18.50
A
4.00 6.00 4.00 4.50
C12 C13
5.50 B
B
ELEVACIÓN
C9 C10 C11
6.00
21.75
C6 C7 C8
C
5.25
C5
C3 C4
5.00
C1 C2
PROYECTO DE PREDIMENSIONAMIENTO
PROYECTO:
LAMINA
UCV INGENIERO:
AREVALO VIDAL, SAMIR 20-09-2022
FECHA: E-1
18.50
A
4.00 6.00 4.00 4.50
C12 C13
5.50
A = 17,8750 A = 8,25
B
B
ELEVACIÓN
C9 C10 C11
A = 18,7656 A = 26,0000 A = 13,7743
6.00
21.75
C6 C7
A = 15,3334
C8
C
A = 28,5410 A = 34,1960
5.25
A = 12,6337
C5
C3 C4
A = 19,2516 A = 28,2500
5.00
A = 12,5000 A = 12,5000
C1 C2
PROYECTO:
AREAS TRIBUTARIAS LAMINA
UCV INGENIERO:
AREVALO VIDAL, SAMIR
FECHA:
20-09-2022 E-2
18.50
A
4.00 6.00 4.00 4.50
C12 C13
5.5012
5.50
5.9213 A = 17,8750 A = 8,25
4.9449
B
8.5326
3.5778
ELEVACIÓN
C9 C10 C11
A = 18,7656 A = 26,0000 A = 13,7743
6.00 6.5786
5.3878
6.7758
7.5415
5.2558
21.75
C6 C7
A = 15,3334
C8
C
A = 28,5410 A = 34,1960
6.1053
5.25 4.7360
6.1811
A = 12,6337
8.9134
C5
C3 C4 3.5778
A = 19,2516 A = 28,2500
A = 12,5000 A = 12,5000
C1 C2
9.3000
PREDIMENSIONAMIENTO DE VIGAS
PROYECTO:
LAMINA
UCV INGENIERO:
AREVALO VIDAL, SAMIR 20-09-2022
FECHA: E-3
PREDIMENSIONAMIENTO DE COLUMNAS
C2
C3
C4
Columnas Centradas =
0.45
Columnas Excentricas y
=
Esquinadas 0.35
= ∗ ∗
Factor de
cumplimiento
PREDIMENSIONAMIENTO DE VIGAS
b RELACIONES DE PREDIMENSIONAMIENTO
d
R.N.E EN LA PRACTICA
ℎ = /10 a ℎ = /16 ℎ = /10
b b = ℎ/2 a b = ℎ/3 b = ℎ/2
a Seccion transversal Ancho minimo bmin=25cm
Seccion Transversal
VIGAS
Descripción L(m) H(m) B(m) H(real) B(real) B/H Condicion
C1 - C2 9.300 0.9300 0.475 0.95 0.50 0.5263 Ok!!!
C3 - C4 8.910 0.8910 0.450 0.90 0.45 0.5000 Ok!!!
C4 - C5 3.580 0.3580 0.200 0.40 0.20 0.5000 Ok!!!
C6 - C7 5.260 0.5260 0.275 0.55 0.30 0.5455 Ok!!!
C9 - C10 8.530 0.8530 0.450 0.90 0.45 0.5000 Ok!!!
C10 - C11 3.580 0.3580 0.200 0.40 0.20 0.5000 Ok!!!
C12 - C13 5.500 0.5500 0.275 0.55 0.30 0.5455 Ok!!!
C13 - C10 4.950 0.4950 0.250 0.50 0.25 0.5000 Ok!!!
C10 - C7 5.400 0.5400 0.275 0.55 0.30 0.5455 Ok!!!
C7 - C4 4.740 0.4740 0.250 0.50 0.25 0.5000 Ok!!!
C4 - C2 4.510 0.4510 0.250 0.50 0.25 0.5000 Ok!!!
C3 - C1 4.460 0.4460 0.225 0.45 0.25 0.5556 Ok!!!
C12 - C9 6.000 0.6000 0.300 0.60 0.30 0.5000 Ok!!!
C9 - C6 6.580 0.6580 0.350 0.70 0.35 0.5000 Ok!!!
C6 - C3 6.110 0.6110 0.325 0.65 0.35 0.5385 Ok!!!
C11 - C8 6.800 0.6800 0.350 0.70 0.35 0.5000 Ok!!!
C8 - C5 6.200 0.6200 0.325 0.65 0.35 0.5385 Ok!!!
PREDIMENSIONAMIENTO DE LOZAS
Losa Maciza L/30 Losa Aligerada L/25
Sector Luz Altura de losa (m) Sector Luz Altura losa (m)
A1 5.750 0.192 A1 5.270 0.250
A2 5.000 0.167 A2 5.000 0.200
B1 5.125 0.171 B1 5.125 0.205
B2 4.625 0.154 B2 4.625 0.230
C1 5.750 0.192 C1 5.750 0.230
C2 5.000 0.167 C2 5.000 0.200