CRONOGRAMA VALORIZADO DE OBRA

ITEM DESCRIPCION MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 TOTAL
01 MEJORAMIENTO TRAMO I KM 0+000 AL 3+580 (L=3.58km) S/. 11,697.13 S/. 0.00 S/. 0.00 S/. 0.00 S/. 13,130.95 S/. 17,275.69 S/. 1,071.60 S/. 0.00 S/. 0.00 S/. 287,855.31 S/. 1,013,086.54 S/. 11,220.31 S/. 1,355,337.530
01.01 TRABAJOS PRELIMINARES S/. 6,697.13 S/. 2,395.70 S/. 6,540.44 S/. 1,071.60 S/. 9,322.77 S/. 14,869.06
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/. 9,322.77
01.01.02 TOPOGRAFIA Y GEOREFERENCIACION S/. 803.70 S/. 4,152.44 S/. 1,071.60
01.01.03 MANTENIMIENTO DE TRANSITO TEMPORAL Y SEGURIDAD VIAL S/. 6,697.13
01.01.04 MANTENIMIENTO PUENTE DE L=35m S/. 14,869.06
01.01.05 LIMPIEZA Y DESCOLMATADO DE ALCANTARILLAS S/. 1,592.00 S/. 2,388.00
01.02 MOVIMIENTO DE TIERRAS S/. 0.00 S/. 10,735.25 S/. 10,735.25 S/. 87,975.32
01.02.01 EXCAVACION PARA EXPLANACIONES
01.02.01.01 REMOCION DE CARPETA ASFALTICA EXISTENTE S/. 10,735.25 S/. 10,735.25
01.02.01.02 REMOCIÓN DE BASE Y SUB BASE EXISTENTE S/. 37,821.58
01.02.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE S/. 38,333.88
CONFORMACION Y ACOMODO DE DME´s
01.02.02.01 CONFORMACION Y ACOMODO DE DME's S/. 11,819.86
01.03 PAVIMENTOS S/. 0.00 S/. 96,897.45 S/. 875,805.40
01.03.01 SUB BASE GRANULAR S/. 96,897.45
01.03.02 BASE GRANULAR S/. 326,279.61
01.03.03 IMPRIMACION ASFALTICA S/. 82,288.89
01.03.04 CARPETA ASFALTICA EN FRIO e= 2" S/. 467,236.90
01.04 TRANSPORTE S/. 0.00 S/. 76,315.27 S/. 88,761.72
01.04.01 TRANSPORTE DE MATERIALES GRANULARES ENTRE 120 m Y 1000 m S/. 32,618.15 S/. 16,309.07
01.04.02 TRANSPORTE DE MATERIALES GRANULARES A MAS DE 1000 m S/. 2,693.97 S/. 51,185.40
01.04.03 TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120 m Y 1000 m S/. 22,985.24
01.04.04 TRANSPORTE DE MATERIALES EXCEDENTES A MAS DE 1000 m S/. 18,017.91 S/. 3,002.99
01.04.05 TRANSPORTE DE MEZCLAS ASFALTICAS HASTA 1000 m S/. 11,678.99
01.04.06 TRANSPORTE DE MEZCLAS ASFALTICAS A MAS DE 1000 m S/. 6,585.27
01.05 SEÑALIZACIÓN Y SEGURIDAD VIAL S/. 0.00 S/. 33,124.49 S/. 11,220.31
01.05.01 SEÑALES INFORMATIVAS S/. 2,540.88
01.05.02 TACHAS RETROFLECTIVAS S/. 11,220.31 S/. 11,220.31
01.05.03 MARCAS EN EL PAVIMENTO S/. 18,420.86
01.05.04 REPINTADO DE GUARDAVIA METALICA S/. 942.44
01.06 PLAN DE SEGURIDAD Y SALUD EN OBRA S/. 5,000.00 S/. 17,344.50 S/. 525.87
01.06.01 ACTIVIDADES PRELIMINARES DE SEGURIDAD Y SALUD EN EL TRABAJO
01.06.01.01 EXAMENES MEDICOS PREOCUPACIONALES S/. 2,280.00
01.06.02 IMPLEMENTACION DEL PLAN DE ENTRENAMIENTO DE RECURSOS
01.06.02.01 ORIENTACION E INDUCCION BASICA EN SEGURIDAD Y SALUD EN EL S/. 5,000.00
01.06.02.02 INDUCCION ESPECIFICA EN TRABAJOS DE ALTO RIESGO S/. 901.50 S/. 525.87
01.06.03 IMPLEMENTACION DEL PLAN DE CONTINGENCIAS
01.06.03.01 BRIGADA DE PRIMEROS AUXILIOS S/. 504.00
01.06.03.02 BRIGADA CONTRA INCENDIOS S/. 1,090.00
01.06.03.03 BRIGADA DE RESCATE Y EMERGENCIAS S/. 2,224.00
01.06.04 IMPLEMENTACION DE EQUIPOS DE PROTECCION
01.06.04.01 EQUIPO DE PROTECCION PERSONAL S/. 7,870.00
01.06.04.02 EQUIPO DE PROTECCION COLECTIVA S/. 2,475.00
02 MEJORAMIENTO TRAMO II: KM 4+660 AL KM 14+030.471 (L=9.37 km) S/. 1,397,707.52 S/. 1,293,196.63 S/. 866,814.08 S/. 735,831.67 S/. 601,904.13 S/. 441,325.04 S/. 61,438.56 S/. 130,494.30 S/. 1,028,829.32 S/. 1,786,025.96 S/. 2,332,441.15 S/. 1,677,469.39 S/. 12,353,477.75

02.01 TRABAJOS PRELIMINARES S/. 89,787.00 S/. 44,549.44 S/. 46,034.42 S/. 46,034.42 S/. 32,669.59
02.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS S/. 9,322.77
02.01.02 TOPOGRAFIA Y GEOREFERENCIACION S/. 40,094.48 S/. 44,549.44 S/. 46,034.42 S/. 46,034.42 S/. 32,669.59
02.01.03 CAMPAMENTOS S/. 40,369.75
02.02 MOVIMIENTO DE TIERRAS S/. 316,143.46 S/. 645,522.96 S/. 700,259.54 S/. 672,145.55 S/. 545,026.72 S/. 441,325.04 S/. 61,438.56 S/. 63,486.51 S/. 114,713.56 S/. 98,351.66
02.02.01 EXCAVACION PARA EXPLANACIONES
02.02.01.01 EXCAVACION EN ROCA FIJA S/. 289,327.97 S/. 332,191.39 S/. 332,191.39 S/. 300,043.84 S/. 203,601.17
02.02.01.02 EXCAVACION EN ROCA FRACTURADA (SUELTA) S/. 207,744.54 S/. 201,043.10 S/. 207,744.54 S/. 207,744.54 S/. 187,640.23 S/. 174,237.36
02.02.01.03 EXCAVACION DE MATERIAL SUELTO S/. 55,294.70 S/. 61,438.56 S/. 63,486.51 S/. 63,486.51 S/. 57,342.65 S/. 63,486.51 S/. 61,438.56 S/. 63,486.51 S/. 61,438.56 S/. 4,095.90
02.02.01.04 PERFILADO Y COMPACTADO EN ZONA DE CORTE S/. 53,275.00 S/. 94,255.76
02.02.02 CONFORMACION Y ACOMODO DE DME´s
02.02.02.01 CONFORMACION Y ACOMODO DE DME's S/. 53,104.22 S/. 93,713.33 S/. 96,837.10 S/. 68,723.11
02.03 PAVIMENTOS S/. 390,828.64 S/. 1,392,139.20 S/. 1,054,593.41
02.03.01 BASE GRANULAR S/. 390,828.64 S/. 586,242.95
02.03.02 IMPRIMACION ASFALTICA S/. 278,599.54
02.03.03 CARPETA ASFALTICA EN FRIO e= 2" S/. 527,296.71 S/. 1,054,593.41
02.04 DRENAJE S/. 63,798.96 S/. 15,773.80 S/. 52,760.21 S/. 421,890.75 S/. 467,489.38 S/. 4,701.56
02.04.01 TRAZO, NIVEL Y REPLANTEO
02.04.01.01 TRAZO NIVELACION Y REPLANTEO - OBRAS DE ARTE S/. 15,773.80
02.04.02 MOVIMIENTO DE TIERRAS
02.04.02.01 EXCAVACION PARA ESTRUCTURAS CON EQUIPO MECANICO S/. 22,581.91 S/. 45,163.81
02.04.02.02 EXCAVACION Y CONFORMACION DE CUENTAS S/. 27,749.71 S/. 59,768.61
02.04.02.03 EXCAVACION EN SANJAS DE CORONACION S/. 1,679.81 S/. 1,119.88
02.04.02.04 RELLENO COMPACTADO PARA ESTRUCTRAS S/. 86,332.84
02.04.02.05 MATERIAL DE BASE COMPACTADO S/. 5,059.86
02.04.02.06 ELIMINACION DE MATERIAL (TRANSPORTE ) S/. 63,798.96
02.04.03 CUNETAS
02.04.03.01 ENCOFRADO Y DESENCOFRADO S/. 2,428.59 S/. 35,214.61
02.04.03.02 CONCRETO F'C=175 KG/CM2 S/. 190,257.53 S/. 164,313.32
02.04.03.03 SELLADOR DE JUNTAS 1" S/. 8,935.16 S/. 18,682.61
02.04.04 BADENES
02.04.04.01 ENCOFRADO Y DESENCOFRADO S/. 13,236.96
02.04.04.02 CONCRETO F'C=210 KG/CM2 S/. 28,547.02 S/. 16,312.58
02.04.04.03 CONCRETO F'C=140 KG/CM2 + 30 P.M. EN MUROS DE ENCAUSAMIENTO S/. 8,982.44
02.04.04.04 PIEDRA EMBOQUILLADA Y ACENTADO CON MORTERO 1:7 S/. 6,681.86
02.04.04.05 JUNTA ASFALTICAS 1" S/. 1,370.94
02.04.05 ALCANTARILLAS TMC
02.04.05.01 ENCOFRADO Y DESENCOFRADO DE ALCANTARILLAS S/. 57,267.19
02.04.05.02 ALCANTARILLA TMC Ø = 900 mm. S/. 39,087.24 S/. 39,087.24
02.04.05.03 CONCRETO F'C=175 KG/CM2 + 25% DE PM EN ALCANTARILLA S/. 57,442.39
02.04.05.04 PIEDRA EMBOQUILLADA Y ACENTADO CON MORTERO 1:7 S/. 4,836.23 S/. 3,224.16
02.04.05.05 EMPEDRADO EN INGRESO Y SALIDA S/. 1,477.40
02.05 OBRAS COMPLEMENTARIAS S/. 1,601.10 S/. 8,438.46 S/. 39,883.24 S/. 161,068.68
02.05.01 MUROS DE SOSTENIMIENTO
02.05.01.01 TRAZO, NIVEL Y REPLANTEO
02.05.01.01.01 TRAZO NIVELACION Y REPLANTEO - OBRAS DE ARTE S/. 1,601.10
02.05.01.02 MOVIMIENTO DE TIERRAS
02.05.01.02.01 EXCAVACION PARA ESTRUCTURAS CON EQUIPO MECANICO S/. 8,438.46 S/. 5,063.07
02.05.01.02.02 RELLENO COMPACTADO PARA ESTRUCTRAS S/. 34,820.17 S/. 13,679.35
02.05.01.02.03 ELIMINACION DE MATERIAL (TRANSPORTE ) S/. 6,311.20
02.05.01.03 GAVION
02.05.01.03.01 GAVION TIPO CAJA S/. 141,078.13
02.06 TRANSPORTE S/. 488,368.29 S/. 586,041.95 S/. 39,069.46 S/. 67,007.79 S/. 861,355.55 S/. 866,516.45 S/. 385,687.96 S/. 41,876.65
02.06.01 TRANSPORTE DE MATERIALES GRANULARES ENTRE 120 m Y 1000 m S/. 134,376.04
02.06.02 TRANSPORTE DE MATERIALES GRANULARES A MAS DE 1000 m S/. 56,901.63 S/. 352,790.08 S/. 352,790.08 S/. 11,380.33
02.06.03 TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120 m Y 1000 m S/. 488,368.29 S/. 586,041.95 S/. 39,069.46
02.06.04 TRANSPORTE DE MATERIALES EXCEDENTES A MAS DE 1000 m S/. 67,007.79 S/. 670,077.88 S/. 513,726.37
02.06.05 TRANSPORTE DE MEZCLAS ASFALTICAS HASTA 1000 m S/. 32,897.88 S/. 8,224.47
02.06.06 TRANSPORTE DE MEZCLAS ASFALTICAS A MAS DE 1000 m S/. 22,271.85
02.07 SEÑALIZACIÓN Y SEGURIDAD VIAL S/. 47,241.37 S/. 415,229.09
02.07.01 SEÑALES PREVENTIVAS S/. 77,826.29
02.07.02 SEÑALES REGLAMENTARIAS S/. 3,321.60
02.07.03 SEÑALES INFORMATIVAS S/. 4,548.97
02.07.04 POSTES DELINEADORES S/. 36,826.52
02.07.05 POSTES DE KILOMETRAJE S/. 1,212.30
02.07.06 TACHAS RETROFLECTIVAS S/. 59,228.91
02.07.07 MARCAS EN EL PAVIMENTO S/. 43,299.04
02.07.08 GUARDAVIAS METALICAS S/. 47,241.37 S/. 188,965.46
02.08 PROTECCION AMBIENTAL S/. 430,999.34
02.08.01 PROTECCION AMBIENTAL S/. 430,999.34
02.09 MONITOREO ARQUEOLOGICO S/. 17,651.70 S/. 17,082.28 S/. 17,651.70 S/. 17,651.70 S/. 6,832.92
02.09.01 MONITOREO ARQUEOLOGICO S/. 17,651.70 S/. 17,082.28 S/. 17,651.70 S/. 17,651.70 S/. 6,832.92
02.10 PLAN DE SEGURIDAD Y SALUD EN OBRA S/. 54,757.73
02.10.01 ACTIVIDADES PRELIMINARES DE SEGURIDAD Y SALUD EN EL TRABAJO

02.10.01.01 EXAMENES MEDICOS PREOCUPACIONALES S/. 6,840.00


02.10.02 IMPLEMENTACION DEL PLAN DE ENTRENAMIENTO DE RECURSOS
HUMANOS
02.10.02.01 ORIENTACION E INDUCCION BASICA EN SEGURIDAD Y SALUD EN EL S/. 5,000.00
02.10.02.02 INDUCCION ESPECIFICA EN TRABAJOS DE ALTO RIESGO S/. 2,854.73
02.10.03 IMPLEMENTACION DEL PLAN DE CONTINGENCIAS
02.10.03.01 BRIGADA DE PRIMEROS AUXILIOS S/. 613.00
02.10.03.02 BRIGADA CONTRA INCENDIOS S/. 1,360.00
02.10.03.03 BRIGADA DE RESCATE Y EMERGENCIAS S/. 2,405.00
02.10.04 IMPLEMENTACION DE EQUIPOS DE PROTECCION
02.10.04.01 EQUIPO DE PROTECCION PERSONAL S/. 31,785.00
02.10.04.02 EQUIPO DE PROTECCION COLECTIVA S/. 3,900.00
S/. 13,708,815.28