.67 S/ 3,255,264.49
GASTOS GENERALES 20.04% S/ 564,829.93 S/ 564,829.93 S/ 564,829.93
SUPERVISION 5.92% S/ 166,886.40 S/ 166,886.40 S/ 166,886.40
GASTOS DE EXP. TEC 1.79% S/ 32,000.00 S/ 32,000.00 S/ 32,000.00
LIQUIDACION 1.14% S/ 50,547.00 S/ 50,547.00 S/ 50,547.00
COSTO TOTAL S/ 3,632,759.22 S/ 4,069,527.82 S/ 4,069,527.82
M
O
D MUNICIPALIDAD DISTRITAL DE POROY
I POROY FORJADO SU DESARROLLO
F
I
C CUADRO RESUMEN
A
C
I
“MEJORAMIENTO DE ADECUADAS CONDICIONES DE LA TRANSITABILIDAD PEATONAL Y VEHICULAR CALLES LOS LIRIOS AV CHINCHASUYO Y EN LOS
PASAJES SNO
ASOCIACION NUEVO HORIZONTE DEL DISTRITO DE POROY PROVINCIA DE CUSCO DEPARTAMENTO DE CUSCO.
N
E
S CUADRO RESUMEN DE LA MODIFICACION N° 03
MODIFICACION DEL EXPEDIENTE TECNICO POR
EXPEDIENTE EXPEDIENTE ADICIONALES DE OBRA Y ACTUALIZACION DE MODIFICACI
EXPEDIENTE PORCENT P TECNICO TECNICO PRECIOS N° - 02 ON DEL
DETALLE INC %
TECNICO AJE (%) R MODIFICADO MODIFICADO MAYORES PARTIDAS TOTAL DE DEDUCTIVO PRESUPUEST
E N°01 N°02 O
S METRADOS NUEVAS ADICIONAL DE OBRA (*)
U
P
COSTO DIRECTO S/. 1,747,399.16 84.39% U S/. 2,818,495.89 S/. 3,255,264.49 ### S/. 260,512.00 S/. 448,974.67 S/. 448,974.67 S/. 3,255,264.49 75.88%
E
GASTOS GENERA S/. 203,929.26 9.85% S S/. 564,829.93 S/. 564,829.93 S/. 564,829.93 17.35%
T
SUPERVISION S/. 61,213.51 2.96% A S/. 166,886.40 S/. 166,886.40 S/. 166,886.40 5.13%
L
GASTOS DE EXP. S/. 32,000.00 1.55% A S/. 32,000.00 S/. 32,000.00 S/. 32,000.00 0.98%
L
LIQUIDACION S/. 26,000.01 1.26% S/. 50,547.00 S/. 50,547.00 S/. 50,547.00 1.55%
E
TOTAL S/. 2,070,541.94 100.00% X S/. 3,632,759.22 S/. 4,069,527.82 ### S/. 260,512.00 S/. 448,974.67 S/. 448,974.67 S/. 4,069,527.82 100.89%
P
E
D
I
E
N
T
E

T
E
C
N
I
C
O
A) DIFERENCIA PTO. EXP. APROBADO + EXP. MODIFICADO N° 01 + EXP. MODIFICADO N°

PRESUPUESTO DIFERENCIA
DESCRIPCION
S/. S/.
PRESUPUESTO EXPEDIENTE TECNICO
S/. 2,070,541.94
APROBADO
PRESUPUESTO EXPEDIENTE TECNICO
S/. 3,632,759.22 ###
MODIFICADO
PRESUPUESTO N°01EXPEDIENTE TECNICO
S/. 4,069,527.82 S/. 436,768.60
MODIFICADO N° 02
INCIDENCIA PERFIL Y EXPEDIENTE ###

B) b) DIFERENCIA PTO.: EXP. APROBADO + EXP. MODIFICADO N° 01 + EXP. MODIFICADO

PRESUPUESTO DIFERENCIA
DESCRIPCION
PRESUPUESTO EXPEDIENTE TECNICO S/. S/.
S/. 1,747,399.16
APROBADO
PRESUPUESTO EXPEDIENTE TECNICO
S/. 2,818,495.89 ###
MODIFICADO
PRESUPUESTON°01EXPEDIENTE TECNICO
S/. 3,255,264.49 S/. 436,768.60
MODIFICADO N° 02
INCIDENCIA PERFIL Y EXPEDIENTE ###

ESTADO FINANCIERO

N° DESCRIPCIÓN EXPEDIENTE %
1 AVANCE FINANCIERO S/. 3,632,759.22 100%

ASIGNACION PRESUPUESTAL
PIM ASIGNACION PTO.
PIM -2019 S/. 260,117.80
PIM -2020 S/. 226,683.00

Cuadro: Modificación Presupuestal por Mayores Metrados, Partidas Nuevas, Deductivos de Obra
APROBADO EXP.
SEGÚN TECNICO
DESCRIPCION
EXPEDIENTE MODIFICAD
TECNICO O N° 01
EXPEDIENTE TECNICO C. D S/. 1,747,399.16

ACTUALIZACION DE PRECIOS

MAYORES METRADOS

PARTIDAS NUEVAS

DEDUCTIVOS
COSTO DIRECTO S/. 1,747,399.16 S/. 2,818,495.89
GASTOS GENERALES S/. 203,929.26 S/. 564,829.93
SUPERVISION S/. 61,213.51 S/. 166,886.40
EXPEDIENTE TECNICO S/. 32,000.00 S/. 32,000.00
LIQUIDACION DE OBRA S/. 26,000.01 S/. 50,547.00
PRESUPUESTO TOTAL S/. 2,070,541.94 S/. 3,632,759.22
VARIACION NIVEL DE INCIDENCIA
EXP. TECNICO APROB. + EXP. TEC. S/ 1,998,985.88
MODIFICADO N° 01 +EXP. TEC. MODIFICADO
N° 02+EXP. TEC. MODIFICADO N° 03

APROBADO EXP.
SEGÚN TECNICO
DESCRIPCION
EXPEDIENTE MODIFICAD
EXPEDIENTE TECNICO C. D TECNICO
S/. 1,747,399.16 O N° 01
ACTUALIZACION DE PRECIOS
MAYORES METRADOS
PARTIDAS NUEVAS
DEDUCTIVOS S/. -
COSTO DIRECTO S/. 1,747,399.16 S/. 2,818,495.89
GASTOS GENERALES S/. 203,929.26 S/. 564,829.93
SUPERVISION S/. 61,213.51 S/. 166,886.40
EXPEDIENTE TECNICO S/. 32,000.00 S/. 32,000.00
LIQUIDACION DE OBRA S/. 26,000.01 S/. 50,547.00
PRESUPUESTO TOTAL S/. 2,070,541.94 S/. 3,632,759.22
VARIACION NIVEL DE INCIDENCIA
EXP. TECNICO APROB. + EXP. TEC. S/. 1,998,985.89
MODIFICADO N° 01 +EXP. TEC.
MODIFICADO N° 02
+ EXP. MODIFICADO N°

% PRESUPUEST DIFERENC
DESCRIPCION
INCIDENCIA O S/. IA S/.
PRESUPUESTO DE ESTUDIO DE
S/ 1,990,217.82
PRE INVERSION PIP
PRESUPUESTO EXPEDIENTE
75.45% S/ 2,070,541.94 S/ 80,324.12
TECNICO
PRESUPUESTO EXPEDIENTE
12.02% S/ 3,632,759.22 ###
TECNICO MODIFICADO N° 01
PRESUPUESTO EXPEDIENTE
96.54% S/ 4,069,527.82 ###
TECNICO MODIFICADO N° 02
INCIDENCIA PERFIL Y
EXPEDIENTE
DO N° 01 + EXP. MODIFICADO N° 02 (COSTO DIRECTO)

%
INCIDENCIA

61.30%
15.50%
86.29%

EJECUTADO % SALDO %
S/. 331,783.18 9.13%### 90.87%

PRESUPUESTAL ASIGNACIÓN PRESUPUESTAL


DEVENGADO PIM ASIGNACIÓN PTO. DEVENGADO
S/. 260,117.80 PI S/. 32,000.00 S/. 32,000.00
S/. 71,665.38 PI S/ 962,602.00 S/ 760,460.48
PI S/ 2,484,774.00 S/ 531,895.00

as Nuevas, Deductivos de Obra y Actualización de Precios


EXP. EXP.
TECNICO TECNICO
MODIFICADO MODIFICAD
N° 02 O N° 03
S/. 3,255,264.49

S/ 188,462.67
1

S/ 260,512.00
2

S/ 448,974.67 3
S/. 3,255,264.49 S/. 3,255,264.49 0.00 MM+PN-D
S/. 564,829.93 S/. 564,829.93
S/. 166,886.40 S/. 166,886.40
S/. 32,000.00 S/. 32,000.00
S/. 50,547.00 S/. 50,547.00
S/. 4,069,527.82 S/. 4,069,527.82 S/. 4,069,527.82

S/ 1,998,985.88 96.54%

EXP.
TECNICO
MODIFICADO
N° 02
S/. 2,818,495.89
S/. 0.00
S/. 145,561.94
S/. 291,206.67
S/. -
S/. 3,255,264.49
S/. 564,829.93
S/. 166,886.40
S/. 32,000.00
S/. 50,547.00
S/. 4,069,527.82

96.54%
%
INCIDENC
IA

4.04%
82.53%
104.48%
104.48%

MONTO
PRESUPUES
DETALLE TAL
SOLICITAD
MAYORES O
METRADO S/ 188,462.67
S
PARTIDAS
S/ 260,512.00
NUEVAS
DEDUCTI
S/ 448,974.67
VOS
MM+PN-D S/ 0.00
CUADRO DE CRONOGRAMA DE EJECUCION DE OBRA CALENDARIO

PLAZOS DIAS CALENDARIO DIAS

Plazo de Ejecución 120

TIEMPO DE EJECUCION FECHAS


INICIO DE OBRA 10/14/2019
PARALIZACION DE OBRA N° 01 12/8/2019
12/9/2019
TIEMPO PARALIZADO
7/6/2020
7/7/2020
REINICIO DE OBRA
9/10/2020

CUADRO DE CRONOGRAMA DE EJECUCIO


PLAZO DE
DETALLE PERIODO
EJECUCION
Ejecución de Obra programado 10/14/2019
Ejecución de Obra Nº 01 10/14/2019
PLAZO DE EXP. TEC.
Paralización de Obra N°1 12/9/2019
Ejecución de Obra N° 02 programado 7/7/2020

TOTAL DE PLAZO (días)

MONTO
PRESUPUEST
Nº DETALLE
AL
SOLICITADO
1 MAYORES METRADOS ###
2 PARTIDAS NUEVAS S/. -
3 DEDUCTIVOS S/. -
4 ACTUALIZACION DE PRECIOS S/. -
MM+PN-D+ACT.PREC ###

N° DESCRIPCIÓN EXPEDIENTE %
1 AVANCE FINANCI S/ 3,632,759.22 100%

MONTO
PRESUPUEST
Nº DETALLE
AL
SOLICITADO
1 CAUSAL MAYORES METRADOS S/. 63,446.70
2 CAUSAL PARTIDAS NUEVAS S/. 63,562.03
3 CAUSAL DEDUCTIVOS S/. 60,547.50
4 ACTUALIZACION DE PRECIOS S/. 19,599.28
MM+PN-D+ACT.PREC S/. 86,060.51

DIFERENCI
DESCRIPCION PRESUPUESTO S/.
A S/.
PRESUPUESTO
DE ESTUDIO DE
S/ 1,990,217.82
PRE INVERSION
PIP
PRESUPUESTO
EXPEDIENTE S/ 2,070,541.94 S/ 80,324.12
PRESUPUESTO
TECNICO
EXPEDIENTE
TECNICO S/ 3,632,759.22 ###
MODIFICADO N°
PRESUPUESTO
01
EXPEDIENTE
TECNICO S/ 4,069,527.82 ###
MODIFICADO N°
INCIDENCIA
02
PERFIL Y
EXPEDIENTE
MODIFICADO N°
02

DIFERENCI
DESCRIPCION PRESUPUESTO S/.
PRESUPUESTO A S/.
DE ESTUDIO DE
S/ 1,703,044.00
PRE INVERSION
PIP
PRESUPUESTO
EXPEDIENTE S/ 1,747,399.16 S/ -44,355.16
PRESUPUESTO
TECNICO
EXPEDIENTE
TECNICO S/ 2,818,495.89 ###
MODIFICADO N°
PRESUPUESTO
01
EXPEDIENTE
TECNICO S/. 4,069227.82 ###
MODIFICADO N°
INCIDENCIA
02
PERFIL Y
EXPEDIENTE
MOD N° 02

MONTO
PRESUPUEST
Nº DETALLE
AL
SOLICITADO
S/.
1 MAYORES METRADOS
145,561.94
S/.
2 PARTIDAS NUEVAS
291,206.67
S/. -
3 DEDUCTIVOS
MM+PN-D S/. 436,768.60
UCION DE OBRA CALENDARIO
§    FECHA DE INICIO
N° RESOLUCION
EJECUCION
§    PRIMERA PARALIZACION
R.A. N°169-2019-AL/MDP
N° 01
DIAS CALENDARIO
§    TIEMPO DE EJECUCION
55
120 §    FECHA DE INICIO DE
PARALIZACION N°01
§    FECHA DE REINICIO DE
210 §OBRA
    TIEMPO PARALIZADO DE
OBRA
§    FECHA DE TERMINO
65 PROGRAMADO

DE CRONOGRAMA DE EJECUCION DE OBRA DIAS CALENDARIOS


TOTAL (días)
PERIODO
PROY. EJEC. PARAL.
al 2/11/2020 120
al 12/8/2019 55
al  7/6/2020 210
al 9/10/2020 65
120
E PLAZO (días)
120 210

EJECUTADO % SALDO %
S/ 89,930.62 2.48% S/ 3,542,828.60 97.52%
PRESUPUE
% INCIDENCIA DESCRIPCION
STO S/.

PRESUPUESTO DE ESTUDIO
###
DE PRE INVERSION PIP

4.04% S/ 2,070,541.94 PRESUPUESTO


4.04% ###
EXPEDIENTE TECNICO
S/ 3,713,083.34 PRESUPUESTO
82.53% EXPEDIENTE TECNICO ###
MODIFICADO N° 01
S/ 5,712,069.22 PRESUPUESTO
104.48% EXPEDIENTE TECNICO ###
MODIFICADO N° 02

INCIDENCIA PERFIL Y
104.48%
EXPEDIENTE MOD N° 02

% INCIDENCIA

-2.60%

-65.50%

-138.96%

-138.96%
: 14 de
octubre del
2019 : 08 de
diciembre
dias
: 55 dias
calendario
: 08/12/2019
: 07/07/2020
: 212 dias
: 09 de calendario
septiembre
del 2020

TOTAL
(P+E+PA)

55
210
65

330
%
DIFERENCIA
INCIDENC
S/.
IA

S/ -44,355.16 -2.60%
S/ -44,355.16 -2.60%

S/ -1,115,451.89 -65.50%
S/ -1,115,451.89 -65.50%

S/ -1,552,220.49 -91.14%

-91.14%
MM PN
PARCELA 23 57522.7 PARCELA 23 60176.31 PARCELA23
PARCELA 24 29900.37 PARCELA 24 156248.75 PARCELA 24
CHINCHAYS 159841.54 CHINCHAY 88344.99 CHINCHAY
LIRIOS N° 2 13917.82 LIRIOS 24095.83 LIRIOS
MM LIRIOS N 1467.33
262649.76 328865.88
220020.96
124663.31
76881.7
49164.15

470730.12