Está en la página 1de 2

CRONOGRAMA DE EJECUCION FISICA

PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA – HUANCAVELICA”.
Id Nombre de tarea Costo '19 03 feb '19 10 feb '19 17 feb '19 24 feb '19 03 mar '19 10 mar '19 17 mar '19 24 mar '19 31 mar '19 07 abr '19 14 abr '19 21 abr '19 28 abr '19 05 may '19 12 may '19 19 may '19 26 may '19 02 jun '19 09 jun '19 16 jun '19 23 jun '19 30 jun '19 07 jul '19 14 jul '19 21 jul '19 28 jul '19 04
M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D
1 PRESUPUESTO TOTAL DE OBRA S/.2,057,354.83
2 INFRAESTRUCTURA DE RIEGO S/.1,280,563.82
3 OBRAS PRELIMINARES S/.3,912.20
4 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/.428.99 01/02 02/02
5 ALMACEN Y CASETA DE GUARDIANIA S/.2,520.00 01/02 02/02
6 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/.551.00 01/02 02/02
7 PLACA RECORDATORIA S/.412.21 30/07 31/07
8 CAPTACION TIPO BOCATOMA (1.00 UNID) S/.23,689.63
9 TRABAJOS PRELIMINARES S/.602.44
10 LIMPIEZA DE TERRENO MANUAL S/.37.26 04/02 05/02
11 TRAZO Y REPLANTEO PRELIMINAR S/.282.59 04/02 05/02
12 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO S/.282.59 04/02 05/02
13 MOVIMIENTO DE TIERRAS S/.4,115.83
14 EXCAVACION MANUAL EN TERRENO NORMAL S/.1,576.15 06/02 06/02
15 REFINE Y NIVELACION EN TERRENO NORMAL S/.254.88 18/02 18/02
16 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO SELECCIONADO S/.2,122.40 18/02 19/02
17 ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.162.40 20/02 21/02
18 OBRAS DE CONCRETO SIMPLE S/.5,292.65
19 SOLADO DE CONCRETO 1:10 C:H, E=2" S/.650.62 04/02 04/02
20 CONCRETO F¨C= 140 kg/cm2 EN TUB. DE LIMPIEZA Y REBOSE S/M S/.1,190.89 08/02 09/02
21 PISO ASENTADO C/MAMPOSTERIA DE PIEDRA C:H 1:5 S/.2,959.42 08/02 09/02
22 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS S/.491.72 08/02 09/02
23 OBRAS DE CONCRETO ARMADO S/.10,990.66
24 CONCRETO F'C=210 KG/CM2 EN CAPTACION S/.6,300.95 12/02 13/02
25 ENCOFRADO Y DESENCOFRADO DE MUROS S/.3,244.70 11/02 11/02
26 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.1,445.01 11/02 11/02
27 REVOQUES Y ENLUCIDOS S/.1,332.74
28 TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZC. 1:5; E=1.5CM S/.767.64 14/02 15/02
29 TARRAJEO EN EXTERIORES MEZC. 1:5; E=1.5CM S/.565.10 14/02 15/02
30 PINTURA S/.574.47
31 PINTURA ESMALTE EN MUROS EXTERIORES DE CAPTACION S/.573.45 18/02 18/02
32 PINTURA EN CARPINTERIA METALICA S/.1.02 18/02 18/02
33 ACCESORIOS VARIOS DE CAPTACION S/.780.84
34 COMPUERTA TARJETA TIPO CANAL SECCIÓN (20cm x 30cm) S/.526.36 16/02 16/02
35 VALVULA COMPUERTA DE BRONCE D=4" S/.254.48 16/02 16/02
36 RESERVORIO 122.00 m³ ( 01 UNDS ) S/.86,146.32
37 OBRAS PRELIMINARES S/.217.76
38 TRAZO, NIVELACION Y REPLANTEO DE RESERVORIOS S/.217.76 11/02 11/02
39 MOVIMIENTO DE TIERRAS S/.20,117.95
40 EXCAVACION MANUAL EN TERRENO S/.10,271.63 12/02 15/02
41 RELLENO CON MATERIAL PROPIO CON EQUIPO S/.3,040.29 13/03 15/03
42 ELIMINACION MANUAL DE MATERIAL EXCEDENTE HASTA 30.00MT S/.6,806.03 16/03 18/03
43 OBRAS DE CONCRETO SIMPLE S/.1,126.29
44 SOLADO C:H 1:10 E=4" S/.1,126.29 18/02 19/02
45 OBRAS DE CONCRETO ARMADO S/.42,161.67
46 ZAPATAS S/.8,787.83
47 CONCRETO F'C=175 KG/CM2 S/.7,646.04 23/02 23/02
48 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.1,141.79 20/02 22/02
49 MUROS DE RESERVORIO S/.33,373.84
50 CONCRETO F'C=210 KG/CM2 S/.16,944.59 27/02 28/02
51 ENCOFRADO Y DESENCOFRADO S/.9,186.09 23/02 26/02
52 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.6,477.08 20/02 22/02
53 SUM. E INSTALACIÓN DE WATER STOP 6" S/.766.08 27/02 28/02
54 REVOQUES ENLUCIDOS Y MOLDURAS S/.6,534.83
55 TARRAJEO CON IMPERMEABILIZANTE S/.3,594.88 04/03 06/03
56 PISO TERMINADO CON IMPERMEABILIZANTE S/.1,476.00 01/03 02/03
57 TARRAJEO EN EXTERIORES MEZC. 1:5; E=1.5CM S/.1,463.95 04/03 07/03
58 PINTURA S/.1,601.44
59 PINTURA ESMALTE EN MUROS EXTERIORES S/.1,601.44 08/03 11/03
60 ACCESORIOS PARA SALIDA DE RESERVORIO S/.1,756.55
61 VALVULA DE MAZA D=4" S/.751.88 04/03 05/03
62 DADOS DE CONCRETO F'C=175 KG/CM2 S/.4.24 01/03 02/03
63 CODO PVC SAL 4"X90° S/.310.90 04/03 05/03
64 TEE PVC-SAP 4"* 4" S/.37.94 04/03 05/03
65 CONO DE REBOSE DE PVC DE 6" A 4" S/.40.53 04/03 05/03
66 TUBERIA PVC DN=4" S/.77.22 04/03 05/03
67 ESCALERA METALICA TIPO GATO S/.533.84 01/03 05/03
68 CERCO PERIMETRICO S/.12,629.83
69 TRAZO Y REPLANTEO S/.84.83 25/02 26/02
70 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.24.56 27/02 28/02
71 CONCRETO CICLOPEO FC=140 KG/CM2 + 30 % PM. S/.174.80 01/03 04/03
72 COLOCACION DE TUBERIA DE FIERRO NEGRO 2 1/2" X 2.5 mm S/.1,430.24 01/03 04/03
73 COLOCACION DE BASTIDOR CON ANGULO DE FIERRO 1 1/2" x 1 1/2" Y MALLAS/.8,465.55
CRIPTADA DE 2" #10 01/03 04/03
74 ALAMBRE DE PUA Nº 12 S/.149.85 05/03 07/03
75 PUERTA DE CERCO PERIMETRICO SEGUN DISEÑO S/.2,300.00 08/03 09/03
76 TOMAS LATERALES (17.00 UNIDADES) S/.30,628.07
77 TRABAJOS PRELIMINARES S/.76.91
78 TRAZO Y REPLANTEO S/.76.91 05/03 09/03
79 MOVIMIENTO DE TIERRAS S/.1,087.52
80 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.655.11 11/03 23/03
81 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.432.41 01/04 04/04
82 CONCRETO SIMPLE S/.522.44
83 SOLADO C:H 1:10 E=2" S/.522.44 13/03 25/03
84 CONCRETO ARMADO S/.10,116.90
85 CONCRETO F'C=175 KG/CM2 S/.4,627.87 22/03 08/04
86 ENCOFRADO Y DESENCOFRADO S/.2,857.90 19/03 04/04
87 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.2,631.13 16/03 03/04
88 VARIOS S/.4,315.31
89 TARRAJEO MEZCLA 1:5 S/.1,199.03 11/04 27/04
90 TAPA METALICA DE 0.85m X1.05m CON PLANCHA ESTRIADA DE 1/8" INC/MARCO S/.2,655.57 15/04 01/05
91 PINTURA ANTICORROSIVA EN REJILLA S/.460.71 18/04 04/05
92 ACCESORIOS VARIOS S/.14,508.99
93 TEE HDPE DE 110 MM A 90 MM S/.3,833.33 09/04 25/04
94 ADAPTADOR MACHO DE HDPE 100 MM S/.2,160.36 09/04 25/04
95 VALVULA COMPUERTA DE BRONCE D=4" S/.4,202.40 09/04 25/04
96 NIPLE DE F° G° DE 0.15 M X 4" S/.1,366.80 09/04 25/04
97 UNIÓN UNIVERSAL DE PVC 4" S/.2,946.10 09/04 25/04
98 CAJA HIDRANTE TIPO I (153 UNIDADES) S/.184,277.95
99 TRABAJOS PRELIMINARES S/.811.51
100 LIMPIEZA Y DESBROCE S/.119.34 01/06 06/07
101 TRAZO Y REPLANTEO S/.692.17 01/06 06/07
102 MOVIMIENTO DE TIERRAS S/.14,688.12
103 EXCAVACION PARA ESTRUCTURAS, TERRENO NORMAL S/.7,664.81 05/06 09/07
104 NIVELACION Y COMPACTACIÓN S/.633.42 08/06 13/07
105 RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO S/.2,205.41 12/06 16/07
106 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)
S/.4,184.48 17/07 19/07
107 CONCRETO SIMPLE S/.235.10
108 SOLADO C:H 1:10 E=2" S/.235.10 14/06 18/07
109 CONCRETO ARMADO S/.96,415.12
110 CONCRETO F'C=210 KG/CM2 S/.47,014.00 20/06 24/07
111 ENCOFRADO Y DESENCOFRADO S/.25,721.14 19/06 23/07
112 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.23,679.98 17/06 20/07
113 VARIOS S/.39,200.97
114 TARRAJEO EN MEZCLA. 1:5; E=1.5CM S/.23,900.13 24/06 27/07
115 TAPA METALICA DE 0.85m X1.05m CON PLANCHA ESTRIADA DE 1/8" INC/MARCO
S/.13,228.01 27/06 19/07
116 PINTURA ANTICORROSIVA EN TAPA METALICA S/.2,072.83 08/07 30/07
117 ACCESORIOS S/.32,927.13
118 ACCESORIOS PARA HIDRANTES S/.32,927.13 25/06 29/07
119 LINEA DE CONDUCCION RED PRINCIPAL S/.294,817.75
120 TRABAJOS PRELIMINARES S/.10,719.35
121 LIMPIEZA Y DESBROCE S/.3,271.16 18/02 25/02
122 TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.7,448.19 20/02 27/02
123 MOVIMIENTO DE TIERRAS S/.157,156.17
124 EXCAVACION MANUAL DE ZANJA, MATERIAL NATURAL COMPACTADO S/.70,747.03 28/02 03/04
125 REFINE NIVELACION Y PERFILADO DE FONDO S/.24,911.17 04/03 06/04
126 CAMA DE APOYO PARA TUBERIAS h=0.10m TUB. DN=110 MM S/.29,893.41 08/03 11/04
127 PRIMER RELLENO CON MATERIAL PROPIO ZARANDEADO S/.5,616.27 03/04 07/05
128 RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO NORMAL S/.25,988.29 09/04 13/05
129 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS S/.126,942.23
130 SUMINISTRO E INSTALACIÓN TUBERÍA HDPE DN=110 mm, PN-100 S/.104,979.20 12/03 15/04
131 PRUEBA HIDRAULICA LINEA DE CONDUCCION S/.18,419.17 15/03 18/04
132 ACCESORIOS VARIOS DE TUBERIA HDPE 100 mm S/.3,543.86 19/03 22/04
133 LINEA DE DISTRIBUCION RED SECUNDARIA S/.348,514.33
134 TRABAJOS PRELIMINARES S/.16,387.26
135 LIMPIEZA DE TERRENO MANUAL S/.5,000.81 21/05 31/05
136 TRAZO, NIVELACION Y REPLANTEO DE ZANJA PARTA TUB. S/.11,386.45 21/05 31/05
137 MOVIMIENTO DE TIERRAS S/.215,323.71
138 EXCAVACION MANUAL DE ZANJA, MATERIAL SUELTO S/.89,506.14 21/05 29/06
139 REFINE NIVELACION Y PERFILADO DE FONDO S/.38,083.07 30/05 09/07
140 CAMA DE APOYO PARA TUBERIAS h=0.10m TUB. DN=90 MM S/.45,699.69 05/06 09/07
141 PRIMER RELLENO CON MATERIAL PROPIO ZARANDEADO S/.8,585.95 11/06 15/07
142 RELLENO COMPACTADO CON MATERIAL PROPIO EN TERRENO NORMAL S/.33,448.86 18/06 22/07
143 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS S/.116,803.36
144 SUMINISTRO E INSTALACIÓN TUBERÍA HDPE DN=90 mm, PN-100 S/.83,782.76 07/06 11/07
145 PRUEBA HIDRAULICA LINEA DE CONDUCCION S/.28,158.39 13/06 17/07
146 ACCESORIOS VARIOS PARA TUBERIAS HDPE 90mm. S/.4,862.21 19/06 23/07

Proyecto: CRONOGRAMA FISICO Tarea Tarea crítica Progreso Hito Resumen Tarea resumida Tarea crítica resumida Hito resumido Progreso resumido División Tareas externas Resumen del proyecto Agrupar por síntesis Fecha límite
Fecha: dom 16/12/18

Página 1
CRONOGRAMA DE EJECUCION FISICA
PROYECTO: “CREACIÓN DEL SERVICIO DE AGUA PARA EL SISTEMA DE RIEGO EN LA COMUNIDAD DE CAPCAS, DISTRITO DE COLCABAMBA, TAYACAJA – HUANCAVELICA”.
Id Nombre de tarea Costo '19 03 feb '19 10 feb '19 17 feb '19 24 feb '19 03 mar '19 10 mar '19 17 mar '19 24 mar '19 31 mar '19 07 abr '19 14 abr '19 21 abr '19 28 abr '19 05 may '19 12 may '19 19 may '19 26 may '19 02 jun '19 09 jun '19 16 jun '19 23 jun '19 30 jun '19 07 jul '19 14 jul '19 21 jul '19 28 jul '19 04
M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D L M X J V S D
147 VALVULA DE PURGA (18.00 UNIDADES) S/.35,223.32
148 TRABAJOS PRELIMINARES S/.46.01
149 LIMPIEZA Y DESBROCE S/.14.04 17/06 21/06
150 TRAZO Y REPLANTEO S/.31.97 17/06 21/06
151 MOVIMIENTO DE TIERRAS S/.2,760.75
152 EXCAVACION MANUAL TERRENO NORMAL S/.805.03 22/06 27/06
153 NIVELACION Y COMPACTACIÓN S/.129.17 24/06 28/06
154 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)
S/.1,826.55 26/06 01/07
155 CONCRETO SIMPLE S/.27.66
156 SOLADO C:H 1:10 E=2" S/.27.66 28/06 03/07
157 CONCRETO ARMADO S/.13,971.48
158 CONCRETO F'C=175 KG/CM2 S/.5,918.24 08/07 12/07
159 ENCOFRADO Y DESENCOFRADO S/.5,267.35 06/07 12/07
160 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.2,785.89 04/07 09/07
161 REVOQUES Y ENLUCIDOS S/.2,528.06
162 TARRAJEO MEZCLA 1:5; E=1.5CM S/.2,528.06 13/07 18/07
163 PINTURA S/.487.73
164 PINTURA ANTICORROSIVA EN TAPA METALICA S/.487.73 19/07 20/07
165 SUMINISTRO E INSTALACION DE TUBERIAS DE HDPE S/.149.15
166 TUBERIA HDPE PN -100 D=90 mm. S/.149.15 19/07 20/07
167 VARIOS S/.4,206.24
168 MARCO Y TAPA METALICA LAC 2.00mm, C/MECAN. 0.85 X 1.05M S/.4,206.24 19/07 20/07
169 ACCESORIOS S/.11,046.24
170 VALVULA COMPUERTA DE BRONCE D=3" S/.4,449.60 13/07 16/07
171 NIPLE DE F° G° DE 0.10 M X 3" S/.1,189.80 13/07 16/07
172 ADAPTADOR MACHO DE HDPE 90 MM S/.2,287.44 13/07 16/07
173 UNIÓN UNIVERSAL DE PVC 3" S/.3,119.40 13/07 16/07
174 CAJA DE VALVULA DE CONTROL (17.00 UNID) S/.29,583.99
175 TRABAJOS PRELIMINARES S/.43.45
176 LIMPIEZA Y DESBROCE S/.13.26 11/03 21/03
177 TRAZO Y REPLANTEO S/.30.19 13/03 23/03
178 MOVIMIENTO DE TIERRAS S/.2,816.21
179 EXCAVACION MANUAL TERRENO NORMAL S/.874.35 13/03 18/03
180 NIVELACION Y COMPACTACIÓN S/.121.99 19/03 23/03
181 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)
S/.1,819.87 08/04 12/04
182 CONCRETO SIMPLE S/.522.44
183 SOLADO C:H 1:10 E=2" S/.522.44 25/03 29/03
184 CONCRETO ARMADO S/.13,196.06
185 CONCRETO F'C=210 KG/CM2 S/.5,590.21 04/04 10/04
186 ENCOFRADO Y DESENCOFRADO S/.4,974.72 02/04 08/04
187 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.2,631.13 30/03 05/04
188 REVOQUES Y ENLUCIDOS S/.2,387.62
189 TARRAJEO MEZCLA 1:5; E=1.5CM S/.2,387.62 11/04 17/04
190 PINTURA S/.460.71
191 PINTURA ANTICORROSIVA S/.460.71 18/04 20/04
192 INSTALACION DE ACCESORIOS S/.2,655.57
193 TAPA METALICA DE 0.85m X1.05m CON PLANCHA ESTRIADA DE 1/8" INC/MARCOS/.2,655.57 18/04 20/04
194 ACCESORIOS S/.7,501.93
195 VALVULA COMPUERTA DE BRONCE Ø=3" S/.1,873.57 11/04 13/04
196 UNIÓN UNIVERSAL DE PVC 3" S/.1,291.66 11/04 13/04
197 ADAPTADOR MACHO DE HDPE 90MM S/.2,769.64 11/04 13/04
198 NIPLE DE F° G° DE 0.15 M X 3" S/.1,567.06 11/04 13/04
199 CRUCE AEREOS S/.21,532.88
200 TRABAJOS PRELIMINARES S/.17.13
201 LIMPIEZA Y DESBROCE S/.5.23 01/04 01/04
202 TRAZO Y REPLANTEO S/.11.90 01/04 01/04
203 MOVIMIENTO DE TIERRAS S/.752.23
204 EXCAVACION MANUAL TERRENO NORMAL S/.395.81 02/04 02/04
205 NIVELACION Y COMPACTACIÓN S/.27.74 03/04 03/04
206 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)
S/.328.68 23/04 23/04
207 CONCRETO SIMPLE S/.1,672.19
208 SOLADO C:H 1:10 E=4" S/.165.02 03/04 03/04
209 CONCRETO Fc=175 Kg/cm2 EN CAMARA DE ANCLAJE S/.952.71 11/04 12/04
210 ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE S/.554.46 11/04 12/04
211 CONCRETO ARMADO S/.3,422.43
212 ZAPATAS S/.1,606.96
213 CONCRETO F'C=210 KG/CM2 S/.1,312.13 06/04 08/04
214 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.294.83 04/04 05/04
215 COLUMNAS S/.1,815.47
216 CONCRETO F'C=210 KG/CM2 S/.473.82 09/04 10/04
217 ENCOFRADO Y DESENCOFRADO S/.650.72 06/04 08/04
218 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.690.93 04/04 05/04
219 REVOQUES Y ENLUCIDOS S/.312.31
220 TARRAJEO MEZCLA 1:5; E=1.5CM S/.312.31 11/04 12/04
221 PINTURA S/.195.09
222 PINTURA ESMALTE EN MUROS EXTERIORES S/.195.09 13/04 15/04
223 ACCESORIOS VARIOS S/.15,161.50
224 PLATINA EN U 0.12X0.25X3/16" S/.1,425.44 15/04 17/04
225 VARILLA DE ANCLAJE DE AºGº de 1" x2.40 m S/.1,591.84 15/04 17/04
226 TENSOR OJO GANCHO D=16 mm x 254 mm S/.1,825.28 15/04 17/04
227 CABLE PRINCIPAL DE ACERO TIPO BOA DE Ø = 1" S/.1,757.14 15/04 17/04
228 PENDOLAS DE ACERO LISO Ø = 3/8" S/.6,067.57 15/04 17/04
229 ABRAZADERA PARA TUBO SEGUN DISEÑO Ø = 4" APROX. INC. ACCESORIOS S/.394.16 15/04 17/04
230 GRILLETES DE ACERO EN U DE Ø 1" S/.2,049.32 15/04 17/04
231 ACERO LISO Ø = 1" EN CAMARA DE ANCLAJE S/.50.75 15/04 17/04
232 CAMARA ROMPE PRESION S/.103,957.00
233 TRABAJOS PRELIMINARES S/.125.24
234 LIMPIEZA Y DESBROCE S/.38.22 01/05 17/05
235 TRAZO Y REPLANTEO S/.87.02 03/05 20/05
236 MOVIMIENTO DE TIERRAS S/.3,812.40
237 EXCAVACION MANUAL TERRENO NORMAL S/.1,972.33 03/05 20/05
238 NIVELACION Y COMPACTACIÓN S/.202.86 04/05 22/05
239 ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)
S/.1,637.21 29/05 30/05
240 CONCRETO SIMPLE S/.2,495.44
241 SOLADO C:H 1:10 E=2" S/.2,495.44 08/05 24/05
242 CONCRETO ARMADO S/.51,971.50
243 CONCRETO F'C=210 KG/CM2 S/.23,841.55 20/05 05/06
244 ENCOFRADO Y DESENCOFRADO S/.20,699.75 16/05 01/06
245 ACERO DE REFUERZO Fy'=4200kg/cm2 S/.7,430.20 13/05 29/05
246 REVOQUES Y ENLUCIDOS S/.13,332.90
247 TARRAJEO CON IMPERMEABILIZANTE S/.9,161.04 06/06 22/06
248 TARRAJEO MEZCLA 1:5; E=1.5CM S/.4,171.86 08/06 26/06
249 CARPINTERIA METALICA S/.6,560.82
250 MARCO Y TAPA METALICA DE 0.75m X0.55m CON PLANCHA ESTRIADA DE 1/8"S/.6,560.82 06/06 22/06
251 PINTURA S/.2,606.06
252 PINTURA ESMALTE EN MUROS EXTERIORES S/.2,606.06 26/06 13/07
253 SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS S/.23,052.64
254 SUMINISTRO E INST. DE ACCESORIOS PARA CRP-T7 PARA TUBERIA DE 90 mm.
S/.20,170.40 06/06 22/06
255 SUMINISTRO E INST. DE ACCESORIOS PARA CRP-T7 PARA TUBERIA DD 110 mm.S/.2,882.24 06/06 22/06
256 FLETE TRASLADO DE MATERIALES HASTA CAPCAS S/.105,280.38
257 FLETE TERRESTRE LOCAL S/.57,748.69
258 FLETE TERRESTRE HASTA CAPCAS S/.24,948.69 01/02 04/02
259 FLETE TERRESTRE DE AGREGADOS S/.32,800.00 04/02 28/02
260 FLETE TERRESTRE RURAL S/.47,531.69
261 TRASLADO DE MATERIALES DESDE EL ALMACEN HASTA EL LUGAR DE TRABAJO S/.47,531.69 11/02 01/07
262 SEGURIDAD Y SALUD S/.13,000.00
263 EQUIPO DE PROTECCION INDIVIDUAL S/.8,500.00 01/02 28/02
264 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD SALUD DURANTE S/.4,500.00 01/02
EL TRABAJO 28/02
265 MITIGACION DE IMPACTO AMBIENTA S/.68,506.08
266 PLAN DE PARTICIPACION CIUDADANA S/.12,879.70 01/02 11/02
267 MEDIDAS DE MITIGACION S/.18,727.78 01/02 11/02
268 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS S/.22,278.40 01/02 11/02
269 PROGRAMA DE SEGUIMIENTO Y CONTROL S/.3,759.48 01/02 11/02
270 PLAN DE CONTINGENCIA S/.4,734.16 01/02 11/02
271 PLAN DE CIERRE O ABANDONO S/.6,126.56 01/02 11/02
272 CAPACITACION EN GESTION Y ORGANIZACION DE L AGUA PARA RIEGO S/.43,860.60
273 CONFORMACION DE LA JUNTA DE REGANTES S/.6,962.00 29/07 31/07
274 CAPACITACION EN FUNCIONES DE LA JUNTA DE REGANTES S/.3,481.00 29/07 31/07
275 CAPACITACION EN DERECHOS Y OBLIGACIONES DE LOS USUARIOS S/.9,746.80 29/07 31/07
276 ELABORACION DE PLAN DE OPERACION Y MANTENIMIENTO S/.6,962.00 29/07 31/07
277 CAPACITACION SOBRE LOS TEMAS DE OPERACION Y MANTENIMIENTO S/.4,873.40 29/07 31/07
278 ENTRENAMIENTO EN CAMPO PARA LA EJECUCION DE LAS ACTIVIDADES A IMPLEMENTARS/.4,873.40 29/07 31/07
279 ELABORACION DE PLAN DE SIEMBRA Y PLAN DE RIEGO S/.6,962.00 29/07 31/07
280 CAPACIDADES PRODUCTIVAS Y ADECUADOS METODOS DE RIEGO S/.17,405.00
281 COMPONENTES DE UN SISTEMA DE RIEGO S/.3,481.00 29/07 31/07
282 RIEGO PARCELARIO S/.6,962.00 29/07 31/07
283 MANEJO AGRONOMICO DE CULTIVOSRIEGO PARCELARIO S/.3,481.00 29/07 31/07
284 MANEJO DE RECURSOS HIDRICOS S/.3,481.00 29/07 31/07
285 GASTOS GENERALES (G. Variables, Gastos fijos) S/.114,546.80
286 UTILIDAD 7% S/.98,723.49
287 IGV 18% S/.292,249.04
288 GASTOS DE SUPERVISION S/.73,500.00
289 ESTUDIO DEFINITIVO S/.68,000.00

Proyecto: CRONOGRAMA FISICO Tarea Tarea crítica Progreso Hito Resumen Tarea resumida Tarea crítica resumida Hito resumido Progreso resumido División Tareas externas Resumen del proyecto Agrupar por síntesis Fecha límite