Está en la página 1de 35

FACULTAD DE INGENIERÍA

HIDROLOGÍA GENERAL

TEMA:
"Cálculo de intensidades y caudal de diseño de la cuenca de
estudio"

DOCENTE:
ING. SALAZAR HUAMAN, ERLYN GIORDANY

ALUMNOS:
Gilmer Chilon Teran
Guevara Rojas Iván
Mendoza Vega Renán Vidal
Peralta Rodas Pool Antony
Rodas Ludeña Josué Erasmo

Cajamarca-Setiembre-2021
INFORMACIÓN METEREOLÓGICA DE LA CUENCA 
ESTACIÓN: E1 ALTITUD : 2251
DEPARTAMENTO: CAJAMARCA
PROVINCIA: SAN MARCOS
DISTRITO: SAN MARCOS
TABLA DE INTENSIDADES
DURACIÓN EN MINUTOS
m AÑO
5 10 30 60 120
1 1980 9.50 10.89 14.26 16.18 19.35
2 1981 16.63 20.40 26.56 31.89 38.56
3 1982 9.82 11.59 15.53 18.56 21.63
4 1983 2.99 3.87 4.86 6.21 7.53
5 1984 6.82 8.23 10.56 12.56 15.25
6 1985 7.03 8.23 11.11 13.25 14.56
7 1986 9.54 11.34 14.93 17.76 21.12
8 1987 7.40 8.80 11.59 13.78 16.39
9 1988 7.23 8.60 11.32 13.46 16.01
10 1989 6.70 7.97 10.49 12.47 14.83
11 1990 4.81 5.72 7.52 8.95 10.64
12 1991 6.65 7.91 10.41 12.38 14.72
13 1992 5.90 7.01 9.23 10.98 13.06
14 1993 4.42 5.25 6.91 8.22 9.78
15 1994 7.28 8.66 11.40 13.55 16.12
16 1995 6.00 7.13 9.38 11.16 13.27
17 1996 7.21 8.57 11.28 13.42 15.96
18 1997 4.30 5.11 6.72 8.00 9.51
19 1998 5.46 6.50 8.55 10.17 12.09
20 1999 6.92 8.23 10.83 12.88 15.31
21 2000 5.00 5.95 7.83 9.31 11.07
22 2001 8.52 10.13 13.34 15.86 18.86
23 2002 6.70 7.97 10.49 12.47 14.83
24 2003 7.70 9.15 12.04 14.32 17.03
25 2004 9.42 11.20 14.74 17.53 20.85
26 2005 8.76 10.42 13.72 16.31 19.40
27 2006 6.85 8.14 10.71 12.74 15.15
28 2007 5.41 6.44 8.47 10.08 11.98
29 2008 5.05 6.00 7.90 9.40 11.18
30 2009 6.82 8.11 10.68 12.70 15.10
31 2010 4.90 5.83 7.67 9.13 10.85
32 2011 5.31 6.23 8.20 10.20 12.00
33 2012 7.20 8.13 8.69 10.26 12.23
34 2013 6.13 7.53 8.96 10.26 12.65
35 2014 5.23 6.35 7.89 9.85 10.89
36 2015 5.00 5.95 7.83 9.31 11.07
37 2016 6.16 7.33 9.65 11.48 13.65
38 2017 6.23 7.56 10.36 12.05 14.36
39 2018 5.36 6.35 8.25 9.86 11.59
40 2019 3.98 6.25 7.63 10.56 10.86

I. TRANSPOSICION DE INTENSIDADES(mm/hr):

DEPARTAMENTO: CAJAMARCA SUB CUENCA: SAN MARCOS


PROVINCIA: SAN MARCOS ALTITUD :
DISTRITO: SAN MARCOS ALTITUD MEDIA:
DATO DE LA CUENTA

𝐼2=𝐼1∗𝐻𝑚𝑒𝑑/𝐻1
DONDE:
I2: INTENSIDAD DE LA SUB CUENCA
I1: INTENSIDAD DE LA ESTACION WEBERBAUER
H1: ALTITUD DE LA ESTACION WEBERBAWER
H med: ALTURA MEDIA DE LA SUB CUENCA

TABLA Nº 1: INTENSIDADES MÁXIMAS TRANSPUESTA A LA SUB CUENCA:

DURACIÓN EN MINUTOS
m AÑO
5 min 10 min 30 min 60 min 120 min
1 1980 12.949 14.844 19.437 22.054 26.375
2 1981 22.667 27.806 36.203 43.468 52.559
3 1982 13.385 15.798 21.168 25.298 29.483
4 1983 4.076 5.275 6.624 8.465 10.264
5 1984 9.296 11.218 14.394 17.120 20.786
6 1985 9.582 11.218 15.143 18.060 19.846
7 1986 13.003 15.457 20.350 24.208 28.788
8 1987 10.087 11.995 15.798 18.783 22.340
9 1988 9.855 11.722 15.430 18.347 21.822
10 1989 9.132 10.863 14.298 16.997 20.214
11 1990 6.556 7.797 10.250 12.199 14.503
12 1991 9.064 10.782 14.189 16.875 20.064
13 1992 8.042 9.555 12.581 14.966 17.801
14 1993 6.025 7.156 9.419 11.204 13.331
15 1994 9.923 11.804 15.539 18.469 21.972
16 1995 8.178 9.719 12.785 15.212 18.088
17 1996 9.828 11.681 15.375 18.292 21.754
18 1997 5.861 6.965 9.160 10.904 12.963
19 1998 7.442 8.860 11.654 13.862 16.479
20 1999 9.432 11.218 14.762 17.556 20.868
21 2000 6.815 8.110 10.673 12.690 15.089
22 2001 11.613 13.808 18.183 21.618 25.707
23 2002 9.132 10.863 14.298 16.997 20.214
24 2003 10.495 12.472 16.411 19.519 23.213
25 2004 12.840 15.266 20.091 23.894 28.420
26 2005 11.940 14.203 18.701 22.231 26.443
27 2006 9.337 11.095 14.598 17.365 20.650
28 2007 7.374 8.778 11.545 13.740 16.329
29 2008 6.883 8.178 10.768 12.813 15.239
30 2009 9.296 11.054 14.557 17.311 20.582
31 2010 6.679 7.947 10.455 12.445 14.789
32 2011 7.238 8.492 11.177 13.903 16.357
33 2012 9.814 11.082 11.845 13.985 16.670
34 2013 8.355 10.264 12.213 13.985 17.243
35 2014 7.129 8.655 10.754 13.426 14.844
36 2015 6.815 8.110 10.673 12.690 15.089
37 2016 8.396 9.991 13.153 15.648 18.606
38 2017 8.492 10.305 14.121 16.425 19.573
39 2018 7.306 8.655 11.245 13.440 15.798
40 2019 5.425 8.519 10.400 14.394 14.803
Desv. Estand. 3.09 3.68 4.88 5.76 6.97
Promedio 9.14 10.94 14.26 17.02 20.15

DATOS ORDENADOS DE LA TABLA:

DURACIÓN EN MINUTOS
m AÑO
5 min 10 min 30 min 60 min 120 min
1 1980 22.667 27.806 36.203 43.468 52.559
2 1981 13.385 15.798 21.168 25.298 29.483
3 1982 13.003 15.457 20.350 24.208 28.788
4 1983 12.949 15.266 20.091 23.894 28.420
5 1984 12.840 14.844 19.437 22.231 26.443
6 1985 11.940 14.203 18.701 22.054 26.375
7 1986 11.613 13.808 18.183 21.618 25.707
8 1987 10.495 12.472 16.411 19.519 23.213
9 1988 10.087 11.995 15.798 18.783 22.340
10 1989 9.923 11.804 15.539 18.469 21.972
11 1990 9.855 11.722 15.430 18.347 21.822
12 1991 9.828 11.681 15.375 18.292 21.754
13 1992 9.814 11.218 15.143 18.060 20.868
14 1993 9.582 11.218 14.762 17.556 20.786
15 1994 9.432 11.218 14.598 17.365 20.650
16 1995 9.337 11.095 14.557 17.311 20.582
17 1996 9.296 11.082 14.394 17.120 20.214
18 1997 9.296 11.054 14.298 16.997 20.214
19 1998 9.132 10.863 14.298 16.997 20.064
20 1999 9.132 10.863 14.189 16.875 19.846
21 2000 9.064 10.782 14.121 16.425 19.573
22 2001 8.492 10.305 13.153 15.648 18.606
23 2002 8.396 10.264 12.785 15.212 18.088
24 2003 8.355 9.991 12.581 14.966 17.801
25 2004 8.178 9.719 12.213 14.394 17.243
26 2005 8.042 9.555 11.845 13.985 16.670
27 2006 7.442 8.860 11.654 13.985 16.479
28 2007 7.374 8.778 11.545 13.903 16.357
29 2008 7.306 8.655 11.245 13.862 16.329
30 2009 7.238 8.655 11.177 13.740 15.798
31 2010 7.129 8.519 10.768 13.440 15.239
32 2011 6.883 8.492 10.754 13.426 15.089
33 2012 6.815 8.178 10.673 12.813 15.089
34 2013 6.815 8.110 10.673 12.690 14.844
35 2014 6.679 8.110 10.455 12.690 14.803
36 2015 6.556 7.947 10.400 12.445 14.789
37 2016 6.025 7.797 10.250 12.199 14.503
38 2017 5.861 7.156 9.419 11.204 13.331
39 2018 5.425 6.965 9.160 10.904 12.963
40 2019.000 4.076 5.275 6.624 8.465 10.264

II. SELECCION DEL MODELO MATEMÁTICO:


II.I. PARA EL MODELO MATEMATICO DE GUMBEL
PRUEBA DE BONDAD DE AJUSTE (SMIRNOV-KOLMOGOROV):

𝐹(𝑥)=𝑒^( 〖−𝑒〗 ^
ESTIMACION DE LOS PARAMETROS PARA T= 5 min:
(−((𝑥−𝑢)/𝛼) ) )
𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 9.14 σy = 1.1413 1/σ = 0.369270248
s= 3.09 μy = 0.5436 σ= 2.708043785
U= 7.671911783

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 2: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 5 min:

m 5 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 22.67 0.024 0.976 0.996 0.020
2 13.39 0.049 0.951 0.886 0.065
3 13.00 0.073 0.927 0.870 0.057
4 12.95 0.098 0.902 0.867 0.035
5 12.84 0.122 0.878 0.862 0.016
6 11.94 0.146 0.854 0.813 0.040
7 11.61 0.171 0.829 0.792 0.037
8 10.50 0.195 0.805 0.703 0.102
9 10.09 0.220 0.780 0.664 0.117
10 9.92 0.244 0.756 0.647 0.109
11 9.85 0.268 0.732 0.640 0.092
12 9.83 0.293 0.707 0.637 0.070
13 9.81 0.317 0.683 0.635 0.047
14 9.58 0.341 0.659 0.610 0.048
15 9.43 0.366 0.634 0.593 0.041
16 9.34 0.390 0.610 0.582 0.027
17 9.30 0.415 0.585 0.578 0.008
18 9.30 0.439 0.561 0.578 0.017
19 9.13 0.463 0.537 0.558 0.022
20 9.13 0.488 0.512 0.558 0.046
21 9.06 0.512 0.488 0.550 0.062
22 8.49 0.537 0.463 0.478 0.014
23 8.40 0.561 0.439 0.465 0.026
24 8.36 0.585 0.415 0.460 0.045
25 8.18 0.610 0.390 0.436 0.046
26 8.04 0.634 0.366 0.418 0.052
27 7.44 0.659 0.341 0.337 0.005
28 7.37 0.683 0.317 0.328 0.010
29 7.31 0.707 0.293 0.318 0.026
30 7.24 0.732 0.268 0.309 0.041
31 7.13 0.756 0.244 0.295 0.051
32 6.88 0.780 0.220 0.262 0.043
33 6.82 0.805 0.195 0.254 0.058
34 6.82 0.829 0.171 0.254 0.083
35 6.68 0.854 0.146 0.236 0.090
36 6.56 0.878 0.122 0.221 0.099
37 6.02 0.902 0.098 0.159 0.062
38 5.86 0.927 0.073 0.142 0.069
39 5.42 0.951 0.049 0.101 0.052
40 4.08 0.976 0.024 0.023 0.001
∆= 0.117

ESTIMACION DE LOS PARAMETROS PARA T= 10 min:

𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 10.94 σy = 1.1413 1/σ = 0.310137911
s= 3.68 μy = 0.5436 σ= 3.224372008
U= 9.186710126

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 3: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 10 min:

m 10 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 27.81 0.024 0.976 0.997 0.021
2 15.80 0.049 0.951 0.879 0.072
3 15.46 0.073 0.927 0.867 0.060
4 15.27 0.098 0.902 0.859 0.043
5 14.84 0.122 0.878 0.841 0.037
6 14.20 0.146 0.854 0.810 0.044
7 13.81 0.171 0.829 0.788 0.042
8 12.47 0.195 0.805 0.697 0.108
9 11.99 0.220 0.780 0.658 0.123
10 11.80 0.244 0.756 0.641 0.115
11 11.72 0.268 0.732 0.634 0.098
12 11.68 0.293 0.707 0.630 0.077
13 11.22 0.317 0.683 0.587 0.096
14 11.22 0.341 0.659 0.587 0.071
15 11.22 0.366 0.634 0.587 0.047
16 11.10 0.390 0.610 0.575 0.035
17 11.08 0.415 0.585 0.574 0.012
18 11.05 0.439 0.561 0.571 0.010
19 10.86 0.463 0.537 0.552 0.015
20 10.86 0.488 0.512 0.552 0.040
21 10.78 0.512 0.488 0.543 0.056
22 10.30 0.537 0.463 0.493 0.030
23 10.26 0.561 0.439 0.489 0.050
24 9.99 0.585 0.415 0.459 0.044
25 9.72 0.610 0.390 0.428 0.038
26 9.55 0.634 0.366 0.410 0.044
27 8.86 0.659 0.341 0.331 0.011
28 8.78 0.683 0.317 0.321 0.004
29 8.66 0.707 0.293 0.308 0.015
30 8.66 0.732 0.268 0.308 0.039
31 8.52 0.756 0.244 0.292 0.048
32 8.49 0.780 0.220 0.289 0.070
33 8.18 0.805 0.195 0.255 0.060
34 8.11 0.829 0.171 0.247 0.077
35 8.11 0.854 0.146 0.247 0.101
36 7.95 0.878 0.122 0.230 0.108
37 7.80 0.902 0.098 0.215 0.117
38 7.16 0.927 0.073 0.153 0.080
39 6.97 0.951 0.049 0.136 0.088
40 5.27 0.976 0.024 0.035 0.010
∆= 0.123

ESTIMACION DE LOS PARAMETROS PARA T= 30 min:

𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 14.26 σy = 1.1413 1/σ = 0.234074917
s= 4.88 μy = 0.5436 σ= 4.272136519
U= 11.93821066

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 4: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 30 min:

m 30 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 36.20 0.024 0.976 0.997 0.021
2 21.17 0.049 0.951 0.891 0.060
3 20.35 0.073 0.927 0.870 0.057
4 20.09 0.098 0.902 0.862 0.040
5 19.44 0.122 0.878 0.841 0.037
6 18.70 0.146 0.854 0.814 0.039
7 18.18 0.171 0.829 0.793 0.036
8 16.41 0.195 0.805 0.704 0.101
9 15.80 0.220 0.780 0.667 0.114
10 15.54 0.244 0.756 0.650 0.106
11 15.43 0.268 0.732 0.643 0.089
12 15.38 0.293 0.707 0.639 0.068
13 15.14 0.317 0.683 0.624 0.059
14 14.76 0.341 0.659 0.597 0.062
15 14.60 0.366 0.634 0.585 0.049
16 14.56 0.390 0.610 0.582 0.028
17 14.39 0.415 0.585 0.570 0.016
18 14.30 0.439 0.561 0.562 0.001
19 14.30 0.463 0.537 0.562 0.026
20 14.19 0.488 0.512 0.554 0.042
21 14.12 0.512 0.488 0.549 0.061
22 13.15 0.537 0.463 0.471 0.008
23 12.79 0.561 0.439 0.440 0.001
24 12.58 0.585 0.415 0.423 0.008
25 12.21 0.610 0.390 0.392 0.001
26 11.84 0.634 0.366 0.360 0.006
27 11.65 0.659 0.341 0.343 0.002
28 11.55 0.683 0.317 0.334 0.017
29 11.25 0.707 0.293 0.308 0.016
30 11.18 0.732 0.268 0.303 0.034
31 10.77 0.756 0.244 0.268 0.025
32 10.75 0.780 0.220 0.267 0.048
33 10.67 0.805 0.195 0.261 0.065
34 10.67 0.829 0.171 0.261 0.090
35 10.45 0.854 0.146 0.243 0.097
36 10.40 0.878 0.122 0.238 0.117
37 10.25 0.902 0.098 0.227 0.129
38 9.42 0.927 0.073 0.165 0.092
39 9.16 0.951 0.049 0.147 0.098
40 6.62 0.976 0.024 0.031 0.007
∆= 0.129

ESTIMACION DE LOS PARAMETROS PARA T= 60 min:

𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 17.02 σy = 1.1413 1/σ = 0.198288345
s= 5.76 μy = 0.5436 σ= 5.043160754
U= 14.27993466

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 5: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 60 min:

m 60 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 43.47 0.024 0.976 0.997 0.021
2 25.30 0.049 0.951 0.894 0.058
3 24.21 0.073 0.927 0.870 0.057
4 23.89 0.098 0.902 0.862 0.041
5 22.23 0.122 0.878 0.813 0.065
6 22.05 0.146 0.854 0.807 0.046
7 21.62 0.171 0.829 0.792 0.037
8 19.52 0.195 0.805 0.702 0.103
9 18.78 0.220 0.780 0.664 0.116
10 18.47 0.244 0.756 0.647 0.109
11 18.35 0.268 0.732 0.640 0.092
12 18.29 0.293 0.707 0.637 0.071
13 18.06 0.317 0.683 0.623 0.060
14 17.56 0.341 0.659 0.593 0.065
15 17.37 0.366 0.634 0.581 0.053
16 17.31 0.390 0.610 0.578 0.032
17 17.12 0.415 0.585 0.566 0.020
18 17.00 0.439 0.561 0.558 0.003
19 17.00 0.463 0.537 0.558 0.021
20 16.87 0.488 0.512 0.550 0.038
21 16.42 0.512 0.488 0.520 0.032
22 15.65 0.537 0.463 0.467 0.003
23 15.21 0.561 0.439 0.435 0.004
24 14.97 0.585 0.415 0.418 0.003
25 14.39 0.610 0.390 0.376 0.014
26 13.98 0.634 0.366 0.346 0.019
27 13.98 0.659 0.341 0.346 0.005
28 13.90 0.683 0.317 0.340 0.023
29 13.86 0.707 0.293 0.337 0.045
30 13.74 0.732 0.268 0.329 0.060
31 13.44 0.756 0.244 0.307 0.063
32 13.43 0.780 0.220 0.306 0.086
33 12.81 0.805 0.195 0.262 0.067
34 12.69 0.829 0.171 0.254 0.083
35 12.69 0.854 0.146 0.254 0.108
36 12.44 0.878 0.122 0.237 0.115
37 12.20 0.902 0.098 0.221 0.123
38 11.20 0.927 0.073 0.159 0.086
39 10.90 0.951 0.049 0.142 0.093
40 8.46 0.976 0.024 0.042 0.018
∆= 0.123

ESTIMACION DE LOS PARAMETROS PARA T= 120 min:

𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 20.15 σy = 1.1413 1/σ = 0.16363915
s= 6.97 μy = 0.5436 σ= 6.111007045
U= 16.82696599

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 6: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 120 min:


m 120 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-
Weibull F(Xi<X)l
1 52.56 0.024 0.976 0.997 0.022
2 29.48 0.049 0.951 0.882 0.070
3 28.79 0.073 0.927 0.868 0.059
4 28.42 0.098 0.902 0.861 0.042
5 26.44 0.122 0.878 0.813 0.065
6 26.37 0.146 0.854 0.811 0.043
7 25.71 0.171 0.829 0.791 0.038
8 23.21 0.195 0.805 0.703 0.101
9 22.34 0.220 0.780 0.667 0.114
10 21.97 0.244 0.756 0.650 0.106
11 21.82 0.268 0.732 0.643 0.089
12 21.75 0.293 0.707 0.640 0.067
13 20.87 0.317 0.683 0.597 0.086
14 20.79 0.341 0.659 0.593 0.066
15 20.65 0.366 0.634 0.586 0.048
16 20.58 0.390 0.610 0.582 0.028
17 20.21 0.415 0.585 0.563 0.022
18 20.21 0.439 0.561 0.563 0.002
19 20.06 0.463 0.537 0.555 0.018
20 19.85 0.488 0.512 0.543 0.031
21 19.57 0.512 0.488 0.528 0.041
22 18.61 0.537 0.463 0.474 0.010
23 18.09 0.561 0.439 0.443 0.004
24 17.80 0.585 0.415 0.426 0.012
25 17.24 0.610 0.390 0.393 0.003
26 16.67 0.634 0.366 0.358 0.007
27 16.48 0.659 0.341 0.347 0.005
28 16.36 0.683 0.317 0.340 0.023
29 16.33 0.707 0.293 0.338 0.045
30 15.80 0.732 0.268 0.306 0.038
31 15.24 0.756 0.244 0.273 0.030
32 15.09 0.780 0.220 0.265 0.045
33 15.09 0.805 0.195 0.265 0.070
34 14.84 0.829 0.171 0.251 0.080
35 14.80 0.854 0.146 0.248 0.102
36 14.79 0.878 0.122 0.248 0.126
37 14.50 0.902 0.098 0.232 0.134
38 13.33 0.927 0.073 0.170 0.097
39 12.96 0.951 0.049 0.152 0.103
40 10.26 0.976 0.024 0.054 0.029
∆= 0.134

ESTIMACION DE LOS PARAMETROS PARA T= 150 min:


𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 21.82 σy = 1.1413 1/σ = 0.150441858
s= 7.59 μy = 0.5436 σ= 6.647086204
U= 18.2086942

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 7: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 150 min:

m 150 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 55.00 0.024 0.976 0.996 0.020
2 35.29 0.049 0.951 0.926 0.025
3 32.11 0.073 0.927 0.884 0.043
4 30.44 0.098 0.902 0.853 0.049
5 30.04 0.122 0.878 0.845 0.033
6 27.96 0.146 0.854 0.794 0.060
7 27.87 0.171 0.829 0.792 0.038
8 27.18 0.195 0.805 0.772 0.033
9 24.55 0.220 0.780 0.680 0.100
10 23.62 0.244 0.756 0.642 0.114
11 23.23 0.268 0.732 0.625 0.107
12 23.08 0.293 0.707 0.618 0.089
13 22.99 0.317 0.683 0.615 0.068
14 22.54 0.341 0.659 0.594 0.065
15 22.07 0.366 0.634 0.571 0.063
16 21.84 0.390 0.610 0.560 0.050
17 21.75 0.415 0.585 0.556 0.029
18 21.37 0.439 0.561 0.537 0.024
19 21.37 0.463 0.537 0.537 0.001
20 21.22 0.488 0.512 0.530 0.018
21 20.75 0.512 0.488 0.505 0.017
22 19.67 0.537 0.463 0.448 0.015
23 19.12 0.561 0.439 0.418 0.021
24 18.95 0.585 0.415 0.409 0.006
25 18.82 0.610 0.390 0.402 0.012
26 18.58 0.634 0.366 0.388 0.022
27 18.48 0.659 0.341 0.383 0.042
28 17.67 0.683 0.317 0.338 0.021
29 17.42 0.707 0.293 0.324 0.032
30 17.42 0.732 0.268 0.324 0.056
31 17.27 0.756 0.244 0.316 0.072
32 16.11 0.780 0.220 0.254 0.034
33 15.95 0.805 0.195 0.245 0.050
34 15.95 0.829 0.171 0.245 0.075
35 15.65 0.854 0.146 0.230 0.084
36 15.48 0.878 0.122 0.222 0.100
37 15.33 0.902 0.098 0.214 0.117
38 14.09 0.927 0.073 0.156 0.083
39 13.71 0.951 0.049 0.140 0.091
40 10.93 0.976 0.024 0.050 0.026
∆= 0.117

ESTIMACION DE LOS PARAMETROS PARA T= 200 min:

𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 22.99 σy = 1.1413 1/σ = 0.145767705
s= 7.83 μy = 0.5436 σ= 6.860230131
U= 19.26198319

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 8: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 200 min:

m 200 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 59.43 0.024 0.976 0.997 0.022
2 33.89 0.049 0.951 0.888 0.063
3 32.70 0.073 0.927 0.868 0.058
4 32.29 0.098 0.902 0.861 0.041
5 30.04 0.122 0.878 0.812 0.066
6 29.35 0.146 0.854 0.795 0.059
7 29.21 0.171 0.829 0.791 0.038
8 26.37 0.195 0.805 0.701 0.103
9 25.38 0.220 0.780 0.664 0.117
10 24.96 0.244 0.756 0.647 0.109
11 24.79 0.268 0.732 0.640 0.092
12 24.71 0.293 0.707 0.636 0.071
13 23.89 0.317 0.683 0.601 0.082
14 23.72 0.341 0.659 0.593 0.065
15 23.66 0.366 0.634 0.591 0.043
16 23.47 0.390 0.610 0.582 0.028
17 23.38 0.415 0.585 0.578 0.008
18 22.97 0.439 0.561 0.558 0.003
19 22.97 0.463 0.537 0.558 0.022
20 22.80 0.488 0.512 0.551 0.038
21 22.30 0.512 0.488 0.526 0.038
22 21.14 0.537 0.463 0.467 0.004
23 20.55 0.561 0.439 0.437 0.002
24 20.21 0.585 0.415 0.419 0.004
25 19.85 0.610 0.390 0.399 0.009
26 19.07 0.634 0.366 0.358 0.008
27 19.06 0.659 0.341 0.357 0.015
28 18.73 0.683 0.317 0.339 0.022
29 18.55 0.707 0.293 0.330 0.037
30 18.07 0.732 0.268 0.305 0.036
31 17.57 0.756 0.244 0.278 0.034
32 17.52 0.780 0.220 0.275 0.056
33 17.31 0.805 0.195 0.265 0.070
34 17.15 0.829 0.171 0.256 0.086
35 17.15 0.854 0.146 0.256 0.110
36 16.81 0.878 0.122 0.239 0.117
37 16.48 0.902 0.098 0.223 0.126
38 15.14 0.927 0.073 0.162 0.088
39 14.73 0.951 0.049 0.144 0.096
40 12.28 0.976 0.024 0.063 0.038
∆= 0.126

ESTIMACION DE LOS PARAMETROS PARA T= 220 min:

𝑈=𝑥 ̅−𝛼∗𝑢_𝑦 1/𝛼=𝜎_𝑦/𝑠

Donde:
x= 23.59 σy = 1.1413 1/σ = 0.140967321
s= 8.10 μy = 0.5436 σ= 7.093842704
U= 19.7330285

P(Xi>X) = m/(n+1) n: n° de datos


m: posición del dato

TABLA Nº 9: PRUEVA DE BONDAD DE AJUSTE SMIRNOV-KOLMOGOROV PARA 220 min:

m 220 min. P(Xi>X) 1-P(Xi>X) F(X<X) lP(Xi<X)-


Weibull F(Xi<X)l
1 61.19 0.024 0.976 0.997 0.021
2 35.25 0.049 0.951 0.894 0.057
3 33.49 0.073 0.927 0.866 0.061
4 33.07 0.098 0.902 0.858 0.044
5 30.76 0.122 0.878 0.810 0.068
6 30.70 0.146 0.854 0.808 0.046
7 29.91 0.171 0.829 0.788 0.041
8 27.02 0.195 0.805 0.699 0.106
9 25.99 0.220 0.780 0.661 0.119
10 25.57 0.244 0.756 0.645 0.112
11 25.39 0.268 0.732 0.637 0.094
12 25.31 0.293 0.707 0.634 0.073
13 24.52 0.317 0.683 0.601 0.082
14 24.34 0.341 0.659 0.593 0.065
15 24.29 0.366 0.634 0.591 0.043
16 24.03 0.390 0.610 0.579 0.030
17 23.95 0.415 0.585 0.576 0.010
18 23.53 0.439 0.561 0.557 0.004
19 23.53 0.463 0.537 0.557 0.020
20 23.35 0.488 0.512 0.548 0.036
21 22.87 0.512 0.488 0.526 0.038
22 21.65 0.537 0.463 0.466 0.003
23 21.05 0.561 0.439 0.436 0.003
24 20.70 0.585 0.415 0.418 0.003
25 20.25 0.610 0.390 0.395 0.005
26 19.85 0.634 0.366 0.374 0.008
27 19.49 0.659 0.341 0.355 0.014
28 19.18 0.683 0.317 0.339 0.022
29 19.01 0.707 0.293 0.331 0.038
30 19.00 0.732 0.268 0.330 0.062
31 18.78 0.756 0.244 0.319 0.075
32 17.72 0.780 0.220 0.265 0.045
33 17.56 0.805 0.195 0.257 0.062
34 17.56 0.829 0.171 0.257 0.086
35 17.22 0.854 0.146 0.240 0.094
36 16.87 0.878 0.122 0.224 0.102
37 16.32 0.902 0.098 0.198 0.101
38 15.51 0.927 0.073 0.163 0.090
39 15.09 0.951 0.049 0.146 0.097
40 12.72 0.976 0.024 0.068 0.044
∆= 0.119

CUADRO RESUMEN:

Weibull ( ∆c máx) 0.117 0.123 0.129 0.123 0.134


Duración de 5 min 10 min 30 min 60 min 120 min
intensidad
CÁLCULO DEL ∆o CRÍTICO
(Para N=40 y nivel de significación igua
∆o = 0.268 0.5%, otros casos valor de Tabla)
DEL CUADRO RESUMEN ANTERIOR PODEMOS VER QUE: SI LO
LOS DATOS SE AJUSTAN AL MODELO DE GU
SINO PROBAR CON OTRO MODELO

COMO: ∆cmáx < ∆o , ENTONCES LOS DATOS SE AJUSTAN AL MODELO DE GUMBEL

𝑥=U−α∗(𝑙𝑛(−𝑙𝑛(1−1/𝑇)))

TABLA Nº 10: PARAMETROS PARA MODELO DE GUMBELL:

5 min 10 min 30 min 60 min 120 min


PARÁMETRO
MAX MAX MAX MAX MAX
PROMEDIO 9.14 10.94 14.26 17.02 20.15
DESV. STANDAR 3.09 3.68 4.88 5.76 6.97
α 2.71 3.22 4.27 5.04 6.11
U 7.67 9.19 11.94 14.28 16.83

TABLA Nº 11: CALCULO PARA LAS INTENSIDADES DE UN TIEMPO DE RETORNO:

TR= (# orden + 100)/2


donde:

Donde: # orden= 40
por lo tanto:
TR= 70

5 min 10 min 30 min 60 min 120 min


PARÁMETROS
MAX MAX MAX MAX MAX
INTENSIDAD 19.16 22.86 30.06 35.67 42.75

TABLA Nº 12: GRAFICA INTENSIDAD - DURACION - TIEMPO DE RETORNO:

TIEMPO INTENSIDAD
(min.) (mm.)
5 19.16
10 22.86
30 30.06
60 35.67
120 42.75
150 46.40
200 48.36
220 49.82

INTENSIDAD-DURACIÓN-TIEMPO DE RETORNO
INTENSIDAD-DURACIÓN-TIEMPO DE RETORNO Power (INTENSIDAD-DURACIÓN-
60.00

50.00
f(x) = 12.7219224894986 x^0.253706425910593
.)
INTENSIDAD-DURACIÓN-TIEMPO DE RETORNO
INTENSIDAD-DURACIÓN-TIEMPO DE RETORNO Power (INTENSIDAD-DURACIÓN-
60.00

50.00
f(x) = 12.7219224894986 x^0.253706425910593

NTENSIDADES (mm.)
40.00

30.00

20.00

10.00

0.00
0 50 100 150
TIEMPO (min.)

ECUACIÓN DE AJUSTE DE LA CURVA:

𝑌=𝐴∗𝑋^𝑒

DONDE EN FUNCION DEL TIEMPO Y DE LA INTENSIDAD, SE TIENE:

𝐼=𝐴∗(𝑇𝑐)^𝑒
DONDE:
I= INTENSIDAD EN MIN.
A= ÁREA DE LA CUENCA.
Tc= TIEMPO DE CONCENTRACIÓN.

SEGÚN KIRPICH EL TIEMPO DE CONCENTRACIÓN ES:

𝑇𝑐=0,0195∗(𝐿^(3/2)/
𝐻^(1/2) )^0,77

DONDE:
Tc= TIEMPO DE CONCENTRACIÓN.
L= MÁXIMA LONGITUD RECOGIDA EN M.
H= DIFERENCIA DE ELEVACION ENTRE LAS COTAS DEL CAUCE PRINCIPAL EN M.

DATOS DE CUENCA:
L= 29928.93 m. Dato de la cuenca
H= 1260 m.s.n.m. Dato de la cuenca

Tc = 184.619 min

Tc = 3.0770 horas
POR LO TANTO:
A= 415.57 Km^2
e= -0.594 constante

I= 18.7273 mm/h

EMPLEANDO EL MÉTODO RACIONAL PARA EL CALCULO DEL CAUDAL DE DISEÑO:

𝑄=𝐶∗𝐼∗𝐴
Donde:
C=
Q= Caudal en (m3/s).
Coeficiente
de
I= Intensidad en m/s.
escorrentía.
A= Área de la cuenca en m2.

Por lo tanto:
I= 5.2020211E-06
A= 415569163.541
C = 0.3 zonas con vegetación media - terrenos
arcillosos y terrenos granulares.

Entonces:
Q= 648.5399 m^3/s

Tipo de superficie Coeficiente de


Pavimentos de hormigón y bituminosos: escorrentia
0.70 a 0.95
Pavimentos de macadam: 0.25 a 0.60
Adoquines: 0.50 a 0.70
Superficie de grava: 0.15 a 0.30
Zonas arboladas y bosque: 0.10 a 0.20
Zonas con vegetación densa:
terrenos granulares 0.05 a 0.35
terrenos arcillosos 0.15 a 0.50
Zonas con vegetación media:
terrenos granulares 0.10 a 0.50
terrenos arcillosos 0.30 a 0.75
Tierra sin vegetación: 0.20 a 0.80
Zonas cultivadas: 0.20 a 0.40
E LA CUENCA 

MINUTOS
150 200 220
20.45 21.53 22.52
40.35 43.60 44.89
23.56 24.86 25.86
8.02 9.01 9.33
25.89 17.36 17.86
16.54 17.53 17.99
22.33 23.99 24.57
17.33 18.62 19.07
16.93 18.19 18.63
15.68 16.85 17.26
11.25 12.09 12.38
15.57 16.73 17.13
13.81 14.83 15.19
10.34 11.11 11.38
17.04 18.31 18.76
14.03 15.08 15.44
16.87 18.13 18.57
10.06 10.81 11.07
12.78 13.74 14.07
16.19 17.40 17.82
11.70 12.58 12.88
19.94 21.43 21.94
15.68 16.85 17.26
18.01 19.35 19.82
22.04 23.69 24.26
20.51 22.04 22.57
16.02 17.22 17.63
12.67 13.61 13.94
11.82 12.70 13.00
15.96 17.15 17.57
11.48 12.33 12.63
13.63 14.56 14.30
12.96 13.98 14.86
13.56 13.99 14.56
11.36 12.85 13.95
11.70 12.58 12.88
14.43 15.51 15.88
15.22 16.36 16.78
12.78 13.26 13.78
13.90 12.89 11.97

2251 m.s.n.m
3068.22 m.s.n.m

MINUTOS
150 min 200 min 220 min
27.874 29.346 30.696
54.999 59.429 61.187
32.113 33.885 35.248
10.932 12.281 12.717
35.289 23.663 24.344
22.545 23.894 24.521
30.437 32.700 33.490
23.622 25.380 25.993
23.076 24.794 25.394
21.373 22.967 23.526
15.334 16.479 16.875
21.223 22.804 23.349
18.824 20.214 20.705
14.094 15.143 15.511
23.226 24.957 25.571
19.124 20.555 21.045
22.995 24.712 25.312
13.712 14.735 15.089
17.420 18.728 19.178
22.068 23.717 24.290
15.948 17.147 17.556
27.179 29.210 29.905
21.373 22.967 23.526
24.548 26.375 27.016
30.042 32.291 33.068
27.956 30.042 30.764
21.836 23.472 24.031
17.270 18.551 19.001
16.111 17.311 17.720
21.754 23.376 23.949
15.648 16.806 17.215
18.578 19.846 19.492
17.665 19.055 20.255
18.483 19.069 19.846
15.484 17.515 19.015
15.948 17.147 17.556
19.669 21.141 21.645
20.746 22.299 22.872
17.420 18.074 18.783
18.946 17.570 16.316
7.59 7.83 8.10
21.82 22.99 23.59

MINUTOS
150 min 200 min 220 min
54.999 59.429 61.187
35.289 33.885 35.248
32.113 32.700 33.490
30.437 32.291 33.068
30.042 30.042 30.764
27.956 29.346 30.696
27.874 29.210 29.905
27.179 26.375 27.016
24.548 25.380 25.993
23.622 24.957 25.571
23.226 24.794 25.394
23.076 24.712 25.312
22.995 23.894 24.521
22.545 23.717 24.344
22.068 23.663 24.290
21.836 23.472 24.031
21.754 23.376 23.949
21.373 22.967 23.526
21.373 22.967 23.526
21.223 22.804 23.349
20.746 22.299 22.872
19.669 21.141 21.645
19.124 20.555 21.045
18.946 20.214 20.705
18.824 19.846 20.255
18.578 19.069 19.846
18.483 19.055 19.492
17.665 18.728 19.178
17.420 18.551 19.015
17.420 18.074 19.001
17.270 17.570 18.783
16.111 17.515 17.720
15.948 17.311 17.556
15.948 17.147 17.556
15.648 17.147 17.215
15.484 16.806 16.875
15.334 16.479 16.316
14.094 15.143 15.511
13.712 14.735 15.089
10.932 12.281 12.717
0.117 0.126 0.119
150 min 200 min 220 min

0 y nivel de significación igual a


otros casos valor de Tabla)
R PODEMOS VER QUE: SI LOS ∆cmáx < ∆o, ENTONCES
AJUSTAN AL MODELO DE GUMBELL
ROBAR CON OTRO MODELO

MODELO DE GUMBEL

))

150 min 200 min 220 min


MAX MAX MAX
21.82 22.99 23.59
7.59 7.83 8.10
6.65 6.86 7.09
18.21 19.26 19.73

150 min 200 min 220 min


MAX MAX MAX
46.40 48.36 49.82

TIEMPO DE RETORNO
Power (INTENSIDAD-DURACIÓN-TIEMPO DE RETORNO)
TIEMPO DE RETORNO
Power (INTENSIDAD-DURACIÓN-TIEMPO DE RETORNO)

150 200 250


O (min.)

PRINCIPAL EN M.
tación media - terrenos
terrenos granulares.

También podría gustarte