CURVA S - AVANCE FISICO

MES
% % % % %
DE % %
Programado Programado Reprogramado Reprogram Reprogramado Ejecutado Ejecutado SPI Variació
AVAN Programado Ejecutado
Acomulado ado Acomulado Acomulado n
CE
INICI
O DE 0 0 0 0 0 0 0 0 0 0 0
OBRA
MES 01 64139.87 14.36% 14.36% 64139.87 14.36% 14.36% S/. 15,025.95 3.36% 3.36% 0.23 -10.99%
MES 02 117170.94 26.23% 40.59% 117170.94 26.23% 40.59% S/. 43,611.03 9.76% 13.13% 0.37 -16.47%
MES 03 206677.74 46.26% 86.85% 206677.74 46.26% 86.85% S/. 37,766.84 8.45% 21.58% 0.18 -37.81%
MES 04 23748.87 5.32% 92.16% 23748.87 5.32% 92.16% S/. 40,097.92 8.98% 30.55% 1.69 3.66%
MES 05 35004.10 7.84% 100.00% 35004.10 7.84% 100.00% S/. 3,491.47 0.78% 31.34% 0.10 -7.05%
MES 06 0.00 0.00% 100.00% 0.00 0.00% 100.00% S/. 21,341.06 4.78% 36.11%
MES 07 0.00 0.00% 100.00% 0.00 0.00% 100.00% S/. 106,479.73 23.83% 59.95%
MES 08 0.00 0.00% 100.00% 0.00 0.00% 100.00% S/. 19,012.10 4.26% 64.20%
MES 09 0.00 0.00% 100.00% 0.00 0.00% 100.00% S/. 13,293.43 2.98% 67.18%
446741.51 100.00%

Ejecuta: Municipalidad Distrital de Oropesa Fecha Inicio: 11/10/2021


Unidad: Sub Gerencia de Obras y Proyectos Fecha Final: 4/25/2022

CURVA "S"
100.00% 100.00% 100.00% 100.00% 100.00%
100.00%

92.16%

90.00% 86.85%

80.00%

70.00% 67.18%
64.20%
59.95%
60.00%
% DE AVANCE

50.00%

40.59%
40.00%
36.11%

30.55% 31.34%
30.00%

21.58%
20.00%
14.36%
13.13%

10.00%
3.36%
0
0.00%
INICIO DE MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09
OBRA

MES DE AVANCE
FICHA TÉCNICA DE PROYECTO

MES DE JULIO DEL 2022


UBICACIÓN CÓDIGO INFOBRAS* NOMBRE DEL PROYECTO (SUB PROYECTO) CATÁLOGO DE OBRA ENTIDAD EJECUTORA
DEPARTA MUNICIPALIDAD DISTRITAL DE
APURIMAC 014 INDUSTRIA
MENTO OROPESA
PROVINCI
A
ANTABAMBA META “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE 031 INDUSTRIA UNIDAD EJECUTORA
SUB GERENCIA DE OBRAS Y
DISTRITO OROPESA OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC” PROYECTOS
0010 INFRAESTRUCTURA Y
LOCALIDA 0023-2022 MODALIDAD DE ADMINISTRACI
HUACULLO EQUIPAMIENTO
D EJECUCIÓN ÓN DIRECTA
AVANCE AVANCE
PLAZO DE AVANCE ACTA DE
VALORIZADO FÍSICO AVANCE VARIACIÓN FECHA DE FECHA DE
EJECUCIÓN FÍSICO REAL SALDO POR SALDO POR ENTREGA FECHA TÉRMINO
EXPEDIENTE TÉCNICO (ET) PROGRAM. PROGRAM. VALORIZADO REAL ACUMULAD INICIO DE LA TÉRMINO
DEL ET ACUMULADO EJECUTAR (S/.) EJECUTAR (%) DE PROGRAMADO (ET)
ACUMULADO ACUMULA ACUMULADO (S/.) A (%) OBRA REAL (MODIF)
(DÍAS) (%) TERRENO
(S/.) DO (%)
N° RESOL.
RESOLUCION DE ALCALDIA N° 136-20
APROBACIÓN
MONTO S/. 6,814,149.33 150 446,741.51 100.00% 300,119.47 67.18% S/. 146,622.05 32.82% 67.18% 10/11/2021 10/11/2021 08/04/2022 25/04/2022
FECHA 10/27/2021
FECHA DE
PRESUPUESTO MODIFICADO APROBADO 2019 FECHA DE INICIO DE
CARGO NOMBRES Y APELLIDOS PROFESIÓN RUC DNI COLEGIATURA TÉRMINO DE
% Respecto al CONTRATO
DETALLE MONTO % Respecto al PT CONTRATO
CD INGENIERO
COSTO DIRECTO S/. 446,741.51 72.6% SUPERVISOR DE OBRA JOSE LUIS RODAS ALATA 10426525726 42652572 140350
CHARLES NESTOR CHECYA CIVIL
INGENIERO
GASTOS GENERALES S/. 96,234.40 21.54% 15.6% RESIDENTE DE OBRA 1041970311 41597031 195531
ALATA CLETO BEJAR
ARNOLD CIVIL
GASTOS DE SUPERVISION S/. 32,500.00 7.27% 5.3% ASISTENTE ADMINISTRATIVO BACHILLER 10733521487 73352148
HUARHUA
EXPEDIENTE TECNICO S/. 6,392.90 1.43% 1.0% ASISTENTE TECNICO LENIN FERNANDEZ GOMEZ BACHILLER 10423230351 42323035
ADMINIST. Y LIQUIDACIÓN DE PRO S/. 33,100.00 7.41% 5.4%

RAZÓN SOCIAL DE LA FECHA DE


TIPO DE RUC DE EMPRESA O MONTO DEL FECHA DE INICIO DE
EMPRESA O CONSORCIO N° CONTRATO TÉRMINO DE
EMPRESA CONSORCIO CONTRATO CONTRATO
(CONTRATISTA)** CONTRATO
PRESUPUESTO TOTAL (PT) S/. 614,968.81 100%

VARIACIÓN VARIACI
CON VARIACIÓN CON ÓN CON
1RA AMPLIACIÓN PRESUPUESTAL / 2DA AMPLIACIÓN PRESUPUESTAL / 3RA AMPLIACIÓN PRESUPUESTAL / COORDENADAS DE LA
RESPECTO RESPECTO AL RESPECT
1RA AMPLIACIÓN DE PLAZO 2DAA AMPLIACIÓN DE PLAZO 3RA AMPLIACIÓN DE PLAZO UBICACIÓN DE LA OBRA
AL PIP PIP VIABLE O AL PIP
VIABLE VIABLE
N° RESOL. N° RESOL. N° RESOL.
N° RESOL. N° RESOL.
APROB. APROB. DE N° RESOL. APROB. APROB.
APROB. DE APROB. DE PUNTO
DE AMP. AMP. DE AMP. PLAZO DE AMP.
AMP. PRES. AMP. PRES.
PRES. PLAZO PLAZO
MONTO MONTO
MONTO MONTO MONTO
DEL ET MONTO DEL ET DEL ET
SOLICITA SOLICITADO SOLICITADO ESTE 761,493.87
MODIFICA MODIFICADO MODIFIC
DO (S/.) (S/.) (S/.)
DO ADO
PLAZO DEL PLAZO
PLAZO PLAZO PLAZO
ET PLAZO DEL ET DEL ET
SOLICITA SOLICITADO SOLICITADO NORTE 8,378,360.66
MODIFICA MODIFICADO MODIFIC
DO (DÍAS) (DÍAS) (DÍAS)
DO ADO
* INGRESO OPCIONAL (EN CASO DE CONTAR CON LA INFORMACIÓN).
** INGRESAR DATOS EN CASO DE OBRA POR CONTRATA.
FORMATO FF - 01
FICHA DE IDENTIFICACION DEL PROYECTO

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO


Nombre del Proyecto:
DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

Unidad Ejecutora Municipalidad Distrital de Oropesa


Residente de Obra Ing. Charles Nestor Checya Alata
Supervisor de Obra Ing. José Luis Rodas Alata
Asistente Administrativo Br. Arnold Cleto Bejar Huarhua
Fecha 8/3/2022

I.- GENERALIDADES
1.1.- GENERALIDADES DEL PROYECTO
1.1.1.- Ubicación
Departamento: Apurimac Provincia : Antabamba
Distrito : Oropesa

Dirección y/o Ubicación : Víctor Simion Huachaca


(Incluye Modificaciones)
1.1.2.- Función Programática
FUNCION : 014 INDUSTRIA
DIVISION FUNC : 031 INDUSTRIA
GRUPO FUNCIONA : 0010 INFRAESTRUCTURA Y EQUIPAMIENTO
“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE
PROYECTO :
META : OROPESA
0023-2022
- PROVINCIA DE ANTABAMBA - REGION APURIMAC”
FUENTE DE FUNCI : RECURSOS DETERMINADOS - CANON - SOBRECANON - FONCOMUN
MODALIDAD DE EJ: ADMINISTRACION DIRECTA
1.1.3.- Aspectos Financieros
MONTO APROBADO EXPEDIENTE TÉCNICO : S/. 614,968.81
MONTO APROBAOO RESOLUCION DE ALCALDIA N° 136-2 : S/. 614,968.81
MONTO ASIGNADO PIM 2022 : S/. 404,107.00

II.- RESUMEN DEL PROYECTO EJECUCIÓN DE OBRA


2.1.- PLAZO DE EJECUCION

Fecha de Entrega de Fecha de inicio de Obra Fecha de Termino Programada Fecha de Termino
Terreno Original REAL
10/11/2021 10/11/2021 01/08/2022 25/04/2022

2.2.- DESCRIPCIÓN GENERAL.-


El proyecto corresponde a la Creación del complejo multiuso en el sector de Huacullo en el distrito de Oropesa - Provincia de Antabamba - Region
Apurímac.
El presente proyecto ha sido concebido en base a las necesidades descritas, tomando como referencia los espacios requeridos para esta
Consideraciones Arquitectónicas
modalidad y contempla las siguientes zonas:
El edifico está conformado por un bloque de tres niveles y funcionalmente el edificio responderá al uso del complejo multiuso considerando las
actividades que en estos espacios deben realizarse.
El planteamiento espacial es sencillo, ya que corresponde a la distribución requerida en el primer piso, comedor, cocina, servicios higiénicos y cuarto
de máquinas, en el segundo piso 3 ambientes y servicios higiénicos y en el tercero la sala de uso múltiple el escenario y un Hall.
Dicho planteamiento espacial es la que en gran medida ha determinado la forma global de la edificación, por tanto, existe racionalidad en el uso del
espacio y la forma, la cual es sustentada de igual modo por una modulación estructural sencilla y sólida.
Programa Arquitectónico

ESPACIOS AREA/ AREA/PISO AREA


COMEDOR ESPACIO
32.00 TOTAL
S
PRIMER

COCINA 7.00
NIVEL

SS.HH 5.80 50.12


CUARTO DE 3.00
MAQUINAS
HALL 2.32
AMBIENTE 1 12.70
AMBIENTE 2 13.35
SEGUNDO
NIVEL

AMBIENTE 3 7.55
54.17 170.27
OFICINA 6.86
HALL 7.25
SS.HH 6.46
SALA DE
USO
TERCER

47.00
NIVEL

MULTIPLE 65.98
ESCENARIO 13.88
HALL 5.10

____________________________________
RESIDENTE DE OBRA

DIRECTIVA PARA FORMULACIÓN, EJECUCION y SUPERVISION DE PROYECTOS EN LA FASE DE INVERSION POR ADMINISTRACION DIRECTA O ENCARGO
FORMATO FS - 02 MUNICIPALIDAD DISTRITAL DE OROPESA

FORMATO FE - 02
INFORME MENSUAL N° 09
MES DE JULIO DEL 2022

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE


Nombre del Proyecto:
ANTABAMBA - REGION APURIMAC”
Unidad Ejecutora Municipalidad Distrital de Oropesa
Residente de Obra Ing. Charles Nestor Checya Alata
Supervisor de Obra Ing. José Luis Rodas Alata
Asistente Administrativo Br. Arnold Cleto Bejar Huarhua

Fecha : 8/3/2022

I.- GENERALIDADES
1.1.- GENERALIDADES DEL PROYECTO

1.1.1.- Ubicación

Departamento: Apurímac Provincia : Antabamba


Distrito : Oropesa
Dirección y/o Ubicación : Víctor Simion Huachaca

(Incluye Modificaciones)
1.1.2.- Función Programática

FUNCION : 014 INDUSTRIA


DIVISION FUNCIONA : 031 INDUSTRIA
GRUPO FUNCIONAL : 0010 INFRAESTRUCTURA Y EQUIPAMIENTO
META : 0023-2022
COMPONENTES :
01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
02 ESTRUCTURAS
03 ARQUITECTURA
04 INSTALACIONES SANITARIAS
05 INSTALACIONES ELECTRICAS
FUENTE DE FUNCIONAM: RECURSOS DETERMINADOS - CANON - SOBRECANON - FONCOMUN
MODALIDAD DE EJECUC: ADMINISTRACION DIRECTA

1.1.3.- Aspectos Financieros

MONTO APROBADO EXPEDIENTE TÉCNICO : S/. 614,968.81


MONTO APROBAOO RESOLUCION DE ALCALDIA N° 136-: S/. 614,968.81
MONTO DEVENGADO 2021 : S/. 160,787.05
MONTO DEVENGADO 2022 : S/. 235,746.85
MONTO TOTAL ACUMULADO DEVENGADO 2021 - 2022 : S/. 396,533.90

FUENTE FINANCIAMIENTO
FONDOS DE COMPENSACIÓN MUNICIPAL : S/. 6,500.00
RECURSOS DIRECTAMENTE RECAUDADOS : S/. 124,019.00
CANON Y SOBRECANON, REGALIAS, RENTA DE ADU: S/. 273,588.00
TOTAL 404,107.00

II.- EJECUCIÓN DE OBRA

2.1.- PLAZO DE EJECUCION

Fecha de Termino Programada


Fecha de Entrega de Terreno Fecha de inicio de Obra Fecha de Termino Real
Original
11/10/2021 10/11/2021 4/8/2022 4/25/2022

Plazo de Ejec. Programado Original (Dias) 150

Paralizacion de obra N° 1 Fecha: 12/23/2021

Reinicio de obra N° 1 Fecha: 1/10/2022

Paralización de obra N° 2 Fecha: 2/28/2022

Reinicio de obra N° 2 Fecha: 3/21/2022

Plazo TOTAL APROBADO 150

Plazo de Ejec. REAL 150


FORMATO FS - 02 MUNICIPALIDAD DISTRITAL DE OROPESA

FORMATO FE - 02
INFORME MENSUAL N° 09
MES DE JULIO DEL 2022

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE


Nombre del Proyecto:
ANTABAMBA - REGION APURIMAC”
Unidad Ejecutora Municipalidad Distrital de Oropesa
Residente de Obra Ing. Charles Nestor Checya Alata
Supervisor de Obra Ing. José Luis Rodas Alata
Asistente Administrativo Br. Arnold Cleto Bejar Huarhua

Fecha : 8/3/2022

2.2.- PARTIDAS EJECUTADAS DURANTE EL PERIODO


Información descriptiva de metas físicas alcanzadas en la ejecución.

ITEMS DESCRIPCIÓN UNIDAD METRADO

1.00 OBRAS PROVISIONALES, PRELIMINARES, SEGURIDAD Y SALUD


1.20 TRABAJOS PRELIMINARES
1.30 TRAZO NIVELES Y REPLANTEO
1.40 SEGURIDAD Y SALUD
1.4.2 EQUIPOS DE PROTECCION COLECTIVA glb 0.10
1.4.3 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 0.10
1.4.4 CAPACITACION EN SEGURIDAD Y SALUD glb 0.08
1.4.5 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO glb 0.06
2.10 MOVIMIENTO DE TIERRAS
2.1.1 EXCAVACIONES
2.1.2 RELLENOS Y COMPACTADOS
2.1.3 ELIMINACION DE MATERIAL EXCEDENTE
2.20 OBRAS DE CONCRETO SIMPLE
2.2.1 SOLADOS
2.2.2 CIMIENTOS CORRIDOS
2.2.3 SOBRECIMIENTOS
2.2.4 FALSO PISO
2.30 OBRAS DE CONCRETO ARMADO
2.3.1 ZAPATAS
2.3.2 VIGAS DE CONEXION
2.3.3 COLUMNAS
2.3.4 COLUMNETAS DE AMARRE
2.3.5 VIGAS
2.3.6 VIGUETAS DE AMARRE
2.3.7 LOSAS ALIGERADAS
2.3.8 ESCALERAS
2.40 ESTRUCTURA METALICA
2.4.1 TECHO METALICO
3.00 ARQUITECTURA
3.10 MUROS Y TABIQUES
3.20 REVOQUES ENLUCIDOS Y MOLDURAS
3.2.2 TARRAJEO EN INTERIORES CON MEZCLA C:A 1:5 m² 192.99
3.2.4 TARRAJEO DE SUPERFICIE DE COLUMNAS C:A 1:5 INCLUYE ARISTAS m² 56.01
3.2.5 TARRAJEO DE SUPERFICIE VIGAS C:A 1:5, INCLUYE ARISTAS m² 28.57
3.2.6 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS MEZCLA C:A 1:5 m 199.95
3.2.7 BRUÑAS DE 1 CM m 165.42
3.30 CIELORRASOS
3.40 PISOS Y PAVIMENTOS
3.4.1 CONTRAPISO
3.4.2 PISOS
3.4.3 PISOS DE CONCRETO
3.50 ZOCALOS Y CONTRAZOCALOS
3.5.1 ZOCALOS
3.5.2 CONTRAZOCALOS
3.60 COBERTURAS
3.70 CARPINTERIA DE MADERA
3.80 MUEBLES
3.90 CARPINTERIA METALICA
3.9.1 VENTANAS DE ALUMINIO
3.9.2 MARCOS DE PUERTAS DE ALUMINIO
3.9.3 DIVISIONES METALICAS
3.9.4 BARANDAS
3.9.5 MUEBLES
3.10 CERRAJERIA
3.10.1 BISAGRAS
3.10.2 CERRADURAS
3.11 VIDRIOS, CRISTALES Y SIMILARES
3.12 PINTURA
3.12.1 PINTURA DE CIELO RASOS, VIGAS, COLUMNAS Y PAREDES
3.12.2 PINTURA EN PUERTAS
3.13 VARIOS LIMPIEZA Y JARDINERIA
3.14 SEÑALIZACION Y SEGURIDAD VIAL
FORMATO FS - 02 MUNICIPALIDAD DISTRITAL DE OROPESA

FORMATO FE - 02
INFORME MENSUAL N° 09
MES DE JULIO DEL 2022

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE


Nombre del Proyecto:
ANTABAMBA - REGION APURIMAC”
Unidad Ejecutora Municipalidad Distrital de Oropesa
Residente de Obra Ing. Charles Nestor Checya Alata
Supervisor de Obra Ing. José Luis Rodas Alata
Asistente Administrativo Br. Arnold Cleto Bejar Huarhua

Fecha : 8/3/2022

2.3.- INFORMACIÓN FISICA - FINANCIERA DEL PERIODO

AVANCE FISICO Presupuesto de Anterior Actual Acumulado Saldo


Obra S/. S/. % S/. % S/. % S/. %
PROGRAMADO 446,741.51 446,741.51 100.00% 0.00 0.00% 446,741.51 100.00% 0.00 0.00%
EJECUTADO 286,826.04 64.20% 13,293.43 2.98% 300,119.47 67.18% 146,622.04 32.82%
ADICIONALES A+B 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
A PART. NUEVAS 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
B M. METRADOS 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
TOTAL EJECUTADO 286,826.04 64.20% 13,293.43 2.98% 300,119.47 67.18% 146,622.04 32.82%

AVANCE Presupuesto Anterior Actual Acumulado Saldo


FINANCIERO Asignado S/. S/. % S/. % S/. % S/. %
PROGRAMADO 2022 S/. 404,107.00 229,246.85 56.73% 6,500.00 1.61% 235,746.85 58.34% 168,360.15 41.66%
EJECUTADO 2022 S/. 235,746.85 229,246.85 56.73% 6,500.00 1.61% 235,746.85 58.34% 168,360.15 41.66%
* Gasto generado en la formulacion del Expediente Tecnico.

TOTAL AVANCE FINANCIERO MENSUAL 229,246.85 56.73% 6,500.00 1.61% 235,746.85 58.34% 168,360.15 41.66%

Anterior Actual Acumulado Saldo


AVANCE Presupuesto
FINANCIERO Según Expediente
TOTAL tecnico. S/. % S/. % S/. % S/. %

PROGRAMADO 614,968.81 614,968.81 100.00% 0.00 0.00% 614,968.81 100.00% 0.00 0.00%
EJECUTADO AL 2022 396,533.90 390,033.90 63.42% 6,500.00 1.06% 396,533.90 64.48% 218,434.91 35.52%

III.- CONTROL DE MANO DE OBRA

RESUMEN MENSUAL DE TRABAJADORES:

MES DE JULIO DEL 2022


Nº de Semana del Semana N° Jornales por semana Monto Pagado por categoria
TOTAL
mes
Del Al Peón Oficial Operario Peón Oficial Operario
1 1-Jul 3-Jul 33 12 9 1,650.00 780.00 675.00 3,105.00
2 4-Jul 10-Jul 81 24 15 4,050.00 1,560.00 1,125.00 6,735.00
3 11-Jul 17-Jul 76 21 14 3,800.00 1,365.00 1,050.00 6,215.00
4 18-Jul 24-Jul 68 18 14 3,400.00 1,170.00 1,050.00 5,620.00
5 25-Jul 31-Jul 60 7 10 3,062.00 455.00 750.00 4,267.00
Escala Remunerativa 50.00 65.00 75.00 15,962.00 5,330.00 4,650.00 25,942.00
Total de jornales del mes 318.00 82.00 62.00 15,962.00 5,330.00 4,650.00 25,942.00

Presupuesto de Anterior Actual Acumulado Saldo


CONTROL DE MANO DE OBRA
Mano de Obra S/. S/. % S/. % S/. % S/. %
PROGRAMADO 67,125.21 67,125.21 100.00% 0.00 0.00% 67,125.21 100.00% 0.00 0.00%
EJECUTADO 134,107.00 108,165.00 161.14% 25,942.00 38.65% 134,107.00 199.79% -66,981.79 -99.79%
HOJAS DE METRADOS ACEROS BLOQUE I-A
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON
CASTILLA, DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I
ACERO GRADO 60 EN COLUMNAS kg 302.83
PRIMER NIVEL
BLOQUE I - A 111.64
C - 2, EJE 1 Y 5 ENTRE EJE A' - A'
ESTRIBOS 3/8" 2.00 28.00 0.920 0.56 51.52 28.85
C - 3 EJE 1 Y 5 ENTRE EJE A-C
ESTRIBOS 3/8" 4.00 28.00 1.320 0.56 147.84 82.79

BLOQUE I - B 191.18
C - 2 EJE 6 Y10 ENTRE EJE A' - A'
HOJAS DE METRADOS ACEROS BLOQUE I-A
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I
PRIMER NIVEL
ACERO GRADO 60 EN ZAPATAS kg 1,277.80
BLOQUE I - A 486.49
Z - 1 EJE A' - A' ENTRE EJE 1 Y 5
LONGITUDINAL 5/8" 2.00 5.00 1.15 1.56 11.50 17.94
TRANSVERSAL 5/8" 2.00 5.00 1.15 1.56 11.50 17.94
Z - 1 EJE A' - A' ENTRE EJE 2, 3 Y 4
LONGITUDINAL 5/8" 3.00 6.00 1.15 1.56 20.70 32.29
TRANSVERSAL 5/8" 3.00 6.00 1.15 1.56 20.70 32.29
Z - 2 EJE A Y C ENTRE EJE 1 Y 5
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I
PRIMER NIVEL
GOBIERNO REGIONAL APURIMAC
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
SUSTENTO DE METRADOS

PROYECTO
"MEJORAMIENTO DE LOS SERVICIOS DE LA INSTITUCION PRIMARIA N° 54018 RAMÓN CASTILLA DEL DISTRITO DE CURAHUASI DE LA PROVINCIA DE ABANCAY
DEPARTAMENTO DE APURÍMAC"
RESPONSABLE
: INGº JOEL QUISPE CERVANTES
FECHA
METRAD :DEL 01 AL 31 DE DICIEMBRE DEL 2015

MET. EXP METRADOS MAYORES


ITEM DESCRIPCION UND CANT N° VECES GK/ML OBS.
TECNICO ANCHO LARGO ALTO SUB. TOT TOTAL METRADOS

02 ESTRUCTURAS
02.01 BLOQUE 1
02.01.02 MOVIMIENTO DE TIERRAS
02.01.02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 149.36 39.51 mayores metrados
BLOQUE 1 - C Factor 1.25 50.14
EJE A-A/EJE 12 - 14 1.00 1.00 0.50 5.26 1.20 3.16
EJE B-B/EJE 13 - 14 1.00 1.00 0.50 2.54 1.20 1.52
EJE C-C/EJE 12 - 14 1.00 1.00 0.50 5.46 1.20 3.28
1.00 1.00 0.30 5.46 0.80 1.31
EJE 12-12/EJE A´- C 1.00 1.00 0.50 3.83 1.20 2.30
1.00 1.00 0.30 0.80 0.80 0.19
EJE 13-13/EJE A´- C 1.00 1.00 0.50 4.75 1.20 2.85
1.00 1.00 0.30 0.80 0.80 0.19
EJE 14-14/EJE A´- C 1.00 1.00 0.40 5.07 1.20 2.43
1.00 1.00 0.25 0.87 0.80 0.17
CAJA DE ESCALERAS
EJE A-A/EJE 11 - 12 1.00 1.00 0.40 2.67 1.20 1.28
1.00 1.00 0.30 2.67 0.80 0.64
EJE RF-12/EJE 11 - 12 1.00 1.00 0.50 2.77 1.20 1.66
EJE 11/EJE A´- RF 1.00 1.00 0.50 4.34 1.20 2.60
1.00 1.00 0.30 0.87 0.80 0.21
RELLENO EN ZAPATAS
ZAPATA EJE A´-A´/EJE 12 Y 13 1.00 2.00 1.00 1.00 1.20 2.40
1.00 2.00 0.25 0.35 1.20 0.21
1.00 2.00 AREA 0.07 -1.20 -0.17
ZAPATA EJE A´-A´/EJE 14 1.00 1.00 1.00 1.00 1.20 1.20
1.00 1.00 0.25 0.38 -1.20 -0.11
1.00 1.00 0.30 0.25 -1.20 -0.09
ZAPATA EJE A-A/EJE 12 Y 13 1.00 2.00 1.20 1.20 1.20 3.46
1.00 2.00 0.25 1.20 -1.20 -0.72
1.00 2.00 0.25 0.95 -1.20 -0.57
ZAPATA EJE A-A/EJE 14 1.00 1.00 1.00 1.00 1.20 1.20
1.00 1.00 0.25 1.00 -1.20 -0.30
1.00 1.00 0.25 0.75 -1.20 -0.23
ZAPATA EJE B-B/EJE 12 1.00 1.00 1.20 1.20 1.20 1.73
1.00 1.00 0.25 1.20 -1.20 -0.36
ZAPATA EJE B-B/EJE 13 1.00 1.00 1.30 1.30 1.20 2.03
1.00 1.00 0.25 1.30 -1.20 -0.39
1.00 1.00 0.25 0.53 -1.20 -0.16
ZAPATA EJE B-B/EJE 14 1.00 1.00 0.90 1.20 1.20 1.30
1.00 1.00 0.25 1.20 -1.20 -0.36
1.00 1.00 0.25 0.65 -1.20 -0.20
ZAPATA EJE C-C/EJE 12 1.00 1.00 1.00 2.25 1.20 2.70
1.00 1.00 0.25 1.88 -1.20 -0.56
1.00 2.00 0.25 0.37 -1.20 -0.22
ZAPATA EJE C-C/EJE 13 1.00 1.00 1.20 1.20 1.20 1.73
1.00 1.00 0.25 1.20 -1.20 -0.36
1.00 2.00 0.25 0.60 -1.20 -0.36
ZAPATA EJE C-C/EJE 14 1.00 1.00 0.90 1.20 1.20 1.30
1.00 1.00 0.25 0.65 -1.20 -0.20
1.00 2.00 0.25 0.85 -1.20 -0.51
RELLENO EN ZAPATAS CAJA DE ESCALERAS
ZAPATA EJE A´-A´/EJE 11 1.00 1.00 1.00 1.00 1.20 1.20
1.00 2.00 0.25 0.38 -1.20 -0.23
1.00 2.00 0.25 0.30 -1.20 -0.18
ZAPATA EJE A-A/EJE 11 1.00 1.00 1.00 1.00 1.20 1.20
1.00 1.00 0.25 1.00 -1.20 -0.30
1.00 2.00 0.25 0.75 -1.20 -0.45
ZAPATA EJE B-B/EJE 11 1.00 1.00 1.00 1.00 1.20 1.20
1.00 1.00 0.25 1.00 -1.20 -0.30
ZAPATA EJE RF-A/EJE 11 1.00 1.00 1.00 1.00 1.20 1.20
1.00 1.00 0.25 0.75 -1.20 -0.23
1.00 1.00 0.25 0.63 -1.20 -0.19

02.01.02.05 NIVELACION Y COMPACTADO EN FALSO PISO m2 401.64 139.00 7.05 mayores metrados
BLOQUE 1 - B 40.49
PASILLO DE CIRCULACION 1.00 1.00 AREA 40.70 40.70
1.00 -3.00 AREA 0.07 -0.21

BLOQUE 1 - C 98.51
AMBIENTE 01 1.00 1.00 AREA 26.71 26.71
AMBIENTE 02 1.00 1.00 AREA 26.71 26.71
CAJA DE ESCALERAS 1.00 1.00 AREA 23.00 23.00
PASILLO DE CIRCULACION 1.00 1.00 AREA 22.23 22.23
1.00 -2.00 AREA 0.07 -0.14
02.01.03 CONCRETO SIMPLE
02.01.03.03 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 24.46 9.92 1.70 Mayores metrados
BLOQUE 1 - C
EJE A-A/EJE 12 - 14 1.00 1.00 0.25 8.20 0.70 1.44
EJE C-C/EJE 12 - 14 1.00 1.00 0.25 8.20 0.70 1.44
EJE B-B/EJE 12 - 14 1.00 1.00 0.25 4.71 0.70 0.82
EJE 12-12/EJE A´- C 1.00 1.00 0.25 6.30 0.70 1.10
EJE 13-13/EJE A´- C 1.00 1.00 0.25 6.45 0.70 1.13
EJE 14-14/EJE A´- C 1.00 1.00 0.25 6.65 0.70 1.16
EJE 11-11/EJE A´- C 1.00 1.00 0.25 7.40 0.70 1.30
CAJA DE ESCALERAS
EJE RF-12/EJE 11 - 12 1.00 1.00 0.25 4.00 0.70 0.70
EJE 11/EJE A´- RF 1.00 1.00 0.25 4.80 0.70 0.84

02.01.03.04 ENCOFRADO Y DESENCOFRADO DE CIMIENTOS CORRIDOS m2 194.85 0.03 mayores metrados


BLOQUE 1 - C 74.86
EJE A-A/EJE 12 - 14 1.00 2.00 7.44 0.70 10.42
EJE B-B/EJE 13 - 14 1.00 2.00 3.75 0.70 5.25
EJE C-C/EJE 12 - 14 1.00 2.00 7.44 0.70 10.42
EJE 12-12/EJE A´- C 1.00 2.00 6.75 0.70 9.45
EJE 13-13/EJE A´- C 1.00 2.00 6.94 0.70 9.72
EJE 14-14/EJE A´- C 1.00 2.00 7.20 0.70 10.08
CAJA DE ESCALERAS
EJE A-A/EJE 11 - 12 1.00 2.00 3.90 0.70 5.46
EJE RF-12/EJE 11 - 12 1.00 2.00 3.90 0.70 5.46
EJE 11/EJE A´- RF 1.00 2.00 6.15 0.70 8.61

02.01.03.05 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 5.34 7.30 6.77 mayores metrados
BLOQUE 1 - A 1.77
EJE A-A ENTRE EJE 1-5 1.00 1.00 0.15 13.38 0.20 0.40
EJE C-C ENTRE EJE 1-5 1.00 1.00 0.15 16.41 0.20 0.49
EJE 1 Y 5 ENTRE EJE A-C 1.00 2.00 0.25 6.06 0.20 0.61
EJE 3 -3 ENTRE EJE A-C 1.00 1.00 0.25 5.46 0.20 0.27
BLOQUE 1 - B
EJE A-A ENTRE 6-10 1.00 1.00 0.15 12.85 0.20 0.39 1.73
EJE C-C ENTRE 6-10 1.00 1.00 0.15 15.66 0.20 0.47
EJE 6 Y 10 ENTRE A-C 1.00 2.00 0.25 6.06 0.20 0.61
EJE 8 ENTRE A-C 1.00 1.00 0.25 5.46 0.20 0.27
BLOQUE 1 - C 3.79
EJE A-A/EJE 12 - 14 1.00 1.00 0.25 5.44 0.40 0.54
EJE C-C/EJE 12 - 14 1.00 1.00 0.25 7.55 0.40 0.76
EJE 12-12/EJE A´- C 1.00 1.00 0.25 5.30 0.40 0.53
EJE 13-13/EJE A´- C 1.00 1.00 0.25 5.45 0.40 0.55
EJE 14-14/EJE A´- C 1.00 1.00 0.25 5.65 0.40 0.57
CAJA DE ESCALERAS
EJE RF-12/EJE 11 - 12 1.00 1.00 0.25 3.90 0.40 0.39
EJE 11/EJE A´- RF 1.00 1.00 0.25 4.60 0.40 0.46

02.01.03.06 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO m2 47.59 62.68 59.95 mayores metrados


BLOQUE 1 - A 16.48
EJE A-A ENTRE EJE 1-5 1.00 2.00 13.27 0.20 5.31
GOBIERNO REGIONAL APURIMAC
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
SUSTENTO DE METRADOS

PROYECTO
"MEJORAMIENTO DE LOS SERVICIOS DE LA INSTITUCION PRIMARIA N° 54018 RAMÓN CASTILLA DEL DISTRITO DE CURAHUASI DE LA PROVINCIA DE ABANCAY
DEPARTAMENTO DE APURÍMAC"
RESPONSABLE
: INGº JOEL QUISPE CERVANTES
FECHA
METRAD :DEL 01 AL 31 DE DICIEMBRE DEL 2015

MET. EXP METRADOS MAYORES


ITEM DESCRIPCION UND CANT N° VECES GK/ML OBS.
TECNICO ANCHO LARGO ALTO SUB. TOT TOTAL METRADOS

EJE C-C ENTRE EJE 1-5 1.00 2.00 16.41 0.20 6.56
EJE 1 Y 5 ENTRE EJE A-C 1.00 2.00 6.06 0.20 2.42
EJE 3 -3 ENTRE EJE A-C 1.00 2.00 5.46 0.20 2.18
BLOQUE 1 - B 16.01
EJE A-A ENTRE 6-10 1.00 2.00 12.85 0.20 5.14
EJE C-C ENTRE 6-10 1.00 2.00 15.66 0.20 6.26
EJE 6 Y 10 ENTRE A-C 1.00 2.00 6.06 0.20 2.42
EJE 8 ENTRE A-C 1.00 2.00 5.46 0.20 2.18
BLOQUE 1 - C 30.19
EJE A-A/EJE 12 - 14 1.00 2.00 5.44 0.40 4.35
EJE C-C/EJE 12 - 14 1.00 2.00 7.44 0.40 5.95
EJE 12-12/EJE A´- C 1.00 2.00 5.26 0.40 4.21
EJE 13-13/EJE A´- C 1.00 2.00 5.45 0.40 4.36
EJE 14-14/EJE A´- C 1.00 2.00 5.65 0.40 4.52
CAJA DE ESCALERAS
EJE RF-12/EJE 11 - 12 1.00 2.00 3.90 0.40 3.12
EJE 11/EJE A´- RF 1.00 2.00 4.60 0.40 3.68

02.01.04 OBRAS DE CONCRETO ARMADO


02.01.04.02 VIGAS DE CONEXION
02.01.04.02.01 CONCRETO EN VIGAS DE CONEXION F'C= 210 KG/CM2 m3 19.74 5.36 0.19 mayores metrados
BLOQUE 1 - C
EJE A-A/EJE 12 - 14 1.00 1.00 0.25 7.62 0.40 0.76
EJE B-B/EJE 13 - 14 1.00 1.00 0.25 3.72 0.40 0.37
EJE C-C/EJE 12 - 14 1.00 1.00 0.25 7.44 0.40 0.74
EJE 12-12/EJE A´- C 1.00 1.00 0.25 6.75 0.40 0.68
EJE 13-13/EJE A´- C 1.00 1.00 0.25 6.94 0.40 0.69
EJE 14-14/EJE A´- C 1.00 1.00 0.25 7.20 0.40 0.72
CAJA DE ESCALERAS
EJE A-A/EJE 11 - 12 1.00 1.00 0.25 3.90 0.40 0.39
EJE RF-12/EJE 11 - 12 1.00 1.00 0.25 3.90 0.40 0.39
EJE 11/EJE A´- RF 1.00 1.00 0.25 6.15 0.40 0.62

02.01.04.02.02 ENCOFRADO Y DESENCOFRADO VIGA DE CONEXIÓN m2 138.75 43.75


BLOQUE 1 - C
EJE A-A/EJE 12 - 14 1.00 2.00 7.62 0.40 6.10
EJE B-B/EJE 13 - 14 1.00 2.00 3.72 0.40 2.98
EJE C-C/EJE 12 - 14 1.00 2.00 7.44 0.40 5.95
EJE 12-12/EJE A´- C 1.00 2.00 6.75 0.40 5.40
EJE 13-13/EJE A´- C 1.00 2.00 6.94 0.40 5.55
EJE 14-14/EJE A´- C 1.00 2.00 7.00 0.40 5.60
CAJA DE ESCALERAS
EJE A-A/EJE 11 - 12 1.00 2.00 3.90 0.40 3.12
EJE RF-12/EJE 11 - 12 1.00 2.00 3.90 0.40 3.12
EJE 11/EJE A´- RF 1.00 2.00 7.00 0.40 5.60

02.01.04.02.03 ACERO GRADO 60 EN VIGAS DE CONEXION kg 2,048.90 1040.27 1036.37 mayores metrados
BLOQUE 1 - A 1.00 1.00 141.76
BLOQUE 1 - B 1.00 1.00 141.76
BLOQUE 1 - C kg 1.00 1.00 756.75

02.01.04.03 COLUMNAS
02.01.04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 m3 44.79 14.75
BLOQUE 1 - A / SEGUNDO NIVEL 6.34
COLUMNA CIRCULAR 01 EJE A´-A´/EJE 2-4 1.00 3.00 AREA 0.07 2.80 0.60
COLUMNA 02 EJE A´-A´/EJE 1 Y 5 1.00 2.00 0.30 0.25 2.80 0.42
COLUMNA 03 EJE A-A/EJE 1 Y 5 1.00 2.00 0.50 0.25 2.80 0.70
COLUMNA 04 "T" EJE A-A/EJE 2-4 1.00 3.00 AREA 0.25 2.80 2.10
COLUMNA 07 EJE B-B/EJE1 Y 5 1.00 2.00 0.40 0.25 2.80 0.56
COLUMNA 03 EJE C-C/EJE 1 Y 5 1.00 2.00 0.50 0.25 2.80 0.70
COLUMNA 05 EJE C-C/EJE 2 Y 4 1.00 2.00 0.30 0.50 2.80 0.84
COLUMNA 06 EJE C-C/EJE 3 1.00 1.00 0.30 0.50 2.80 0.42

BLOQUE 1 - C / PRIMER NIVEL 8.41


COLUMNA CIRCULAR 01 EJE A´-A´/EJE 12 y 13 1.00 2.00 AREA 0.07 5.00 0.70
COLUMNA 02 EJE A´-A´/EJE 14 1.00 1.00 0.30 0.25 5.00 0.37
COLUMNA 05 EJE A-A/EJE 12 y 13 1.00 2.00 0.50 0.25 5.00 1.23
COLUMNA 03 EJE A-A/EJE 14 1.00 1.00 0.40 0.25 5.00 0.49
COLUMNA 04 EJE B-B/EJE 12 y 14 1.00 2.00 0.40 0.25 5.00 0.98
COLUMNA 05 EJE B-B/EJE 13 1.00 1.00 0.50 0.25 5.00 0.61
COLUMNA 03 EJE C-C/EJE 12 1.00 2.00 0.40 0.25 5.00 0.98
COLUMNA 05 EJE C-C/EJE 13 y 14 1.00 2.00 0.50 0.25 5.00 1.23

CAJA DE ESCALERAS
COLUMNA 02 EJE A´-A´/EJE 11 1.00 1.00 0.30 0.25 5.00 0.37
COLUMNA 03 EJE 11 - 11/EJE A-RF 1.00 3.00 0.40 0.25 5.00 1.47

02.01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 525.99 179.26


BLOQUE 1 - A / SEGUNDO NIVEL 69.26
COLUMNA CIRCULAR 01 EJE A´-A´/EJE 2-4 1.00 3.00 PERIMET. 0.95 2.80 7.70
COLUMNA 02 EJE A´-A´/EJE 1 Y 5 1.00 2.00 PERIMET. 1.10 2.80 5.94
COLUMNA 03 EJE A-A/EJE 1 Y 5 1.00 2.00 PERIMET. 1.50 2.80 8.10
COLUMNA 04 "T" EJE A-A/EJE 2-4 1.00 3.00 PERIMET. 2.40 2.80 19.44
COLUMNA 07 EJE B-B/EJE1 Y 5 1.00 2.00 PERIMET. 1.30 2.80 7.02
COLUMNA 03 EJE C-C/EJE 1 Y 5 1.00 2.00 PERIMET. 1.50 2.80 8.10
COLUMNA 05 EJE C-C/EJE 2 Y 4 1.00 2.00 PERIMET. 1.60 2.80 8.64
COLUMNA 06 EJE C-C/EJE 3 1.00 1.00 PERIMET. 1.60 2.80 4.32

BLOQUE 1 - C / PRIMER NIVEL 110.00


COLUMNA CIRCULAR 01 EJE A´-A´/EJE 12 y 13 1.00 2.00 PERIMET. 0.95 5.00 9.50
COLUMNA 02 EJE A´-A´/EJE 14 1.00 1.00 PERIMET. 1.10 5.00 5.50
COLUMNA 05 EJE A-A/EJE 12 y 13 1.00 2.00 PERIMET. 1.50 5.00 15.00
COLUMNA 03 EJE A-A/EJE 14 1.00 1.00 PERIMET. 1.30 5.00 6.50
COLUMNA 04 EJE B-B/EJE 12 y 14 1.00 2.00 PERIMET. 1.30 5.00 13.00
COLUMNA 05 EJE B-B/EJE 13 1.00 1.00 PERIMET. 1.50 5.00 7.50
COLUMNA 02 EJE C-C/EJE 12 1.00 2.00 PERIMET. 1.30 5.00 13.00
COLUMNA 05 EJE C-C/EJE 13 y 14 1.00 2.00 PERIMET. 1.50 5.00 15.00
CAJA DE ESCALERAS
COLUMNA 02 EJE A´-A´/EJE 11 1.00 1.00 PERIMET. 1.10 5.00 5.50
COLUMNA 03 EJE 11 - 11/EJE A-RF 1.00 3.00 PERIMET. 1.30 5.00 19.50

02.01.04.03.03 ACERO GRADO 60 EN COLUMNAS kg 8,110.20 807.24 807.24 mayores metrados


BLOQUE 1 - A / SEGUNDO NIVEL 1.00 1.00 807.24

02.01.04.03 ELEMENTOS DE CONFINAMIENETO COLUMNETAS


02.01.04.04.03 ACERO GRADO 60 EN COLUMNETAS kg 1,532.19 1008.42
BLOQUE 1 - A / SEGUNDO NIVEL 1.00 1.00 256.98
BLOQUE 1 - B / SEGUNDO NIVEL 1.00 1.00 256.98
BLOQUE 1 - C / SEGUNDO NIVEL 1.00 1.00 494.47

02.01.04.05 VIGAS
02.01.04.05.01 CONCRETO EN VIGAS F'C=210 KG/CM2 m3 67.17 31.24
BLOQUE 1 - A 12.12
EJE A´-A´/EJE 1 - 5 1.00 1.00 0.20 18.07 0.40 1.45
EJE A-A/EJE 1 - 5 1.00 1.00 0.25 18.07 0.40 1.81
EJE C-C/EJE 1 - 5 1.00 1.00 0.25 18.28 0.40 1.83
EJE 1-1/EJE A´-C 1.00 1.00 0.25 8.30 0.40 0.83
EJE 2-2/EJE A´-C 1.00 1.00 0.30 1.80 0.40 0.22
1.00 2.00 AREA 3.10 0.30 1.86
EJE 3-3/EJE A´-C 1.00 1.00 0.30 1.80 0.40 0.22
1.00 1.00 0.30 6.45 0.50 0.97
EJE 4-4/EJE A´C 1.00 1.00 0.30 1.80 0.40 0.22
1.00 2.00 AREA 3.10 0.30 1.86
EJE 5-5/EJE A´-C 1.00 1.00 0.25 8.76 0.40 0.88

BLOQUE 1 - B 12.06
GOBIERNO REGIONAL APURIMAC
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
SUSTENTO DE METRADOS

PROYECTO
"MEJORAMIENTO DE LOS SERVICIOS DE LA INSTITUCION PRIMARIA N° 54018 RAMÓN CASTILLA DEL DISTRITO DE CURAHUASI DE LA PROVINCIA DE ABANCAY
DEPARTAMENTO DE APURÍMAC"
RESPONSABLE
: INGº JOEL QUISPE CERVANTES
FECHA
METRAD :DEL 01 AL 31 DE DICIEMBRE DEL 2015

MET. EXP METRADOS MAYORES


ITEM DESCRIPCION UND CANT N° VECES GK/ML OBS.
TECNICO ANCHO LARGO ALTO SUB. TOT TOTAL METRADOS

EJE A´-A´/EJE 6-10 1.00 1.00 0.20 17.95 0.40 1.44


EJE A-A/EJE 6-10 1.00 1.00 0.25 17.95 0.40 1.80
EJE C-C/EJE 6-10 1.00 1.00 0.25 17.95 0.40 1.80
EJE 6-6/EJE A´-C 1.00 1.00 0.25 8.26 0.40 0.83
EJE 7-7/EJE A´-C 1.00 1.00 0.30 1.80 0.40 0.22
1.00 2.00 AREA 3.10 0.30 1.86
EJE 8-8/EJE A´-C 1.00 1.00 0.30 1.80 0.40 0.22
1.00 1.00 0.30 6.45 0.50 0.97
EJE 9-9/EJE A´C 1.00 1.00 0.30 1.80 0.40 0.22
1.00 2.00 AREA 3.10 0.30 1.86
EJE 10-10/EJE A´-C 1.00 1.00 0.25 8.76 0.40 0.88

BLOQUE 1 - C 7.06
EJE A´-A´/ENTRE EJE 12-14 1.00 1.00 0.20 8.21 0.40 0.66
EJE A-A/ENTRE EJE 12-14 1.00 1.00 0.25 8.21 0.40 0.82
EJE B-B/ENTRE EJE 12-14 1.00 1.00 0.25 4.22 0.40 0.42
EJE C-C/ENTRE EJE 12-14 1.00 1.00 0.25 8.21 0.40 0.82
ENTRE EJE A-C/EJE 12-14 3.00 1.00 0.25 8.05 0.40 2.42
CAJA DE ESCALERAS
EJE A´-A´/EJE 11-12 1.00 1.00 0.20 4.15 0.40 0.33
EJE A-A/EJE 11-12 1.00 1.00 0.25 4.15 0.40 0.42
EJE RF-12/EJE 11-12 1.00 1.00 0.25 4.15 0.40 0.42
EJE 11-11/EJE A´-RF 1.00 1.00 0.25 7.61 0.40 0.76

02.01.04.05.02 ENCOFRADO Y DESENC. PARA VIGAS m2 482.57 151.81


BLOQUE 1 - B 92.70
EJE A´-A´/EJE 6 - 10 1.00 1.00 17.95 0.40 7.18
1.00 2.00 17.95 0.20 7.18
1.00 2.00 0.25 -0.20 -0.10
1.00 6.00 0.30 -0.20 -0.36
EJE A-A/EJE 6 - 10 1.00 1.00 17.95 0.65 11.67
1.00 2.00 17.95 0.25 8.98
EJE C-C/EJE 6-10 1.00 1.00 17.95 0.40 7.18
1.00 2.00 17.95 0.25 8.98
1.00 2.00 0.25 -0.25 -0.13
1.00 6.00 0.30 -0.25 -0.45

EJE 6-6/EJE A´-C 1.00 1.00 8.76 0.85 7.45


1.00 2.00 0.20 -0.40 -0.16
1.00 5.00 0.25 -0.40 -0.50
EJE 7-7/EJE A´-A 1.00 1.00 1.80 0.70 1.26
EJE 7-7/EJE A-C 1.00 2.00 AREA 2.10 4.21
1.00 1.00 5.95 0.30 1.79
EJE 8-8/EJE A´-C 1.00 1.00 1.80 0.70 1.26
1.00 1.00 6.20 0.90 5.58

EJE 9-9/EJE A´C 1.00 1.00 1.80 0.70 1.26


1.00 2.00 AREA 2.10 4.21
1.00 1.00 5.95 0.30 1.79
EJE 10-10/EJE A´-C 1.00 1.00 8.76 0.85 7.45
1.00 2.00 8.76 0.40 7.01
BLOQUE 1 - C 59.11
EJE A´-A´/ENTRE EJE 12-14 1.00 1.00 8.21 0.40 3.28
1.00 2.00 8.21 0.20 3.28

ENTRE EJE A-C/EJE 12-14 2.00 2.00 8.21 0.20 6.57


3.00 1.00 8.21 0.25 6.16
1.00 1.00 8.21 0.20 1.64
EJE C-C/ENTRE EJE 12-14 1.00 1.00 8.21 0.40 3.28

EJE 12-12/EJE A´-C 1.00 1.00 8.18 0.25 2.05


1.00 1.00 8.18 0.20 1.64
1.00 5.00 8.18 0.20 8.18
EJE 13-13/EJE A´-C 1.00 2.00 7.74 0.20 3.10
1.00 1.00 7.29 0.25 1.82
EJE 14-14/EJE A´-C 1.00 1.00 8.75 0.40 3.50
1.00 1.00 7.33 0.25 1.83
1.00 1.00 7.74 0.25 1.94
CAJA DE ESCALERAS
EJE A´-A´/EJE 11-12 1.00 1.00 4.15 0.40 1.66
1.00 1.00 3.86 0.25 0.97
1.00 1.00 3.90 0.25 0.98
EJE A-A/EJE 11-12 1.00 2.00 4.15 0.25 2.08
1.00 1.00 3.90 0.40 1.56
EJE ENTRE B Y C/EJE 11-12 1.00 1.00 4.15 0.40 1.66
1.00 1.00 3.90 0.25 0.98
1.00 1.00 3.90 0.25 0.98

02.01.04.05.03 ACERO GRADO 60 EN VIGAS kg 7,808.04 2192.63


BLOQUE 1 - B 1.00 1.00 1290.58
BLOQUE 1 - C 1.00 1.00 902.05

02.01.04.07 LOSAS ALIGERADAS


02.01.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 48.17 70.91 22.77 Mayores metrados
BLOQUE 1 - A 27.10
EN EJE A´- A´/TRAMO 1-2 TRAMO A´-A 1.00 1.00 AREA 7.36 0.20 1.47
EN EJE A´- A´/TRAMO 2-3 TRAMO A´-A 1.00 1.00 6.84 0.20 1.37
EN EJE A´- A´/TRAMO 3-4 TRAMO A´-A 1.00 1.00 6.57 0.20 1.31
EN EJE A´- A´/TRAMO 4-5 TRAMO A´-A 1.00 1.00 6.64 0.20 1.33
EN EJE A- A/TRAMO 1-2 TRAMO A-C 1.00 1.00 AREA 27.24 0.20 5.45
EN EJE A- A/TRAMO 2-3 TRAMO A-C 1.00 1.00 27.57 0.20 5.51
EN EJE A- A/TRAMO 3-4 TRAMO A-C 1.00 1.00 26.50 0.20 5.30
EN EJE A- A/TRAMO 4-5 TRAMO A-C 1.00 1.00 26.79 0.20 5.36

BLOQUE 1 - B 26.68
EN EJE A´- A´/TRAMO 6-7 TRAMO A´-A 1.00 1.00 6.55 0.20 1.31
EN EJE A´- A´/TRAMO 7-8 TRAMO A´-A 1.00 1.00 6.50 0.20 1.30
EN EJE A´- A´/TRAMO 8-9 TRAMO A´-A 1.00 1.00 6.70 0.20 1.34
EN EJE A´- A´/TRAMO 9-10 TRAMO A´-A 1.00 1.00 6.30 0.20 1.26
EN EJE A- A/TRAMO 6-7 TRAMO A-C 1.00 1.00 26.80 0.20 5.36
EN EJE A- A/TRAMO 7-8 TRAMO A-C 1.00 1.00 26.55 0.20 5.31
EN EJE A- A/TRAMO 8-9 TRAMO A-C 1.00 1.00 28.00 0.20 5.60
EN EJE A- A/TRAMO 9-10 TRAMO A-C 1.00 1.00 26.00 0.20 5.20

BLOQUE 1 - C 17.13
EN EJE A´- A´/TRAMO 12-13 TRAMO A-A 1.00 1.00 1.60 3.67 0.20 1.17
EN EJE A´- A´/TRAMO 13-14 TRAMO A-A 1.00 1.00 1.60 3.67 0.20 1.17
EN EJE A- A/TRAMO 12-13 TRAMO 1.00 2.00 3.10 3.72 0.20 4.61
EN EJE A- A/TRAMO 13-14 TRAMO 1.00 2.00 3.10 3.72 0.20 4.61
EN EJE C-C/TRAMO 12-14 TRAMO B-C 1.00 2.00 3.10 3.72 0.20 4.61
CAJA DE ESCALERAS
EJE A´-A´/EJE A´-A TRAMO 11-12 1.00 1.00 AREA 4.72 0.20 0.94

02.01.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 664.73 198.04


BLOQUE 1 - B 134.36
EN EJE A´- A´/TRAMO 6-7 TRAMO A´-A 1.00 1.00 1.60 4.20 6.72
EN EJE A´- A´/TRAMO 7-8 TRAMO A´-A 1.00 1.00 1.60 4.15 6.64
EN EJE A´- A´/TRAMO 8-9 TRAMO A´-A 1.00 1.00 1.60 4.30 6.88
EN EJE A´- A´/TRAMO 9-10 TRAMO A´-A 1.00 1.00 1.60 4.00 6.40
EN EJE A- A/TRAMO 6-7 TRAMO A-C 1.00 1.00 6.45 4.20 27.09
EN EJE A- A/TRAMO 7-8 TRAMO A-C 1.00 1.00 6.45 4.20 27.09
EN EJE A- A/TRAMO 8-9 TRAMO A-C 1.00 1.00 6.45 4.30 27.74
EN EJE A- A/TRAMO 9-10 TRAMO A-C 1.00 1.00 6.45 4.00 25.80

BLOQUE 1 - C 63.68
EN EJE A´- A´/TRAMO 12-14 TRAMO A´-A 1.00 2.00 1.60 3.72 11.90
GOBIERNO REGIONAL APURIMAC
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
SUSTENTO DE METRADOS

PROYECTO
"MEJORAMIENTO DE LOS SERVICIOS DE LA INSTITUCION PRIMARIA N° 54018 RAMÓN CASTILLA DEL DISTRITO DE CURAHUASI DE LA PROVINCIA DE ABANCAY
DEPARTAMENTO DE APURÍMAC"
RESPONSABLE
: INGº JOEL QUISPE CERVANTES
FECHA
METRAD :DEL 01 AL 31 DE DICIEMBRE DEL 2015

MET. EXP METRADOS MAYORES


ITEM DESCRIPCION UND CANT N° VECES GK/ML OBS.
TECNICO ANCHO LARGO ALTO SUB. TOT TOTAL METRADOS

EN EJE A- A/TRAMO 12-14 TRAMO A-B 1.00 2.00 3.10 3.72 23.06
EN EJE C-C/TRAMO 12-14 TRAMO B-C 1.00 1.00 6.45 3.72 23.99
CAJA DE ESCALERAS
EJE A´-A´/EJE A´-A TRAMO 11-12 1.00 1.00 AREA 4.72 4.72

02.01.04.07.03 ACERO GRADO 60 EN LOSAS ALIGERADAS kg 6,514.93 4090.82


BLOQUE 1 - A 1.00 1.00 1716.36
BLOQUE 1 - B 1.00 1.00 1697.86
BLOQUE 1 -C 1.00 1.00 676.59

02.01.04.07.04 LADRILLO HUECO DE ARCILLA 15x30x30cm PARA TECHO ALIGERADO und 5,539.00 2980.00
BLOQUE 1 - A 1230.00
EJE 1-5/EJE A-C 1.00 2.00 545.00 1090.00
EJE 1-5/EJE A'-A 1.00 2.00 70.00 140.00

BLOQUE 1 - B 1150.00
EJE 1-5/EJE A-C 1.00 2.00 505.00 1010.00
EJE 1-5/EJE A'-A 1.00 2.00 70.00 140.00

BLOQUE 1 - C 600.00
EJE 12-14/EJE A-C 1.00 1.00 600.00 600.00

02.01.04.08 LOSAS MACIZAS


02.01.04.08.01 CONCRETO EN LOSAS MACIZAS F'C=210 KG/CM2 m3 2.83 0.83
BLOQUE 1 - C 0.83
CAJA DE ESCALERAS
EN EJE A- A/TRAMO 11-12 TRAMO A´-A 1.00 1.00 0.80 1.90 0.20 0.30
CANALETA DE CONCRETO
EJE C-C/TRAMO 12-14 1.00 1.00 0.60 3.72 0.10 0.22
CAJA DE ESCALERAS
EJE RF-12/TRAMO 11-12 1.00 1.00 0.60 1.15 0.10 0.07
1.00 1.00 0.60 3.90 0.10 0.23

02.01.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS MACIZAS m2 57.34 12.48


BLOQUE 1 - C 12.48
CAJA DE ESCALERAS
EN EJE A- A/TRAMO 11-12 TRAMO A´-A 1.00 1.00 3.80 1.90 7.22
CANALETA DE CONCRETO
EJE C-C/TRAMO 12-14 1.00 1.00 0.60 3.72 2.23
CAJA DE ESCALERAS
EJE RF-12/TRAMO 11-12 1.00 1.00 0.60 1.15 0.69
1.00 1.00 0.60 3.90 2.34

02.01.04.08.03 ACERO GRADO 60 EN LOSAS MACIZAS kg 653.17 164.00


BLOQUE 1 - C 1.00 1.00 164.00

02.01.04.09 ESCALERAS
02.01.04.09.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 m3 9.47 9.47
BLOQUE 1 - C 9.47
TRAMO 1 1.00 1.00 2.10 AREA 0.16 0.33
1.00 1.00 2.10 AREA 0.97 2.05
DESCANZO 1.00 1.00 2.10 3.90 0.65 5.32
TRAMO 2 1.00 1.00 2.10 AREA 0.84 1.77

02.01.04.09.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS m2 44.00 44.00


BLOQUE 1 - C 44.00
TRAMO 1 1.00 1.00 2.10 4.18 8.78
DESCANZO 1.00 2.00 2.06 3.90 16.07
PASO Y CONTRAPASO 1.00 12.00 2.10 0.17 4.28
COSTADO DE ESCALERA 1.00 1.00 0.40 4.18 1.67
TRAMO 2 1.00 1.00 2.10 3.70 7.77
PASO Y CONTRAPASO 1.00 11.00 2.10 0.17 3.93
COSTADO DE ESCALERA 1.00 1.00 0.40 3.74 1.50

02.01.04.09.03 ACERO GRADO 60 EN ESCALERAS kg 689.84 656.82


BLOQUE 1 - C 1.00 1.00 656.82
03 ARQUITECTURA
03.01 BLOQUE 1
03.01.01.03 JUNTA DE CONSTRUCCION CON TEKNOPORT m 99.69 55.00
Bloque "1" Primer Nivel 55.00
Eje A-A entre los ejes 1-5 9.00 1.00 0.25 2.70 6.08
Eje C-C entre los ejes 1-5 11.00 1.00 0.25 2.70 7.43
Eje B-B entre los ejes 1-5 6.00 1.00 0.25 2.70 4.05
Eje A-A entre los ejes 6-10 9.00 1.00 0.25 3.20 7.20
Eje C-C entre los ejes 6-10 11.00 1.00 0.25 3.20 8.80
Eje B-B entre los ejes 6-10 6.00 1.00 0.25 3.20 4.80
Eje A-A entre los ejes 12-14 5.00 1.00 0.25 3.70 4.63
Eje C-C entre los ejes 12-14 7.00 1.00 0.25 3.70 6.48
Eje B-B entre los ejes 12-14 6.00 1.00 0.25 3.70 5.55
03.01.03 REVOQUES ENLUCIDOS Y MOLDURAS
03.01.03.04 TARRAJEO EN COLUMNAS INC. ARISTAS m2 469.22 422.75
Bloque "1" Primer Nivel 340.78
Columnas Rectangulares .50x.25 ejes A-B-C entre ejes 1-14
bloque 1A 4.00 1.00 1.50 3.90 23.40
bloque 1B 4.00 1.00 1.50 4.40 26.40
bloque 1C 5.00 1.00 1.50 4.90 36.75
Columnas Rectangulares .40x.25 ejes A-B-C entre ejes 1-14
bloque 1A 2.00 1.00 1.40 3.90 10.92
bloque 1B 2.00 1.00 1.40 4.40 12.32
bloque 1C 6.00 1.00 1.40 4.90 41.16
FR 2.00 1.00 1.40 4.90 13.72
Columnas "T" .70x.25 ejes A-B-C entre ejes 1-14
bloque 1A 3.00 1.00 2.40 3.90 28.08
bloque 1B 3.00 1.00 2.40 4.40 31.68
Columas Circulares ejes A'-A' entre ejes 1-14
bloque 1A 3.00 1.00 0.94 3.90 11.00
bloque 1B 3.00 1.00 0.94 4.40 12.41
Columnas Rectangulares .30x.25 ejes A-A' 1-14
bloque 1A 2.00 1.00 1.10 3.90 8.58
bloque 1B 2.00 1.00 1.10 4.40 9.68
bloque 1C 4.00 1.00 1.10 4.90 21.56
Columnas Rectangulares .50x.30 ejes A-B-C entre ejes 1-14
bloque 1A 4.00 1.00 1.60 3.90 24.96
bloque 1B 4.00 1.00 1.60 4.40 28.16
Bloque "1" Segundo Nivel 81.98
Columnas Rectangulares .50x.25 ejes A-B-C entre ejes 1-14
bloque 1A 4.00 1.00 1.50 3.90 23.40
Columnas Rectangulares .40x.25 ejes A-B-C entre ejes 1-14
bloque 1A 2.00 1.00 1.40 3.90 10.92
Columnas "T" .70x.25 ejes A-B-C entre ejes 1-14
bloque 1A 3.00 1.00 2.40 3.90 28.08
Columas Circulares ejes A'-A' entre ejes 1-14
bloque 1A 3.00 1.00 0.94 3.90 11.00
Columnas Rectangulares .30x.25 ejes A-A' 1-14
bloque 1A 2.00 1.00 1.10 3.90 8.58
Columnas Rectangulares .50x.30 ejes A-B-C entre ejes 1-14
bloque 1A 4.00 1.00 1.60 3.90 24.96

03.01.03.05 TARRAJEO EN VIGAS ING. ARISTAS m2 557.70 144.80


Bloque "1" Primer Nivel 144.80
Eje 1,2,3,4,5,6,7,8,9,10,12,13,14 entre los ejes A'-C
bloque 1A
Eje 1,5/A' -C 2.00 1.00 0.65 7.65 9.95
Eje2,3 Y 4/A' -C 2.00 1.00 0.90 7.50 13.50
1.00 1.00 0.90 7.01 6.31
GOBIERNO REGIONAL APURIMAC
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUB GERENCIA DE OBRAS
SUSTENTO DE METRADOS

PROYECTO
"MEJORAMIENTO DE LOS SERVICIOS DE LA INSTITUCION PRIMARIA N° 54018 RAMÓN CASTILLA DEL DISTRITO DE CURAHUASI DE LA PROVINCIA DE ABANCAY
DEPARTAMENTO DE APURÍMAC"
RESPONSABLE
: INGº JOEL QUISPE CERVANTES
FECHA
METRAD :DEL 01 AL 31 DE DICIEMBRE DEL 2015

MET. EXP METRADOS MAYORES


ITEM DESCRIPCION UND CANT N° VECES GK/ML OBS.
TECNICO ANCHO LARGO ALTO SUB. TOT TOTAL METRADOS

Eje A'/1-5 1.00 1.00 0.25 16.50 4.13


Eje A-A/1-5 1.00 1.00 0.65 15.50 10.08
Eje C-C/1-5 1.00 1.00 0.65 16.62 10.80
bloque 1B
Eje 6Y10/A' -C 2.00 1.00 0.65 7.65 9.95
Eje 7,8,Y9/A' -C 2.00 1.00 0.90 7.50 13.50
1.00 1.00 0.90 7.01 6.31
Eje A'/6-10 1.00 1.00 0.25 16.50 4.13
Eje A-A/6-10 1.00 1.00 0.65 15.50 10.08
Eje C-C/6-10 1.00 1.00 0.65 16.62 10.80
bloque 1C
Eje 11Y14/A' -C 1.00 1.00 0.65 4.10 2.67
1.00 1.00 0.65 7.31 4.75
Eje 12 Y 13/A' -C 1.00 1.00 0.65 5.30 3.45
1.00 1.00 0.65 7.01 4.56
Eje A'/1-5 1.00 1.00 0.25 11.20 2.80
Eje A-A/1-5 1.00 1.00 0.65 11.20 7.28
Eje B-B/1-5 1.00 1.00 0.65 3.71 2.41
R-F/1-5 1.00 1.00 0.65 3.90 2.54
Eje C-C/1-5 1.00 1.00 0.65 7.45 4.84
04 INSTALACIONES SANITARIAS
04.01 BLOQUES
04.01.04 SISTEMA DE DESAGUE Y VENTILACION
BLOQUE 1 - B
04.01.04.01 SALIDA DE DESAGUE PVC PARA DESAGUE DE 2" pto 31.00 25.00
1.00 1.00 25.00 25.00
04.01.04.03 RED DE DISTRIBUCION TUBERIA PVC DE 2" ML 54.08 1.00 1.00 120.00
BLOQUE 1 - C 1.00 1.00 120.00

04.01.04.01 SALIDA DE DESAGUE PVC PARA DESAGUE DE 2" pto 31.00 1.00 1.00 20
04.01.04.02 SALIDA DE DESAGUE PVC PARA DESAGUE DE 4" pto 22.00 1.00 1.00 4
04.01.04.03 RED DE DESAGUE TUBERIA PVC DE 2" m 54.08 1.00 1.00 40
04.01.04.04 RED DE DESAGUE TUBERIA PVC DE 4" m 247.50 1.00 1.00 45
04.01.04.05 REGISTROS DE BRONCE DE 4" pza 10.00 1.00 1.00 4
04.01.04.06 REGISTROS DE BRONCE DE 2" pza 6.00 1.00 1.00 6
04.01.04.07 SUMIDEROS DE 2" pza 20.00 1.00 1.00 5
04.01.04.08 SALIDA DE VENTILACION PVC Ø 2" pto 12.00 1.00 1.00 2

04.01.05 REDES DE AGUA FRIA Y ALIMENTADORES


BLOQUE 1C
04.01.05.01 SALIDA DE AGUA FRIA Ø 1/2" pto 53.00 54.31 2878.43 1.00 1.00 25
04.01.05.02 RED DE DISTRIBUCION TUBERIA PVC SP C-10 Ø DE 1/2" M 70.20 30.31 2127.76
04.01.05.03 RED DE DISTRIBUCION TUBERIA PVC SP C-10 Ø DE 3/4" m 231.00 23.11 5338.41 1.00 1.00 100
04.01.05.04 RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP m 31.56 31.50 994.14
04.01.05.05 RED DE DISTRIBUCION TUBERIA DE 2" PVC-SAP m 95.42 37.94 3620.23
04.01.05.06 EXCAVACION DE ZANJAS HASTA h=1.00m m3 24.38 32.52 792.84
04.01.05.07 RELLENO COMPACTADO CON MATERIAL PROPIO m3 21.94 44.62 978.96

05 INSTALACIONES ELECTRICAS
05.01 BLOQUE 1
05.01.01 SALIDAS PARA ALUMBRADOS, TOMACORRIENTES, FUERZA Y SEÑALES DEBILES
05.01.01.01 SALIDA DE TECHO CENTROS DE LUZ pto 97.00 70.00
BLOQUE 1 - A 1.00 1.00 30.00
BLOQUE 1 - B 1.00 1.00 30.00
BLOQUE 1 - C 1.00 1.00 10.00
05.01.01.05 SALIDA PARA TOMACORRIENTES SIMPLE/L.TIERRA pto 98.00 50.00
BLOQUE 1 - A 1.00 1.00 25.00
BLOQUE 1 - B 1.00 1.00 25.00
BLOQUE 1 - C 1.00 1.00
01.01.02 CANALIZACIONES, CONDUCTOS O TUBERIAS
01.01.02.01 TUBERIAS PARA INSTALACIONES ELECTRICAS DE 15 mmØ (3/4") m 490.00 240.00
BLOQUE 1 - A 1.00 1.00 120.00
BLOQUE 1 - B 120.00
BLOQUE 1 - C
01.01.02.02 TUBERIAS PVC SAP DE 20MM (ELECTRICAS) D=3/4" EN CENTRO DE LUZ m 873.00 450.00
BLOQUE 1 - A 200.00
BLOQUE 1 - B 200.00
BLOQUE 1 - C 50.00
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I

ACERO GRADO 60 EN VIGAS DE CONECCION kg 1,040.27


PRIMER NIVEL
BLOQUE I - A 141.76
REFUERZO DE ACERO
EJE A Y C/EJE 1-5 1/4" 2.00 3.00 9.00 0.25 54.00 13.50
1/4" 2.00 3.00 7.41 1.25 44.46 55.58
BASTONES 1/4" 2.00 50.00 1.00 0.25 100.00 25.00
EJE 1-5/EJE A-C 1/4" 5.00 3.00 6.05 0.25 90.75 22.69
BASTONES 1/4" 5.00 20.00 1.00 0.25 100.00 25.00

BLOQUE I - B 141.76
REFUERZO DE ACERO
EJE A Y C/EJE 1-5 1/4" 2.00 3.00 9.00 0.25 54.00 13.50
1/4" 2.00 3.00 7.41 1.25 44.46 55.58
BASTONES 1/4" 2.00 50.00 1.00 0.25 100.00 25.00
EJE 1-5/EJE A-C 1/4" 5.00 3.00 6.05 0.25 90.75 22.69
BASTONES 1/4" 5.00 20.00 1.00 0.25 100.00 25.00

BLOQUE I - C 756.75
EJE A-A/EJE 11-14 5/8" 1.00 4.00 13.25 1.56 53.00 82.68
ESTRIBOS 3/8" 1.00 60.00 1.18 0.56 70.80 39.65
EJE B-B/EJE 13-14 5/8" 1.00 4.00 4.54 1.56 18.16 28.33
ESTRIBOS 3/8" 1.00 20.00 1.18 0.56 23.60 13.22
EJE RF-12/EJE 11-12 5/8" 1.00 4.00 4.72 1.56 18.88 29.45
ESTRIBOS 3/8" 1.00 20.00 1.18 0.56 23.60 13.22
EJE C-C/EJE 12-14 5/8" 1.00 4.00 8.50 1.56 34.00 53.04
ESTRIBOS 3/8" 1.00 40.00 1.18 0.56 47.20 26.43
EJE 11-11/EJE A´-C 5/8" 1.00 4.00 7.92 1.56 31.68 49.42
5/8" 1.00 1.00 2.52 1.56 2.52 3.93
ESTRIBOS 3/8" 1.00 33.00 1.18 0.56 38.94 21.81
EJE 12-12, 13-13, 14-14/EJE A´-C 5/8" 3.00 4.00 9.07 1.56 108.84 169.79
5/8" 3.00 1.00 7.27 1.56 21.81 34.02
3/8" 3.00 38.00 1.18 0.56 134.52 75.33
REFUERZO DE ACERO
EJE A Y C/EJE 11-14 1/4" 2.00 3.00 9.00 0.25 54.00 13.50
1/4" 2.00 3.00 2.16 1.25 12.96 16.20
BASTONES 1/4" 2.00 36.00 1.00 0.25 72.00 18.00
EJE B-B/EJE 12-14 1/4" 1.00 3.00 7.44 0.25 22.32 5.58
BASTONES 1/4" 1.00 20.00 1.00 1.25 20.00 25.00
EJE 11-14/A-C 1/4" 4.00 3.00 6.05 0.25 72.60 18.15
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BASTONES 1/4" 4.00 20.00 1.00 0.25 80.00 20.00

ACERO GRADO 60 EN COLUMNAS kg 807.24


SEGUNDO NIVEL 807.24
BLOQUE I - A
C - 1 EJE A' - A' ENTRE EJE 2, 3 Y 4
ESTRIBOS 3/8" 3.00 50.00 0.89 0.56 133.50 74.76
C - 2 EJE A' - A' ENTRE EJE 1 Y 5
ESTRIBOS 3/8" 2.00 50.00 1.18 0.56 118.00 66.08
C - 3 EJE A Y C ENTRE EJE 1 Y 5
ESTRIBOS 3/8" 4.00 50.00 1.48 0.56 296.00 165.76
C - 4 EJE A - A ENTRE EJE 2, 3 Y 4 3/8" 3.00 50.00 1.48 0.56 222.00 124.32
ESTRIBOS 3/8" 3.00 50.00 1.78 0.56 267.00 149.52
C - 5 EJE B - B ENTRE EJE 3 - 3
ESTRIBOS 3/8" 1.00 50.00 1.48 0.56 74.00 41.44
C - 6 EJE C - C ENTRE EJE 2, 3 Y 4
ESTRIBOS 3/8" 3.00 50.00 1.42 0.56 213.00 119.28
C - 7 EJE B - B ENTRE EJE 1 Y 5
ESTRIBOS 3/8" 2.00 50.00 1.18 0.56 118.00 66.08

ACERO GRADO 60 EN COLUMNETAS kg 1,502.90


SEGUNDO NIVEL
BLOQUE I - A 256.98
EJE A-A/EJE1-5 SECCION C´-C´ 3/8" 6.00 4.00 3.20 0.56 76.80 43.01
3/8" 2.00 4.00 2.10 0.56 16.80 9.41
ESTRIBOS 1/4" 6.00 15.00 0.60 0.25 54.00 13.50
ESTRIBOS 1/4" 2.00 9.00 0.60 0.25 10.80 2.70
EJE C-C/EJE1-5 SECCION D´-D´ 3/8" 8.00 4.00 3.20 0.56 102.40 57.34
ESTRIBOS 1/4" 8.00 15.00 0.60 0.25 72.00 18.00
EJE 5-5/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 3.20 0.56 51.20 28.67
ESTRIBOS 1/4" 4.00 15.00 0.60 0.25 36.00 9.00
EJE 3-3/EJE A-C SECCION B´-B´ 3/8" 4.00 4.00 3.20 0.56 51.20 28.67
ESTRIBOS 1/4" 4.00 15.00 0.60 0.25 36.00 9.00
EJE 1-1/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 3.20 0.56 51.20 28.67
ESTRIBOS 1/4" 4.00 15.00 0.60 0.25 36.00 9.00

BLOQUE I - B 256.98
EJE A-A/EJE6-10 SECCION C´-C´ 3/8" 6.00 4.00 3.20 0.56 76.80 43.01
3/8" 2.00 4.00 2.10 0.56 16.80 9.41
ESTRIBOS 1/4" 6.00 15.00 0.60 0.25 54.00 13.50
ESTRIBOS 1/4" 2.00 9.00 0.60 0.25 10.80 2.70
EJE C-C/EJE6-10 SECCION D´-D´ 3/8" 8.00 4.00 3.20 0.56 102.40 57.34
ESTRIBOS 1/4" 8.00 15.00 0.60 0.25 72.00 18.00
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
EJE 10-10/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 3.20 0.56 51.20 28.67
ESTRIBOS 1/4" 4.00 15.00 0.60 0.25 36.00 9.00
EJE 8-8/EJE A-C SECCION B´-B´ 3/8" 4.00 4.00 3.20 0.56 51.20 28.67
ESTRIBOS 1/4" 4.00 15.00 0.60 0.25 36.00 9.00
EJE 1-1/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 3.20 0.56 51.20 28.67
ESTRIBOS 1/4" 4.00 15.00 0.60 0.25 36.00 9.00

BLOQUE I - C 494.47
PRIMER NIVEL 247.24
EJE 5-5/EJE A-C SECCION A´-A´ 3/8" 2.00 4.00 2.80 0.56 22.40 12.54
3/8" 2.00 4.00 2.10 0.56 16.80 9.41
ESTRIBOS 1/4" 6.00 20.00 0.60 0.25 72.00 18.00
ESTRIBOS 1/4" 2.00 11.00 0.60 0.25 13.20 3.30
EJE 5-5/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 5-5/EJE A-C SECCION A´-A´ 3/8" 2.00 4.00 2.80 0.56 22.40 12.54
ESTRIBOS 1/4" 2.00 20.00 0.60 0.25 24.00 6.00
EJE 5-5/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 5-5/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 13-13/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 14-14/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
SEGUNDO NIVEL
EJE A-A/EJE 11-14 SECCION C´-C´ 3/8" 2.00 4.00 2.80 0.56 22.40 12.54 247.24
3/8" 2.00 4.00 2.10 0.56 16.80 9.41
ESTRIBOS 1/4" 6.00 20.00 0.60 0.25 72.00 18.00
ESTRIBOS 1/4" 2.00 11.00 0.60 0.25 13.20 3.30
EJE C-C/EJE12-14 SECCION D´-D´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE RF-12/EJE11-12 SECCION D´-D´ 3/8" 2.00 4.00 2.80 0.56 22.40 12.54
ESTRIBOS 1/4" 2.00 20.00 0.60 0.25 24.00 6.00
EJE 11-11/EJE A-RF SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 12-12/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 13-13/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
EJE 14-14/EJE A-C SECCION A´-A´ 3/8" 4.00 4.00 2.80 0.56 44.80 25.09
ESTRIBOS 1/4" 4.00 20.00 0.60 0.25 48.00 12.00
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
ACERO GRADO 60 EN VIGAS kg 2,192.63
PRIMER NIVEL
BLOQUE I - B 1,290.58
EJE A´-A´/EJE 6 - 10 SECCION A-A 5/8" 1.00 4.00 19.45 1.56 77.80 121.37
EJE A´-A´/EJE 6 Y 10 SECCION B-B 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE A´-A´/EJE 7-9 SECCION B-B 5/8" 1.00 3.00 2.50 1.56 7.50 11.70
ESTRIBOS 3/8" 1.00 123.00 1.080 0.56 132.84 74.39
EJE A-A/EJE 6 - 10 SECCION C-C 5/8" 1.00 4.00 19.45 1.56 77.80 121.37
EJE A-A/EJE 6 Y 10 SECCION D-D 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE A-A/EJE 7-9 SECCION D-D 5/8" 1.00 3.00 2.50 1.56 7.50 11.70
ESTRIBOS 3/8" 1.00 99.00 1.180 0.56 116.82 65.42
EJE C-C/EJE 6 - 10 SECCION C-C 5/8" 1.00 4.00 19.45 1.56 77.80 121.37
EJE C-C/EJE 6 Y 10 SECCION D-D 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE C-C/EJE 7 - 9 SECCION D-D 5/8" 1.00 3.00 2.50 1.56 7.50 11.70
ESTRIBOS 3/8" 1.00 99.00 1.180 0.56 116.82 65.42
EJE 6-6/EJE A´-C SECCION G-G 5/8" 1.00 4.00 9.05 1.56 36.20 56.47
ESTRIBOS 3/8" 1.00 64.00 1.180 0.56 75.52 42.29
EJE 7-7/EJE A´-A SECCION H-H 5/8" 1.00 2.00 9.05 1.56 18.10 28.24
5/8" 1.00 2.00 3.74 1.56 7.48 11.67
ESTRIBOS 3/8" 1.00 12.00 1.280 0.56 15.36 8.60
EJE 7-7/EJE A -C SECCION I-I 5/8" 1.00 2.00 7.28 1.56 14.56 22.71
EJE 7-7/EJE A -C SECCION I-I 5/8" 1.00 3.00 7.23 1.56 21.69 33.84
EJE 7-7/EJE A -C SECCION I-I 5/8" 1.00 2.00 2.66 1.56 5.32 8.30
EJE 7-7/EJE A -C SECCION J-J 5/8" 1.00 1.00 7.23 1.56 7.23 11.28
ESTRIBOS 3/8" 1.00 30.00 1.580 0.56 47.40 26.54
ESTRIBOS 3/8" 1.00 15.00 1.480 0.56 22.20 12.43
EJE 8-8/EJE A´-A SECCION H-H 5/8" 1.00 2.00 3.74 1.56 7.48 11.67
5/8" 1.00 2.00 3.74 1.56 7.48 11.67
ESTRIBOS 3/8" 1.00 12.00 1.280 0.56 15.36 8.60
EJE 8-8/EJE A - C SECCION K-K 3/4" 1.00 4.00 7.23 2.26 28.92 65.36
3/4" 1.00 1.00 2.00 2.26 2.00 4.52
3/4" 1.00 1.00 1.65 2.26 1.65 3.73
3/8" 1.00 50.00 1.480 0.56 74.00 41.44
EJE 9-9/EJE A´-A SECCION H-H 5/8" 1.00 2.00 9.05 1.56 18.10 28.24
5/8" 1.00 2.00 3.74 1.56 7.48 11.67
ESTRIBOS 3/8" 1.00 12.00 1.280 0.56 15.36 8.60
EJE 9-9/EJE A -C SECCION I-I 5/8" 1.00 2.00 7.28 1.56 14.56 22.71
EJE 9-9/EJE A -C SECCION I-I 5/8" 1.00 3.00 7.23 1.56 21.69 33.84
EJE 9-9/EJE A -C SECCION I-I 5/8" 1.00 2.00 2.66 1.56 5.32 8.30
EJE 9-9/EJE A -C SECCION J-J 5/8" 1.00 1.00 7.23 1.56 7.23 11.28
ESTRIBOS 3/8" 1.00 30.00 1.580 0.56 47.40 26.54
ESTRIBOS 3/8" 1.00 15.00 1.480 0.56 22.20 12.43
EJE 10-10/EJE A´-C SECCION G-G 5/8" 1.00 4.00 9.05 1.56 36.20 56.47
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
ESTRIBOS 3/8" 1.00 64.00 1.180 0.56 75.52 42.29

BLOQUE I - C 902.05
EJE A´-A´/EJE 11-14 SECCION C-C 5/8" 1.00 4.00 13.26 1.56 53.04 82.74
EJE A´-A´/EJE 11 Y 14 SECCION D-D 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE A´-A´/EJE 12-13 SECCION D-D 5/8" 1.00 3.00 2.50 1.56 7.50 11.70
ESTRIBOS 3/8" 1.00 75.00 1.080 0.56 81.00 45.36
EJE A-A/EJE 11-14 SECCION A-A 5/8" 1.00 4.00 13.26 1.56 53.04 82.74
EJE A-A/EJE 11 - 12 SECCION B-B 5/8" 1.00 2.00 4.72 1.56 9.44 14.73
EJE A-A/EJE 11 Y 14 SECCION B-B 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE A-A/EJE 12-13 SECCION B-B 5/8" 1.00 2.00 2.50 1.56 5.00 7.80
ESTRIBOS 3/8" 1.00 75.00 1.180 0.56 88.50 49.56
EJE B-B/EJE 12-14 SECCION A-A 5/8" 1.00 4.00 8.50 1.56 34.00 53.04
EJE B-B/EJE 12 Y 14 SECCION B-B 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE B-B/EJE 13 SECCION B-B 5/8" 1.00 2.00 2.50 1.56 5.00 7.80
ESTRIBOS 3/8" 1.00 50.00 1.180 0.56 59.00 33.04
EJE C-C/EJE 12-14 SECCION A-A 5/8" 1.00 4.00 8.50 1.56 34.00 53.04
EJE C-C/EJE 12 Y 14 SECCION B-B 5/8" 1.00 2.00 1.54 1.56 3.08 4.80
EJE C-C/EJE 13 SECCION B-B 5/8" 1.00 3.00 2.50 1.56 7.50 11.70
ESTRIBOS 3/8" 1.00 50.00 1.180 0.56 59.00 33.04
EJE 11-11/EJE A´-RF SECCION A-A 5/8" 1.00 4.00 7.92 1.56 31.68 49.42
EJE 11-11/EJE A´-A SECCION B-B 5/8" 1.00 1.00 0.91 1.56 0.91 1.42
EJE 11-11/EJE A-B SECCION B-B 5/8" 1.00 2.00 1.75 1.56 3.50 5.46
ESTRIBOS 3/8" 1.00 50.00 1.180 0.56 59.00 33.04
EJE 12-12/EJE A´-C SECCION A-A 5/8" 1.00 4.00 9.08 1.56 36.32 56.66
EJE 12-12/EJE A´-A SECCION B-B 5/8" 1.00 1.00 0.91 1.56 0.91 1.42
EJE 12-C/EJE A -C SECCION B-B 5/8" 1.00 3.00 1.75 1.56 5.25 8.19
ESTRIBOS 3/8" 1.00 56.00 1.180 0.56 66.08 37.00
EJE 13-13/EJE A´-A SECCION A-A 5/8" 1.00 4.00 9.08 1.56 36.32 56.66
EJE 13-13/EJE A´ Y C SECCION B-B 5/8" 1.00 2.00 0.91 1.56 1.82 2.84
EJE 13-13/EJE A Y B SECCION B-B 5/8" 1.00 2.00 1.75 1.56 3.50 5.46
ESTRIBOS 3/8" 1.00 56.00 1.180 0.56 66.08 37.00
EJE 14-14/EJE A´-A SECCION A-A 5/8" 1.00 4.00 9.08 1.56 36.32 56.66
EJE 14-14/EJE A´ Y C SECCION B-B 5/8" 1.00 2.00 0.91 1.56 1.82 2.84
EJE 14-14/EJE A Y B SECCION B-B 5/8" 1.00 2.00 1.75 1.56 3.50 5.46
ESTRIBOS 3/8" 1.00 56.00 1.180 0.56 66.08 37.00

ACERO GRADO 60 EN LOSA ALIGERADA kg 4,090.82


PRIMER NIVEL
BLOQUE I - A 1,716.36
EN VIGUETAS
EN EJE A´-A´/ TRAMO 1-5, TRAMO A´-A 1/2" 4.00 1.00 19.21 1.02 76.84 78.38
1/2" 8.00 2.00 2.30 1.02 36.80 37.54
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
1/2" 12.00 3.00 3.40 1.02 122.40 124.85
3/8" 6.00 4.00 1.10 0.56 26.40 14.78
ESTRIBO "S" 1/4" 4.00 18.00 0.25 0.25 18.00 4.50
EN EJE A-A/TRAMO 1-5, TRAMO A-C 1/2" 17.00 1.00 19.28 1.02 327.76 334.32
1/2" 34.00 2.00 1.85 1.02 125.80 128.32
1/2" 51.00 3.00 3.30 1.02 504.90 515.00
3/8" 22.00 4.00 1.10 0.56 96.80 54.21
ESTRIBO "S" 1/4" 4.00 66.00 0.25 0.25 66.00 16.50
EN TEMPERATURA
EN EJE 1-5 TRAMO A´-C 1/4" 1.00 74.00 18.08 0.25 1337.92 334.48
EN EJE A´-C TRAMO 1-5 1/4" 1.00 35.00 8.40 0.25 294.00 73.50

BLOQUE I - B 1,697.86
EN VIGUETAS
EN EJE A´-A´/ TRAMO 6-10, TRAMO A´-A 1/2" 4.00 1.00 19.09 1.02 76.36 77.89
1/2" 8.00 2.00 1.85 1.02 29.60 30.19
1/2" 12.00 3.00 3.30 1.02 118.80 121.18
3/8" 6.00 4.00 1.10 0.56 26.40 14.78
ESTRIBO "S" 1/4" 4.00 18.00 0.25 0.25 18.00 4.50
EN EJE A-A/TRAMO 6-10, TRAMO A-C 1/2" 17.00 1.00 19.09 1.02 324.53 331.02
1/2" 34.00 2.00 1.85 1.02 125.80 128.32
1/2" 51.00 3.00 3.30 1.02 504.90 515.00
3/8" 22.00 4.00 1.10 0.56 96.80 54.21
ESTRIBO "S" 1/4" 4.00 66.00 0.25 0.25 66.00 16.50
EN TEMPERATURA
EN EJE 6-10 TRAMO A´-C 1/4" 1.00 74.00 17.88 0.25 1323.12 330.78
EN EJE A´-C TRAMO 6-10 1/4" 1.00 35.00 8.40 0.25 294.00 73.50

BLOQUE I - C 676.59
EN EJE A´-A´/ TRAMO 11-14, TRAMO A´-A 1/2" 5.00 1.00 12.33 1.02 61.65 62.88
1/2" 5.00 2.00 1.65 1.02 16.50 16.83
1/2" 4.00 2.00 2.45 1.02 19.60 19.99
ESTRIBO "S" 1/4" 3.00 18.00 0.25 0.25 13.50 3.38
EN EJE A-A/TRAMO 12-14, TRAMO A-C 1/2" 17.00 1.00 8.17 1.02 138.89 141.67
1/2" 34.00 2.00 1.65 1.02 112.20 114.44
1/2" 17.00 1.00 2.25 1.02 38.25 39.02
ESTRIBO "S" 1/4" 2.00 36.00 0.25 0.25 18.00 4.50
EN TEMPERATURA
EN EJE 11-14 TRAMO A´-A 1/4" 1.00 50.00 12.31 0.25 615.50 153.88
EN EJE A´-A TRAMO 11-14 1/4" 1.00 8.00 2.05 0.25 16.40 4.10
EN EJE 12-14 TRAMO A-C 1/4" 1.00 33.00 8.17 0.25 269.61 67.40
EN EJE A-C TRAMO 12-14 1/4" 1.00 28.00 6.93 0.25 194.04 48.51
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG

ACERO GRADO 60 EN LOSA MACISA kg 164.00


PRIMER NIVEL
BLOQUE I - C 164.00
CANALETA DE CONCRETO
TRANSVERSAL INFERIOR 1/2" 1.00 47.00 0.85 1.02 39.95 40.75
LONGITUDINAL INFERIOR 1/2" 1.00 3.00 13.48 1.02 40.44 41.25
TRANSVERSAL SUPERIOR 1/2" 1.00 47.00 0.85 1.02 39.95 40.75
LONGITUDINAL SUPERIOR 1/2" 1.00 3.00 13.48 1.02 40.44 41.25

ACERO GRADO 60 EN ESCALERA kg 656.82


PRIMER NIVEL -
BLOQUE I - C 656.82
TRAMO 1 1/2" 2.00 12.00 14.61 1.02 350.64 357.65
1/2" 2.00 38.00 1.80 1.02 136.80 139.54
5/8" 1.00 5.00 4.00 1.02 20.00 20.40
ESTRIBOS 1/2" 1.00 65.00 2.10 1.02 136.50 139.23
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA,
DISTRITO DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I
HOJAS DE METRADOS ACEROS BLOQUE I
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA, DISTRITO
DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I
HOJAS DE METRADOS ACEROS BLOQUE I Y BLOQUE 2
MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES Y APRENDIZAJE DE LOS ESTUDIANTES DEL C.S.M. RAMON CASTILLA, DISTRITO
DE CURAHUASI, PROVINCIA DE ABANCAY, REGIÓN APURÍMAC.
METRADOS
DESCRIPCION DIAMETRO N° N° LONGITUD DE ACERO PESO DE LONGITUD PESO TOTAL SUB
PARCIAL KG
UND VECES DE PIEZAS 1/4" 3/8" 1/2" 5/8" 3/4" ACERO KG/M. TOTAL ML. DE ACERO KG. TOTAL KG
BLOQUE I
FORMATO FE - 03
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %

1 OBRAS PROVISIONALES, PRELIMINARES, SEGURIDAD Y SALUD 36540.040 29,802.07 824.02


1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 24233.260
1.1.1 HITO INICIO
1.1.2 OFICINAS m² 29.250 152.900 4472.330 29.25 4,472.33 100.00% 0.00 0.00 0.00% 29.25 4,472.33 ### 0.00 0.00 0.00%
1.1.3 ALMACENES m² 44.850 152.900 6857.570 44.85 6,857.57 100.00% 0.00 0.00 0.00% 44.85 6,857.57 ### 0.00 0.00 0.00%
1.1.4 SERVICIOS HIGIENICOS PROVISIONALES glb 1.000 1500.000 1500.000 1.00 1,500.00 100.00% 0.00 0.00 0.00% 1.00 1,500.00 ### 0.00 0.00 0.00%
1.1.5 CERCO PROVISIONAL DE ARPILLERA H = 3.00 m m 36.000 15.760 567.360 36.00 567.36 100.00% 0.00 0.00 0.00% 36.00 567.36 ### 0.00 0.00 0.00%
1.1.6 CARTEL DE IDENTIFICACION DE OBRA und 1.000 836.000 836.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 836.00 100.00%
1.1.7 FLETE TERRESTRE DE MATERIALES Y EQUIPOS gbl 1.000 ### 10000.000 0.72 7,192.88 71.93% 0.00 0.00 0.00% 0.72 7,192.88 71.93% 0.28 2,807.12 28.07%
1.2 TRABAJOS PRELIMINARES 86.520
1.2.1 LIMPIEZA DEL TERRENO m² 84.000 1.030 86.520 84.00 86.52 100.00% 0.00 0.00 0.00% 84.00 86.52 ### 0.00 0.00 0.00%
1.3 TRAZO NIVELES Y REPLANTEO 313.320
1.3.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 84.000 3.730 313.320 84.00 313.32 100.00% 0.00 0.00 0.00% 84.00 313.32 ### 0.00 0.00 0.00%
1.4 SEGURIDAD Y SALUD 11906.940
1.4.1 EQUIPOS DE PROTECCION INDIVIDUAL glb 1.000 2292.720 2292.720 1.00 2,292.72 100.00% 0.00 0.00 0.00% 1.00 2,292.72 ### 0.00 0.00 0.00%
1.4.2 EQUIPOS DE PROTECCION COLECTIVA glb 1.000 1781.720 1781.720 0.67 1,193.75 67.00% 0.10 178.17 10.00% 0.77 1,371.92 77.00% 0.23 409.80 23.00%
1.4.3 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.000 3397.500 3397.500 0.66 2,253.37 66.32% 0.10 339.75 10.00% 0.76 2,593.12 76.32% 0.24 804.38 23.68%
1.4.4 CAPACITACION EN SEGURIDAD Y SALUD glb 1.000 2000.000 2000.000 0.69 1,380.00 69.00% 0.08 160.00 8.00% 0.77 1,540.00 77.00% 0.23 460.00 23.00%
1.4.5 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN Sglb 1.000 2435.000 2435.000 0.69 1,692.25 69.50% 0.06 146.10 6.00% 0.75 1,838.35 75.50% 0.25 596.65 24.50%
2 ESTRUCTURAS 213223.320 203,045.44 0.00
2.1 MOVIMIENTO DE TIERRAS 5181.450
2.1.1 EXCAVACIONES 1666.180
2.1.1.1 EXCAVACION m³ 72.290 19.810 1432.060 72.29 1,432.06 100.00% 0.00 0.00 0.00% 72.29 1,432.06 ### 0.00 0.00 0.00%
2.1.1.2 NIVELACION DEL TERRENO m² 45.460 5.150 234.120 45.46 234.12 100.00% 0.00 0.00 0.00% 45.46 234.12 ### 0.00 0.00 0.00%
2.1.2 RELLENOS Y COMPACTADOS 2538.210
2.1.2.1 RELLENO Y COMPACTADO CON MATERIAL PROPIO m³ 49.720 51.050 2538.210 49.72 2,538.21 100.00% 0.00 0.00 0.00% 49.72 2,538.21 ### 0.00 0.00 0.00%
2.1.3 ELIMINACION DE MATERIAL EXCEDENTE 977.060
2.1.3.1 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO Hm³ 29.340 33.300 977.060 10.00 333.00 34.08% 0.00 0.00 0.00% 10.00 333.00 34.08% 19.34 644.06 65.92%
2.2 OBRAS DE CONCRETO SIMPLE 21929.210
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
2.2.1 SOLADOS 2603.490
2.2.1.1 SOLADOS DE CONCRETO 1:12 CEM-HORMIGON E=0.10m m² 45.460 57.270 2603.490 45.46 2,603.49 100.00% 0.00 0.00 0.00% 45.46 2,603.49 ### 0.00 0.00 0.00%
2.2.2 CIMIENTOS CORRIDOS 2684.600
2.2.2.1 CONCRETO EN CIMIENTOS CORRIDOS C:H 1:10 + 30%PG m³ 5.520 486.340 2684.600 5.52 2,684.60 100.00% 0.00 0.00 0.00% 5.52 2,684.60 ### 0.00 0.00 0.00%
2.2.3 SOBRECIMIENTOS 8139.050
2.2.3.1 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m² 62.140 55.650 3458.090 62.14 3,458.09 100.00% 0.00 0.00 0.00% 62.14 3,458.09 ### 0.00 0.00 0.00%
2.2.3.2 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m³ 8.840 529.520 4680.960 8.84 4,680.96 100.00% 0.00 0.00 0.00% 8.84 4,680.96 ### 0.00 0.00 0.00%
2.2.4 FALSO PISO 8502.070
2.2.4.1 FALSO PISO MEZCLA C:H - 1:6 e=4" m² 63.250 134.420 8502.070 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 63.25 8,502.07 100.00%
2.3 OBRAS DE CONCRETO ARMADO 124990.280
2.3.1 ZAPATAS 9942.010
2.3.1.1 ACERO EN ZAPATAS kg 345.760 5.440 1880.930 345.76 1,880.93 100.00% 0.00 0.00 0.00% 345.76 1,880.93 ### 0.00 0.00 0.00%
2.3.1.2 CONCRETO F'C=210kg/cm2 EN ZAPATAS m³ 11.060 728.850 8061.080 11.06 8,061.08 100.00% 0.00 0.00 0.00% 11.06 8,061.08 ### 0.00 0.00 0.00%
2.3.2 VIGAS DE CONEXION 12480.030
2.3.2.1 ACERO EN VIGAS DE CONEXION kg 1025.550 5.570 5712.310 1,025.55 5,712.31 100.00% 0.00 0.00 0.00% 1,025.55 5,712.31 ### 0.00 0.00 0.00%
2.3.2.2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONEXIONm² 46.200 37.160 1716.790 46.20 1,716.79 100.00% 0.00 0.00 0.00% 46.20 1,716.79 ### 0.00 0.00 0.00%
2.3.2.3 CONCRETO 210kg/cm2 EN VIGAS DE CONEXION m³ 6.930 728.850 5050.930 6.93 5,050.93 100.00% 0.00 0.00 0.00% 6.93 5,050.93 ### 0.00 0.00 0.00%
2.3.3 COLUMNAS 25075.410
2.3.3.1 ACERO EN COLUMNAS kg 1719.400 5.570 9577.060 1,719.40 9,577.04 100.00% 0.00 0.00 0.00% 1,719.40 9,577.04 ### 0.00 0.02 0.00%
2.3.3.2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m² 136.080 51.440 6999.960 136.08 6,999.96 100.00% 0.00 0.00 0.00% 136.08 6,999.96 ### 0.00 0.00 0.00%
2.3.3.3 CONCRETO F'C=210kg/cm2 EN COLUMNAS m³ 11.660 728.850 8498.390 11.66 8,496.93 99.98% 0.00 0.00 0.00% 11.66 8,496.93 99.98% 0.00 1.46 0.02%
2.3.4 COLUMNETAS DE AMARRE 11076.350
2.3.4.1 ACERO EN COLUMNETAS kg 385.260 5.440 2095.810 385.26 2,095.81 100.00% 0.00 0.00 0.00% 385.26 2,095.81 ### 0.00 0.00 0.00%
2.3.4.2 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m² 63.900 57.080 3647.410 63.90 3,647.41 100.00% 0.00 0.00 0.00% 63.90 3,647.41 ### 0.00 0.00 0.00%
2.3.4.3 JUNTA CON TEKNOPORT DE 1" PARA COLUMNETAS m² 79.520 9.720 772.930 23.50 228.42 29.55% 0.00 0.00 0.00% 23.50 228.42 29.55% 56.02 544.51 70.45%
2.3.4.4 CONCRETO F'C=175kg/cm2 EN COLUMNETAS m³ 6.040 755.000 4560.200 6.04 4,560.20 100.00% 0.00 0.00 0.00% 6.04 4,560.20 ### 0.00 0.00 0.00%
2.3.5 VIGAS 28248.990
2.3.5.1 ENCOFRADO Y DESENCOFRADO EN VIGAS m² 119.460 54.200 6474.730 119.46 6,474.73 100.00% 0.00 0.00 0.00% 119.46 6,474.73 ### 0.00 0.00 0.00%
2.3.5.2 ACERO EN VIGAS kg 2062.870 5.570 11490.190 2,062.87 11,490.19 100.00% 0.00 0.00 0.00% 2,062.87 11,490.19 ### 0.00 0.00 0.00%
2.3.5.3 CONCRETO F'C=210kg/cm2 EN VIGAS m³ 14.110 728.850 10284.070 14.11 10,284.07 100.00% 0.00 0.00 0.00% 14.11 10,284.07 ### 0.00 0.00 0.00%
2.3.6 VIGUETAS DE AMARRE 3908.730
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
2.3.6.1 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE AMAR m² 9.550 69.620 664.870 9.55 664.87 100.00% 0.00 0.00 0.00% 9.55 664.87 ### 0.00 0.00 0.00%
2.3.6.2 ACERO EN VIGUETAS DE AMARRE kg 226.030 5.570 1258.990 226.03 1,258.99 100.00% 0.00 0.00 0.00% 226.03 1,258.99 ### 0.00 0.00 0.00%
2.3.6.3 m²
JUNTA CON TEKNOPORT 1" PARA AISLAMIENTO DE MURO 15.910 11.340 180.420 15.91 180.42 100.00% 0.00 0.00 0.00% 15.91 180.42 ### 0.00 0.00 0.00%
2.3.6.4 CONCRETO F'C=175kg/cm2 EN VIGUETAS DE AMARRE m³ 2.390 755.000 1804.450 2.39 1,804.45 100.00% 0.00 0.00 0.00% 2.39 1,804.45 ### 0.00 0.00 0.00%
2.3.7 LOSAS ALIGERADAS 23348.850
2.3.7.1 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m² 143.530 52.190 7490.830 143.53 7,490.83 100.00% 0.00 0.00 0.00% 143.53 7,490.83 ### 0.00 0.00 0.00%
2.3.7.2 BLOQUES DE TECKNOPORT h=15 cm PARA LOSA ALIGERAm 126.500 3.840 485.760 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 126.50 485.76 100.00%
2.3.7.3 LADRILLOS TECHO DE ARCILLA 15X303X30 CM - LOSA PRund 428.000 5.840 2499.520 428.00 2,499.52 100.00% 0.00 0.00 0.00% 428.00 2,499.52 ### 0.00 0.00 0.00%
2.3.7.4 ACERO EN LOSAS ALIGERADAS kg 857.310 5.570 4775.220 857.31 4,775.22 100.00% 0.00 0.00 0.00% 857.31 4,775.22 ### 0.00 0.00 0.00%
2.3.7.5 CONCRETO F'C=210kg/cm2 EN LOSAS ALIGERADAS m³ 11.110 728.850 8097.520 11.11 8,097.52 100.00% 0.00 0.00 0.00% 11.11 8,097.52 ### 0.00 0.00 0.00%
2.3.8 ESCALERAS 10909.910
2.3.8.1 ENCOFRADO Y DESENCOFRADO EN ESCALERAS m² 34.500 60.160 2075.520 34.50 2,075.52 100.00% 0.00 0.00 0.00% 34.50 2,075.52 ### 0.00 0.00 0.00%
2.3.8.2 ACERO EN ESCALERAS kg 543.170 5.570 3025.460 543.17 3,025.46 100.00% 0.00 0.00 0.00% 543.17 3,025.46 ### 0.00 0.00 0.00%
2.3.8.3 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m³ 7.970 728.850 5808.930 7.97 5,808.93 100.00% 0.00 0.00 0.00% 7.97 5,808.93 ### 0.00 0.00 0.00%
2.4 ESTRUCTURA METALICA 61122.380
2.4.1 TECHO METALICO 61122.380
2.4.1.1 ARMADO DE TIJERAL METALICO und 4.000 9221.620 36886.480 4.00 36,886.48 100.00% 0.00 0.00 0.00% 4.00 36,886.48 ### 0.00 0.00 0.00%
2.4.1.2 ARMADO DE CORREAS METALICAS m 128.700 119.010 15316.590 128.70 15,316.59 100.00% 0.00 0.00 0.00% 128.70 15,316.59 ### 0.00 0.00 0.00%
2.4.1.3 ARENADO Y PINTURA ANTICORROSIVA PARA ESTRUCTUm² 74.030 73.330 5428.400 74.03 5,428.40 100.00% 0.00 0.00 0.00% 74.03 5,428.40 ### 0.00 0.00 0.00%
2.4.1.4 PINTURA ESMALTE EPOXICO PARA ESTRUCTURA METALm² 74.030 40.550 3001.790 74.03 3,001.79 100.00% 0.00 0.00 0.00% 74.03 3,001.79 ### 0.00 0.00 0.00%
2.4.1.5 IZAJE DE TIJERALES und 4.000 122.280 489.120 4.00 489.12 100.00% 0.00 0.00 0.00% 4.00 489.12 ### 0.00 0.00 0.00%
3 ARQUITECTURA 150135.770 51,410.13 12,469.41
3.1 MUROS Y TABIQUES 37841.240
3.1.1 MURO CABEZA DE LADRILLO KING-KONG CON CEMEN m² 58.280 205.250 11961.970 58.28 11,961.97 100.00% 0.00 0.00 0.00% 58.28 11,961.97 ### 0.00 0.00 0.00%
3.1.2 MURO SOGA DE BLOQUE HUECO E=12CM MEZCLA 1:5 m² 224.160 115.450 25879.270 224.16 25,879.27 100.00% 0.00 0.00 0.00% 224.16 25,879.27 ### 0.00 0.00 0.00%
3.2 REVOQUES ENLUCIDOS Y MOLDURAS 30521.940
3.2.1 TARRAJEO RAYADO PRIMARIO CON MEZCLA C:A 1:5 m² 57.040 22.820 1301.650 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 57.04 1,301.65 100.00%
3.2.2 TARRAJEO EN INTERIORES CON MEZCLA C:A 1:5 m² 285.860 27.510 7864.010 92.87 2,554.85 32.49% 192.99 5,309.15 68.00% 285.86 7,864.01 ### 0.00 0.00 0.00%
3.2.3 TARRAJEO EN EXTERIORES CON MEZCLA C:A 1:5 m² 212.950 36.850 7847.210 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 212.95 7,847.21 100.00%
3.2.4 TARRAJEO DE SUPERFICIE DE COLUMNAS C:A 1:5 INCLU m² 61.390 38.490 2362.900 5.38 207.08 8.76% 56.01 2,155.82 91.00% 61.39 2,362.90 ### 0.00 0.00 0.00%
3.2.5 TARRAJEO DE SUPERFICIE VIGAS C:A 1:5, INCLUYE ARIS m² 62.170 41.730 2594.350 33.60 1,402.13 54.05% 28.57 1,192.23 46.00% 62.17 2,594.35 ### 0.00 0.00 0.00%
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
3.2.6 m
VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VA 262.390 12.770 3350.720 62.44 797.36 23.80% 199.95 2,553.36 76.00% 262.39 3,350.72 ### 0.00 0.00 0.00%
3.2.7 BRUÑAS DE 1 CM m 165.420 7.610 1258.850 0.00 0.00 0.00% 165.42 1,258.85 ### 165.42 1,258.85 ### 0.00 0.00 0.00%
3.2.8 TARRAJEO EN FONDO DE ESCALERAS m² 21.510 34.810 748.760 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21.51 748.76 100.00%
3.2.9 PREPARACION DE GRADAS DE CONCRETO m 105.000 23.170 2432.850 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 105.00 2,432.85 100.00%
3.2.10 PREPARACION DE DESCANSOS m² 13.500 26.350 355.730 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13.50 355.73 100.00%
3.2.11 PREPARACION DE BANDAS LATERALES DE ESCALERAS m² 9.000 26.350 237.150 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.00 237.15 100.00%
3.2.12 ENCHAPE PORCELANATO 60 x 60 cm PARA MESAS CON m² 2.330 72.000 167.760 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.33 167.76 100.00%
3.3 CIELORRASOS 1632.280
3.3.1 CIELORRASOS CON YESO m² 98.330 16.600 1632.280 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 98.33 1,632.28 100.00%
3.4 PISOS Y PAVIMENTOS 22937.290
3.4.1 CONTRAPISO 5331.420
3.4.1.1 CONTRAPISO DE 48 mm m² 129.090 41.300 5331.420 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 129.09 5,331.42 100.00%
3.4.2 PISOS 1000.860
3.4.2.1 PISO DE CERAMICO ANTIDESLIZANTE DE 30x30 cm m² 19.510 51.300 1000.860 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.51 1,000.86 100.00%
3.4.3 PISOS DE CONCRETO 16605.010
3.4.3.1 PISO DE CEMENTO PULIDO m² 171.380 96.890 16605.010 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 171.38 16,605.01 100.00%
3.5 ZOCALOS Y CONTRAZOCALOS 3291.620
3.5.1 ZOCALOS 3016.300
3.5.1.1 ZOCALOS DE CERAMICA DE 30X30cm h=1.20m m² 43.400 69.500 3016.300 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 43.40 3,016.30 100.00%
3.5.2 CONTRAZOCALOS 275.320
3.5.2.1 CEMENTO PULIDO H= 30cm m 27.450 10.030 275.320 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.45 275.32 100.00%
3.6 COBERTURAS 8607.470
3.6.1 COBETURA METALICA ALUZINC 25 mm - Techo Aluzinc Tr-4m² 113.690 75.710 8607.470 113.69 8,607.47 100.00% 0.00 0.00 0.00% 113.69 8,607.47 ### 0.00 0.00 0.00%
3.7 CARPINTERIA DE MADERA 6887.370
3.7.1 PUERTA TABLERO REBAJADO C/MARCO DE MADERA INC.m² 29.840 230.810 6887.370 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.84 6,887.37 100.00%
3.8 MUEBLES 112.070
3.8.1 REPOSTERO DE MELAMINA 18mm m² 1.000 112.070 112.070 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 112.07 100.00%
3.9 CARPINTERIA METALICA 8984.710
3.9.1 VENTANAS DE ALUMINIO 3656.040
3.9.1.1 VENTANA DE ALUMINIO DE 1 1/2" x 3" x 1.5 mm CON CA m² 35.290 103.600 3656.040 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.29 3,656.04 100.00%
3.9.2 MARCOS DE PUERTAS DE ALUMINIO 1901.810
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
3.9.2.1 m²
PUERTA DE SS.HH CON MELAMINE DE 18 mm C/ PERFIL DE 4.680 406.370 1901.810 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.68 1,901.81 100.00%
3.9.3 DIVISIONES METALICAS 1410.800
3.9.3.1 m²
SEPARADOR DE URINARIO CON MELAMINA DE 15 mm. CON 1.700 157.620 267.950 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.70 267.95 100.00%
3.9.3.2 m²
SEPARADOR DE BAÑO CON MELAMINA DE 15 mm. CON PER 7.310 156.340 1142.850 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.31 1,142.85 100.00%
3.9.4 BARANDAS 1475.880
3.9.4.1 BARANDA METALICA SEGUN DISEÑO 01 m 12.000 122.990 1475.880 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 1,475.88 100.00%
3.9.5 MUEBLES 540.180
3.9.5.1 REPOSTERO DE MELAMINA 18mm m² 4.820 112.070 540.180 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.82 540.18 100.00%
3.10 CERRAJERIA 1332.420
3.10.1 BISAGRAS 786.720
3.10.1.1 BISAGRA CAPUCHINA ALUMINIZADA DE 4" pza 44.000 17.880 786.720 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 44.00 786.72 100.00%
3.10.2 CERRADURAS 545.700
3.10.2.1 pza
CERRADURA PARA PUERTAS CON MANIJA Y CHAPA DE DE 7.000 70.150 491.050 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 491.05 100.00%
3.10.2.2 CERRADURA DE MANIJA 2 GOLPES pza 1.000 54.650 54.650 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 54.65 100.00%
3.11 VIDRIOS, CRISTALES Y SIMILARES 9391.890
3.11.1 VIDRIO LAMINADO INCOLORO DE 6mm m² 71.530 131.300 9391.890 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.53 9,391.89 100.00%
3.12 PINTURA 14338.780
3.12.1 PINTURA DE CIELO RASOS, VIGAS, COLUMNAS Y PAREDES 14286.570
3.12.1.1 PINTURA EN CIELORASOS 2 MANOS m² 99.320 19.270 1913.900 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 99.32 1,913.90 100.00%
3.12.1.2 PINTURA EN VIGAS 2 MANOS m² 62.800 10.670 670.080 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.80 670.08 100.00%
3.12.1.3 PINTURA EN COLUMNAS RASOS 2 MANOS m² 62.000 10.180 631.160 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 62.00 631.16 100.00%
3.12.1.4 PINTURA EN DERRAMES m² 265.010 10.180 2697.800 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 265.01 2,697.80 100.00%
3.12.1.5 PINTURA EN MUROS INTERIORES 2 MANOS m² 288.720 18.580 5364.420 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 288.72 5,364.42 100.00%
3.12.1.6 PINTURA EN MUROS EXTERIORES 2 MANOS m² 295.600 10.180 3009.210 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 295.60 3,009.21 100.00%
3.12.2 PINTURA EN PUERTAS 52.210
3.12.2.1 PINTURA BARNIZ DD m² 5.360 9.740 52.210 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.36 52.21 100.00%
3.13 VARIOS LIMPIEZA Y JARDINERIA 3073.680
3.13.1 LIMPIEZA PERMANENTE EN OBRA glb 1.000 2000.000 2000.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,000.00 100.00%
3.13.2 LIMPIEZA FINAL glb 1.000 1000.000 1000.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,000.00 100.00%
3.13.3 LIMPIEZA DE VIDRIOS m² 71.530 1.030 73.680 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.53 73.68 100.00%
3.14 SEÑALIZACION Y SEGURIDAD VIAL 1183.010
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
3.14.1 SEÑALIZACION DE AMBIENTES SEGUN DEFENSA CIVIL glb 1.000 1183.010 1183.010 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,183.01 100.00%
4 INSTALACIONES SANITARIAS 12689.160 566.490 0.000
4.1 APARATOS SANITARIOS Y ACCESORIOS 4089.280
4.1.1 SUMINISTRO DE APARATOS SANITARIOS 1137.680
4.1.1.1 SUMINISTRO DE INODOROS 579.680
4.1.1.1.1 INODORO TANQUE BAJO DE CERAMICA VITRIFICADA und 4.000 144.920 579.680 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 579.68 100.00%
4.1.1.2 SUMINISTRO DE LAVATORIOS 558.000
4.1.1.2.1 LAVATORIO DE CERAMICA VITRIFICADA DE 0.46X0.37m und 8.000 38.000 304.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 304.00 100.00%
4.1.1.2.2 LAVADERO DE ACERO INOXIDABLE DE UNA POZA CON ES und 1.000 254.000 254.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 254.00 100.00%
4.1.2 SUMINISTRO DE ACCESORIOS 2439.000
4.1.2.1 SUMINISTRO DE ACCESORIOS PARA INODOROS 370.640
4.1.2.1.1 ACCESORIOS PARA INODORO TANQUE BAJO DE CERAMICund 4.000 92.660 370.640 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 370.64 100.00%
4.1.2.2 SUMINISTRO DE ACCESORIOS PARA LAVATORIOS 495.910
4.1.2.2.1 ACCESORIOS PARA LAVATORIO DE CERAMICA VITRIFIC und 8.000 57.380 459.040 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 459.04 100.00%
4.1.2.2.2 ACCESORIOS PARA LAVADERO DE ACERO INOXIDABLE und 1.000 36.870 36.870 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 36.87 100.00%
4.1.2.3 SUMINISTRO DE GRIFERIA 1518.530
4.1.2.3.1 LLAVE DE BRONCE CROMADO AL MUEBLE DE LAVATORund 12.000 76.090 913.080 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 913.08 100.00%
4.1.2.3.2 LLAVE DE BRONCE CROMADO TIPO CUELLO DE GANSO Aund 5.000 116.090 580.450 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 580.45 100.00%
4.1.2.3.3 LLAVE ESFERICA DE BRONCE CROMADO DE 1/2" und 1.000 25.000 25.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 25.00 100.00%
4.1.2.4 SUMINISTRO DE ACCESORIOS COMPLEMENTARIOS 53.920
4.1.2.4.1 PORTAROLLO DE LOSA BLANCA pza 4.000 13.480 53.920 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 53.92 100.00%
4.1.3 INSTALACION DE APARATOS SANITARIOS 222.010
4.1.3.1 INSTALACION DE INODOROS 68.640
4.1.3.1.1 INSTALACION DE INODORO TANQUE BAJO DE CERAMICAund 4.000 17.160 68.640 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 68.64 100.00%
4.1.3.2 INSTALACION DE LAVATORIOS 153.370
4.1.3.2.1 INSTALACION DE LAVATORIO DE CERAMICA VITRIFICA und 8.000 17.160 137.280 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 137.28 100.00%
4.1.3.2.2 INSTALACION DE LAVADERO DE ACERO INOXIDABLE COund 1.000 16.090 16.090 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 16.09 100.00%
4.1.4 INSTALACION DE ACCESORIOS 290.590
4.1.4.1 INSTALACION DE ACCESORIOS PARA INODOROS 38.600
4.1.4.1.1 INSTALACION DE ACCESORIOS PARA INODORO DE CERAund 4.000 9.650 38.600 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 38.60 100.00%
4.1.4.2 INSTALACION DE ACCESORIOS PARA LAVATORIOS 154.410
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
4.1.4.2.1 INSTALACION DE ACCESORIOS PARA LAVATORIO DE CE und 8.000 9.650 77.200 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 77.20 100.00%
4.1.4.2.2 INSTALACION DE ACCESORIOS PARA LAVADERO DE ACEund 1.000 77.210 77.210 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 77.21 100.00%
4.1.4.3 INSTALACION DE GRIFERIA 87.260
4.1.4.3.1 INSTALACION DE LLAVE DE BRONCE CROMADO AL MUEund 12.000 4.830 57.960 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 57.96 100.00%
4.1.4.3.2 INSTALACION DE LLAVE DE BRONCE CROMADO TIPO CUund 5.000 4.830 24.150 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 24.15 100.00%
4.1.4.3.3 und
INSTALACION DE LLAVE ESFERICA DE BRONCE CROMADO 1.000 5.150 5.150 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 5.15 100.00%
4.1.4.4 INSTALACION DE ACCESORIOS COMPLEMENTARIOS 10.320
4.1.4.4.1 INSTALACION DE PORTAROLLO DE LOZA BLANCA und 4.000 2.580 10.320 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 10.32 100.00%
4.2 SISTEMA DE AGUA FRIA 2858.110
4.2.1 SALIDAS DE AGUA FRIA 281.230
4.2.1.1 SALIDA DE AGUA PARA INODORO TANQUE BAJO DE 1/2" pto 4.000 31.160 124.640 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 124.64 100.00%
4.2.1.2 SALIDA DE AGUA PARA LAVATORIO DE 1/2" pto 7.000 22.370 156.590 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 156.59 100.00%
4.2.2 REDES DE DISTRIBUCION 176.570
4.2.2.1 TUBERIA PARA AGUA FRIA CON ROSCA PVC SAP C-10 DE m
3 9.950 5.430 54.030 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.95 54.03 100.00%
4.2.2.2 TUBERIA PARA AGUA FRIA CON ROSCA PVC SAP C-10 DE m
1 23.840 5.140 122.540 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.84 122.54 100.00%
4.2.3 REDES DE ALIMENTACION 27.150
4.2.3.1 TUBERIA PARA AGUA FRIA CON ROSCA PVC SAP C-10 DE m
3 5.000 5.430 27.150 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 27.15 100.00%
4.2.4 ACCESORIOS DE REDES DE AGUA 280.080
4.2.4.1 TEE ROSCADA PVC SAP DE 1/2" und 12.000 3.090 37.080 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 37.08 100.00%
4.2.4.2 TEE ROSCADA PVC SAP DE 3/4" und 10.000 3.340 33.400 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 33.40 100.00%
4.2.4.3 CODO ROSCADO PVC CL-10 DE 1/2" X 90° und 40.000 2.460 98.400 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.00 98.40 100.00%
4.2.4.4 CODO ROSCADO PVC CL-10 DE 3/4" X 90° und 40.000 2.780 111.200 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.00 111.20 100.00%
4.2.5 VALVULAS 1300.970
4.2.5.1 VALVULA ESFERICA DE BRONCE PESADA DE 3/4" und 4.000 66.470 265.880 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 265.88 100.00%
4.2.5.2 VALVULA ESFERICA DE BRONCE PESADA DE 1/2" und 6.000 53.190 319.140 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 319.14 100.00%
4.2.5.3 NICHO PARA VALVULAS und 10.000 61.870 618.700 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 618.70 100.00%
4.2.5.4 CAJA DE VALVULA CON TAPA DE F°G° und 1.000 97.250 97.250 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 97.25 100.00%
4.2.6 PRUEBAS HIDRAULICAS 112.110
4.2.6.1 PRUEBA HIDRAULICA EN LA RED DE AGUA Y DESINFECCm 111.000 1.010 112.110 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 111.00 112.11 100.00%
4.2.7 CONEXION A LA RED EXTERIOR 680.000
4.2.7.1 CONEXION DE 3/4" A LA RED EXTERIOR DE AGUA und 1.000 680.000 680.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 680.00 100.00%
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
4.3 SISTEMA DE DRENAJE PLUVIAL 2582.770
4.3.1 CANALETAS 432.810
4.3.1.1 CANALETA DE PLANCHA GALVANIZADA 15x25CM und 27.000 16.030 432.810 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 432.81 100.00%
4.3.2 MONTANTES 1149.960
4.3.2.1 MONTANTES DE 3" (3 NIVELES) und 4.000 140.210 560.840 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 560.84 100.00%
4.3.2.2 COLUMNETAS PARA PROTECCION DE MONTANTES und 4.000 147.280 589.120 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 589.12 100.00%
4.3.3 CONEXION A LA RED EXTERIOR 1000.000
4.3.3.1 CONEXION A RED EXTERIOR DE DRENAJE PLUVIAL und 4.000 250.000 1000.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,000.00 100.00%
4.4 DESAGUE Y VENTILACION 3159.000
4.4.1 SALIDAS DE DESAGUE 427.050
4.4.1.1 SALIDA DE DESAGUE PARA INODOROS 4" pto 15.000 28.470 427.050 7.00 199.29 46.67% 0.00 0.00 0.00% 7.00 199.29 46.67% 8.00 227.76 53.33%
4.4.2 REDES DE DERIVACION 1039.110
4.4.2.1 TUBERIA PARA DESAGUE PVC SAL CP DE 4" m 14.410 50.500 727.710 2.20 111.10 15.27% 0.00 0.00 0.00% 2.20 111.10 15.27% 12.21 616.61 84.73%
4.4.2.2 TUBERIA PARA DESAGUE PVC SAL CP DE 2" m 45.000 6.920 311.400 6.30 43.60 14.00% 0.00 0.00 0.00% 6.30 43.60 14.00% 38.70 267.80 86.00%
4.4.3 REDES COLECTORAS 84.600
4.4.3.1 TUBERIA PARA DESAGUE PVC SAL CP DE 4" m 6.000 14.100 84.600 2.15 30.32 35.84% 0.00 0.00 0.00% 2.15 30.32 35.84% 3.85 54.29 64.17%
4.4.4 ACCESORIOS DE REDES COLECTORAS 761.080
4.4.4.1 SUMIDERO DE BRONCE CROMADO DE 2" und 6.000 24.440 146.640 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 146.64 100.00%
4.4.4.2 REGISTRO ROSCADO DE BRONCE CROMADO 2" und 6.000 27.540 165.240 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 165.24 100.00%
4.4.4.3 REGISTRO ROSCADO DE BRONCE CROMADO 4" und 4.000 30.080 120.320 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 120.32 100.00%
4.4.4.4 YEE PVC SAL DE 2"X2" und 2.000 6.660 13.320 1.00 6.66 50.00% 0.00 0.00 0.00% 1.00 6.66 50.00% 1.00 6.66 50.00%
4.4.4.5 YEE PVC SAL DE 4"X2" und 13.000 7.420 96.460 6.00 44.52 46.15% 0.00 0.00 0.00% 6.00 44.52 46.15% 7.00 51.94 53.85%
4.4.4.6 CODO PVC SAL 2"X45° und 6.000 2.510 15.060 3.00 7.53 50.00% 0.00 0.00 0.00% 3.00 7.53 50.00% 3.00 7.53 50.00%
4.4.4.7 CODO PVC SAL 4"X45° und 2.000 5.900 11.800 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 11.80 100.00%
4.4.4.8 CODO PVC SAL 2"X90° und 24.000 5.470 131.280 17.00 92.99 70.83% 0.00 0.00 0.00% 17.00 92.99 70.83% 7.00 38.29 29.17%
4.4.4.9 CODO PVC SAL 4"X90° und 6.000 10.160 60.960 3.00 30.48 50.00% 0.00 0.00 0.00% 3.00 30.48 50.00% 3.00 30.48 50.00%
4.4.5 CAMARAS DE INSPECCION 229.440
4.4.5.1 CAJA DE REGISTRO DE DESAGUE 12"X24" und 2.000 114.720 229.440 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 229.44 100.00%
4.4.6 PRUEBAS HIDRAULICAS 37.720
4.4.6.1 PRUEBA HIDRAULICA DE DESAGUE m 82.000 0.460 37.720 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 82.00 37.72 100.00%
4.4.7 CONEXION A LA RED EXTERIOR 580.000
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
4.4.7.1 CONEXION DE 6" A LA RED EXTERIOR DE DESAGUE und 1.000 580.000 580.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 580.00 100.00%
5 INSTALACIONES ELECTRICAS 34153.220 2001.910 0.000
5.1 SALIDA DE INSTALACIONES INTERIORES 3964.090
5.1.1 SALIDA PARA CENTRO DE LUZ TECHO pto 19.000 49.510 940.690 15.00 742.65 78.95% 0.00 0.00 0.00% 15.00 742.65 78.95% 4.00 198.04 21.05%
5.1.2 SALIDA PARA CENTRO DE LUZ EN PARED pto 2.000 37.510 75.020 2.00 75.02 100.00% 0.00 0.00 0.00% 2.00 75.02 ### 0.00 0.00 0.00%
5.1.3 SALIDA TOMACORRIENTE DOBLE C/PLACA METALICA 2P+pto 18.000 91.010 1638.180 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.00 1,638.18 100.00%
5.1.4 INTERRUPTOR SIMPLE TIPO PALANCA C/PLACA DE ACERpto 14.000 64.010 896.140 9.00 576.09 64.29% 0.00 0.00 0.00% 9.00 576.09 64.29% 5.00 320.05 35.71%
5.1.5 INTERRUPTOR DOBLE TIPO PALANCA C/PLACA DE ACER pto 6.000 69.010 414.060 3.00 207.03 50.00% 0.00 0.00 0.00% 3.00 207.03 50.00% 3.00 207.03 50.00%
5.2 CANALES Y TUBERIAS 237.120
5.2.1 TUBERIA PVC SEL 20MM m 48.000 4.940 237.120 48.00 237.12 100.00% 0.00 0.00 0.00% 48.00 237.12 ### 0.00 0.00 0.00%
5.3 CONDUCTORES Y/O CABLES 1074.880
5.3.1 CABLE -1*10mm2 TW -AWG(POZO A TIERRA) m 8.000 3.080 24.640 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 24.64 100.00%
5.3.2 CABLE -2*4.0mm2 TW -AWG m 6.000 4.230 25.380 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 25.38 100.00%
5.3.3 CABLE -2*4.0mm2 TW -AWG m 190.000 4.230 803.700 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 190.00 803.70 100.00%
5.3.4 CABLE -1*2.5mm2 TW -AWG m 38.000 3.880 147.440 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 38.00 147.44 100.00%
5.3.5 CABLE -2*2.5mm2TW-AWG m 19.000 3.880 73.720 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.00 73.72 100.00%
5.4 TABLEROS ELECTRICOS 14978.430
5.4.1 TABLERO DE DISTRIBUCION TE-01 und 3.000 4992.810 14978.430 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 14,978.43 100.00%
5.5 CAJAS DE PASO 1376.000
5.5.1 CAJA OCTOGONAL 100X55MM DE FºGº PESADO CON TAPApza 8.000 20.500 164.000 8.00 164.00 100.00% 0.00 0.00 0.00% 8.00 164.00 ### 0.00 0.00 0.00%
5.5.2 CAJA DE FºGº PESADO DE 100X100X50 MM CON TAPA pza 8.000 40.500 324.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 324.00 100.00%
5.5.3 CAJA DE FºGº PESADO DE 200X200X150 MM CON TAPA pza 16.000 55.500 888.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.00 888.00 100.00%
5.6 ARTEFACTOS 5675.860
5.6.1 EQP
LUMINARIA TIPO PANEL LED 36W DE 60X60X4CM ADOSAD 8.000 275.130 2201.040 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 2,201.04 100.00%
5.6.2 LUMINARIA DE SECCIÓN CIRCULAR PARA ADOSAR CON UEQP 6.000 205.130 1230.780 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 1,230.78 100.00%
5.6.3 APLIQUES ESTANCIS PARA MONTAJE ADOSADO A PAREDEQP 2.000 187.130 374.260 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 374.26 100.00%
5.6.4 ARTEFACTO DE ILUMINACIÓN IP54, TIPO PANEL LED R EQP 3.000 269.000 807.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 807.00 100.00%
5.6.5 LUMINARIA DICROICO 1X25W EMPOTRADA IP65 EQP 2.000 205.130 410.260 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 410.26 100.00%
5.6.6 LUZ DE EMERGENCIA LED AUTONOMIA MIN. 3 HORAS EQP 4.000 163.130 652.520 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 652.52 100.00%
5.7 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES 3346.840
5.7.1 POZO PUESTA A TIERRA und 4.000 836.710 3346.840 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 3,346.84 100.00%
VALORIZACION MENSUAL DE OBRA N° 09
MES DE JULIO DEL 2022

PROYECT : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - FECHA 8/3/2022
O REGION APURIMAC”
DISTRITO : OROPESA
RESIDENTE: Ing. Charles Nestor Checya Alata PROVINCIA : ANTABAMBA
SUPERVISO: Ing. José Luis Rodas Alata DEPARTAMENTO : APURIMAC
FTE - FTO : RECURSOS DETERMINADOS - CANON - FONCOMUN
MODALIDA: ADMINISTRACION DIRECTA

AVANCE DE OBRA
SALDO
ANTERIOR ACTUAL ACUMULADO
PARTIDA DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
5.8 PRUEBAS ELECTRICAS 3500.000
5.8.1 PRUEBAS ELECTRICAS gbl 1.000 3500.000 3500.000 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 3,500.00 100.00%
5.8.2 HF
COSTO DIRECTO 446,741.51 286,826.04 64.20% 13,293.43 2.98% 300,119.47 67.18% 146,622.05 32.82%
2.02 SUSTENTO DE METRADOS MES DE DICIEMBRE
METRADOS
MET. EXP
ITEM B UND CANT N° VECES GK/ML
TECNICO
LARGO ANCHO ALTO SUB. TOT TOTAL
VALORIZACION MAYORES METRADOS N° 10
MES DE JUNIO DEL 2016
:MEJORAMIENTO DE LOS SERVICIOS DE LA INSTITUCION PRIMARIA N°54018 RAMON CASTILLA DEL DISTRITO DE CURAHUASI DE LA FECHA :30/06/2016
PROYECTO
PROVINCIA DE ABANCAY DEPARTAMENTO DE APURIMAC DISTRITO : CURAHUASI

COMPONENTE : PROVINCIA : ABANCAY

SUB META : DEPARTAMENTO : APURIMAC

FTE - FTO : RECURSOS PROPIOS

MODALIDAD : ADMINISTRACION DIRECTA


AVANCE DE OBRA
SALDO
VALOR REFERENCIAL ANTERIOR ACTUAL ACUMULADO
PART DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
OBRA : "AMPIACION E IMPLEMENTACION DEL INSTITUTO SUPERIOR TECNOLOGICO PUBLICO DE ABANCAY PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE
APRENDIZAJE DE LOS ESTUDIANTES, PROV. DE ABANCAY - REGION APURIMAC

VALORIZACION ADICIONAL DE PARTIDAS NUEVAS JULIO - 2014 (SEDE CENTRAL)


COMPONENTE :
META : 064-2014 FECHA : 31/07/2014
FTE - FTO :RECURSOS ORDINARIOS DISTRITO : ABANCAY
MODALIDAD : ADMINISTRACIÓN DERECTA PROVINCIA : ABANCAY

AÑO : 2014 DEPARTAMENTO : APURIMAC

AVANCES DE OBRA
SALDO
VALOR REFERENCIAL ANTERIOR ACTUAL ACUMULADO
PART DESCRIPCION UND METR. P. UNIT P.PARC. METR VALORIZ % METR VALORIZ % METR VALORIZ % METR VALORIZ %
06.00 CERCO PERIMETRICO
06.01.00 ESTRUCTURAS
06.01.01.00 OBRAS PROVISIONALES
06.01.01.01 DEMOLICIONES.

COSTO DIRECTO. 3,573,032.79 0.00 - 0.00 0.00 0.00 0.00 0.00 100.00

37
RESUMEN ADICIONAL DE PARTIDAS NUEVAS

METRADO
ITEM DESCRIPCION UND Oct-13 Nov-13 ### Jan-14 Feb-14 Mar-14 Apr-14
ACUMULADO

38
RESUMEN ADICIONAL DE PARTIDAS NUEVAS

METRADO
ITEM DESCRIPCION UND Oct-13 Nov-13 ### Jan-14 Feb-14 Mar-14 Apr-14
ACUMULADO

39
MUNICIPALIDAD DISTRITAL DE OROPESA

OBRA : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

RESIDENTE : Ing. Charles Nestor Checya Alata

SUPERVISOR: Ing. José Luis Rodas Alata

FECHA 8/3/2022

MES JULIO
M.
ITEM DESCRIPCION M.
UND M. PROGR. ANTERIO V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D TOTAL SALDO
ACTUAL
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

1 OBRAS PROVISIONALES, PRELIMINARES, SEGURIDAD Y SALUD


1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
1.1.1 HITO INICIO
1.1.2 OFICINAS m² 29.25 29.25 0.00 29.25 0.00
1.1.3 ALMACENES m² 44.85 44.85 0.00 44.85 0.00
1.1.4 SERVICIOS HIGIENICOS PROVISIONALES glb 1 1.00 0.00 1.00 0.00
1.1.5 CERCO PROVISIONAL DE ARPILLERA H = 3.00 m m 36 36.00 0.00 36.00 0.00
1.1.6 CARTEL DE IDENTIFICACION DE OBRA und 1 0.00 0.00 0.00 1.00
1.1.7 FLETE TERRESTRE DE MATERIALES Y EQUIPOS gbl 1 0.72 0.00 0.72 0.28
1.2 TRABAJOS PRELIMINARES
1.2.1 LIMPIEZA DEL TERRENO m² 84 84.00 0.00 84.00 0.00
1.3 TRAZO NIVELES Y REPLANTEO
1.3.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 84 84.00 0.00 84.00 0.00
1.4 SEGURIDAD Y SALUD
1.4.1 EQUIPOS DE PROTECCION INDIVIDUAL glb 1 1.00 0.00 1.00 0.00
1.4.2 EQUIPOS DE PROTECCION COLECTIVA glb 1 0.67 0.02 0.02 0.02 0.02 0.02 0.10 0.77 0.23
1.4.3 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1 0.66 0.02 0.02 0.02 0.02 0.02 0.10 0.76 0.24
1.4.4 CAPACITACION EN SEGURIDAD Y SALUD glb 1 0.69 0.02 0.02 0.02 0.02 0.08 0.77 0.23
1.4.5 glb
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS 1 0.69 0.02 0.02 0.02 0.06 0.75 0.25
2 ESTRUCTURAS
2.1 MOVIMIENTO DE TIERRAS
2.1.1 EXCAVACIONES
2.1.1.1 EXCAVACION m³ 72.29 72.29 0.00 72.29 0.00
2.1.1.2 NIVELACION DEL TERRENO m² 45.46 45.46 0.00 45.46 0.00
2.1.2 RELLENOS Y COMPACTADOS
2.1.2.1 RELLENO Y COMPACTADO CON MATERIAL PROPIOm³ 49.72 49.72 0.00 49.72 0.00
2.1.3 ELIMINACION DE MATERIAL EXCEDENTE
2.1.3.1 ELIMINACION DE MATERIAL EXCEDENTE CON EQUm³ 29.34 10.00 0.00 10.00 19.34
2.2 OBRAS DE CONCRETO SIMPLE
2.2.1 SOLADOS
2.2.1.1 SOLADOS DE CONCRETO 1:12 CEM-HORMIGON E=0.m² 45.46 45.46 0.00 45.46 0.00
2.2.2 CIMIENTOS CORRIDOS
2.2.2.1 CONCRETO EN CIMIENTOS CORRIDOS C:H 1:10 + 3 m³ 5.52 5.52 0.00 5.52 0.00
2.2.3 SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO DE m² 62.14
2.2.3.1
SOBRECIMIENTO
62.14 0.00 62.14 0.00
2.2.3.2 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m³ 8.84 8.84 0.00 8.84 0.00
2.2.4 FALSO PISO
2.2.4.1 FALSO PISO MEZCLA C:H - 1:6 e=4" m² 63.25 0.00 0.00 0.00 63.25
2.3 OBRAS DE CONCRETO ARMADO
2.3.1 ZAPATAS
2.3.1.1 ACERO EN ZAPATAS kg 345.76 345.76 0.00 345.76 0.00
2.3.1.2 CONCRETO F'C=210kg/cm2 EN ZAPATAS m³ 11.06 11.06 0.00 11.06 0.00
2.3.2 VIGAS DE CONEXION
2.3.2.1 ACERO EN VIGAS DE CONEXION kg 1025.55 1,025.55 0.00 1,025.55 0.00
2.3.2.2 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONm² 46.2 46.20 0.00 46.20 0.00
2.3.2.3 CONCRETO 210kg/cm2 EN VIGAS DE CONEXION m³ 6.93 6.93 0.00 6.93 0.00
2.3.3 COLUMNAS
2.3.3.1 ACERO EN COLUMNAS kg 1719.4 1,719.40 0.00 1,719.40 0.00
2.3.3.2 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m² 136.08 136.08 0.00 136.08 0.00
2.3.3.3 CONCRETO F'C=210kg/cm2 EN COLUMNAS m³ 11.66 11.66 0.00 11.66 0.00
2.3.4 COLUMNETAS DE AMARRE
2.3.4.1 ACERO EN COLUMNETAS kg 385.26 385.26 0.00 385.26 0.00
2.3.4.2 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m² 63.9 63.90 0.00 63.90 0.00
MUNICIPALIDAD DISTRITAL DE OROPESA

OBRA : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

RESIDENTE : Ing. Charles Nestor Checya Alata

SUPERVISOR: Ing. José Luis Rodas Alata

FECHA 8/3/2022

MES JULIO
M.
ITEM DESCRIPCION M.
UND M. PROGR. ANTERIO V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D TOTAL SALDO
ACTUAL
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
2.3.4.3 JUNTA CON TEKNOPORT DE 1" PARA COLUMNETA m² 79.52 23.50 0.00 23.50 56.02
2.3.4.4 CONCRETO F'C=175kg/cm2 EN COLUMNETAS m³ 6.04 6.04 0.00 6.04 0.00
2.3.5 VIGAS
2.3.5.1 ENCOFRADO Y DESENCOFRADO EN VIGAS m² 119.46 119.46 0.00 119.46 0.00
2.3.5.2 ACERO EN VIGAS kg 2062.87 2,062.87 0.00 2,062.87 0.00
2.3.5.3 CONCRETO F'C=210kg/cm2 EN VIGAS m³ 14.11 14.11 0.00 14.11 0.00
2.3.6 VIGUETAS DE AMARRE
2.3.6.1 ENCOFRADO Y DESENCOFRADO EN VIGUETAS DE m² 9.55 9.55 0.00 9.55 0.00
2.3.6.2 ACERO EN VIGUETAS DE AMARRE kg 226.03 226.03 0.00 226.03 0.00
2.3.6.3 JUNTA CON TEKNOPORT 1" PARA AISLAMIENTO D m² 15.91 15.91 0.00 15.91 0.00
2.3.6.4 CONCRETO F'C=175kg/cm2 EN VIGUETAS DE AMAR m³ 2.39 2.39 0.00 2.39 0.00
2.3.7 LOSAS ALIGERADAS
2.3.7.1 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGE m² 143.53 143.53 0.00 143.53 0.00
2.3.7.2 BLOQUES DE TECKNOPORT h=15 cm PARA LOSA ALm 126.5 0.00 0.00 0.00 126.50
2.3.7.3 LADRILLOS TECHO DE ARCILLA 15X303X30 CM - L und 428 428.00 0.00 428.00 0.00
2.3.7.4 ACERO EN LOSAS ALIGERADAS kg 857.31 857.31 0.00 857.31 0.00
2.3.7.5 CONCRETO F'C=210kg/cm2 EN LOSAS ALIGERADAS m³ 11.11 11.11 0.00 11.11 0.00
2.3.8 ESCALERAS
2.3.8.1 ENCOFRADO Y DESENCOFRADO EN ESCALERAS m² 34.5 34.50 0.00 34.50 0.00
2.3.8.2 ACERO EN ESCALERAS kg 543.17 543.17 0.00 543.17 0.00
2.3.8.3 CONCRETO EN ESCALERAS f'c=210 kg/cm2 m³ 7.97 7.97 0.00 7.97 0.00
2.4 ESTRUCTURA METALICA
2.4.1 TECHO METALICO
2.4.1.1 ARMADO DE TIJERAL METALICO und 4 4.00 0.00 4.00 0.00
2.4.1.2 ARMADO DE CORREAS METALICAS m 128.7 128.70 0.00 128.70 0.00
2.4.1.3 ARENADO Y PINTURA ANTICORROSIVA PARA EST m² 74.03 74.03 0.00 74.03 0.00
2.4.1.4 PINTURA ESMALTE EPOXICO PARA ESTRUCTURA m² 74.03 74.03 0.00 74.03 0.00
2.4.1.5 IZAJE DE TIJERALES und 4 4.00 0.00 4.00 0.00
3 ARQUITECTURA
3.1 MUROS Y TABIQUES
3.1.1 MURO CABEZA DE LADRILLO KING-KONG CON m² 58.28 58.28 0.00 58.28 0.00
3.1.2 MURO SOGA DE BLOQUE HUECO E=12CM MEZCLAm² 224.16 224.16 0.00 224.16 0.00
3.2 REVOQUES ENLUCIDOS Y MOLDURAS
3.2.1 TARRAJEO RAYADO PRIMARIO CON MEZCLA C:A 1:m² 57.04 0.00 0.00 0.00 57.04
3.2.2 TARRAJEO EN INTERIORES CON MEZCLA C:A 1:5 m² 285.86 92.87 7.31 10.00 10.00 8.25 10.00 5.00 7.05 5.00 10.53 10.53 10.5 10.5 11 11 11 11 3.99 10.59 10.00 10.35 9.39 192.99 285.86 0.00
3.2.3 TARRAJEO EN EXTERIORES CON MEZCLA C:A 1:5 m² 212.95 0.00 0.00 0.00 212.95
3.2.4 TARRAJEO DE SUPERFICIE DE COLUMNAS C:A 1:5 m² 61.39 5.38 7.98 4.39 7.98 9.58 8.91 9.31 7.86 56.01 61.39 0.00
3.2.5 TARRAJEO DE SUPERFICIE VIGAS C:A 1:5, INCLUYEm² 62.17 33.60 4.87 3.72 5.50 5.52 5.55 3.41 28.57 62.17 0.00
3.2.6 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS m 262.39 62.44 12.02 6.00 14.24 9.04 13.16 13.64 11.84 16.96 17.64 17.40 17.08 17.48 16.00 17.45 199.95 262.39 0.00
3.2.7 BRUÑAS DE 1 CM m 165.42 0.00 10.00 10.00 10.00 10.00 5.00 10.00 15 15.00 10.00 15.00 5.00 15.00 10.00 15.42 10.00 165.42 165.42 0.00
3.2.8 TARRAJEO EN FONDO DE ESCALERAS m² 21.51 0.00 0.00 0.00 21.51
3.2.9 PREPARACION DE GRADAS DE CONCRETO m 105 0.00 0.00 0.00 105.00
3.2.10 PREPARACION DE DESCANSOS m² 13.5 0.00 0.00 0.00 13.50
3.2.11 PREPARACION DE BANDAS LATERALES DE ESCAL m² 9 0.00 0.00 0.00 9.00
3.2.12 ENCHAPE PORCELANATO 60 x 60 cm PARA MESASm² 2.33 0.00 0.00 0.00 2.33
3.3 CIELORRASOS
3.3.1 CIELORRASOS CON YESO m² 98.33 0.00 0.00 0.00 98.33
3.4 PISOS Y PAVIMENTOS
3.4.1 CONTRAPISO
3.4.1.1 CONTRAPISO DE 48 mm m² 129.09 0.00 0.00 0.00 129.09
3.4.2 PISOS
3.4.2.1 PISO DE CERAMICO ANTIDESLIZANTE DE 30x30 cm m² 19.51 0.00 0.00 0.00 19.51
3.4.3 PISOS DE CONCRETO
3.4.3.1 PISO DE CEMENTO PULIDO m² 171.38 0.00 0.00 0.00 171.38
MUNICIPALIDAD DISTRITAL DE OROPESA

OBRA : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

RESIDENTE : Ing. Charles Nestor Checya Alata

SUPERVISOR: Ing. José Luis Rodas Alata

FECHA 8/3/2022

MES JULIO
M.
ITEM DESCRIPCION M.
UND M. PROGR. ANTERIO V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D TOTAL SALDO
ACTUAL
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
3.5 ZOCALOS Y CONTRAZOCALOS
3.5.1 ZOCALOS
3.5.1.1 ZOCALOS DE CERAMICA DE 30X30cm h=1.20m m² 43.4 0.00 0.00 0.00 43.40
3.5.2 CONTRAZOCALOS
3.5.2.1 CEMENTO PULIDO H= 30cm m 27.45 0.00 0.00 0.00 27.45
3.6 COBERTURAS
3.6.1 m²
COBETURA METALICA ALUZINC 25 mm - Techo Aluzinc 113.69 113.69 0.00 113.69 0.00
3.7 CARPINTERIA DE MADERA
3.7.1 PUERTA TABLERO REBAJADO C/MARCO DE MADERA m² 29.84 0.00 0.00 0.00 29.84
3.8 MUEBLES
3.8.1 REPOSTERO DE MELAMINA 18mm m² 1 0.00 0.00 0.00 1.00
3.9 CARPINTERIA METALICA
3.9.1 VENTANAS DE ALUMINIO
3.9.1.1 VENTANA DE ALUMINIO DE 1 1/2" x 3" x 1.5 mm m² 35.29 0.00 0.00 0.00 35.29
3.9.2 MARCOS DE PUERTAS DE ALUMINIO
3.9.2.1 PUERTA DE SS.HH CON MELAMINE DE 18 mm C/ PERm² 4.68 0.00 0.00 0.00 4.68
3.9.3 DIVISIONES METALICAS
3.9.3.1 m²
SEPARADOR DE URINARIO CON MELAMINA DE 15 m 1.7 0.00 0.00 0.00 1.70
3.9.3.2 m²
SEPARADOR DE BAÑO CON MELAMINA DE 15 mm. C 7.31 0.00 0.00 0.00 7.31
3.9.4 BARANDAS
3.9.4.1 BARANDA METALICA SEGUN DISEÑO 01 m 12 0.00 0.00 0.00 12.00
3.9.5 MUEBLES
3.9.5.1 REPOSTERO DE MELAMINA 18mm m² 4.82 0.00 0.00 0.00 4.82
3.10 CERRAJERIA
3.10.1 BISAGRAS
3.10.1.1 BISAGRA CAPUCHINA ALUMINIZADA DE 4" pza 44 0.00 0.00 0.00 44.00
3.10.2 CERRADURAS
3.10.2.1 pza
CERRADURA PARA PUERTAS CON MANIJA Y CHAPA 7 0.00 0.00 0.00 7.00
3.10.2.2 CERRADURA DE MANIJA 2 GOLPES pza 1 0.00 0.00 0.00 1.00
3.11 VIDRIOS, CRISTALES Y SIMILARES
3.11.1 VIDRIO LAMINADO INCOLORO DE 6mm m² 71.53 0.00 0.00 0.00 71.53
3.12 PINTURA
3.12.1 PINTURA DE CIELO RASOS, VIGAS, COLUMNAS Y PAREDES
3.12.1.1 PINTURA EN CIELORASOS 2 MANOS m² 99.32 0.00 0.00 0.00 99.32
3.12.1.2 PINTURA EN VIGAS 2 MANOS m² 62.8 0.00 0.00 0.00 62.80
3.12.1.3 PINTURA EN COLUMNAS RASOS 2 MANOS m² 62 0.00 0.00 0.00 62.00
3.12.1.4 PINTURA EN DERRAMES m² 265.01 0.00 0.00 0.00 265.01
3.12.1.5 PINTURA EN MUROS INTERIORES 2 MANOS m² 288.72 0.00 0.00 0.00 288.72
3.12.1.6 PINTURA EN MUROS EXTERIORES 2 MANOS m² 295.6 0.00 0.00 0.00 295.60
3.12.2 PINTURA EN PUERTAS
3.12.2.1 PINTURA BARNIZ DD m² 5.36 0.00 0.00 0.00 5.36
3.13 VARIOS LIMPIEZA Y JARDINERIA
3.13.1 LIMPIEZA PERMANENTE EN OBRA glb 1 0.00 0.00 0.00 1.00
3.13.2 LIMPIEZA FINAL glb 1 0.00 0.00 0.00 1.00
3.13.3 LIMPIEZA DE VIDRIOS m² 71.53 0.00 0.00 0.00 71.53
3.14 SEÑALIZACION Y SEGURIDAD VIAL
SEÑALIZACION DE AMBIENTES SEGUN DEFENSA glb 1
3.14.1 0.00 0.00 0.00 1.00
CIVIL
4 INSTALACIONES SANITARIAS
4.1 APARATOS SANITARIOS Y ACCESORIOS
4.1.1 SUMINISTRO DE APARATOS SANITARIOS
4.1.1.1 SUMINISTRO DE INODOROS
4.1.1.1.1 INODORO TANQUE BAJO DE CERAMICA VITRIFICAund 4 0.00 0.00 0.00 4.00
4.1.1.2 SUMINISTRO DE LAVATORIOS
4.1.1.2.1 LAVATORIO DE CERAMICA VITRIFICADA DE 0.46X0und 8 0.00 0.00 0.00 8.00
MUNICIPALIDAD DISTRITAL DE OROPESA

OBRA : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

RESIDENTE : Ing. Charles Nestor Checya Alata

SUPERVISOR: Ing. José Luis Rodas Alata

FECHA 8/3/2022

MES JULIO
M.
ITEM DESCRIPCION M.
UND M. PROGR. ANTERIO V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D TOTAL SALDO
ACTUAL
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
4.1.1.2.2 LAVADERO DE ACERO INOXIDABLE DE UNA POZA und
C 1 0.00 0.00 0.00 1.00
4.1.2 SUMINISTRO DE ACCESORIOS
4.1.2.1 SUMINISTRO DE ACCESORIOS PARA INODOROS
4.1.2.1.1 ACCESORIOS PARA INODORO TANQUE BAJO DE CEund 4 0.00 0.00 0.00 4.00
4.1.2.2 SUMINISTRO DE ACCESORIOS PARA LAVATORIOS
4.1.2.2.1 ACCESORIOS PARA LAVATORIO DE CERAMICA VITund 8 0.00 0.00 0.00 8.00
4.1.2.2.2 ACCESORIOS PARA LAVADERO DE ACERO INOXID und 1 0.00 0.00 0.00 1.00
4.1.2.3 SUMINISTRO DE GRIFERIA
4.1.2.3.1 LLAVE DE BRONCE CROMADO AL MUEBLE DE LAVund 12 0.00 0.00 0.00 12.00
4.1.2.3.2 LLAVE DE BRONCE CROMADO TIPO CUELLO DE G und 5 0.00 0.00 0.00 5.00
4.1.2.3.3 LLAVE ESFERICA DE BRONCE CROMADO DE 1/2" und 1 0.00 0.00 0.00 1.00
4.1.2.4 SUMINISTRO DE ACCESORIOS COMPLEMENTARIOS
4.1.2.4.1 PORTAROLLO DE LOSA BLANCA pza 4 0.00 0.00 0.00 4.00
4.1.3 INSTALACION DE APARATOS SANITARIOS
4.1.3.1 INSTALACION DE INODOROS
4.1.3.1.1 INSTALACION DE INODORO TANQUE BAJO DE CERund 4 0.00 0.00 0.00 4.00
4.1.3.2 INSTALACION DE LAVATORIOS
4.1.3.2.1 INSTALACION DE LAVATORIO DE CERAMICA VITRund 8 0.00 0.00 0.00 8.00
4.1.3.2.2 INSTALACION DE LAVADERO DE ACERO INOXIDA und 1 0.00 0.00 0.00 1.00
4.1.4 INSTALACION DE ACCESORIOS
4.1.4.1 INSTALACION DE ACCESORIOS PARA INODOROS
4.1.4.1.1 INSTALACION DE ACCESORIOS PARA INODORO DEund 4 0.00 0.00 0.00 4.00
4.1.4.2 INSTALACION DE ACCESORIOS PARA LAVATORIOS
4.1.4.2.1 INSTALACION DE ACCESORIOS PARA LAVATORIO und 8 0.00 0.00 0.00 8.00
4.1.4.2.2 INSTALACION DE ACCESORIOS PARA LAVADERO Dund 1 0.00 0.00 0.00 1.00
4.1.4.3 INSTALACION DE GRIFERIA
4.1.4.3.1 INSTALACION DE LLAVE DE BRONCE CROMADO Aund 12 0.00 0.00 0.00 12.00
4.1.4.3.2 INSTALACION DE LLAVE DE BRONCE CROMADO TIund 5 0.00 0.00 0.00 5.00
4.1.4.3.3 INSTALACION DE LLAVE ESFERICA DE BRONCE CRund 1 0.00 0.00 0.00 1.00
4.1.4.4 INSTALACION DE ACCESORIOS COMPLEMENTARIOS
4.1.4.4.1 INSTALACION DE PORTAROLLO DE LOZA BLANCAund 4 0.00 0.00 0.00 4.00
4.2 SISTEMA DE AGUA FRIA
4.2.1 SALIDAS DE AGUA FRIA
4.2.1.1 pto
SALIDA DE AGUA PARA INODORO TANQUE BAJO DE 4 0.00 0.00 0.00 4.00
4.2.1.2 SALIDA DE AGUA PARA LAVATORIO DE 1/2" pto 7 0.00 0.00 0.00 7.00
4.2.2 REDES DE DISTRIBUCION
4.2.2.1 m
TUBERIA PARA AGUA FRIA CON ROSCA PVC SAP C-1 9.95 0.00 0.00 0.00 9.95
4.2.2.2 m
TUBERIA PARA AGUA FRIA CON ROSCA PVC SAP C-1 23.84 0.00 0.00 0.00 23.84
4.2.3 REDES DE ALIMENTACION
4.2.3.1 m
TUBERIA PARA AGUA FRIA CON ROSCA PVC SAP C-1 5 0.00 0.00 0.00 5.00
4.2.4 ACCESORIOS DE REDES DE AGUA
4.2.4.1 TEE ROSCADA PVC SAP DE 1/2" und 12 0.00 0.00 0.00 12.00
4.2.4.2 TEE ROSCADA PVC SAP DE 3/4" und 10 0.00 0.00 0.00 10.00
4.2.4.3 CODO ROSCADO PVC CL-10 DE 1/2" X 90° und 40 0.00 0.00 0.00 40.00
4.2.4.4 CODO ROSCADO PVC CL-10 DE 3/4" X 90° und 40 0.00 0.00 0.00 40.00
4.2.5 VALVULAS
4.2.5.1 VALVULA ESFERICA DE BRONCE PESADA DE 3/4" und 4 0.00 0.00 0.00 4.00
4.2.5.2 VALVULA ESFERICA DE BRONCE PESADA DE 1/2" und 6 0.00 0.00 0.00 6.00
4.2.5.3 NICHO PARA VALVULAS und 10 0.00 0.00 0.00 10.00
4.2.5.4 CAJA DE VALVULA CON TAPA DE F°G° und 1 0.00 0.00 0.00 1.00
4.2.6 PRUEBAS HIDRAULICAS
4.2.6.1 PRUEBA HIDRAULICA EN LA RED DE AGUA Y DESIm 111 0.00 0.00 0.00 111.00
4.2.7 CONEXION A LA RED EXTERIOR
4.2.7.1 CONEXION DE 3/4" A LA RED EXTERIOR DE AGUA und 1 0.00 0.00 0.00 1.00
MUNICIPALIDAD DISTRITAL DE OROPESA

OBRA : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

RESIDENTE : Ing. Charles Nestor Checya Alata

SUPERVISOR: Ing. José Luis Rodas Alata

FECHA 8/3/2022

MES JULIO
M.
ITEM DESCRIPCION M.
UND M. PROGR. ANTERIO V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D TOTAL SALDO
ACTUAL
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
4.3 SISTEMA DE DRENAJE PLUVIAL
4.3.1 CANALETAS
4.3.1.1 CANALETA DE PLANCHA GALVANIZADA 15x25CM und 27 0.00 0.00 0.00 27.00
4.3.2 MONTANTES
4.3.2.1 MONTANTES DE 3" (3 NIVELES) und 4 0.00 0.00 0.00 4.00
4.3.2.2 COLUMNETAS PARA PROTECCION DE MONTANTESund 4 0.00 0.00 0.00 4.00
4.3.3 CONEXION A LA RED EXTERIOR
4.3.3.1 CONEXION A RED EXTERIOR DE DRENAJE PLUVIALund 4 0.00 0.00 0.00 4.00
4.4 DESAGUE Y VENTILACION
4.4.1 SALIDAS DE DESAGUE
4.4.1.1 SALIDA DE DESAGUE PARA INODOROS 4" pto 15 7.00 0.00 7.00 8.00
4.4.2 REDES DE DERIVACION
4.4.2.1 TUBERIA PARA DESAGUE PVC SAL CP DE 4" m 14.41 2.20 0.00 2.20 12.21
4.4.2.2 TUBERIA PARA DESAGUE PVC SAL CP DE 2" m 45 6.30 0.00 6.30 38.70
4.4.3 REDES COLECTORAS
4.4.3.1 TUBERIA PARA DESAGUE PVC SAL CP DE 4" m 6 2.15 0.00 2.15 3.85
4.4.4 ACCESORIOS DE REDES COLECTORAS
4.4.4.1 SUMIDERO DE BRONCE CROMADO DE 2" und 6 0.00 0.00 0.00 6.00
4.4.4.2 REGISTRO ROSCADO DE BRONCE CROMADO 2" und 6 0.00 0.00 0.00 6.00
4.4.4.3 REGISTRO ROSCADO DE BRONCE CROMADO 4" und 4 0.00 0.00 0.00 4.00
4.4.4.4 YEE PVC SAL DE 2"X2" und 2 1.00 0.00 1.00 1.00
4.4.4.5 YEE PVC SAL DE 4"X2" und 13 6.00 0.00 6.00 7.00
4.4.4.6 CODO PVC SAL 2"X45° und 6 3.00 0.00 3.00 3.00
4.4.4.7 CODO PVC SAL 4"X45° und 2 0.00 0.00 0.00 2.00
4.4.4.8 CODO PVC SAL 2"X90° und 24 17.00 0.00 17.00 7.00
4.4.4.9 CODO PVC SAL 4"X90° und 6 3.00 0.00 3.00 3.00
4.4.5 CAMARAS DE INSPECCION
4.4.5.1 CAJA DE REGISTRO DE DESAGUE 12"X24" und 2 0.00 0.00 0.00 2.00
4.4.6 PRUEBAS HIDRAULICAS
4.4.6.1 PRUEBA HIDRAULICA DE DESAGUE m 82 0.00 0.00 0.00 82.00
4.4.7 CONEXION A LA RED EXTERIOR
4.4.7.1 CONEXION DE 6" A LA RED EXTERIOR DE DESAGU und 1 0.00 0.00 0.00 1.00
5 INSTALACIONES ELECTRICAS
5.1 SALIDA DE INSTALACIONES INTERIORES
5.1.1 SALIDA PARA CENTRO DE LUZ TECHO pto 19 15.00 0.00 15.00 4.00
5.1.2 SALIDA PARA CENTRO DE LUZ EN PARED pto 2 2.00 0.00 2.00 0.00
5.1.3 SALIDA TOMACORRIENTE DOBLE C/PLACA METALIC pto 18 0.00 0.00 0.00 18.00
5.1.4 INTERRUPTOR SIMPLE TIPO PALANCA C/PLACA DEpto 14 9.00 0.00 9.00 5.00
5.1.5 INTERRUPTOR DOBLE TIPO PALANCA C/PLACA DEpto 6 3.00 0.00 3.00 3.00
5.2 CANALES Y TUBERIAS
5.2.1 TUBERIA PVC SEL 20MM m 48 48.00 0.00 48.00 0.00
5.3 CONDUCTORES Y/O CABLES
5.3.1 CABLE -1*10mm2 TW -AWG(POZO A TIERRA) m 8 0.00 0.00 0.00 8.00
5.3.2 CABLE -2*4.0mm2 TW -AWG m 6 0.00 0.00 0.00 6.00
5.3.3 CABLE -2*4.0mm2 TW -AWG m 190 0.00 0.00 0.00 190.00
5.3.4 CABLE -1*2.5mm2 TW -AWG m 38 0.00 0.00 0.00 38.00
5.3.5 CABLE -2*2.5mm2TW-AWG m 19 0.00 0.00 0.00 19.00
5.4 TABLEROS ELECTRICOS
5.4.1 TABLERO DE DISTRIBUCION TE-01 und 3 0.00 0.00 0.00 3.00
5.5 CAJAS DE PASO
5.5.1 CAJA OCTOGONAL 100X55MM DE FºGº PESADO CONpza 8 8.00 0.00 8.00 0.00
5.5.2 CAJA DE FºGº PESADO DE 100X100X50 MM CON TAPpza 8 0.00 0.00 0.00 8.00
5.5.3 CAJA DE FºGº PESADO DE 200X200X150 MM CON TApza 16 0.00 0.00 0.00 16.00
5.6 ARTEFACTOS
MUNICIPALIDAD DISTRITAL DE OROPESA

OBRA : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

RESIDENTE : Ing. Charles Nestor Checya Alata

SUPERVISOR: Ing. José Luis Rodas Alata

FECHA 8/3/2022

MES JULIO
M.
ITEM DESCRIPCION M.
UND M. PROGR. ANTERIO V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D TOTAL SALDO
ACTUAL
R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
5.6.1 LUMINARIA TIPO PANEL LED 36W DE 60X60X4CM AEQP 8 0.00 0.00 0.00 8.00
5.6.2 LUMINARIA DE SECCIÓN CIRCULAR PARA ADOSAREQP 6 0.00 0.00 0.00 6.00
5.6.3 APLIQUES ESTANCIS PARA MONTAJE ADOSADO A EQP 2 0.00 0.00 0.00 2.00
5.6.4 ARTEFACTO DE ILUMINACIÓN IP54, TIPO PANEL EQP 3 0.00 0.00 0.00 3.00
5.6.5 LUMINARIA DICROICO 1X25W EMPOTRADA IP65 EQP 2 0.00 0.00 0.00 2.00
5.6.6 LUZ DE EMERGENCIA LED AUTONOMIA MIN. 3 HO EQP 4 0.00 0.00 0.00 4.00
5.7 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES
5.7.1 POZO PUESTA A TIERRA und 4 0.00 0.00 0.00 4.00
5.8 PRUEBAS ELECTRICAS
5.8.1 PRUEBAS ELECTRICAS gbl 1 0.00 0.00 0.00 1.00
5.8.2 HF
SECUENCIA FOTOGRÁFICA
JULIO 2022

EN LA IMAGEN SE OBSERVA EL TARRAJEO DE COLUMNAS

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

EN LA IMAGEN SE OBSERVA EL TARRAJEO DE VIGAS Y COLUMNAS

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”
EN LA IMAGEN SE OBSERVA EL TARRAJEO DE VIGAS Y COLUMNAS

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

EN LA IMAGEN SE OBSERVA EL TARRAJEO DE MUROS

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

----------------------------------------------------------- -----------------------------------------------------------
ING. RESIDENTE DE OBRA ING. SUPERVISOR DE OBRA
----------------------------------------------------------- -----------------------------------------------------------
ING. RESIDENTE DE OBRA ING. SUPERVISOR DE OBRA
----------------------------------------------------------- -----------------------------------------------------------
ING. RESIDENTE DE OBRA ING. SUPERVISOR DE OBRA

EN LA IMAGEN SE OBSERVA EL ARMADO DE ACERO EN COLUMNAS Y VIGUETAS DEL TERCER NIVEL

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

EN LA IMAGEN SE OBSERVA EL DESENCOFRADO DE COLUMNAS PARA COLOCADO DE TECHO METALICO

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”
EN LA IMAGEN SE OBSERVA EL ARMADO DE ACERO DE COLUMNAS Y VIGUETAS DEL TERCER NIVEL

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

EN LA IMAGEN SE OBSERVA EL VACIADO DE CONCRETO EN VIGUETAS DE TERCER NIVEL

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”
EN LA IMAGEN SE OBSERVA EN LA IMAGEN SE OBSERVA EL ARMADO DEL TECHO METALICO

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

EN LA IMAGEN SE OBSERVA LA APLICACIÓN DE PINTURA ANTICORROSIVA

“CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC”

----------------------------------------------------------- -----------------------------------------------------------
ING. RESIDENTE DE OBRA ING. SUPERVISOR DE OBRA
FORMATO FE - 11
CONSUMO DE COMBUSTIBLE
LUBRICANTES REPUESTOS Y OTROS DE MAQUINARIA PROPIA MENSUAL
DICIEMBRE 2019

"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE EDUCACION BASICA ESPECIAL 01 PIERRE FRANCOIS JAMET, DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY, REGION APURIMAC”
PROYECTO:
META : 308-2019
MODALIDAD: : ADMINISTRACION DIRECTA
RESPONSABLE :JAVIER PAREDES PEREZ
INSPECTOR :JUAN RAMIREZ BEMBOA
PROVEEDOR :ESTACION DE SERVICIOS GRUPO A.T PERU
MES: 2/10/2023
COSTO
GASOLINA 90 PETROLEO REPUESTOS OTROS
DIA TOTAL
Glns P.Unit. Parcial Glns P.Unit. Parcial tipo P.Unit. Parcial Glns P.Unit. Parcial (S/.)

12/2/2019 13.28 - 1.00 12.77 12.77 12.77


12/3/2019 13.20 - 12.77 - -
12/4/2019 13.20 - 10.00 12.77 127.70 127.70
12/5/2019 3.00 13.20 39.60 1.00 12.77 12.77 52.37
12/6/2019 13.20 - 1.00 12.77 12.77 12.77
12/7/2019 1.00 13.20 13.20 12.77 - 13.20
12/9/2019 13.20 - 11.00 12.77 140.47 140.47
12/10/2019 13.20 - 8.00 12.77 102.16 102.16
12/11/2019 2.00 13.20 26.40 12.77 - 26.40
12/12/2019 13.20 - 1.00 12.77 12.77 12.77
12/13/2019 2.00 13.20 26.40 12.77 - 26.40
12/14/2019 1.00 13.20 13.20 1.00 12.77 12.77 25.97
12/16/2019 1.00 13.20 13.20 1.00 12.77 12.77 25.97
12/17/2019 3.00 13.20 39.60 12.77 - 39.60
12/18/2019 13.20 - 1.00 12.77 12.77 12.77
12/19/2019 2.00 13.20 26.40 2.00 12.77 25.54 51.94
12/20/2019 13.20 - 10.00 12.77 127.70 127.70
12/21/2019 13.20 - 12.77 - -
12/23/2019 13.20 - 12.77 - -
12/24/2019 13.20 - 12.77 - -
12/25/2019 13.20 - 12.77 - -
12/26/2019 13.20 - 12.77 - -
12/27/2019 13.20 - 12.77 - -
12/28/2019 14.20 - 13.77 - -
12/30/2019 16.20 - 15.77 - -
12/31/2019 17.20 - 16.77 - -

TOTAL 15.00 198.00 48.00 612.96 - - - - 810.96

-----------------------------------------------------ING. ----------------------------------------------------
RESIDENTE DE OBRA ALMACENERO
Firma y Sello Firma y Sello
FORMATO FE - 10
VALES DE PAMPA
PIEDRA CHANCADA DE 3/4"
CORRELATIVO DE META: :0308-2019
PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE EDUCACION BASICA ESPECIAL 01 PIERRE FRANCOIS JAMET, DISTRITO DE ABANCAY,
PROVINCIA DE ABANCAY, REGION APURIMAC”
MODALIDAD: : ADMINISTRACION DIRECTA
RESPONSABLE :JAVIER PAREDES PEREZ
INSPECTOR :JUAN RAMIREZ BEMBOA
PROVEEDOR :GRUPO MURILLO E.I.R.LTDA
MES: 2/10/2023
PIEDRA CHANCADA DE 3/4"
DIA INSUMO
UND CANTIDAD P.U TOTAL S/.

12/6/2019 PIEDRA CHANCADA DE 3/4" M3 16 48 768.00


12/16/2019 PIEDRA CHANCADA DE 3/4" M3 15 48 720.00

TOTAL M3 31 1,488.00
ORDEN DE COMPRA -2327
FORMATO FE - 10
VALES DE PAMPA
ARENA GRUESA
CORRELATIVO DE META: :0308-2019
PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE EDUCACION BASICA ESPECIAL 01 PIERRE FRANCOIS JAMET, DISTRITO DE ABANCAY,
PROVINCIA DE ABANCAY, REGION APURIMAC”
MODALIDAD : ADMINISTRACION DIRECTA
RESPONSABLE :JAVIER PAREDES PEREZ
INSPECTOR :JUAN RAMIREZ BEMBOA
PROVEEDOR :GRUPO MURILLO E.I.R.LTDA
MES: 2/10/2023
ARENA GRUESA
DIA INSUMO
UND CANTIDAD P.U TOTAL S/.

12/7/2019 PIEDRA CHANCADA DE 3/4" M3 16 48 768.00


12/16/2019 PIEDRA CHANCADA DE 3/4" M3 15 48 720.00

TOTAL M3 31 1,488.00
ORDEN DE COMPRA -2327
FORMATO FE - 09
MAQUINARIA PROPIA / ALQUILADA
HORAS TRABAJADAS
CORRELATIVO DE META: :0308-2019
PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE EDUCACION BASICA ESPECIAL 01 PIERRE FRANCOIS JAMET, DISTRITO DE ABANCAY, PROVINCIA
DE ABANCAY, REGION APURIMAC”

VIBRADOR DE CONCRETO
META : 308-2019 MAQUINARIA : DE 5.5 HP

MODALIDAD: : ADMINISTRACION DIRECTA POTENCIA


RESPONSABLE :JAVIER PAREDES PEREZ CAPACIDAD :
INSPECTOR :JUAN RAMIREZ BEMBOA PLACA Nº MOT.
PROVEEDOR
MES: 2/10/2023
HORAS TRABAJADAS (HM)
DIA TRABAJOS REALIZADOS
Anterior Actual Acumulado Actual

12/5/2019 VIGAS DE CIMENTACION - CONCRETO F´c=210 Kg/cm2 0:00:00 8:00:00 8:00:00


12/11/2019 VIGAS DE CIMENTACION - CONCRETO F´c=210 Kg/cm4 0:00:00 8:00:00 8:00:00
12/12/2019 COLUMNAS CONCRETO F´c=210 Kg/cm2 0:00:00 8:00:00 8:00:00
12/13/2019 COLUMNAS CONCRETO F´c=210 Kg/cm3 0:00:00 8:00:00 8:00:00
12/14/2019 COLUMNAS CONCRETO F´c=210 Kg/cm4 0:00:00 8:00:00 8:00:00
12/16/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
12/17/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
12/19/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
12/20/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
TOTALES DE HORAS TRABAJADAS MES 72:00:00 72:00:00 144:00:00
PRECIO POR ALQUILER o DEPRECIACION HORARIA (S/.)
FORMATO FE - 09
MAQUINARIA PROPIA / ALQUILADA
HORAS TRABAJADAS
CORRELATIVO DE META: :0308-2019
PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE EDUCACION BASICA ESPECIAL 01 PIERRE FRANCOIS JAMET, DISTRITO DE ABANCAY, PROVINCIA DE ABANCAY,
REGION APURIMAC”

META : 308-2019 MAQUINARIA : MEZCLADORA TIPO TROMPO

MODALIDAD: : ADMINISTRACION DIRECTA POTENCIA


RESPONSABLE :JAVIER PAREDES PEREZ CAPACIDAD :
INSPECTOR :JUAN RAMIREZ BEMBOA PLACA Nº MOT.
PROVEEDOR
MES: 2/10/2023
HORAS TRABAJADAS (HM)
DIA TRABAJOS REALIZADOS
Anterior Actual Acumulado Actual

12/2/2019 SOLADO E= 2" MEZCLA 1:12 EN VIGAS DE CIMENTACION 0:00:00 8:00:00 8:00:00
12/3/2019 SOLADO E= 2" MEZCLA 1:12 EN VIGAS DE CIMENTACION 0:00:00 8:00:00 8:00:00
12/5/2019 VIGAS DE CIMENTACION - CONCRETO F´c=210 Kg/cm2 0:00:00 8:00:00 8:00:00
12/7/2019 VIGAS DE CIMENTACION - CONCRETO F´c=210 Kg/cm3 0:00:00 8:00:00 8:00:00
12/11/2019 VIGAS DE CIMENTACION - CONCRETO F´c=210 Kg/cm4 0:00:00 8:00:00 8:00:00
12/12/2019 COLUMNAS CONCRETO F´c=210 Kg/cm2 0:00:00 8:00:00 8:00:00
12/13/2019 COLUMNAS CONCRETO F´c=210 Kg/cm3 0:00:00 8:00:00 8:00:00
12/14/2019 COLUMNAS CONCRETO F´c=210 Kg/cm4 0:00:00 8:00:00 8:00:00
12/16/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
12/17/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
12/19/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
12/20/2019 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA 0:00:00 8:00:00 8:00:00
TOTALES DE HORAS TRABAJADAS MES 72:00:00 96:00:00 168:00:00
PRECIO POR ALQUILER o DEPRECIACION HORARIA (S/.)
FORMATO FE - 04
RESUMEN DE VALORIZACION DE AVANCE DE OBRA
MES DE JULIO DEL 2022

PROYEC : “CREACION DEL COMPLEJO MULTIUSO EN EL SECTOR DE HUACULLO EN EL DISTRITO DE OROPESA - PROVINCIA DE ANTABAMBA - REGION APURIMAC” FECHA 8/3/2022
TO DISTRITO : OROPESA
FTE - FTO : RECURSOS DETERMINADOS - CANON - SOBRECANON - FONCOMUN PROVINCIA : ANTABAMBA
DALIDAD : ADMINISTRACION DIRECTA DEPARTAME: APURIMAC

AVANCE
SALDO
PART DESCRIPCION PRESUPUESTO MES DE DICIEMBRE MES DE ENERO MES DE FEBRERO MES DE MARZO MES DE ABRIL MES DE MAYO MES DE JUNIO MES DE JULIO ACUMULADO
VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
1 OBRAS PROVISIONALES, 36,540.04 13,208.37 36.15% 2,961.42 8.10% 2,961.42 8.10% 183.58 0.50% 431.80 1.18% 7,717.25 21.12% 2,338.23 6.40% 824.02 2.26% 30,626.09 83.82% 5,913.95 16.18%
2 PRELIMINARES,
ESTRUCTURAS SEGURIDAD Y SALUD 213,223.32 45,428.56 21.31% 33,328.24 15.63% 28,849.50 13.53% 3,307.89 1.55% 14,070.49 6.60% 76,339.85 35.80% 1,720.92 0.81% 0.00 0.00% 203,045.45 95.23% 10,177.87 4.77%
3 ARQUITECTURA 150,135.77 0.00 0.00% 0.00 0.00% 8,287.00 5.52% 0.00 0.00% 6,838.77 4.56% 21,331.41 14.21% 14,952.95 9.96% 12,469.41 8.31% 63,879.54 42.55% 86,256.23 57.45%
4 INSTALACIONES SANITARIAS 12,689.16 0.00 0.00% 566.49 4.46% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 566.49 4.46% 12,122.67 95.54%
5 INSTALACIONES ELECTRICAS 34,153.22 0.00 0.00% 910.69 2.67% 0.00 0.00% 0.00 0.00% 0.00 0.00% 1,091.22 3.20% 0.00 0.00% 0.00 0.00% 2,001.91 5.86% 32,151.31 94.14%
TOTAL COSTO DIRECTO 446,741.51 58,636.93 13.13% 37,766.84 8.45% 40,097.92 8.98% 3,491.47 0.78% 21,341.06 4.78% 106,479.73 23.83% 19,012.10 4.26% 13,293.43 2.98% 300,119.47 67.18% 146,622.04 32.82%
GASTOS GENERALES (21.54%) S/. 96,234.40 27,308.00 28.38% 1,700.00 1.77% 7,543.33 7.84% 2,900.00 3.01% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 39451.33 41.00% 56,783.07 59.00%
GASTOS DE SUPERVISION (7.27%) S/. 32,500.00 6,500.00 20.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 6500.00 20.00% 13000.00 40.00% 19,500.00 60.00%
GASTOS DE LIQUIDACIÓN (1.43%) S/. 6,392.90 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 6,392.90 100.00%
GASTOS ELABORACIÓN DE EXPEDIENTE TECNICO S/. 33,100.00 9,930.00 30.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00% 9930.00 30.00% 23,170.00 70.00%
(7.41%) TOTAL 614,968.81 102,374.93 16.65% 39,466.84 6.42% 47,641.25 7.75% 6,391.47 1.04% 21,341.06 3.47% 106,479.73 17.31% 19,012.10 3.09% 19,793.43 3.22% 362,500.80 58.95% 252,468.01 41.05%

VALORIZACION INFRAESTRUCTURA 300,119.47


% DE AVANCE FISICO 67.18%
FORMATO FE - 04
RESUMEN DE VALORIZACION DE AVANCE DE OBRA
MES DE FEBRERO 2022

PROYEC "MEJORAMIENTO DE LA PRESTACION DE SERVICIOS DE LA DIRECCION FECHA 8/3/2022


TO REGIONAL DE TRABAJO Y PROMOCION DEL EMPLEO EN LAS 7 PROVINCIAS DEL DISTRITO : OROPESA
DEPARTAMENTO DE APURÍMAC”
FTE - FTO : Recursos Ordinarios y Determinados PROVINCIA
: ANTABAMBA
ALIDAD : ADMINISTRACION DIRECTA DEPARTAME : APURIMAC

AVANCE
SALDO
PART DESCRIPCION PRESUPUESTO ANTERIOR ACTUAL ACUMULADO
VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
1 OBRAS PROVISIONALES, S/. 36,540.04 29,802.07 81.56% 824.02 2.26% 30,626.09 83.82% 5,913.95 16.18%
2 PRELIMINARES, SEGURIDAD
CONCRETO 1:8+25% Y SALUD
P.M. PARA S/. 4,680.96 ### 0.00 0.00% #VALUE! #VALUE! #VALUE! ###
3 SOBRECIMIENTOS
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
6 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
7 Err:509 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF! Err:509 Err:509
8 Err:509 Err:509 0.00 Err:509 #REF! #REF! #REF! #REF! Err:509 Err:509
TOTAL COSTO DIRECTO Err:509 Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509
GASTOS GENERALES (21.54%) S/. 96,234.40 15,546.11 16.15% 33480.55 34.79% 49026.66 50.95% 47,207.74 49.05%
GASTOS DE SUPERVISION (7.27%) S/. 32,500.00 4,596.67 14.14% 5232.00 16.10% 9828.67 30.24% 22,671.33 69.76%
Err:509 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509 Err:509 Err:509
Err:509 Err:509 0.00 Err:509 0.00 Err:509 0.00 Err:509 Err:509 Err:509
GASTOS DE LIQUIDACIÓN (1.43%) S/. 6,392.90 154,205.16 ### 0.00 0.00% 154205.16 2412.13% -147,812.26 ###
GASTOS ELABORACIÓN DE EXPEDIENTE TECNICO S/. 33,100.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 33,100.00 100.00%
(7.41%) TOTAL Err:509 Err:509 Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509
VALORIZACION INFRAESTRUCTURA Err:509
% DE AVANCE FISICO Err:509
PROD. / PROY.
META
FTE. FTO.
MODALIDAD
RESIDENTE
SUPERVISOR
ASIST. ADM.

MES DE JULIO
CATEGORIA VIE SÁB DOM LUN MAR MIÉ JUE VIE SÁB DOM LUN MAR MIÉ JUE VIE SÁB DOM LUN MAR MIÉ JUE VIE SÁB DOM LUN MAR MIÉ JUE VIE SÁB DOM
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
ASITENTE TECNICO 1 1 0 2 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 7 1 1 1 1 1 1 1 7
TOPOGRAFO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ALMACENERO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0
ASISTENTE DE ALMA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
OPERARIO 3 3 3 9 3 2 2 2 2 2 2 15 2 2 2 2 2 2 2 14 2 2 2 2 2 2 2 14 2 2 2 1 1 1 1 10
OFICIAL 4 4 4 12 4 4 4 3 3 3 3 24 3 3 3 3 3 3 3 21 2 2 3 3 3 3 2 18 3 2 2 0 0 0 0 7
PEON 12 12 9 33 12 12 12 12 11 11 11 81 11 11 11 11 11 11 10 76 10 9 10 10 10 10 9 68 10 10 10 10 7 7 6 60
GUARDIAN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O. DE MAQUINARIA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
RELACION DE PERSONAL MENSUAL Y TOTAL ACUMULADO EMPLEADO POR CATEGORIAS
FECHA DE
N° NOMBRE Y APELLIDO CATEGORIA DNI NACIMIEN
TO
AREA TÉCNICA
1 NOBLEGA CRUZ EMILSON ALAINASITENTE TECNICO 01 43593161 6/6/1986
2 MACCAPA CHANCA FIDEL ASISTENTE TECNICO 02 40893930 5/15/1981
3 CCONISLLA GARCIA SANTIAGO MAESTRO 31004834 10/21/1964
4 PALMA CHIPANA ESTEBAN ALMACENERO 31039199 12/26/1971
5 RIOS PEDRAZA MARIA ISABEL ASISTENTE DE ALMACEN31042045 9/18/1973
6 SIERRA OYOLA PERCY E. ASISTENTE ADMINISTRATIVO31004835 10/22/1964
7 BLAS CARLOS KARI DAMIAN REFORMULADOR 42142581 8/6/1981
TRABAJADORES REGION
1 BONIFACIO TTICA MOISES OPERARIO 40222452 6/28/1977
2 CARBAJAL RAYME GENARO OPERARIO 42246256 2/3/1982
3 RIVAS PEDRAZA FABIAN OPERARIO 31015206 1/20/1973
4 BELLIDO ALIAGA JUAN CARLOS OPERARIO 40707013 5/1/1978
5 ZEGARRA OVALLE LAZARO OPERARIO 31019473 12/17/1967
6 BARAZORDA OVALLE LUCIO OFICIAL 42201734 11/5/1983
7 CAMERO SOTO WILDER WILSON OFICIAL 70759586 5/23/1995
8 VALDERRAMA SANCHEZ NATIVID PEON 80186520 9/8/1978
9 RIVERA BAUTISTA AMERICO PEON 31020372 12/16/1972
10 ORTIZ TAIPE ADERSON PEON 42807488 11/14/1984
11 MUÑOS ACUÑA CESAR PEON 41065761 12/4/1980
12 GUTIERREZ MUÑOS GUALBERTO PEON 31030600 4/14/1958
13 HUILCAHUA PEÑA LAZARO PEON 80578527 12/23/1973
14 GORDILLO PECEROS PEON 9830215 4/6/1974
15 AGUILAR DAVALOS EDWIN PEON 46177893 12/28/1988
16 TORRES FUENTES JORGE PEON 42790863 10/4/1984
17 PATIÑO FUERTES WALDIMER PEON 40077969 12/4/1978
18 ROJAS ESTRADA RAGUL PEON 31024395 10/19/1967
19 BORDA SOCA ESTANISLAO PEON 31131417 11/13/1961
20 ROJAS ROJAS PAUL PEON 71313580 1/3/1994
21 CAMACHO ROJAS HECTOR PEON 31024669 2/24/1974
22 CALLE ZUÑIGA PERCY PEON 31036671 11/8/1975
23 GUTIERREZ ESTRADA ALCIDES PEON 31031979 10/19/1966
24 HUAMANÑAHUI RAMOS MARCOS PEON 40174087 10/24/1977
25 SANCHEZ AYMARA JUVENAL PEON 43273666 4/13/1980
26 OCHOA CAMPANA ENRIQUE PEON 80623250 1/28/1979
27 RAMOS TORRES MIGUEL ANGEL PEON 41114330 1/23/1980
28 CERRO CHALCO JUAN PEON 10212959 6/24/1974

GUARDIANIA
1 BERTI MEDRANO EDGAR GUARDIAN 31037624 2/1/1969
2 CORTEZ UGARTE PUBLIO RAMIRO GUARDIAN 31042428 10/8/1941
3 SARMIENTO CORDOVA VALENTIN GUARDIAN 31014885 12/16/1968
MAQUINISTAS
1 HUAMANÑAHUI HUAMAN CRISTIAO. DE MAQUINARIA 42918959 7/8/1984
2 PALOMINO AVALOS JULIO CESAR O. DE MAQUINARIA 41541189 12/26/1981
TRABAJADORES SINDICATO
1 PEDRAZA MESARES EMILIANO OPERARIO 31015256 2/2/1974
2 CARBAJAL PEÑA JUAN INOCENCIO OFICIAL 31020428 12/28/1974
3 CHIPANA CANALES LUIS ANTONIO OFICIAL 46261177 1/13/1988
4 CAHUANA CHARA ROSENDO OFICIAL 24714683 7/1/1967
5 SOCA AYQUIPA WILFREDO OFICIAL 80010659 10/8/1976
6 CAMACHO PORTILLO AMERICO PEON 47800228 1/5/1993
7 OTERO MINA MOISES PEON 31031806 8/28/1968
8 GUTIERREZ ESTRADA SANTIAGO PEON 15357479 5/11/1970
9 MONTESINOS CONTRERAS JAIME PEON 43432440 11/8/1985
10 GUIZADO SANTE MAXIMO PEON 43596785 5/25/1986
11 JURO MENDOZA ERNESTO PEON 46137872 10/2/1989
12 BAZAN TAIPE WILFREDO PEON 80002920 4/5/1977
13 CHIRINOS MAYHUIRI LUIS PEON 31031647 10/10/1967
14 HUAMAN MIRANDA FLORENCIO PEON 31043557 2/23/1976
15 POCCOHUANCA ARZUBIALDE JOSE PEON 42902986 11/14/1963
16 BARRIAL QUISPE PAULIÑO PEON 31170327 5/4/1972
17 GUILEN COBARRUBIAS LEONIDAS PEON 31012173 1/28/1953
18 CONDORI HUILLCAS FRANCISCO PEON 31001313 6/28/1949
19 CAMACHO RODRIGUEZ YEDER PEON 40538371 4/6/1980
20 ALCA ALA JHONATHAN PEON 43694738 1/17/1986
21 DAVALOS MOLINA JHON FRAN PEON 44030180 10/16/1986
22 DAMIAN FERRO LINO PEON 9637744 9/24/1969
23 LIMA CCOYURI VICTOR PEON 44257296 4/1/1980
24 ZAVALA CHACON JOSE ALBERTO PEON 44049712 12/26/1980
25 ONTON ANDRADE HILARIO PEON 30483861 11/21/1955
26 RAMOS MORREL FRANCISCO PEON 31025452 7/24/1958
27 CRUZ CARDENAS SEVERO PEON 31132288 10/1/1947
28 GAMBOA TORRES SANTUSA PEON 31036361 11/1/1976
29 SALCEDO ARONI FRANK PEON 74750678 10/12/1999
30 TAPIA OCAÑA FELICIANO PEON 31347993 8/30/1968
REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

1 43593161 NOBLEGA CRUZ EMILSON ALAIN 6/6/1986

2 40893930 MACCAPA CHANCA FIDEL 5/15/1981

3 31004834 CCONISLLA GARCIA SANTIAGO 10/21/1964

4 40222452 BONIFACIO TTICA MOISES 6/28/1977

5 31015256 PEDRAZA MESARES EMILIANO 2/2/1974

6 42246256 CARBAJAL RAYME GENARO 2/3/1982

7 31015206 RIVAS PEDRAZA FABIAN 1/20/1973

8 40707013 BELLIDO ALIAGA JUAN CARLOS 5/1/1978

9 31019473 ZEGARRA OVALLE LAZARO 12/17/1967

10 31020428 CARBAJAL PEÑ A JUAN 12/28/1974

11 42201734 BARAZORDA OVALLE LUCIO 11/5/1983


REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

12 42142581 KARI DAMIAN BLAS CARLOS 8/6/1981

13 46261177 CHIPANA CANALES LUIS ANTONIO 1/13/1988

14 70759586 CAMERO SOTO WILDER WILSON 5/23/1995

15 31002710 CAHUANA CHARA ROSENDO 3/1/1965

16 40174087 HUAMANÑ AHUI RAMOS MARCOS 10/24/1977

17 80010659 SOCA AYQUIPA WILFREDO 10/8/1976

18 47800228 CAMACHO PORTILLO AMERICO 1/5/1993

19 80186520 VALDERRAMA SANCHEZ NATIVIDO 9/8/1978

20 31020372 RIVERA BAUTISTA AMERICO 12/16/1972

21 42807488 ORTIZ TAIPE EDERSON 11/14/1984

22 31030600 GUTIERREZ MUÑ OS GUALBERTO 4/14/1958


REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

23 43694738 ALCA ALA JHONATHAN 1/17/1986

24 44030180 DAVALOS MOLINA JHON FRAN 10/16/1986

25 15357479 GUTIERREZ ESTRADA SANTIAGO 5/11/1970

26 43432440 MONTESINOS CONTRERAS JAIME 11/8/1985

27 43596785 GUIZADO SANTE MAXIMO 5/25/1986

28 46137872 JURO MENDOZA ERNESTO 10/2/1989

29 80002920 BAZAN TAIPE WILFREDO 4/5/1977

30 31031647 CHIRINOS MAYHUIRI LUIS 10/10/1967

31 31043557 HUAMAN MIRANDA FLORENCIO 2/23/1976

32 80578527 HUILCAHUA PEÑ A LAZARO 12/23/1973

33 31031806 OTERO MINA MOISES 8/28/1968


REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

34 9830215 GORDILLO PECEROS LOURDES 4/6/1974

35 46177893 AGUILAR DAVALOS EDWIN 12/28/1988

36 42790863 TORRES FUENTES JORGE 10/4/1984

37 40077969 PATIÑ O FUENTES WALDIMER 12/4/1978

38 31024395 ROJAS ESTRADA RABUL 10/19/1967

39 31131417 BORDA SOCA ESTANISLAO 11/13/1961

40 71313580 ROJAS ROJAS PAUL 1/3/1994

41 31024669 CAMACHO ROJAS HECTOR 2/24/1974

42 31001313 CONDORI HUILLCAS FRANCISCO 6/28/1949

43 42902986 POCCOHUANCA ARZUBIALDE JOSE LUIS 11/14/1963

44 31170327 BARRIAL QUISPE PAULIÑ O 5/4/1972


REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

45 31012173 GUILLEN COBARRUBIAS LEONIDAS 1/28/1953

46 46718289 CAMACHO RODRIGUEZ YEDER 9/19/1990

47 31036671 CALLE ZUÑ IGA PERCY 11/8/1975

48 31031979 GUTIERREZ ESTRADA ALCIDES 10/19/1966

49 43273666 SANCHEZ AYMARA JUVENAL 4/13/1980

50 80623250 OCHOA CAMPANA ENRIQUE 1/28/1979

51 80576358 SIERRA OYOLA PERCY 06/081/1993

52 41065761 MUÑ OS ACUÑ A CESAR 12/4/1980

53 41114330 RAMOS TORRES MIGUEL ANGEL 1/23/1980

54 10212959 CERRO CHALCO JUAN 6/24/1974

55 9637744 DAMIAN FERRO LINO 9/24/1969


REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

56 44257296 LIMA CCOYURI VICTOR 4/1/1980

57 44049712 ZAVALA CHACON JOSE ALBERTO 12/26/1980

58 30483861 ONTON ANDRADE HILARIO 11/21/1955

59 31025452 RAMOS MORREL FRANCISCO 7/24/1958

60 31132288 CRUZ CARDENAS SEVERO 10/1/1947

61 74750678 SALCEDO ARONI FRANK 10/12/1999

62 31347993 TAPIA OCAÑ A FELICIANO 8/30/1968

63 31036361 GAMBOA TORRES SANTUSA 11/1/1976

64 31039199 PALMA CHIPANA ESTEBAN 12/26/1971

65 31042045 RIOS PEDRAZA MARIA ISABEL 9/18/1973

66 31037624 BERTI MEDRANO EDGAR 2/1/1969


REGISTRO DE ASISTENCIA A CAPACITACIONES Y/O
ENTRENAMIENTO
GERENCIA REGIONAL DE INFRAESTRUCTURA
SUBGERENCIA DE OBRAS

“MEJORAMIENTO DEL COMPLEJO DEPORTIVO EL OLIVO PARA EL DESARROLLO


PROYECTO: DE LAS ACTIVIDADES DEPORTIVAS EN EL DISTRITO ABANCAY, PROVINCIA DE SIG-GRAP-SST - 015
ABANCAY, REGIÓN APURÍMAC”

INDUCCION TALLER CURSO


CHARLA INSTRUCTIVO OTROS (Especifique) ………………………………

ORGANIZADO POR:
GERENCIA DE
INFRAESTRUCTURA: SUB GERENCIA DE OBRA:

DIRECCION REGIONAL DE
SUPERVISION: SEGURIDAD Y SALUD EN EL TRABAJO:

OTROS (Especifique): …………………………………………………………………………………………………………………………………………………….

TEMA :
EXPOSITOR:
FECHA: HORARIO: TOTAL HORAS:
OBJETIVOS
INTERNA EXTERNA
MATERIALES ENTREGADOS:
LUGAR DE CAPACITACIÓ N:

PARTICIPANTES
FECHA DE NACIMEINTO FIRMA
N° CÓDIGO o DNI APELLIDOS Y NOMBRES

67 31042428 CORTEZ UGARTE PUBLIO RAMIRO 10/8/1941

68 31014885 SARMIENTO CORDOVA VALENTIN 12/16/1968

69 41541189 PALOMINO AVALOS JULIO CESAR 12/26/1981

70 42918959 HUAMANÑ AHUI HUAMAN CRISTIAN 7/8/1984

OBSERVACIONES: TOTAL

ACUERDOS Y/O COMPROMISOS:

RESPONSABLE DE LA CAPACITACIÓ N

Pag …….. de ……….

También podría gustarte