Está en la página 1de 5

FORMATO FE - 04

EJECUCION PRESUPUESTAL MENSUAL


MES ABRIL DEL 2021

PROYECTO : MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DEL PASAJE JUDICIAL DEL DISTRITO ANDAHUAYLAS, PROVINCIA DE ANDAHUAYLAS - APURIMAC

EJECUTA : MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS

SUB META : 038-2021

FTE.FTO : CANON SOBRECANON,REGALIAS,RENTAS DE ADUANAS Y PARTICIPACIONES

MODALIDAD : ADMINISTRACION DIRECTA


AÑO : 2021


DOCUMENTO COMPROBANTE DE GASTO EJECUCION PRESPUPUESTAL POR ESPECIFICAS (mensual) COSTOS
DETALLE DE GASTOS
FECHA CLASE Nº IMPORTE FECHA Nº 2.6.23.24 2.6.23.25 2.6.23.26 2.6.32.12 2.6.32.31 Directos Indirectos PECOSA TOTAL
COSTO DE CONSTRUCCION POR ADMINISTRO DIRECTA - PERSONAL 28,050.00 28,050.00
07-04-21 1043 28,050.00 PLANILLA PLANILLA DE PERSONAL DE OBRA 28,050.00 28,050.00 28,050.00
COSTO DE CONSTRUCCION DIRECTA - BIENES 0.00 38,989.55 0.00 0.00 15,370.25 15,370.25
07-04-21 o/p 1051 1,140.00 002-0002446 29/03/21 COMPRA DE GIGANTOGRAFIA PARA CARTEL DE OBRA YOVANA ANGELINO BUEN DIA 1,140.00 1,140.00 1,140.00
27-04-21 o/p 1363 14,230.25 CEMENTO PORTLAND CORALTA 14,230.25 14,230.25 125 14,230.25
COSTO DE CONSTRUCCION POR ADMINISTRO DIRECTA - SERVI 0.00 0.00 5,550.00 0.00 0.00 16,450.00 5,550.00
09-04-21 O/S 1107 1,800.00 R/H ALMACENERA NOEMI PEREZ LIZARMEN 1,800.00 1,800.00 1,800.00
13-04-21 O/S 1172 1,500.00 R/H ENFERMERA LEYVA POLANCO MABEL A. 1,500.00 1,500.00 1,500.00
05-04-21 O/S 1113 2,250.00 001-28 10/03/2021 ASISTE NTE ADMINISTRATIVO LUISA ALTAMIRANO AROHUILLCA 2,250.00 2,250.00 2,250.00
55,439.55 0.00 0.00 38,989.55 5,550.00 0.00 0.00 43,420.25 16,450.00 0.00 48,970.25
FORMATO FE - 16
CUADRO COMPARATIVO DEL PRESUPUESTO ANALITICO APROBADO Y EJECUTADO
MES DE ABRIL

PROYECTO " PROYECTO: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DEL PASAJE JUDICIAL DEL DISTRITO ANDAHUAYLAS, PROVINCIA DE ANDAHUAYLAS - APURIMAC"

EJECUTA MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS


SUB META 038 - 2021
FTE - FTO CANON SOBRECANON,REGALIAS,RENTAS DE ADUANAS Y PARTICIPACIONES

MODALIDAD ADMINISTRACION DIRECTA


AÑO 2021
MES DE ABRIL - 2021

ESPECIFICA DETALLE PRESUPUESTO APROBADO PRESUPUESTO EJECUTADO ANTERIOR PRESUPUESTO EJECUTADO ACTUAL PRESUPUESTO EJECUTADO ACUMULADO SALDO ACUMULADO

DE GASTO DIRECTOS INDIRECTOS TOTAL DIRECTOS INDIRECTOS TOTAL % DIRECTOS INDIRECTOS TOTAL % DIRECTOS INDIRECTOS TOTAL % DIRECTOS INDIRECTOS TOTAL %

2.6.23.24 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 51,397.00 51,397.00 - 0.00% 28,050.00 28,050.00 54.58% 28,050.00 - 28,050.00 54.58% 23,347.00 - 23,347.00 45.42%

2.6.23.25 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 154,384.01 12,796.99 167,181.00 22,416.00 1,203.30 23,619.30 14.13% 15,370.25 - 15,370.25 9.19% 37,786.25 1,203.30 38,989.55 23.32% 116,597.76 11,593.69 128,191.45 76.68%

2.6.23.26 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 7,490.00 57,436.00 64,926.00 - 10,900.00 10,900.00 16.79% - 5,550.00 5,550.00 8.55% - 16,450.00 16,450.00 25.34% 7,490.00 40,986.00 48,476.00 74.66%

2.6.32.12 MOBILIARIO 450.00 450.00 - 0.00% - 0.00% - - - 0.00% - 450.00 450.00 100.00%

2.6.32.31 EQUIPOS COMPUTACIONALES Y PERIFERICOS 4,385.00 4,385.00 - 0.00% - 0.00% - - - 0.00% - 4,385.00 4,385.00 100.00%

TOTAL 213,271.01 75,067.99 288,339.00 12,103.30 34,519.30 11.97% 43,420.25 5,550.00 48,970.25 16.98% 65,836.25 17,653.30 83,489.55 28.96% 147,434.76 57,414.69 204,849.45 71.04%
FORMATO FE - 6
CUADRO COMPARATIVO DEL PRESUPUESTO ANALITICO APROBADO Y EJECUTADO
MES DE SEPTIEMBRE

" PROYECTO IOARR “REPARACION DE LA CAPTACION DE AGUA Y RESERVORIO, CONSTRUCCION DE SISTEMA DE TRATAMIENTO QUIMICO, EN EL SISTEMA DE AGUA EN LA
PROYECTO LOCALIDAD DE TAPAYA DISTRITO DE ANDAHUAYLAS, PROVINCIA DE ANDAHUAYLAS, DEPARTAMENTO DE APURIMAC”.
EJECUTA MUNICIPALIDAD PROVINCIAL DE ANDAHUAYLAS
SUB META 176
FTE - FTO RECURSOS DETERMINADOS
MODALIDAD ADMINISTRACION DIRECTA
AÑO 2020
MES: SEPTIEMBRE
ESPECIFICA DETALLE PRESUPUESTO APROBADO PRESUPUESTO EJECUTADO ANTERIOR PRESUPUESTO EJECUTADO ACUMULADO

DE GASTO DIRECTOS INDIRECTOS TOTAL DIRECTOS INDIRECTOS TOTAL % DIRECTOS INDIRECTOS TOTAL %

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-PLANILLA 38,069.29 38,069.29 0.00 0.00 0.00 0.00% 0.00 0.00 0.00%

2.6.2.3.5.4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-BIENES 100,034.63 1,499.30 101,533.93 0.00 0.00 0.00 0.00% 29,477.39 29,477.39 29%

2.6.2.3.5.5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA-SERVICIO 7,450.15 19,453.00 26,903.15 0.00 0.00 0.00 0.00% 1,041.00 1,041.00 4%

TOTAL 145,554.07 20,952.30 166,506.37 0.00 0.00 0.00 0.00% 29,477.39 1,041.00 30,518.39 18%

______________________________ ______________________________ _____________________________


ING. RESIDENTE DE OBRA ASISTENTE ADMINISTRATIVO ING. SUPERVISOR O INSPECTOR
Firma y Sello Firma y Sello Firma y Sello
CERTIFICADO Y
DEVENGADO
220 220
300 300
95 95
1401.8 1401.8
3018.5 3018.5
4564 4564
270 270
456 456
231.59 231.59
1242 1242
9900 9900
904 904
2540 2540
2815.5 2815.5
1560 1560
1000 1000
2675.2 2675.2 RESI
18675 18675
2600 2600 ASIS
1008 1008
1080 1080
2875.84 2875.84 SUPER
420 420
338 338
20480 20480
324 CERTIFICADO 324
80994.43 80994.43
DEVENGADO
220
300
95
1401.8
3018.5
4564
270
456

1242
9900
904
2540
2815.5
1560
1000
2675.2 RESIDENTE
18675 PLANILLA
2600
1008
1080
2875.84 SUPERVISOR
59200.84 PAGADO