PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN,
DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
AGOSTO 2020 SETIEMBRE 2020 OCTUBRE 2020 NOCIEMBRE 2020 DICIEMBRE 2020
DESCRIPCIÓN AVANCE DE OBRA
01 31 01 30 01 31 01 30 01 15
TOTAL COSTO DIRECTO DE OBRA (CD) S/. 536,858.52 S/. 133,281.84 S/. 759,322.64 S/. 823,571.89 S/. 682,243.08 S/. 189,494.26
% AVANCE DE MES 17.18% 4.27% 24.30% 26.36% 21.83% 6.06%
% AVANCE ACUMULADO MENSUAL 17.18% 21.45% 45.75% 72.10% 93.94% 100.00%
GASTOS GENERALES 9.21% S/. 49,421.34 S/. 12,269.47 S/. 69,900.62 S/. 75,815.18 S/. 62,804.94 S/. 17,444.19
UTILIDAD 9.00% S/. 48,317.27 S/. 11,995.37 S/. 68,339.04 S/. 74,121.47 S/. 61,401.88 S/. 17,054.48
SUBTOTAL S/. 634,597.13 S/. 157,546.67 S/. 897,562.29 S/. 973,508.54 S/. 806,449.90 S/. 223,992.93
IGV (18%) S/. 114,227.48 S/. 28,358.40 S/. 161,561.21 S/. 175,231.54 S/. 145,160.98 S/. 40,318.73
TOTAL MENSUAL S/. 748,824.61 S/. 185,905.07 S/. 1,059,123.50 S/. 1,148,740.08 S/. 951,610.88 S/. 264,311.66
90%
80%
70%
% DE AVANCE
60%
50%
40%
30%
20%
10%
0%
1 2 3 4 5 6 7
EXAMEN DE VALORIZACIONES
PRECIO BASE DEL PROYECTO: AGOSTO 2018, YA ESTAN COLOCADOS LOS INDICES DE AGOSTO 2018, SOLO
1.00 COLOCAR LOS INDICES DE CADA VALORIZACION, AREA GEOGRAFICA 2 (ICA)
2.00 REALIZAR VALORIZACION 01 - MES DE FEB 2019 (INDICES UNIFICADOS ASUMIDOS A ENERO 2019)
3.00 REALIZAR VALORIZACION 02 - MES DE MARZO 2019 (INDICES UNIFICADOS ASUMIDOS A FEBRERO 2019)
4.00 REALIZAR VALORIZACION 03 - MES DE ABRIL 2019 (INDICES UNIFICADOS ASUMIDOS A MARZO 2019)
5.00 REALIZAR VALORIZACION 04 - MES DE MAYO 2019 (INDICES UNIFICADOS ASUMIDOS A ABRIL 2019)
6.00 SE RECIBIO ADELANTO DIRECTO DE 10% PARA INICIO DE OBRA - APLICAR AMORTIZACION
7.00 NO SE REALIZO ADELANTO DE MATERIALES
8.00 NO SE REALIZO NINGUN ADICIONAL
EXAMEN DE VALORIZACIONES
COLOCAR DATOS
COLOCAR DATOS
OYECTO: AGOSTO 2018, YA ESTAN COLOCADOS LOS INDICES DE AGOSTO 2018, SOLO
S DE CADA VALORIZACION, AREA GEOGRAFICA 2 (ICA)
ION 01 - MES DE FEB 2019 (INDICES UNIFICADOS ASUMIDOS A ENERO 2019)
ION 02 - MES DE MARZO 2019 (INDICES UNIFICADOS ASUMIDOS A FEBRERO 2019)
ION 03 - MES DE ABRIL 2019 (INDICES UNIFICADOS ASUMIDOS A MARZO 2019)
ION 04 - MES DE MAYO 2019 (INDICES UNIFICADOS ASUMIDOS A ABRIL 2019)
O DIRECTO DE 10% PARA INICIO DE OBRA - APLICAR AMORTIZACION
ANTO DE MATERIALES
UN ADICIONAL
CURVA "S"
PROGRAMADO VS EJECUTADO
MEJORAMIENTO, AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO IN-
TEGRAL DE LA I.E. N° 22273 Y DE LA I.E. N° 320 – CHAVIN, DISTRITO DE CHAVIN
100.00% – PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA100.00%
Avance Programado Avance Ejecutado
90.00%
83.42%
80.00%
70.00%
60.00% 59.44%
50.00%
42.02%
40.00%
26.70%
30.00%
20.00% 11.40%
10.00% 10.72%
0.00%
10.72% 10.72% 10.72% 10.72% 10.72%
0.00% 0.00%
- del 01/02/19 al del 01/03/19 al del 01/04/19 al del 01/05/19 al del 01/06/19 al del 01/07/19 al
28/02/19 31/03/19 30/04/19 31/05/19 30/06/19 30/07/19
CRONOGRAMA REPROGRAMADO - CONTRACTUAL GORE
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E.
Nº 320 – CHAVIN, DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
FEBRERO 2019 MARZO 2019 ABRIL 2019 MAYO 2019 JUNIO 2019 JULIO 2019
DESCRIPCIÓN
01 28 01 31 01 30 01 31 01 30 01 30
TOTAL COSTO DIRECTO DE OBRA (CD) S/. 81,114.73 S/. 108,864.51 S/. 109,006.81 S/. 123,949.00 S/. 170,625.55 S/. 117,972.13
% AVANCE DE MES 11.40% 15.30% 15.32% 17.42% 23.98% 16.58%
% AVANCE ACUMULADO MENSUAL 11.40% 26.70% 42.02% 59.44% 83.42% 100.00%
GASTOS GENERALES 22.00% S/. 17,845.24 S/. 23,950.19 S/. 23,981.50 S/. 27,268.78 S/. 37,537.62 S/. 25,953.87
UTILIDAD 10.00% S/. 8,111.47 S/. 10,886.45 S/. 10,900.68 S/. 12,394.90 S/. 17,062.55 S/. 11,797.21
SUBTOTAL S/. 107,071.44 S/. 143,701.15 S/. 143,888.99 S/. 163,612.68 S/. 225,225.72 S/. 155,723.21
IGV (18%) S/. 19,272.86 S/. 25,866.21 S/. 25,900.02 S/. 29,450.28 S/. 40,540.63 S/. 28,030.18
TOTAL MENSUAL S/. 126,344.30 S/. 169,567.35 S/. 169,789.01 S/. 193,062.96 S/. 265,766.35 S/. 183,753.38
90%
83.42%
80%
70%
% DE AVANCE
60% 59.44%
50%
40% 42.02%
30%
26.70%
20%
10% 11.40%
0% 0%
1 2 3 4 5 6 7
CRONOGRAMA EJECUTADO - CONTRACTUAL GORE
PROYECTO: "MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E.
Nº 320 – CHAVIN, DISTRITO CHAVIN – PROVINCIA CHINCHA – ICA"
FEBRERO 2019 MARZO 2019 ABRIL 2019 MAYO 2019 JUNIO 2019 JULIO 2019
DESCRIPCIÓN
01 28 01 31 01 30 01 31 01 30 01 30
TOTAL COSTO DIRECTO DE OBRA (CD) S/. 76,257.28 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
% AVANCE DE MES 10.72% 0.00% 0.00% 0.00% 0.00% 0.00%
% AVANCE ACUMULADO MENSUAL 10.72% 10.72% 10.72% 10.72% 10.72% 10.72%
GASTOS GENERALES 22.00% S/. 16,776.60 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
UTILIDAD 10.00% S/. 7,625.73 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
SUBTOTAL S/. 100,659.61 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
IGV (18%) S/. 18,118.73 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
TOTAL MENSUAL S/. 118,778.34 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
90%
80%
70%
% DE AVANCE
60%
50%
40%
30%
20%
0% 0%
1 2 3 4 5 6 7
RESUMEN DE AVANCE DE EJECUCIÓN
PROGRAMADO EJECUTADO
VALORIZACION PERIODO
ACUMULADO ACUMULADO
INICIO - 0.00% 0.00%
VAL 01 del 01/02/19 al 28/02/19 11.40% 10.72%
VAL 02 del 01/03/19 al 31/03/19 26.70% 10.72%
VAL 03 del 01/04/19 al 30/04/19 42.02% 10.72%
VAL 04 del 01/05/19 al 31/05/19 59.44% 10.72%
VAL 05 del 01/06/19 al 30/06/19 83.42% 10.72%
VAL 06 del 01/07/19 al 30/07/19 100.00% 10.72%
OBRA : MEJORAMIENTO, AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. N° 22273 Y DE LA I.E. N° 320 – CHAVIN, DISTRITO DE CHAVIN – PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA
ENTIDAD : GOBIERNO REGIONAL DE ICA
SUPERVISIÓN : CONSORCIO SUPERVISION CHINCHA
CONTRATISTA : PARADIZO S.R.L.
PLAZO : 180 DIAS CALENDARIOS
MODALIDAD : A SUMA ALZADA
PLANILLA DE VALORIZACION N° 06
01/10/2018 AL 31/10/2018
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 8
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
02.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 17.76 53.08 942.70 17.76 942.70 100.00% 0.00 0.00 0.00% 17.76 942.70 100.00% 0.00 0.00 0.00%
02.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS kg 240.44 4.18 1,005.04 240.44 1,005.04 100.00% 0.00 0.00 0.00% 240.44 1,005.04 100.00% 0.00 0.00 0.00%
02.02 ARQUITECTURA 119,572.63
02.02.01 ALBAÑILERIA 6,173.76
02.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARE m2 111.48 55.38 6,173.76 111.48 6,173.76 100.00% 0.00 0.00 0.00% 111.48 6,173.76 100.00% 0.00 0.00 0.00%
02.02.02 REVOQUES 16,085.43
02.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 m2 140.42 26.62 3,737.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 140.42 3,737.98 100.00%
02.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 m2 93.80 26.62 2,496.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 93.80 2,496.96 100.00%
02.02.02.03 TARRAJEO DE COLUMNAS Y PLACAS C:A-1:4 m2 139.00 28.80 4,003.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 139.00 4,003.20 100.00%
02.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS Y PLACAS m 245.20 3.45 845.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 245.20 845.94 100.00%
02.02.02.05 TARRAJEO DE VIGAS C:A-1:4 m2 98.14 31.39 3,080.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 98.14 3,080.61 100.00%
02.02.02.06 VESTIDURA DE ARISTAS EN VIGAS m 99.44 3.45 343.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 99.44 343.07 100.00%
02.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1 m 64.80 13.60 881.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.80 881.28 100.00%
02.02.02.08 BRUÑAS DE 1.0 cm m 74.72 9.32 696.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 74.72 696.39 100.00%
02.02.03 PISOS Y PAVIMENTOS 10,893.71
02.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 m2 118.50 35.38 4,192.53 118.50 4,192.53 100.00% 0.00 0.00 0.00% 118.50 4,192.53 100.00% 0.00 0.00 0.00%
02.02.03.02 PISO DE CERAMICO 45 X 45 CM m2 118.50 56.55 6,701.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 118.50 6,701.18 100.00%
02.02.04 CONTRAZOCALOS 5,499.22
02.02.04.01 CONTRAZOCALO CERAMICO H=0.10 m. m 77.10 19.27 1,485.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 77.10 1,485.72 100.00%
02.02.04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 96.80 15.40 1,490.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 96.80 1,490.72 100.00%
02.02.04.03 ZOCALO DE CERAMICA 20 X 30 CM m2 27.15 92.92 2,522.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.15 2,522.78 100.00%
02.02.05 CARPINTERIA MADERA 3,658.71
02.02.05.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 5.72 496.22 2,838.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.72 2,838.38 100.00%
02.02.05.02 PUERTA CONTRAPLACADA SEGUN DISEÑO m2 2.34 350.57 820.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.34 820.33 100.00%
02.02.06 CARPINTERIA METALICA 7,302.36
02.02.06.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 37.84 192.98 7,302.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.84 7,302.36 100.00%
02.02.07 CERRAJERIA 245.96
02.02.07.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 2.00 77.93 155.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 155.86 100.00%
02.02.07.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 10.00 9.01 90.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 90.10 100.00%
02.02.08 VIDRIOS, CRISTALES Y SIMILARES 5,262.45
02.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 407.31 12.92 5,262.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 407.31 5,262.45 100.00%
02.02.09 PINTURAS 4,843.26
02.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 222.96 10.57 2,356.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 222.96 2,356.69 100.00%
02.02.09.02 PINTURA EN CONTRAZOCALO m2 9.68 7.96 77.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.68 77.05 100.00%
02.02.09.03 PINTURA EN VIGAS m2 98.14 13.73 1,347.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 98.14 1,347.46 100.00%
02.02.09.04 PINTURA EN COLUMNAS Y PLACAS m2 80.52 13.19 1,062.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 80.52 1,062.06 100.00%
02.02.10 CUBIERTA METALICA Y CIELO RASO 59,607.77
02.02.10.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOS m2 190.30 122.00 23,216.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 190.30 23,216.60 100.00%
02.02.10.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPOR m 183.00 75.18 13,757.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 183.00 13,757.94 100.00%
02.02.10.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 194.11 116.60 22,633.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 194.11 22,633.23 100.00%
02.03 INSTALACIONES ELECTRICAS 14,806.77
02.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 25.00 145.99 3,649.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.00 3,649.75 100.00%
02.03.02 SALIDA TOMACORRIENTE pto 8.00 215.17 1,721.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 1,721.36 100.00%
02.03.03 SALIDA TOMACORRIENTE A PRUEBA DE AGUA pto 2.00 219.38 438.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 438.76 100.00%
02.03.04 SALIDA PARA INTERRUPTOR SIMPLE pto 5.00 108.23 541.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 541.15 100.00%
02.03.05 SALIDA PARA INTERRUPTOR TRIPLE pto 2.00 114.38 228.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 228.76 100.00%
02.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/E und 22.00 205.71 4,525.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.00 4,525.62 100.00%
02.03.07 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIR und 3.00 68.59 205.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 205.77 100.00%
02.03.08 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 136.56 10.81 1,476.21 90.00 972.90 65.91% 0.00 0.00 0.00% 90.00 972.90 65.91% 46.56 503.31 34.09%
02.03.09 ALAMBRE THHN 2.5 mm2 m 264.68 1.67 442.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 264.68 442.02 100.00%
02.03.10 ALAMBRE THHN 4 mm2 m 106.00 2.19 232.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 106.00 232.14 100.00%
02.03.11 TABLERO DE DISTRIBUCION und 1.00 439.49 439.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 439.49 100.00%
02.03.12 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
02.03.13 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
02.04 INSTALACIONES SANITARIAS 6,713.37
02.04.01 APARATOS Y ACCESORIOS SANITARIOS 1,193.88
02.04.01.01 INODORO TANQUE BAJO pza 2.00 361.79 723.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 723.58 100.00%
02.04.01.02 LAVATORIO DE LOZA BLANCA und 2.00 195.88 391.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 391.76 100.00%
02.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" und 2.00 39.27 78.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 78.54 100.00%
02.04.02 SISTEMA DE DESAGUE 2,066.22
02.04.02.01 SALIDA DE DESAGUE PVC D=2" pto 2.00 93.15 186.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 186.30 100.00%
Página 9
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
02.04.02.02 SALIDA DE DESAGUE PVC D=4" pto 2.00 145.54 291.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 291.08 100.00%
02.04.02.03 SALIDA VENTILACION DE 2" pto 2.00 58.08 116.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 116.16 100.00%
02.04.02.04 REGISTRO DE BRONCE 4" und 1.00 285.99 285.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 285.99 100.00%
02.04.02.05 SUMIDERO DE 2" pza 1.00 77.41 77.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 77.41 100.00%
02.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" m 10.00 33.95 339.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 339.50 100.00%
02.04.02.07 YEE PVC SAL 4"X2" und 3.00 61.97 185.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 185.91 100.00%
02.04.02.08 CODO PVC SAL P/DESAGUE D=2" und 2.00 25.81 51.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 51.62 100.00%
02.04.02.09 EXCAVACION MANUAL PARA TUBERIA m 10.00 14.89 148.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 148.90 100.00%
02.04.02.10 REFINE NIVELACION Y COMPACTACION DE ZANJA m 10.00 3.86 38.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 38.60 100.00%
02.04.02.11 CAMA DE APOYO m 10.00 9.44 94.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 94.40 100.00%
02.04.02.12 RELLENO COMPACTADO DE ZANJAS m 10.00 12.00 120.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 120.00 100.00%
02.04.02.13 CAJA DE REGISTRO CON REJILLA METALICA und 1.00 130.35 130.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 130.35 100.00%
02.04.03 SISTEMA DE AGUA FRIA 955.73
02.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" pto 4.00 72.84 291.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 291.36 100.00%
02.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" m 8.05 17.01 136.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.05 136.93 100.00%
02.04.03.03 CODO PVC 1/2" und 1.00 9.94 9.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 9.94 100.00%
02.04.03.04 TEE PVC 1/2" und 3.00 11.04 33.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 33.12 100.00%
02.04.03.05 EXCAVACION MANUAL PARA TUBERIA m 7.05 14.89 104.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.05 104.97 100.00%
02.04.03.06 REFINE NIVELACION Y COMPACTACION DE ZANJA m 7.05 3.86 27.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.05 27.21 100.00%
02.04.03.07 CAMA DE APOYO m 7.05 9.44 66.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.05 66.55 100.00%
02.04.03.08 RELLENO COMPACTADO DE ZANJAS m 7.05 12.00 84.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.05 84.60 100.00%
02.04.03.09 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE und 1.00 70.70 70.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 70.70 100.00%
02.04.03.10 CAJA PARA VALVULAS und 1.00 130.35 130.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 130.35 100.00%
02.04.04 SISTEMA DE AGUA PLUVIAL 2,497.54
02.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" m 36.60 58.77 2,150.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.60 2,150.98 100.00%
02.04.04.02 TUBERIA PVC SAL D=4" m 6.00 45.40 272.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 272.40 100.00%
02.04.04.03 CODO PVC SAL D=4" und 2.00 37.08 74.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 74.16 100.00%
03 SECTOR SECUNDARIA 373,415.79
03.01 ESTRUCTURAS 157,033.01
03.01.01 OBRAS PRELIMINARES 311.88
03.01.01.01 LIMPIEZA DE TERRENO m2 115.94 0.95 110.14 115.94 110.14 100.00% 0.00 0.00 0.00% 115.94 110.14 100.00% 0.00 0.00 0.00%
03.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 115.94 1.74 201.74 115.94 201.74 100.00% 0.00 0.00 0.00% 115.94 201.74 100.00% 0.00 0.00 0.00%
03.01.02 MOVIMIENTO DE TIERRAS 11,127.55
03.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 20.92 41.41 866.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.92 866.30 100.00%
03.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS m3 85.68 41.41 3,548.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 85.68 3,548.01 100.00%
03.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS m2 105.00 2.48 260.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 105.00 260.40 100.00%
03.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 55.88 27.36 1,528.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 55.88 1,528.88 100.00%
03.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 19.69 197.01 3,879.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.69 3,879.13 100.00%
03.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 12 m3 65.92 15.85 1,044.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 65.92 1,044.83 100.00%
03.01.03 OBRAS DE CONCRETO SIMPLE 12,111.33
03.01.03.01 SOLADO PARA ZAPATAS m2 65.83 35.13 2,312.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 65.83 2,312.61 100.00%
03.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 3 m3 5.72 333.17 1,905.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.72 1,905.73 100.00%
03.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M m3 3.70 387.67 1,434.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.70 1,434.38 100.00%
03.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 49.28 46.45 2,289.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.28 2,289.06 100.00%
03.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM m2 105.00 39.71 4,169.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 105.00 4,169.55 100.00%
03.01.04 OBRAS DE CONCRETO ARMADO 133,482.25
03.01.04.01 ZAPATAS 20,484.56
03.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 m3 35.51 449.81 15,972.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.51 15,972.75 100.00%
03.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 kg 1,079.38 4.18 4,511.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,079.38 4,511.81 100.00%
03.01.04.02 VIGA DE CIMENTACION 12,509.61
03.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 m3 8.59 449.81 3,863.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.59 3,863.87 100.00%
03.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACI m2 68.75 51.41 3,534.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 68.75 3,534.44 100.00%
03.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION kg 1,222.80 4.18 5,111.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,222.80 5,111.30 100.00%
03.01.04.03 COLUMNAS Y PLACAS 47,206.14
03.01.04.03.01 CONCRETO COLUMNAS Y PLACAS f'c=210 kg/cm2 m3 27.42 449.81 12,333.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.42 12,333.79 100.00%
03.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y PLACAS m2 281.66 53.08 14,950.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 281.66 14,950.51 100.00%
03.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS Y PLACA kg 4,765.99 4.18 19,921.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4,765.99 19,921.84 100.00%
03.01.04.04 VIGAS 27,967.41
03.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 16.99 449.81 7,642.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.99 7,642.27 100.00%
03.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 163.64 62.13 10,166.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 163.64 10,166.95 100.00%
03.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 kg 2,430.19 4.18 10,158.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,430.19 10,158.19 100.00%
Página 10
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 11
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
03.03.08 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 218.62 10.81 2,363.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 218.62 2,363.28 100.00%
03.03.09 ALAMBRE THHN 2.5 mm2 m 324.68 1.67 542.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 324.68 542.22 100.00%
03.03.10 ALAMBRE THHN 4 mm2 m 131.32 2.19 287.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 131.32 287.59 100.00%
03.03.11 TABLERO DE DISTRIBUCION und 1.00 469.91 469.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 469.91 100.00%
03.03.12 SUBTABLERO DE DISTRIBUCION und 1.00 439.49 439.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 439.49 100.00%
03.03.13 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
03.03.14 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
03.04 INSTALACIONES SANITARIAS 2,809.47
03.04.01 SISTEMA DE AGUA PLUVIAL 2,809.47
03.04.01.01 CANALETA PARA AGUA FLUVIAL DE 4" m 36.50 58.77 2,145.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.50 2,145.11 100.00%
03.04.01.02 TUBERIA PVC SAL D=4" m 13.00 45.40 590.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.00 590.20 100.00%
03.04.01.03 CODO PVC SAL D=4" und 2.00 37.08 74.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 74.16 100.00%
03.05 CONSTRUCCION DE ESCALERAS 24,897.01
03.05.01 OBRAS PRELIMINARES 48.31
03.05.01.01 LIMPIEZA DE TERRENO m2 17.96 0.95 17.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.96 17.06 100.00%
03.05.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 17.96 1.74 31.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.96 31.25 100.00%
03.05.02 MOVIMIENTO DE TIERRAS 1,179.42
03.05.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 13.85 41.41 573.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.85 573.53 100.00%
03.05.02.02 NIVELACION Y APISONADO MANUAL PARA PISOS m2 14.13 2.48 35.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 35.04 100.00%
03.05.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.54 27.36 96.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.54 96.85 100.00%
03.05.02.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 1.41 197.01 277.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.41 277.78 100.00%
03.05.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 12 m3 12.38 15.85 196.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.38 196.22 100.00%
03.05.03 OBRAS DE CONCRETO SIMPLE 3,851.27
03.05.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 3 m3 5.33 333.17 1,775.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.33 1,775.80 100.00%
03.05.03.02 SOBRECIMIENTO 1:8 + 25% P.M m3 1.74 387.67 674.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.74 674.55 100.00%
03.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 18.08 46.45 839.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.08 839.82 100.00%
03.05.03.04 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM m2 14.13 39.71 561.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 561.10 100.00%
03.05.04 OBRAS DE CONCRETO ARMADO 11,546.69
03.05.04.01 VIGA DE CIMENTACION 2,645.43
03.05.04.01.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 m3 2.00 449.81 899.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 899.62 100.00%
03.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACI m2 20.02 51.41 1,029.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.02 1,029.23 100.00%
03.05.04.01.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION kg 171.43 4.18 716.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 171.43 716.58 100.00%
03.05.04.02 COLUMNAS 2,896.60
03.05.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 1.67 449.81 751.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.67 751.18 100.00%
03.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 15.07 53.08 799.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.07 799.92 100.00%
03.05.04.02.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS kg 321.89 4.18 1,345.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 321.89 1,345.50 100.00%
03.05.04.03 VIGAS 2,222.94
03.05.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 1.66 449.81 746.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.66 746.68 100.00%
03.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 12.90 62.13 801.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.90 801.48 100.00%
03.05.04.03.03 VIGAS ACERO fy=4,200 kg/cm2 kg 161.43 4.18 674.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 161.43 674.78 100.00%
03.05.04.04 ESCALERAS 2,484.68
03.05.04.04.01 ESCALERAS CONCRETO FC=210 KG/CM2 m3 1.89 449.81 850.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.89 850.14 100.00%
03.05.04.04.02 ESCALERA ENCOFRADO Y DESENCOFRADO m2 11.19 60.97 682.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.19 682.25 100.00%
03.05.04.04.03 ESCALERA ACERO fy=4,200 kg/cm2 kg 227.82 4.18 952.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 227.82 952.29 100.00%
03.05.04.05 LOSA MACIZA 1,297.04
03.05.04.05.01 LOSA MACIZA CONCRETO FC=210 KG/CM2 m3 0.77 449.81 346.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.77 346.35 100.00%
03.05.04.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA m2 5.15 54.29 279.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.15 279.59 100.00%
03.05.04.05.03 LOSA MACIZA ACERO fy=4,200 kg/cm2 kg 160.55 4.18 671.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 160.55 671.10 100.00%
03.05.05 ALBAÑILERIA 1,616.54
03.05.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARE m2 29.19 55.38 1,616.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.19 1,616.54 100.00%
03.05.06 REVOQUES 4,512.97
03.05.06.01 TARRAJEO EN EXTERIORES C:A-1:4 m2 58.38 26.62 1,554.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.38 1,554.08 100.00%
03.05.06.02 TARRAJEO DE COLUMNAS C:A-1:4 m2 15.07 28.80 434.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.07 434.02 100.00%
03.05.06.03 VESTIDURA DE ARISTAS EN COLUMNAS m 64.72 3.45 223.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.72 223.28 100.00%
03.05.06.04 TARRAJEO DE VIGAS C:A-1:4 m2 12.90 31.39 404.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.90 404.93 100.00%
03.05.06.05 VESTIDURA DE ARISTAS EN VIGAS m 51.73 3.45 178.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.73 178.47 100.00%
03.05.06.06 BRUÑAS DE 1.0 cm m 82.78 9.32 771.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 82.78 771.51 100.00%
03.05.06.07 REVESTIMIENTO DE GRADAS Y ESCALERA m2 15.39 36.85 567.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.39 567.12 100.00%
03.05.06.08 REVESTIMIENTO DE FONDO DE ESCALERAS CON CEMENTO m2 10.30 36.85 379.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.30 379.56 100.00%
03.05.07 PISOS 732.78
03.05.07.01 PISO CEMENTO PULIDO E=2" m2 14.13 51.86 732.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 732.78 100.00%
Página 12
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 13
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
04.02.02.03 TARRAJEO DE COLUMNAS Y PLACAS C:A-1:4 m2 216.32 28.80 6,230.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.32 6,230.02 100.00%
04.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS Y PLACAS m 191.40 3.45 660.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 191.40 660.33 100.00%
04.02.02.05 TARRAJEO DE VIGAS C:A-1:4 m2 132.75 31.39 4,167.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.75 4,167.02 100.00%
04.02.02.06 VESTIDURA DE ARISTAS EN VIGAS m 216.98 3.45 748.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.98 748.58 100.00%
04.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1 m 138.00 13.60 1,876.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 138.00 1,876.80 100.00%
04.02.02.08 BRUÑAS DE 1.0 cm m 136.40 9.32 1,271.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 136.40 1,271.25 100.00%
04.02.03 CIELO RASO 6,170.56
04.02.03.01 TARRAJEO DE CIELO RASO - SUPERFICIE CON CEMENTO-A m2 142.31 43.36 6,170.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 142.31 6,170.56 100.00%
04.02.04 PISOS Y PAVIMENTOS 23,179.67
04.02.04.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 m2 232.88 35.38 8,239.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 232.88 8,239.29 100.00%
04.02.04.02 PISO DE CERAMICO 45 X 45 CM m2 232.88 56.55 13,169.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 232.88 13,169.36 100.00%
04.02.04.03 PISO CEMENTO PULIDO E=2" m2 34.15 51.86 1,771.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 34.15 1,771.02 100.00%
04.02.05 CONTRAZOCALOS 5,606.04
04.02.05.01 CONTRAZOCALO CERAMICO H=0.10 m. m 138.18 19.27 2,662.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 138.18 2,662.73 100.00%
04.02.05.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 76.00 15.40 1,170.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.00 1,170.40 100.00%
04.02.05.03 ZOCALO DE CERAMICA 20 X 30 CM m2 19.08 92.92 1,772.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.08 1,772.91 100.00%
04.02.06 CARPINTERIA MADERA 9,607.44
04.02.06.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 16.50 496.22 8,187.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.50 8,187.63 100.00%
04.02.06.02 PUERTA CONTRAPLACADA SEGUN DISEÑO m2 4.05 350.57 1,419.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.05 1,419.81 100.00%
04.02.07 CARPINTERIA METALICA 13,514.39
04.02.07.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 70.03 192.98 13,514.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 70.03 13,514.39 100.00%
04.02.08 CERRAJERIA 839.68
04.02.08.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 8.00 77.93 623.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 623.44 100.00%
04.02.08.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 24.00 9.01 216.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 216.24 100.00%
04.02.09 VIDRIOS, CRISTALES Y SIMILARES 9,738.32
04.02.09.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 753.74 12.92 9,738.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 753.74 9,738.32 100.00%
04.02.10 PINTURAS 10,210.13
04.02.10.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 369.82 10.57 3,909.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 369.82 3,909.00 100.00%
04.02.10.02 PINTURA EN CONTRAZOCALO m2 15.20 7.96 120.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.20 120.99 100.00%
04.02.10.03 PINTURA EN VIGAS m2 132.75 13.73 1,822.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.75 1,822.66 100.00%
04.02.10.04 PINTURA EN COLUMNAS Y PLACAS m2 216.32 13.19 2,853.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 216.32 2,853.26 100.00%
04.02.10.05 PINTURA EN CIELO RASO m2 142.31 10.57 1,504.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 142.31 1,504.22 100.00%
04.02.11 CUBIERTA METALICA Y CIELO RASO 62,184.64
04.02.11.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOS m2 201.47 122.00 24,579.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 201.47 24,579.34 100.00%
04.02.11.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPOR m 181.50 75.18 13,645.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 181.50 13,645.17 100.00%
04.02.11.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 205.49 116.60 23,960.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 205.49 23,960.13 100.00%
04.03 INSTALACIONES ELECTRICAS 33,036.01
04.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 41.00 145.99 5,985.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 41.00 5,985.59 100.00%
04.03.02 SALIDA TOMACORRIENTE pto 54.00 215.17 11,619.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.00 11,619.18 100.00%
04.03.03 SALIDA PARA INTERRUPTOR SIMPLE pto 8.00 108.23 865.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 865.84 100.00%
04.03.04 SALIDA PARA INTERRUPTOR TRIPLE pto 2.00 114.38 228.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 228.76 100.00%
04.03.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/E und 38.00 205.71 7,816.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 38.00 7,816.98 100.00%
04.03.06 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIR und 2.00 68.59 137.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 137.18 100.00%
04.03.07 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 285.11 10.81 3,082.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 285.11 3,082.04 100.00%
04.03.08 ALAMBRE THHN 2.5 mm2 m 344.56 1.67 575.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 344.56 575.42 100.00%
04.03.09 ALAMBRE THHN 4 mm2 m 415.47 2.19 909.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 415.47 909.88 100.00%
04.03.10 TABLERO DE DISTRIBUCION und 1.00 469.91 469.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 469.91 100.00%
04.03.11 SUBTABLERO DE DISTRIBUCION und 1.00 439.49 439.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 439.49 100.00%
04.03.12 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
04.03.13 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
04.04 INSTALACIONES SANITARIAS 7,294.83
04.04.01 APARATOS Y ACCESORIOS SANITARIOS 1,193.88
04.04.01.01 INODORO TANQUE BAJO pza 2.00 361.79 723.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 723.58 100.00%
04.04.01.02 LAVATORIO DE LOZA BLANCA und 2.00 195.88 391.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 391.76 100.00%
04.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" und 2.00 39.27 78.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 78.54 100.00%
04.04.02 SISTEMA DE DESAGUE 2,175.09
04.04.02.01 SALIDA DE DESAGUE PVC D=2" pto 2.00 93.15 186.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 186.30 100.00%
04.04.02.02 SALIDA DE DESAGUE PVC D=4" pto 2.00 145.54 291.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 291.08 100.00%
04.04.02.03 SALIDA VENTILACION DE 2" pto 1.00 58.08 58.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 58.08 100.00%
04.04.02.04 REGISTRO DE BRONCE 4" und 1.00 285.99 285.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 285.99 100.00%
04.04.02.05 SUMIDERO DE 2" pza 2.00 77.41 154.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 154.82 100.00%
Página 14
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
04.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" m 10.47 33.95 355.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.47 355.46 100.00%
04.04.02.07 YEE PVC SAL 4"X2" und 2.00 61.97 123.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 123.94 100.00%
04.04.02.08 YEE PVC SAL 2"X2" und 2.00 58.33 116.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 116.66 100.00%
04.04.02.09 CODO PVC SAL P/DESAGUE D=2" und 2.00 25.81 51.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 51.62 100.00%
04.04.02.10 EXCAVACION MANUAL PARA TUBERIA m 10.47 14.89 155.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.47 155.90 100.00%
04.04.02.11 REFINE NIVELACION Y COMPACTACION DE ZANJA m 10.47 3.86 40.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.47 40.41 100.00%
04.04.02.12 CAMA DE APOYO m 10.47 9.44 98.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.47 98.84 100.00%
04.04.02.13 RELLENO COMPACTADO DE ZANJAS m 10.47 12.00 125.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.47 125.64 100.00%
04.04.02.14 CAJA DE REGISTRO CON REJILLA METALICA und 1.00 130.35 130.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 130.35 100.00%
04.04.03 SISTEMA DE AGUA FRIA 1,193.38
04.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" pto 4.00 72.84 291.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 291.36 100.00%
04.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" m 4.01 17.01 68.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.01 68.21 100.00%
04.04.03.03 TUBERIA PVC SAP CLASE 10-3/4" m 7.00 18.07 126.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 126.49 100.00%
04.04.03.04 CODO PVC 1/2" und 2.00 9.94 19.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 19.88 100.00%
04.04.03.05 TEE PVC 1/2" und 3.00 11.04 33.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 33.12 100.00%
04.04.03.06 CODO PVC 3/4" und 1.00 10.78 10.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 10.78 100.00%
04.04.03.07 EXCAVACION MANUAL PARA TUBERIA m 11.01 14.89 163.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.01 163.94 100.00%
04.04.03.08 REFINE NIVELACION Y COMPACTACION DE ZANJA m 11.01 3.86 42.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.01 42.50 100.00%
04.04.03.09 CAMA DE APOYO m 11.01 9.44 103.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.01 103.93 100.00%
04.04.03.10 RELLENO COMPACTADO DE ZANJAS m 11.01 12.00 132.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.01 132.12 100.00%
04.04.03.11 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE und 1.00 70.70 70.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 70.70 100.00%
04.04.03.12 CAJA PARA VALVULAS und 1.00 130.35 130.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 130.35 100.00%
04.04.04 SISTEMA DE AGUA PLUVIAL 2,732.48
04.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" m 32.10 58.77 1,886.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 32.10 1,886.52 100.00%
04.04.04.02 TUBERIA PVC SAL D=4" m 17.00 45.40 771.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.00 771.80 100.00%
04.04.04.03 CODO PVC SAL D=4" und 2.00 37.08 74.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 74.16 100.00%
04.05 CONSTRUCCION DE ESCALERAS 24,897.01
04.05.01 OBRAS PRELIMINARES 48.31
04.05.01.01 LIMPIEZA DE TERRENO m2 17.96 0.95 17.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.96 17.06 100.00%
04.05.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 17.96 1.74 31.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.96 31.25 100.00%
04.05.02 MOVIMIENTO DE TIERRAS 1,179.42
04.05.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 13.85 41.41 573.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.85 573.53 100.00%
04.05.02.02 NIVELACION Y APISONADO MANUAL PARA PISOS m2 14.13 2.48 35.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 35.04 100.00%
04.05.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3.54 27.36 96.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.54 96.85 100.00%
04.05.02.04 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 1.41 197.01 277.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.41 277.78 100.00%
04.05.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 12 m3 12.38 15.85 196.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.38 196.22 100.00%
04.05.03 OBRAS DE CONCRETO SIMPLE 3,851.27
04.05.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 3 m3 5.33 333.17 1,775.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.33 1,775.80 100.00%
04.05.03.02 SOBRECIMIENTO 1:8 + 25% P.M m3 1.74 387.67 674.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.74 674.55 100.00%
04.05.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 18.08 46.45 839.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.08 839.82 100.00%
04.05.03.04 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM m2 14.13 39.71 561.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 561.10 100.00%
04.05.04 OBRAS DE CONCRETO ARMADO 11,546.69 0.00
04.05.04.01 VIGA DE CIMENTACION 2,645.43
04.05.04.01.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 m3 2.00 449.81 899.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 899.62 100.00%
04.05.04.01.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACI m2 20.02 51.41 1,029.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.02 1,029.23 100.00%
04.05.04.01.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION kg 171.43 4.18 716.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 171.43 716.58 100.00%
04.05.04.02 COLUMNAS 2,896.60
04.05.04.02.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 1.67 449.81 751.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.67 751.18 100.00%
04.05.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 15.07 53.08 799.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.07 799.92 100.00%
04.05.04.02.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS kg 321.89 4.18 1,345.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 321.89 1,345.50 100.00%
04.05.04.03 VIGAS 2,222.94
04.05.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 1.66 449.81 746.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.66 746.68 100.00%
04.05.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 12.90 62.13 801.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.90 801.48 100.00%
04.05.04.03.03 VIGAS ACERO fy=4,200 kg/cm2 kg 161.43 4.18 674.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 161.43 674.78 100.00%
04.05.04.04 ESCALERAS 2,484.68
04.05.04.04.01 ESCALERAS CONCRETO FC=210 KG/CM2 m3 1.89 449.81 850.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.89 850.14 100.00%
04.05.04.04.02 ESCALERA ENCOFRADO Y DESENCOFRADO m2 11.19 60.97 682.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.19 682.25 100.00%
04.05.04.04.03 ESCALERA ACERO fy=4,200 kg/cm2 kg 227.82 4.18 952.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 227.82 952.29 100.00%
04.05.04.05 LOSA MACIZA 1,297.04
04.05.04.05.01 LOSA MACIZA CONCRETO FC=210 KG/CM2 m3 0.77 449.81 346.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.77 346.35 100.00%
04.05.04.05.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA m2 5.15 54.29 279.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.15 279.59 100.00%
Página 15
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
04.05.04.05.03 LOSA MACIZA ACERO fy=4,200 kg/cm2 kg 160.55 4.18 671.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 160.55 671.10 100.00%
04.05.05 ALBAÑILERIA 1,616.54
04.05.05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARE m2 29.19 55.38 1,616.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.19 1,616.54 100.00%
04.05.06 REVOQUES 4,512.97
04.05.06.01 TARRAJEO EN EXTERIORES C:A-1:4 m2 58.38 26.62 1,554.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.38 1,554.08 100.00%
04.05.06.02 TARRAJEO DE COLUMNAS C:A-1:4 m2 15.07 28.80 434.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.07 434.02 100.00%
04.05.06.03 VESTIDURA DE ARISTAS EN COLUMNAS m 64.72 3.45 223.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.72 223.28 100.00%
04.05.06.04 TARRAJEO DE VIGAS C:A-1:4 m2 12.90 31.39 404.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.90 404.93 100.00%
04.05.06.05 VESTIDURA DE ARISTAS EN VIGAS m 51.73 3.45 178.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.73 178.47 100.00%
04.05.06.06 BRUÑAS DE 1.0 cm m 82.78 9.32 771.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 82.78 771.51 100.00%
04.05.06.07 REVESTIMIENTO DE GRADAS Y ESCALERA m2 15.39 36.85 567.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.39 567.12 100.00%
04.05.06.08 REVESTIMIENTO DE FONDO DE ESCALERAS CON CEMENTO m2 10.30 36.85 379.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.30 379.56 100.00%
04.05.07 PISOS 732.78
04.05.07.01 PISO CEMENTO PULIDO E=2" m2 14.13 51.86 732.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 732.78 100.00%
04.05.08 CONTRAZOCALOS 262.11
04.05.08.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 17.02 15.40 262.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.02 262.11 100.00%
04.05.09 PINTURAS 1,146.92
04.05.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 58.38 10.57 617.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 58.38 617.08 100.00%
04.05.09.02 PINTURA EN COLUMNAS m2 15.07 13.19 198.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.07 198.77 100.00%
04.05.09.03 PINTURA EN VIGAS m2 12.90 13.73 177.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.90 177.12 100.00%
04.05.09.04 PINTURA EN FONDO DE ESCALERA m2 8.39 11.37 95.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.39 95.39 100.00%
04.05.09.05 PINTURA EN LOSA MACIZA m2 5.15 11.37 58.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.15 58.56 100.00%
05 CONSTRUCCION DE COMEDOR 144,917.87
05.01 ESTRUCTURAS 52,611.09
05.01.01 OBRAS PRELIMINARES 188.04
05.01.01.01 LIMPIEZA DE TERRENO m2 69.90 0.95 66.41 69.90 66.41 100.00% 0.00 0.00 0.00% 69.90 66.41 100.00% 0.00 0.00 0.01%
05.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 69.90 1.74 121.63 69.90 121.63 100.00% 0.00 0.00 0.00% 69.90 121.63 100.00% 0.00 0.00 0.00%
05.01.02 MOVIMIENTO DE TIERRAS 4,303.76
05.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 18.27 41.41 756.56 18.27 756.56 100.00% 0.00 0.00 0.00% 18.27 756.56 100.00% 0.00 0.00 0.00%
05.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS m3 25.91 41.41 1,072.93 25.91 1,072.93 100.00% 0.00 0.00 0.00% 25.91 1,072.93 100.00% 0.00 0.00 0.00%
05.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS m2 63.56 2.48 157.63 63.56 157.63 100.00% 0.00 0.00 0.00% 63.56 157.63 100.00% 0.00 0.00 0.00%
05.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 29.59 27.36 809.58 29.59 809.58 100.00% 0.00 0.00 0.00% 29.59 809.58 100.00% 0.00 0.00 0.00%
05.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 6.36 197.01 1,252.98 6.36 1,252.98 100.00% 0.00 0.00 0.00% 6.36 1,252.98 100.00% 0.00 0.00 0.00%
05.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 12 m3 16.03 15.85 254.08 16.03 254.08 100.00% 0.00 0.00 0.00% 16.03 254.08 100.00% 0.00 0.00 0.00%
05.01.03 OBRAS DE CONCRETO SIMPLE 7,695.11
05.01.03.01 SOLADO PARA ZAPATAS m2 19.93 35.13 700.14 19.93 700.14 100.00% 0.00 0.00 0.00% 19.93 700.14 100.00% 0.00 0.00 0.00%
05.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 3 m3 5.29 333.17 1,762.47 5.29 1,762.47 100.00% 0.00 0.00 0.00% 5.29 1,762.47 100.00% 0.00 0.00 0.00%
05.01.03.03 SOBRECIMIENTO 1:8 + 25% P.M m3 2.69 387.67 1,042.83 2.69 1,042.83 100.00% 0.00 0.00 0.00% 2.69 1,042.83 100.00% 0.00 0.00 0.00%
05.01.03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 35.86 46.45 1,665.70 35.86 1,665.70 100.00% 0.00 0.00 0.00% 35.86 1,665.70 100.00% 0.00 0.00 0.00%
05.01.03.05 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM m2 63.56 39.71 2,523.97 63.56 2,523.97 100.00% 0.00 0.00 0.00% 63.56 2,523.97 100.00% 0.00 0.00 0.00%
05.01.04 OBRAS DE CONCRETO ARMADO 40,424.18
05.01.04.01 ZAPATAS 5,545.41
05.01.04.01.01 ZAPATAS CONCRETO f'c=210 kg/cm2 m3 9.97 449.81 4,484.61 9.97 4,484.61 100.00% 0.00 0.00 0.00% 9.97 4,484.61 100.00% 0.00 0.00 0.00%
05.01.04.01.02 ZAPATAS ACERO fy=4,200 kg/cm2 kg 253.78 4.18 1,060.80 253.78 1,060.80 100.00% 0.00 0.00 0.00% 253.78 1,060.80 100.00% 0.00 0.00 0.00%
05.01.04.02 VIGA DE CIMENTACION 8,818.36
05.01.04.02.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 m3 6.35 449.81 2,856.29 6.35 2,856.29 100.00% 0.00 0.00 0.00% 6.35 2,856.29 100.00% 0.00 0.00 0.00%
05.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACI m2 50.80 51.41 2,611.63 50.80 2,611.63 100.00% 0.00 0.00 0.00% 50.80 2,611.63 100.00% 0.00 0.00 0.00%
05.01.04.02.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION kg 801.54 4.18 3,350.44 801.54 3,350.44 100.00% 0.00 0.00 0.00% 801.54 3,350.44 100.00% 0.00 0.00 0.00%
05.01.04.03 COLUMNAS Y PLACAS 13,991.50
05.01.04.03.01 CONCRETO COLUMNAS Y PLACAS f'c=210 kg/cm2 m3 8.21 449.81 3,692.94 8.21 3,692.94 100.00% 0.00 0.00 0.00% 8.21 3,692.94 100.00% 0.00 0.00 0.00%
05.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y PLACAS m2 91.20 53.08 4,840.90 91.20 4,840.90 100.00% 0.00 0.00 0.00% 91.20 4,840.90 100.00% 0.00 0.00 0.00%
05.01.04.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS Y PLACA kg 1,305.66 4.18 5,457.66 1,305.66 5,457.66 100.00% 0.00 0.00 0.00% 1,305.66 5,457.66 100.00% 0.00 0.00 0.00%
05.01.04.04 VIGAS 10,012.03
05.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 6.62 449.81 2,977.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.62 2,977.74 100.00%
05.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 63.32 62.13 3,934.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 63.32 3,934.07 100.00%
05.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 kg 741.68 4.18 3,100.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 741.68 3,100.22 100.00%
05.01.04.05 COLUMNETAS 2,056.88
05.01.04.05.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 m3 1.13 419.72 474.28 1.13 474.28 100.00% 0.00 0.00 0.00% 1.13 474.28 100.00% 0.00 0.00 0.00%
05.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 15.12 53.08 802.57 15.12 802.57 100.00% 0.00 0.00 0.00% 15.12 802.57 100.00% 0.00 0.00 0.00%
05.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS kg 186.61 4.18 780.03 186.61 780.03 100.00% 0.00 0.00 0.00% 186.61 780.03 100.00% 0.00 0.00 0.00%
05.02 ARQUITECTURA 78,614.27
Página 16
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 17
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 18
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
06.02.02.05 TARRAJEO DE VIGAS C:A-1:4 m2 84.20 31.39 2,643.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 84.20 2,643.04 100.00%
06.02.02.06 VESTIDURA DE ARISTAS EN VIGAS m 109.88 3.45 379.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 109.88 379.09 100.00%
06.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A-1: m2 92.20 27.89 2,571.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 92.20 2,571.46 100.00%
06.02.02.08 BRUÑAS DE 1.0 cm m 54.16 9.32 504.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.16 504.77 100.00%
06.02.03 PISOS 7,031.73
06.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 m2 76.49 35.38 2,706.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.49 2,706.22 100.00%
06.02.03.02 PISO DE CERAMICO 45 X 45 CM m2 76.49 56.55 4,325.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.49 4,325.51 100.00%
06.02.04 ZOCALOS 16,988.89
06.02.04.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 32.00 15.40 492.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 32.00 492.80 100.00%
06.02.04.02 ZOCALO DE CERAMICA 20 X 30 CM m2 177.53 92.92 16,496.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.53 16,496.09 100.00%
06.02.05 CARPINTERIA DE MADERA 24,845.08
06.02.05.01 PUERTAS 14,785.70
06.02.05.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 17.08 496.22 8,475.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.08 8,475.44 100.00%
06.02.05.01.02 PUERTA CONTRAPLACADA SEGUN DISEÑO m2 18.00 350.57 6,310.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 6,310.26 100.00%
06.02.05.02 TABIQUES DIVISORIOS 10,059.38
06.02.05.02.01 DIVISIONES CONTRAPLACADAS DE MADERA (SSHH) m2 37.44 268.68 10,059.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.44 10,059.38 100.00%
06.02.06 CARPINTERIA METALICA 2,223.13
06.02.06.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 11.52 192.98 2,223.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.52 2,223.13 100.00%
06.02.07 CERRAJERIA 1,475.26
06.02.07.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 8.00 77.93 623.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 623.44 100.00%
06.02.07.02 PICAPORTE DE ALUMINIO 2 PULGADAS pza 18.00 17.29 311.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 311.22 100.00%
06.02.07.03 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 60.00 9.01 540.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 60.00 540.60 100.00%
06.02.08 VIDRIOS, CRISTALES Y SIMILARES 1,602.08
06.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 124.00 12.92 1,602.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 124.00 1,602.08 100.00%
06.02.09 PINTURAS 4,756.73
06.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 224.12 10.57 2,368.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 224.12 2,368.95 100.00%
06.02.09.02 PINTURA EN CONTRAZOCALO m2 6.40 7.96 50.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.40 50.94 100.00%
06.02.09.03 PINTURA EN VIGAS m2 84.20 13.73 1,156.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 84.20 1,156.07 100.00%
06.02.09.04 PINTURA EN COLUMNAS Y PLACAS m2 89.52 13.19 1,180.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 89.52 1,180.77 100.00%
06.02.10 CUBIERTA METALICA Y CIELO RASO 42,162.92
06.02.10.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOS m2 132.41 122.00 16,154.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.41 16,154.02 100.00%
06.02.10.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPOR m 136.50 75.18 10,262.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 136.50 10,262.07 100.00%
06.02.10.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 135.05 116.60 15,746.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 135.05 15,746.83 100.00%
06.03 INSTALACIONES ELECTRICAS 12,831.07
06.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 20.00 145.99 2,919.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 2,919.80 100.00%
06.03.02 SALIDA TOMACORRIENTE A PRUEBA DE AGUA pto 8.00 219.38 1,755.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 1,755.04 100.00%
06.03.03 SALIDA PARA INTERRUPTOR SIMPLE pto 10.00 108.23 1,082.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 1,082.30 100.00%
06.03.04 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/E und 20.00 205.71 4,114.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 4,114.20 100.00%
06.03.05 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 99.90 10.81 1,079.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 99.90 1,079.92 100.00%
06.03.06 ALAMBRE THHN 2.5 mm2 m 206.80 1.67 345.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 206.80 345.36 100.00%
06.03.07 ALAMBRE THHN 4 mm2 m 86.40 2.19 189.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 86.40 189.22 100.00%
06.03.08 TABLERO DE DISTRIBUCION und 1.00 439.49 439.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 439.49 100.00%
06.03.09 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
06.03.10 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
06.04 INSTALACIONES SANITARIAS 32,714.28
06.04.01 APARATOS Y ACCESORIOS SANITARIOS 11,468.50
06.04.01.01 INODORO TANQUE BAJO pza 20.00 361.79 7,235.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 7,235.80 100.00%
06.04.01.02 LAVATORIO DE LOZA BLANCA und 18.00 195.88 3,525.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 3,525.84 100.00%
06.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" und 18.00 39.27 706.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 706.86 100.00%
06.04.02 SISTEMA DE DESAGUE 11,848.24
06.04.02.01 SALIDA DE DESAGUE PVC D=2" pto 18.00 93.15 1,676.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 1,676.70 100.00%
06.04.02.02 SALIDA DE DESAGUE PVC D=4" pto 20.00 145.54 2,910.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 2,910.80 100.00%
06.04.02.03 SALIDA VENTILACION DE 2" pto 4.00 58.08 232.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 232.32 100.00%
06.04.02.04 REGISTRO DE BRONCE 4" und 8.00 285.99 2,287.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 2,287.92 100.00%
06.04.02.05 SUMIDERO DE 2" pza 10.00 77.41 774.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 774.10 100.00%
06.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" m 35.40 33.95 1,201.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.40 1,201.83 100.00%
06.04.02.07 YEE PVC SAL 4"X2" und 8.00 61.97 495.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 495.76 100.00%
06.04.02.08 CODO PVC SAL P/DESAGUE D=2" und 6.00 25.81 154.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 154.86 100.00%
06.04.02.09 YEE PVC SAL 4" und 4.00 64.85 259.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 259.40 100.00%
06.04.02.10 CODO PVC SAL P/DESAGUE D=4" und 6.00 28.52 171.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 171.12 100.00%
06.04.02.11 EXCAVACION MANUAL PARA TUBERIA m 35.40 14.89 527.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.40 527.11 100.00%
Página 19
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
06.04.02.12 REFINE NIVELACION Y COMPACTACION DE ZANJA m 35.40 3.86 136.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.40 136.64 100.00%
06.04.02.13 CAMA DE APOYO m 35.40 9.44 334.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.40 334.18 100.00%
06.04.02.14 RELLENO COMPACTADO DE ZANJAS m 35.40 12.00 424.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.40 424.80 100.00%
06.04.02.15 CAJA DE REGISTRO CON REJILLA METALICA und 2.00 130.35 260.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 260.70 100.00%
06.04.03 SISTEMA DE AGUA FRIA 7,446.56
06.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" pto 42.00 72.84 3,059.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 42.00 3,059.28 100.00%
06.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" m 41.40 17.01 704.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 41.40 704.21 100.00%
06.04.03.03 TUBERIA PVC SAP CLASE 10-3/4" m 7.74 18.07 139.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.74 139.86 100.00%
06.04.03.04 CODO PVC 1/2" und 10.00 9.94 99.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 99.40 100.00%
06.04.03.05 TEE PVC 1/2" und 12.00 11.04 132.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 132.48 100.00%
06.04.03.06 REDUCCION PVC 3/4" - 1/2" und 6.00 10.11 60.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 60.66 100.00%
06.04.03.07 CODO PVC 3/4" und 2.00 10.78 21.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 21.56 100.00%
06.04.03.08 TEE PVC 3/4" und 4.00 11.97 47.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 47.88 100.00%
06.04.03.09 EXCAVACION MANUAL PARA TUBERIA m 49.14 14.89 731.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.14 731.69 100.00%
06.04.03.10 REFINE NIVELACION Y COMPACTACION DE ZANJA m 49.14 3.86 189.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.14 189.68 100.00%
06.04.03.11 CAMA DE APOYO m 49.14 9.44 463.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.14 463.88 100.00%
06.04.03.12 RELLENO COMPACTADO DE ZANJAS m 49.14 12.00 589.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.14 589.68 100.00%
06.04.03.13 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE und 6.00 70.70 424.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 424.20 100.00%
06.04.03.14 CAJA PARA VALVULAS und 6.00 130.35 782.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 782.10 100.00%
06.04.04 SISTEMA DE AGUA PLUVIAL 1,950.98
06.04.04.01 CANALETA PARA AGUA FLUVIAL DE 4" m 27.30 58.77 1,604.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.30 1,604.42 100.00%
06.04.04.02 TUBERIA PVC SAL D=4" m 6.00 45.40 272.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 272.40 100.00%
06.04.04.03 CODO PVC SAL D=4" und 2.00 37.08 74.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 74.16 100.00%
07 TANQUE CISTERNA - TANQUE ELEVADO 49,283.11 0.00%
07.01 ESTRUCTURAS 26,769.78
07.01.01 OBRAS PRELIMINARES 23.54
07.01.01.01 LIMPIEZA DE TERRENO m2 8.75 0.95 8.31 8.75 8.31 100.00% 0.00 0.00 0.00% 8.75 8.31 100.00% 0.00 0.00 0.00%
07.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 8.75 1.74 15.23 8.75 15.23 100.00% 0.00 0.00 0.00% 8.75 15.23 100.00% 0.00 0.00 0.00%
07.01.02 MOVIMIENTO DE TIERRAS 1,079.23
07.01.02.01 EXCAVACION DE ZANJAS PARA CISTERNA m3 17.50 41.41 724.68 17.50 724.68 100.00% 0.00 0.00 0.00% 17.50 724.68 100.00% 0.00 0.01 0.00%
07.01.02.02 NIVELACION Y APISONADO MANUAL PARA PISOS m2 8.75 2.48 21.70 8.75 21.70 100.00% 0.00 0.00 0.00% 8.75 21.70 100.00% 0.00 0.00 0.00%
07.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 12 m3 21.00 15.85 332.85 21.00 332.85 100.00% 0.00 0.00 0.00% 21.00 332.85 100.00% 0.00 0.00 0.00%
07.01.03 CONCRETO SIMPLE 586.88
07.01.03.01 SOLADO m2 8.75 35.13 307.39 8.75 307.39 100.00% 0.00 0.00 0.00% 8.75 307.39 100.00% 0.00 0.00 0.00%
07.01.03.02 SOBRECIMIENTO 1:8 + 25% P.M m3 0.28 387.67 108.55 0.28 108.55 100.00% 0.00 0.00 0.00% 0.28 108.55 100.00% 0.00 0.00 0.00%
07.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 3.68 46.45 170.94 3.68 170.94 100.00% 0.00 0.00 0.00% 3.68 170.94 100.00% 0.00 0.00 0.00%
07.01.04 CONCRETO ARMADO 25,080.13
07.01.04.01 COLUMNAS 7,138.87
07.01.04.01.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 3.98 449.81 1,790.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.98 1,790.24 100.00%
07.01.04.01.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 49.04 53.08 2,603.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.04 2,603.04 100.00%
07.01.04.01.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS kg 656.84 4.18 2,745.59 656.84 2,745.59 100.00% 0.00 0.00 0.00% 656.84 2,745.59 100.00% 0.00 0.00 0.00%
07.01.04.02 VIGAS 4,141.00
07.01.04.02.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 2.16 449.81 971.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.16 971.59 100.00%
07.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 24.48 62.13 1,520.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.48 1,520.94 100.00%
07.01.04.02.03 VIGAS ACERO fy=4,200 kg/cm2 kg 394.37 4.18 1,648.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 394.37 1,648.47 100.00%
07.01.04.03 LOSA MACIZA 3,002.53
07.01.04.03.01 LOSA MACIZA CONCRETO FC=210 KG/CM2 m3 2.40 449.81 1,079.54 2.40 1,079.54 100.00% 0.00 0.00 0.00% 2.40 1,079.54 100.00% 0.00 0.00 0.00%
07.01.04.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA MACIZA m2 12.00 54.29 651.48 12.00 651.48 100.00% 0.00 0.00 0.00% 12.00 651.48 100.00% 0.00 0.00 0.00%
07.01.04.03.03 LOSA MACIZA ACERO fy=4,200 kg/cm2 kg 304.19 4.18 1,271.51 304.19 1,271.51 100.00% 0.00 0.00 0.00% 304.19 1,271.51 100.00% 0.00 0.00 0.00%
07.01.04.04 CISTERNA 10,317.18
07.01.04.04.01 CONCRETO EN CISTERNA f'c=210 kg/cm2 m3 11.25 485.41 5,460.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.25 5,460.86 100.00%
07.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2 18.22 51.41 936.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.22 936.69 100.00%
07.01.04.04.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN CISTERNA kg 937.71 4.18 3,919.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 937.71 3,919.63 100.00%
07.01.04.05 COLUMNETAS 480.55
07.01.04.05.01 CONCRETO COLUMNETAS f'c=175 kg/cm2 m3 0.28 419.72 117.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.28 117.52 100.00%
07.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 3.68 53.08 195.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.68 195.33 100.00%
07.01.04.05.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS kg 40.12 4.18 167.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.12 167.70 100.00%
07.02 ARQUITECTURA 11,218.94
07.02.01 MUROS Y TABIQUES 835.13
07.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARE m2 15.08 55.38 835.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.08 835.13 100.00%
07.02.02 REVOQUES 4,950.63
Página 20
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
07.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 m2 15.84 26.62 421.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.84 421.66 100.00%
07.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 m2 15.84 26.62 421.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.84 421.66 100.00%
07.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 m2 49.04 28.80 1,412.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.04 1,412.35 100.00%
07.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS m 152.00 3.45 524.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 152.00 524.40 100.00%
07.02.02.05 TARRAJEO DE VIGAS C:A-1:4 m2 24.48 31.39 768.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.48 768.43 100.00%
07.02.02.06 VESTIDURA DE ARISTAS EN VIGAS m 57.60 3.45 198.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 57.60 198.72 100.00%
07.02.02.07 REVESTIMIENTO DE CIELO RASO EN LOSA MACIZA m2 12.00 36.85 442.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 442.20 100.00%
07.02.02.08 TARRAJEO CON IMPERMEABILIZANTE EN TANQUE CISTERN m2 18.22 38.42 700.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.22 700.01 100.00%
07.02.02.09 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1 m 4.50 13.60 61.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.50 61.20 100.00%
07.02.03 PISOS 365.09
07.02.03.01 PISO CEMENTO PULIDO E=2" m2 7.04 51.86 365.09 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.04 365.09 100.00%
07.02.04 ZOCALOS 369.60 0.00
07.02.04.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 24.00 15.40 369.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 369.60 100.00%
07.02.05 CARPINTERIA DE MADERA 803.88
07.02.05.01 PUERTAS 803.88
07.02.05.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 1.62 496.22 803.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.62 803.88 100.00%
07.02.06 CARPINTERIA METALICA 2,119.02
07.02.06.01 VENTANAS 463.15
07.02.06.01.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 2.40 192.98 463.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.40 463.15 100.00%
07.02.06.02 ESCALERAS 1,655.87
07.02.06.02.01 ESCALERA GATO, TUBO F.G. 1 1/2" Y 1" TQE. ELEVADO m 8.50 135.43 1,151.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.50 1,151.16 100.00%
07.02.06.02.02 ESCALERA GATO ALUMINIO - CISTERNA und 1.00 309.90 309.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 309.90 100.00%
07.02.06.02.03 MARCO Y TAPA DE FIERRO 60x60 und 1.00 194.81 194.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 194.81 100.00%
07.02.07 CERRAJERIA 104.96 0.00
07.02.07.01 CERRADURA DE DOS GOLPES TIPO PESADO pza 1.00 77.93 77.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 77.93 100.00%
07.02.07.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 3.00 9.01 27.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 27.03 100.00%
07.02.08 VIDRIOS, CRISTALES Y SIMILARES 333.72
07.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 25.83 12.92 333.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.83 333.72 100.00%
07.02.09 PINTURAS 1,336.91
07.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 31.68 10.57 334.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.68 334.86 100.00%
07.02.09.02 PINTURA EN CONTRAZOCALO m2 2.40 7.96 19.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.40 19.10 100.00%
07.02.09.03 PINTURA EN VIGAS m2 24.48 13.73 336.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.48 336.11 100.00%
07.02.09.04 PINTURA EN COLUMNAS m2 49.04 13.19 646.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.04 646.84 100.00%
07.03 INSTALACIONES ELECTRICAS 3,766.59
07.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 1.00 145.99 145.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 145.99 100.00%
07.03.02 SALIDA TOMACORRIENTE A PRUEBA DE AGUA pto 1.00 219.38 219.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 219.38 100.00%
07.03.03 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 108.23 108.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 108.23 100.00%
07.03.04 SALIDA PARA ELECTROBOMBA pto 2.00 104.38 208.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 208.76 100.00%
07.03.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIR und 1.00 68.59 68.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 68.59 100.00%
07.03.06 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 9.96 10.81 107.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.96 107.67 100.00%
07.03.07 ALAMBRE THHN 2.5 mm2 m 5.08 1.67 8.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.08 8.48 100.00%
07.03.08 ALAMBRE THHN 4 mm2 m 22.26 2.19 48.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.26 48.75 100.00%
07.03.09 EQUIPO DE BOMBEO, INC. 2 ELECTROBOMBAS 1 HP Y TABL und 1.00 1,505.51 1,505.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,505.51 100.00%
07.03.10 TABLERO DE DISTRIBUCION und 1.00 439.49 439.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 439.49 100.00%
07.03.11 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
07.03.12 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
07.04 INSTALACIONES SANITARIAS 7,527.80
07.04.01 VALVULAS Y LLAVES 1,332.90
07.04.01.01 VALVULA COMPUERTA DE 3/4" und 1.00 100.51 100.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 100.51 100.00%
07.04.01.02 VALVULA COMPUERTA DE 1 1/2" und 3.00 189.35 568.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 568.05 100.00%
07.04.01.03 VALVULA CHECK DE BRONCE 1 1/2" und 2.00 98.74 197.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 197.48 100.00%
07.04.01.04 VALVULA FLOTADORA 3/4" und 1.00 101.28 101.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 101.28 100.00%
07.04.01.05 VALVULA PIE CON CANASTILLA DE BRONCE 2" und 2.00 182.79 365.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 365.58 100.00%
07.04.02 ALMACENAMIENTO DE AGUA 6,033.58
07.04.02.01 TUBERIA F°G° 3" m 1.00 51.83 51.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 51.83 100.00%
07.04.02.02 TUBERIA F°G° 2" m 15.70 33.60 527.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.70 527.52 100.00%
07.04.02.03 TUBERIA F°G° 1 1/2" m 22.35 27.70 619.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 22.35 619.10 100.00%
07.04.02.04 CODO F°G° 3" x 90 und 1.00 56.76 56.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 56.76 100.00%
07.04.02.05 CODO F°G° 2" x 90 und 7.00 31.93 223.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 223.51 100.00%
07.04.02.06 CODO F°G° 1 1/2" x 90 und 8.00 26.51 212.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 212.08 100.00%
07.04.02.07 TEE F°G° 2" und 1.00 35.32 35.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 35.32 100.00%
Página 21
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
07.04.02.08 TEE F°G° 1 1/2" und 2.00 31.08 62.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 62.16 100.00%
07.04.02.09 UNION UNIVERSAL F°G° 2" und 6.00 79.25 475.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 475.50 100.00%
07.04.02.10 UNION UNIVERSAL F°G° 1 1/2" und 8.00 56.84 454.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 454.72 100.00%
07.04.02.11 BRIDA ROMPE AGUA und 3.00 38.94 116.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 116.82 100.00%
07.04.02.12 JUNTA WATER STOP 8" m 11.20 76.42 855.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.20 855.90 100.00%
07.04.02.13 CAJA DE REBOSE C/REJILLA DE FIERRO und 1.00 280.52 280.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 280.52 100.00%
07.04.02.14 TAPA METALICA SANITARIA und 1.00 326.48 326.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 326.48 100.00%
07.04.02.15 ABRAZADERAS DE F°G° und 23.00 10.67 245.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.00 245.41 100.00%
07.04.02.16 TANQUE DE POLIETILENO 2500 LT und 1.00 1,489.95 1,489.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,489.95 100.00%
07.04.03 DESAGUE Y VENTILACION 161.32
07.04.03.01 SALIDA DE DESAGUE PVC D=4" pto 1.00 145.54 145.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 145.54 100.00%
07.04.03.02 SOMBRERO DE VENTILACION 2" und 1.00 15.78 15.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 15.78 100.00%
08 PORTADA Y CASETA DE VIGILANCIA 22,918.40
08.01 ESTRUCTURAS 9,518.16
08.01.01 OBRAS PRELIMINARES 16.90
08.01.01.01 LIMPIEZA DE TERRENO m2 6.28 0.95 5.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.28 5.97 100.00%
08.01.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 6.28 1.74 10.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.28 10.93 100.00%
08.01.02 MOVIMIENTO DE TIERRAS 743.23
08.01.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 2.56 41.41 106.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.56 106.01 100.00%
08.01.02.02 EXCAVACION DE ZANJAS PARA ZAPATAS m3 7.96 41.41 329.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.96 329.62 100.00%
08.01.02.03 NIVELACION Y APISONADO MANUAL PARA PISOS m2 3.81 2.48 9.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.81 9.45 100.00%
08.01.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 0.96 27.36 26.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.96 26.27 100.00%
08.01.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 0.38 197.01 74.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.38 74.86 100.00%
08.01.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 12 m3 12.43 15.85 197.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.43 197.02 100.00%
08.01.03 OBRAS DE CONCRETO SIMPLE 717.03
08.01.03.01 SOLADO PARA ZAPATAS m2 6.62 35.13 232.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.62 232.56 100.00%
08.01.03.02 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 3 m3 1.00 333.17 333.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 333.17 100.00%
08.01.03.03 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM m2 3.81 39.71 151.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.81 151.30 100.00%
08.01.04 OBRAS DE CONCRETO ARMADO 8,041.00
08.01.04.01 SOBRECIMIENTO ARMADO 1,094.65
08.01.04.01.01 SOBRECIMIENTO 1:8 + 25% P.M m3 0.88 387.67 341.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.88 341.15 100.00%
08.01.04.01.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 11.78 46.45 547.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.78 547.18 100.00%
08.01.04.01.03 SOBRECIMIENTO ACERO fy=4,200 kg/cm2 kg 49.36 4.18 206.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 49.36 206.32 100.00%
08.01.04.02 ZAPATAS 1,709.32
08.01.04.02.01 ZAPATAS CONCRETO f'c=210 kg/cm2 m3 3.06 449.81 1,376.42 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.06 1,376.42 100.00%
08.01.04.02.02 ZAPATAS ACERO fy=4,200 kg/cm2 kg 79.64 4.18 332.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 79.64 332.90 100.00%
08.01.04.03 VIGA DE CIMENTACION 611.69
08.01.04.03.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 m3 0.46 449.81 206.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.46 206.91 100.00%
08.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACI m2 3.70 51.41 190.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.70 190.22 100.00%
08.01.04.03.03 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION kg 51.33 4.18 214.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.33 214.56 100.00%
08.01.04.04 COLUMNAS 2,534.69
08.01.04.04.01 CONCRETO COLUMNAS f'c=210 kg/cm2 m3 1.21 449.81 544.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.21 544.27 100.00%
08.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 20.01 53.08 1,062.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.01 1,062.13 100.00%
08.01.04.04.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS kg 222.08 4.18 928.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 222.08 928.29 100.00%
08.01.04.05 VIGAS 1,500.04 0.00
08.01.04.05.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 0.84 449.81 377.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.84 377.84 100.00%
08.01.04.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 9.61 62.13 597.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.61 597.07 100.00%
08.01.04.05.03 VIGAS ACERO fy=4,200 kg/cm2 kg 125.63 4.18 525.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 125.63 525.13 100.00%
08.01.04.06 PARAPETO 276.08
08.01.04.06.01 CONCRETO PARAPETO f'c=210 kg/cm2 m3 0.18 449.81 80.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.18 80.97 100.00%
08.01.04.06.02 ENCOFRADO Y DESENCOFRADO EN PARAPETO m2 2.45 62.13 152.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.45 152.22 100.00%
08.01.04.06.03 PARAPETO ACERO fy=4,200 kg/cm2 kg 10.26 4.18 42.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.26 42.89 100.00%
08.01.04.07 LOSAS ALIGERADAS 314.53
08.01.04.07.01 CONCRETO LOSA ALIGERADA f'c= 210 kg/cm2 m3 0.21 449.81 94.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.21 94.46 100.00%
08.01.04.07.02 LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO m2 2.41 51.12 123.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.41 123.20 100.00%
08.01.04.07.03 LOSAS ALIGERADAS ACERO fy=4,200 kg/cm2 kg 9.41 4.18 39.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.41 39.33 100.00%
08.01.04.07.04 LOSA ALIGERADA LADRILLO HUECO 15X30X30 und 21.00 2.74 57.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.00 57.54 100.00%
08.02 ARQUITECTURA 9,207.85
08.02.01 ALBAÑILERIA 798.58
08.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARE m2 14.42 55.38 798.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.42 798.58 100.00%
08.02.02 REVOQUES 1,810.03
Página 22
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
08.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 m2 14.42 26.62 383.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.42 383.86 100.00%
08.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 m2 14.42 26.62 383.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.42 383.86 100.00%
08.02.02.03 TARRAJEO DE COLUMNAS C:A-1:4 m2 12.72 28.80 366.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.72 366.34 100.00%
08.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS m 37.10 3.45 128.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.10 128.00 100.00%
08.02.02.05 TARRAJEO DE VIGAS C:A-1:4 m2 9.61 31.39 301.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.61 301.66 100.00%
08.02.02.06 VESTIDURA DE ARISTAS EN VIGAS m 23.30 3.45 80.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.30 80.39 100.00%
08.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1 m 12.20 13.60 165.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.20 165.92 100.00%
08.02.03 CIELO RASO 104.50
08.02.03.01 TARRAJEO DE CIELO RASO - SUPERFICIE CON CEMENTO-A m2 2.41 43.36 104.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.41 104.50 100.00%
08.02.04 PISOS Y PAVIMENTOS 197.59
08.02.04.01 PISO CEMENTO PULIDO E=2" m2 3.81 51.86 197.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.81 197.59 100.00%
08.02.05 CONTRAZOCALOS 267.96
08.02.05.01 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 17.40 15.40 267.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.40 267.96 100.00%
08.02.06 CARPINTERIA MADERA 1,276.07
08.02.06.01 PUERTA CONTRAPLACADA SEGUN DISEÑO m2 3.64 350.57 1,276.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.64 1,276.07 100.00%
08.02.07 CARPINTERIA METALICA 3,627.00
08.02.07.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 2.44 192.98 470.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.44 470.87 100.00%
08.02.07.02 PUERTA INGRESO PRINCIPAL C/PERFILES 3/16" m2 9.62 328.08 3,156.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.62 3,156.13 100.00%
08.02.08 CERRAJERIA 209.92
08.02.08.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 2.00 77.93 155.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 155.86 100.00%
08.02.08.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 6.00 9.01 54.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 54.06 100.00%
08.02.09 VIDRIOS, CRISTALES Y SIMILARES 339.28
08.02.09.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 26.26 12.92 339.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.26 339.28 100.00%
08.02.10 PINTURAS 576.92
08.02.10.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 23.84 10.57 251.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.84 251.99 100.00%
08.02.10.02 PINTURA EN CONTRAZOCALO m2 3.48 7.96 27.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.48 27.70 100.00%
08.02.10.03 PINTURA EN VIGAS m2 9.61 13.73 131.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.61 131.95 100.00%
08.02.10.04 PINTURA EN COLUMNAS m2 10.60 13.19 139.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.60 139.81 100.00%
08.02.10.05 PINTURA EN CIELO RASO m2 2.41 10.57 25.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.41 25.47 100.00%
08.03 INSTALACIONES ELECTRICAS 1,807.85
08.03.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 2.00 145.99 291.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 291.98 100.00%
08.03.02 SALIDA TOMACORRIENTE pto 2.00 215.17 430.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 430.34 100.00%
08.03.03 SALIDA PARA INTERRUPTOR SIMPLE pto 2.00 108.23 216.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 216.46 100.00%
08.03.04 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR CIR und 2.00 68.59 137.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 137.18 100.00%
08.03.05 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 12.00 10.81 129.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 129.72 100.00%
08.03.06 ALAMBRE THHN 2.5 mm2 m 36.00 1.67 60.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.00 60.12 100.00%
08.03.07 ALAMBRE THHN 4 mm2 m 24.00 2.19 52.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 52.56 100.00%
08.03.08 TABLERO DE DISTRIBUCION und 1.00 439.49 439.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 439.49 100.00%
08.03.09 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
08.04 INSTALACIONES SANITARIAS 2,384.54
08.04.01 APARATOS Y ACCESORIOS SANITARIOS 596.94
08.04.01.01 INODORO TANQUE BAJO pza 1.00 361.79 361.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 361.79 100.00%
08.04.01.02 LAVATORIO DE LOZA BLANCA und 1.00 195.88 195.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 195.88 100.00%
08.04.01.03 CAÑO DE BRONCE - LLAVE DE 1/2" und 1.00 39.27 39.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 39.27 100.00%
08.04.02 SISTEMA DE DESAGUE 1,219.68
08.04.02.01 SALIDA DE DESAGUE PVC D=2" pto 2.00 93.15 186.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 186.30 100.00%
08.04.02.02 SALIDA DE DESAGUE PVC D=4" pto 1.00 145.54 145.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 145.54 100.00%
08.04.02.03 SALIDA VENTILACION DE 2" pto 1.00 58.08 58.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 58.08 100.00%
08.04.02.04 REGISTRO DE BRONCE 4" und 1.00 285.99 285.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 285.99 100.00%
08.04.02.05 SUMIDERO DE 2" pza 1.00 77.41 77.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 77.41 100.00%
08.04.02.06 TUBERIA PVC SAL P/DESAGUE D=4" m 3.00 33.95 101.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 101.85 100.00%
08.04.02.07 YEE PVC SAL 4"X2" und 1.00 61.97 61.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 61.97 100.00%
08.04.02.08 CODO PVC SAL P/DESAGUE D=2" und 2.00 25.81 51.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 51.62 100.00%
08.04.02.09 EXCAVACION MANUAL PARA TUBERIA m 3.00 14.89 44.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 44.67 100.00%
08.04.02.10 REFINE NIVELACION Y COMPACTACION DE ZANJA m 3.00 3.86 11.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 11.58 100.00%
08.04.02.11 CAMA DE APOYO m 3.00 9.44 28.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 28.32 100.00%
08.04.02.12 RELLENO COMPACTADO DE ZANJAS m 3.00 12.00 36.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 36.00 100.00%
08.04.02.13 CAJA DE REGISTRO CON REJILLA METALICA und 1.00 130.35 130.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 130.35 100.00%
08.04.03 SISTEMA DE AGUA FRIA 567.92
08.04.03.01 SALIDA DE AGUA FRIA TUBERIA PVC C-10 D=1/2" pto 2.00 72.84 145.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 145.68 100.00%
08.04.03.02 TUBERIA PVC SAP CLASE 10-1/2" m 3.50 17.01 59.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.50 59.54 100.00%
Página 23
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
08.04.03.03 CODO PVC 1/2" und 1.00 9.94 9.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 9.94 100.00%
08.04.03.04 TEE PVC 1/2" und 1.00 11.04 11.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 11.04 100.00%
08.04.03.05 EXCAVACION MANUAL PARA TUBERIA m 3.50 14.89 52.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.50 52.12 100.00%
08.04.03.06 REFINE NIVELACION Y COMPACTACION DE ZANJA m 3.50 3.86 13.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.50 13.51 100.00%
08.04.03.07 CAMA DE APOYO m 3.50 9.44 33.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.50 33.04 100.00%
08.04.03.08 RELLENO COMPACTADO DE ZANJAS m 3.50 12.00 42.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.50 42.00 100.00%
08.04.03.09 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE und 1.00 70.70 70.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 70.70 100.00%
08.04.03.10 CAJA PARA VALVULAS und 1.00 130.35 130.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 130.35 100.00%
09 MITIGACIÓN AMBIENTAL 25,000.00
09.01 MITIGACION DEL IMPACTO AMBIENTAL glb 1.00 25,000.00 25,000.00 0.80 20,000.00 80.00% 0.00 0.00 0.00% 0.80 20,000.00 80.00% 0.20 5,000.00 20.00%
10 CAPACITACION Y SENSIBILIZACION 19,880.00
10.01 CAPACITACION PARA MANTENIMIENTO glb 1.00 8,380.00 8,380.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 8,380.00 100.00%
10.02 SENSIBILIZACION DE BENEFICIARIOS glb 1.00 11,500.00 11,500.00 0.30 3,450.00 30.00% 0.00 0.00 0.00% 0.30 3,450.00 30.00% 0.70 8,050.00 70.00%
11 REMODELACION Y CAMBIO DE CUBIERTA SECTOR PRIMARIA AULAS 1 Y 2 65,432.56
11.01 CARPINTERIA MADERA 2,580.34
11.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 5.20 496.22 2,580.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.20 2,580.34 100.00%
11.02 CARPINTERIA METALICA 3,189.96
11.02.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 16.53 192.98 3,189.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.53 3,189.96 100.00%
11.03 CERRAJERIA 209.92
11.03.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 2.00 77.93 155.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 155.86 100.00%
11.03.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 6.00 9.01 54.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 54.06 100.00%
11.04 VIDRIOS, CRISTALES Y SIMILARES 2,298.86
11.04.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 177.93 12.92 2,298.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.93 2,298.86 100.00%
11.05 PINTURAS 3,174.34
11.05.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 164.80 10.57 1,741.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 164.80 1,741.94 100.00%
11.05.02 PINTURA EN VIGAS m2 77.60 13.73 1,065.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 77.60 1,065.45 100.00%
11.05.03 PINTURA EN COLUMNAS m2 27.82 13.19 366.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.82 366.95 100.00%
11.06 CUBIERTA METALICA Y CIELO RASO 44,352.34
11.06.01 DESMONTAJE DE COBERTURA EXISTENTE glb 1.00 607.27 607.27 1.00 607.27 100.00% 0.00 0.00 0.00% 1.00 607.27 100.00% 0.00 0.00 0.00%
11.06.02 RESANE PRODUCTO DE DESMONTAJE glb 1.00 1,582.15 1,582.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,582.15 100.00%
11.06.03 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS m2 132.41 122.00 16,154.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.41 16,154.02 100.00%
11.06.04 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORT m 136.50 75.18 10,262.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 136.50 10,262.07 100.00%
11.06.05 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 135.05 116.60 15,746.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 135.05 15,746.83 100.00%
11.07 INSTALACIONES ELECTRICAS 8,783.50
11.07.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 15.00 145.99 2,189.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 2,189.85 100.00%
11.07.02 SALIDA TOMACORRIENTE pto 5.00 215.17 1,075.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 1,075.85 100.00%
11.07.03 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 108.23 108.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 108.23 100.00%
11.07.04 SALIDA PARA INTERRUPTOR DOBLE pto 2.00 112.89 225.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 225.78 100.00%
11.07.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/E und 15.00 205.71 3,085.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 3,085.65 100.00%
11.07.06 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 73.02 10.81 789.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 73.02 789.35 100.00%
11.07.07 ALAMBRE THHN 2.5 mm2 m 147.44 1.67 246.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 147.44 246.22 100.00%
11.07.08 ALAMBRE THHN 4 mm2 m 71.61 2.19 156.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.61 156.83 100.00%
11.07.09 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
11.07.10 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
11.08 VARIOS 843.30 0.00
11.08.01 CANALETA PARA AGUA FLUVIAL DE 4" m 27.30 30.89 843.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.30 843.30 100.00%
12 REMODELACION Y CAMBIO DE CUBIERTA SECTOR PRIMARIA AULAS 1 Y 2 65,432.56
12.01 CARPINTERIA MADERA 2,580.34
12.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 5.20 496.22 2,580.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.20 2,580.34 100.00%
12.02 CARPINTERIA METALICA 3,189.96
12.02.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 16.53 192.98 3,189.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.53 3,189.96 100.00%
12.03 CERRAJERIA 209.92
12.03.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 2.00 77.93 155.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 155.86 100.00%
12.03.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 6.00 9.01 54.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 54.06 100.00%
12.04 VIDRIOS, CRISTALES Y SIMILARES 2,298.86
12.04.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 177.93 12.92 2,298.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.93 2,298.86 100.00%
12.05 PINTURAS 3,174.34
12.05.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 164.80 10.57 1,741.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 164.80 1,741.94 100.00%
12.05.02 PINTURA EN VIGAS m2 77.60 13.73 1,065.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 77.60 1,065.45 100.00%
12.05.03 PINTURA EN COLUMNAS m2 27.82 13.19 366.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.82 366.95 100.00%
12.06 CUBIERTA METALICA Y CIELO RASO 44,352.34
Página 24
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
12.06.01 DESMONTAJE DE COBERTURA EXISTENTE glb 1.00 607.27 607.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 607.27 100.00%
12.06.02 RESANE PRODUCTO DE DESMONTAJE glb 1.00 1,582.15 1,582.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,582.15 100.00%
12.06.03 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS m2 132.41 122.00 16,154.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.41 16,154.02 100.00%
12.06.04 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORT m 136.50 75.18 10,262.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 136.50 10,262.07 100.00%
12.06.05 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 135.05 116.60 15,746.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 135.05 15,746.83 100.00%
12.07 INSTALACIONES ELECTRICAS 8,783.50
12.07.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 15.00 145.99 2,189.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 2,189.85 100.00%
12.07.02 SALIDA TOMACORRIENTE pto 5.00 215.17 1,075.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 1,075.85 100.00%
12.07.03 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 108.23 108.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 108.23 100.00%
12.07.04 SALIDA PARA INTERRUPTOR DOBLE pto 2.00 112.89 225.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 225.78 100.00%
12.07.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/E und 15.00 205.71 3,085.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 3,085.65 100.00%
12.07.06 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 73.02 10.81 789.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 73.02 789.35 100.00%
12.07.07 ALAMBRE THHN 2.5 mm2 m 147.44 1.67 246.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 147.44 246.22 100.00%
12.07.08 ALAMBRE THHN 4 mm2 m 71.61 2.19 156.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.61 156.83 100.00%
12.07.09 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
12.07.10 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
12.08 VARIOS 843.30
12.08.01 CANALETA PARA AGUA FLUVIAL DE 4" m 27.30 30.89 843.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.30 843.30 100.00%
13 REMODELACION Y CAMBIO DE CUBIERTA SECTOR PRIMARIA AULAS 1 Y 2 65,432.56
13.01 CARPINTERIA MADERA 2,580.34
13.01.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 5.20 496.22 2,580.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.20 2,580.34 100.00%
13.02 CARPINTERIA METALICA 3,189.96
13.02.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 16.53 192.98 3,189.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.53 3,189.96 100.00%
13.03 CERRAJERIA 209.92
13.03.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 2.00 77.93 155.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 155.86 100.00%
13.03.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 6.00 9.01 54.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 54.06 100.00%
13.04 VIDRIOS, CRISTALES Y SIMILARES 2,298.86
13.04.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 177.93 12.92 2,298.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.93 2,298.86 100.00%
13.05 PINTURAS 3,174.34
13.05.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 164.80 10.57 1,741.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 164.80 1,741.94 100.00%
13.05.02 PINTURA EN VIGAS m2 77.60 13.73 1,065.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 77.60 1,065.45 100.00%
13.05.03 PINTURA EN COLUMNAS m2 27.82 13.19 366.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.82 366.95 100.00%
13.06 CUBIERTA METALICA Y CIELO RASO 44,352.34 0.00
13.06.01 DESMONTAJE DE COBERTURA EXISTENTE glb 1.00 607.27 607.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 607.27 100.00%
13.06.02 RESANE PRODUCTO DE DESMONTAJE glb 1.00 1,582.15 1,582.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,582.15 100.00%
13.06.03 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS m2 132.41 122.00 16,154.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.41 16,154.02 100.00%
13.06.04 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORT m 136.50 75.18 10,262.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 136.50 10,262.07 100.00%
13.06.05 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 135.05 116.60 15,746.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 135.05 15,746.83 100.00%
13.07 INSTALACIONES ELECTRICAS 8,783.50
13.07.01 SALIDA DE TECHO PARA CENTRO DE LUZ pto 15.00 145.99 2,189.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 2,189.85 100.00%
13.07.02 SALIDA TOMACORRIENTE pto 5.00 215.17 1,075.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 1,075.85 100.00%
13.07.03 SALIDA PARA INTERRUPTOR SIMPLE pto 1.00 108.23 108.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 108.23 100.00%
13.07.04 SALIDA PARA INTERRUPTOR DOBLE pto 2.00 112.89 225.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 225.78 100.00%
13.07.05 SUM. E INST. DE ARTEFACTO DE ALUMBRADO INTERIOR P/E und 15.00 205.71 3,085.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 15.00 3,085.65 100.00%
13.07.06 TUBERIA PVC-SAP ELECTRICA DE 20 mm m 73.02 10.81 789.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 73.02 789.35 100.00%
13.07.07 ALAMBRE THHN 2.5 mm2 m 147.44 1.67 246.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 147.44 246.22 100.00%
13.07.08 ALAMBRE THHN 4 mm2 m 71.61 2.19 156.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.61 156.83 100.00%
13.07.09 PRUEBA ELECTRICA glb 1.00 50.00 50.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 50.00 100.00%
13.07.10 POZO DE CONEXION A TIERRA und 1.00 855.74 855.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 855.74 100.00%
13.08 VARIOS 843.30
13.08.01 CANALETA PARA AGUA FLUVIAL DE 4" m 27.30 30.89 843.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.30 843.30 100.00%
14 CONSTRUCCION DE VEREDAS 124,773.80
14.01 OBRAS PRELIMINARES 2,711.41
14.01.01 LIMPIEZA DE TERRENO m2 1,034.89 0.97 1,003.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,034.89 1,003.84 100.00%
14.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 1,034.89 1.65 1,707.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,034.89 1,707.57 100.00%
14.02 MOVIMIENTO DE TIERRAS 43,860.65
14.02.01 CORTE DE TERRENO CON MAQUINARIA m3 206.98 5.34 1,105.27 200.00 1,068.00 96.63% 0.00 0.00 0.00% 200.00 1,068.00 96.63% 6.98 37.27 3.37%
14.02.02 BASE PARA VEREDAS DE 0.15 M m2 1,034.89 37.51 38,818.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,034.89 38,818.72 100.00%
14.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 248.37 15.85 3,936.66 240.00 3,804.00 96.63% 0.00 0.00 0.00% 240.00 3,804.00 96.63% 8.37 132.66 3.37%
14.03 CONCRETO SIMPLE 78,201.74
14.03.01 VEREDA CONC. FC=175 KG/CM2 E=4" m2 1,034.89 43.57 45,090.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,034.89 45,090.16 100.00%
Página 25
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
14.03.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS m2 275.97 41.82 11,541.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 275.97 11,541.07 100.00%
14.03.03 JUNTA DE DILATACION m 1,379.85 13.78 19,014.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,379.85 19,014.33 100.00%
14.03.04 CURADO CON AGUA EN VEREDA m2 1,034.89 2.47 2,556.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,034.89 2,556.18 100.00%
15 RAMPAS 8,542.76
15.01 OBRAS PRELIMINARES 104.64
15.01.01 LIMPIEZA DE TERRENO m2 39.94 0.97 38.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.94 38.74 100.00%
15.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 39.94 1.65 65.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.94 65.90 100.00%
15.02 MOVIMIENTO DE TIERRAS 255.14
15.02.01 CORTE DE TERRENO CON MAQUINARIA m3 1.25 5.34 6.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.25 6.68 100.00%
15.02.02 BASE PARA RAMPAS DE 0.15 M m2 5.99 37.51 224.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.99 224.68 100.00%
15.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 1.50 15.85 23.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.50 23.78 100.00%
15.03 CONCRETO SIMPLE 3,159.80
15.03.01 CONCRETO FROTACHADO EN LOSA FC=175 KG/CM2 E=4" m3 4.63 439.64 2,035.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.63 2,035.53 100.00%
15.03.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 19.17 41.82 801.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.17 801.69 100.00%
15.03.03 JUNTA DE DILATACION m 16.25 13.78 223.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.25 223.93 100.00%
15.03.04 CURADO CON AGUA EN RAMPAS m2 39.94 2.47 98.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.94 98.65 100.00%
15.04 CARPINTERIA METALICA 5,023.18
15.04.01 BARANDAS METALICAS DE TUBO 2" m 63.90 78.61 5,023.18 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 63.90 5,023.18 100.00%
16 GRADAS Y ESCALERAS 15,269.04
16.01 OBRAS PRELIMINARES 60.34
16.01.01 LIMPIEZA DE TERRENO m2 22.43 0.95 21.31 2.90 2.76 12.93% 0.00 0.00 0.00% 2.90 2.76 12.93% 19.53 18.56 87.07%
16.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 22.43 1.74 39.03 2.90 5.05 12.93% 0.00 0.00 0.00% 2.90 5.05 12.93% 19.53 33.98 87.07%
16.02 MOVIMIENTO DE TIERRAS 1,247.62
16.02.01 EXCAVACION DE ZANJAS MANUAL m3 5.25 41.41 217.40 1.00 41.41 19.05% 0.00 0.00 0.00% 1.00 41.41 19.05% 4.25 175.99 80.95%
16.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 13.46 27.36 368.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.46 368.27 100.00%
16.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 3.36 197.01 661.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.36 661.95 100.00%
16.03 OBRAS DE CONCRETO 6,737.15
16.03.01 CIMIENTOS 1,749.14
16.03.01.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 3 m3 5.25 333.17 1,749.14 1.00 333.17 19.05% 0.00 0.00 0.00% 1.00 333.17 19.05% 4.25 1,415.97 80.95%
16.03.02 ESCALERAS 4,988.01
16.03.02.01 ESCALERAS CONCRETO FC=210 KG/CM2 m3 7.98 449.81 3,589.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.98 3,589.48 100.00%
16.03.02.02 ESCALERA ENCOFRADO Y DESENCOFRADO m2 14.70 60.97 896.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.70 896.26 100.00%
16.03.02.03 ESCALERA ACERO fy=4,200 kg/cm2 kg 120.16 4.18 502.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 120.16 502.27 100.00%
16.04 REVOQUES 1,470.32
16.04.01 REVESTIMIENTO DE GRADAS Y ESCALERA m2 39.90 36.85 1,470.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 39.90 1,470.32 100.00%
16.05 CARPINTERIA METALICA 4,997.34
16.05.01 BARANDAS METALICAS DE TUBO 2" m 44.85 78.61 3,525.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 44.85 3,525.66 100.00%
16.05.02 CANTONERA DE ALUMINIO EN PASOS DE ESCALERA m 84.00 17.52 1,471.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 84.00 1,471.68 100.00%
16.06 PINTURAS 466.89
16.06.01 PINTURA ANTICORROSIVA EN BARANDAS m 44.85 10.41 466.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 44.85 466.89 100.00%
16.07 VARIOS 289.38
16.07.01 JUNTA DE DILATACION m 21.00 13.78 289.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.00 289.38 100.00%
17 PATIO DE HONOR 28,317.10
17.01 OBRAS PRELIMINARES 709.26
17.01.01 LIMPIEZA DE TERRENO m2 270.71 0.97 262.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 270.71 262.59 100.00%
17.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 270.71 1.65 446.67 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 270.71 446.67 100.00%
17.02 MOVIMIENTO DE TIERRAS 11,012.28
17.02.01 CORTE DE TERRENO CON MAQUINARIA m3 27.07 5.34 144.55 27.07 144.55 100.00% 0.00 0.00 0.00% 27.07 144.55 100.00% 0.00 0.00 0.00%
17.02.02 BASE GRANULAR DE 0.15 M m2 276.00 37.51 10,352.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 276.00 10,352.76 100.00%
17.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 32.49 15.85 514.97 32.49 514.97 100.00% 0.00 0.00 0.00% 32.49 514.97 100.00% 0.00 0.00 0.00%
17.03 CONCRETO SIMPLE 16,595.56
17.03.01 CONCRETO SEMIPULIDO EN LOSA FC=175 KG/CM2 m3 27.07 439.64 11,901.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.07 11,901.05 100.00%
17.03.02 ENCOFRADO Y DESENCOFRADO EN PATIO m2 36.80 41.82 1,538.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.80 1,538.98 100.00%
17.03.03 JUNTA DE DILATACION m 180.47 13.78 2,486.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 180.47 2,486.88 100.00%
17.03.04 CURADO CON AGUA m2 270.71 2.47 668.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 270.71 668.65 100.00%
18 LOSAS DEPORTIVA 60,745.47
18.01 OBRAS PRELIMINARES 1,092.02
18.01.01 LIMPIEZA DE TERRENO m2 416.80 0.97 404.30 416.80 404.30 100.00% 0.00 0.00 0.00% 416.80 404.30 100.00% 0.00 0.00 0.00%
18.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 416.80 1.65 687.72 416.80 687.72 100.00% 0.00 0.00 0.00% 416.80 687.72 100.00% 0.00 0.00 0.00%
18.02 MOVIMIENTO DE TIERRAS 17,157.10
18.02.01 CORTE DE TERRENO CON MAQUINARIA m3 62.52 5.34 333.86 62.52 333.86 100.00% 0.00 0.00 0.00% 62.52 333.86 100.00% 0.00 0.00 0.00%
Página 26
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
18.02.02 BASE GRANULAR DE 0.15 M m2 416.80 37.51 15,634.17 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 416.80 15,634.17 100.00%
18.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 75.02 15.85 1,189.07 75.02 1,189.07 100.00% 0.00 0.00 0.00% 75.02 1,189.07 100.00% 0.00 0.00 0.00%
18.03 CONCRETO SIMPLE 31,783.50
18.03.01 CONCRETO SEMIPULIDO EN LOSA FC=175 KG/CM2 m3 62.52 439.64 27,486.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.52 27,486.29 100.00%
18.03.02 ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA m2 83.36 51.55 4,297.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 83.36 4,297.21 100.00%
18.04 PINTURAS 1,837.47
18.04.01 PINTURA DE MARCA EN LOSA DEPORTIVA m 266.30 6.90 1,837.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 266.30 1,837.47 100.00%
18.05 VARIOS 8,875.38
18.05.01 JUNTA DE DILATACION m 277.87 13.78 3,829.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 277.87 3,829.05 100.00%
18.05.02 CURADO CON ADITIVO ANTISOL m2 416.80 3.71 1,546.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 416.80 1,546.33 100.00%
18.05.03 ARCOS DE FUTBOL CON TABLERO DE BASQUET pza 2.00 1,500.00 3,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 3,000.00 100.00%
18.05.04 POSTE DE TUBO PARA VOLEY pza 2.00 250.00 500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 500.00 100.00%
19 CONSTRUCCION DE MURO DE CONTENCION 647,548.41
19.01 OBRAS PRELIMINARES 2,466.94
19.01.01 LIMPIEZA DE TERRENO m2 941.58 0.97 913.33 800.00 776.00 84.96% 0.00 0.00 0.00% 800.00 776.00 84.96% 141.58 137.33 15.04%
19.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 941.58 1.65 1,553.61 800.00 1,320.00 84.96% 0.00 0.00 0.00% 800.00 1,320.00 84.96% 141.58 233.61 15.04%
19.02 MOVIMIENTO DE TIERRAS 123,308.74
19.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 685.44 41.41 28,384.07 120.40 4,985.76 17.57% 0.00 0.00 0.00% 120.40 4,985.76 17.57% 565.04 23,398.31 82.43%
19.02.02 NIVELACION Y APISONADO MANUAL m2 763.37 2.48 1,893.16 50.00 124.00 6.55% 0.00 0.00 0.00% 50.00 124.00 6.55% 713.37 1,769.16 93.45%
19.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO (AFI m3 381.63 197.01 75,184.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 381.63 75,184.93 100.00%
19.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 637.26 27.36 17,435.43 10.00 273.60 1.57% 0.00 0.00 0.00% 10.00 273.60 1.57% 627.26 17,161.83 98.43%
19.02.05 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 25.94 15.85 411.15 8.00 126.80 30.84% 0.00 0.00 0.00% 8.00 126.80 30.84% 17.94 284.35 69.16%
19.03 OBRAS DE CONCRETO 520,704.96
19.03.01 CONCRETO CICLOPEO MURO DE CONTENCION FC=140 KG/CM m3 1,108.26 372.14 412,427.88 215.00 80,010.10 19.40% 0.00 0.00 0.00% 215.00 80,010.10 19.40% 893.26 332,417.78 80.60%
19.03.02 ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION m2 2,120.17 51.07 108,277.08 296.00 15,116.72 13.96% 0.00 0.00 0.00% 296.00 15,116.72 13.96% 1,824.17 93,160.36 86.04%
19.04 VARIOS 1,067.77
19.04.01 TUBERIA PVC SAL D=3" DRENAJE MUROS m 83.16 12.84 1,067.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 83.16 1,067.77 100.00%
20 CONSTRUCCION DE CERCO 53,726.28
20.01 OBRAS PRELIMINARES 127.62
20.01.01 LIMPIEZA DE TERRENO m2 48.71 0.97 47.25 48.71 47.25 100.00% 0.00 0.00 0.00% 48.71 47.25 100.00% 0.00 0.00 0.00%
20.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 48.71 1.65 80.37 48.71 80.37 100.00% 0.00 0.00 0.00% 48.71 80.37 100.00% 0.00 0.00 0.00%
20.02 MOVIMIENTO DE TIERRAS 49.07 0.00
20.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 0.81 41.41 33.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.81 33.54 100.00%
20.02.02 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 0.98 15.85 15.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.98 15.53 100.00%
20.03 OBRAS DE CONCRETO SIMPLE 269.87
20.03.01 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30 m3 0.81 333.17 269.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.81 269.87 100.00%
20.04 CARPINTERIA METALICA 53,279.72
20.04.01 CERCO MALLA METALICA COCADA DE 2" m 173.51 307.07 53,279.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 173.51 53,279.72 100.00%
21 ADQUISICION E INSTALACION DE POSTES ORNAMENTALES 30,322.97
21.01 ADQUISICION DE POSTES ORNAMENTALES und 26.00 350.00 9,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 9,100.00 100.00%
21.02 TRAZO NIVELADO Y REPLANTEO m2 13.00 1.67 21.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.00 21.71 100.00%
21.03 CIMENTACION PARA POSTES m3 6.50 333.17 2,165.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.50 2,165.61 100.00%
21.04 EXCAVACION DE ZANJAS PARA CABLE SUBTERRANEO m3 76.53 41.41 3,169.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.53 3,169.11 100.00%
21.05 INSTALACION DE POSTES ORNAMENTALES und 26.00 6.34 164.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 164.84 100.00%
21.06 INSTALACION DE FAROLAS ORNAMENTALES und 26.00 209.37 5,443.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 26.00 5,443.62 100.00%
21.07 INSTALACION DE CABLE SUBTERRANEO NYY 3X10MM2 m 306.12 33.51 10,258.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 306.12 10,258.08 100.00%
22 CORTES GENERALES 145,915.73
22.01 EXCAVACION CON MAQUINARIA m3 5,516.20 6.96 38,392.75 5,516.20 38,392.75 100.00% 0.00 0.00 0.00% 5,516.20 38,392.75 100.00% 0.00 0.00 0.00%
22.02 RELLENO CON MATERIAL PROPIO, COMPACTADO m3 345.58 27.36 9,455.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 345.58 9,455.07 100.00%
22.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP m3 6,187.25 15.85 98,067.91 6,187.25 98,067.91 100.00% 0.00 0.00 0.00% 6,187.25 98,067.91 100.00% 0.00 0.00 0.00%
23 INSTALACION DE SISTEMA DE AGUA Y DESAGUE 28,190.61
23.01 SISTEMA DE DESAGUE 8,307.53
23.01.01 TRAZO NIVELADO Y REPLANTEO m 91.31 1.65 150.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.31 150.66 100.00%
23.01.02 EXCAVACION MANUAL PARA TUBERIA m 91.31 14.89 1,359.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.31 1,359.61 100.00%
23.01.03 REFINE NIVELACION Y COMPACTACION DE ZANJA m 91.31 3.86 352.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.31 352.46 100.00%
23.01.04 CAMA DE APOYO m 91.31 9.44 861.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.31 861.97 100.00%
23.01.05 RELLENO COMPACTADO DE ZANJAS m 91.31 12.00 1,095.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.31 1,095.72 100.00%
23.01.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 3.65 15.85 57.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.65 57.85 100.00%
23.01.07 SUMINISTRO E INSTALACION DE TUBERIA 4" DE DESAGUE m 14.03 21.56 302.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.03 302.49 100.00%
23.01.08 SUMINISTRO E INSTALACION DE TUBERIA 6" DE DESAGUE m 77.28 41.51 3,207.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 77.28 3,207.89 100.00%
23.01.09 CAJAS DE REGISTRO DE DESAGUE 60 x 60 cm und 3.00 192.46 577.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 577.38 100.00%
Página 27
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
23.01.10 PRUEBA HIDRAULICA m 91.31 3.74 341.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.31 341.50 100.00%
23.02 SISTEMA DE AGUA 6,827.77
23.02.01 TRAZO NIVELADO Y REPLANTEO m 112.03 1.65 184.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.03 184.85 100.00%
23.02.02 EXCAVACION MANUAL PARA TUBERIA m 112.03 14.89 1,668.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.03 1,668.13 100.00%
23.02.03 REFINE NIVELACION Y COMPACTACION DE ZANJA m 112.03 3.86 432.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.03 432.44 100.00%
23.02.04 CAMA DE APOYO m 112.03 9.44 1,057.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.03 1,057.56 100.00%
23.02.05 RELLENO COMPACTADO DE ZANJAS m 112.03 12.00 1,344.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.03 1,344.36 100.00%
23.02.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 5.38 15.85 85.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.38 85.27 100.00%
23.02.07 SUMINISTRO E INSTALACION DE TUBERIA 1 1/2" AGUA m 75.48 15.65 1,181.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 75.48 1,181.26 100.00%
23.02.08 SUMINISTRO E INSTALACION DE TUBERIA 3/4" AGUA m 36.55 10.07 368.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.55 368.06 100.00%
23.02.09 SUMINISTRO E INSTALACION DE ACCESORIOS glb 1.00 86.85 86.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 86.85 100.00%
23.02.10 PRUEBA HIDRAULICA m 112.03 3.74 418.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 112.03 418.99 100.00%
23.03 SISTEMA DE DRENAJE 13,055.31
23.03.01 TRAZO NIVELADO Y REPLANTEO m 133.95 1.65 221.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 133.95 221.02 100.00%
23.03.02 EXCAVACION MANUAL PARA TUBERIA m 133.95 14.89 1,994.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 133.95 1,994.52 100.00%
23.03.03 REFINE NIVELACION Y COMPACTACION DE ZANJA m 133.95 3.86 517.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 133.95 517.05 100.00%
23.03.04 CAMA DE APOYO m 133.95 9.44 1,264.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 133.95 1,264.49 100.00%
23.03.05 RELLENO COMPACTADO DE ZANJAS m 133.95 12.00 1,607.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 133.95 1,607.40 100.00%
23.03.06 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 5.36 15.85 84.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.36 84.96 100.00%
23.03.07 SUMINISTRO E INSTALACION DE TUBERIA 4" DE DESAGUE m 55.02 21.56 1,186.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 55.02 1,186.23 100.00%
23.03.08 SUMINISTRO E INSTALACION DE TUBERIA 6" DE DESAGUE m 41.00 41.51 1,701.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 41.00 1,701.91 100.00%
23.03.09 SUMINISTRO E INSTALACION DE TUBERIA 8" DE DESAGUE m 37.93 51.82 1,965.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 37.93 1,965.53 100.00%
23.03.10 CAJA DE REGISTRO 30X60 CM CON REJILLA METALICA und 11.00 130.35 1,433.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.00 1,433.85 100.00%
23.03.11 CAJAS DE REGISTRO DE DESAGUE 60 x 60 cm und 3.00 192.46 577.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 577.38 100.00%
23.03.12 PRUEBA HIDRAULICA m 133.95 3.74 500.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 133.95 500.97 100.00%
24 INSTALACIONES ELECTRICAS GENERALES 22,569.52
24.01 TRAZO NIVELADO Y REPLANTEO m 140.00 1.65 231.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 140.00 231.00 100.00%
24.02 EXCAVACION MANUAL PARA TUBERIA m 140.00 14.89 2,084.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 140.00 2,084.60 100.00%
24.03 REFINE NIVELACION Y COMPACTACION DE ZANJA m 140.00 3.86 540.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 140.00 540.40 100.00%
24.04 CAMA DE APOYO m 140.00 9.44 1,321.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 140.00 1,321.60 100.00%
24.05 RELLENO COMPACTADO DE ZANJAS m 140.00 12.00 1,680.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 140.00 1,680.00 100.00%
24.06 CABLE NYY 6MM2 m 657.93 7.04 4,631.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 657.93 4,631.83 100.00%
24.07 CABLE NYY 10MM2 m 347.04 10.57 3,668.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 347.04 3,668.21 100.00%
24.08 CABLE NYY 16MM2 m 255.00 15.18 3,870.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 255.00 3,870.90 100.00%
24.09 SUMINISTRO E INSTALACION DE TUBERIA ELECTRICA 1" m 419.99 8.79 3,691.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 419.99 3,691.71 100.00%
24.10 TABLERO DE DISTRIBUCION und 1.00 543.57 543.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 543.57 100.00%
24.11 CAJA DE REGISTRO 40X40 CM und 3.00 101.90 305.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 305.70 100.00%
25 AREAS VERDES 42,366.85
25.01 OBRAS PRELIMINARES 1,990.31
25.01.01 LIMPIEZA DE TERRENO m2 759.66 0.97 736.87 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 736.87 100.00%
25.01.02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 759.66 1.65 1,253.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 1,253.44 100.00%
25.02 MOVIMIENTO DE TIERRAS 15,402.98
25.02.01 CORTE MANUAL DE TERRENO m3 75.97 24.14 1,833.92 50.00 1,207.00 65.82% 0.00 0.00 0.00% 50.00 1,207.00 65.82% 25.97 626.92 34.18%
25.02.02 PREPARACION DE TIERRA DE CHACRA m2 759.66 6.53 4,960.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 4,960.58 100.00%
25.02.03 EXT. Y NIV. DE TIERRA DE CHACRA PARA SEMBRADO DE GRA m2 759.66 9.43 7,163.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 7,163.59 100.00%
25.02.04 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125 m3 91.16 15.85 1,444.89 70.00 1,109.50 76.79% 0.00 0.00 0.00% 70.00 1,109.50 76.79% 21.16 335.39 23.21%
25.03 SEMBRADO DE GRASS 17,973.56
25.03.01 SEMBRADO DE GRASS m2 759.66 23.66 17,973.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 17,973.56 100.00%
25.04 VARIOS 7,000.00
25.04.01 ADQUISICION E INSTALACION DE JUEGO RECREATIVOS und 2.00 3,500.00 7,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 7,000.00 100.00%
26 ADQUISICION DE EQUIPAMIENTO 63,256.00
26.01 ADQUISICION DE EQUIPAMIENTO COCINA glb 1.00 4,980.00 4,980.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,980.00 100.00%
26.02 ADQUISICION DE EQUIPAMIENTO SALA DE COMPUTO glb 1.00 58,276.00 58,276.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 58,276.00 100.00%
27 ADQUISICION DE MOBILIARIO ESCOLAR 64,465.00
27.01 ADQUISICION DE MOBILIARIO ESCOLAR INICIAL glb 4.00 240.00 960.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 960.00 100.00%
27.02 ADQUISICION DE MOBILIARIO ESCOLAR PRIMARIO glb 74.00 270.00 19,980.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 74.00 19,980.00 100.00%
27.03 ADQUISICION DE MOBILIARIO ESCOLAR SECUNDARIO glb 53.00 270.00 14,310.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 53.00 14,310.00 100.00%
27.04 ADQUISICION DE MOBILIARIO PARA AULAS glb 1.00 10,380.00 10,380.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 10,380.00 100.00%
27.05 ADQUISICION DE MOBILIARIO PARA SALA DE USOS MULTIPLES glb 1.00 3,615.00 3,615.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,615.00 100.00%
27.06 ADQUISICION DE MOBILIARIO PARA SALA DE COMPUTO glb 1.00 6,865.00 6,865.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 6,865.00 100.00%
27.07 ADQUISICION DE MOBILIARIO PARA DIRECCION glb 1.00 715.00 715.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 715.00 100.00%
Página 28
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
27.08 ADQUISICION DE MOBILIARIO PARA SECRETARIA Y ESPERA glb 1.00 970.00 970.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 970.00 100.00%
27.09 ADQUISICION DE MOBILIARIO PARA SALA DE PROFESORES glb 1.00 2,295.00 2,295.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,295.00 100.00%
27.10 ADQUISICION DE MOBILIARIO PARA CENTRO DE RECURSOS E glb 1.00 2,855.00 2,855.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,855.00 100.00%
27.11 ADQUISICION DE MOBILIARIO PARA COCINA glb 1.00 1,520.00 1,520.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,520.00 100.00%
28 FLETE TERRESTRE 4,000.00
28.01 TRANSPORTE DE EQUIPAMIENTO Y MOBILIARIO A OBRA glb 1.00 4,000.00 4,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 4,000.00 100.00%
VALOR REFERENCIAL 4,358,515.80 679,423.65 15.59% 69,400.97 1.59% 748,824.61 17.18% 3,609,691.19 82.82%
EXPEDIENTE TECNICO 110,263.07
Página 29
VALORIZACION N°01
PROPIETARIO : GOBIERNO REGIONAL DE ICA
"MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO CHAVIN –
EJECUCIÓN DE LA OBRA
PROVINCIA CHINCHA – ICA"
UBICACIÓN : ICA - ICA - REGION DE ICA
CONTRATISTA EJECUTOR :
SISTEMA DE CONTRATACIÓN : SUMA ALZADA INICIO DE PLAZO CONTRACTUAL : 2/1/2019
SUPERVISOR DE OBRA :
VALOR REFERENCIAL DE OBRA S/. 1,108,283.37 Incluído IGV PLAZO DE EJECUCION : 180 DIAS CALENDARIOS
VALORIZACIÓN N° 11 - (VB)
VALORIZACIÓN N° 11 BRUTA - (VB) 939,223.19 0.00 100,659.61 100,659.61 10.72% 838,563.58 89.28%
COSTO DIRECTO 711,532.72 76,257.28 76,257.28
GASTO GENERAL - 22% 156,537.20 16,776.60
UTILIDAD - 10% 71,153.27 7,625.73
REAJUSTES (S)
AMORTIZACIONES (A)
0
AMORTIZACION ADELANTO DIRECTO
AMORTIZACION ADELANTO DIRECTO 10% 93,922.32 0.00 10,065.96 10,065.96 10.72% 83,856.36 89.28%
AMORTIZACION ADELANTO DE MATERIALES (NO SOLICITADO) 0.00 0.00 0.00 0.00 0.00% 0.00 0.00%
VALORIZACION N°01ESTRUCTURAS
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
01 OBRAS PROVISIONALES
01.01 CARTEL PARA LA OBRA 2.40 X 3.60 und 1.00 2,000.00 2,000.00 0.00 0.00 0.00% 1.00 2,000.00 100.00% 1.00 2,000.00 100.00% 0.00 0.00 0.00%
01.01.01 ALMACEN DE OBRA glb 1.00 6,000.00 6,000.00 0.00 0.00 0.00% 1.00 6,000.00 100.00% 1.00 6,000.00 100.00% 0.00 0.00 0.00%
01.01.02 OBRAS PRELIMINARES
01.02 TRANSPORTE DE MATERIALES A OBRA glb 1.00 10,000.00 10,000.00 0.00 0.00 0.00% 0.17 1,666.67 16.67% 0.17 1,666.67 16.67% 0.83 8,333.33 83.33%
01.02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS PARAglb 1.00 8,000.00 8,000.00 0.00 0.00 0.00% 0.17 1,333.33 16.67% 0.17 1,333.33 16.67% 0.83 6,666.67 83.33%
01.02.02 IMPLEMENTOS DE SEGURIDAD PARA LOS TRABAJADORES glb 1.00 12,000.00 12,000.00 0.00 0.00 0.00% 0.17 2,000.00 16.67% 0.17 2,000.00 16.67% 0.83 10,000.00 83.33%
01.02.03 LIMPIEZA DE TERRENO m2 272.30 1.03 280.47 0.00 0.00 0.00% 272.30 280.47 100.00% 272.30 280.47 100.00% 0.00 0.00 0.00%
02 TRAZO NIVELADO Y REPLANTEO INICIAL m2 272.30 1.83 498.31 0.00 0.00 0.00% 272.30 498.31 100.00% 272.30 498.31 100.00% 0.00 0.00 0.00%
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 69.93 38.73 2,708.39 0.00 0.00 0.00% 69.93 2,708.39 100.00% 69.93 2,708.39 100.00% 0.00 0.00 0.00%
02.01.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 136.08 38.73 5,270.38 0.00 0.00 0.00% 136.08 5,270.38 100.00% 136.08 5,270.38 100.00% 0.00 0.00 0.00%
02.01.01.02 NIVELACION Y APISONADO MANUAL PARA PISOS m2 231.23 2.50 578.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 231.23 578.08 100.00%
02.01.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 91.95 27.97 2,571.84 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.95 2,571.84 100.00%
02.01.02.01 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 32.31 197.62 6,385.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 32.31 6,385.10 100.00%
02.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ 15 m3 140.30 15.86 2,225.16 0.00 0.00 0.00% 140.30 2,225.16 100.00% 140.30 2,225.16 100.00% 0.00 0.00 0.00%
02.01.02.03 OBRAS DE CONCRETO SIMPLE
02.01.02.04 SOLADO PARA ZAPATAS m2 101.83 22.74 2,315.61 0.00 0.00 0.00% 101.83 2,315.61 100.00% 101.83 2,315.61 100.00% 0.00 0.00 0.00%
02.01.02.05 CONCRETO PARA CIMIENTOS CORRIDOS FC=100 KG/CM2 + 30% PG (6" Mm3 24.13 225.96 5,452.41 0.00 0.00 0.00% 24.13 5,452.41 100.00% 24.13 5,452.41 100.00% 0.00 0.00 0.00%
02.01.02.06 SOBRECIMIENTO 1:8 + 25% P.M m3 10.83 281.44 3,048.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.83 3,048.00 100.00%
02.01.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 139.19 46.99 6,540.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 139.19 6,540.54 100.00%
02.01.03.01 CONCRETO EN FALSO PISO FC=140 KG/CM2 E=10CM m2 231.23 37.83 8,747.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 231.23 8,747.43 100.00%
02.01.03.02 OBRAS DE CONCRETO ARMADO
02.01.03.03 ZAPATAS
02.01.03.04 ZAPATAS CONCRETO f'c=210 kg/cm2 m3 53.51 435.54 23,305.75 0.00 0.00 0.00% 53.51 23,305.75 100.00% 53.51 23,305.75 100.00% 0.00 0.00 0.00%
02.01.03.05 ZAPATAS ACERO fy=4,200 kg/cm2 kg 1,536.34 4.80 7,374.43 0.00 0.00 0.00% 1,536.34 7,374.43 100.00% 1,536.34 7,374.43 100.00% 0.00 0.00 0.00%
02.01.04 VIGA DE CIMENTACION
02.01.04.01 VIGAS DE CIMENTACION CONCRETO f'c=210 kg/cm2 m3 20.09 435.54 8,750.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.09 8,750.00 100.00%
02.01.04.01.01 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 164.77 52.11 8,586.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 164.77 8,586.16 100.00%
02.01.04.01.02 ACERO fy=4,200 kg/cm2 PARA VIGAS DE CIMENTACION kg 2,598.56 4.80 12,473.09 0.00 0.00 0.00% 2,598.56 12,473.09 100.00% 2,598.56 12,473.09 100.00% 0.00 0.00 0.00%
02.01.04.02 COLUMNAS Y PLACAS
02.01.04.02.01 CONCRETO COLUMNAS Y PLACAS f'c=210 kg/cm2 m3 40.62 435.54 17,691.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.62 17,691.63 100.00%
02.01.04.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y PLACAS m2 423.73 53.72 22,762.78 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 423.73 22,762.78 100.00%
02.01.04.02.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS Y PLACAS kg 6,925.84 4.80 33,244.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,925.84 33,244.03 100.00%
02.01.04.03 VIGAS
02.01.04.03.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 28.84 435.54 12,560.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.84 12,560.97 100.00%
02.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 274.68 62.83 17,258.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 274.68 17,258.14 100.00%
02.01.04.03.03 VIGAS ACERO fy=4,200 kg/cm2 kg 3,782.03 4.80 18,153.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,782.03 18,153.74 100.00%
02.01.04.04 LOSA ALIGERADA
02.01.04.04.01 CONCRETO VIGAS f'c=210 kg/cm2 m3 11.60 435.54 5,052.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.60 5,052.26 100.00%
02.01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 132.54 62.83 8,327.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.54 8,327.49 100.00%
02.01.04.04.03 VIGAS ACERO fy=4,200 kg/cm2 kg 466.17 4.80 2,237.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 466.17 2,237.62 100.00%
02.01.04.05 LOSA ALIGERADA LADRILLO HUECO 15X30X30 und 1,104.46 3.07 3,390.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,104.46 3,390.69 100.00%
02.01.04.05.01 COLUMNETAS
02.01.04.05.02 CONCRETO COLUMNETAS f'c=175 kg/cm2 m3 5.72 403.68 2,309.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.72 2,309.05 100.00%
02.01.04.05.03 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 76.32 53.72 4,099.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 76.32 4,099.91 100.00%
Página 31
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
02.02 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNETAS kg 923.29 4.80 4,431.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 923.29 4,431.79 100.00%
02.02.01 ESCALERAS
02.02.01.01 CONCRETO COLUMNAS Y PLACAS f'c=210 kg/cm2 m3 2.54 435.54 1,106.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.54 1,106.27 100.00%
02.02.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS Y PLACAS m2 16.76 53.72 900.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.76 900.35 100.00%
02.02.02.01 ACERO fy=4,200 kg/cm2 GRADO 60 EN COLUMNAS Y PLACAS kg 391.21 4.80 1,877.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 391.21 1,877.81 100.00%
02.02.02.02 CONSTRUCCION DE VEREDAS
02.02.02.03 OBRAS PRELIMINARES
02.02.02.04 LIMPIEZA DE TERRENO m2 182.20 1.05 191.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.20 191.31 100.00%
02.02.02.05 TRAZO NIVELADO Y REPLANTEO INICIAL m2 182.20 1.74 317.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.20 317.03 100.00%
02.02.02.06 MOVIMIENTO DE TIERRAS
02.02.02.07 CORTE DE TERRENO CON MAQUINARIA m3 12.20 5.38 65.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.20 65.64 100.00%
02.02.02.08 BASE PARA VEREDAS DE 0.15 M m2 182.20 37.92 6,909.02 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.20 6,909.02 100.00%
02.02.03 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOLQ m3 12.20 15.86 193.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.20 193.49 100.00%
02.02.03.01 CONCRETO SIMPLE
02.02.03.02 VEREDA CONC. FC=175 KG/CM2 E=4" m2 182.20 46.86 8,537.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.20 8,537.89 100.00%
02.02.04 JUNTA DE DILATACION m 122.00 13.80 1,683.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 122.00 1,683.60 100.00%
02.02.04.01 CURADO CON AGUA EN VEREDA m2 182.20 2.44 444.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.20 444.57 100.00%
VALOR REFERENCIAL 496,653.59 - 0.00% 116,670.47 23.49% 116,670.47 23.49% 379,983.12 76.51%
Página 32
OBRA : MEJORAMIENTO, AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. N° 22273 Y DE LA I.E. N° 320 – CHAVIN, DISTRITO DE CHAVIN – PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA
ENTIDAD : GOBIERNO REGIONAL DE ICA
SUPERVISIÓN : CONSORCIO SUPERVISION CHINCHA
CONTRATISTA : ICONSER SAC
PLAZO : 120 DIAS CALENDARIOS
MODALIDAD : A SUMA ALZADA
VALORIZACION N°01ARQUITECTURA
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
02.02 ARQUITECTURA
02.02.01 ALBAÑILERIA
02.02.01.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 301.38 55.45 16,711.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 301.38 16,711.52 100.00%
02.02.02 REVOQUES
02.02.02.01 TARRAJEO EN INTERIORES C:A-1:4 m2 409.19 26.68 10,917.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 409.19 10,917.19 100.00%
02.02.02.02 TARRAJEO EN EXTERIORES C:A-1:4 m2 219.90 26.68 5,866.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 219.90 5,866.93 100.00%
02.02.02.03 TARRAJEO DE COLUMNAS Y PLACAS C:A-1:4 m2 485.38 28.73 13,944.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 485.38 13,944.97 100.00%
02.02.02.04 VESTIDURA DE ARISTAS EN COLUMNAS Y PLACAS m 697.70 3.75 2,616.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 697.70 2,616.38 100.00%
02.02.02.05 TARRAJEO DE VIGAS C:A-1:4 m2 313.51 31.30 9,812.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 313.51 9,812.86 100.00%
02.02.02.06 VESTIDURA DE ARISTAS EN VIGAS m 581.02 3.75 2,178.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 581.02 2,178.83 100.00%
02.02.02.07 VESTIDURA DE DERRAMES EN PUERTAS Y VENTANAS C:A (1:4) m 195.39 13.56 2,649.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 195.39 2,649.49 100.00%
02.02.02.08 BRUÑAS DE 1.0 cm m 270.41 9.30 2,514.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 270.41 2,514.81 100.00%
TARRAJEO DE CIELO RASO - SUPERFICIE CON CEMENTO-ARENA m2 132.54 64.95 8,608.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.54 8,608.47 100.00%
02.02.03 PISOS Y PAVIMENTOS
02.02.03.01 CONTRAPISO DE 48 mm, MEZCLA 1:5 m2 328.50 36.52 11,996.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 328.50 11,996.82 100.00%
02.02.03.02 PISO DE CERAMICO 45 X 45 CM m2 328.50 56.47 18,550.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 328.50 18,550.40 100.00%
PISO DE CEMENTO PULIDO m2 14.13 31.66 447.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.13 447.36 100.00%
02.02.04 CONTRAZOCALOS
02.02.04.01 CONTRAZOCALO CERAMICO H=0.10 m. m 217.50 19.23 4,182.53 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 217.50 4,182.53 100.00%
02.02.04.02 CONTRAZOCALO DE CEMENTO PULIDO h=0.20 m m 192.72 16.53 3,185.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 192.72 3,185.66 100.00%
02.02.04.03 ZOCALO DE CERAMICA 20 X 30 CM m2 27.15 92.72 2,517.35 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.15 2,517.35 100.00%
02.02.05 CARPINTERIA MADERA
02.02.05.01 PUERTA DE CEDRO MACHIMBRADA SEGUN DISEÑO m2 20.72 507.16 10,508.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.72 10,508.36 100.00%
02.02.05.02 PUERTA CONTRAPLACADA SEGUN DISEÑO m2 2.34 357.88 837.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.34 837.44 100.00%
02.02.06 CARPINTERIA METALICA
02.02.06.01 VENTANA C/PERFILES DE ALUMINIO - SISTEMA DIRECTO m2 93.64 195.14 18,272.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 93.64 18,272.91 100.00%
02.02.07 CERRAJERIA
02.02.07.01 CERRADURA DE TRES GOLPES TIPO PESADO pza 8.00 76.93 615.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 615.44 100.00%
02.02.07.02 BISAGRA CAPUCHINAS ALUMINIZADA DE 3½" X 3½" und 28.00 9.62 269.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.00 269.36 100.00%
02.02.08 VIDRIOS, CRISTALES Y SIMILARES
02.02.08.01 SUM. E INST. DE VIDRIO CRUDO SEMIDOBLE p2 1,007.94 12.88 12,982.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,007.94 12,982.27 100.00%
02.02.09 PINTURAS
02.02.09.01 PINTURA LATEX EN EXTERIORES E INTERIORES 2 MANOS m2 626.56 10.45 6,547.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 626.56 6,547.55 100.00%
02.02.09.02 PINTURA EN CONTRAZOCALO m2 54.16 7.90 427.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 54.16 427.86 100.00%
02.02.09.03 PINTURA EN VIGAS m2 236.02 13.63 3,216.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 236.02 3,216.95 100.00%
02.02.09.04 PINTURA EN COLUMNAS Y PLACAS m2 277.34 13.11 3,635.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 277.34 3,635.93 100.00%
PINTURA EN CIELO RASO m2 132.54 11.22 1,487.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 132.54 1,487.10 100.00%
02.02.10 CUBIERTA METALICA Y CIELO RASO
02.02.10.01 SUM. E INST. DE CIELO RASO SUSPENDIDO CON BALDOSAS DE SUPE m2 376.22 125.79 47,324.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 376.22 47,324.71 100.00%
02.02.10.02 SUM. E INST. DE CORREAS METALICAS INCL. BASE, SOPORTE, PINTU m 363.50 75.95 27,607.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 363.50 27,607.83 100.00%
02.02.10.03 SUM. E INST. DE COBERTURA TR4 Y CUMBRERA m2 383.74 119.63 45,906.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 383.74 45,906.82 100.00%
AREAS VERDES
LIMPIEZA DE TERRENO m2 759.66 1.05 797.64 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 797.64 100.00%
TRAZO NIVELADO Y REPLANTEO INICIAL m2 759.66 1.74 1,321.81 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 1,321.81 100.00%
MOVIMIENTO DE TIERRAS
CORTE MANUAL DE TERRENO m3 75.97 22.59 1,716.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 75.97 1,716.16 100.00%
Página 33
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
PREPARACION DE TIERRA DE CHACRA m2 759.66 6.56 4,983.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 4,983.37 100.00%
EXT. Y NIV. DE TIERRA DE CHACRA PARA SEMBRADO DE GRASS m2 759.66 9.35 7,102.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 7,102.82 100.00%
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO C/EQ 125HP/VOL m3 91.16 15.86 1,445.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.16 1,445.80 100.00%
SEMBRADO DE GRASS
SEMBRADO DE GRASS m2 759.66 23.70 18,003.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 759.66 18,003.94 100.00%
VARIOS
ADQUISICION E INSTALACION DE JUEGO RECREATIVOS und 2.00 3,500.00 7,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 7,000.00 100.00%
Página 34
OBRA : MEJORAMIENTO, AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. N° 22273 Y DE LA I.E. N° 320 – CHAVIN, DISTRITO DE CHAVIN – PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA
ENTIDAD : GOBIERNO REGIONAL DE ICA
SUPERVISIÓN : CONSORCIO SUPERVISION CHINCHA
CONTRATISTA : ICONSER SAC
PLAZO : 120 DIAS CALENDARIOS
MODALIDAD : A SUMA ALZADA
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
VALOR REFERENCIAL 68,503.51 - 0.00% 2,107.87 3.08% 2,107.88 3.08% 66,395.63 96.92%
Página 35
OBRA : MEJORAMIENTO, AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO INTEGRAL DE LA I.E. N° 22273 Y DE LA I.E. N° 320 – CHAVIN, DISTRITO DE CHAVIN – PROVINCIA DE CHINCHA – DEPARTAMENTO DE ICA
ENTIDAD : GOBIERNO REGIONAL DE ICA
SUPERVISIÓN : CONSORCIO SUPERVISION CHINCHA
CONTRATISTA : ICONSER SAC
PLAZO : 120 DIAS CALENDARIOS
MODALIDAD : A SUMA ALZADA
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 36
PRESUPUESTO AVANCE ACUMULADO ANTERIOR AVANCE ACTUAL AVANCE ACUMULADO ACTUAL SALDO ACTUAL
ITEM DESCRIPCION DE LA PARTIDA
UNIDAD METRADO P. UNIT MONTO S/. METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. % METRADO MONTO S/. %
Página 37
38
Presupuesto Contratado:
Presupuesto Contratado:
Obra:
"MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO
INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO
CHAVIN – PROVINCIA CHINCHA – ICA"
Fecha Presup.
Base AGOSTO 2018
Fórmula: ESTRUCTURAS
VAL Avance Avance K-1 Reajuste Reajuste Reajuste
N° Programado Ejecutado Programado Ejecutado Reconocido
(1) (2) (3) (1) x (3) (2) x (3) (4)
1 105,171.33 98,873.28 0.000 0.00 0.00 0.00
105,171.33 98,873.28
2 124,301.89 0.00 0.000 0.00 0.00 0.00
229,473.22 98,873.28
3 71,887.47 0.00 0.000 0.00 0.00 0.00
301,360.69 98,873.28
4 103,041.41 0.00 0.000 0.00 0.00 0.00
404,402.10 98,873.28
5 8,083.97 0.00 0.000 0.00 0.00 0.00
412,486.06 98,873.28
6 8,406.81 0.00 0.000 0.00 0.00 0.00
420,892.87 98,873.28
0.00 0.00 0.00
Fórmula: ARQUITECTURA
VAL Avance Avance K-1 Reajuste Reajuste Reajuste
N° Programado Ejecutado Programado Ejecutado Reconocido
(1) (2) (3) (1) x (3) (2) x (3) (4)
1 0.00 0.00 0.000 0.00 0.00 0.00
0.00 0.00
2 9,120.19 0.00 0.000 0.00 0.00 0.00
9,120.19 0.00
3 53,766.79 0.00 0.000 0.00 0.00 0.00
62,886.98 0.00
4 58,622.81 0.00 0.000 0.00 0.00 0.00
121,509.80 0.00
5 198,433.43 0.00 0.000 0.00 0.00 0.00
319,943.23 0.00
6 127,158.74 0.00 0.000 0.00 0.00 0.00
447,101.97 0.00
0.00 0.00 0.00
Obra:
"MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO
INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO
CHAVIN – PROVINCIA CHINCHA – ICA"
Fecha Presup.
Base AGOSTO 2018
Obra:
"MEJORAMIENTO Y AMPLIACION DE LA CALIDAD DEL SERVICIO EDUCATIVO
INTEGRAL DE LA I.E. Nº 22273 Y DE LA I.E. Nº 320 – CHAVIN, DISTRITO
CHAVIN – PROVINCIA CHINCHA – ICA"
Fecha Presup.
Base AGOSTO 2018
Obra : MEJORAMIENTO DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CARLOS FERMIN FITZCARRALD N° DE CONTRATO : 036-2012/GOREMAD/GGR.
Obra : MEJORAMIENTO DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CARLOS FERMIN FITZCARRALD N° DE CONTRATO : 036-2012/GOREMAD/GGR.
COSTO DIRECTO 371,446.17 287,929.50 66.70% 0.00 0.00% 287,929.50 77.52% 83,516.67 22.48%
VALORIZACION DE OBRA N° 04
CORRESPONDIENTE AL MES DE NOVIEMBRE DEL 2012
Obra : MEJORAMIENTO DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CARLOS FERMIN FITZCARRALD N° DE CONTRATO : 036-2012/GOREMAD/GGR.
Obra : MEJORAMIENTO DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CARLOS FERMIN FITZCARRALD N° DE CONTRATO : 036-2012/GOREMAD/GGR.
Form. : 01 PRESUPUESTO GENERAL CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD FECHA : 03/07/2012
Cliente : GOBIERNO REGIONAL DE MADRE DE DIOS INSPECTOR: ING. EDUARDO DONAIRES CASTILLO MONTO DE CONTRATO : S/. 23,508,980.65 (INC. IGV.)
Ubicac. : TAMBOPATA - TAMBOPATA - MADRE DE DIOS. FACTOR DE RELACION: 1.0000000000 PLAZO EJECUCION : 548 DIAS CALENDARIOS
Obra : MEJORAMIENTO DE LA INFRAESTRUCTURA EN LA INSTITUCIÓN EDUCATIVA CARLOS FERMIN FITZCARRALD N° DE CONTRATO : 036-2012/GOREMAD/GGR.
Form. : 01 PRESUPUESTO GENERAL CONTRATISTA: CONSORCIO CARLOS F. FITZCARRALD FECHA : 03/07/2012
Cliente : GOBIERNO REGIONAL DE MADRE DE DIOS INSPECTOR: ING. EDUARDO DONAIRES CASTILLO MONTO DE CONTRATO : S/. 23,508,980.65 (INC. IGV.)
Ubicac. : TAMBOPATA - TAMBOPATA - MADRE DE DIOS. FACTOR DE RELACION: 1.0000000000 PLAZO EJECUCION : 548 DIAS CALENDARIOS
COSTO DIRECTO 417,998.30 320,950.89 76.78% 50,935.38 12.19% 371,886.27 88.97% 46,112.03 11.03%