MES 1
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. 1 2 3 4 5 6 7 8 9
26-Jul
27-Jul
28-Jul
29-Jul
30-Jul
31-Jul
1-Aug
2-Aug
3-Aug
CONSTRUCCION DE TANQUE ELEVADO C.P. PUERTO SANTA
01
35.00M3
01.01 OBRAS PRELIMINARES
50.80
32,500.00
MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA Y EQUIPO
01.01.02 glb 1.00 65,000.00 65,000.00
PARA FABRICACION E HINCADO DE PILOTES
50%
13.82
01.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m 19.19 0.72 13.82
72%
19,131.6
01.04.03 COLUMNAS
01.04.03.01 CONCRETO F`C=280 KG/CM2 EN COLUMNAS HASTA 5.00M DEL NPT m3 10.50 568.82 5,972.61
01.04.03.07 CONCRETO F`C=280 KG/CM2 EN COLUMNAS DESDE 10.01M DEL NPT m3 11.43 642.92 7,348.58
01.04.04 VIGAS
01.04.04.01 CONCRETO F`C=280 KG/CM2 EN VIGAS HASTA 5.00M DEL NPT m3 7.90 420.66 3,323.21
01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS HASTA 5.00M DEL NPT m2 59.26 78.38 4,644.80
01.04.04.07 CONCRETO F`C=280 KG/CM2 EN VIGAS DESDE 10.01M DEL NPT m3 10.43 457.70 4,773.81
01.04.04.08 ENCOFRADO Y DESENCOFRADO EN VIGAS DESDE 10.01M DEL NPT m2 72.34 95.15 6,883.15
01.04.04.01 CONCRETO F'C = 280 KG/CM2 EN LOSA DE TANQUE ELEVADO m3 3.63 457.70 1,661.45
01.04.04.04 CONCRETO F'C=280 KG/CM2 EN CUERPO DE TANQUE ELEVADO m3 8.67 568.82 4,931.67
01.05.01 TARRAJEO EN ESTRUCTURAS DE TANQUE ELEVADO M=1:5, E=1.5CM m2 432.11 40.73 17,599.84
01.06.04 BARANDA C/TUBO F° G° PASAMANO 1 1/2" Y PARANTE 1" X 1.00M m 17.70 105.31 1,863.99
01.06.05 PLATAFORMA DE PLANCHA LAC 1/8" SEGUN DISEÑO m2 1.14 116.56 132.88
01.06.07 SOPORTE METALICO TIPO ABRAZADERA PARA TUBERIA DN 90MM und 12.00 41.93 503.16
01.06.08 VENTILACION TUBERIA Fo. Go, 3" S/DISEÑO und 1.00 112.69 112.69
01.07 PINTURA
01.08 OTROS
01.08.03 DESINFECCION DEL TANQUE CON EQUIPO DE BOMBEO m3 35.00 10.08 352.80
01.08.05 REGLA GRADUADA-INDICADOR DE NIVELES PARE RESERVORIOS und 1.00 856.51 856.51
01.11 VARIOS
9,450.00
01.11.01 FABRICACION DE PUNTA METALICA PARA PILOTE und 7.00 1,350.00 9,450.00
100.00%
33,774.75
COSTO DIRECTO 484,572.54
3,377.47
UTILIDAD (10% DEL COSTO DIRECTO) 10.00% 48,457.25
3,377.47
GASTOS GENERALES (10% DEL COSTO DIRECTO) 10.00% 48,457.25
40,529.70
SUBTOTAL 581,487.05
7,295.35
IMPUESTO(IGV) 18% 18.00% 104,667.67
PRESUPUESTO TOTAL 686,154.71 47,825.05
6.97%
6.97%
TA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH”
MES 2
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
10-Aug
11-Aug
12-Aug
13-Aug
14-Aug
15-Aug
16-Aug
17-Aug
18-Aug
19-Aug
20-Aug
21-Aug
22-Aug
23-Aug
24-Aug
25-Aug
26-Aug
27-Aug
28-Aug
4-Aug
5-Aug
6-Aug
7-Aug
8-Aug
9-Aug
574.74
100%
19,131.60
100%
12,673.05
100%
6,985.44
100%
16,078.70
100.00%
9,450.00
100.00%
65,135.55
6,513.56
6,513.56
78,162.67
14,069.28
92,231.95
13.44%
20.41%
CALENDARIO DE OBRA VALORIZADO
TIEMPO DE EJECUCION
MES 3
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
29-Aug
30-Aug
31-Aug
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
2,262.81
100.00%
742.98
100.00%
2,341.37
100%
16,187.97
100%
1,102.66
100%
7,688.03
100%
5,972.61
100%
6,098.40
100%
6,838.03
100%
5,369.96
100%
3,323.21
100%
4,644.80
100%
6,955.95
100%
18.73
100%
95.07
100%
260.28
100%
70.78
100%
191.46
100%
23.70
100%
134.68
100%
356.03
100%
95.79
100%
191.46
100%
7.32
100%
35.65
100%
99.80
100%
29.47
100%
8,806.56
100.00%
3,920.00
100.00%
9,520.00
100.00%
62,987.26
100.00%
166,118.81
16,611.88
16,611.88
199,342.57
35,881.66
235,224.23
34.28%
54.69%
84
17-Oct
MES 4
83
16-Oct
82
15-Oct
81
14-Oct
7,845.55
100%
80
13-Oct
79
12-Oct
8,124.74
78
11-Oct
77
10-Oct
76
9-Oct
75
8-Oct
74
7-Oct
73
6-Oct
72
5-Oct
71
4-Oct
70
3-Oct
69
2-Oct
4,513.13
100%
68
1-Oct
67
30-Sep
66
29-Sep
65
28-Sep
4,707.60
100%
64
27-Sep
63
26-Sep
100.00%
881.66
62
61 25-Sep
24-Sep
60
23-Sep
9.96
0%
100%
1,726.58
100%
2,539.88
100%
3,626.00
100%
6,883.15
100%
10,953.52
100%
3,013.00
100%
1,8
1
191.46
100%
182.43
100%
166.82 250.24
40% 60%
24.32 36.49
40% 60%
2,500.00
100%
6,595.12
100%
62,987.26
100.00%
3,591.70
100%
103,684.40
10,368.44
10,368.44
124,421.28
22,395.83
146,817.11
21.40%
76.09%
MES 4 MES 5
TOTAL
85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105
18-Oct
19-Oct
20-Oct
21-Oct
22-Oct
23-Oct
24-Oct
25-Oct
26-Oct
27-Oct
28-Oct
29-Oct
30-Oct
31-Oct
1-Nov
2-Nov
3-Nov
4-Nov
5-Nov
6-Nov
7-Nov
50.80
100.00%
32,500.00 65,000.00
50% 100.00%
13.82
100.00%
1,452.16
100.00%
574.74
100.00%
2,262.81
100.00%
742.98
100.00%
2,341.37
100.00%
19,131.60
100.00%
881.66
100.00%
12,673.05
100.00%
6,985.44
100.00%
16,078.70
100.00%
16,187.97
100.00%
1,102.66
100.00%
7,688.03
100.00%
5,972.61
100.00%
6,098.40
100.00%
6,838.03
100.00%
4,513.13
100.00%
4,707.60
100.00%
5,369.96
100.00%
7,348.58 7,348.58
100% 100.00%
7,845.55
100.00%
8,124.74
100.00%
3,323.21
100.00%
4,644.80
100.00%
6,955.95
100.00%
1,726.58
100.00%
2,539.88
100.00%
3,626.00
100.00%
4,773.81 4,773.81
100% 100.00%
6,883.15 6,883.15
100% 100.00%
10,953.52
100.00%
1,661.45 1,661.45
100% 100.00%
2,016.23 2,016.23
100% 100.00%
3,013.00
100.00%
4,931.67 4,931.67
100% 100.00%
7,901.02 7,901.02
100% 100.00%
6,309.90 6,309.90
100% 100.00%
961.17 961.17
100% 100.00%
452.87 452.87 905.75
100% 100.00%
17,599.84 17,599.84
100% 100.00%
48,583.33 48,583.33
100% 100.00%
51.27 51.27
100% 100.00%
2,235.19 2,235.19
100% 100.00%
2,556.59 2,556.59
100% 100.00%
1,863.99 1,863.99
100% 100.00%
132.88 132.88
100% 100.00%
191.46 191.46
100% 100.00%
503.16 503.16
100% 100.00%
112.69 112.69
100% 100.00%
6,934.66 6,934.66
100% 100.00%
366.90 366.90
100% 100.00%
654.85 654.85
100% 100.00%
352.80 352.80
100% 100.00%
5,248.14 5,248.14
100% 100.00%
856.51 856.51
100% 100.00%
1,714.83 1,714.83
100% 100.00%
18.73
100.00%
95.07
100.00%
260.28
100.00%
70.78
100.00%
191.46
100.00%
23.70
100.00%
134.68
100.00%
356.03
100.00%
95.79
100.00%
191.46
100.00%
7.32
100.00%
35.65
100.00%
99.80
100.00%
29.47
100.00%
191.46
100.00%
182.43
100.00%
417.06
100.00%
60.81
100.00%
2,500.00
100.00%
6,595.12
100.00%
9,450.00
100.00%
8,806.56
100.00%
3,920.00
100.00%
9,520.00
100.00%
62,987.26
100.00%
3,591.70
100.00%
103,684.40 115,859.03 484,572.54
10,368.44 11,585.90 48,457.25
10,368.44 11,585.90 48,457.25
124,421.28 139,030.83 581,487.05
22,395.83 25,025.55 104,667.67
146,817.11 164,056.38 686,154.71
21.40% 23.91%
76.09% 100.00%
CALENDARIO DE OBRA VALORIZADO
OBRA : ADICIONAL Y DEDUCTIVO VINCULANTE N° 01 DE LA OBRA: “CREACION DE LOS SERVICIOS DE AGUA POTABLE EN EL C.P. PUERTO SANTA Y A.H. PAMPA LA GRAMA, DISTRITO DE SANTA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH”
UBICACIÓN : C.P. PUERTO SANTA, DISTRITO DE SANTA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA
TIEMPO DE EJECUCION
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. MES 1 (30 DIAS) MES 2 (30 DIAS) MES 3 (30 DIAS) MES 4 (15 DIAS)
Metrado S/ % Metrado S/ % Metrado S/ % Metrado S/ %
01.01.01 TRAZO Y REPLANTEO m2 27.02 1.88 50.80 27.02 50.80 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
MOVILIZACION Y DESMOVILIZACION DE MAQUINQRIA Y EQUIPO PARA
01.01.02 glb 1.00 65,000.00 65,000.00 1.00 65000.00 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
FABRICACION E HINCADO DE PILOTES
01.01.03 CINTA PLASTICA SEÑALIZADORA P/LIMITE SEGURIDAD DE OBRA m 19.19 0.72 13.82 19.19 13.82 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.02.01 EXCAVACION C/MAQ. EN TERRENO SATURADO m3 82.98 17.50 1,452.16 82.98 1452.16 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.02.02 EXCAVACION MANUAL EN TERRENO NORMAL m3 12.77 45.02 574.74 12.77 574.74 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.02.03 RELLENO CON MATERIAL DE PRESTAMO m3 31.25 72.41 2,262.81 31.25 2262.81 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA D=5 KM m3 42.00 17.69 742.98 42.00 742.98 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
ENTIBADO Y DESENTIBADO DE ZANJA HASTA 2.20M DE PROFUNDIDAD EN TERRENO
01.02.05 m 19.19 122.01 2,341.37 19.19 2341.37 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
SATURADO
01.02.06 CONSTRUCCION DE CAMA DE PREFABRICACION DE PILOTES m2 60.00 318.86 19,131.60 60.00 19131.60 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.03.01 SOLADOS CONCRETO 1:12 C:H h=4" m2 27.02 32.63 881.66 0.00 0.00% 27.02 881.66 100.00% 0.00 0.00% 0.00 0.00%
01.04.01.01 CONCRETO EN PILOTES F'C=350 KG/CM2 m3 16.25 779.88 12,673.05 16.25 12673.05 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.04.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA - DE PILOTES m2 66.00 105.84 6,985.44 66.00 6985.44 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.04.01.03 ACERO FY=4200 KG/CM2 GRADO 60 EN PILOTES kg 3,421.00 4.70 16,078.70 3421.00 16078.70 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.04.02.01 CONCRETO F'C=280 KG/CM2 EN PLATEA DE CIMENTACION (CABEZAL) m3 33.26 486.71 16,187.97 33.26 16187.97 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.04.02.02 ENCOFRADO Y DESENCOFRADO EN CABEZAL m2 19.20 57.43 1,102.66 19.20 1102.66 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.04.02.03 ACERO FY=4200 KG/CM2 GRADO 60 EN CABEZAL kg 1,635.75 4.70 7,688.03 1635.75 7688.03 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.04.03.01 CONCRETO F`C=280 KG/CM2 EN COLUMNAS HASTA 5.00M DEL NPT m3 10.50 568.82 5,972.61 0.00 0.00% 10.50 5972.61 100.00% 0.00 0.00% 0.00 0.00%
01.04.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS HASTA 5.00M DEL NPT m2 84.00 72.60 6,098.40 0.00 0.00% 84.00 6098.40 100.00% 0.00 0.00% 0.00 0.00%
01.04.03.03 ACERO CORRUGADO FY= 4200 KG/CM2 EN COLUMNAS HASTA 5.00M DEL NPT kg 1,454.90 4.70 6,838.03 0.00 0.00% 1454.90 6838.03 100.00% 0.00 0.00% 0.00 0.00%
CONCRETO F`C=280 KG/CM2 EN COLUMNAS DESDE 5.01M HASTA 10.00M DEL
01.04.03.04 m3 7.50 601.75 4,513.13 0.00 0.00% 7.50 4513.13 100.00% 0.00 0.00% 0.00 0.00%
NPT
ENCOFRADO Y DESENCOFRADO EN COLUMNAS DESDE 5.01M HASTA 10.00M DEL
01.04.03.05 m2 60.00 78.46 4,707.60 0.00 0.00% 60.00 4707.60 100.00% 0.00 0.00% 0.00 0.00%
NPT
ACERO CORRUGADO FY= 4200 KG/CM2 EN COLUMNAS DESDE 5.01M HASTA
01.04.03.06 kg 1,095.91 4.90 5,369.96 0.00 0.00% 1095.91 5369.96 100.00% 0.00 0.00% 0.00 0.00%
10.00M DEL NPT
01.04.03.07 CONCRETO F`C=280 KG/CM2 EN COLUMNAS DESDE 10.01M DEL NPT m3 11.43 642.92 7,348.58 0.00 0.00% 0.00 0.00% 11.43 7348.58 100.00% 0.00 0.00%
01.04.03.08 ENCOFRADO Y DESENCOFRADO EN COLUMNAS DESDE 10.01M DEL NPT m2 91.44 85.80 7,845.55 0.00 0.00% 0.00 0.00% 91.44 7845.55 100.00% 0.00 0.00%
01.04.03.09 ACERO CORRUGADO FY= 4200 KG/CM2 EN COLUMNAS DESDE 10.01M DEL NPT kg 1,583.77 5.13 8,124.74 0.00 0.00% 0.00 0.00% 1583.77 8124.74 100.00% 0.00 0.00%
01.04.04.01 CONCRETO F`C=280 KG/CM2 EN VIGAS HASTA 5.00M DEL NPT m3 7.90 420.66 3,323.21 0.00 0.00% 7.90 3323.21 100.00% 0.00 0.00% 0.00 0.00%
01.04.04.02 ENCOFRADO Y DESENCOFRADO EN VIGAS HASTA 5.00M DEL NPT m2 59.26 78.38 4,644.80 0.00 0.00% 59.26 4644.80 100.00% 0.00 0.00% 0.00 0.00%
01.04.04.03 ACERO CORRUGADO FY= 4200 KG/CM2 EN VIGAS HASTA 5.00M DEL NPT kg 1,479.99 4.70 6,955.95 0.00 0.00% 1479.99 6955.95 100.00% 0.00 0.00% 0.00 0.00%
01.04.04.04 CONCRETO F`C=280 KG/CM2 EN VIGAS DESDE 5.01M HASTA 10.00M DEL NPT m3 3.95 437.11 1,726.58 0.00 0.00% 3.95 1726.58 100.00% 0.00 0.00% 0.00 0.00%
01.04.04.05 ENCOFRADO Y DESENCOFRADO EN VIGAS DESDE 5.01M HASTA 10.00M DEL NPT m2 29.63 85.72 2,539.88 0.00 0.00% 29.63 2539.88 100.00% 0.00 0.00% 0.00 0.00%
ACERO CORRUGADO FY= 4200 KG/CM2 EN VIGAS DESDE 5.01M HASTA 10.00M
01.04.04.06 kg 740.00 4.90 3,626.00 0.00 0.00% 740.00 3626.00 100.00% 0.00 0.00% 0.00 0.00%
DEL NPT
01.04.04.07 CONCRETO F`C=280 KG/CM2 EN VIGAS DESDE 10.01M DEL NPT m3 10.43 457.70 4,773.81 0.00 0.00% 0.00 0.00% 10.43 4773.81 100.00% 0.00 0.00%
01.04.04.08 ENCOFRADO Y DESENCOFRADO EN VIGAS DESDE 10.01M DEL NPT m2 72.34 95.15 6,883.15 0.00 0.00% 0.00 0.00% 72.34 6883.15 100.00% 0.00 0.00%
01.04.04.09 ACERO CORRUGADO FY= 4200 KG/CM2 EN VIGAS DESDE 10.01M DEL NPT kg 2,135.19 5.13 10,953.52 0.00 0.00% 0.00 0.00% 2135.19 10953.52 100.00% 0.00 0.00%
01.04.04.01 CONCRETO F'C = 280 KG/CM2 EN LOSA DE TANQUE ELEVADO m3 3.63 457.70 1,661.45 0.00 0.00% 0.00 0.00% 3.63 1661.45 100.00% 0.00 0.00%
01.04.04.02 ENCOFRADO Y DESENCOFRADO EN FONDO DE TANQUE ELEVADO m2 21.19 95.15 2,016.23 0.00 0.00% 0.00 0.00% 21.19 2016.23 100.00% 0.00 0.00%
01.04.04.03 ACERO CORRUGADO FY= 4200 KG/CM2 EN FONDO DE TANQUE ELEVADO kg 587.33 5.13 3,013.00 0.00 0.00% 0.00 0.00% 587.33 3013.00 100.00% 0.00 0.00%
01.04.04.04 CONCRETO F'C=280 KG/CM2 EN CUERPO DE TANQUE ELEVADO m3 8.67 568.82 4,931.67 0.00 0.00% 0.00 0.00% 8.67 4931.67 100.00% 0.00 0.00%
01.04.04.05 ENCOFRADO Y DESENCOFRADO EN CUERPO DE TANQUE ELEVADO m2 86.71 91.12 7,901.02 0.00 0.00% 0.00 0.00% 86.71 7901.02 100.00% 0.00 0.00%
01.04.04.06 ACERO CORRUGADO FY= 4200 KG/CM2 EN CUERPO DE TANQUE ELEVADO kg 1,230.00 5.13 6,309.90 0.00 0.00% 0.00 0.00% 1230.00 6309.90 100.00% 0.00 0.00%
01.04.04.07 CONCRETO F'C = 280 KG/CM2 EN LOSA DE TECHO EN TANQUE ELEVADO m3 2.10 457.70 961.17 0.00 0.00% 0.00 0.00% 2.10 961.17 100.00% 0.00 0.00%
01.04.04.08 ENCOFRADO Y DESENCOFRADO DE TECHO EN TANQUE ELEVADO m2 15.98 56.68 905.75 0.00 0.00% 0.00 0.00% 15.98 905.75 100.00% 0.00 0.00%
01.04.04.09 ACERO CORRUGADO FY= 4200 KG/CM2 DE TECHO EN TANQUE ELEVADO kg 325.02 5.13 1,667.35 0.00 0.00% 0.00 0.00% 325.02 1667.35 100.00% 0.00 0.00%
01.05.01 TARRAJEO EN ESTRUCTURAS DE TANQUE ELEVADO M=1:5, E=1.5CM m2 432.11 40.73 17,599.84 0.00 0.00% 0.00 0.00% 432.11 17599.84 100.00% 0.00 0.00%
TARRAJEO CON IMPERMEABILIZANTE EN PAREDES DE TANQUE ELEVADO
01.05.02 m2 868.49 55.94 48,583.33 0.00 0.00% 0.00 0.00% 868.49 48583.33 100.00% 0.00 0.00%
M=1.5, E=1.5CM
01.06 CARPINTERIA METALICA 7,647.23
01.06.01 CANDADO, INCLUYENDO ALDABAS und 1.00 51.27 51.27 0.00 0.00% 0.00 0.00% 1.00 51.27 100.00% 0.00 0.00%
01.06.02 ESCALERA DE TUBO FO. GALV. CON PARANTES DE 2" CON PELDAÑOS DE 3/4" m 21.32 104.84 2,235.19 0.00 0.00% 0.00 0.00% 21.32 2235.19 100.00% 0.00 0.00%
01.06.03 ANILLO PROTECTOR P/ESCALERA RESERVORIO ELEVADO m 15.39 166.12 2,556.59 0.00 0.00% 0.00 0.00% 15.39 2556.59 100.00% 0.00 0.00%
01.06.04 BARANDA C/TUBO F° G° PASAMANO 1 1/2" Y PARANTE 1" X 1.00M m 17.70 105.31 1,863.99 0.00 0.00% 0.00 0.00% 17.70 1863.99 100.00% 0.00 0.00%
01.06.05 PLATAFORMA DE PLANCHA LAC 1/8" SEGUN DISEÑO m2 1.14 116.56 132.88 0.00 0.00% 0.00 0.00% 1.14 132.88 100.00% 0.00 0.00%
MARCO Y TAPA DE PLANCHA LAC 1/8" CON MECANISMO DE SEGURIDAD
01.06.06 und 1.00 191.46 191.46 0.00 0.00% 0.00 0.00% 1.00 191.46 100.00% 0.00 0.00%
SEGUN DISEÑO
01.06.07 SOPORTE METALICO TIPO ABRAZADERA PARA TUBERIA DN 90MM und 12.00 41.93 503.16 0.00 0.00% 0.00 0.00% 12.00 503.16 100.00% 0.00 0.00%
01.06.08 VENTILACION TUBERIA Fo. Go, 3" S/DISEÑO und 1.00 112.69 112.69 0.00 0.00% 0.00 0.00% 1.00 112.69 100.00% 0.00 0.00%
01.08.01 JUNTA WATER STOP 6" m 18.40 19.94 366.90 0.00 0.00% 0.00 0.00% 18.40 366.90 100.00% 0.00 0.00%
PRUEBA HIDRAULICA C/EMPL. DE CISTERNA+EQUIPO DE BOMBEO
01.08.02 m3 35.00 18.71 654.85 0.00 0.00% 0.00 0.00% 0.00 0.00% 35.00 654.85 100.00%
P/LLENADO
01.08.03 DESINFECCION DEL TANQUE CON EQUIPO DE BOMBEO m3 35.00 10.08 352.80 0.00 0.00% 0.00 0.00% 0.00 0.00% 35.00 352.80 100.00%
01.08.04 MONTAJE Y DESMONTAJE DE ANDAMIOS DE MADERA glb 1.00 5,248.14 5,248.14 0.00 0.00% 0.00 0.00% 1.00 5248.14 100.00% 0.00 0.00%
01.08.05 REGLA GRADUADA-INDICADOR DE NIVELES PARE RESERVORIOS und 1.00 856.51 856.51 0.00 0.00% 0.00 0.00% 1.00 856.51 100.00% 0.00 0.00%
01.08.06 BOMBEO DE AGUAS SUBTERRANEAS glb 1.00 1,714.83 1,714.83 0.00 0.00% 0.00 0.00% 0.00 0.00% 1.00 1714.83 100.00%
01.09.01.01 SOLADO DE 4" MEZCLA 1:12 C:H m2 0.64 29.26 18.73 0.00 0.00% 0.64 18.73 100.00% 0.00 0.00% 0.00 0.00%
01.09.01.02 CONCRETO F'c=210 KG/CM2 m3 0.24 396.12 95.07 0.00 0.00% 0.24 95.07 100.00% 0.00 0.00% 0.00 0.00%
01.09.01.03 ENCOFRADO Y DESENCOFRADO m2 3.86 67.43 260.28 0.00 0.00% 3.86 260.28 100.00% 0.00 0.00% 0.00 0.00%
01.09.01.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 15.06 4.70 70.78 0.00 0.00% 15.06 70.78 100.00% 0.00 0.00% 0.00 0.00%
MARCO Y TAPA DE PLANCHA LAC 1/8" CON MECANISMO DE SEGURIDAD
01.09.01.05 und 1.00 191.46 191.46 0.00 0.00% 1.00 191.46 100.00% 0.00 0.00% 0.00 0.00%
SEGUN DISEÑO
01.09.02 CAJAS DE VALVULA DE SALIDA 801.66
01.09.02.01 SOLADO DE 4" MEZCLA 1:12 C:H m2 0.81 29.26 23.70 0.00 0.00% 0.81 23.70 100.00% 0.00 0.00% 0.00 0.00%
01.09.02.02 CONCRETO F'c=210 KG/CM2 m3 0.34 396.12 134.68 0.00 0.00% 0.34 134.68 100.00% 0.00 0.00% 0.00 0.00%
01.09.02.03 ENCOFRADO Y DESENCOFRADO m2 5.28 67.43 356.03 0.00 0.00% 5.28 356.03 100.00% 0.00 0.00% 0.00 0.00%
01.09.02.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 20.38 4.70 95.79 0.00 0.00% 20.38 95.79 100.00% 0.00 0.00% 0.00 0.00%
CALENDARIO DE OBRA VALORIZADO
OBRA : ADICIONAL Y DEDUCTIVO VINCULANTE N° 01 DE LA OBRA: “CREACION DE LOS SERVICIOS DE AGUA POTABLE EN EL C.P. PUERTO SANTA Y A.H. PAMPA LA GRAMA, DISTRITO DE SANTA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH”
UBICACIÓN : C.P. PUERTO SANTA, DISTRITO DE SANTA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SANTA
TIEMPO DE EJECUCION
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. MES 1 (30 DIAS) MES 2 (30 DIAS) MES 3 (30 DIAS) MES 4 (15 DIAS)
Metrado S/ % Metrado S/ % Metrado S/ % Metrado S/ %
MARCO Y TAPA DE PLANCHA LAC 1/8" CON MECANISMO DE SEGURIDAD
01.09.02.05 und 1.00 191.46 191.46 0.00 0.00% 1.00 191.46 100.00% 0.00 0.00% 0.00 0.00%
SEGUN DISEÑO
01.09.03 CAJAS DE VALVULA DE REBOSE 363.70
01.09.03.01 SOLADO DE 4" MEZCLA 1:12 C:H m2 0.25 29.26 7.32 0.00 0.00% 0.00 0.00% 0.25 7.32 100.00% 0.00 0.00%
01.09.03.02 CONCRETO F'c=210 KG/CM2 m3 0.09 396.12 35.65 0.00 0.00% 0.00 0.00% 0.09 35.65 100.00% 0.00 0.00%
01.09.03.03 ENCOFRADO Y DESENCOFRADO m2 1.48 67.43 99.80 0.00 0.00% 0.00 0.00% 1.48 99.80 100.00% 0.00 0.00%
01.09.03.04 ACERO DE REFUERZO fy=4,200 kg/cm2 kg 6.27 4.70 29.47 0.00 0.00% 0.00 0.00% 6.27 29.47 100.00% 0.00 0.00%
MARCO Y TAPA DE PLANCHA LAC 1/8" CON MECANISMO DE SEGURIDAD
01.09.03.05 und 1.00 191.46 191.46 0.00 0.00% 0.00 0.00% 1.00 191.46 100.00% 0.00 0.00%
SEGUN DISEÑO
01.10 EQUIPAMIENTO HIDRAULICO 9,755.42
SUMINISTRO E INSTALACION DE TUBERIAS ISO 4422 DN 90MM C-10 DE
01.10.01 m 9.00 20.27 182.43 0.00 0.00% 0.00 0.00% 9.00 182.43 100.00% 0.00 0.00%
IMPULSION
SUMINISTRO E INSTALACION DE TUBERIAS ISO 4422 DN 110MM C-10 DE
01.10.02 m 18.00 23.17 417.06 0.00 0.00% 0.00 0.00% 18.00 417.06 100.00% 0.00 0.00%
LIMPIA Y REBOSE
SUMINISTRO E INSTALACION DE TUBERIAS ISO 4422 DN 90MM C-10 DE
01.10.03 m 3.00 20.27 60.81 0.00 0.00% 0.00 0.00% 3.00 60.81 100.00% 0.00 0.00%
CONDUCCION
01.10.04 CASETA Y CLORACION INC. CONSTRUC. SUMINISTRO E INSTALACION glb 1.00 2,500.00 2,500.00 0.00 0.00% 0.00 0.00% 1.00 2500.00 100.00% 0.00 0.00%
01.10.05 SUMINISTRO E INSTALACION DE ACCESORIOS EN TANQUE ELEVADO glb 1.00 6,595.12 6,595.12 0.00 0.00% 0.00 0.00% 1.00 6595.12 100.00% 0.00 0.00%
01.11.01 FABRICACION DE PUNTA METALICA PARA PILOTE und 7.00 1,350.00 9,450.00 7.00 9450.00 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
MANIPULEO Y TRANSPORTE DE PILOTE DESDE LA CAMA DE PREFABRICACION
01.11.02 und 7.00 1,258.08 8,806.56 7.00 8806.56 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
A LUGAR DE ALMACENAMIENTO E HINCADO
01.11.03 EMPLANTILLADO DE PILOTES PARA HINCADO und 7.00 560.00 3,920.00 7.00 3920.00 100.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
01.11.04 POSICIONAMIENTO DE PILOTES PARA EL HINCADO und 7.00 1,360.00 9,520.00 0.00 0.00 0.00% 7.00 9520.00 100.00% 0.00 0.00% 0.00 0.00%
01.11.05 HINCADO DE PILOTES und 7.00 8,998.18 62,987.26 0.00 0.00 0.00% 7.00 62987.26 100.00% 0.00 0.00% 0.00 0.00%
01.11.06 DESCABEZADO DE PILOTES und 7.00 513.10 3,591.70 0.00 0.00 0.00% 7.00 3591.70 100.00% 0.00 0.00% 0.00 0.00%
UTILIDAD (10% DEL COSTO DIRECTO) 10.00% 48,457.25 17,446.27 13,473.48 16,571.79 965.72
GASTOS GENERALES (10% DEL COSTO DIRECTO) 10.00% 48,457.25 17,446.27 13,473.48 16,571.79 965.72
36.00% 27.80% 34.20% 1.99%
SUBTOTAL 581,487.05 209,355.22 161,681.71 198,861.53 11,588.60
MES 1
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/.
Del 26/07/22
Metrado S/
01 CONSTRUCCION DE TANQUE ELEVADO C.P. PUERTO SANTA 35.00M3
01.01 OBRAS PRELIMINARES
TIEMPO DE EJECUCION
MES 1 MES 2 MES 3 MES 4 MES 5
al 31/07/22 Del 01/08/22 al 31/08/22 Del 01/09/22 al 30/09/22 Del 01/10/22 al 31/10/22 Del 01/11/22
%
0.00% 50.80
50.00% 65,000.00
0.00% 13.82
0.00
0.00% 1,452.16
0.00% 574.74
0.00% 2,262.81
0.00% 742.98
0.00% 2,341.37
0.00% 19,131.60
0.00
0.00% 881.66
0.00
0.00
0.00% 12,673.05
0.00% 6,985.44
0.00% 16,078.70
0.00
0.00% 16,187.97
0.00% 1,102.66
0.00% 7,688.03
0.00
0.00% 5,972.61
0.00% 6,098.40
0.00% 6,838.03
0.00% 4,513.13
0.00% 4,707.60
0.00% 5,369.96
0.00% 7,348.58
0.00% 7,845.55
0.00% 8,124.74
0.00
0.00% 3,323.21
0.00% 4,644.80
0.00% 6,955.95
0.00% 1,726.58
0.00% 2,539.88
0.00% 3,626.00
0.00% 4,773.81
0.00% 6,883.15
0.00% 10,953.52
0.00
0.00% 1,661.45
0.00% 2,016.23
0.00% 3,013.00
0.00% 4,931.67
0.00% 7,901.02
0.00% 6,309.90
100.00% 961.17
50.00% 905.75
0.00% 1,667.35
0.00
100.00% 17,599.84
100.00% 48,583.33
0.00
0.00% 51.27
0.00% 2,235.19
0.00% 2,556.59
0.00% 1,863.99
0.00% 132.88
0.00% 191.46
0.00% 503.16
0.00% 112.69
0.00
100.00% 6,934.66
0.00
0.00% 366.90
100.00% 654.85
100.00% 352.80
100.00% 5,248.14
100.00% 856.51
100.00% 1,714.83
0.00
0.00
0.00% 18.73
0.00% 95.07
0.00% 260.28
0.00% 70.78
0.00% 191.46
0.00
0.00% 23.70
0.00% 134.68
0.00% 356.03
0.00% 95.79
0.00% 191.46
0.00
0.00% 7.32
0.00% 35.65
0.00% 99.80
0.00% 29.47
0.00% 191.46
0.00
0.00% 182.43
0.00% 417.06
0.00% 60.81
0.00% 2,500.00
0.00% 6,595.12
0.00
0.00% 9,450.00
0.00% 8,806.56
0.00% 3,920.00
0.00% 9,520.00
0.00% 62,987.26
0.00% 3,591.70
484,572.53
48,457.25
48,457.25
23.91%
581,487.03
104,667.68
686,154.71
100.00%