CRONOGRAMA DE EJECUCION FISICA

PROYECTO: "CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CHACAS - DISTRITO DE COLCABAMBA - PROVINCIA DE TAYACAJA – DEPARTAMENTO DE HUANCAVELICA"
Id Nombre de tarea Costo 03 mar '19 10 mar '19 17 mar '19 24 mar '19 31 mar '19 07 abr '19 14 abr '19 21 abr '19 28 abr '19 05 may '19 12 may '19 19 may '19 26 may '19 02 jun '19 09 jun '19 16 jun '19 23 jun '19 30 jun '19 07 jul '19 14 jul '19 21 jul '19 28 jul '19 04 ago '19 11 ago '19 18 ago '19 25 ago '19 01 se
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
1 SISTEMA DE RIEGO CHACAS S/.2,042,943.04
2 OBRAS PRELIMINARES S/.7,755.12
3 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/.638.91 01/03 02/03
4 OFICINA Y ALMACEN DE MATERIALES 20X20M S/.6,124.00 01/03 02/03
5 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/.580.00 02/03 06/03
6 PLACA RECORDATORIA S/.412.21 01/03 02/03
7 CAPTACION TIPO BOCATOMA (1.00 UNID) S/.29,015.82
8 TRABAJOS PRELIMINARES S/.1,171.79
9 LIMPIEZA DE TERRENO MANUAL S/.59.83 04/03 04/03
10 TRAZO Y REPLANTEO PRELIMINAR S/.555.98 05/03 05/03
11 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO S/.555.98 06/03 06/03
12 MOVIMIENTO DE TIERRAS S/.1,750.02
13 EXCAVACION MANUAL EN TERRENO NORMAL S/.844.17 09/03 11/03
14 REFINE Y NIVELACION EN TERRENO NORMAL S/.82.98 09/03 11/03
15 RELLENO CON MATERIAL DE PRESTAMO MANUAL S/.18.68 30/03 02/04
16 RELLENO CON GRAVA CLASIFICADO S/.109.70 30/03 02/04
17 ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.694.49 03/04 06/04
18 OBRAS DE CONCRETO SIMPLE S/.11,483.75
19 CONCRETO CICLOPEO FC=140 KG/CM2 + 30 % PM. S/.2,292.49 16/03 16/03
20 PISO ASENTADO C/MAMPOSTERIA DE PIEDRA C:H 1:5 S/.6,326.25 16/03 16/03
21 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS S/.2,524.13 14/03 15/03
22 ENROCADO EN PISO DE PROTECCION S/.340.88 18/03 20/03
23 OBRAS DE CONCRETO ARMADO S/.13,313.14
24 CONCRETO F'C=210 KG/CM2 EN MURO LATERAL S/.6,956.47 22/03 23/03
25 ENCOFRADO Y DESENCOFRADO DE MUROS S/.3,172.30 20/03 21/03
26 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.3,184.37 18/03 19/03
27 REVOQUES Y ENLUCIDOS S/.1,297.12
28 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZC. 1:5; E=1.5CM S/.819.25 25/03 27/03
29 TARRAJEO EN EXTERIORES MEZC. 1:5; E=1.5CM S/.477.87 28/03 29/03
30 POZO DE DISIPACION TIPO 1, 2 Y 3 (03.00 UNID.) S/.3,636.08
31 TRABAJOS PRELIMINARES S/.14.40
32 TRAZO Y REPLANTEO S/.14.40 11/03 12/03
33 MOVIMIENTO DE TIERRAS S/.178.33
34 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.165.48 13/03 14/03
35 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.12.85 13/03 14/03
36 CONCRETO SIMPLE S/.164.87
37 SOLADO DE CONCRETO 1:10 C:H, E=2 S/.164.87 15/03 15/03
38 CONCRETO ARMADO S/.1,893.51
39 CONCRETO F'C=175 KG/CM2 S/.866.21 22/03 23/03
40 ENCOFRADO Y DESENCOFRADO S/.370.15 20/03 21/03
41 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.657.15 18/03 19/03
42 VARIOS S/.1,384.97
43 TARRAJEO CON IMPERMEABILIZANTE S/.678.57 25/03 26/03
44 COMPUERTA TIPO TARJETA DE 0.70 X 0.30 e=3/8" S/.686.88 27/03 28/03
45 PINTURA ANTICORROSIVA EN COMPUERTA TIPO TARJETA S/.19.52 29/03 30/03
46 POZO DISIPADOR (CAIDA VERTICAL) S/.46,252.39
47 TRABAJOS PRELIMINARES S/.391.59
48 LIMPIEZA Y DESBROCE S/.83.45 01/04 20/04
49 TRAZO Y REPLANTEO S/.308.14 05/04 25/04
50 MOVIMIENTO DE TIERRAS S/.7,595.97
51 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.4,085.58 10/04 20/05
52 NIVELACION Y COMPACTACIÓN S/.481.33 15/04 24/05
53 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.821.11 22/04 31/05
54 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.2,207.95 29/04 07/06
55 CONCRETO ARMADO S/.28,094.48
56 CONCRETO F'C=175 KG/CM2 S/.17,099.49 11/05 21/06
57 ENCOFRADO Y DESENCOFRADO S/.6,146.25 07/05 15/06
58 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.4,848.74 03/05 12/06
59 VARIOS S/.10,170.35
60 TARRAJEO CON IMPERMEABILIZANTE S/.10,170.35 20/05 28/06
61 LINEA DE CONDUCCION RED PRINCIPAL S/.34,174.26
62 TRABAJOS PRELIMINARES S/.1,454.48
63 LIMPIEZA Y DESBROCE S/.141.32 01/04 03/04
64 TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.1,313.16 04/04 06/04
65 MOVIMIENTO DE TIERRAS S/.3,145.13
66 EXCAVACION MANUAL DE ZANJA, MATERIAL SUELTO S/.2,563.88 08/04 24/04
67 REFINE NIVELACION Y PERFILADO DE FONDO S/.487.00 12/04 27/04
68 RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO NORMAL S/.94.25 17/05 28/05
69 CONCRETO SIMPLE S/.19,780.90
70 CONCRETO F'C=175 KG/CM2 S/.10,214.75 22/04 08/05
71 ENCOFRADO Y DESENCOFRADO S/.9,566.15 16/04 02/05
72 VARIOS S/.9,793.75
73 TARRAJEO CON IMPERMEABILIZANTE S/.9,387.24 25/04 11/05
74 JUNTA DE CONSTRUCCION S/.406.51 30/04 16/05
75 LINEA DE DISTRIBUCION RED SECUNDARIA S/.371,579.06
76 TRABAJOS PRELIMINARES S/.19,483.22
77 LIMPIEZA Y DESBROCE S/.1,892.99 06/05 22/05
78 TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.17,590.23 10/05 27/05
79 MOVIMIENTO DE TIERRAS S/.28,059.81
80 EXCAVACION MANUAL DE ZANJA, MATERIAL SUELTO S/.21,536.28 28/05 01/07
81 REFINE NIVELACION Y PERFILADO DE FONDO S/.6,523.53 06/06 10/07
82 CONCRETO SIMPLE S/.192,902.38
83 CONCRETO F'C=175 KG/CM2 S/.136,840.88 18/06 22/07
84 ENCOFRADO Y DESENCOFRADO S/.56,061.50 14/06 18/07
85 VARIOS S/.131,133.65
86 TARRAJEO CON IMPERMEABILIZANTE S/.125,745.61 24/06 22/07
87 JUNTA DE CONSTRUCCION S/.5,388.04 28/06 26/07
88 COMPUERTA DE INUNDACION S/.7,580.71
89 TRABAJOS PRELIMINARES S/.23.68
90 TRAZO Y REPLANTEO S/.23.68 12/06 28/06
91 MOVIMIENTO DE TIERRAS S/.41.33
92 EXCAVACION MANUAL TERRENO NORMAL S/.36.38 17/06 30/07
93 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.4.95 21/06 25/07
94 CONCRETO SIMPLE S/.783.14
95 CONCRETO F'C=175 KG/CM2 S/.379.99 08/07 14/08
96 ENCOFRADO Y DESENCOFRADO S/.403.15 02/07 05/08
97 VARIOS S/.6,732.56
98 TARRAJEO CON IMPERMEABILIZANTE S/.422.23 18/07 20/08
99 COMPUERTA TIPO TARJETA DE 0.25 X 0.35 e=5/8" S/.6,177.43 29/07 26/08
100 PINTURA ANTICORROSIVA EN COMPUERTA TIPO TARJETA S/.132.90 31/07 28/08
101 FLETE TRASLADO DE MATERIALES HASTA CHACAS S/.204,600.35
102 FLETE TERRESTRE LOCAL S/.55,668.03
103 FLETE TERRESTRE LOCAL S/.55,668.03 05/03 13/03
104 FLETE TERRESTRE RURAL S/.96,532.32
105 FLETE TERRESTRE RURAL S/.96,532.32 05/03 13/03
106 FLETE DE AGREGADOS S/.52,400.00
107 FLETE DE AGREGADOS S/.52,400.00 05/03 02/07
108 SEGURIDAD Y SALUD S/.33,000.00
109 EQUIPO DE PROTECCION INDIVIDUAL S/.15,000.00 05/03 31/08
110 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD SALUD DURANTE EL TRABAJO
S/.18,000.00 05/03 31/08
111 OBRAS PRELIMINARES S/.6,762.91
112 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/.638.91 02/03 05/03
113 OFICINA Y ALMACEN DE MATERIALES 20X20M S/.6,124.00 02/03 05/03
114 CAPTACION TIPO LADERA (1.00 UND) S/.15,187.24
115 TRABAJOS PRELIMINARES S/.528.67
116 LIMPIEZA DE TERRENO MANUAL S/.26.99 01/04 02/04
117 TRAZO Y REPLANTEO PRELIMINAR S/.250.84 03/04 04/04
118 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO S/.250.84 05/04 06/04
119 MOVIMIENTO DE TIERRAS S/.598.25
120 EXCAVACION MANUAL EN TERRENO NORMAL S/.250.83 08/04 09/04
121 REFINE Y NIVELACION EN TERRENO NORMAL S/.15.26 10/04 11/04
122 RELLENO CON MATERIAL DE PRESTAMO MANUAL S/.21.49 12/04 13/04
123 RELLENO CON GRAVA CLASIFICADO S/.109.70 15/04 16/04
124 ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.200.97 17/04 18/04
125 OBRAS DE CONCRETO SIMPLE S/.189.64
126 SOLADO DE CONCRETO 1:10 C:H, E=2 S/.53.54 10/04 11/04
127 CONCRETO F¨C= 140 kg/cm2 EN TUB. DE LIMPIEZA Y REBOSE S/M S/.7.60 23/04 24/04
128 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS S/.6.87 20/04 22/04
129 PISO ASENTADO C/MAMPOSTERIA DE PIEDRA C:H 1:5 S/.121.63 25/04 26/04
130 OBRAS DE CONCRETO ARMADO S/.1,874.44
131 CONCRETO F'C=210 KG/CM2 EN CAPTACION S/.631.09 17/04 19/04
132 ENCOFRADO Y DESENCOFRADO DE MUROS S/.962.99 15/04 16/04
133 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.280.36 12/04 13/04
134 REVOQUES Y ENLUCIDOS S/.478.70
135 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZC. 1:5; E=1.5CM S/.189.66 20/04 22/04
136 TARRAJEO EN EXTERIORES MEZC. 1:5; E=1.5CM S/.289.04 23/04 24/04
137 PINTURA S/.185.81
138 PINTURA ESMALTE EN MUROS EXTERIORES S/.166.83 25/04 26/04
139 PINTURA EN CARPINTERIA METALICA S/.18.98 25/04 26/04
140 FILTRO DE GRAVA Y ARENA S/.263.29
141 SUMINISTRO DE FILTRO CON MATERIAL DE GRAVA Y ARENA S/.263.29 25/04 27/04
142 CARPINTERIA METALICA S/.512.66
143 MARCO Y TAPA METALICA LAC 2.00mm, C/MECAN. 0.45 X 0.45 M S/.223.68 27/04 29/04
144 MARCO Y TAPA METALICA LAC 2.00mm, C/MECAN. 0.65 X 0.65M S/.288.98 27/04 29/04
145 VALVULAS Y ACCESORIOS S/.1,321.42
146 SUMINISTRO Y COLOCACION DE ACCESORIOS S/.1,321.42 30/04 02/05
147 CERCO PERIMETRICO CAPTACION S/.9,234.36
148 LIMPIEZA DE TERRENO MANUAL S/.16.90 15/04 16/04
149 TRAZO Y REPLANTEO PRELIMINAR S/.62.82 17/04 18/04
150 EXCAVACION MANUAL EN TERRENO NORMAL S/.39.51 19/04 20/04
151 ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.32.67 22/04 23/04
152 CONCRETO F'C= 140 KG/CM2 EN DADOS PARA ROLLIZOS S/.402.57 22/04 25/04
153 COLOCADO DE ROLLIZOS CON CHAMPAS ANCHO 1.50 M S/.7,822.43 22/04 25/04
154 ALAMBRE DE PUA Nº 12 S/.361.15 26/04 27/04
155 COLOCADO DE PUERTA CON MARCO DE MADERA S/.496.31 29/04 30/04
156 POZO DE DISIPACION TIPO 1 (01.00 UNID.) S/.1,213.74
157 TRABAJOS PRELIMINARES S/.4.80
158 TRAZO Y REPLANTEO S/.4.80 01/05 02/05
159 MOVIMIENTO DE TIERRAS S/.59.44
160 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.55.16 03/05 04/05

Proyecto: CRONOGRAMA DE AVANC Tarea Tarea crítica Progreso Hito Resumen Tarea resumida Tarea crítica resumida Hito resumido Progreso resumido División Tareas externas Resumen del proyecto Agrupar por síntesis Fecha límite
Fecha: lun 28/01/19

Página 1
CRONOGRAMA DE EJECUCION FISICA
PROYECTO: "CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CHACAS - DISTRITO DE COLCABAMBA - PROVINCIA DE TAYACAJA – DEPARTAMENTO DE HUANCAVELICA"
Id Nombre de tarea Costo 03 mar '19 10 mar '19 17 mar '19 24 mar '19 31 mar '19 07 abr '19 14 abr '19 21 abr '19 28 abr '19 05 may '19 12 may '19 19 may '19 26 may '19 02 jun '19 09 jun '19 16 jun '19 23 jun '19 30 jun '19 07 jul '19 14 jul '19 21 jul '19 28 jul '19 04 ago '19 11 ago '19 18 ago '19 25 ago '19 01 se
X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L
161 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.4.28 06/05 07/05
162 CONCRETO SIMPLE S/.55.08
163 SOLADO DE CONCRETO 1:10 C:H, E=2 S/.55.08 06/05 07/05
164 CONCRETO ARMADO S/.632.61
165 CONCRETO F'C=175 KG/CM2 S/.290.10 13/05 14/05
166 ENCOFRADO Y DESENCOFRADO S/.123.48 10/05 11/05
167 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.219.03 08/05 09/05
168 VARIOS S/.461.81
169 TARRAJEO CON IMPERMEABILIZANTE S/.226.34 15/05 16/05
170 COMPUERTA TIPO TARJETA DE 0.70 X 0.30 e=3/8" S/.228.96 17/05 18/05
171 PINTURA ANTICORROSIVA EN COMPUERTA TIPO TARJETA S/.6.51 17/05 18/05
172 POZO DISIPADOR (CAIDA VERTICAL) S/.58,581.89
173 TRABAJOS PRELIMINARES S/.496.02
174 LIMPIEZA Y DESBROCE S/.105.71 01/04 20/04
175 TRAZO Y REPLANTEO S/.390.31 01/04 20/04
176 MOVIMIENTO DE TIERRAS S/.9,617.15
177 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.5,175.19 10/04 20/05
178 NIVELACION Y COMPACTACIÓN S/.604.98 15/04 24/05
179 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.1,040.23 22/04 31/05
180 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.2,796.75 29/04 07/06
181 CONCRETO ARMADO S/.35,586.37
182 CONCRETO F'C=175 KG/CM2 S/.21,659.36 11/05 21/06
183 ENCOFRADO Y DESENCOFRADO S/.7,785.25 07/05 15/06
184 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.6,141.76 03/05 12/06
185 VARIOS S/.12,882.35
186 TARRAJEO CON IMPERMEABILIZANTE S/.12,882.35 20/05 28/06
187 LINEA DE CONDUCCION RED PRINCIPAL S/.1,371.21
188 TRABAJOS PRELIMINARES S/.55.53
189 LIMPIEZA Y DESBROCE S/.5.40 01/04 03/04
190 TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.50.13 04/04 06/04
191 MOVIMIENTO DE TIERRAS S/.188.94
192 EXCAVACION MANUAL DE ZANJA, MATERIAL SUELTO S/.76.10 08/04 10/04
193 REFINE NIVELACION Y PERFILADO DE FONDO S/.18.59 11/04 13/04
194 RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO NORMAL S/.94.25 15/04 17/04
195 CONCRETO SIMPLE S/.753.36
196 CONCRETO F'C=175 KG/CM2 S/.388.16 15/04 17/04
197 ENCOFRADO Y DESENCOFRADO S/.365.20 11/04 13/04
198 VARIOS S/.373.38
199 TARRAJEO CON IMPERMEABILIZANTE S/.358.60 18/04 20/04
200 JUNTA DE CONSTRUCCION S/.14.78 22/04 24/04
201 LINEA DE DISTRIBUCION RED SECUNDARIA S/.523,576.42
202 TRABAJOS PRELIMINARES S/.26,979.50
203 LIMPIEZA Y DESBROCE S/.2,621.33 06/05 22/05
204 TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.24,358.17 10/05 27/05
205 MOVIMIENTO DE TIERRAS S/.47,896.65
206 EXCAVACION MANUAL DE ZANJA, MATERIAL SUELTO S/.38,863.16 28/05 01/07
207 REFINE NIVELACION Y PERFILADO DE FONDO S/.9,033.49 06/06 10/07
208 CONCRETO SIMPLE S/.267,123.46
209 CONCRETO F'C=175 KG/CM2 S/.189,491.78 18/06 22/07
210 ENCOFRADO Y DESENCOFRADO S/.77,631.68 14/06 18/07
211 VARIOS S/.181,576.81
212 TARRAJEO CON IMPERMEABILIZANTE S/.174,126.68 24/06 22/07
213 JUNTA DE CONSTRUCCION S/.7,450.13 28/06 26/07
214 COMPUERTA DE INUNDACION S/.14,695.65
215 TRABAJOS PRELIMINARES S/.45.90
216 TRAZO Y REPLANTEO S/.45.90 12/06 28/06
217 MOVIMIENTO DE TIERRAS S/.79.94
218 EXCAVACION MANUAL TERRENO NORMAL S/.70.53 17/06 30/07
219 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA) S/.9.41 21/06 25/07
220 CONCRETO SIMPLE S/.1,517.01
221 CONCRETO F'C=175 KG/CM2 S/.735.46 08/07 14/08
222 ENCOFRADO Y DESENCOFRADO S/.781.55 02/07 05/08
223 VARIOS S/.13,052.80
224 TARRAJEO CON IMPERMEABILIZANTE S/.818.55 18/07 20/08
225 COMPUERTA TIPO TARJETA DE 0.25 X 0.35 e=5/8" S/.11,976.65 21/08 26/08
226 PINTURA ANTICORROSIVA EN COMPUERTA TIPO TARJETA S/.257.60 21/08 26/08
227 MITIGACIÓN AMBIENTAL S/.47,400.00
228 PLAN DE PARTICIPACIÓN CIUDADAN S/.9,250.00
229 SENSIBILIZACIÓN AMBIENTAL S/.4,750.00 04/03 01/04
230 CAPACITACION EN TEMAS AMBIENTAL S/.4,500.00 04/03 01/04
231 MEDIDAS DE MITIGACIÓN S/.11,650.00
232 RIEGO CONTINUO PARA HUMEDECER EL MATERIAL EXTRAÍDO DE LA ZANJA PARA EVITAR S/.3,000.00
LA GENERACIÓN DE POLVOS 18/03 01/07
233 MANTENIMIENTO DE EQUIPOS DE MANEJO S/.1,200.00 18/03 01/07
234 ELIMINACIÓN DE SUELOS CONTAMINADOS S/.3,500.00 18/03 01/07
235 ADQUISICIÓN DE CINTAS DE SEGURIDAD S/.1,000.00 18/03 01/07
236 TRABAJOS DE SEÑALIZACIÓN S/.2,200.00 18/03 01/07
237 IMPLEMENTACIÓN DE KIT ANTIDERRAME S/.500.00 18/03 01/07
238 PAÑOS ABSORBENTES PARA DERRAMES DE HIDROCARBUROS 15"X17" S/.250.00 18/03 01/07
239 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LÍQUIDOS S/.16,000.00
240 ADQUISICIÓN DE CONTENEDORES PARA LOS RR.SS S/.2,800.00 04/03 29/03
241 SUMINISTRO DE BAÑOS PORTÁTILES S/.13,200.00 04/03 05/03
242 PROGRAMA DE SEGUIMIENTO Y CONTROL S/.2,700.00
243 MONITOREO DE RUIDO AMBIENTAL S/.1,200.00 04/03 31/08
244 MONITOREO DE AGUA S/.1,500.00 04/03 31/08
245 PLAN DE CONTINGENCIA S/.3,400.00
246 SUMINISTRO DE BOTIQUINES S/.1,500.00 04/03 05/03
247 CAMILLA S/.580.00 04/03 05/03
248 REPOSICIÓN DE MEDICAMENTOS S/.120.00 04/03 05/03
249 IMPLEMENTACIÓN CONTRA INCENDIOS(EXTINTORES) S/.850.00 04/03 05/03
250 REVISIÓN Y RECARGA DE EXTINTORES S/.350.00 04/03 05/03
251 PLAN DE CIERRE O ABANDONO S/.4,400.00
252 REFORESTACION CON ESPECIES ARBOREAS DE AREAS IMPACTADAS S/.4,400.00 19/08 31/08
253 GESTION Y ORGANIZACION DE REGANTES S/.31,500.00
254 ORGANIZACION DE USUARIO S/.14,500.00 04/03 06/03
255 IMPLEMENTACION Y MANEJO EN INSTRUMENTOS DE GESTION S/.17,000.00 04/03 18/03
256 CAPACIDADES PRODUCTIVAS Y ADECUADOS MÉTODOS DE RIEGO S/.12,500.00
257 CAPACIDADES PRODUCTIVAS Y ADECUADOS MÉTODOS DE RIEGO S/.12,500.00 04/03 15/03
258 GASTOS GENERALES (G. Variables, Gastos fijos) S/.75,301.40
259 UTILIDAD 7% S/.101,526.80
260 IGV 18% S/.292,897.99
261 GASTOS DE SUPERVISION S/.74,834.00
262 ESTUDIO DEFINITIVO S/.48,000.00

Proyecto: CRONOGRAMA DE AVANC Tarea Tarea crítica Progreso Hito Resumen Tarea resumida Tarea crítica resumida Hito resumido Progreso resumido División Tareas externas Resumen del proyecto Agrupar por síntesis Fecha límite
Fecha: lun 28/01/19