DATOS SOLICITADOS PARA OBRA DE MISHOLLO

ESPECIFICACION und metrado chancados de agregados en planta


SUB BASE
HORMIGON ZARANDEADO MAXIMO 1 1/2" m3 4500.00
BASE
ARENA NATURAL ZARANDEADA DE UN 1/4" m3 3520.00
GRAVILLA TRITURADA DE 1 1/2" A 3/4" m3 2220.00
GRAVILLA TRUTURADA DE 1/2" A 3/8" m3 3520.00
TRATAMIENTO SUPERFICIAL BICAPA
GRAVILLA TRITURADA DE 1" A 3/4" m3 500.00 7831.61 m3
CONCRETO 280KG/CM2 PARA RAMPAS
PIEDRA CHANCADA DE 3/4" m3 1530.00
PIEDRA CHANCADA DE 1/2" m3 10.00
RELLENO CON HORMIGÓN
HORMIGON ZARANDEADO MAXIMO 1 1/2" m3 9644.86
PIEDRA OVER MAXIMO 4" m3 139.82
PIEDRA OVER DE 6" m3 247.30

50
35
45
80
200
410 SUB BASE
hormigon 8124.084
ligante 902.676
total 9026.76
BASE
1/2/ a 3/8 3064.2745
55 1 1/2 a 3/4 2188.7675
arena 1/4 3502.028
total 8755.07
CARPETA DE RODADURA
3077.25 1407.15 ARENA FINA 157.9051
0.45727516 1/2 A 3/8 217.909038
1" A 3/4" 486.347708
1670.1 262.95 PASES VEHICULARES
1407.15 3/4" 9.6
ARENA GRUESA 4.2
OBRAS DE ARTE Y DRENAJE
PUENTE 01
HORMIGON 1 1/2" 31.38
OVER 4" 28.35
SOLAD HORM 1 1/2" 6.52806
3/4" 102.1215
ARENA GRUESA 64.9053
1/2" 1.014
ARENA FINA 1.352

PUENTE 2
HORMIGON 1 1/2" 31.24
OVER 4" 30.84
SOLAD HORM 1 1/2" 6.49656
3/4" 98.0005
ARENA GRUESA 67.1309
1/2" 0.819
ARENA FINA 1.092

PUENTE 3
HORMIGON 1 1/2" 36.31
OVER 4" 39.56
SOLAD HORM 1 1/2" 7.56252
3/4" 109.6315
ARENA GRUESA 80.1905
1/2" 0.819
ARENA FINA 1.092

PUENTE 4
HORMIGON 1 1/2" 34.19
OVER 4" 38.32
SOLAD HORM 1 1/2" 7.18074
3/4" 104.6045
ARENA GRUESA 67.9897
1/2" 0.819
ARENA FINA 1.092

ALCANTARILLA (2UND)
HORMIGON 1 1/2" 30.9
OVER 4" 2.745
SOLAD HORM 1 1/2" 5.94972
3/4" 59.955
ARENA GRUESA 34.9755
1/2"
ARENA FINA

BADENES
HORMIGON 1 1/2" 164.39
OVER 6" 212.262
SOLAD HORM 1 1/2" 56.91105
3/4" 414.457
ARENA GRUESA 246.1432
1/2"
ARENA FINA 13.28

CUNETAS REVESTIDAS
HORMIGON 1 1/2" 1095.16
OVER 6"
SOLAD HORM 1 1/2"
3/4" 548.1168
ARENA GRUESA 373.716
1/2"
ARENA FINA 111.9964

SEÑALIZACION
HORMIGON 1 1/2" 5.92
OVER 6"
SOLAD HORM 1 1/2"
3/4"
ARENA GRUESA
1/2"
ARENA FINA 0.05
1 1/2 A 3/4" 2188.7675
1/2 A 3/8 217.91
3/4" 1497.91
1/2" 3.47
1/2 A 3/8" 3282.18
1" A 3/4" 486.35
TTAL 7676.5875

HORMIGON 1/2" 9644.86


PIEDRA 6" 247.3
OVER 4" 139.82
ARENA FINA 287.86
ARENA GRUESA 960.95
ARENA NATURA Z 3502.02
14782.81
22459.3975

RESUMEN UND CANTIDAD


HORMIGON m3 9644.20265
ARENA GRUESA m3 939.2511
ARENA FINA m3 287.8595
OVER DE 4" m3 139.815
OVER DE 6" m3 212.262
PIEDRA 3/4" m3 1446.4868
1/2/ a 3/8 m3 3064.2745
1 1/2 a 3/4 m3 2188.7675
arena 1/4 m3 3502.028
ARENA FINA m3 157.9051
1/2 A 3/8 m3 217.909038
1" A 3/4" m3 486.347708
22287.1089