Está en la página 1de 1

PROGRAMACION DE CRONOGRAMA VALORIZADO ADICIONAL VINCULANTE DE OBRA N°01- ACTUALIZADO

PROYECTO
: "MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO DEL DISTRITO DE SAN JUAN DE LICUPIS – PROVINCIA DE CHOTA - REGION CAJAMARCA"

CLIENTE : MUNICIPALIDAD DISTRITAL DE SAN JUAN DE LICUPIS


LUGAR : SAN JUAN DE LICUPIS - CHOTA - CAJAMARCA
FECHA : DIC. DE 2022

PRESUPUESTO BASE MES 1 - 2020 MES 2 - 2020 MES 3 - 2020 MES 4 - 2021 MES 5 - 2021 MES 6 - 2021 MES 7 - 2021 MES 8 - 2021 MES 9 - 2022 MES 10 - 2022 MES 11 - 2022 MES 12 - 2022
ITEM DESCRIPCION UNID METRADO
P.U. PARCIAL OCTUBRE: 26-31 NOVIEMBRE:01-30 DICIEMBRE:01-08 JULIO:21-31 AGOSTO:01-31 SEPTIEMBRE:01-30 OCTUBRE:01-31 NOVIEMBRE:01-28 SETIEMBRE:24-30 OCTUBRE:01-30 31 OCT. AL 30 NOV. 22 01 DIC. AL 31 DIC. 22
(S/.) (S/.) AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO AVANCE MONTO

01 ADICIONAL VINCULANTE - SISTEMA DE AGUA POTABLE 39,085.61


01.01 LINEA DE CONDUCCION 32,034.45
01.01.01 MOVIMIENTO DE TIERRAS 15,796.95
01.01.01.01 EXCAVACIÓN A PULSO DE ZANJAS T.S.R, H=0.25M m 750.00 14.05 10,537.50 0.00% 0.00% 0.00% - 73.33% 7,727.50 26.67% 2,810.00 -
01.01.01.02 REFINE Y NIVELACION ZANJA T.S.R m 750.00 3.13 2,347.50 0.00% 0.00% 0.00% - 73.33% 1,721.50 26.67% 626.00 -
01.01.01.03 RELLENO COMP. DE ZANJA CON MAT. PROPIO SELECCIONADO m 750.00 3.31 2,482.50 0.00% 0.00% 0.00% - 73.33% 1,820.50 26.67% 662.00 -
01.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE m3 15.00 28.63 429.45 0.00% 0.00% 0.00% - 66.67% 286.30 33.33% 143.15 -
01.01.02 TUBERIAS 16,237.50 -
01.01.02.01 SUMINISTRO E INSTALACION DE TUBERIA HDPE 1 1/2" m 750.00 21.65 16,237.50 0.00% 0.00% 0.00% - 0.00% - 100.00% 16,237.50 -
01.02 RESERVORIO CIRCULAR ( V = 20 M3) 5,730.57 -
01.02.01 CERCO PERIMETRICO METALICO 5,730.57 -
01.02.01.01 CARPINTERIA METALICA 5,730.57 -
01.02.01.01.01 CERCO METALICO CON MALLA ELECTROSOLDADA EXAGONAL H=2.00m m 38.47 114.44 4,402.51 0.00% 0.00% 0.00% - 0.00% - 0.00% - 100.00% 4,402.51
01.02.01.01.02 POSTE METALICO F° G° 3PULG x 2.5mm, H=3.10m und 8.00 129.19 1,033.52 0.00% 0.00% 0.00% - 0.00% - 0.00% - 100.00% 1,033.52
01.02.01.01.03 PUERTA METALICA CON MALLA EXAGONAL D=1.0x2.0M GLB 1.00 294.54 294.54 0.00% 0.00% 0.00% - 0.00% - 0.00% - 100.00% 294.54
01.03 OTROS 1,320.59 -
01.03.01 FLETE TERRESTRE DESDE CHICLAYO GLB 1.00 664.09 664.09 20.00% 132.82 0.00% 10.00% 66.41 0.00% - 50.00% 332.05 5.00% 33.20 5.00% 33.20 10.00% 66.41
01.03.02 FLETE RURAL AGUA P. GLB 1.00 656.50 656.50 20.00% 131.30 0.00% 10.00% 65.65 0.00% - 50.00% 328.25 5.00% 32.83 5.00% 32.83 10.00% 65.65

02 ADICIONAL VINCULANTE - PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 29,932.54


02.01 CERCO PERIMETRICO DE PTAR 28,149.36
02.01.01 CARPINTERIA METALICA 28,149.36
02.01.01.01 CERCO METALICO CON MALLA ELECTROSOLDADA EXAGONAL H=2.00m m 173.41 114.44 19,845.04 0.00% 0.00% 0.00% - 0.00% - 0.00% 60.00% 11,907.48 40.00% 7,937.56
02.01.01.02 POSTE METALICO F° G° 2PULG x 2.5mm, H=3.10m und 62.00 129.19 8,009.78 0.00% 0.00% 0.00% - 64.52% 5,167.60 16.13% 1,291.90 19.35% 1,550.28
02.01.01.03 PUERTA METALICA CON MALLA EXAGONAL D=1.05*2.0M GLB 1.00 294.54 294.54 0.00% 0.00% 0.00% - 0.00% - 0.00% - 100.00% 294.54
02.02 FLETE TERRESTRE 1,783.18 -
02.02.01 FLETE TERRESTRE - SISTEMA ALCANTARILLADO est 1.00 1,783.18 1,783.18 10.00% 178.32 20.00% 356.64 0.00% 10.00% 178.32 0.00% - 40.00% 713.27 5.00% 89.16 5.00% 89.16 10.00% 178.32

03 ADICIONAL VINCULANTE - UNIDADES BASICA DE SENEAMIENTO 630,243.79


03.01 FLETE 249,994.67
03.01.01 FLETE TERRESTRE UBS est 1.00 170,457.17 170,457.17 21.00% 35,796.01 29.00% 49,432.58 5.00% 8,522.86 10.00% 17,045.72 10.00% 17,045.72 10.00% 17,045.72 10.00% 17,045.72 5.00% 8,522.86
03.01.02 FLETE RURAL UBS est 1.00 79,537.50 79,537.50 21.00% 16,702.88 29.00% 23,065.88 5.00% 3,976.88 10.00% 7,953.75 10.00% 7,953.75 10.00% 7,953.75 10.00% 7,953.75 5.00% 3,976.88
03.02 MODULO DE SSHH - EDIFICACIONES 222,180.55
03.02.01 CUBIERTAS 85,982.67
03.02.01.01 COBERTURA DE PLANCHA CALAMINA N° 030-UBS m2 2,010.35 42.77 85,982.67 21.13% 18,165.27 24.65% 21,192.96 5.28% 4,541.32 9.86% 8,477.01 21.83% 18,770.90 12.32% 10,596.27 0.00% - 4.93% 4,238.93 0.00% 0.01
03.02.02 CARPINTERIA DE MADERA 136,197.88 -
03.02.02.01 MARCO DE MADERA Y PUERTA TRIPLAY CONTRAPLACADA DE 0.70X2.00 m und 284.00 440.69 125,155.96 0.00% 0.00% 0.00% - 17.61% 22,034.50 0.00% - 42.25% 52,882.80 57.04% 71,391.78 -21,153.12
03.02.02.02 VENTANA DE MADERA CON MALLA MOSQUITERO (0.40x0.50m) und 284.00 38.88 11,041.92 0.00% 0.00% 0.00% - 17.61% 1,944.00 0.00% - 42.25% 4,665.60 57.04% 6,298.56 -1,866.24
03.03 SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES 158,068.57
03.03.01 POZO PERCOLADOR 158,068.57
03.03.01.01 CONCRETO ARMADO 25,429.36
03.03.01.01.01 TAPA DE CONCRETO PREFABRICADA F´c=175 kg/cm2 D=0.60 x 0.05m und 284.00 89.54 25,429.36 21.13% 5,372.40 24.65% 6,267.80 14.08% 3,581.60 1.76% 447.70 7.04% 1,790.80 14.08% 3,581.60 15.85% 4,029.30 0.00% - 1.41% 358.16
03.03.01.02 ALBAÑILERIA 132,639.21 -
03.03.01.02.01 ASENTADO DE LADRILLO PARA POZO m2 2,158.49 61.45 132,639.21 21.13% 28,022.43 24.65% 32,692.63 14.08% 18,681.41 1.76% 2,335.10 7.04% 9,341.01 15.84% 21,016.51 10.56% 14,011.21 0.00% - 4.93% 6,538.28

TOTAL COSTO DIRECTO (A) S/ 699,261.94 104,237.31 133,272.61 34,762.75 32,323.59 44,918.67 68,368.48 95,711.72 34,425.48 57,703.60 64,847.78 12,217.86 16,472.09
GASTOS GENERALES (B) 10.00% S/ 69,926.19 10,423.73 13,327.26 3,476.28 3,232.36 4,491.87 6,836.85 9,571.17 3,442.55 5,770.36 6,484.77 1,221.78 1,647.21
UTILIDAD (C) 4.60% S/ 32,166.05 4,794.92 6,130.54 1,599.09 1,486.89 2,066.26 3,144.95 4,402.74 1,583.57 2,654.37 2,982.98 562.02 757.72
SUBTOTAL (A+B+C) S/ 801,354.18 119,455.96 152,730.41 39,838.12 37,042.84 51,476.80 78,350.28 109,685.63 39,451.60 66,128.33 74,315.53 14,001.66 18,877.02
IGV (18.00%) S/ 144,243.75 21,502.07 27,491.47 7,170.86 6,667.71 9,265.82 14,103.05 19,743.41 7,101.29 11,903.11 13,376.81 2,520.30 3,397.85
TOTAL PRESUPUESTO CON IGV S/ 945,597.93 140,958.03 180,221.88 47,008.98 43,710.55 60,742.62 92,453.33 129,429.04 46,552.89 78,031.44 87,692.34 16,521.96 22,274.87
MONTO ACUMULADO 140,958.03 321,179.91 368,188.89 411,899.44 472,642.06 565,095.39 694,524.43 741,077.32 819,108.76 906,801.10 923,323.06 945,597.93

AVANCE PARCIAL 14.91% 19.06% 4.97% 4.62% 6.42% 9.78% 13.69% 4.92% 8.25% 9.27% 2.36%
AVANCE ACUMULADO 14.91% 33.97% 38.94% 43.56% 49.98% 59.76% 73.45% 78.37% 86.62% 95.90% 98.25%