PROGRAMACION MENSUAL DE ACTIVIDADES

PROYECTO:

"MANTENIMIENTO VIAL RUTINARIO DEL CAMINO VECINAL: EMP. SM-104 - SHANAO, L=8.38 KM."

UBICACIÓN: SAN MARTIN- LAMAS - SHANAO

FECHA: MAYO 2023

VALORIZACION MENSUAL
ITEM DESCRIPCIÓN UND. METRADO PRECIO S/. PARCIAL S/.
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7
METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL
MANTENIMIENTO RUTINARIO S/ 25,048.37 S/ 3,577.93 S/ 4,748.35 S/ 3,605.78 S/ 3,784.77 S/ 3,872.77 S/ 3,242.69 S/ 2,216.08
1 LIMPIEZA DE CALZADA S/ 1,612.80
1.01 LIMPIEZA DE CALZADA km 6.00 268.80 S/ 1,612.80 0.50 S/ 134.40 S/ 1.00 S/ 268.80 S/ 1.00 S/ 268.80 S/ 1.00 S/ 268.80 S/ 1.00 S/ 268.80 S/ 0.50 S/ 134.40 S/ 1.00 S/ 268.80
02 BACHEO S/ 10,295.85
02.01 BACHEO m2 3,500.00 2.80 S/ 9,800.00 1000.00 S/ 2,800.00 S/ 500.00 S/ 1,400.00 S/ 500.00 S/ 1,400.00 S/ 500.00 S/ 1,400.00 S/ 500.00 S/ 1,400.00 S/ 500.00 S/ 1,400.00 S/ - S/ -
02.02 TRANSPORTE DE AGREGADOS m3 5.00 67.07 S/ 335.35 1.00 S/ 67.07 1.00 S/ 67.07 1.00 S/ 67.07 S/ - S/ 1.00 S/ 67.07 S/ 1.00 S/ 67.07
02.03 TRANSPORTE DE AGUA m3 50.00 3.21 S/ 160.50 0.00 S/ - S/ 15.00 S/ 48.15 S/ 10.00 S/ 32.10 S/ 15.00 S/ 48.15 S/ 10.00 S/ 32.10
03 DESQUINCHE S/ 61.44
03.01 DESQUINCHE Y REFNE DE TALUDES EN ROCA m3 2.00 30.72 S/ 61.44
FIJA S/ - S/ 2.00 S/ 61.44 S/ - S/ -
04 REMOCION DE DERRUMBES S/ 43.02
| REMOCION DE DERRUMBES m3 3.00 14.34 S/ 43.02 0.00 S/ 3.00 S/ 43.02 S/ - S/ - S/ -
05 LIMPIEZA DE CUNETAS S/ 6,700.00
05.01 LIMPIEZA DE CUNETAS NO REVESTIDAS m 5,000.00 1.34 S/ 6,700.00 S/ 1,428.57 S/ 1,914.29 S/ 714.29 S/ 957.14 S/ 714.29 S/ 957.14 S/ 714.29 S/ 957.14 S/ 714.29 S/ 957.14 S/ 714.29 S/ 957.14
06 LIMPIEZA DE ALCANTARILLAS(TAJEAS) S/ 806.40
06.01 LIMPIEZA MANUAL DE ALCANTARILLAS alc 6.00 134.40 S/ 806.40 0.00 S/ 2.00 S/ 268.80 S/ 1.00 S/ 134.40 S/ 1.00 S/ 134.40 S/ 2.00 S/ 268.80 S/ -
07 LIMPIEZA DE BADEN S/ 268.80
07.01 LIMPIEZA DE BADEN m2 120.00 2.24 S/ 268.80 S/ 60.00 S/ 134.40 S/ 60.00 S/ 134.40 S/ - S/ -
08 LIMPIEZA DE ZANJAS DE CORONACION 0.00 S/ - S/ - S/ - S/ - S/ -
08.01 LIMPIEZA DE ZANJAS DE CORONACION m 0.00 4.87 0.00 S/ - S/ - S/ - S/ - S/ -
09 LIMPIEZA DE PONTONES S/ 71.68
09.01 LIMPIEZA DE PONTONES m 8.00 8.96 S/ 71.68 0.00 S/ - S/ - S/ 4.00 S/ 35.84 S/ 4.00 S/ 35.84 S/ -
10 ENCAUZAMIENTO DE PEQ. CURSOS DE AGUA S/ 111.60
10.01 ENCAUZAMIENTO DE CAUCES O CURSOS DE m 20.00 5.58 S/ 111.60
AGUA S/ 4.00 S/ 22.32 S/ 4.00 S/ 22.32 S/ 4.00 S/ 22.32 S/ 4.00 S/ 22.32 S/ 4.00 S/ 22.32 S/ -
11 ROCE Y LIMPIEZA S/ 3,800.00
11.01 ROCE Y LIMPIEZA m2 20,000.00 0.19 S/ 3,800.00 2857.14 S/ 542.86 S/ 2,857.14 S/ 542.86 S/ 2,857.14 S/ 542.86 S/ 2,857.14 S/ 542.86 S/ 2,857.14 S/ 542.86 S/ 2,857.14 S/ 542.86 S/ 2,857.14 S/ 542.86
12 CONSERVACION DE SEÑALES S/ 319.20
12.01 CONSERVACION DE SEÑALES und 6.00 53.20 S/ 319.20 0.00 S/ 1.00 S/ 53.20 S/ 1.00 S/ 53.20 S/ 1.00 S/ 53.20 S/ 2.00 S/ 106.40 S/ 1.00 S/ 53.20
13 REFORESTACION S/ 413.68
13.01 REFORESTACIÓN DE AREAS AFECTADAS ha 0.50 827.36 S/ 413.68 S/ - S/ - S/ - S/ - S/ - S/ 0.50 S/ 413.68
14 VIGILANCIA Y CONTROL S/ 268.80
14.01 VIGILANCIA Y CONTROL glb 16.00 16.80 S/ 268.80 2.00 S/ 33.60 S/ 2.00 S/ 33.60 S/ 3.00 S/ 50.40 S/ 2.00 S/ 33.60 S/ 3.00 S/ 50.40 S/ 2.00 S/ 33.60 S/ 2.00 S/ 33.60
15 REPARACION DE MUROS SECOS S/ 104.99
15.01 MUROS SECOS m3 1.00 104.99 S/ 104.99 S/ 1.00 S/ 104.99
16 REPARACION DE PONTONES S/ 170.11
16.01 REPARACION DE PONTONES und 1.00 170.11 S/ 170.11 S/ 1.00 S/ 170.11 S/ -
COSTO DIRECTO S/ 25,048.37 S/ 3,577.93 S/ 4,748.35 S/ 3,605.78 S/ 3,784.77 S/ 3,872.77 S/ 3,242.69 S/ 2,216.08
GASTOS GENERALES (85.43% CD) S/ 21,398.88 S/ 3,056.62 S/ 4,056.52 S/ 3,080.42 S/ 3,233.33 S/ 3,308.51 S/ 2,770.23 S/ 1,893.20
UTILIDAD (6.99% CD) S/ 1,752.49 S/. 250.10 S/. 331.91 S/. 252.04 S/. 264.56 S/. 270.71 S/. 226.66 S/. 154.90
PRESUPUESTO TOTAL S/ 48,199.74 S/. 6,884.65 S/. 9,136.78 S/. 6,938.24 S/. 7,283.65 S/. 7,452.06 S/. 6,240.17 S/. 4,264.18